Alcohol and Tobacco Tax and Trade Bureau, Treasury § 9.111

Total Page:16

File Type:pdf, Size:1020Kb

Alcohol and Tobacco Tax and Trade Bureau, Treasury § 9.111 Alcohol and Tobacco Tax and Trade Bureau, Treasury § 9.111 (xiv) Then following the 1600-foot (3) Apple Grove, Ohio—W. Va., dated contour line generally northward to an 1968, photorevised 1975; unimproved road. (4) Glenwood, W. Va.—Ohio, dated (xv) Then looping southward along 1968; the unimproved road and continuing (5) Milton, W. Va., dated 1972; eastward past the designated ‘‘Spring’’ (6) West Hamlin, W. Va., dated 1957; and then northward parallel with Bo- (7) Hamlin, W. Va., dated 1958; nanza Gulch to the Vineyard School on (8) Garrets Bend, W. Va., dated 1958; Cienega Road (on the Hollister map). (9) Scott Depot, W. Va., dated 1958; (xvi) From there in a straight line (10) Saint Albans, W. Va., dated 1958; northeastward, crossing Bird Creek and (11) Pocatalico, W. Va., dated 1958; the San Benito River, to the north- (12) Sissonville, W. Va., dated 1958; western corner of Section 19, Township 13 South, Range 6 East (on the Tres (13) Romance, W. Va.,—Ky., dated Pinos map). 1957; (xvii) From there following the (14) Kentuck, W. Va., dated 1957; northern border of Sections 19 and 20, (15) Kenna, W. Va., dated 1957; Township 13 South, Range 6 East, to (16) Ripley, W. Va., dated 1960; the northeastern corner of Section 20. (17) Cottageville, W. Va., dated 1960; (xviii) From there in a straight line (18) Mount Alto, W. Va.—Ohio, dated due eastward to the Range line R.6E./ 1958, photorevised 1972; R7E. (19) Beech Hill, W. Va.—Ohio, dated (xix) Then southward along that 1957, photorevised 1975; Range line to the Township line T.13S./ (20) Cheshire, W. Va.—Ohio, dated T.14S. 1968; (xx) Then eastward along that Town- (c) Boundary description. The bound- ship line to the eastern border of Sec- ary description of the Kanawha River tion 6, Township 14 South, Range 7 Valley viticultural area includes (in East (on the Quien Sabe Valley map). parentheses) the name of the map on (xxi) Then southward along the east- which each described point is found. ern border of Sections 6, 7, and 18, The boundary description is as follows: Township 14 South, Range 7 East, to (1) The beginning point is the West the northern border of Section 20, Virginia-Ohio State Line at the con- Township 14 South, Range 7 East (on fluence of Champaign Creek and the the Cherry Peak map). Ohio River. (Addison quadrangle) (xxii) Then eastward along that (2) The boundary follows the West northern border to the eastern border Virginia-Ohio State Line, in the Ohio of Section 20. River (across the Gallipolis and Apple (xxiii) Then southward along the Grove quadrangles) southwesterly to eastern border of Sections 20, 29, and the point at which the Mason County- 32, Township 14 South, Range 7 East, Cabell County Line intersects the and continuing southward along the State Line. (Glenwood quadrangle) eastern border of Sections 5, 8, and 17, (3) The boundary proceeds in a Township 15 South, Range 7 East, to straight line southerly to the bench- the starting point. mark at 583 ft. elevation in the town of [T.D. ATF–258, 52 FR 37137, Oct. 5, 1987] Yates Crossing in Cabell County, WV. (Milton quadrangle) § 9.111 Kanawha River Valley. (4) The boundary proceeds in a (a) Name. The name of the straight line southeasterly to the viticultural area described in this sec- benchmark at 640 ft. elevation in the tion is ‘‘Kanawha River Valley’’. town of Balls Gap, in Lincoln County, (b) Approved maps. The approved WV. (West Hamlin quadrangle) maps for determining the boundary of (5) The boundary proceeds in a the Kanawha River Valley viticultural straight line easterly (across the Ham- area are 20 U.S.G.S. topographic maps lin, Garrett Bend, and Scott Depot in the 7.5-Minute series as follows: quadrangles) to the benchmark at 590 (1) Addison, Ohio—W. Va., dated 1960; ft. elevation in the town of Institute in (2) Gallipolis, Ohio—W. Va., dated Kanawha