2017-03-31-Scrofty-Pea-C84ol6.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

2017-03-31-Scrofty-Pea-C84ol6.Pdf TECHNICAL REPORT AND PRELIMINARY ECONOMIC ASSESSMENT ON THE SOUTH CROFTY TIN PROJECT, CORNWALL, UNITED KINGDOM FOR STRONGBOW EXPLORATION INC. LATITUDE 50o 13’ 21” N LONGITUDE 5o 16’ 32” W 30U 337,679 mE 5,565,836 mN NI 43-101 & 43-101F1 Technical Report No. 320 Eugene Puritch, P.Eng., FEC Andrew Bradfield, P.Eng. Alexandru Veresezan, P.Eng. Richard Routledge, P.Geo. Jarita Barry, P.Geo. Yungang Wu, P.Geo. David Burga, P.Geo. Alfred Hayden, P.Eng. Ernest Burga, P.Eng. Effective Date: February 16, 2017 Signing Date: March 31, 2017 TABLE OF CONTENTS 1.0 SUMMARY ............................................................................................................................1 1.1 INTRODUCTION ......................................................................................................1 1.2 RELIANCE ON OTHER EXPERTS .........................................................................4 1.3 HISTORY ...................................................................................................................4 1.4 GEOLOGICAL SETTING AND MINERALIZATION ............................................5 1.5 DEPOSIT TYPES .......................................................................................................5 1.6 EXPLORATION.........................................................................................................5 1.7 DRILLING ..................................................................................................................5 1.8 SAMPLE PREPARATION, ANALYSIS, SECURITY AND DATA VERIFICATION......................................................................................................6 1.9 MINERAL PROCESSING AND METALLURGICAL TESTING ..........................6 1.10 MINERAL RESOURCE ESTIMATE ......................................................................6 1.11 MINING METHODS .............................................................................................10 1.12 RECOVERY METHODS .......................................................................................14 1.13 PROJECT INFRASTRUCTURE ...........................................................................15 1.14 MARKET STUDIES AND CONTRACTS ............................................................15 1.15 ENVIRONMENTAL ..............................................................................................15 1.16 CAPITAL AND OPERATING COSTS .................................................................16 1.16.1 Capital Costs ..............................................................................................16 1.16.2 Operating Costs ..........................................................................................17 1.17 ECONOMIC ANALYSIS ......................................................................................19 1.17.1 Revenue......................................................................................................20 1.17.2 Costs ...........................................................................................................20 1.17.3 Net Present Value ......................................................................................20 1.17.4 Sensitivity Analysis ...................................................................................21 1.18 ADJACENT PROPERTIES ...................................................................................22 1.19 INTERPRETATION AND CONCLUSIONS ........................................................22 1.20 RECOMMENDATIONS ........................................................................................25 2.0 INTRODUCTION AND TERMS OF REFERENCE ..........................................................27 2.1 TERMS OF REFERENCE .......................................................................................27 2.2 SOURCES OF INFORMATION .............................................................................27 2.3 UNITS AND CURRENCY ......................................................................................28 3.0 RELIANCE ON OTHER EXPERTS ...................................................................................30 4.0 PROPERTY DESCRIPTION AND LOCATION ................................................................31 4.1 PROPERTY LOCATION .........................................................................................31 4.2 PROPERTY DESCRIPTION AND TENURE .........................................................31 4.3 PERMITS ..................................................................................................................34 5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY .............................................................................................................37 5.1 ACCESS ...................................................................................................................37 5.2 CLIMATE .................................................................................................................37 5.3 LOCAL RESOURCES .............................................................................................38 5.4 INFRASTRUCTURE ...............................................................................................38 5.5 PHYSIOGRAPHY ....................................................................................................39 6.0 HISTORY .............................................................................................................................41 