“Works in Progress to the Football World Cup – Brazil 2014”
Airports Pavement Seminar & VI FAA Airport Pavement Workshop, I Short Course of Airfield Pavements Maintenance
AIRPORT INFRASTRUCTURE FIFA WORLD CUP 2014
August 2011
Eng. Márcio Eduardo Rodrigues Kuntz INFRAERO Airports – FIFA WORLD CUP 2014
• Belo Horizonte (Confins) - MG 1. Tancredo Neves International Airport– Confins 2. Belo Horizonte, Pampulha Airport – Carlos Drummond de Andrade • Brasília - DF 3. Brasília International Airport – Presidente Juscelino Kubitschek • Cuiabá - MT 4. Marechal Rondon International Airport - Cuiabá • Curitiba - PR Manaus Fortaleza Natal
5. Afonso Pena International Airport - Curitiba Recife
• Fortaleza - CE Salvador Cuiabá 6. Pinto Martins International Airport - Fortaleza Brasília Confins Pampulha • Manaus - AM Campinas Congonhas Galeão 7. Eduardo Gomes International Airport – Manaus Santos Dumont Curitiba Guarulhos • Natal - RN
8. São Gonçalo do Amarante International Airport – Natal Porto Alegre
Airports - FIFA WORLD CUP 2014
• Porto Alegre - RS 9. Salgado Filho International Airport – Porto Alegre • Recife - PE 10. Recife – Guararapes International Airport – Gilberto Freire • Rio de Janeiro - RJ 11. Rio de Janeiro,Galeão International Airport – Antonio Carlos Jobim – Rio de Janeiro 12. Santos Dumont Airport – Rio de Janeiro • Salvador - BA 13. Salvador International Airport – Deputado Luis Eduardo Magalhães • São Paulo, Guarulhos e Campinas - SP 14. Congonhas Airport - São Paulo 15. São Paulo,Guarulhos International Airport – Gov. André Franco Montoro 16. Viracopos,Campinas International Airport - Campinas Airports Investiments- FIFA WORLD CUP2014
Overview Host Citys FIFA WORLD CUP Investiments ‐ 2010 to 2014
Value (R$ million) 2010 (mi) 2014 (mi) Ord City Airport Ca Dem Ca Dem 1São Paulo Guarulhos 1.229,36 24,9 26,8 52,7 38,9 Congonhas ‐ 12,0 13,7 15,0 15,0 Campinas 804,1 6,8 5,4 24,0 9,5 2Rio de Janeiro Galeão 697,30 17,4 12,3 44,0 18,7 Santos Dumont ‐ 8,5 3,6 8,5 5,4 3Belo Horizonte Confins 505,65 10,2 7,2 16,5 13,0 Pampulha ‐ 1,5 0,6 1,5 0,9 4 Brasília Brasília 563,24 14,0 14,3 26,5 21,30 5Porto Alegre Porto Alegre 711,35 11,2 6,6 15,2 8,8 6 Curitiba Curitiba 242,36 7,8 5,7 14,6 7,6 7 Recife Recife 24,60 16,7 5,9 16,7 7,8 8 Salvador Salvador 47,61 12,9 7,6 12,9 10,2 9 Fortaleza Fortaleza 347,78 6,2 5,0 8,6 7,0 10 Manaus Manaus 393,51 6,4 2,6 13,5 3,8 11 Cuiabá Cuiabá 91,33 1,9 2,1 5,7 3,1 12 Natal São Gonçalo do Amarante 506,32 ‐‐5,9 2,9 Totais 5,658,19 158,40 119,40 275,90 171,0 Legend: Ca – Capacity of Airport Terminal Dem ‐ Demand of passengers (boarding, landing and connection).