County, WV. (Saint Albans 1958; quadrangle) 201 VerDate Sep<11>2014 10:14 May 12, 2016 Jkt 238111 PO 00000 Frm 00211 Fmt 8010 Sfmt 8010 Y:\SGML\238111.XXX 238111 Lhorne on DSK30JT082PROD with CFR § 9.112 27 CFR Ch. I (4–1–16 Edition) (6) The boundary proceeds in a (2) Boundary Description. (i) South- straight line northeasterly to the westward along the Arkansas River to benchmark at 654 ft. elevation in the Vache Grasse Creek. town of Pocatalico, in Kanawha Coun- (ii) Then southeastward and south- ty, WV. (Pocatalico quadrangle) westward following Vache Grasse (7) The boundary proceeds in a Creek to the place where it is crossed straight line northeasterly (across the by Arkansas Highway 10, near Green- Sissonville quadrangle) to the con- wood, Arkansas. fluence of Johns Branch and Sugar (iii) From there westward along Creek in the town of Romance, in Highway 10 to U.S. Highway 71. (Note: Jackson County, WV. (Romance quad- Highway 10 is the primary highway rangle) leading to Greenwood to Hackett, Ar- (8) The boundary proceeds in a kansas.) straight line northwesterly (across the (iv) Then southward and eastward Kentuck quadrangle) to the confluence along Highway 71 until it crosses Rock of Plum Orchard Run and Stonelick Creek. Creek in the town of Plum Orchard, in (v) Then northeastward along Rock Jackson County, WV. (Kenna quad- Creek to Petit Jean Creek. rangle) (vi) Then generally northeastward (9) The boundary proceeds in a and eastward along Petit Jean Creek straight line northwesterly (across the until it becomes the Petit Jean River Ripley quadrangle) to the Baltimore (on the Russellville map). and Ohio Railroad crossing of State (vii) Then generally eastward along Highway 87 in the town of Evans, in the Petit Jean River, flowing through Jackson County, WV. (Cottageville Blue Mountain Lake, until the Petit quadrangle) Jean River joins the Arkansas River. (10) The boundary proceeds in a (viii) Then generally eastward along straight line northwesterly (across the the Arkansas River to Cadron Creek. Mount Alto quadrangle) to the bench- (ix) Then generally northward and mark at 674 ft. elevation in the town of northeastward along Cadron Creek to Flatrock, in Mason County, WV. the place where it is crossed by U.S. (Beech Hill quadrangle) Highway 65. (11) The boundary proceeds north- (x) From there northward along westerly in a straight line (across the Highway 65 to its intersection with Ar- Cheshire quadrangle) to the beginning kansas Highway 16 near Clinton, Ar- point. kansas. [T.D. ATF–226, 51 FR 11913, Apr. 8, 1986] (xi) From there following Highway 16 generally westward to its intersection § 9.112 Arkansas Mountain. with Arkansas Highway 23 in (a) Name. The name of the Brashears, Arkansas. viticultural area described in this sec- (xii) From there southward along tion is ‘‘Arkansas Mountain.’’ Highway 23 to the Madison County- (b) Approved maps. The appropriate Franklin County line. maps for determining the boundary of (xiii) Then westward and southward the Arkansas Mountain viticultural along that county line to the Madison area are two U.S.G.S. maps, titled: County-Crawford County line. (1) Russellville, Arkansas, 1:250,000 (xiv) Then westward along that coun- series compiled in 1954. ty line to the Washington County- (2) Fort Smith, Arkansas-Oklahoma, Crawford County line. 1:250,000 series, 1978. (xv) Then westward along that coun- (c) Boundary—(1) General. The Arkan- ty line to Jones Fork (on the Fort sas Mountain viticultural area is lo- Smith map). cated in northwestern Arkansas. Start- (xvi) Then southward along Jones ing at the point where Frog Bayou con- Fork until it joins Frog Bayou near verges with the Arkansas River, near Winfrey, Arkansas. Yoestown, Arkansas (or the Fort Smith (xvii) Then generally southward map), the boundary proceeds: along Frog Bayou, flowing through 202 VerDate Sep<11>2014 10:14 May 12, 2016 Jkt 238111 PO 00000 Frm 00212 Fmt 8010 Sfmt 8010 Y:\SGML\238111.XXX 238111 Lhorne on DSK30JT082PROD with CFR.