6.1 SOUTH CROFTY MINE HISTORY .......................................................................41 6.1.1 Early History ..............................................................................................41 6.1.2 South Crofty Mine History 19th Century to Closure in 1998 ....................42 6.1.3 South Crofty Mine History and Ownership after 1998 Mine Closure .......43 6.2 HISTORIC EXPLORATION ...................................................................................44 6.3 HISTORIC PRODUCTION .....................................................................................45 6.4 HISTORICAL ESTIMATES ....................................................................................46 6.4.1 Owen and Leboutillier (1998) Closure Estimate .......................................46 6.4.2 Additional Historic Estimates ....................................................................47 6.5 PREVIOUS NI 43-101 RESOURCE ESTIMATES ................................................48 7.0 GEOLOGICAL SETTING AND MINERALIZATION ......................................................50 7.1 REGIONAL GEOLOGY ..........................................................................................50 7.2 LOCAL GEOLOGY .................................................................................................51 7.3 DEPOSIT GEOLOGY ..............................................................................................53 7.4 MINERALIZATION ................................................................................................54 8.0 DEPOSIT TYPES .................................................................................................................57 9.0 EXPLORATION...................................................................................................................59 9.1 WUM PROGRAM 2008-2013 .................................................................................59 9.2 TIN SHIELD PROGRAM ........................................................................................59 10.0 DRILLING ..........................................................................................................................60 11.0 SAMPLE PREPARATION, ANALYSES AND SECURITY ...........................................62 11.1 SAMPLE PREPARATION AND SECURITY ......................................................62 11.2 ANALYSES ............................................................................................................63 11.2.1 WAI Laboratory/ X-Ray Minerals Laboratory ..........................................63 11.2.2 AGAT Laboratory ......................................................................................64 11.2.3 SGS Laboratory .........................................................................................65 12.0 DATA VERIFICATION ....................................................................................................66 12.1 SITE VISIT AND INDEPENDENT SAMPLING .................................................66 12.2 QUALITY ASSURANCE/QUALITY CONTROL PROGRAM ..........................68 12.2.1 2010 – 2011 (Batches SD01-47): WAI Prep / X-Ray Minerals Analysis .68 12.2.2 2012 (Pre-August) (Batches SD48-104): AGAT Lab ...............................69 12.2.3 2012 (Post-August) (Batches SD105-135): SGS Lab ................................70 12.3 CHECK ASSAYS ...................................................................................................71 12.4 DATA VERIFICATION RECOMMENDATIONS AND CONCLUSIONS ........72 13.0 MINERAL PROCESSING AND METALLURGICAL TESTING ..................................73 14.0 RESOURCE ESTIMATE ...................................................................................................74 14.1 SUMMARY ............................................................................................................74 14.2 SOURCE OF DATA...............................................................................................76
Recommended publications
  • Minewater Study
    National Rivers Authority (South Western-Region).__ Croftef Minewater Study Final Report CONSULTING ' ENGINEERS;. NATIONAL RIVERS AUTHORITY SOUTH WESTERN REGION SOUTH CROFTY MINEWATER STUDY FINAL REPORT KNIGHT PIESOLD & PARTNERS Kanthack House Station Road September 1994 Ashford Kent 10995\r8065\MC\P JS TN23 1PP ENVIRONMENT AGENCY 125218 r:\10995\f8065\fp.Wp5 National Rivers Authority South Crofty Minewater Study South Western Region Final Report CONTENTS Page EXECUTIVE SUMMARY -1- 1. INTRODUCTION 1-1 2. THE SOUTH CROFTY MINE 2-1 2.1 Location____________________________________________________ 2-1 ________2.2 _ Mfning J4istojy_______________________________________ ________2-1. 2.3 Geology 2-1 2.4 Mine Operation 2-2 3. HYDROLOGY 3-1 3.1 Groundwater 3-1 3.2 Surface Water 3-1 3.3 Adit Drainage 3-2 3.3.1 Dolcoath Deep and Penhale Adits 3-3 3.3.2 Shallow/Pool Adit 3-4 3.3.3 Barncoose Adit 3-5 4. MINE DEWATERING 4-1 4.1 Mine Inflows 4-1 4.2 Pumped Outflows 4-2 4.3 Relationship of Rainfall to Pumped Discharge 4-3 4.4 Regional Impact of Dewatering 4-4 4.5 Dewatered Yield 4-5 4.5.1 Void Estimates from Mine Plans 4-5 4.5.2 Void Estimate from Production Tonnages 4-6 5. MINEWATER QUALITY 5-1 5.1 Connate Water 5-2 5.2 South Crofty Discharge 5-3 5.3 Adit Water 5-4 5.4 Acidic Minewater 5-5 Knif»ht Piesold :\10995\r8065\contants.Wp5 (l) consulting enCneers National Rivers Authority South Crofty Minewater Study South Western Region Final Report CONTENTS (continued) Page 6.
