Social Monitoring Report

Project Number 42459-013 Loan 2790 Semestral Report July to December 2016

SRI : Local Government Enhancement Sector Project (LGESP)

Prepared by LGESP (Pura Neguma) Project Management Unit for the Ministry of Provincial Councils and Local Government, , and the Asian Development Bank.

Th e Social monitoring reports are documents owned by the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Public Communication Policy 2011 and as agreed between ADB and the Democratic Socialist Republic of Sri Lanka.

Government of Sri Lanka Ministry of Provincial Councils and Local Government

Semi- Annual Social Safeguards Monitoring Report

(for period ending 31.12.2016)

January 2017

Local Government Enhancement Sector Project ADB Loan Number: Loan 2790-SRI

Project Management Unit Local Government Enhancement Sector Project 191 A - J R Jayawardane Centre, Colombo 07, Sri Lanka Ministry of Provincial Councils and Local Government

LOCAL GOVERNMENT ENHANCEMENT SECTOR PROJECT

SOCIAL SAFEGUARDS MONITORING REPORT (As on 31 12 2016)

A. Executive Summary

The Overall progress of the Project is around 93% in 91% elapsed time considering the extended period 30/06/2017. elapsed time. All 184 Civil works are awarded to date and 152 works have been completed and the others are in advanced stages of implementation.

Resettlement Screening has been done for all subprojects and they have been categorized as “C”.

Impact on Indigenous People Screening has been done for all subprojects and they have been categorized as “C”

All the subprojects comply with the concerned laws and regulations of Sri Lanka.

Hence, it can be concluded that sub-projects of the Project do not have significant social safeguard issues. The subprojects have been categorized as ‘C’ as they do not have significant impacts based on the screening mentioned above.

Public consultations are carried out during planning and design stage and public issues are addressed during implementation to ensure that the any of stakeholders are not affected adversely on implementation of the subprojects.

GRM for the project is developed and approved by ADB and disclosed in project website. All the Grievances are attended by the Project Authorities.

No resettlement issues in the project to date.

B. Background of the Report and Project Description

Background of the Report:

The objective of the report is to provide an insight into the Compliance of social safeguard under the project and provide information on various safeguard issues (if any) and measures taken to solve them.

Project Description:

The Project – Local Government Enhancement Sector Project (LGESP) funded by the Asian Development Bank under Loan 2790 SRI (SF) is being implemented by the Ministry Provincial Councils and Local Government (MPC& LG), .

The Project is envisaged to improve the infrastructure services in selected local authorities who are lagging in terms of overall development. About 108 Local Authorities in seven of Sri Lanka (except Northern and Eastern Provinces) have been selected to be taken up for development of Infrastructure facilities under the Project. The various subprojects Local Government Enhancement Sector Project Page 2 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government that would be taken up for implementation under this Project are roads and bridges, water supply and sanitation, drainage, solid waste management, and other basic facilities, including building or enhancing health-care centers and public markets.

The project will also support the institutional strengthening of the local authorities for improved and sustainable service delivery through business process reengineering and the development of their information technology (IT) system.

The Project has three components – Component 1: Local Government Infrastructure and Service Delivery System; Component 2: Local Government Policy Reforms and Capacity Building Support; Component 3: Project Management and Administration Support which were explained in detail in the first monthly report.

An amount of 59 Million USD (Present Net Amount – 52.09 Million) is obtained as a loan from Asian Development Bank and GoSL contributes 9.77 Million USD equivalent to the Project of size 62.77Million USD.

The Ministry of Provincial Councils and Local Government is the Executing Agency of the Project and implements the Project by establishing a Project Management Unit (PMU) to oversee and coordinate the overall implementation of the Project. The PMU is headed by the Project Director with necessary staff. At Provincial Level the Project is Co-ordinated by Sub Project Co-ordination Unit (Units).

C. Scope of Impacts

The subprojects are very small to the tune of 0.1 to 0.4mn US $ and consists of small office buildings, markets, libraries, small water supply projects etc. which do not have any significant adverse social impacts.

D. Compensation and Rehabilitation

As on date, considering the subprojects taken up, there is no rehabilitation / resettlement involved in the project. However, the project would report if it encounters any cases of rehabilitation / resettlement in future.

The process of temporary relocation of the vendors during the weekly fair to a nearby place with basic facilities was informed to ADB and ADB has since concurred the process and the process as agreed with ADB is being followed.

E. Project disclosure, public participation and consultation

The project has followed a consultative process in deciding the subprojects and finalizing the designs of the project.

At the PPTA and further stages adequate consultations were held in finalization of the subprojects. The details of the consultation in the project identification stage were given in the previous report. Public Consultations are once again held during the finalization of the design and comments considered in finalization of design. Public Consultations were held during the Implementation stage also. The details of public consultations during the design stage and implementation stage are given in Attachment 1.