Recommended publications
  • Official Statement Dated October 20, 2015
    OFFICIAL STATEMENT DATED OCTOBER 20, 2015 NEW ISSUE BOOK-ENTRY ONLY In the opinion of Bond Counsel, under existing law, assuming compliance with certain covenants described herein, (i) interest on the Series 2015 Bonds is excluded from gross income for federal income tax purposes; (ii) interest on the Series 2015 Bonds is not an item of tax preference for purposes of the federal alternative minimum tax imposed on individuals and corporations, (iii) with respect to corporations, interest on the Series 2015 Bonds will be taken into account in determining adjusted current earnings for the purpose of computing the federal alternative minimum tax of corporations and the federal environmental tax, (iv) the Series 2015 Bonds are "qualified tax-exempt obligations" within the meaning of Section 265(b)(3) of the Internal Revenue Code of 1986; (v) interest on the Series 2015 Bonds is exempt from State of Arkansas income tax, and (vi) the Series 2015 Bonds are not subject to property taxes in the State of Arkansas. (See TAX EXEMPTION - Opinion of Bond Counsel). $2,000,000 BOARD OF TRUSTEES OF ARKANSAS TECH UNIVERSITY STUDENT FEE REVENUE IMPROVEMENT BONDS SERIES 2015 Dated: November 1, 2015 Due: November 1, as shown below Interest on the Series 2015 Bonds (the "Series 2015 Bonds") will be payable on May 1 and November 1 of each year, commencing May 1, 2016. Interest will be paid by check or draft of the Trustee, Bank of the Ozarks, Little Rock, Arkansas, by mail to the person reflected as registered owner on the registration book maintained by Trustee, as bond registrar, on the 15th day of the month preceding the interest payment date.
    [Show full text]
  • Arkansas Game and Fish Commission Code Book
    As of December 8, 2020 Arkansas Game and Fish Commission Code Book The regulations in this Code Book are hereby adopted by the Arkansas State Game and Fish Commission under authority of Amendment 35 to the Constitution of the State of Arkansas. All laws, rules, regulations, or orders in conflict with the regulations in this Code Book are hereby repealed by the Arkansas State Game and Fish Commission. 1 As of December 8, 2020 20.00 Wildlife Management Area General Regulations 20.01 Killing Or Capturing Devices Prohibited On WMAs 20.02 Firearm Restrictions On WMAs 20.03 Loaded Firearms Prohibited In Camping Areas On All WMAs 20.04 Cutting Devices And Chemicals Prohibited On WMAs 20.05 Baiting Or Hunting Over Baited Portions Of WMAs Prohibited 20.06 Structures And Personal Property On WMAs 20.07 Permit Requirements On Certain WMAs 20.08 RESERVED 20.09 Killing Or Capture Devices And Dogs Prohibited 20.10 Hunting From Roads Prohibited On WMAs 20.11 Deer Hunting Prohibited During Flooding On Certain WMAs 20.12 Mobility-Impaired Access Permit Restrictions On Commission-Owned WMAs 20.13 Dog Training Restrictions On Camp Robinson Special Use Area 20.14 Compliance With Camp Robinson WMA And Fort Chaffee WMA Military Post Regulations Required 20.15 Hunting From Motorized Land Vehicles Prohibited On WMAs 20.16 Compliance With Terms Of Permit Hunts On WMAs Required 20.17 Season Restrictions During Permit Hunts On WMAs 20.18 Camping Restrictions On WMAs During Permit Hunts 20.19 Vehicle Restrictions On WMAs 20.20 Horse And Mule Restrictions On Certain WMAs 20.21 Hunting And Camping Prohibited On Electric Island WMA And Lake Maumelle 20.22 Use Or Possession Of Alcohol Or Illegal Controlled Substances Prohibited On Commission- Controlled WMAs 20.23 RESERVED 20.24 Feral Hog Restrictions On WMAs 20.25 Restrictions On All Natural Area WMAs 20.26 RESERVED 20.27 Boating Restrictions On Certain WMAs and NWRs 20.01 Killing Or Capturing Devices Prohibited On WMAs It is unlawful to hunt, trap, or possess a killing or capturing device on any WMA.