    [Show full text]
  • Kevin Barnes Job Title: Project Manager Date: May 2010
    Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Name: Kevin Barnes Job title: Project Manager Date: May 2010 Wheal Jane Minewater Project Pilot Passive Treatment Plant Background – Decommissioning Project Mining has taken place in the Carnon Valley area of Cornwall for thousands of years. The Wheal Jane Mine was opened in Oct 1971. In the 1980’s 900 tonnes of ore containing tin, zinc & copper was mined and processed at the Wheal Jane mine site on a daily basis. In 1985 tin prices fell from £10,500 to £3,300. In 1991 mining was officially terminated at the Wheal Jane site and a temporary water treatment system was installed. On 13th January 1992 50,000m3 of mine water left the Nangiles Adit…. Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Wheal Jane Mine water Treatment Project – The project was initiated following the abandonment of the Wheal Jane Mine and the subsequent 1992 pollution event, to treat the metalliferous acid mine water which was continuing to discharge from the mine workings. A long term treatment strategy with two main options was assessed; 1. An Active Treatment Plant based upon lime dosing and settlement/storage within the Clemow’s Valley Tailings Dam. 2. A Pilot Passive Treatment Plant located in the Carnon Valley. Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Carnon Valley - 1993 Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Land Ownership The National Rivers Authority acquired 44 hectares of land in the Carnon Valley between July 1993 & November 1994. The land was purchased for the construction of the Pilot Passive Treatment Plant.
    [Show full text]
  • Visit to Wheal Jane Tin Mine” British Mining No.3, Pp.8-10
    BRITISH MINING No.3 BRITISH MINING No.3 MEMOIRS 1976 Hunter, J. 1976 “Visit to Wheal Jane Tin Mine” British Mining No.3, pp.8-10 NB This publication was originally issued in the 10 by 8 inch format then used by the society. It has now been digitised and reformatted at A5. This has changed the original pagination of articles, which is given in square brackets. ISSN 0309-2199 VISIT TO WHEAL JANE TIN MINE J. Hunter B.Sc. During our Easter field excursion to Dartmoor the other year, we were privileged to be given permission to visit the newly opened Wheal Jane tin mine, near Redruth, Cornwall. We had to set off from our lodgings in Ashburton at 6.00am to be underground by 8.30am. Lamps, belts, helmets and safety boots were all provided, and at the shaft top our party was divided into two groups. One group was left at the 2nd level, and shown around the dry workings, while the rest of us, because we had gone in supposedly waterproof clothing, were taken down to the 7th level, known as the ‘wet level’. Three main lodes are mined at Wheal Jane, two of which are associated with a porphyritic ‘elvan’ dyke and dip at a shallow angle to the S.E. down to the 70 fm. level. The elvan dyke was previously thought to have controlled the deposition of the lodes, but careful study has revealed that the tin ore was deposited in several phases, some of which preceed the dyke, and the presence of the two features in such close proximity is probably due to an earlier shear zone being a favourable site for both.