Local Government Enhancement Sector Project Page 3 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

All project information and details of the subproject awards is informed in website of the project www.puraneguma.lk

F. Grievance Redress Mechanism (GRM)

A Grievance Redress Mechanism (GRM) has been prepared for the project and got cleared by ADB.

The framework of Grievance Redress Mechanism was given in the previous reports.

The Grievance Redress Mechanism of the Project is disclosed in the project website www.puraneguma.lk

The list of grievances recorded and attended is provided regularly in the quarterly progress reports.

G. Institutional Arrangement

Following are the institutional arrangements in respect to social safeguards:

Following are the details of the staff / experts hired for PMU (Project Management Unit); SPCU (Subproject Coordination Units of the Provinces) and the consultants.

1. Project Management Unit (PMU) - Central Office at Colombo.

This is staffed by:  One Safeguard Manager (Social and Gender) This responsibility is looked after by the Safeguards Manager (Environment) on an acting basis.

2. Subproject Coordination Unit (SPCU) - All Seven Provinces

This is staffed by:  Safeguard Manager (to look after social, gender and environmental issues)

3. The Project Management Consultants has also staffed by a Safeguards Expert (Social and Gender) who was also looking after all safeguard issues.

H. Monitoring Results – Findings

As on date, the project has not encountered any rehabilitation / resettlement issues.

There has been no significant issue on this account till date. The details of monitoring and safeguard compliance has been cumulated as on 31 December 2016 and attached to this report as Attachment 2.

Local Government Enhancement Sector Project Page 4 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

I. Follow up Actions, Recommendation and Disclosure

There are no specific follow up actions and recommendation at this stage.

The safeguard compliance reports as on 31 December 2016, are disclosed in the Project website www.puraneguma.lk

J. Social Safeguard Monitoring Checklist

Enclosed vide Attachment 4.

Attachment 1: Details of public consultation during Design and Implementation

Attachment 2: Social Safeguard Compliance Report as on 31 December 2016

Attachment 3 Grievances Redresal Status Summery Reports

Attachment 4: Other Social Safeguards related Reports

Attachment 5: Social Safeguard Monitoring checklist.

Local Government Enhancement Sector Project Page 5 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Attachment 1 Details of Public Consultation during Project Design and Implementation

Local Government Enhancement Sector Project Page 6 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Local Government Enhancement Sector Project – Pura Neguma Details of Community Consultation – Design and Implementation Stage – 31 December 2016 (Including Sex-disaggregated details)

1. Central

No. of Participants Sl. Design Stage Implementation Stage Sub project Name No % % Male Female Total Male Female Total Female Female Construction of 56 08 64 13 06 02 08 25 01 Patha hewaheta MPB Construction of PS Building 11 14 25 56 15 13 28 46% Construction of weekly Fair 79 15 94 16 60 20 80 25% 02 Rattota Construction of Health Center 24 13 37 35 20 10 30 33% Construction of water scheme 42 42 84 50 39 46 133 35 03 Udadumbara Construction of weekly Fair & Public 42 17 59 29 57 38 95 40 Toilets Construction of water scheme 47 26 73 37 17 04 21 19 04 Minipe Construction of 10 15 25 60 8 12 20 60% MPB 05 Thumpane Construction of 07 05 12 42 13 36 49 73 MPB 06 Naula Construction of 32 16 48 33 09 02 11 18 MPB 07 Panwila Construction of Bridge 90 73 163 45 28 17 45 38 Construction of Health Center 28 17 45 38 35 46 81 57 08 Wilgamuwa Construction of 151 45 196 30 58 60 118 51 weekly Fair Construction of water scheme 22 23 45 51 59 41 100 41 Construction of crematorium 23 23 46 50 18 11 29 38 Construction of PS upper floor 06 14 20 70 10 12 22 54%

Local Government Enhancement Sector Project Page 7 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

