Section 2: Development Management Policies
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Consultation Statement New Forest National Park Local Plan 2016
Consultation Statement New Forest National Park Local Plan 2016 - 2036 May 2018 1. Introduction 1.1 The New Forest National Park Authority is undertaking a review of the local planning policies covering the National Park – currently contained within the Core Strategy & Development Management Policies DPD (adopted December 2010). This review is in response to changes in national policy and the experiences of applying the adopted planning policies for the past 7 years. The review will result in the production of a revised Local Plan covering the whole of the National Park. 1.2 The revised Local Plan will form a key part of the statutory ‘development plan’ for the National Park and will ultimately guide decisions on planning applications submitted within the Park. The Local Plan will set out how the planning system can contribute towards the vision for the New Forest National Park in 2036 and will include detailed planning policies and allocations that seek to deliver the two statutory National Park purposes and related socio-economic duty. 1.3 This Statement is a record of the consultation undertaken during the Local Plan- making process which started in 2015. As required by Regulation 22 of the Town and Country (Local Planning) (England) Regulations 2012, it sets out who has been invited to make representations on the Local Plan; summarises the main issues raised; and how they have been taken into account during the development of the Plan. The Statement covers the Regulation 18 consultation on the scope and main issues to be covered in the Local Plan review; the public consultation on the non- statutory draft Local Plan published in October 2016; the subsequent consultation on potential alternative housing sites undertaken in June – July 2017; and finally the statutory 6-week public consultation on the proposed Submission draft Local Plan in January and February 2018 (Regulation 19). -
OLD BEAMS INN Salisbury Road, Ibsley, Ringwood, BH24 3PP
FREEHOLD FOR SALE GUIDE PRICE £695,000 OLD BEAMS INN Salisbury Road, Ibsley, Ringwood, BH24 3PP Key Highlights • Prominently located on A338 between Ringwood and Fordingbridge • Freehold public house • Grade II Listed • Large site of approximately 0.647 acres (0.262 ha) • Of interest to investors and owner-occupiers • Separate manager’s/owner’s flat SAVILLS SOUTHAMPTON 2 Charlotte Place Southampton, SO14 0TB 023 8071 3900 savills.co.uk Location Ibsley is a village in Hampshire situated on the There is parking for circa 20 vehicles to the front western edge of the New Forest National Park. The of the property. Towards the rear, there is a trade hamlet is situated on the A338 road, connecting garden as well as a large gravel car park with space Bournemouth with Salisbury. The nearest town is for approximately 50 cars. Ringwood, which lies approximately 3.5 miles to The pub is accessed by three doors on the front the south. elevation and internally, the pub is split into a The public house is situated equidistant between number of interconnecting rooms. There are Ringwood and Fordingbridge, in a prominent extensions which provide two conservatory-style position fronting the A338 albeit slightly recessed. dining areas to the rear of each side of the pub. The surrounding area is predominantly of residential There are a total of approximately 100 covers. form. The area is picturesque and very popular with The bar servery holds a central position, with the hikers and tourists. open trade kitchen on the right hand side of the property. The ladies’ and gent’s WC facilities are Description located to the left of the main entrance. -
Damerham Primary School 1863 – 1980 Excerpts From
