FORM –1

Slum Rehabilitation Scheme “Aventus Heights”

At

C.T.S No. 1A (pt) of village Deonar, Taluka Kurla, at Plot No. 49, Survey no.93 (pt.), Road No. 5/6 Shivaji Nagar, East, Mumbai- 400 043.

By M/s. RATNAAKAR SHELTER LLP

06, Vallabh Society, 90 ft. road, Ghatkopar (E), Mumbai – 400075

APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information

Sr. Item Details 1. Name of the project/s “Aventus Heights” Slum Rehabilitation Scheme at Govandi East, Mumbai 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Total Plot Area: 4423.95 Sq. mt. to be handled/command area/lease Deductions: 408.13 Sq. mt. area/number of wells to be drilled Net Plot Area: 4015.82 Sq. mt. Built up Area as per FSI: 17384.86 Sq. mt. (Including Fungible Area) Total Construction Built-up Area: 25867.78 Sq. mt.

Project Proposal: Building Details Rehabilitation Building 1: Flats: 96 Nos. Ground + 13 upper floors PAP: 73 Nos. Balwadi: 2 Nos. Welfare Centre: 2 Nos. Society Office: 1 No. Municipal Housing: 16 Nos. Rehabilitation Building 2: Shops: 25 Nos. Ground + 1 floor Sale Building: Flats: 246 Nos. 1 Building with 3 wings: Rehabilitation Shops: 2 Nos. Basement + Ground + 21

Upper floors 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. Not applicable 6. Category of project i.e.’ A’ or ‘B’ B 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? Not Applicable If yes, please specify. 9. Location Govandi East, Mumbai Plot/Survey/ Khasra No. C.T.S No. 1A (pt) of village Deonar, Plot No. 49, Survey no.93(pt.), Govandi East Village Deonar Tehsil Kurla District Mumbai district State 10. Nearest railway station Govandi Railway Station: Within 2.00 (Road distance) Nearest airport Mumbai Chhatrapati Shivaji Terminals: Within 14.00 km.(Road distance) 11. Nearest Town, city, District Mumbai Metropolitan Region (MMR) headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation of Greater Mumbai (M.C.G.M.) Municipal Corporation, Local body (complete postal address with telephone nos. to be given)

1 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai Sr. Item Details 13. Name of the applicant M/s. Ratnaakar Shelter LLP 14. Registered Address 06, Vallabh Society, 90 ft. road, Ghatkopar (E), Mumbai – 400075 15. Address for correspondence 06, Vallabh Society, 90 ft. road, Ghatkopar (E), Mumbai – 400075 Name Mr. Vinod S. Mehta Designation(Owner/Partner/ CEO) Partner Address 06, Vallabh Society, 90 ft. road, Ghatkopar (E), Mumbai – 400075 Pin Code 400075 E-mail [email protected] Telephone No. 022-22672755 Fax No. -- 16. Details of Alternative Sites examined, Not applicable if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not applicable 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? Not Applicable (b) The Wildlife (Protection) Act, 1972? Not Applicable (c) The C.R.Z Notification, 1991? Not Applicable 22. Whether there is any Government Received Letter of Intent (LOI) on 22nd December, 2016 from Order/Policy relevant/ relating to the Slum Rehabilitation Scheme. Copy attached as Enclosure 1. site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.1 Permanent or temporary change in No The site is in Residential zone as per the DP Remarks. land use, land cover or topography DP remark is attached as an Enclosure 2. including increase in intensity of land use (with respect to local land use plan)

2 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.2 Clearance of existing land, No There was slums on site which has already been demolished vegetation and building? 1.3 Creation of new land uses? No -- 1.4 Pre-construction investigation e.g. Yes Geotechnical Investigation has been carried out and is bore houses, soil testing? referred as an Enclosure 3. 1.5 Construction works? Yes Residential development with shops 1.6 Demolition works? No There was slums on site which has already been demolished. 1.7 Temporary sites used for No -- construction works or housing of construction workers? 1.8 Above ground building, structures Yes Excavation material shall be partly reused on site for or earthworks including linear backfilling and leveling and remaining shall be disposed to structures, cut and fill or authorized landfill site. excavations Construction waste material shall be partly recycled and remaining disposed to the authorized land fill site. 1.9 Underground works including No -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the construction raw materials? material. 1.15 Facilities for treatment or disposal Yes • STP for treatment of sewage of solid waste or liquid effluents? • Segregation of solid waste into non-biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Non-biodegradable waste shall be handed over to Authorized recyclers • Dried sludge from STP : As manure 1.16 Facilities for long term housing of Yes Cabins for watchmen/ gardener etc. operational workers? 1.17 New road, rail, or sea traffic during No -- construction or operation? 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines No -- or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No --