No. of Participants Sl. Design Stage Implementation Stage Pradeshiya Sabha Sub project Name No % % Male Female Total Male Female Total Female Female 09 Yatawatta Construction of PS upper floor 31 41 72 57 10 02 12 17 10 Ambagamuwa Construction of internal Roads 40 08 48 17 13 03 16 19 Construction of public toilet 16 04 20 20 14 06 20 30% 11 Gangawatako Construction of 28 48 76 63 22 36 58 62% rale MPB 12 Laggala Pallegama Construction of water scheme 49 26 75 35 14 16 30 53 Construction of weekly Fair 15 09 25 36 08 12 20 40 13 Ambangangak Construction of MPB 34 42 76 55 28 38 66 57% orale 14 Medadumbara Construction of crematorium 28 04 32 13 26 10 36 27% Construction of internal Roads 48 25 73 27 30 08 38 21 15 Construction of MPB 18 01 19 05 15 12 27 44% 16 Harispattuwa Construction of PS Building 25 01 26 04 23 08 31 25% 17 Udapalatha Construction of water scheme 91 81 172 47 130 129 259 50 18 Ambagamuwa Construction of Public toilet 34 42 76 55 40 08 48 17 korale Construction of internal roads 40 08 48 17 15 53 68 78 19 Construction of PS Building 16 11 27 41 18 04 22 18 20 Wilgamuwa Construction of 55 25 76 33 60 35 95 36% Drinking Water Scheme(CKD) 21 Pallepola Construction of MPB 17 09 26 35 - - - - 22 Construction of MPB 25 08 33 24 - - - - 23 Construction of MPB 13 01 14 07 - - - - Construction of MPB 24 06 30 20 - - - - 24 Construction of Drinking Water 57 70 127 55 - - - - Scheme (CKD) 25 Galewela Construction of Drinking Water 14 29 43 67 - - - - Scheme (CKD) 26 Dambulla Water Treatment Plant 22 20 42 48 - - - - Water Treatment Plant 21 32 53 60 - - - - Local Government Enhancement Sector Project Page 8 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

No. of Participants Sl. Design Stage Implementation Stage Pradeshiya Sabha Sub project Name No % % Male Female Total Male Female Total Female Female 27 Udunuwara Construction of MPB 15 02 17 12 - - - - Total 1446 919 2365 38% 918 750 1668 45%

North Central Province

No. of Participants Design Stage Implementation Stage Sl. Pradeshiya Sabha Sub project Name % % No Male Female Total Femal Male Female Total Femal e e 1 Galenbindunawewa Construction of a multipurpose building, 29 51 80 36 55 30 85 35 Children’s park 2 Galenbindunawewa Improvement of existing water supply 29 51 80 36 23 22 45 49 3 Galenbindunawewa Development of the weekly fair 56 17 73 30 23 22 45 49 4 Galnewa Construction of Bulnewa weekly fair 14 6 20 30 28 10 38 26 5 Galnewa Construction of public toilet facility 14 6 20 30 28 10 38 26 6 Galnewa Completion of water projects of Musnawa, 109 97 206 47 24 12 36 33 Namalgamuwa and Kandegama 7 Horowpohwwthana Construction of a multipurpose building, 31 10 31 24 16 14 30 46 Children’s park 8 Horowpothana Public toilet 31 10 31 24 16 14 30 46 9 Ipalogama Multipurpose building 28 27 55 49 14 6 21 28

10 Ipalogama Construction of public toilet facility 28 27 55 49 14 6 21 28 11 Kebithigollawa Completion of balance work of PS building 21 20 41 49 14 09 23 39 13 Kebithigollawa Improvement to existing public toilet facility 21 20 41 49 14 09 23 39 14 Kebithigollawa Construction of weekly fair 160 39 199 20 14 09 23 39 15 Padaviya PS Construction of a multipurpose building 44 26 70 37 38 21 59 35 with children’s park - Prackramapura 16 Padaviya Construction of public toilet facility - 44 26 70 37 38 21 59 35 Prackramapura, 17 Padaviya Construction of internal roads with 44 26 70 37 38 21 59 35 drainage system – Prackramapura, Local Government Enhancement Sector Project Page 9 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

No. of Participants Design Stage Implementation Stage Sl. Pradeshiya Sabha Sub project Name % % No Male Female Total Femal Male Female Total Femal e e 18 Palagala Construction of a multipurpose building 14 8 25 36 9 16 25 64 with children’s park 19 Palagala Construction of public toilet facilities 14 8 25 36 9 16 25 64 20 Palagala Construction of weekly fair 41 9 18 9 16 25 64 21 Rajangane Construction of weekly fair it’s access road 128 54 182 27 66 62 128 48 and drainage system 22 Rajanganaya Completion of water projects of 35 29 64 45 66 62 128 48 Rajanganaya 23 Rambewa Construction of a multipurpose building 21 4 25 16 81 22 93 23 24 Rambewa Construction of the weekly fair with toilet 108 19 129 15 81 22 93 23 facility 25 Thirappane Construction of a city hall with a podium 36 12 48 25 13 15 28 53 and library 26 Thirappane Construction of public toilet facility 79 21 100 21 13 15 28 53