Mr Hibberd DAMERHAM PRIMARY SCHOOL Messrs. Masters and Man 2 10 0 Mr. J. Smart 1863 – 1980 Mr. Welch EXCERPTS FROM THE SCHOOL LOG BOOKS C EXCERPTS FROM DAMERHAM SCHOOL LOGBOOKS APRIL 1863 – DECEMBER 1980 April 1863 John Ambrose Head 1863 Jane Ambrose Infants & Needlework STATEMENT OF EXPENSES INCURRED IN BUILDING THE SCHOOLROOM May 11 1863 No school in afternoon owing to an awful fire which broke out in the village about 1 o’clock £ s d May 12 1863 No school in consequence of the fire Carpenter’s bill 70 0 0 May 13 1863 58 present in morning and afternoon. The falling off in attendance was owing Bricklayers 45 126 to the fire, a great number of the scholars and their friends being burnt out of Mr. Nicklen’s bill for bricks 57 0 0 their homes. Messrs. Alexander’s (Glazing) bill 13 19 9 June 1 1863 Master absent 20 minutes chasing Jessie Blake who was playing truant Mr. Blanchard for slate 13 12 0 June 9 1863 Charles Young using foul language – his mother told and said she did not know Messrs. Percy and Hillary 5 11 5 he used such language. Mr. Brown for stone 15 0 July 13 1863 Low attendance. Pupils employed ‘bird scaring’1. Mr. Lush’s bill for carriage 1 10 0 July 16 1863 Charles Frampton (his mother being a poor widow) threw a stone and broke a Mr. Tilley’s bill 3 10 0 window. No play for one week.. Mr. Master’s bill 2 10 0 July 29 1863 Poor attendance due to many pupils attending a ceremony for the laying of the Mr. -
Hampshire Superfast Broadband Programme
Hampshire Superfast Broadband Programme New Forest Consultative Panel Lyndhurst 7 December 2018 Glenn Peacey Shaun Dale Hampshire County Council Openreach [email protected] [email protected] Superfast Broadband Checker HCC Contract 2 HCC Contract 1 Commercially Funded Coverage Hampshire Superfast Programme • Commercially Funded Upgrades reach 80% of premises by end of 2013 • Government Intervention 2013 - 2019 – Wave 1 - £11m • 64,500 premises upgraded 2013 - 2015 – Wave 2 - £18m (£9.2m from HCC) • 34,500 premises 2016 - 2018 – Wave 2 Extension - £6.8m • 8,500 premises 2018 – 2019 • Universal Service Obligation 2020 • 100% FTTP Coverage by 2033 Superfast Broadband Programme Upgrading connections to more than 107,000 premises Over 12,000 Fibre to the Premises (FTTP) • Increase coverage from 80% to more than 97.4% by end of 2019 • 15-20,000 premises across Hampshire • Looking for new funding streams to reach the last 2.6%, likely cost £20-£40m • Better Broadband Scheme Offers 4G, satellite and fixed wireless solutions for premises with a sub-2Mbps speed The scheme was extended until end 2018 We have issued 900 codes for installations • A national Gigabit Broadband Voucher Scheme has been launched, with the aim of extending full fibre coverage specifically to small/medium-sized enterprises Internet Telephone Exchange Exchange Only lines Too far from the cabinet New Forest Upgrades Exchange Name: 219 Structures Planned ASHURST 148 Structures Live BEAULIEU BRANSGORE More than 500 FTTP Premises connected BROCKENHURST BURLEY -
Fordingbridge, Godshill Walk
Fordingbridge, Godshill Walk Distance: 3.25 miles Start: Godshill Cricket pitch The River Avon runs through this small town that lies 13 miles south of Salisbury. To the east is the New Forest and to the west are the Western Downlands and Cranborne Chase. Fordingbridge is surrounded by attractive villages and hamlets including Bickton, Breamore, Godshill, Hyde, Rockbourne and Woodgreen. The area was populated from early times with the remains of significant Roman occupation which is still evident at Rockbourne Roman villa. Directions From the Godshill Cricket Pitch car park walk towards the Fighting Cocks pub and take the first right. Walk 150 yards past the village hall and take the footpath on the left (stile). Follow path to the end of the field and then turn right descending to a stile. Follow the path through a copse, across a gravel track and continue on until you reach a metal gate. Turn left follow the footpath signs (stream on your right), crossing stiles and eventually a bridge. After this, walk between hedges to reach two cottages (Brook and Arden). Follow the route along the edge of the road descending down eventually to a cattle grid (gate and stile). Continue along, passing buildings and a yard, taking the second path on left. Follow this then take the footpath on the right through woodland to reach a stile into a field ahead. Cross the stile and bear left across the corner of the field following the fence on the left for 50 yards to a stile into woodland. Proceed uphill on the gravel track. -
