Listed below are the designated areas for the planned maintenance work as for November, 2019:

Bil. Day & Date Time Location Work Description Affected Areas for Outages

Wednesday From Spg. 1878 to Spg. 1959, Kg. Junjungan and the 1 8.30 am to 11.30 am Kg. Junjungan Transfer and Maintenance of Overhead Lines 06th November 2019 surrounding areas.

Wednesday 2 8.00 am to 3.00 pm Kg. Salar Installation of Mini Feeder Pillar Spg. 599 to Spg. 620, Kg. Salar and the surrounding areas. 06th November 2019

Wednesday 8.00 am to 12.00 noon Spg. 37 to Spg. 86, Kampong Bebatik Kilanas and the 3 Kampong Bebatik Kilanas Maintenance of Overhead Line Pole 06th November 2019 2.00 pm to 4.00 pm surrounding areas.

Wednesday Replacement of Overhead Lines Cable to Low Voltage Spg. 128 Kg. Pangkalan Gadong and the surrounding 4 9.00 am to 3.00 pm Sub-Station 128 Pengkalan Gadong 06th November 2019 ABC Cable areas.

Thursday Spg. 321 to Spg. 361, Kg. Kapok and the surrounding 5 8.00 am to 3.00 pm Kg. Kapok Installation of Mini Feeder Pillar 07th November 2019 areas.

Thursday Simpang 1761-30, Kampong Tanjong Nangka and the 6 8.30 am to 11.30 am Kampong Tanjong Nangka Maintenance of Overhead Lines 07th November 2019 surrounding areas.

Thursday 7 8.30 am to 3.00 pm Jalan Kecil Lampaki Transfer and Install of New Overhead Lines Spg. 41, Jalan Kecil Lampaki and the surrounding areas. 07th November 2019

Monday 8 9.00 am to 12.00 noon Main Intake Station Kota Batu Maintenance of 11,000 Volt High Voltage Equipment Spg. 314 Jalan Kota Batu and the surrounding areas 11th November 2019

9.00 am to 5.00 pm (For info, Department of Electrical Services will Monday 9 supply temporary electricity to the affected Sub-Station Sg Besar 3 Replacement of RMU Switchgear Spg. 672 Kg. Sg. Besar and the surrounding areas. 11th November 2019 areas through mobile generator services at the substation)

Monday Replacement of Overhead Lines Cable to Low Voltage Spg. 235 Kg. Pasar Baru Gadong and the 10 9.00 am to 3.00 pm Sub-Station Semeo Votech 11th November 2019 ABC Cable surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Tuesday 11 supply temporary electricity to the affected Sub-Station Bangunan Hassanin Batu 1 Maintenance of Distribution Transformer Hassanin Batu 1 Building and the surrounding areas. 12th November 2019 areas through mobile generator services at the substation)

Tuesday Replacement of Overhead Lines Cable to Low Voltage Spg. 128 Kg. Pangkalan Gadong and the surrounding 12 9.00 am to 3.00 pm Sub-Station 128 Pangkalan Gadong 12th November 2019 ABC Cable areas.

Tuesday 13 8.00 am to 4.00 pm Jalan Kapok Kiri Replacement of Overhead Line Jalan Kapok Kiri and the surrounding areas. 12th November 2019

Tuesday Spg. 73 and Spg. 51, Jalan Ban 3A Mulaut and the 14 8.30 am to 11.30 am Jalan Ban 3A Mulaut Maintenance of Overhead Line Pole 12th November 2019 surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Wednesday 15 supply temporary electricity to the affected Sub-Station Industri Replacement of RMU Switchgear Anggerek Desa Industry and the surrounding areas. 13th November 2019 areas through mobile generator services at the substation)