27 Dimbulagala Improvements of projects Nuwaragala, 77 43 120 36 40 20 60 33 Siripura and Aralaganvila 28 Dimbulagala Construction of the weekly fair with toilet 17 11 28 39 40 20 60 33 29 Dimbulagala Internal roads and pavements - 17 11 28 39 40 20 60 33 Aralaganwila 30 Lankapura Construction of bus stand & public toilet 30 22 52 42 25 19 44 43 facility 31 Lankapura Community facility with public toilet 30 22 52 42 46 19 38 29 32 Lankapura Improvement of internal roads 30 22 52 42 25 19 44 43 33 Lankapura Construction of the weekly fair 30 10 40 25 25 19 44 43 34 Welikanda Agro based Economic Centre 151 50 201 23 14 15 29 51 35 Welikanda Construction of public toilet facilities 151 50 201 23 14 15 29 51 36 Mihinthale 11 12 33 33 27 21 58 36 Supply and Laying of Main Delivery Line for Mihinthale Water Supply Scheme

37 Thamankaduwa Water supply Scheme for Kalahagala 55 59 104 52 26 09 35 26 Water Supply 38 Higurakgoda Water supply Scheme for Kumaragama 28 34 62 55 21 36 57 63 Water Supply Scheme Local Government Enhancement Sector Project Page 10 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

No. of Participants Design Stage Implementation Stage Sl. Pradeshiya Sabha Sub project Name % % No Male Female Total Femal Male Female Total Femal e e 39 Welikanda Water supply Scheme for Welikanda 20 41 61 67 70 60 130 46 40 Thirappane (CKD) Water supply Scheme for Uththupitiya 63 23 86 26 41 Higurakgoda (CKD) Water supply Scheme for Bendiwewa 45 37 82 45 - - - - Thamankaduwa (CKD) 42 Higurakgoda (CKD) Capacity improvement of Minneriya Water 19 12 39 35 - - - -- Treatment Plant 43 Mahailluppallama Water Supply Extension to 125 92 217 42 - - - - (CKD) Thirappane Mahailluppalama and Thirappane, North (CKD) central Province. 44 Kekirawa (CKD) Extension of Pipe Line to Elagamuwa in 131 71 202 54 - - - -- Grater Dhambulla water Supply Scheme 45 Mihinthale (CKD) Improvement of Nuwarawewa Water 21 19 40 47 - - - - Nuwaragampalatha Treatment Plant East (CKD) Total 2230 1271 3501 36 1157 774 1931 40

3. North Western Province

No. of Participants S. Design Stage Implementation Stage PradeshiyaSabha Sub project Name No % % Male Female Total Male Female Total Female Female Construction of Water Supply Scheme for Wanathawilluwa 1 Wanathavilluwa PS 137 113 250 45 51 85 136 63 Supplying and Laying of Pipes for the extension of Nikaweratiya water supply Maho/ Polpithigama 2 scheme in Maho and Polpithigama 28 34 62 55 82 148 230 65 Pradeshiya Sabha Areas 3 Supplying &Installation of Pumps and Maho/ Polpithigama -- Accessories for Extension of Nikaweratiya - - Local Government Enhancement Sector Project Page 11 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Water Supply Scheme in Maho & 25 17 42 41 Polpithigama Pradeshiya Sabha Areas 4 Ibbagamuwa Supplying and laying of pipe for the -- Ibbagamuwa PS Areas 85 108 193 56 - - Ibbagamuwa Supplying and laying of pipe for the 5 108 37 145 -- Ibbagamuwa PS Areas 25 - - 6 Karuwalagaswewa Water Supply Scheme 91 201 296 67 - -- -

Construction of PS building, and 28 2 30 6 -- 7 Kudagalgamuwa Library building - - 8 19 9 28 Construction of PS building 32 -- - - 39 10 49 - - Construction of new public market complex 20 -- 9 Construction of Madurankuliya Library 16 10 26 Puttalam 38 -- 10 Building - - 11 Karathanwilluwa Drinkinig Water supply 24 8 32 - - Puttalam 25 -- project 12 15 17 32 53 - - Nattandiya Water supply project in Myilawa Cruis Watta --

13 20 16 36 - - Nattandiya Panangoda Water supply project 44 --

14 Nattandiya Construction of Marada Drainage system 11 11 22 50 - -- - Total 646 593 1239 48 - -- -

Sabaragamuwa Province

No. of Participants Sl. Design Stage Implementation Stage Pradeshiya Sabha Sub project Name No % % Male Female Total Male Female Total Female Female 1 Udawalawe Weekly Fair 52 28 80 35 116 87 203 42 2 Kahawatta Kahawatta weekly fair 34 19 53 36 104 75 179 43

Local Government Enhancement Sector Project Page 12 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