3 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the land Yes By considering the runoff prior to development and runoff surface affecting drainage or run- after development there is some increment in runoff of storm off? water. Incremental Runoff = 0.02 m3/sec 1.25 Transport of personnel or materials Yes Transport of construction materials. for construction, operation or Precautions will be taken to reduce the impact of the decommissioning? vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There will be influx of ~1230 persons (Sale occupancy only) temporarily or permanently? 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No --

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sr. Information/checklist Yes Details thereof (with approximate quantities /rates, wherever No. confirmation / No possible) with source of information data 2.1 Land especially No The land is in developed infrastructure area. undeveloped or agricultural land (ha) 2.2 Water (expected source & Yes During Construction Phase – competing users) unit : KLD • For Workers: From M.C.G.M.: 5 KLD • For Construction : From Water tankers : 10 - 20 KLD (depending on construction activity)

During Operational Phase – • Fresh water from M.C.G.M./ Rain water harvesting in monsoon season: 197 KLD (Domestic) 2.3 Minerals (MT) No -- 2.4 Construction material – Yes Quantity : As per requirement stone, aggregates, and / soil Sources: The material required for construction activities shall be (expected source – MT) procured from company’s authorized / approved vendors/open market. 2.5 Forests and timber (source – Yes Timber required for doors sourced from local suppliers. MT) 2.6 Energy including electricity Yes During Construction Phase - and fuels (source, competing Reliance Energy: 50 KW users) Unit: fuel (MT), D.G. Sets: As per requirement energy (MW) During Operational Phase Source: Reliance Energy

4 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai Sr. Information/checklist Yes Details thereof (with approximate quantities /rates, wherever No. confirmation / No possible) with source of information data Rehabilitation Sale Building Total Building Connected load 2351 KW 3951 KW 6302 KW Maximum demand 674 KW 1080 KW 1754 KW D.G. Sets D.G. Set of D.G. Set of -- (For emergency capacity 100 capacity 160 back-up in case of kVA kVA power failure)

2.7 Any other natural resources No -- (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No -- hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect No -- disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No -- changing living conditions? 3.4 Vulnerable groups of people who could be No -- affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No --

4. Production of solid wastes during construction or operation or decommissioning (MT/month): Sr. Yes / Details thereof (with approximate quantities / rates, Information/Checklist confirmation No. No wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No -- 4.2 Municipal waste (domestic and or Yes During Construction Phase: commercial wastes) The total quantity of solid waste: 10 Kg /day. (Biodegradable and Non-biodegradable)

During Operation phase: The total quantity of solid waste: 982 Kg /day. (Biodegradable and Non-biodegradable) 4.3 Hazardous wastes (as per Hazardous Yes Waste oil generated from DG set shall be stored at waste Management Rules) separate location duly marked and will be sold to the CPCB authorized recyclers. 4.4 Other industrial process wastes No -- 4.5 Surplus product No -- 4.6 Sewage sludge or other sludge from Yes Dried sludge from STP: As manure for plants within effluent treatment. the premises 4.7 Construction or demolition wastes. Yes Excavation material shall be partly reused on site for backfilling and leveling and remaining shall be

5 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai Sr. Yes / Details thereof (with approximate quantities / rates, Information/Checklist confirmation No. No wherever possible) with source of information data disposed to authorized landfill site. Construction waste material shall be partly recycled and remaining disposed to the authorized land fill site. 4.8 Redundant machinery or equipment. No -- 4.9 Contaminated soils or other materials. No -- 4.10 Agriculture wastes. No -- 4.11 Other solid wastes. No --

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) :

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/ rates, No. No wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes CPCB approved D.G. Sets will be used during power fuels from stationary or mobile sources failure. 5.2 Emissions from production processes No -- 5.3 Emissions from materials handling Yes Fugitive dust emission due to handling and loading- including storage or transport unloading activities is envisaged during construction. Frequent water sprinkling will be done to minimize the fugitive emissions. 5.4 Emissions from construction activities Yes / Precautions taken to reduce dust generation during including plant and equipment Marginal construction phase: • Water sprinkling at regular intervals to reduce control of dust generation 5.5 Dust or odours from handling of Yes Dust generation controlled as described above. materials including construction For odour control: Proper ventilation shall be provided materials, sewage and waste around STP and solid waste management facilities 5.6 Emissions from incineration of waste No -- 5.7 Emissions from burning of waste in No -- open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No --

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/rates, No. No wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes but For control of noise following measures shall be engines, ventilation plant, crushers. negligible adopted: • Regular noise monitoring to maintain the noise level within the levels prescribed by CPCB during day and night time • Provision of ear plugs to workers • Use of high efficiency mufflers • No noise polluting work in night shifts • Provision of barricades (Height – 5 mt.) along the periphery of the site 6.2 From industrial or similar processes. No -- 6.3 From construction or demolition. Yes Noise levels may increase due to operation of machinery as well as transportation vehicles. Following precautions shall be taken to control noise pollution: • Regular noise monitoring to maintain the noise level

6 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/rates, No. No wherever possible) with source of information data within the levels prescribed by CPCB during day and night time • Provision of ear plugs to workers • Use of high efficiency mufflers • No noise polluting work in night shifts • Provision of barricades along the periphery of the site • Acoustic enclosure for D.G. set 6.4 From blasting or piling. No -- 6.5 From construction or operational Yes During Construction phase: traffic. • Proper traffic management for the construction vehicles • Regular maintenance of vehicles with suitable enclosures and intake silencers • Planning and ensuring effective implementation of the waste movement plan for loading and offsite movement in non-traffic hours.