Wednesday Simpang 833, Kampong , Jalan Tutong and 16 9.00 am to 3.00 pm Kampong Tasek Meradun Replacement of Mini Feeder Pillar 13th November 2019 the surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Thursday Sub-Station Umi Kalsom Batu 1 and the surrounding 17 supply temporary electricity to the affected Sub-Station Umi Kalsom Batu 1 Maintenance of Distribution Transformer 14th November 2019 areas. areas through mobile generator services at the substation) Thursday Spg. 179 and Spg. 299, Kampong Mentiri and the 18 8.00 am to 3.00 pm Kampong Mentiri Installation of Overhead Line 14th November 2019 surrounding areas. 9.00 am to 5.00 pm (For info, Department of Electrical Services will Saturday Spg. 564 Flat Bandaran Kg. Subok and the surrounding 19 supply temporary electricity to the affected Sub-Station Spg. 564 Flat Bandaran Kg. Subok Maintenance of Distribution Transformer 16th November 2019 areas. areas through mobile generator services at the substation)

Spg. 53, Jalan Mulaut Lampaki and the surrounding areas. Saturday 20 8.30 am to 11.30 am Jalan Mulaut Lampaki & Kg. Sinarubai Maintenance of Overhead Line Spg. 226, Kg. Sinarubai, Jln Bengkurong and the 16th November 2019 surrounding areas.

Saturday Spg. 339, Kg. Jerudong and the surrounding areas. 21 8.30 am to 11.30 am Kg. Jerudong & Kg. Masin Maintenance of Overhead Line 16th November 2019 Spg. 564, Kg. Masin and the surrounding areas.

Page 1 9.00 am to 5.00 pm (For info, Department of Electrical Services will Saturday 22 supply temporary electricity to the affected Sub-Station Sg. Matan Maintenance of Distribution Ring Main Unit (RMU) Spg. 688 Kg. Sg. Matan and the surrounding areas. 16th November 2019 areas through mobile generator services at the substation)

Saturday 8.30 am to 11.30 am 23 Kg. Tanjung Bunut Maintenance of Overhead Line Pole Spg. 1273 Kg. Tanjung Bunut and the surrounding areas. 16th November 2019 2.00 pm to 4.30 pm

Thursday 8.30 am to 11.30 am Spg. 37 to Spg. 86, Kampong Bebatik Kilanas and the 24 Kg. Bebatik Kilanas Maintenance of Overhead Line Pole 17th November 2019 2.00 pm to 4.00 pm surrounding areas.

Monday Replacement of Overhead Lines Cable to Low Voltage 25 9.00 am to 3.00 pm Sub-Station Spg 217 Kg. Tungku Spg. 217 Kg. Tungku Gadong and the surrounding areas. 18th November 2019 ABC Cable

Monday Jln Ban 3A Kg. Mulaut from Spg. 5 until Spg. 51 and the 26 8.30 am to 12.00 noon Kg. Mulaut Maintenance of Overhead Line Pole 18th November 2019 surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Monday 27 supply temporary electricity to the affected Sub-Station Sg. Matan Maintenance of Distribution Ring Main Unit (RMU) Spg. 688 Kg. Sg. Matan and the surrounding areas. 18th November 2019 areas through mobile generator services at the substation) 9.00 am to 5.00 pm (For info, Department of Electrical Services will Tuesday Sub-Station Umi Kalsom Batu 1 and the surrounding 28 supply temporary electricity to the affected Sub-Station Umi Kalsom Batu 1 Maintenance of Distribution Transformer 19th November 2019 areas. areas through mobile generator services at the substation)

Tuesday Replacement of Overhead Lines Cable to Low Voltage 29 9.00 am to 3.00 pm Sub-Station Spg 217 Kg. Tungku Spg. 217 Kg. Tungku Gadong and the surrounding areas. 19th November 2019 ABC Cable

Tuesday Spg. 5, Jalan D, RPN Kg. mentiri and the surrounding 30 8.00 am to 4.30 pm RPN Kg. Mentiri Replacement og Overhead Line 19th November 2019 areas.

Tuesday Sungai Tajau Kg. Wasan and the surrounding areas. 31 8.30 am to 11.30 am Kg. Wasan & Kg. Sungai Tampoi Maintenance of Overhead Line 19th November 2019 Kg. Sungai Tampoi Spg. 14 and the surrounding areas.