City: Belo Horizonte Airport: Int. Tancredo Neves - Confins
FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 505,65 million
Operational Data 2010 2014 Airport Terminal (m²): 60.305 67.675 Airport Terminal Capacity (pax,year): 10,28 million 16,5 million Airport Passenger Demands,Year: 7,26 million 13,0 million
Airport Apron(m²): 114.240 306.640 City: Belo Horizonte Airport: Int. Tancredo Neves - Confins
1 AIRPORT TERMINAL RENOVATION AND ROAD SYSTEM ADEQUACY Scheduled Start: September,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 236,65 million
2 RUNWAY AND APRON RENOVATION AND EXPANSION Scheduled Start: September,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 169,00 million
3 NEW REMOT AIRPORT TERMINAL, PARK, AIRPORT CARGO TERMINAL EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: March,2012 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 100,00 million
City:Brasília Airport: Int. Pres. Juscelino Kubitschek
FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 563,24 million
Operational Data 2010 2014 Airport Terminal (m²): 81.200 175.000 Airport Terminal Capacity (pax,year): 12,00 million 26,50 million Airport Passenger Demands,Year: 14,34 million 21,34 million
Airport Apron(m²): 181.000 403.000 City:Brasília Airport: Int. Pres. Juscelino Kubitschek
1 AIRPORT TERMINAL EXPANSION - TEMPORARY Scheduled Start: August,2011 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 4,63 million
2 AIRPORT TERMINAL RENOVATION Start: April2011 Scheduled Conclusion: January,2012 Total Planned Investment: R$ 4,9 million
3 AIRPORT TERMINAL RENOVATION, APRON EXPANSION, ROAD SISTEM AND NEW BUI/LDINGS COMPLEMENTARY Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 4,9 million
4 2º AIRPORT VIADUCT Scheduled Start: January,2012 Scheduled Conclusion: October,2012 Total Planned Investment: R$ 116,24 million
City: Cuiabá Airport: Int. Marechal Rondon
FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 91,33 million
Operational Data 2010 2014 Airport Terminal (m²): 5.460 13.200 Airport Terminal Capacity (pax,year): 1,98 million 5,7 million Airport Passenger Demands,Year: 2,1 million 3,1 million
Airport Apron(m²): 38.800 38.800
Airport Park (m²): 9.450 13.785 Aiport Park Capacity (un): 405 517 1.533 City: Cuiabá Airport: Int. Marechal Rondon
1 AIRPORT TERMINAL RENOVATION AND EXPANSION, 2 AIRPORT TERMINAL EXPANSION - TEMPORARY ROAD SYSTEM ADEQUACY END NEW PARK Start: June,2011 Scheduled Start: April,2012 Scheduled Conclusion: November,2011 Scheduled Conclusion: July,2013 Total Planned Investment: R$ 2,90 million Total Planned Investment: R$ 88,43million
ESTACIONAMENTO VEÍCULOS
City: Curitiba Airport: Int. Afonso Pena
FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 242,36 million
Operational Data 2010 2014 Airport Terminal (m²): 45.000 62.445 Airport Terminal Capacity (pax,year): 7,8 million 14,6 million Airport Passenger Demands,Year: 5,7 million 7,6 million
Airport Apron(m²): 84.062 143.941 City: Curitiba Airport: Int. Afonso Pena
1 RUNWAY AND TAXIWAY SISTEM EXPANSION Start: July,2011 Scheduled Conclusion: April,2013 Total Planned Investment: R$ 1,69 million
2 AIRPORT TERMINAL AND ROAD SISTEM EXPANSION Scheduled Start: April,2012 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 41,30 million
3 AIRPORT CARGO TERMINAL EXPANSION 4 THIRD RUNWAY PROJECT Start: December,2010 Scheduled Start: January,2013 Scheduled Conclusion: March,2013 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 17,78 million Total Planned Investment: R$ 14,28 million
City: Fortaleza Airport: Int. Pinto Martins
FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 347,78 million
Operational Data 2010 2014 Airport Terminal (m²): 38.500 61.964 Airport Terminal Capacity (pax,year): 6,22 million 8,7 million Airport Passenger Demands,Year: 5,07 million 6,5 million
Airport Apron(m²): 38.000 76.000 City: Fortaleza Airport: Int. Pinto Martins
1 AIRPORT TERMINAL RENOVATION AND EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: January,2012 Scheduled Conclusion: December,2013 PÁTIO of AERONAVES Total Planned Investment: R$ 347,78 million
City: Manaus Airport: Int. Eduardo Gomes
FIFA WORLD CUP 2014 Investiments 2011-2014 R$ 393,51 million
Operational Data 2010 2014 Airport Terminal (m²): 43.000 80.000 Airport Terminal Capacity (pax,year): 6,4 million 13,5 million Airport Passenger Demands,Year: 2,6 million 3,8 million
Airport Apron(m²): 45.000 45.000 City: Manaus Airport: Int. Eduardo Gomes
1 AIRPORT TERMINAL RENOVATION AND EXPANSION AND ROAD SYSTEM ADEQUACY Scheduled Start: November,2011 Scheduled Conclusion: December,2013
Total Planned Investment: R$ 393,51 million PÁTIO of AERONAVES
PISTA of POUSO,ofCOLAGEM
City: Natal Airport: São Gonçalo do Amarante
FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 506,32 million
Operational Data 2010 2014 Airport Terminal (m²): - 5,9 million Airport Terminal Capacity (pax,year): - 2,9 million
Airport Apron(m²): 200.400 200.400 City: Natal Airport: São Gonçalo do Amarante
1 NEW TAXIWAY AND APRON Start: May,2011 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 98,32 million
2 AIRPORT TERMINAL CONSTRUCTION Scheduled Start: August,2011 Scheduled Conclusion: - Total Planned Investment: R$ 408,00 million
City: Porto Alegre Airport: Int. Salgado Filho
FIFA WORLD CUP2014 Investiments 2010-2014 R$ 711,35 million
Operational Data 2010 2014 Airport Terminal (m²): 37.600 104.304 Airport Terminal Capacity (pax,year): 11,24 million 15,24 million Airport Passenger Demands,Year: 6,6 million 8,8 million
Airport Apron(m²): 92.567 130.587
Airport Park (vehicles) (m²): 54.837 130.000 Airport Park Capacity (vehicles) (un): 2.031 4.653 Airport Park Demands (vehicles) (un): 2.667 4.000 City: Porto Alegre Airport: Int. Salgado Filho
1 AIPORT TERMINAL AND APRON RENOVATION AND EXPANSION Scheduled Start: September,2011 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 345,80 million
2 RUNWAY AND TAXIWAY EXPANSION Scheduled Start: February,2012 Scheduled Conclusion: November,2013 Total Planned Investment: R$ 223,20 million
3 NEW AIRPORT CARGO TERMINAL 4 AIRPORT TERMINAL EXPANSION Start: November,2010 Start: May,2011 Scheduled Conclusion: October,2012 Scheduled Conclusion: November,2011 Total Planned Investment: R$ 137,15 million Total Planned Investment: R$ 5,20 million
City:Recife Airport: Int. Gilberto Freire
FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 24,60 million
Operational Data 2010 2014 Airport Terminal (m²): 52.000 52.000 Airport Terminal Capacity (pax,year): 8,0 million 8,0 million Airport Passenger Demands,Year: 4,7 million 7,3 million
Airport Apron(m²): 132.000 132.000 City:Recife Airport: Int. Gilberto Freire
1 NEW AIRPORT CONTROL TOWER 2 NEW CONECTOR Scheduled Start: February,2012 Finished Scheduled Conclusion: December,2013 Total Planned Investment: R$ 6,13 million Total Planned Investment: R$ 18,47 million
City: Rio de Janeiro Airport: Int. Antônio Carlos Jobim
FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 697,30 million
Operational Data 2010 2014 Airport Terminal (m²): 150.000 150.000 Airport Terminal Capacity (pax,year): 17,4 million 44,03 million Airport Passenger Demands,Year: 12,3 million 18,7 million