    [Show full text]
  • Little Rock Engineer's Club
    Mark Headley District 6 Engineer Little Rock Engineer’s Club Monday, December 16, 2019 Statewide Program Updates 2 Interstate Rehabilitation Program Completed Number of Projects: 47 Miles: 291 Amount (Millions): $1,027 Interstate Rehabilitation Program Under Construction Number of Projects: 5 Miles: 53 Amount (Millions): $287 Let To Contract Number of Projects: 52 Miles: 344 Amount (Millions): $1,314 Interstate Rehabilitation Program Scheduled Number of Projects: 27 Miles: 160 Amount (Millions): $219 Total Program Number of Projects: 79 Miles: 504 Amount (Millions): $1,533 Connecting Arkansas Program $175 Million Scheduled $533 Million $1.26 Billion Completed Under Construction Local Updates 7 Big Rock Interchange Completed 3 Projects $120 Million 30 Crossing Scheduled 1 Project 7 Miles Estimated $500-600 Million Interstate 30 Under Construction 6 Miles $187 Million Interstate 630 Under Construction 1 Project 2 Miles $87 Million U.S. Highway 67 Completed 1 Project 1 Interchange $26 Million Scheduled 1 Project 2 Interchanges Estimated $30-40 Million U.S. Highway 67 Completed 4 Projects 8.4 Miles $137 Million Scheduled 1 Project 2 Miles Estimated $75-100 Million U.S. Highway 70 Completed 18 Miles $79 Million Arkansas Highway 10 Completed Scheduled Programmed 1 Project 1 Project 1 Project 0 Miles 2 Miles 1 Miles $23 Million Estimated $15-20 Million Estimated $50-75 Million Interstate 40 Completed 1 Project $15 Million Arkansas Highway 9 Completed 17 Miles $9 Million Arkansas Highway 5 Under Construction 2 Miles $17 Million Arkansas Highway 5 Scheduled 1 Mile Estimated $5-10 Million Arkansas Highway 5 Completed Scheduled Programmed 3 Projects 2 Projects 1 Project 26 Miles 18 Miles 1 Mile $9 Million Estimated $15 Million Estimated $10-15 Million Bridge Replacement – Pulaski Co.
    [Show full text]
  • Alcohol and Tobacco Tax and Trade Bureau, Treasury § 9.109
    Alcohol and Tobacco Tax and Trade Bureau, Treasury § 9.109 (2) Boundary Description. (i) The until it becomes the Petit Jean River boundary proceeds from the starting (on the Russellville map); point westward along the Missouri (xiv) Then generally eastward along River until it meets the Osage River; the Petit Jean River, flowing through (ii) Then further westward along the Blue Mountain Lake, until the Petit Osage River (flowing through Lake of Jean River joins the Arkansas River; the Ozarks and the Harry S. Truman (xv) Then generally eastward along Reservoir) until it passes adjacent to the Arkansas River to Cadron Creek; Missouri Highway 82 in Osceola, Mis- (xvi) Then northeastward and east- souri (on the Jefferson City map); ward along Cadron Creek, for about 21⁄2 (iii) Then southwestward along Mis- miles, until it pases under U.S. High- souri Highway 82 until it intersects way 64, approximately 31⁄2 miles west of U.S. Highway 54 in Eldorado Springs, Conway, Arkansas; Missouri (on the Joplin map); (xvii) Then eastward along U.S. High- (iv) Then westward along U.S. High- way 64 until it intersects U.S. Highway way 54 until it intersects U.S. Highway 67, near Beebe, Arkansas (on the Mem- 71 near Nevada, Missouri; phis map); (xviii) Then northeastward along (v) Then southward along U.S. High- U.S. Highway 67 into the state of Mis- way 71 until it intersects Interstate souri, then northward until U.S. High- Highway 44, approximately 5 miles way 67 intersects U.S. Highway 60, in south of Carthage, Missouri; Poplar Bluff, Missouri (on the Poplar (vi) Then westward and southwest- Bluff map); ward along Interstate Highway 44 into (xix) Then eastward along U.S.