September 2018-August 2019
Blashford Lakes Annual Report 2018-19 September 2018-August 2019 Wild Day Out – exploring the new sculpture trail © Tracy Standish Blashford Lakes Annual Report 2018-2019 Acknowledgements The Blashford Project is a partnership between Bournemouth Water, Hampshire & Isle of Wight Wildlife Trust and Wessex Water During the period of 2018-2019 we are also very grateful to New Forest District Council for a grant towards the day to day running costs of managing the Centre and Nature Reserve, New Forest LEADER for their grant towards improving the visitor experience at Blashford Lakes (in particular the installation of wildlife camera’s for viewing by the public and the visitor improvements to the environs inside and immediately around the Centre) and to Veolia Environmental Trust, with money from the Landfill Communities Fund, for the creation of a new wildlife pond, the construction of a new hide and a volunteer manned visitor information hub and improvements to site interpretation and signage. The Trust would also like to acknowledge and thank the many members and other supporters who gave so genererously to our appeal for match funding. Thank you also to the Cameron Bespolka Trust for their generous funding and continued support of our Young Naturalist group. Publication Details How to cite report: No part of this document may be reproduced without permission. This document should be cited as: author, date, publisher etc. For information on how to obtain further copies of this document Disclaimers: and accompanying data please contact Hampshire & Isle of Wight All recommendations given by Hampshire & Isle of Wight Wildlife Wildlife Trust: [email protected] Trust (HIWWT) are done so in good faith and every effort is made to ensure that they are accurate and appropriate however it is the Front cover: sole responsibility of the landowner to ensure that any actions they Wild Day Out – exploring the new sculpture trail © Tracy Standish take are both legally and contractually compliant. -
Somerley 07/114
Nea Farm, Phase GP5, Somerley, Ringwood, Hampshire An Archaeological Excavation for Tarmac Southern Ltd by Andy Taylor Thames Valley Archaeological Services Ltd Site Code SOM07/114 List of Figures Figure 1 Location of site in Southern England and Ringwood Figure 2 Location of site on the Somerley Estate and previous phases of work Figure 3 Plan of Excavation Areas showing all features Figure 4 Sections (1) Figure 5 Sections (2) Figure 6 Selected pottery (see text for details) Nea Farm, Phase GP5, Somerley, Ringwood, Hampshire An Archaeological Excavation by Andy Taylor with contributions by Steve Ford, Malcolm Lyne, Rosalind McKenna and Frances Raymond Report 07/114 Summary Excavation prior to gravel extraction revealed a small number of archaeological deposits across the stripped areas mostly consisting of linear features representing field boundaries. These are tentatively dated to the Roman and/or medieval periods. Several pits and postholes were also observed, the majority of which were undated but some were medieval. Of particular significance due to their rarity was the discovery of three prehistoric pits. One of these was of Early Neolithic date with a radiocarbon determination of 3517–3393 cal BC (KIA39673), a second with Beaker pottery of Early Bronze Age date produced a radiocarbon determination of 2134–2078 cal BC (KIA39674),and a third was of Middle Bronze Age or Iron Age date. Introduction An archaeological excavation was carried out by Thames Valley Archaeological Services at Nea Farm, Somerley, Ringwood, Hampshire (SU 1290 0820) (Fig. 1). The work was commissioned by Mr Andy Cadell of Tarmac Southern Limited, Stancombe Quarry, Stancombe Lane, Flax Bourton, Bristol, BS48 3QD. -