Airport Apron(m²): 666.400 666.400 City: Rio de Janeiro Airport: Int. Antônio Carlos Jobim
1 AIRPORT TERMINAL 1 RENOVATION Scheduled Start: January, 2012 Scheduled Conclusion: July ,2013 Total Planned Investment: R$ 254,10 million
2 AIRPORT TERMINAL 2 RENOVATION
Start: November, 2008 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 316,53 million
3 RUNWAY AND APRON SISTEM 4 AIRPORT CARGO TERMINAL RENOVATION RENOVATION Start: September,2009 Scheduled Start: September,2011 Scheduled Conclusion: December,2011 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 23,24 million Total Planned Investment: R$ 103,43 million
City: Salvador Airport: Int. Luís Eduardo Magalhães
FIFA WORLD CUP 2014 Investiments 2010-2014 R$ 47,61million
Operational Data 2010 2014 Airport Terminal (m²): 69.750 69.750 Airport Terminal Capacity (pax,year): 12,96 million 12,96 million Airport Passenger Demands,Year: 7,69 million 10,28 million
Airport Apron(m²): 79.645 91.395 City: Salvador Airport: Int. Luís Eduardo Magalhães
PISTA of POUSO,ofCOLAGEM
1 AIRPORT TERMINAL RENOVATION AND 2 NEW AIRPORT CONTROL TOWER ADEQUACY AND APRON EXPANSION Scheduled Start: January,2012 Scheduled Start: March,2012 Scheduled Conclusion: November,2013 Scheduled Conclusion: July ,2013 Total Planned Investment: R$ 15,44 million Total Planned Investment: R$ 32,17 million
City: Guarulhos Airport: Int. Gov. André Franco Montoro
FIFA WORLD CUP2014 Investiments 2010-2014 R$ 1,229 Billion
Operational Data 2010 2014 Airport Terminal (m²): 175.000 290.000 Airport Terminal Capacity (pax,year): 24,97 million 52,74 million Airport Passenger Demands,Year: 26,8 million 38,91 million
Airport Apron(m²): 650.747,73 768.547,73 City: Guarulhos Airport: Int. Gov. André Franco Montoro
1 THIRD AIRPORT TERMINAL PROJECT Start: May,2011 Scheduled Conclusion: November,2012 Total Planned Investment: R$ 752,91 million
2 RUNWAY AND APRON SISTEM EXPANSION Start: May,2010 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 307,05 million
3 NEW TAXIWAY Scheduled Start: January,2012 Scheduled Conclusion: March,2013 Total Planned Investment: R$ 57,34 million
5 AIRPORT TERMINAL NEW EXPANSION - TEMPORARY 4 AIRPORT TERMINAL NEW EXPANSION - Scheduled Start: April,2012 TEMPORARY Scheduled Conclusion: December,2012 Start: July,2011 Total Planned Investment: R$ 23,20 Scheduled Conclusion: January,2012 million Total Planned Investment: R$ 86 million
City: Campinas Airport: Int. Viracopos
FIFA WORLD CUP2014 Investiments 2009-2013 R$ 804,10 million
Operational Data 2009 2014 Airport Terminal (m²): 25.215 25.215 Airport Terminal Capacity (pax,year): 6,8 million 17,26 million Airport Passenger Demands,Year: 5,4 million 9,53 million City: Campinas Airport: Int. Viracopos
1 AIRPORT TERMINAL NEW EXPANSION - TEMPORARY Start: October,2010 Scheduled Conclusion: August,2011 Total Planned Investment: R$ 7,0 million
2 AIRPORT TERMINAL ADEQUACY Scheduled Start: July,2012 Scheduled Conclusion: October,2013 Total Planned Investment: R$ 48,06 million
3 NEW AIRPORT TERMINAL AND APRON Scheduled Start: June,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 664,61 million
4 SECOND RUNWAY 5 TAXIWAYS WITH FILLETS FOR A380 ADAPTATION , AIRPORT Start: June,2011 CARGO TERMINAL EXPANSION, NEW APRON AND RUNWAY Scheduled Conclusion: May,2012 RESURFACING Total Planned Investment: R$ 5,0 million Scheduled Start: February,2012 Scheduled Conclusion: December,2013 Total Planned Investment: R$ 79,43 million
Thank You!
Eng. Márcio Eduardo Rodrigues Kuntz
INFRAERO Superintendence of Works [email protected]
(55 61) 3312-2568