Tuesday 32 8.30 am to 11.30 am Kg. Jerudong Maintenance of Overhead Line Kg. Jerudong Spg. 544-22 and the surrounding areas. 19th November 2019

Wednesday Replacement of Overhead Lines Cable to Low Voltage 33 9.00 am to 3.00 pm Sub-Station 207 Kg. Tungku Spg. 207 Kg. Tungku Gadong and surrounding areas. 20th November 2019 ABC Cable

Wednesday Maintenance of Overhead Line High Voltage 11,000 Volt 34 8.30 am to 12.00 noon Jalan Bebatik Kilanas Spg. 94 Jalan Bebatik Kilanas and the surrounding areas. 20th November 2019 and Low Voltage 415Volt

Wednesday 8.30 am to 11.30 am Spg. 843, Spg. 855, include Simpang Jalan Kecil Kg. Agau 35 Kg. Agau Maintenance of Overhead Line Pole 20th November 2019 2.00 pm to 4.30 pm areas and the surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Thursday 36 supply temporary electricity to the affected Sub-Station Bangunan Hj Tahir 2 Maintenance of Distribution Transformer Hj Tahir 2 Building and the surrounding areas. 21st November 2019 areas through mobile generator services at the substation)

Thursday Replacement of Overhead Lines Cable to Low Voltage 37 9.00 am to 3.00 pm Sub-Station 207 Kg. Tungku Spg. 207 Kg. Tungku Gadong and surrounding areas. 21st November 2019 ABC Cable

Thursday Spg. 28 to Spg. 57 Kg. Sungai Buloh and the surrounding 38 8.00 am to 4.30 pm Kg. Sungai Buloh Replacement of Overhead Line 21st November 2019 areas.

Thursday Simpang 658 to Simpang 672 Kampong Sungai Besar and 39 8.00 am to 12.00 noon Kampong Sungai Besar Transfer of Mini Feeder Pillar 21st November 2019 the surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Saturday 40 supply temporary electricity to the affected Sub-Station Jln Laila Wijaya Kg Mata-Mata Maintenance of Distribution Transformer Jln Laila Wijaya Kg. Mata-Mata and the surrounding areas. 23rd November 2019 areas through mobile generator services at the substation)

9.00 am to 5.00 pm (For info, Department of Electrical Services will Saturday 41 supply temporary electricity to the affected Sub-Station Spg. 67 Kg. Berangan Maintenance of Ring Main Unit (RMU) Spg. 67 Kg. Berangan and the surrounding areas. 23rd November 2019 areas through mobile generator services at the substation)

Saturday Simpang 96, Kampong Sungai Buloh and the surrounding 42 8.00 am to 12.00 noon Kampong Sungai Buloh Maintenance of Overhead Line 23rd November 2019 areas.

Saturday Simpang 163-12 Kampong , Jalan Kiarong and the 43 9.00 am to 3.00 pm Kampong Kiulap Replacement of Mini Feeder Pillar 23rd November 2019 surrounding areas.

Saturday Replacement of Overhead Lines Cable to Low Voltage Spg. 507 Kg. Lambak Jalan Pasir Berakas and the 44 9.00 am to 3.00 pm Main Intake Station Lambak Pasir Berakas 23rd November 2019 ABC Cable surrounding areas.

Monday Jalan Damuan, Jalan Pahlawan, Jalan Puni Perumahan 45 9.00 am to 12.00 noon Main Intake Station Tentera Laut Diraja Maintenance of High Voltage 11,000 Volt Equipment 25th November 2019 Tentera Laut Diraja Brunei and the surrounding areas.

Page 2 Monday Replacement of Overhead Lines Cable to Low Voltage Spg. 507 Kg. Lambak Jalan Pasir Berakas and the 46 9.00 am to 3.00 pm Main Intake Station Lambak Pasir Berakas 25th November 2019 ABC Cable surrounding areas.