    [Show full text]
  • Map Referred to in the Cornwall (Electoral Changes) Order 2011 D R a I Lw a Sheet 5 of 20 Y
    SHEET 5, MAP 5 Electoral Divisions in Camborne and Ilogan Park Portreath 1 0 3 3 KEY B L L ELECTORAL DIVISION BOUNDARY Carvannel Downs I H A PARISH BOUNDARY E G E R PARISH BOUNDARY COINCIDENT WITH ELECTORAL DIVISION BOUNDARY T PARISH WARD BOUNDARY Feadon Farm PARISH WARD BOUNDARY COINCIDENT WITH ELECTORAL DIVISION BOUNDARY MOUNT HAWKE AND PORTREATH ED ILLOGAN ED ELECTORAL DIVISION NAME CAMBORNE CP PARISH NAME PORTREATH CP TEHIDY PARISH WARD PARISH WARD NAME 1 0 3 3 B Carvannel Carvannel Farm Downs Mirrose Chytodden D is Well Cove m a n t le Map referred to in the Cornwall (Electoral Changes) Order 2011 d R a i lw a Sheet 5 of 20 y Penpraze Trengove Crane Islands Basset's Cove This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown copyright. Tehidy Barton Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. The Local Government Boundary Commission for England GD100049926 2011. Nursery r e t r a e t W a w W o ILLOGAN ED h A L LE Scale : 1cm = 0.08500 km g XA n i ND a RA H R e OA n D M a ILLOGAN Grid interval 1km e M PARISH WARD Golf Links C O T R Greenbank Cove O A NE D LA fs E lif IN C B h D rt OO o W N ILLOGAN CP Deadman's Cove Reskajeage Downs (National Trust) S P A R LA N E S O U T H D R Old Merrose Farm IV E I Derrick LL Merrose Farm O Cove iffs G Cl A rth N No D O W N S Home Farm Tehidy Park 01 B 33 TEHIDY Nursery PARISH WARD PARK BOTTOM PARISH WARD Downs Farm Magor Farm POOL AND TEHIDY
    [Show full text]
  • A Unique Opportunity for Copper, Tin and Lithium in Cornwall
    A unique opportunity for copper, tin and lithium in Cornwall All information ©Cornish Metals Inc. All Rights Reserved. 1 Cornish Metals Inc Corporate Presentation Disclaimer This presentation may contain forward-looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements may include statements regarding exploration results and budgets, resource estimates, work programs, strategic plans, market price of metals, or other statements that are not statements of fact. Although the expectations reflected in such forward-looking statements are reasonable, there is no assurance that such expectations will prove to have been correct. Various factors that may affect future results include, but are not limited to: fluctuations in market prices of metals, foreign currency exchange fluctuations, risks relating to exploration, including resource estimation and costs and timing of commercial production, requirements for additional financing, political and regulatory risks. Accordingly, undue reliance should not be placed on forward-looking statements. All technical information contained within this presentation has been reviewed and approved for disclosure by Owen Mihalop, (MCSM, BSc (Hons), MSc, FGS, MIMMM, CEng), Cornish Metals’ Qualified Person as designated by NI 43-101. Readers are further referred
    [Show full text]
  • Computer Simulation at Wheal Jane, Cornwall
    Computer Simulation at Wheal Jane, Cornwall K. A. Lewis,* A. Wells,t and P. Tucker* Abstract Mathematical modelling methods were used at Wheal Jane. to investigate the sensitivity of the Stokes hydrosizer to changes in the operating variables, with the view to improving the process efficiency. The major conclusion was that the hydrosizer was overloaded. The results indicated that throughput and spigot densities were the most sensitive variables. The model predictions demonstrated that a significant improvement in classification efficiency (both in sharpness of separation and in fines misplacement) could be achieved by (i) increasing hydrosizer capacity and (ii) increasing spigot 1 density to its practical limit. Based on these predictions, a decision was made to install a second hydrosizer in parallel with the first. Subsequent test work on the new circuit validated the predictions and confirmed that an improved efficiency had been achieved. From monitoring plant performance for 4 month periods before and after the change, it was established that a significant increase in overall tin concentrate grade had resulted. Further improvements are now expected from optimizing the hydrosizer/primary tabling circuit (as an integral unit), that is by tuning the table operations to more fully exploit the now better classified feeds. Recommendations, in this direction, will be provided by computer simulation methods. This paper reports on the computer simulation techniques used in this study: their basis and their application to optimizing both unit processes and larger blocks of the process flowsheet. The mathematical models of the Stokes hydrosizer and the shaking table are discussed briefly and their scope and limitations are ex~mined within the context of this investigation.