Strategic Flood Risk Assessment Report
New Forest District Council & New Forest National Park Authority Level 1 Strategic Flood Risk Assessment Phase Four report: Main Report October 2017 New Forest National Park Authority Lymington Town Hall Avenue Road Lymington SO41 9ZG JBA Project Manager Ben Gibson BSc MSc MCIWEM C.WEM JBA Consulting 35 Perrymount Road Haywards Heath West Sussex RH16 3BW Revision History Revision Ref / Amendments Issued to Date Issued Version 1 / - Andrew Herring August 2017 (New Forest District Council) and David Illsley (New Forest National Park Authority) Version 2 / Amendments made following Andrew Herring October 2017 comments received from New Forest (New Forest District Council) District Council and New Forest and David Illsley National Planning Authority of 6 (New Forest National Park October 2017 Authority) Contract This report describes work commissioned by New Forest District Council and New Forest National Park Authority, on behalf of David Illsley, by a letter dated 20 September 2016. New Forest District Council’s representative for the contract was Andrew Herring and New Forest National Park Authority's representative for the contract was David Illsley. Kristie Darling, Georgina Latus, Aaron Barber, Ffion Wilson and Ben Gibson of JBA Consulting carried out this work. Prepared by .................................................. Kristie Darling BSc Technical Assistant ....................................................................... Georgina Latus BSc Technical Assistant ...................................................................... -
Somerley-House-Weddings-Brochure-2022.Pdf
Make Our House YOUR HOME We are extremely proud to be the present custodians of this hidden gem on the Hampshire/Dorset border. Somerley has been in our family for seven generations and we never take for granted how lucky we are to live and raise our family in this beautiful place. This is a house built for making memories in. It’s glorious and grand, but it’s our family home so there’s real heart here. We like to think of it as stately, not stuffy, and it’s at its best when its rooms and galleries are filled with life and laughter. So, whether you’re dreaming of a candlelit dinner among the portraits in our Picture Gallery, a cosy ceremony by the fire in the Drawing Room, or a sprawling summer celebration in our grounds and gardens, Somerley is the perfect place to make your own. Our expert events team will help you to create a wedding that befits your imagination. We’re delighted to share our home with you and your loved ones for your most special of days, as you make Somerley House part of your personal histories. The Earl and Countess of Normanton Exclusively YOURS A wedding at Somerley combines luxury and opulence with comfort and warmth. This exquisite Country House is the perfect place for a celebration – The Picture Gallery it’s sumptuously elegant, with the welcoming embrace of a family home. The ground floor of the Main House has a range of licensed ceremony rooms to choose from, each with its own distinct atmosphere. -
Statement of Persons Nominated, Notice of Poll and Situation of Polling Stations
STATEMENT OF PERSONS NOMINATED, NOTICE OF POLL AND SITUATION OF POLLING STATIONS Election of a Member of Parliament for the New Forest West Constituency Notice is hereby given that: 1. A poll for the election of a Member of Parliament for the New Forest West Constituency will be held on Thursday 7 May 2015, between the hours of 7:00 am and 10:00 pm. 2. One Member of Parliament is to be elected. 