3 Ruwanwalla Multipurpose building with PS office 9 24 33 73 12 11 23 49 4 Palmadulla Multipurpose Building with Fair 28 9 37 24 14 3 17 18 5 Ayagama Weekly Fair 18 15 33 45 5 4 9 44 6 Yatyantota Weekly Fair 28 13 41 32 7 3 10 30 7 Galigamuwa Multipurpose Building with Weekly Fair & 28 13 41 32 82 38 120 33 Ahakiyatha Road 8 Aranayaka MPB with PS Building 40 8 48 17 9 8 17 40 9 Yatyantota Weekly Fair 46 35 81 43 10 Kollonna MPB with PS Building 10 11 21 52 11 9 20 45 11 Dehiovita Drainage System 19 14 33 42 6 2 6 25 12 Bulathkohupitiya Road to Compost Plant 12 5 17 29 6 2 8 25 13 MPB & Pre-school 42 24 66 36 6 2 8 25 14 Ayagama Bus Stand with Toilet 14 5 19 26 7 5 12 41 15 Daraniyagala MPB 14 3 17 18 5 3 8 37 16 Embilipitaya Kaparalla Road 40 29 69 42 24 21 45 45 17 Kegalla MPB 7 16 23 70 4 2 6 32 18 Bulathkohupitiya MPB 22 8 30 26 6 3 9 50 19 Imbulpe MPB 53 27 80 34 9 2 11 33 20 Daraniyagala Link Road 13 3 16 19 6 3 9 25 21 Imbulpe Samanalagama Road 30 15 45 33 40 15 55 30 22 Balangoda Compost Building 18 8 26 31 - - - - 23 MPB with PS Office 24 12 36 33 8 3 11 27 24 Yatiyantota Weekly Fair 25 6 31 20 5 3 8 27% 25 Palmadulla Weekly Fair 13 6 19 30 8 5 13 35% 26 Balangoda Compost Building 24 15 39 40 - - - - 27 Palmadulla Weekly Fair 86 53 139 30 - - - - 28 Galigamuwa Ahakiyatha Road 13 4 17 23 3 2 5 40 29 Galigamuwa MPB with weekly Fair - - - - 12 4 16 25 Total 761 428 1189 36 515 315 830 38

Local Government Enhancement Sector Project Page 13 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

5. Southern Province:

Design Period Implementation Period No. of Participants No. of Participants S/N LA Sub project Male Female Total % Male Female Total % Female Female Construction of PS Building 1 Akuressa 11 3 14 21% Development of Compost Plant Construction of bridge 8 3 11 38 % 2 Athuraliya 6 8 14 57% Weekly Fair 10 5 15 33 % Construction of the roads 3 Hakmana 16 6 22 27% Water Supply 4 Kamburupitiya Kamburupitiya Bus Stand- - - - - 21 11 32 34 % Construction of bus stand with few shops + 5 Kirinda - Puhulwella 28 15 43 35% Weekly fair + Improvement to PS Building Construction of Multipurpose Building 6 Kotapola (Maternity and Health Centre, Library, 7 4 11 27% Community Hall) Construction of PS office building along with the 7 Malimbada 32 12 44 27% library and Community Hall Construction of PS office building + Weekly fair 8 Mulatiyana - - - - 43 10 53 19 % + Public Toilet 9 Pasgoda Construction of PS Building - - - - 26 10 36 28 % Construction of Weekly Fair + Improvement to Library Building + (Construction of multi- 10 Pitabeddara 10 8 18 44% purpose building (Community Hall, Montessori, HR development center)

Local Government Enhancement Sector Project Page 14 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Construction of the weekly fair + PS Office 11 Thihagoda 67 7 74 9% 11 01 12 8 % Building Construction of Bus Stand + Public Toilet ------12 Imaduwa Improvement to existing 12 shops and - - - - 50 9 59 15% construction of front yard and Community Hall) Construction of Multipurpose Building Sub 13 5 18 28% 13 Karandeniya office, Library, Ayurveda Montessori Improvement of Public Toilet - - - - 13 5 18 28% Construction of weekly fair + Multipurpose 14 Nagoda Building (Sub office, Library, Community Hall & 26 8 34 24% Montessori) PS Office Building + Weekly fair 15 Neluwa Internal Roads 28 5 33 15% Internal Road CC need to be conduct Construction of Weekly Fair + Bus stand and 16 Thawalama 19 5 24 21% Toilet + PS Office Construction of a Multi- purpose building Welivitiya - 17 (Library, Ayurweda, Montessori, Community 27 11 38 29% Divithura Hall etc.) Construction of PS Building 18 22 12 34 35% Solid Waste Management (Compost Plant) Construction of Bus Stand (Building with 19 Katuwana 22 8 30 27% upstairs) Construction of a new complete PS Office 20 Lunugamwehera - - - - 13 10 23 40 % building Improvements of weekly fair with entrance 21 Sorriyawewa - - - - 45 24 69 34 % roads

22 Thissamaharamaya Construction of weekly fair - - - -

6.