    [Show full text]
  • Environmental Protection Final Draft Report
    Environmental Protection Final Draft Report ANNUAL CLASSIFICATION OF RIVER WATER QUALITY 1992: NUMBERS OF SAMPLES EXCEEDING THE QUALITY STANDARD June 1993 FWS/93/012 Author: R J Broome Freshwater Scientist NRA C.V.M. Davies National Rivers Authority Environmental Protection Manager South West R egion ANNUAL CLASSIFICATION OF RIVER WATER QUALITY 1992: NUMBERS OF SAMPLES EXCEEDING TOE QUALITY STANDARD - FWS/93/012 This report shows the number of samples taken and the frequency with which individual determinand values failed to comply with National Water Council river classification standards, at routinely monitored river sites during the 1992 classification period. Compliance was assessed at all sites against the quality criterion for each determinand relevant to the River Water Quality Objective (RQO) of that site. The criterion are shown in Table 1. A dashed line in the schedule indicates no samples failed to comply. This report should be read in conjunction with Water Quality Technical note FWS/93/005, entitled: River Water Quality 1991, Classification by Determinand? where for each site the classification for each individual determinand is given, together with relevant statistics. The results are grouped in catchments for easy reference, commencing with the most south easterly catchments in the region and progressing sequentially around the coast to the most north easterly catchment. ENVIRONMENT AGENCY 110221i i i H i m NATIONAL RIVERS AUTHORITY - 80UTH WEST REGION 1992 RIVER WATER QUALITY CLASSIFICATION NUMBER OF SAMPLES (N) AND NUMBER
    [Show full text]
  • Godrevy Cove
    North Coast – West Cornwall GODREVY COVE This is stretch of beach at low water forms the northern end of the longest beach in Cornwall (5.5km) sweeping round St.Ives Bay to the Hayle Estuary. For most people the beach starts at the Red River and continues to the headland. Facing due west it has views of St.Ives and the Penwith Moors beyond. The sandy beach above high water mark Cove with steps to the beach. At high water there is only a small area of fine golden sand but at low water the beach stretches for over 700m, interspersed with rocky outcrops, to the Red River where it joins the beach of Gwithian. In winter, much of the sand can often be replaced by areas of shingle. The beach can be quite exposed both from any wind from a westerly direction and also the Atlantic swell. Immediately north of the sandy Cove there is an accessible rocky foreshore with patches of The Cove with the iconic Godrevy Island and Lighthouse beyond shingle which is worth exploring but care needs to be taken not to be caught by an incoming tide TR27 5ED - The access road to the National Trust car parks is 1km north of Gwithian on There is rescue/safety equipment and RNLI the B3301 coast road from Hayle to Portreath by the lifeguards are on duty at the Red River end of the bridge over the Red River. The main car parking area beach from mid May until the end of September. (capacity over 100 cars) is open all year, on the edge of the sand dunes, and, within a short walk to the beach along a fenced board-walk path.
