South Development Office Civil Engineering and Development Department
Briefing on the Gazette Scheme of the Boardwalk underneath the Island Eastern Corridor (IEC)
September 2020 2 Background Information Development Stage Time Stage 1 Community Engagement (CE1) February 2016 – March 2016
Stage 2 Community Engagement (CE2) November 2016 – January 2017
Stage 3 Community Engagement (CE3) February 2019 – April 2019
Commencement of Design December 2019
South Development Office Civil Engineering and Development Department 3
Objective of the Briefing
To brief members on the gazette scheme of the proposed Boardwalk underneath Island Eastern Corridor (IEC) (Boardwalk), including the gazette procedure and the enhancement of the Boardwalk scheme
In response to the public views to commence the construction works as early as possible, preparation works are ongoing and will be completed by phases
The proposed scheme is ready for gazettal and we will continue to work on the architectural and landscape design of the Boardwalk and consult HC in due course
South Development Office Civil Engineering and Development Department 4 Major Views and Comments from Key Stakeholders in CE3
General agreement on the alignment and width as well as supporting facilities and clear support for early implementation
Reducing the gradient and level of boardwalk for a more comfortable and closer to water walking environment
More Viewing Platforms for public enjoyment
Integrating with the planned and existing promenade to achieve a continuous waterfront promenade
South Development Office Civil Engineering and Development Department Gazette Scheme – Layout Plan
South Development Office Civil Engineering and Development Department Gazette Scheme – Eastern Section 6
/ Viewing Decks Movable Bridge Access Linkbridge
Outside IEC footprint Underneath IEC structure
Additional Viewing Decks under Current Scheme 4
Additional Movable 5 Bridges under Current Scheme
Tin Chiu Street 6 Man Hong Street Extension to Quarry Bay Promenade Healthy Street East
Hoi Yu Street Quarry 5 Bay 4 6 Promenade
South Development Office Civil Engineering and Development Department Gazette Scheme – Western Section 77
/ Viewing Decks Movable Bridge Fishing Platform Access Linkbridge
Outside IEC footprint Additional Viewing Decks 3 under Current Scheme Underneath IEC structure 2
Provident Garden
Oil Street East Coast 1 2 3 Park
South Development Office Civil Engineering and Development Department Gazette Scheme – Eastern Section 8
NPVFP
NPFSD Pier
Hoi Yu Street Extension
Movable Bridge
South Development Office Civil Engineering and Development Department Gazette Scheme – Western Section 9
Movable Bridge
South Development Office Civil Engineering and Development Department Enhanced Boardwalk Scheme 10
V6. • Added new Viewing Platform V2. to improve the • Modify the shape of experience on V1. V5. Viewing Platform to the boardwalk V3. • Modify the • Added new improve the • the shape V4. Viewing Platform of Viewing shape of pedestrian • Modify the to improve the Platform Viewing circulation shape of experience on the remained Platform to Viewing boardwalk unchanged improve the Platform to pedestrian improve the circulation pedestrian circulation
L1. F1. • Lower the • Modify the shape of gradient of Fishing Platform the Link and the Corridor to Bridge improve pedestrain L2. L3. D1. circulation • the shape of Link • Lower the • Extend boardwalk Bridge remained gradient of the to Quarry Bay unchanged Link Bridge Promenade
South Development Office Civil Engineering and Development Department Vertical Profile of Gazette Scheme
South Development Office Civil Engineering and Development Department Typical Section 12
min. 10m
1100m(h) railing
Waterfront Inland
South Development Office Civil Engineering and Development Department Access from MTR Station/Tram Stop 13 Access Points Route Time Taken Time Taken (From MTR) (From Tram Stop) Oil Street Approx. 9 mins Approx. 10 mins Provident Garden Approx. 7 mins Approx. 5 mins Tong Shui Road Approx. 4 mins Approx. 4 mins
Pedestrian Access
MTR
Tram
South Development Office Civil Engineering and Development Department Access from MTR Station/Tram Stop 14
Access Points Route Time Taken Time Taken (From MTR) (From Tram Stop) North Point Promenade Approx. 6 mins Approx. 6 mins North Point Vehicular Ferry Pier Approx. 7mins Approx. 6mins Man Hong Street Approx. 9 mins Approx. 3 mins Healthy Street East Approx.6mins Approx. 3mins Hoi Yu Street Approx. 7 mins Approx. 4 mins Pedestrian Access
MTR
Tram
South Development Office Civil Engineering and Development Department Design Elements of Boardwalk 15
Playful elements Viewing decks Water playground Place for sunbathing Display artist's Open space artwork Fishing platform
Food and beverage facilities Bicycle facilities
South Development Office Civil Engineering and Development Department Other Facilities 16
- Toilets
- Drinking Fountains
- Refreshment Kiosks
- Shelters
- Seatings
South Development Office Civil Engineering and Development Department 17 Photomontage
Access Point of Boardwalk at Oil Street South Development Office Civil Engineering and Development Department 18 Photomontage
Near North Point FSD Pier
South Development Office Civil Engineering and Development Department 19 Photomontage
Movable bridge along Proposed Boardwalk South Development Office Civil Engineering and Development Department Return 20 Photomontage
Movable bridge at the linkbridge of Proposed Boardwalk South Development Office Civil Engineering and Development Department Return 21 Boardwalk underneath IEC Tentative Implementation Programme / Key Dates Event Date
Gazette Procedures Q4 2020
Consult Harbourfront Commission and other stakeholders on Architectural and Landscape First half of 2021 Design Seek funding approval from the Legislative Q2 2021 Council
Commencement of Construction Work late 2021
Phased Completion from Completion and Commissioning of the project end 2024
South Development Office Civil Engineering and Development Department North Point Vehicular Ferry Pier (NPVFP)
Key Plan
Upper Deck Of NPVFP Proposed lift & staircase
Return South Development Office Civil Engineering and Development Department Non-Shared use of North Point FSD Pier ‐ Closure at irregular hours Re‐provisioning of Relocation of Petrol cause inconvenience to Inner Berth 23 the Boardwalk users Refueling facility
Additional Movable Bridge Existing Existing Petrol Inner Berth Refueling facility Return South Development Office Civil Engineering and Development Department Hoi Yu Street Extension
Hoi Yu Street Extension
Existing 2m wide footpath
Return South Development Office Civil Engineering and Development Department South Development Office Civil Engineering and Development Department
Thank you