No. of Participants SN LA Sub project Design Stage Implementation stage Local Government Enhancement Sector Project Page 15 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

% % Fem Tot Male Female Total Femal Male Femal ale al e e 1 Multi-Purpose Building (PS office 07 04 11 36% 04 09 13 60% Library, conference Hall) 06 03 09 33% - - - - 15 04 19 26% - - - - Total 28 11 39 28% 04 09 13 60% 2 Multi-Purpose building (PS office, 16 02 18 12% 05 07 12 58% weekly fair) 09 11 20 45% Total 25 13 38 34% 05 07 12 58% Water project Bandarawela 18 24 42 57% - - - - 31 61 92 66% - - - - Total 49 85 134 63% ---- 3 Haldummulla PS building 08 11 19 42% - - - - Multi-Purpose building 13 08 21 38% - - - - 4 PS building 09 21 30 70% 12 17 29 59% Umankandura Road 20 13 33 39% 30 27 57 47% 5 Kandeketiya PS building 13 06 19 31% 08 09 17 53% Weekly fair 38 37 75 49% 6 Lunugala PS building & Multipurpose building 10 10 20 50% 06 13 19 68% 11 05 16 31% - - - - 11 04 15 26% - - - - Total 32 19 51 37% 06 13 19 68% 7 Meegahakiula Comfort Centre 14 06 20 30% 21 05 26 20% Weekly fair 12 08 20 40% 18 06 24 25% - - - - 34 05 39 13% Total 52 11 63 17% Bus Stand 12 08 20 40% 19 09 28 32% - - - - 21 05 26 20% Total 40 14 54 26% 8 Rideemaliyadda Weekly fair 14 06 20 30% 9 Uva Paranagama Internal roads 33 08 41 19% 24 06 30 20% 10 14 24 58% Total 34 20 54 37% 10 Badalkumbura PS sub office 10 01 11 10% 05 14 19 73% 06 14 20 70% Total 15 15 30 50% 06 14 20 70% Kirigalpotta Road 12 01 13 7% Local Government Enhancement Sector Project Page 16 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

22 13 35 37% Total 34 14 48 29% 11 Katharagama PS building 04 14 18 22% 05 16 21 75% Total 53 34 87 39% 12 Madulla Bus stand 22 06 28 21% 05 30 35 86% Children park 08 18 26 69% Road & pavement 28 08 36 22% 13 Medagama Comfort centre 08 02 10 20% Library Building 07 07 14 15% 08 09 17 53% 14 Siyambalanduwa PS building 10 08 18 44% 04 09 13 69% Bus Stand 11 09 20 45% 15 PS building 14 06 20 30% 05 09 14 65% Anapallama Crematorium 13 05 18 27% 16 Thanamalwila PS building 07 15 22 65% 09 13 22 59% Weekly fair 12 03 15 20% - - - 17 Passara Water project-P 10 5 15 33% - - - Water project-P 24 8 32 25% - - - Total 34 13 47 27% --- 18 Planning stage- CKD-(p) 27 23 50 46% - - - Rathkinda 77 67 144 46% Committee meeting 13 02 15 13% Committee meeting 14 02 16 12% Total 104 90 194 46% --- 19 Buttala Kukurampola – CKD –(p) 71 46 117 39% - - - Kukurampola 54 28 82 34% - - - Kumaragama 62 43 105 40% - - - Total 187 117 304 38% --- 20 Rideemaliyadda Kuralawela – CKD (p) 54 18 72 25% - - - Ekiriyankumbura (p) 38 23 61 37% - - - 21 Thanamalwila Hambegamuwa-CKD-(p) 18 05 23 21% - - - Hambegamuwa – CKD – (p) 21 05 26 19% - - - Hambegamuwa- 84 87 171 50% --- Kahakurulanpellassa(p) Hambegamuwa(p) 83 145 228 63% - - - Kotaweramankada(p) 55 25 80 31% - - - Kandiyapita(p) 108 47 155 30% - - - Aluthwewa (p) 141 92 233 39% - - - Hambegamuwa-Janapadaya (p) 94 78 172 45% - - - 22 Mahiyangana Batalayaya (CKD) (p) 27 07 34 - - - Local Government Enhancement Sector Project Page 17 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Diulapelassa (CKD) (p) 36 17 53 - - - Belganwewa (CKD) (p) 116 87 203 - - - TOTAL 1713 1246 2959 42% 508 333 84 40% 1

7. Western Province

No. of Participants Design Stage Implementation Stage S Pradeshiya Sub project Name Male Female Total % Male Femal Total % Female N Sabha Female e Construction of PS Building and Library 1 at Pallewela 14 20 34 59 40 22 62 35 2 Water Project 48 14 62 23 90 22 112 19