    [Show full text]
  • Environmentol Protection Report WATER QUALITY MONITORING
    5k Environmentol Protection Report WATER QUALITY MONITORING LOCATIONS 1992 April 1992 FW P/9 2/ 0 0 1 Author: B Steele Technicol Assistant, Freshwater NRA National Rivers Authority CVM Davies South West Region Environmental Protection Manager HATER QUALITY MONITORING LOCATIONS 1992 _ . - - TECHNICAL REPORT NO: FWP/92/001 The maps in this report indicate the monitoring locations for the 1992 Regional Water Quality Monitoring Programme which is described separately. The presentation of all monitoring features into these catchment maps will assist in developing an integrated approach to catchment management and operation. The water quality monitoring maps and index were originally incorporated into the Catchment Action Plans. They provide a visual presentation of monitored sites within a catchment and enable water quality data to be accessed easily by all departments and external organisations. The maps bring together information from different sections within Water Quality. The routine river monitoring and tidal water monitoring points, the licensed waste disposal sites and the monitored effluent discharges (pic, non-plc, fish farms, COPA Variation Order [non-plc and pic]) are plotted. The type of discharge is identified such as sewage effluent, dairy factory, etc. Additionally, river impact and control sites are indicated for significant effluent discharges. If the watercourse is not sampled then the location symbol is qualified by (*). Additional details give the type of monitoring undertaken at sites (ie chemical, biological and algological) and whether they are analysed for more specialised substances as required by: a. EC Dangerous Substances Directive b. EC Freshwater Fish Water Quality Directive c. DOE Harmonised Monitoring Scheme d. DOE Red List Reduction Programme c.
    [Show full text]
  • Cobalt Mineralisation in Cornwall – a New Discovery at Porthtowan
    G.K. Rollinson, N. Le Boutillier and R. Selly COBALT MINERALISATION IN CORNWALL – A NEW DISCOVERY AT PORTHTOWAN G.K. ROLLINSON 1, N. LE BOUTILLIER AND R. SELLY Rollinson, G.K., Le Boutillier, N. and Selly, R. 2018. Cobalt mineralisation in Cornwall – A new discovery at Porthtowan. Geoscience in South-West England, 14, 176–187. Although cobalt mineralisation has been noted in Cornwall and Devon in the mining literature, there are limited details of its production and paragenesis; detailed mineral studies of cobalt are almost non-existent. This paper describes in detail previously unrecorded cobalt mineralisation discovered at Porthtowan, Cornwall, in the vicinity of old workings which are part of the Wheal Lushington group of mines, immediately west of the village. A small number of massive sulphide/gangue samples (taken from a larger sample suite) were chosen to be as representative as possible. Analysis was carried out using a QEMSCAN® automated mineral SEM-EDS system, which found that samples contained up to 50% cobaltite, along with chalcopyrite, bornite, galena, sphalerite, acanthite, erythrite, matildite, chlorargyite and other primary and secondary mineral species. This assemblage is typical of a sub-type of crosscourse mineralisation, with secondary species a result of significant weathering and supergene alteration, complicated by seawater infiltration due to the coastal location. While the number of samples is limited, the detail of the mineralogical assemblage is significant, as it is the first time such an assemblage has been subjected to this level of scientific scrutiny in Cornwall. 1 Camborne School of Mines, University of Exeter, Cornwall Campus, Penryn, Cornwall, TR10 9FE, UK.