Monday 47 9.00 am to 5.00 pm Sub-Station Sekolah Ugama Kilanas Maintenance of Ring Main Unit (RMU) Kg. Tasek Meradun, Kg. Dadap and the surrounding areas. 25th November 2019

9.00 am to 5.00 pm (For info, Department of Electrical Services will Tuesday 48 supply temporary electricity to the affected Sub-Station Bangunan Hj Othman Maintenance of Distribution Transformer Simpang 6 Kg. and the surrounding areas. 26th November 2019 areas through mobile generator services at the substation)

Tuesday Replacement of Overhead Lines Cable to Low Voltage Spg. 409 Kg. Lambak Jalan Pasir Berakas and the 49 9.00 am to 3.00 pm Sub-Station 409 Lambak Berakas 26th November 2019 ABC Cable surrounding areas.

9.00 am to 5.00 pm (For info, Department of Electrical Services will Wednesday Spg. 80 Kg. Menglait, Pengkalan Gadong and the 50 supply temporary electricity to the affected Sub-Station Spg 80 Kg Menglait Pengkalan Gadong Maintenance of Ring Main Unit (RMU) 27th November 2019 surrounding areas. areas through mobile generator services at the substation)

Wednesday Replacement of Overhead Lines Cable to Low Voltage Spg. 409 Kg. Lambak Jalan Pasir Berakas and the 51 9.00 am to 3.00 pm Sub-Station 409 Lambak Berakas 27th November 2019 ABC Cable surrounding areas.

Thursday Replacement of Overhead Lines Cable to Low Voltage Spg. 423 Kg. Lambak Jalan Pasir Berakas and the 52 9.00 am to 3.00 pm Sub-Station 409 Lambak Berakas 28th November 2019 ABC Cable surrounding areas.

Page 3 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan November, 2019:

Bil. Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Terjejas Pemotongan Bekalan Elektrik

Hari Rabu Dari Spg. 1878 hingga Spg. 1959, Kg. Junjungan dan 1 8.30 pagi hingga 11.30 pagi Kg. Junjungan Pemindahan dan Pemeliharaan Kawat Atas 06hb November 2019 kawasan sekitarnya.

Hari Rabu Spg. 599 hingga Spg. 620, Kg. Salar dan kawasan 2 8.00 pagi hingga 3.00 petang Kg. Salar Pemasangan "Mini Feeder Pillar" 06hb November 2019 sekitarnya.

Hari Rabu 8.00 pagi hingga 12.00 tengah hari Spg. 37 hingga Spg. 86, Kampong Bebatik Kilanas dan 3 Kampong Bebatik Kilanas Penyelenggaraan Tiang Kawat Atas 06hb November 2019 2.00 petang hingga 4.00 petang kawasan sekitarnya.

Hari Rabu Penggantian Kabel Kawat Atas ke Kabel ABC Voltan 4 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 128 Pengkalan Gadong Spg. 128 Kg. Pengkalan Gadong dan kawasan sekitarnya. 06hb November 2019 Rendah

Hari Khamis Spg. 321 hingga Spg. 361, Kg. Kapok dan kawasan 5 8.00 pagi hingga 3.00 petang Kg. Kapok Pemasangan "Mini Feeder Pillar" 07hb November 2019 sekitarnya.

Hari Khamis Simpang 1761-30, Kampong Tanjong Nangka dan kawasan 6 8.30 pagi hingga 11.30 pagi Kampong Tanjong Nangka Penyelenggaraan Talian Kawat Atas 07hb November 2019 sekitarnya.

Hari Khamis Pemindahan dan Pemasangan Talian Kawat Atas yang 7 8.30 pagi hingga 3.00 petang Jalan Kecil Lampaki Spg. 41, Jalan Kecil Lampaki dan kawasan sekitarnya. 07hb November 2019 Baru

Hari Isnin 8 9.00 pagi hingga 12.00 tengah hari Stesen Utama Elektrik Kota Batu Penyelenggaraan Peralatan Voltan Tinggi 11,000 Volt Spg. 314 Jalan Kota Batu dan kawasan sekitarnya. 11hb November 2019

