FORM.1

FOR

HERBAL EXTRACTION PLANT

AT

ETHEREAL AROMATICS KHASRA NO. 107 K INDUSTRIAL AREA, TEHSIL NARENDRA NAGAR DISTRICT TEHRI GARHWAL (U.K) Form-I

APPENDIX I (See paragraPh-6) FORM 1 (11 Basic Information

S.No Item Details HerDat t. Name of the Project/ s Proposed new lndustry ol :xtiaction to produce natural health products by processing of sprces and herbs by Ethereal Aromatics Khasra No. 1O7 K Industrial Area, Dhalwala Tehsil Narendranagar, District Tehri Garhwal producrs unocr 2^ S. No. the schedule Herbal Extractlon Orange category of Notification S.O. 102 (tr) Dated 1"t Februarv 1989. :t 3. Proposed CaPacilY I areal PROPOSED PRODUCT length/tonnage to be handled/ ffi command area/ lease area/ Natural Health t8 MT/Month number of wells to be drilled product (Concentrate Svrup / Product)

4. Raw Materials As per Annexure Atlached 5. r@ New

"Orange" 6. Category of Project i.e. A or B tle.trat Bt traction under category as Per Doon ValleY Nnf ilica tion 1989. 8. Does it attract the general N.A condition? if ves, Please sPecify' 9. boes it attract the sPecific NA condirion? Il Yes, Please specif) to. Location lnduslrial Area, Dhalwala

Plot/ Su.vey / K hasr 107-A I-)holrxrpla Villa ge Tehsi I Narendra nagar District T"h.i G"tl't*"1 Slare I lt tarakhand S1C!9" 11. Nearest railwaY statrenl44lelt Railway 15. QLI\4)

M/S ETHEREAL AROMATICS

- Form-l along with distance in kms. Airport Jolly Grant ( 1 2 .0 K. M) 12. Nearest Town, City, District Rishikesh - 01 K.M Headquarters along with District He adquarte r- Dehradun (25 distance in kms. K.M} 13. Village Panch a.yaIs, Zllla As above Parishad. municipal Corporation, Local body ( complete postal Addresses with telephone nos. to be given) 74. Name of the applicant Dr. Krishna 15. Registered Address Mint House Khuni Pull, Begum Bridge Road N{ssiq(u BL_- 16. Address for correspondence: As above Name Or. Sul K ri"l' n. Designation Partner (Owner/ Partner/ C EO) Address As above Pin Code 250001 E- mail [email protected] Telephone No. o12I-2665306 Fax No. 1.7. Details of Alternative Site Present site only examined, if any location of these sites should be shou.n on a topo sheet. 18. Interlinked Projects NA 19. Whether separate application of N.A interlinked project has been submitted 20. If yes, date of submission N.A 21.. if no, reason N.A

22. Whether the proposal involves N.A approval / clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation Act, 1980 (b) The Wildlife (ProtectionO Act, 1972 (c) The C.R.Z notification, 1991 a2 Whether there is any Yes, Doon Valley Notification 1989 Government Order/ Policy relevant / relating to the site

M/S ETH EREA L AROMATIC,' Form-l

24. Forest land involved (hectares) N.A 'R Whether there is any litigation N.A pending against the project and f or land in which the project is proposes to be set up

ia) Name of the Couft

tbl No.

(c) Orders/ direction of the Court, if any and its relevance with the proposed proiect. Contact Information

Screening Category Capttcity corresponding to sectoral actiuitg {sueh, as prod.uction capacitA for mctnufachtring, mining lease cLrea and production capacitA mineral production, area mineral exploration, ,. 'length for for for linear transport infrastntcture, generation capacitg for potl)er generation etc. (II] Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.

S.No Information/ Checklist Yes/No confirmation 1.1 Permanent or temporary No The facility shall be established on change in land use, land a plot area 1245.35 sq.mt and cover or topography covered area shall be 560.61 sq. incJuding increase in mt. The site of plant is located rn intensity of land use (with industrial area of Dhalwala. respect to local land use plan) 1C Clearance of existing 1and, No No clearance of gxisting land & vegetation and buildings? vegetation is required. Civil structure is established since 1986. 1.3 Creation of new land No Proposed site will be used for uses? He rbal Extraction Plant. 1.4 Pre-construction No N.R investigations e.g. bore houses, soil testine?