    [Show full text]
  • Arkansas Hunting Guidebook
    2015-16 Arkansas Hunting Guidebook Pick up an AGFC conservation license plate at your local revenue office. Learn more atwww.agfc.com. WHEN THE OUTDOORS IS YOUR FIRST PRIORITY, TRUST THE EXPERTS Bass Pro Shops® has all the hunting and fishing equipment you’ll ever need. TRACKER® Boats are the world’s #1-selling boats because outdoorsmen trust us to get them where they’re going smoothly and efficiently. We’re the friendly experts who understand the outdoors, inside and out, because having fun outdoors is why we’re here. Combined, we’ve been serving outdoorsmen for over 75 years… and the best is yet to come. ROAM FREE AT BASSPRO.COM or TRACKERBOATS.COM facebook.com/bassproshops twitter.com/bass_pro_shops 1 Bass Pro Dr. Little Rock, AR 72210 (501) 954-4500 TR151605 Arkansas Game and Fish Commission Main Office Contact Information 2 Natural Resources Drive • Little Rock, Arkansas 72205 501-223-6300 • 800-364-4263 • www.agfc.com Important Numbers Regional Office Contact Information Stop Poaching Hotline WMA Region 1 • Northeast Office Toll-free: 800-482-9262 600-B East Lawson • Jonesboro, AR 72404 Toll-free: 877-972-5438 #TIP (#847) for AT&T users (charges apply) 24 hours a day, 7 days a week WMA Region 2 • East Central Office Text a Tip (TIP411) 1201 North Highway 49 • Brinkley, AR 72021 Text AGFC and your tip to TIP411 (847411) Toll-free: 877-734-4581 Texts are completely anonymous WMA Region 3 • Southeast Office Game Checking 771 Jordan Drive • Monticello, AR 71655 Toll-free: 866-305-0808 Toll-free: 877-367-3559 24 hours a day, 7 days a
    [Show full text]
  • 27 CFR Ch. I (4–1–16 Edition)
    § 9.112 27 CFR Ch. I (4–1–16 Edition) (6) The boundary proceeds in a (2) Boundary Description. (i) South- straight line northeasterly to the westward along the Arkansas River to benchmark at 654 ft. elevation in the Vache Grasse Creek. town of Pocatalico, in Kanawha Coun- (ii) Then southeastward and south- ty, WV. (Pocatalico quadrangle) westward following Vache Grasse (7) The boundary proceeds in a Creek to the place where it is crossed straight line northeasterly (across the by Arkansas Highway 10, near Green- Sissonville quadrangle) to the con- wood, Arkansas. fluence of Johns Branch and Sugar (iii) From there westward along Creek in the town of Romance, in Highway 10 to U.S. Highway 71. (Note: Jackson County, WV. (Romance quad- Highway 10 is the primary highway rangle) leading to Greenwood to Hackett, Ar- (8) The boundary proceeds in a kansas.) straight line northwesterly (across the (iv) Then southward and eastward Kentuck quadrangle) to the confluence along Highway 71 until it crosses Rock of Plum Orchard Run and Stonelick Creek. Creek in the town of Plum Orchard, in (v) Then northeastward along Rock Jackson County, WV. (Kenna quad- Creek to Petit Jean Creek. rangle) (vi) Then generally northeastward (9) The boundary proceeds in a and eastward along Petit Jean Creek straight line northwesterly (across the until it becomes the Petit Jean River Ripley quadrangle) to the Baltimore (on the Russellville map). and Ohio Railroad crossing of State (vii) Then generally eastward along Highway 87 in the town of Evans, in the Petit Jean River, flowing through Jackson County, WV.
    [Show full text]
  • 27 CFR Ch. I (4–1–13 Edition) § 9.109
    § 9.109 27 CFR Ch. I (4–1–13 Edition) (iv) Then westward along U.S. High- 67, near Beebe, Arkansas (on the Mem- way 54 until it intersects U.S. Highway phis map); 71 near Nevada, Missouri; (xviii) Then northeastward along (v) Then southward along U.S. High- U.S. Highway 67 into the state of Mis- way 71 until it intersects Interstate souri, then northward until U.S. High- Highway 44, approximately 5 miles way 67 intersects U.S. Highway 60, in south of Carthage, Missouri; Poplar Bluff, Missouri (on the Poplar (vi) Then westward and southwest- Bluff map); ward along Interstate Highway 44 into (xix) Then eastward along U.S. High- the State of Oklahoma, and continuing way 60 until it crosses the western southwestward until Interstate High- boundary of Stoddard County. Note: way 44 crosses the Neosho River near Here that boundary is the St. Francis Miami, Oklahoma (on the Tulsa map); River; (vii) Then southward along the Neo- (xx) Then northward, northeastward, sho River (flowing through the Lake of and eastward along the boundary of the Cherokees, Lake Hudson, and Fort Stoddard County until it joins the Gibson Lake) until it flows into the Ar- southern boundary of Cape Girardeau kansas River, approximately 2 miles County (on the Cape Girardeau map); west of Fort Gibson, Oklahoma (on the (xxi) Then northeastward along the Fort Smith map); Cape Girardeau County boundary until (viii) Then southward and eastward it meets the Mississippi River south of along the Arkansas River (flowing Cape Girardeau, Missouri; through the Robert S.