During Operation Phase : • Install traffic control measures to regulate the flow of traffic 6.6 From lighting or cooling systems. No -- 6.7 From any other sources. No --

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea : Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/rates, No. No wherever possible) with source of information data 7.1 From handling, storage, use or spillage No -- of hazardous materials. 7.2 From discharge of sewage or other No During Construction Phase: effluents to water or the land (expected Disposal of sewage to municipal sewer line mode and place of discharge). During Operation Phase: The treated sewage will be reused for flushing and gardening within the premises. Excess treated sewage will be disposed to existing sewer line 7.3 By deposition of pollutants emitted to No Dust during construction phase from earthworks and air into the land or into water. movement of vehicles. Provision of dust control measures, including water sprinkling of exposed areas and dust covers for trucks, to minimize any impacts. Stack height of DG set shall be as per CPCB guidelines. 7.4 From any other sources. No -- 7.5 Is there a risk of long term build up of No -- pollutants in the environment from these sources?

7 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment:

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/rates, No. No wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No -- from storage, handling, use or production of hazardous substances 8.2 From any other causes. No -- 8.3 Could the project be affected by natural Yes Landslides are not expected in the area. disasters causing environmental damage Management plan for flood and earthquake is as (e.g. floods, earthquakes, landslides, follows: and cloudburst)? Flood : • Minimizing the incremental runoff from the site with the help of rain water harvesting tank (2 nos. of RWH tanks of total capacity 50 KL) • Proper management of channelization of storm water from site by using proper SWD system of adequate capacity • Use of screens and silt traps to SWD • Proper maintenance of storm water drainage to avoid choking of drains and flooding on site Earthquake : The structure of the building is designed as per IS codes for zone III. Disaster Management Plan is attached as Enclosure 4.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality:

Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities/rates, No. No wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: •Supporting infrastructure (roads, power No Supporting infrastructure is already in existence. supply, waste or waste water treatment, etc.) • housing development Yes Slum Rehabilitation Project • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which No -- could have an impact on the environment 9.3 Set a precedent for later developments Yes Will create job opportunities in construction and operation phase with support staff like security, maintenance, household workers, shop keepers etc. 9.4 Have cumulative effects due to Yes Impacts on water availability, storm water drainage, proximity to other existing or planned availability of electricity, traffic congestion etc. projects with similar effects

8 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai (III) Environmental Sensitivity Aerial distance (Within 15 Sr. Name/ Areas km.) Proposed project No. Identity location boundary 1 Areas protected under international Sanjay Gandhi National Park Approx. 9.00 Km conventions, national or local legislation Maharashtra Nature Park Approx. 7.00 Km for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive Approx. 4.00 Km for ecological reasons – Wetlands, Mahul Seweri Creek Approx. 8.00 Km watercourses other water bodies, coastal Approx. 5.00 km zone, biospheres, mounting, forests Powai Lake Approx. 7.00 km Chandivali Lake Approx. 6.00 km Vihar Lake Approx. 9.00 km Tulsi Lake Approx. 14.00 km Arabian Sea Approx. 11.00 km 3 Areas used by protected, important or Sanjay Gandhi National Park Approx. 9.00 Km sensitive species of flora or fauna for Maharashtra Nature Park Approx. 7.00 Km breeding, nesting, foraging, resting, over wintering, migration 4 Inland, costal, marine or underground Thane Creek Approx. 4.00 Km waters Mahul Seweri Creek Approx. 8.00 Km Mithi River Approx. 5.00 km Powai Lake Approx. 7.00 km Chandivali Lake Approx. 6.00 km Vihar Lake Approx. 9.00 km Tulsi Lake Approx. 14.00 km Arabian Sea Approx. 11.00 km 5 State, national boundaries None --- 6 Routes or facilities used by the public No -- for access to recreation or other tourist, pilgrim areas 7 Defense installations No -- 8 Densely populated or built-up area Mumbai Metropolitan Region -- 9 Areas occupied by sensitive man-made Mumbai Metropolitan Region -- land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality No -- or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No -- environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No -- which could cause the project to preset environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies: Not applicable

9 Form 1- Slum Rehabilitation Scheme, Govandi - Mumbai