3. The names, home addresses and descriptions of the candidates validly nominated for election and the names of persons signing the candidates’ nomination papers are as follows: Names of Signatories Names of Signatories Names of Signatories Name of Description (if Home Address Proposers(+), Seconders(++) & Proposers(+), Seconders(++) & Proposers(+), Seconders(++) & Candidate any) Assentors Assentors Assentors BAILEY (address in the UK Independence Vasilesco Ann(+) Linney Ian T(++) Paul New Forest West Party (UKIP) Wilkins Marlene Beggs Michael C Constituency) Blake David C Rasey Sidney J Day John E.F. Pilling Grace E Levett Anthony E Cossey Keith G RICHARDS St Hildas, The Green Party Richards Farmer Janet Elizabeth Sycamore Green, Walford R(+) Mark D L(++) Martin, Palmer Rachel M Eardley Robert B Fordingbridge, Eardley Frances Burleigh Charlotte J Valentine Sandra D Spreadbury Hampshire, Spreadbury Aaron R Suzanne E SP6 3LG Lawes Hazel J SAMUELS (address in the Labour Party Williams Phillips Martin(++) Lena New Forest West Desmond R(+) Stocks Pamela E Constituency) Hexter Caroline R Iles Joan Harper Peter J Emberson Priscilla A Alexander Carole -
Burley Denny Lodge Hursley Overton Minstead Binsted Beaulieu Fawley
Mortimer Newtown West End East Ashford Hill with Headley Stratfield Saye Silchester Bramshill Woodhay Tadley Stratfield TurgisHeckfield Eversley Highclere Pamber Yateley Burghclere Kingsclere Baughurst BramleyHartley Wespall Mattingley Linkenholt Ecchinswell, Sydmonton Blackwater Faccombe Sherfield on Loddon and Hawley Vernhams and Bishops Green Sherborne St. John Hartley Wintney Ashmansworth Monk Sherborne Sherfield Park Rotherwick Dean Elvetham Heath Litchfield and Woodcott Hannington Chineham Wootton St. Lawrence Hook Fleet Hurstbourne Tarrant Rooksdown Newnham Winchfield Old Basing and Lychpit Church Crookham Dogmersfield Crookham Tangley St. Mary Bourne Mapledurwell and Up Nately Oakley Greywell Village Whitchurch Deane Odiham Ewshot Smannell Overton Winslade Appleshaw Enham Alamein Cliddesden Tunworth Penton Grafton Upton Grey Crondall Kimpton Steventon Charlton Hurstbourne Priors Farleigh Wallop Weston Corbett Fyfield Andover Laverstoke North Waltham Long Sutton Penton Mewsey Ellisfield South Warnborough Shipton Bellinger Dummer Herriard Weston Patrick Bentley Thruxton Amport Longparish Nutley Monxton Popham Froyle Upper Clatford Quarley Abbotts Ann Bradley Lasham Bullington Shalden Grateley Goodworth Clatford Preston Candover Wherwell Binsted Barton Stacey Micheldever Bentworth Wonston Candovers Wield Alton Over Wallop Beech Chilbolton Kingsley Longstock Northington Worldham Leckford Chawton Headley Nether Wallop Medstead South Wonston Old Alresford Lindford Stockbridge Crawley Farringdon Grayshott Bighton Little Somborne Kings -
Winchester Museums Service Historic Resources Centre
GB 1869 AA2/110 Winchester Museums Service Historic Resources Centre This catalogue was digitised by The National Archives as part of the National Register of Archives digitisation project NRA 41727 The National Archives ppl-6 of the following report is a list of the archaeological sites in Hampshire which John Peere Williams-Freeman helped to excavate. There are notes, correspondence and plans relating to each site. p7 summarises Williams-Freeman's other papers held by the Winchester Museums Service. William Freeman Index of Archaeology in Hampshire. Abbots Ann, Roman Villa, Hampshire 23 SW Aldershot, Earthwork - Bats Hogsty, Hampshire 20 SE Aldershot, Iron Age Hill Fort - Ceasar's Camp, Hampshire 20 SE Alton, Underground Passage' - Theddon Grange, Hampshire 35 NW Alverstoke, Mound Cemetery etc, Hampshire 83 SW Ampfield, Misc finds, Hampshire 49 SW Ampress,Promy fort, Hampshire 80 SW Andover, Iron Age Hill Fort - Bagsbury or Balksbury, Hampshire 23 SE Andover, Skeleton, Hampshire 24 NW Andover, Dug-out canoe or trough, Hampshire 22 NE Appleshaw, Flint implement from gravel pit, Hampshire 15 SW Ashley, Ring-motte and Castle, Hampshire 40 SW Ashley, Earthwork, Roman Building etc, Hampshire 40 SW Avington, Cross-dyke and 'Ring' - Chesford Head, Hampshire 50 NE Barton Stacey, Linear Earthwork - The Andyke, Hampshire 24 SE Basing, Park Pale - Pyotts Hill, Hampshire 19 SW Basing, Motte and Bailey - Oliver's Battery, Hampshire 19 NW Bitterne (Clausentum), Roman site, Hampshire 65 NE Basing, Motte and Bailey, Hampshire 19 NW Basingstoke, Iron