GREATER REGIONAL TRANSIT AUTHORITY FFY 2022 GRANT PROGRAM PROJECT DESCRIPTIONS

Section 5307 Capital Formula (1237-2022-XXXX)

Bus Replacement Program - Vehicles - This project is part of a three-year program to replace a total of 105 vehicles that have reached the end of their useful life. Funds are programmed in 2022 to support the vehicle purchases.

Bus Replacement Program – Spare Parts - This project is part of a three-year program to replace a total of 105 vehicles that have reached the end of their useful life. Funds are programmed in 2022 for spare parts purchases.

Light Rail Track Rehabilitation Program – This program is a multi-year program to reconstruct the Tracks. The track bed, rail, ties, and drainage are in need of rehabilitation. Funds are programmed in 2022 for the construction, third party construction management and force account costs.

Rail State of Good Repair Projects - This program funds the acquisition of equipment and materials and construction required to upgrade the rail line infrastructure on RTA’s 34 miles of rail track. It will assist RTA in providing safer, faster rail service along the Red, Blue, and Green rail lines. Funds are programmed in 2022 to support this program.

Preventative Maintenance Bus – Preventive maintenance activities for 2022 will include the purchase of inventory materials and supplies, equipment, as well as capitalized maintenance expenses (including mechanic labor) for bus operations.

Enhanced ADA Access - Rail - This program will utilize enhancement funds to fund the enhancement eligible items included in our various ADA Station Reconstruction and Rehabilitation projects. It represents a majority of GCRTA’s annual enhancement projects. For 2022 it is focused improving rail station areas and includes purchase and installation of shelters and other amenities at our rail stations.

NOACA Unserved Area Projects – This program is for a small portion of the Urbanized Areas funds to be distributed by NOACA to the transit agencies within the region for projects that are competitively selected. The funds are carried in the TIP under GCRTA and non-GCRTA projects are then funded through sub-recipient agreements.

Pavement Improvement Program – This program is a multi-year program to reconstruct/rehabilitate pavement at a number of facilities to maintain a State of Good Repair at these facilities. Funds are programmed in 2022 for the construction, third party construction management and force account costs.

Roof Replacement Program – This program is a multi-year program to replace/rehabilitate roofs at a number of facilities that have exceeded their useful life. Funds are programmed in 2022 for the construction, third party construction management, and force account costs.

1 GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2022 GRANT PROGRAM PROJECT DESCRIPTIONS

Track Bridge Rehabilitation over Brookpark – This project is to rehabilitate the Red Line track bridge over Brookpark Road. The bridge superstructure and deck are in need of rehabilitation. Funds are programmed in 2022 in support of the construction costs.

Overhead Catenary System (OCS) Program – This program is the third year of a multi- year program to repair, replace, and upgrade catenary structures and overhead lines and appurtenances in order to achieve a state of good repair. Funds are programmed in 2022 to support the construction, third party construction management and force account costs.

Rail Car Replacement Program - Vehicles - This project is part of a ten-year program to replace a total of 74 rail vehicles that have reached the end of their useful life. The first phase of the program will be the heavy rail vehicles (HRV). Funds are programmed in 2022 to support the vehicle purchases and force account costs.

HVAC System Improvement Program – This program is a multi-year program to reconstruct/rehabilitate our HVAC systems at a number of facilities to upgrade monitoring, controls and equipment that have exceeded their useful life. Funds are programmed in 2022 for the purchase of replacement equipment and controls, and force account costs.

Hayden Bus Lift Replacements – This project is to replace 60 ft bus lift equipment that has exceeded it useful life. Funds are programmed in 2022 to purchase and install the new equipment.

Hayden Bus Wash Replacement – This project is to replace the bus wash equipment that has exceeded it useful life and replace it with a more energy and water efficient bus wash system. Funds are programmed in 2022 to purchase and install the new equipment.

Waterfront Line Track Bridge Rehabilitation – This project is to rehabilitate the Waterfront Line track bridge over Front Street and the Norfolk Southern tracks in the east bank of . The first and last spans of the segmental concrete bridge are in need of rehabilitation. Funds are programmed in 2022 in support of the construction costs.