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Isnin sementara bekalan tenaga elektrik ke kawasan 9 Stesen Kecil Elektrik Sg Besar 3 Penggantian "RMU Switchgear" Spg. 672 Kg. Sg. Besar dan kawasan sekitarnya 11hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Isnin Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 235 Kg. Kiarong Pasar Baru Gadong dan kawasan 10 9.00 pagi hingga 3.00 petang Stesen Kecil Semeo Votech 11hb November 2019 Rendah sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Selasa sementara bekalan tenaga elektrik ke kawasan 11 Stesen Kecil Elektrik Bangunan Hassanin Batu 1 Pemeliharaan "Distribution Transformer" Bangunan Hassanin Batu 1 dan kawasan sekitarnya. 12hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Selasa Penggantian Kabel Kawat Atas ke Kabel ABC Voltan 12 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 128 Pengkalan Gadong Spg. 128 Kg. Pengkalan Gadong dan kawasan sekitarnya. 12hb November 2019 Rendah

Hari Selasa 13 8.00 pagi hingga 4.00 petang Jalan Kapok Kiri Replacement of Overhead Line Jalan Kapok Kiri dan kawasan sekitarnya. 12hb November 2019

Hari Selasa Spg. 73 dan Spg. 51, Jalan Ban 3A Mulaut dan kawasan 14 8.30 pagi hingga 11.30 pagi Jalan Ban 3A Mulaut Maintenance of Overhead Line Pole 12hb November 2019 sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Rabu sementara bekalan tenaga elektrik ke kawasan 15 Stesen Kecil Elektrik Industri Anggerek Desa Penggantian "RMU Switchgear" Industri Anggerek Desa dan kawasan sekitarnya. 13hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Rabu Simpang 833, Kampong Tasek Meradun, Jalan Tutong dan 16 9.00 pagi hingga 3.00 petang Kampong Tasek Meradun Penggantian "Mini Feeder Pillar" 13hb November 2019 kawasan sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Khamis sementara bekalan tenaga elektrik ke kawasan Stesen Kecil Elektrik Umi Kalsom Batu 1 dan kawasan 17 Stesen Kecil Elektrik Umi Kalsom Batu 1 Pemeliharaan "Distribution Transformer" 14hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa sekitarnya. Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Khamis Spg. 179 dan Spg. 299, Kampong Mentiri dan kawasan 18 8.00 pagi hingga 3.00 petang Kampong Mentiri Pemasangan Kabel Kawat Atas 14hb November 2019 sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Sabtu sementara bekalan tenaga elektrik ke kawasan Stesen Kecil Elektrik Spg. 564 Flat Bandaran Kg. Spg. 564 Flat Bandaran Kg. Subok dan kawasan 19 Pemeliharaan "Distribution Transformer" 16hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Subok sekitarnya. Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Page 4 Spg. 53, Jalan Mulaut Lampaki dan kawasan sekitarnya. Hari Sabtu 20 8.30 pagi hingga 11.30 pagi Jalan Mulaut Lampaki & Kg. Sinarubai Penyelenggaraan Talian Kawat Atas Spg. 226, Kg. Sinarubai, Jln Bengkurong dan kawasan 16hb November 2019 sekitarnya.

Hari Sabtu Spg. 339, Kg. Jerudong dan kawasan sekitarnya. 21 8.30 pagi hingga 11.30 pagi Kg. Jerudong & Kg. Masin Penyelenggaraan Talian Kawat Atas 16hb November 2019 Spg. 564, Kg. Masin dan kawasan sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Sabtu sementara bekalan tenaga elektrik ke kawasan 22 Kg. Sg. Matan Pemeliharaan "Distribution Ring Main Unit (RMU)" Spg. 688 Kg. Sg. Matan dan kawasan sekitarnya. 16hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Sabtu 8.30 pagi hingga 11.30 pagi 23 Kg. Tanjung Bunut Penyelenggaraan Tiang Kawat Atas Spg. 1273 Kg. Tanjung Bunut dan kawasan sekitarnya. 16hb November 2019 2.00 petang hingga 4.30 petang

Hari Khamis 8.30 pagi hingga 11.30 pagi Spg. 37 hingga Spg. 86, Kampong Bebatik Kilanas dan 24 Kg. Bebatik Kilanas Penyelenggaraan Talian Kawat Atas 17hb November 2019 2.00 pagi hingga 4.00 pagi kawasan sekitarnya.