    [Show full text]
  • The Entomologist's Record and Journal of Variation
    M DC, — _ CO ^. E CO iliSNrNVINOSHilWS' S3ldVyan~LIBRARlES*"SMITHS0N!AN~lNSTITUTl0N N' oCO z to Z (/>*Z COZ ^RIES SMITHSONIAN_INSTITUTlON NOIiniIiSNI_NVINOSHllWS S3ldVaan_L: iiiSNi'^NviNOSHiiNS S3iavyan libraries Smithsonian institution N( — > Z r- 2 r" Z 2to LI ^R I ES^'SMITHSONIAN INSTITUTlON'"NOIini!iSNI~NVINOSHilVMS' S3 I b VM 8 11 w </» z z z n g ^^ liiiSNi NviNOSHims S3iyvyan libraries Smithsonian institution N' 2><^ =: to =: t/J t/i </> Z _J Z -I ARIES SMITHSONIAN INSTITUTION NOIiniliSNI NVINOSHilWS SSIdVyan L — — </> — to >'. ± CO uiiSNi NViNosHiiws S3iyvaan libraries Smithsonian institution n CO <fi Z "ZL ~,f. 2 .V ^ oCO 0r Vo^^c>/ - -^^r- - 2 ^ > ^^^^— i ^ > CO z to * z to * z ARIES SMITHSONIAN INSTITUTION NOIinillSNl NVINOSHllWS S3iaVdan L to 2 ^ '^ ^ z "^ O v.- - NiOmst^liS^> Q Z * -J Z I ID DAD I re CH^ITUCnMIAM IMOTtTIITinM / c. — t" — (/) \ Z fj. Nl NVINOSHIIINS S3 I M Vd I 8 H L B R AR I ES, SMITHSONlAN~INSTITUTION NOIlfl :S^SMITHS0NIAN_ INSTITUTION N0liniliSNI__NIVIN0SHillMs'^S3 I 8 VM 8 nf LI B R, ^Jl"!NVINOSHimS^S3iavyan"'LIBRARIES^SMITHS0NIAN~'lNSTITUTI0N^NOIin L '~^' ^ [I ^ d 2 OJ .^ . ° /<SS^ CD /<dSi^ 2 .^^^. ro /l^2l^!^ 2 /<^ > ^'^^ ^ ..... ^ - m x^^osvAVix ^' m S SMITHSONIAN INSTITUTION — NOIlfliliSNrNVINOSHimS^SS iyvyan~LIBR/ S "^ ^ ^ c/> z 2 O _ Xto Iz JI_NVIN0SH1I1/MS^S3 I a Vd a n^LI B RAR I ES'^SMITHSONIAN JNSTITUTION "^NOlin Z -I 2 _j 2 _j S SMITHSONIAN INSTITUTION NOIinillSNI NVINOSHilWS S3iyVaan LI BR/ 2: r- — 2 r- z NVINOSHiltNS ^1 S3 I MVy I 8 n~L B R AR I Es'^SMITHSONIAN'iNSTITUTIOn'^ NOlin ^^^>^ CO z w • z i ^^ > ^ s smithsonian_institution NoiiniiiSNi to NviNosHiiws'^ss I dVH a n^Li br; <n / .* -5^ \^A DO « ^\t PUBLISHED BI-MONTHLY ENTOMOLOGIST'S RECORD AND Journal of Variation Edited by P.A.
    [Show full text]
  • CORNWALL ELECTRIC POWER COMPANY by Eric Edmonds
    SUPPLEMENT TO THE HISTELEC NEWS No.S23 APRIL 2003 ELECTRICITY IN CORNWALL – PART 2 CORNWALL ELECTRIC POWER COMPANY by Eric Edmonds Continuing our story of “Electricity in Cornwall” with Part 2 extracted from 6 articles in the Trevithick Society Annual Journal No.29 as above written by Eric Edmond, who I failed to say last time, that he is President of the Trevithick Society. This edition also includes three appendices : 2 – Hayle Generating Station, mainly plant details 3 – Areas Never Supplied by CEPC 4 – Staff – Management & Engineering Department ---------------------------------------------------------------------------------------------------------------------------------------------------- Dolcoath Mine and The Cornwall Electric Power Mine gave an option to Edmundsons to purchase the Act 1902 rights of the 1902 Act, and on 3.10.08 Edmundsons Sinking of the Williams' Shaft had been started in resolved to take up this option. On the same date, the 1896, in order to improve the haulage of ore from the CEPCo., held another meeting at Dolcoath Mine and mine. It was also evident from the start that the three Directors nominated by Edmundsons were existing Cornish pumping engines would soon have to present, and thereafter, Messrs. F Harvey, 0.Wethered be replaced. Consideration was given by the mine to and L.C. Foster are not listed in the Minute Book. Mr. generating their own supply and the Cornwall Electric C.H. Jones took over as Secretary. Power Syndicate was formed, with Mr. F Harvey as Chairman, and Mr. O.Wethered as Vice-Chairman. In 1908 the Royal Cornwall Polytechnic Society They were respectively Chairman and Vice-Chairman chose Camborne as the site for their annual of Dolcoath Mine Ltd.
    [Show full text]