M/S ETHEREAL AROMATICS 1.5 Construction works? No Civil structure established since 1986. 1.6 Demolition works? No N-A. r.7 Temporary sites used for No N.A construction works or housing of construction workers? 1.8 Above ground buildings, No N.A structiires or land fill or excavations 1.9 Underground works No N.A including mining or tunnelinq? 1. 10 Reclamation works? No N.A 1.11 Dredsine? No N.A 1.12 Offshore structures? No N.A 1. 13 Production and Yes Manufacturing Flow Chart manufacturing processes? annexed herewith. 1^14 Facilities for storage of Yes General ware house shall be goods or materials? maintained as an unclassified zone. 1.15 Facilities for treatinent or Yes No effluent will be generated from disposal of solid waste or the process, all the water from liquid effluents Aqueous Alcohol extraction will recycled back and steam condensate will recycled back to Boiler. Waste water generated from floor washing & Cooling Tower bleed treated through trTP and will be used for gree n-Belt irrigation. Domestic effluent is directly subjected to Septic Tank I Soakaee Pit. 7.76 Facilities for long term No The operation workers shall come housing of operational from nearby areas. workers? Hence housing provision will not

be provided at site .

1.17 New road, rail or sea No N.A I traffic during construction or operation? 1.18 New road, rail, alr No N.A waterborne or other transport infrastructure including new or altered routes and stations,

M/S ETHEREAL AROMATICS Form-I ports, airports etc? 1.19 Ciosure or diversion ol No N.A existing transport routes No closure or diversion of existing or infrastructure leadirrg of transport to changes routes or in traffic infrastructure leading to changes movements? in traffic movements. 1"24 New or diverted No N,A transmission lines or pipelines? 7.21 Impoundment, damming, No N.A culver ting, realignment or other changes ro the hydrology of watercourses or aquifers? qqgqm 1.22 crossings? No N.A 1 a') Abstraction or transfers Yes of lnrtrally f resh wate r de mand will water form ground or be 5.0 KLD, and recvcled water surface waters? will be 1.0 KLD. Net water required for production of Syrup / Powder will be 1,25 KLD, which will be met from Bore,well. 1.24 Changes in | water bodies No No, as plant will operate on zero lor the land surface discharge, hence no change in affecring ] drainage or run- water bodies or the land surfaces. off.: 1.25 Transport of personnel or No The workers and staff shall come materials for to work by their own means. construction, operation or dec ommi s sio ning? 1.26 Long-term dismantling or No Not required, Civil structure iJ decommissioning or already installed since 1986. restoration works? r.27 Ongoing activity during No decommissioning which could have an impact on the environment? r.28 Influx of people to an area No Influx of people in an area shali be in either temporarily or temporary as workers shall work permanently? crurtng day tlme. , r.29 Introduction of alien No N.A speqies? 1.30 Loss of native species or No N.A genetic diversity? 1.31 Anv other actions? No -

M/S ETHEREAL AROMATICS

- Form-1

2, Use of natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non - renewable or in short supplyl:

s.N Information/ checklist Yes/ No o. confirmation 2.1 Land especially Yes Proposed site will be used as undeveloped or Herbal Extraction unit. agricultural land (ha) 2.2 Water (expected source & Yes Totai water requirement for competing users) unit: KLD industrial purpose will be 5.0 KLD, which will be met through Bore- well. Minerals(MT) No N.A 2.4 Construction material - No N.A stone, aggregates, and / soil (expected source-MT) 2.5 Forests and timber (source No N.A _MT) 2.6 Energr including electricity Yes The total Power requirement shall and fuels (source, be 300 H.P met from competing users) unit: fue 1 power Corporation Ltd. One Boiler (MT), energy (MW) of 1 .5 TPH capacity will be installed with 20 meter stack and wet scrubber. The 150 KVA capacity D.G. Set wili be installed with acoustic enclosure and suitable stack height as standby power arrangements. a7 Any other natural No N.A resources (use appropriate standard units)

Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Information/ checklist Yes/ No Details thereof (with approximate confirmation quantities / rates, wherever possible) with source of information date Use of substances or During Aqueous -Alco holic materials. which are extraction Drocess some