East 79th Street Light Rail Station ADA Reconstruction – This program is a multi-year program to reconstruct the East 79th Street Light Rail station. It will include new platforms, shelters, stairway and ADA compliant ramps. Funds are programmed in 2022 for the design and project administration costs.

Light Rail Guard and Retaining Wall Rehabilitation – This program is a two year program to rehabilitate the remaining section of guard and retaining walls along the Blue Line in the median of Van Aken between Ashby and Avalon. Funds are programmed in 2022 to support the design and project administration costs.

Fare Collection System Replacement – This project is to replace fare collection technology and on-board and off-board fare collection equipment that has exceeded it useful. Funds are programmed in 2022 to purchase and install the new equipment.

2 GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2022 GRANT PROGRAM PROJECT DESCRIPTIONS

Rail Work Equipment Replacement – This project is to replace various rail work equipment that has exceeded its useful life. Funds are programmed in 2022 for the acquisition new rail work equipment.

Section 5337 State of Good Repair Formula (1237-2022-XXXX)

Light Rail Track Rehabilitation Program – This program is a multi-year program to reconstruct the Light Rail Tracks. The track bed, rail, ties, and drainage are in need of rehabilitation. Funds are programmed in 2022 for the design and construction costs.

Rail Spare Parts - This project is to replace major rail car and equipment components that require replacement during the 30 year life of a rail car such as pantographs, trucks, systems and rail maintenance equipment. Funds are programmed in 2022 for spare parts purchases.

Rail State of Good Repair Projects - This program funds the acquisition of equipment and materials and construction required to upgrade the rail line infrastructure on RTA’s 34 miles of rail track. It will assist RTA in providing safer, faster rail service along the Red, Blue, and Green rail lines. Funds are programmed in 2022 to support this program.

Preventative Maintenance Rail – Preventive maintenance activities will include the purchase of inventory materials and supplies, equipment, as well as capitalized maintenance expenses and maintenance of the rail track right-of-way. Funds are programmed in 2022 to support this program.

Rail Infrastructure Program - This project funds the acquisition of equipment and materials and construction required to upgrade the rail line infrastructure on RTA’s 34 miles of rail track. It will assist RTA in providing safer, faster rail service along the Red, Blue, and Green rail lines. Funds are programmed in 2022 to support this program.

On-Call Rail Engineering Services - This project funds design services to support the GCRTA engineering department. Funds are programmed in 2022 to support this program.

Rail Car Replacement Program - Infrastructure – This project funds the rehabilitation of the Red Line platforms, and Central Rail and Brookpark rail facilities to accommodate the new rail cars. Funds are programmed in 2022 to support the construction and equipment acquisition costs.

Track Bridge Rehabilitation over Brookpark – This project is to rehabilitate the Red Line track bridge over Brookpark Road. The bridge superstructure and deck are in need of rehabilitation. Funds are programmed in 2022 in support of the construction, third party construction management and force account costs.

Overhead Catenary System (OCS) Program – This program is the third year of a multi- year program to repair, replace, and upgrade catenary structures and overhead lines and appurtenances in order to achieve a state of good repair. Funds are programmed in 2022 to support the construction costs. 3 GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2022 GRANT PROGRAM PROJECT DESCRIPTIONS

Track Bridge Rehabilitation over Ambler – This project is to rehabilitate the Light Rail track bridge over Ambler. The bridge superstructure and deck are in need of rehabilitation. Funds are programmed in 2022 in support of the design and project administration costs.

Signal System Upgrade Program – This program is a multi-year program to repair, replace, and upgrade signal equipment, hardware, software, controls, bonds and appurtenances in order to achieve a state of good repair. Funds are programmed in 2022 to support the construction and force account costs.

Section 5339 Bus Facility Grant (1237-2022-XXXX)

Bus Replacement Program - This project is part of a three-year program to replace a total of 105 vehicles that have reached the end of their useful life. Funds are programmed in 2022 to support the vehicle purchases.

Bus Replacement Program – Spare Parts - This project is part of a three-year program to replace a total of 105 vehicles that have reached the end of their useful life. Funds are programmed in 2022 grant for spare parts purchases.