Federal Register / Vol. 61, No. 201 / Wednesday, October 16, 1996 / Notices 53905 kilograms? If yes, please specify what determining the appropriate action to be core wall and known as Guarding Hill information (e.g., coal production, taken but will not serve to make or Main Dam; (b) a 2,500-foot-long natural gas consumption, and crude oil protestants parties to the proceeding. earthen structure known as Canal or imports), the metric unit(s) of Copies of this filing are on file with the Guarding Hill Dike; (c) four small dike measurement preferred, and in which Commission and are available for public structures; (d) a reservoir having a EIA publication(s) you would like to see inspection. 5,600-acre surface area and an 8,250- such information. Lois D. Cashell, acre-foot useable storage volume at Comments submitted in response to Secretary. normal pool elevation 428.14 m.s.l. and this notice will be summarized and/or [FR Doc. 96–26403 Filed 10–15–96; 8:45 am] known as ; (e) a 3,190- included in the request for OMB foot-long canal; (f) an intake structure BILLING CODE 6717±01±M approval of the form. They also will and a concrete/woodstave/riveted steel become a matter of public record. penstock; (g) a powerhouse containing a Statutory Authority: Section 3506(c)(2)(A) Hydroelectric Applications [The 25,000-Kw generating unit and two of the Paperwork Reduction Act of 1995 Light and Power 3,000-Kw reversible pump/generator (Pub. L. No. 104–13). Company, et al.] Notice of Applications units for an installed generating Issued in Washington, DC, October 8, 1996. capacity of 31,000-Kw; and (h) [Project Nos. P±2576±000, et al.] John Gross, appurtenant facilities. Acting Director, Office of Statistical Take notice that the following (3) the Shepaug Development, Standards, Energy Information hydroelectric applications have been comprising: (a) a 1,412-foot-long, 147- Administration. filed with the Commission and are foot-high concrete gravity-type structure [FR Doc. 96–26421 Filed 10–15–96; 8:45 am] available for public inspection: known as Shepaug Dam; (b) a reservoir BILLING CODE 6450±01±P 1a. Type of filing: Notice of Intent to having a 1,870-acre surface area and a File An Application for a New License. 5,400-acre-foot useable storage volume b. Project No.: 2576. at normal pool elevation 198.28 feet Federal Energy Regulatory c. Date filed: August 19, 1996. m.s.l. and known as ; (c) Commission d. Submitted By: The Connecticut an intake structure and a 25-foot- Light and Power Company, current diameter penstock; (d) a powerhouse [Docket No. RP91±103±007] licensee. containing a 37,200-Kw generating unit; Alabama-Tennessee Natural Gas e. Name of Project: . and (e) appurtenant facilities. Company; Notice of Filing of Tariff f. Location: On the Housatonic River, (4) the Stevenson Development, Sheet and Refund Report in the Towns of Bridgewater, comprising: (a) a 1,250-foot-long, 124- Brookfield, Kent, Monroe, New foot-high concrete gravity-type structure October 9, 1996. Fairfield, New Milford, Newtown, having a 520-foot-long spillway Take notice that on October 4, 1996, Oxford, Roxbury, Sherman, and surmounted by 3-foot-high wooden Alabama-Tennessee Natural Gas Southbury, in the City of Danbury, flashboards and known as Stevenson Company (Alabama-Tennessee), Litchfield, Fairfield, and New Haven Dam; (b) a reservoir having a 1,063-acre tendered for filing as part of its FERC Counties, CT. surface area and a 5,038-acre-foot Gas Tariff, Second Revised Volume No. g. Filed Pursuant to: Section 15 of the useable storage volume at normal pool 1, Fourth Revised Sheet No. 4A, Federal Power Act, 18 CFR 16.6 of the elevation 101.3 feet m.s.l. and known as superseding Sub. Third Revised Sheet Commission’s regulations. Lake Zoar; (c) an intake structure and No. 4A. Alabama-Tennessee also filed a h. Effective date of original license: four 12-foot-square penstocks; (d) a report of refunds, pursuant to Article 1, March 1, 1953. powerhouse containing an 8,000-Kw Paragraph 3(c) of the Stipulation and i. Expiration date of original license: generating unit and three 7,500-Kw Agreement in Docket No. RP91–103– September 30, 2001. generating units for a total installed 000, et al., remitted to customers on j. The project consists of four capacity of 30,500 Kw; and (e) September 25, 1996. developments: appurtenant facilities; Alabama-Tennessee states that Fourth (1) the Bulls Bridge Development, The project has a total installed Revised Sheet No. 4A reflects the comprising: (a) a 203-foot-long, 24-foot- capacity of 105,900-Kw. elimination of Take-or-Pay Surcharges high concrete gravity-overflow structure k. Pursuant to 18 CFR 16.7, pursuant to the Stipulation and known as Bulls Bridge or Main Dam; (b) information on the project is available Agreement approved by FERC Order a 156-foot-long, 17-foot-high rockfill at: The Connecticut Light and Power dated October 17, 1991. Alabama- concrete-capped overflow structure Company, 41 Park Lane Road, New Tennessee requests an effective date of having 3-foot-high wooden flashboards Milford, CT 06776, (860) 355–6527. September 1, 1996. and known as Spooner Dam; (c) a l. FERC contact: Charles T. Raabe Alabama-Tennessee has requested reservoir having a 120-acre surface area (202) 219–2811. that the Commission grant such waivers and a 233-acre-foot useable storage as may be necessary to accept and volume at normal pool elevation 354.6 m. Pursuant to 18 CFR 16.8, 16.9, and approve the filing as submitted. feet m.s.l.; (d) an intake structure and a 16.10 each application for a new license Any person desiring to protest said 2-mile-long canal; (e) a forebay and two and any competing license applications filing should file a protest with the (one 13-foot-diameter and one 8-foot- must be filed with the Commission at Federal Energy Regulatory Commission, diameter) 420-foot-long penstocks; (f) a least 24 months prior to the expiration 888 First Street, N.E., Washington, D.C. powerhouse containing six 1,200-Kw of the existing license. All applications 20426, in accordance with Rule 211 of generating units for a total installed for license for this project must be filed the Commission’s Rules of Practice and capacity of 7,200-Kw; and (g) by September 30, 1999. Procedure (18 CFR 385.211). All such appurtenant facilities. 2a. Type of filing: Notice of Intent To protests must be filed on or before (2) the Rocky River Development, File an Application for a New License. October 16, 1996. Protests will be comprising: (a) a 952-foot-long, 100- b. Project No.: 2597. considered by the Commission in foot-high earth-filled structure having a c. Date filed: August 21, 1996.