M/S ETHEREAL AROMATICS Form-l

hazardous (as per MSIHC Methanol, Acetone, Ethyl Acetate rules) to human health or and Isopropanol Alcohol will be the environment (flora, used. All the above will be recycled fauna, and water after recovering through supplies) evaporation and condensation process. Little quantity will be lost during process due to self evaporation characteristics of the above solvent. MSDS of all major rau. materials are provided. Changes in occurrence of No No effect envisaged. disease or aflecl disease vectors (e.g. insect or water borne diseases) O1 Affect the welfare of No Additional employment opportunitl, people e.g. by changing will have positive impact on the living conditions? welfare of locai peopie. Rise in living standards and improve infrastructure facilities are predicable. 3.4 Vulnerable groups of No N.A people u'ho could be alfected by the project e.g. hospital patients, children, the elderly etc. Anv other causes None N.A

b. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No Information/ checklist Yes/No Details thereof (with approximate confirmation quantities / rates, wherever possiblef with source of information date 4.1 Spoil, overburden or No N.A mine wastes 4.2 Municipal waste Yes Municipal solid waste will not (dome stic and or generated as the plant will not have commercial wastes) ltlgle srdq n trg! qolo41for workers. 4.3 Hazardous wastes (as per No ApproximaLely 50 liters pe. annum 1 Hazardous Waste ol hazardous waste generated in the Management rules) lorm ol Spent oil from D.C. Ser shall be disposed r hrough reqistered recvcler- 4.4 Other industrial process No Nil waste

M/S ETHER EAL AROMATIC,g Form- I

4.5 Surplus product No Ni1 4.6 Sewage sludge or other Yes No sewage sludge shall be sludge from effluent generated. treatmerrt 4"7 Construction or No N.A demolition wastes 4.4 Redundant machinery or No N.A equipment 49 Contaminated soils or No N.A other materials 4.10 Asricultural wastes No N.A 4.II Other solid wastes Yes N.A

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

s.N Information/ checklist Yes/ No Details thereof {with approximate o. conlirmation quantities f rates, wherever possible) with source of information date 5.1 Emission form Yes One boiler of capacity 1 5 TPH combustion of fossil fuels using wood residue after herbal from stationary or mobile extraction as fuel is proposed for SOLITCES which proper stack height wrth Wet scrubber shali be installed. One 150 KVA capacity D.G. Set will also be installed u'ith acoustic enclosure in case ol power failure.

5.2 Emissions from No There u'ill be no emission takes production processes place from the proposed productron process.

tra Emission from materials No A11 the material will be kept in safe handling including storage, properly handled and storage or transport transported carefullv. 5.4 Emission from No The entire operation will be done in construction activities proper ventilated sulroundings. including plant and equipment tr< Dust or odors from Yes Dust will be generated from handling of materials jnstallation of mach ineries. ver1 including construction less civil construction will be material, sewage and required, as structure is already waste. provided.

M/S ETH E REAL AROMAT IC'S Frtrm-l

5"6 Emissions from No Nii incineration of waste Emissions from burning No No such activity is proposed. of waste in open air (e.g. slash materials, construction debris) 5.8 Emission from any other No N.A. SOUTCCS

6. Generation of Noise and Vibration, and Emissions of Light and Heat :

s. Information/ checklist Yes/N Details thereof (with approximate No. confirmation o quantities /rates, wherever possible) with source of information date 6.1. From operation of No Noise level outside the plant will gquipment e.g. engines, range between 50-55 db. ventilation plant, crushers 6.2 From industrial or similar No processes Noise will not be generated. 6.3 From construction or No demolition Only installation of machineries required construction activity. So not much noise will be generated. 6.4 From blasting or piling No N,A. 6.5 From construction or Yes N.A. operational traffic 6.6 From lighting or cooling No N.A. systems 6.7 From anv other sources No N.A.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers surface waters, groundwater, coastal waters or the sea: s.N Information/ checklist Yes/ No Details thereof (witfr approximate o. confirmation quantities / rates, wherever possible) with source of information date 7.1 From handling storage, No The solvent will be handled use or spillage of systematically. Since the use of hazardous materials these solvents is confined and the risk due to the same also during

M/S ETHEREAL AROMATICS Form-l

con senr ren.Fs rrrill l-,^ li*;+-,r 7.2 From discharge of sewage Yes l\o ellluenl will be generated lrom or other effluents to water the production process. or the land (expected Domestic effluent is subjectecl to mode and place of Septic tank and Soakage pit. discharge) 7.3 By deposition of No pollutants @no emitted to air water discharged outside, and the into the land or into water chances of emission of pollutants are also negligible as boiler / D.G. Set shall be equipped with ApCS.