3 Diulapitiya Construction of PS Office Building 76 45 121 37 28 34 62 55 Construction of a Multi-Purpose 4 Biyagama Building at Mawaramandiya 75 99 174 57 25 27 52 51 Construction of the PS office building 5 Seetawaka include a Library at 23 13 36 36 16 12 28 42 6 Dodangoda construction of PS Office Building and Weekly Fair 83 18 101 18 15 28 43 65 Construction of Weekly Fair and Public 7 Toilet 33 21 54 39 31 09 40 23 Construction of Weekly fair & Toilet 8 Walallawita Block at Iththapana 07 22 29 76 58 16 74 22 Construction of the Multi-Purpose 9 building at Iththapana 02 27 29 93 14 12 26 46

10 Palindanuwara Toilet Block 08 11 19 58 25 15 40 37

11 Water Project 52 18 70 26 73 33 106 31

12 Improvement to Internal Roads 62 27 89 30 17 07 24 29 Construction of Multipurpose building at 13 Madurawala Anguruwatota 25 13 38 34 41 31 72 43 Construction of Library building at 14 Anguruwatota 16 10 26 38 04 11 15 73 Local Government Enhancement Sector Project Page 18 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

No. of Participants Design Stage Implementation Stage S Pradeshiya Sub project Name Male Female Total % Male Femal Total % Female N Sabha Female e 15 Water Project 60 24 84 29 32 21 53 39 Improvements to solid waste 16 Agalawatta management center for Agalawatta PS 11 11 22 50 15 14 29 48 Construction of Multipurpose building for 17 Agalawatta PS 15 24 39 62

Total 610 417 1027 40 524 314 838 37

Local Government Enhancement Sector Project Page 19 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Attachment 2 Detailed Social Safeguard Compliance Reports as on 31 December 2016

Local Government Enhancement Sector Project Page 20 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

1. Central Province

SI. Name of Package No & Status Categori Remarks Further No Pradeshiya Name of Package Contract value (Physical zation Social Safeguard compliance details action Sabha (LKR Mn) progress %) Requires (if any) Resettlement Screening - No IR impact- No Construction of a resettlement issues. (Category C) Land No adverse social 1 Gangawata multi-purpose building CP-NCB-GAN- 100% belongs to the PS. issues reported during korale (Health Centre, 05 Completed. C Impacts on Indigenous People –Screening – the reporting period Community hall, (LKR 45.5Mn) completed. No impacts (category C) - No IPDP Ayurvedic Clinic, / IPDF or specific action required. Library)- Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed 2 Harispattuw Construction of PS CP-NCB-HAR- 100% (category C) - No IR impact- No resettlement No adverse social a office Building 06 Completed issues. issues reported during including (LKR 55.1Mn) C Land belongs to the PS. the reporting period Community Hall, Impacts on Indigenous People –Screening – Health Centre, completed. No impacts (category C)- No IPDP Maternity Care / Centre. IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – Completed 3 Medadumb Improvement of CP-NCB-MED- 100% C (category C) - No IR impact. No adverse social ara Roads. 09 Completed All lands are Government lands. No case of issues reported during (LKR 40.3Mn) resettlement. the reporting period Impacts on Indigenous People –Screening – completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Local Government Enhancement Sector Project Page 21 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

SI. Name of Package No & Status Categori Remarks Further No Pradeshiya Name of Package Contract value (Physical zation Social Safeguard compliance details action Sabha (LKR Mn) progress %) Requires (if any) Resettlement Screening – completed 4 Minipe Construction of CP-NCB-MIN-11 96% (category C) - No IR impact- No resettlement No adverse social Multipurpose building (LKR 61.6Mn) Works in C issues. issues reported during (Community Hall, PS progress Land belongs to the PS. the reporting period Building, Ayurvedic Impacts on Indigenous People –Screening – Clinic, Maternity Care completed. No impacts (category C)- No IPDP Centre) / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed 5 Panwila Huluganga Bridge. CP-NCB-PAN-07 100% C (category No adverse social (LKR 37.6Mn) Completed C) - No IR impact issues reported during No case of resettlement. the reporting period Impacts on Indigenous People –Screening – completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category C) - No IR impact- No resettlement No adverse social 6 Panwila Construction of CP-NCB-PAN- 100% C issues. issues reported during Health Centre. 14 Completed Land belongs to the PS. the reporting period (LKR10.9Mn) Impacts on Indigenous People –Screening – completed. No impacts (category C)- No IPDP IPDF or specific action required Compliance to Sri Lankan Laws and regulation complies with Sri Lankan laws and regulations.