Hari Isnin 25 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik Spg. 217 Kg. Tungku Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 217 Kg. Tungku Gadong dan kawasan sekitarnya. 18hb November 2019

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Isnin sementara bekalan tenaga elektrik ke kawasan 26 Stesen Kecil Elektrik Sg. Matan Pemeliharaan "Distribution Ring Main Unit (RMU)" Spg. 688 Kg. Sg. Matan dan kawasan sekitarnya. 18hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Isnin Jln Ban 3A Kg. Mulaut from Spg. 5 hingga ke Spg. 51 dan 27 8.30 pagi hingga 12.00 tengah hari Kg. Mulaut Penyelengaraan Tiang Kawat Atas 18hb November 2019 kawasan sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Selasa sementara bekalan tenaga elektrik ke kawasan Stesen Kecil Elektrik Umi Kalsom Batu 1 dan kawasan 28 Stesen Kecil Elektrik Umi Kalsom Batu 1 Pemeliharaan "Distribution Transformer" 19hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa sekitarnya. Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Selasa 29 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik Spg. 217 Kg. Tungku Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 217 Kg. Tungku Gadong dan kawasan sekitarnya. 19hb November 2019

Hari Selasa 30 8.00 pagi hingga 4.30 petang RPN Kg. Mentiri Penggantian Kabel Kawat Atas Spg. 5, Jalan D, RPN Kg. Mentiri dan kawasan sekitarnya. 19hb November 2019

Hari Selasa Sungai Tajau Kg. Wasan dan kawasan sekitarnya. 31 8.30 pagi hingga 11.30 pagi Kg. Wasan & Kg. Sungai Tampoi Penyelengaraan Talian Kawat Atas 19hb November 2019 Kg. Sungai Tampoi Spg. 14 dan kawasan sekitarnya.

Hari Selasa 32 8.30 pagi hingga 11.30 pagi Kg. Jerudong Penyelengaraan Talian Kawat Atas Kg. Jerudong Spg. 544-22 dan kawasan sekitarnya. 19hb November 2019

Hari Rabu 33 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik Spg. 207 Kg. Tungku Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 207 Kg. Tungku Gadong dan kawasan sekitarnya. 20hb November 2019

Hari Rabu Penyelengaraan Talian Kawat Atas Voltan Tinggi 11,000 34 8.30 pagi hingga 12.00 tengah hari Jalan bebatik Kilanas Spg. 94 Jalan Bebatik Kilanas dan kawasan sekitarnya. 20hb November 2019 Volt dan Voltan Rendah 415 Volt

Hari Rabu 8.30 pagi hingga 11.30 pagi Spg. 843, Spg. 855, termasuk Simpang kawasan Jalan 35 Kg. Agau Penyelengaraan Tiang Kawat Atas 20hb November 2019 2.00 petang hingga 4.30 petang Kecil Kg. Agau dan kawasan sekitarnya

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Khamis sementara bekalan tenaga elektrik ke kawasan 36 Stesen Kecil Elektrik Bangunan Hj Tahir 2 Pemeliharaan "Distribution Transformer" Bangunan Hj Tahir 2 dan kawasan sekitarnya. 21hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Khamis 37 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik Spg. 207 Kg. Tungku Penggantian Kawat Atas ke Kabel ABC Voltan Rendah Spg. 207 Kg. Tungku Gadong dan kawasan sekitarnya. 21hb November 2019

Hari Khamis Spg. 28 hingga Spg. 57 Kg. Sungai Buloh dan kawasan 38 8.00 pagi hingga 4.30 petang Kg. Sungai Buloh Penggantian Kabel Kawat Atas 21hb November 2019 sekitarnya.