7.4 From any other sources No 7.5 Is there a risk of lorrg No No ellect rs envisaged. term build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation ofthe project; which could affect human health or the environment

s.N Information/ checklist Yes/No Details thereof (with approximate o. confirmation quantities /rates, wherever possiblef with source of il&r4e!&l- le!g_ 8.1 From explosions, Yes As per the rule of fire safety, Fire spillages, fires etc from extinguishers will be placed at storage, handling. use or various locations. Fire hazard will be production of hazardous controlled using suitable substances arrangements to avoid any spillage, exp&!l!n e1l. _ 8.2 From any other causes No N.A. 8.3 Could the project be Yes -h-rra faf ls under ron" lV-ol rh. affected by natural seismic scale and is prone to disasters causing earthquake. The design of the environmental damage building is earthquake resistant to (e.g. floods, earthquakes, avoid any environmental damage landslides, cloudburst due to naturai disasters. etc)?

9. Factors which shourd be considered (such as consequentiar development) which courd read to environmentar effects or the potential for cumulative impacts with other existing or planned activities in the locality

M/S ETHE REAL AROMATIC.S Form- I

s.N Information/ checklist Yes/No Details thereof (with approximate o. confirmation quantities /rates, wherever possible) with source of information date 9.r Lead to development of The project would have positive supporting facilities, impact as de velopments ancilla such 11 developme nt or improve development stimulated inlrastructure facilities and by the project u'hich could standard of living of the area and have impact on the the peopie involved. Hence overall environment e.g.: development of the whole area is r Supporting Yes predictable. infrastructure (roads, power supply, waste or waste water treatment, Yes etc.) No housing development No extractive industries No supply industries other 9.2 Lead to after-use of the No N.A. site, which could have an impact on the environment 9.3 Set a precedent for later Yes Green belt area will be de velope d developments and it will give a better aesthetic vief{ gI_19n! end building. 9.4 Have cumulative effects No Green cover will be pianted to due to proximity ro other reduce noise as well as other existing or planned background pollution level. projects with similar effec ts

3. Environmental Sensitivity s. Areas Name/ Aerial distance (within No. Identit 1SKm.) Proposed project v location boundary. 1 Areas protected under Yes Doon Valley Not jlication 1989 international conventions, national or loca I legislation for their ecological, landscape, cultural or other related value

M/S ETHEREAL AROMATICS Form-l

2 Areas which are important No None or sensitive for ecological reasons -Wetlands watercourses or other water bodies, coastal zotle, biospheres. mounta ins, forests 3 Areas used by protected, No Rajaji National park- 3.5 K.M important or sensitive species of flora of fauna for breeding. ncsring, foraging. resting. over winl ering. migration 4 Inland, coastal, marine or No Ganga River- 3.5 K.M underground waters 5 State, National boundaries No 35 K.M Himachal Pradesh 60 K.M 6 Routes or Facilities used by Yes N.H. 72 - 15.O K.M the public for access to Railway station - 5.2 K.M recreation or other tourist Bus Stand - 3.5 K.M. pilgrim areas 7 Defence installations. No IMA - 35 K.M 8 Densely populated or built- Yes Rishikesh Town - 1.5 K.M. up area 9 Areas occupied by sensitive Yes Temple 3.5 K.M man made land uses (hospitals schools places of worship, community facilities) 10 Areas containing important, No Ganga River - 3.5 K.M. high quality or scarce resources (ground wate r resources surlace resources, forestry, agricullure. lis h eries, tourism, minerals.) 11 Areas already subjected to No N.A. pollution or environmental damage. (those where existing legal environmental standards are exceeded)

M/S ETHEREAL AROMATICS Form-1

L2 Areas susceptible to natural No Project site falls in Industrial hazard which could cause area, Dhalwala, District Tehri the project or present Garhwal under zone IV and is environmental problems prone to earthquake. The (earthquakes, subsidence, design of I he building is landslides, erosion, flooding earthquake resistant to avoid or extreme or adverse any environmental damage climatic conditions) due to natural disaster.

(IVf . Proposed Terms of Reference for EIA studies Unit is proposed to manufacture Herbal extraction syrup / Powder under Orange Category of Doon Valley Notification S.O. 1O2 (El Dated lst February 1989 due to:-

. Manufacturing of Herbal extraction products under Orange Category of Doon Valley Notification S.O. 1O2 (E) Dated 1st ,. February 1989 . Man power- 25 . Installation ofDG Sets of 15O KVA . Installation of Boiler (One no. of 1.5 TPH using wood residue after herbal extraction as fuel) "I hereby given undertaking that the data and information given in the application and enclosures are true to best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost"

Date:- 12.O1.2O16 Place: Dehradun \"v '-5-t'

(Dr. Bal Krishna)

(Partner) Ethereal Aromatics Khasra no. 1O7 A, Industrial Area, Dhalwala Tehri Garhwal(UKf

M/S ETHEREAL AROMATICS