    [Show full text]
  • Hazard Mitigation Plan Pulaski County, Arkansas 2014
    Hazard Mitigation Plan Pulaski County, Arkansas 2014 Alexander ● Cammack Village ● Jacksonville ● Little Rock ● Little Rock School District ● Maumelle ● North Little Rock North Little Rock School District ●Pulaski County Special School District ● Sherwood ●Wrightsville Hazard Mitigation Plan Pulaski County, Arkansas 2014 Prepared for: Pulaski County 201 S. Broadway Little Rock, AR 72201 In collaboration with: Alexander, Cammack Village, Jacksonville, Little Rock, Little Rock School District, Maumelle, North Little Rock, North Little Rock School District, Pulaski County Special School District, Sherwood, and Wrightsville Prepared by: CSA Ocean Sciences Inc. 8502 SW Kansas Avenue Stuart, FL 34997 www.csaocean.com Cover Photo: A couple of people braved the elements on Brookswood Road in the City of Sherwood, Arkansas, Pulaski County. NOAA, National Weather Service Weather Forecast Office. 25/26 December 2012. TABLE OF CONTENTS Page Section 1 Prerequisites ...................................................................................................................................1-1 Section 2 Plan Process and Plan Maintenance ...............................................................................................2-1 Section 3 Risk Assessment ............................................................................................................................3-1 Section 4 Mitigation Strategy ........................................................................................................................4-1 Section
    [Show full text]
  • Narrative Description For
    NARRATIVE DESCRIPTION FOR Tenberge Dairy ENGINEER: __~J~o~e~W~i~ll~i~f~o~rd~____________RE~~IT #________2~9~0~1_-~W__________~DATE: 10/3/83 Mr. John Tenberge plans to construct and operate a 60 cow dairy operation. This facility is located in Section 15; Township 16 North, Range 26 West of Madison County or about two miles south­ east of Huntsville on Arkansas Highway 23. Waste material from the milking area will be flushed to a holding pond with 365 days storage capacity. The pond wil I have a one foot thick clay I iner. Contents of the pond are to be land appl ied to 234 acres of pasture, 22 acres are required for nitrogen assumilation. If runoff should occur it wouild go to War Eagle Creek, a tributary to the Beaver Reservoir, Segment No. 4K of the White River Basin. Dead animals will be disposed of by burial. -..-:-:- . _. ' .... PERMIT luuecl By DEPARTMENT OF POLLUTION CONTROL & ECOLOGY 8001 National Drin UHf. Rock, AJokcmaal 72209 Permit No._--=2 ....9.=..0.:...1--'W"--­ __ Date Novembe r 1! 1983 TO: Tenberge Dairy Consulting Engineers: c/o John Tenberge U.S. Soil Conservation Service Post Office Box 511 Post Office Box 2323 Huntsville, Arkansas 72740 Little Rock, Arkansas 72203 This permit is your authority to construct, operate, and maintain the waste disposal system set forth in your application doted Sep tembe r 25; 198 3.This permit is issued subject to the provisions of Act 472 of 1949, as amended (sec.82-190) et seq., Ark.