Hari Khamis Simpang 658 hingga Simpang 672 Kampong Sungai Besar 39 8.00 pagi hingga 12.00 tengah hari Kampong Sungai Besar Pemindahan "Mini Feeder Pillar" 21hb November 2019 dan kawasan sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Sabtu sementara bekalan tenaga elektrik ke kawasan 40 Stesen Kecil Elektrik Jln Laila Wijaya Kg. Mata-Mata Pemeliharaan "Distribution Transformer" Jln Laila Wijaya Kg. Mata-Mata dan kawasan sekitarnya. 23hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Page 5 9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Sabtu sementara bekalan tenaga elektrik ke kawasan 41 Stesen Kecil Elektrik Spg. 67 Kg. Berangan Pemeliharaan "Ring Main Unit (RMU)" Spg. 67 Kg. Berangan dan kawasan sekitarnya. 23hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Sabtu Simpang 96, Kampong Sungai Buloh dan kawasan 42 8.00 pagi hingga 12.00 tengah hari Kampong Sungai Buloh Penyelenggaraan Talian Kawat Atas 23hb November 2019 sekitarnya.

Hari Sabtu Simpang 163-12 Kampong Kiulap, Jalan Kiarong dan 43 9.00 pagi hingga 3.00 petang Kampong Kiulap Penukaran " Mini Feeder Pillar" 23hb November 2019 kawasan sekitarnya.

Hari Sabtu Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 507 Kg. Lambak Jalan Pasir Berakas dan kawasan 44 9.00 pagi hingga 3.00 petang Stesen Utama Elektrik Lambak Pasir Berakas 23hb November 2019 Rendah sekitarnya.

Hari Isnin Jalan Damuan, Jalan Pahlawan, Jalan Puni Perumahan 45 9.00 pagi hingga 12.00 tengah hari Stesen Utama Elektrik Tentera Laut Diraja Brunei Penyelenggaraan Peralatan Voltan Tinggi 11,000 Volt 25hb November 2019 Tentera Laut Diraja Brunei dan kawasan sekitarnya.

Hari Isnin Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 507 Kg. Lambak Jalan Pasir Berakas dan kawasan 46 9.00 pagi hingga 12.00 tengah hari Stesen Utama Elektrik Lambak Pasir Berakas 25hb November 2019 Rendah sekitarnya.

Hari Isnin 47 9.00 pagi hingga 5.00 petang Stesen Utama Elektrik Sekolah Ugama Kilanas Penyelenggaraan "Ring Main Unit" Kg. Tasek Meradun, Kg. Dadap dan kawasan sekitarnya 25hb November 2019

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Selasa sementara bekalan tenaga elektrik ke kawasan 48 Stesen Kecil Elektrik Bangunan Hj Othman Pemeliharaan "Distribution Transformer" Simpang 6 Kg. Meglait dan kawasan sekitarnya. 26hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Selasa Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 409 Kg. Lambak Jalan Pasir Berakas dan kawasan 49 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 409 Lambak Berakas 26hb November 2019 Rendah sekitarnya.

9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan Hari Rabu sementara bekalan tenaga elektrik ke kawasan Stesen Kecil Elektrik Spg. 80 Kg. Menglait Spg. 80 Kg. Menglait, Pengkalan Gadong dan kawasan 50 Pemeliharaan "Ring Main Unit (RMU)" 27hb November 2019 yang terlibat melalui Perkhidmatan Janakuasa Pengkalan Gadong sekitarnya. Bergerak [Genset] di stesen elektrik yang dimaksudkan)

Hari Rabu Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 409 Kg. Lambak Jalan Pasir Berakas dan kawasan 51 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 409 Lambak Berakas 27hb November 2019 Rendah sekitarnya.

Hari Khamis Penggantian Kabel Kawat Atas ke Kabel ABC Voltan Spg. 423 Kg. Lambak Jalan Pasir Berakas dan kawasan 52 9.00 pagi hingga 3.00 petang Stesen Kecil Elektrik 409 Lambak Berakas 28hb November 2019 Rendah sekitarnya.