    [Show full text]
  • Lake Maumelle Watershed Man
    ACKNOWLEDGEMENTS Many individuals contributed their time, energy, and expertise to the development of the Lake Maumelle Watershed Management Plan. Deserving special credit are members of the Central Arkansas Water Board of Commissioners and staff, the Policy Advisory Council and Technical Advisory Council. i February 2007 n Tetra Tech, Inc. Lake Maumelle Watershed Management Plan 2007 CAW Board of Commissioners Tony Kendall, Chair Roby Robertson, Ph.D., Vice Chair Jay Hartman, Secretary Jane Dickey Eddie Powell Thomas Rimmer Francille Turbyfill CAW Staff Jim Harvey, Chief Executive Officer Bruno Kirsch, J.D., P.E., Director of Watershed Management and Chief Operating Officer Marie Crawford, Director of Communications Gary Hum, Director of Source & Treatment Steve Morgan, Director of Regionalism & Future Water Source Dennis Yarro, P.E., Supervisor of Water Sources Jos Bell, GIS Manager Shani Canada, Communications and Administrative Support Assistant Brandi McGreevy, Communications and Administrative Support Assistant Policy Advisory Council Member Representing Designation Mr. Tony Kendall, Commission Chair Central Arkansas Water Board of Primary Commissioners Roby Robertson, Ph.D., Central Arkansas Water Board of Alternate Commission Vice Chair Commissioners Ms. Jane Dickey, Commissioner Central Arkansas Water Board of Alternate Commissioners Ms. Kate Althoff, Coordinator Citizens Protecting Maumelle Watershed Primary Mr. Barry Haas Citizens Protecting Maumelle Watershed Alternate Ms. Ruth Bell League of Women Voters of Pulaski County Primary Ms. Kathleen Oleson League of Women Voters of Pulaski County Alternate Mr. Randy Wilbourn Little Rock Regional Chamber of Primary Commerce Mr. Jay Chesshir, President and Chief Little Rock Regional Chamber of Alternate Executive Officer Commerce Mr. Steve Owen, Chairman of Board of North Little Rock Chamber of Commerce Primary Directors Mr.
    [Show full text]
  • 2014-2015 Statewide and Wma General Hunting Regulations
    2014-2015 STATEWIDE AND WMA GENERAL HUNTING REGULATIONS 2015 DEER SEASON OPENING DATES Deer (archery): Sat., Sept. 26, 2015 (4th Sat. in Sept. annually) Deer (muzzleloader): Sat., Oct. 17, 2015 (3rd Sat. in Oct. annually) Deer (modern gun): Sat., Nov. 14, 2015 (2nd Sat. in Nov. annually) Deer (doe only): Deer (special youth hunt): 01.00-C DEFINITION OF TERMS 04-14 For the purposes of the Arkansas State Game and Fish Code of Regulations, the following terms shall be construed, respectively, to mean and include: ADULT GOBBLER – Male turkeys having at least one of the following characteristics: a) tail feathers which are the same length, b) wing feathers that have white barring all the way to the tip or c) a beard more than six (6) inches in length. ALLIGATOR DEALER – Any person, firm or corporation engaging in the sale, purchase, barter or exchange of an American alligator (Alligator mississippiensis) or other crocodilian species, or any part, nest or eggs thereof in Arkansas. ALLIGATOR FARMER – Any person, firm or corporation possessing an American alligator (Alligator mississippiensis) or other crocodilian species, or any part, nest or eggs thereof in Arkansas for the purpose of propagation, production or rearing. ALLIGATOR SNAPPING TURTLE DEALER – Any person, firm or corporation engaged in the sale or purchase of alligator snapping turtles. ALLIGATOR SNAPPING TURTLE BREEDER – Any person, firm or corporation possessing alligator snapping turtles for the purpose of propagation, production, rearing or sale. ANIMAL – An organism of the animal kingdom, as distinguished from the plant kingdom, including any part, product, egg or offspring thereof.
    [Show full text]
  • Logan County Mitigation Plan
    Hazard Mitigation Plan Logan County, Arkansas 2015 County Line School District • Booneville School District • Paris School District • Magazine School District Scranton School District • Caulksville • Ratcliff • Morrison Bluff • Paris Blue Mountain • Magazine • Booneville • Subiaco • Scranton Hazard Mitigation Plan Logan County, Arkansas 2015 Prepared for: Logan County 205 East Maple Paris, AR 72855 In collaboration with: County Line School District, Booneville School District, Paris School District, Magazine School District, Scranton School District, Caulksville, Ratcliff, Morrison Bluff, Paris, Blue Mountain, Magazine, Booneville, Subiaco, and Scranton Prepared by: Lincoln Walther Consulting, LLC 7897 Jack James Drive, Suite A Stuart, FL 34997 In association with CSA Ocean Sciences Inc. 8502 SW Kansas Avenue Stuart, FL 34997 Cover image: Logan County Emergency Management Office TABLE OF CONTENTS Page Section 1 Prerequisites ..................................................................................................................... 1-1 Section 2 Planning Process and Plan Maintenance .......................................................................... 2-1 Section 3 Risk Assessment .............................................................................................................. 3-1 Section 4 Mitigation Strategy .......................................................................................................... 4-1 Section 5 References .......................................................................................................................
    [Show full text]