Local Government Enhancement Sector Project Page 22 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

SI. Name of Package No & Status Categori Remarks Further No Pradeshiya Name of Package Contract value (Physical zation Social Safeguard compliance details action Sabha (LKR Mn) progress %) Requires (if any) Resettlement Screening – Completed Construction of a (category C) - No IR impact- No resettlement 7 Pathahewa Multi-Purpose CP-NCB-PAT-15 92% issues. No adverse social heta Building including PS (LKR 51.7Mn) Completed C Land belongs to the PS. issues reported during Office & Impacts on Indigenous People –Screening – the reporting period Library and completed. No impacts (category C)- No IPDP Community Hall - / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed Construction of a CP-NCB-THU-19 100% C (category C) - No IR impact- No resettlement 8 Thumpane Multi - purpose (LKR 58.5Mn) Completed issues. No adverse social building Land belongs to the PS. issues reported during (Community Hall, Impacts on Indigenous People –Screening – the reporting period Library, computer completed. No impacts (category C)- No IPDP center) IPDF or specific action required Compliance to Sri Lankan Laws and regulation complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category 9 Udadumba Water Supply Project CP-NCB-UDA- 95% C C)- No IR impact No adverse social ra 21 Completed All lands are Government lands. No case of issues reported during (LKR 57.1Mn) resettlement. the reporting period Impacts on Indigenous People –Screening – completed. No impacts (category C)- No IPDP IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

Local Government Enhancement Sector Project Page 23 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

SI. Name of Package No & Status Categori Remarks Further No Pradeshiya Name of Package Contract value (Physical zation Social Safeguard compliance details action Sabha (LKR Mn) progress %) Requires (if any) Construction of Resettlement Screening – completed 10 Udadumba Weekly fair, Library, CP-NCB-UDA- 100% C (category C) - No IR impact- No resettlement No adverse social ra Health Centre, 20 Completed issues. issues reported during Community Hall at (LKR 40.4Mn) Land belongs to the PS. the reporting period Hunnasgiriya + Public (Due to variation) Impacts on Indigenous People –Screening – Toilet. completed. No impacts (category C)- No IPDP IPDF or specific action required Compliance to Sri Lankan Laws and regulation complies with Sri Lankan laws and regulations Resettlement Screening – completed Construction of CP-NCB-UPT-22 60% C (category C) - No IR impact. 11 Udapalatha Intakes & Raw water - P1 Completed All lands are Government lands. No case of No adverse social mains for Drinking (LKR 92.7Mn) resettlement. issues reported during water project Impacts on Indigenous People –Screening – the reporting period. Udapalatha PS. completed. No impacts (category C)- No IPDP IPDF or specific action required Compliance to Sri Lankan Laws and regulation complies with Sri Lankan laws and regulations

Local Government Enhancement Sector Project Page 24 ADB Loan Number: Loan 2790-SRI Resettlement Screening – completed (category Construction of Roughing CP-NCB-UPT-22 95% C) - No IR impact. 12 Udapalatha Filters Filter, Chlorinator - P2 (LKR Completed C All lands are Government lands. No No adverse social issues House, Sump &Ministry Care Takers of Provincial39.6Mn) Councils and Local Government resettlement issues. reported during the House for Drinking water Impacts on Indigenous People –Screening – reporting period project Udapalatha PS completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category Construction of CP-NCB-UPT-22 85% C) - No IR impact. Udapalatha Distribution - P3 (LKR Completed C All lands are Government lands. Hence, no No adverse social issues System & Break Pressure 76.2Mn) resettlement issues. reported during the Tanks for Drinking water Impacts on Indigenous People –Screening – reporting period project completed. No impacts (category C)- No IPDP / Udapalatha PS. IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Construction of Resettlement Screening – completed (category Multipurpose CP-NCB-AMB-04 100% C) - No IR impact- No resettlement issues. No adverse social issues 13 Ambangan Building (LKR 45.2Mn) Completed. C Land belongs to the PS. reported during the gakorale (Community Hall, Impacts on Indigenous People –Screening – reporting period Library and completed. No impacts (category C)- No IPDP / Computer Centre) with IPDF or specific action required Children's park. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category Construction of PS building CP-NCB-DAM-01 C) - No IR impact- No resettlement issues Land No adverse social issues 143 Dambulla including Community Hall + (LKR 47.9Mn) 100% C belongs to the PS. reported during the Library. Completed. Impacts on Indigenous People –Screening – reporting period completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category 15 Laggala Construction of CP-NCB-LAG-08 C) - No IR impact- No resettlement issues. Pallegama Weekly Fair Internal (LKR 26.8Mn) 100% C Land belongs to the PS. No adverse social issues Roads and Drainage Completed Impacts on Indigenous People –Screening – reported during the completed. No impacts (category C) - No IPDP / reporting period IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations.

Local Government Enhancement Sector Project Page 25 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Resettlement Screening – completed (category CP-NCB-LAG-13 98% C) - No IR impact. 16 Laggala Water Supply (LKR 59.2Mn) Completed C All lands are Government lands. No case of No adverse social issues Pallegama Project. resettlement. reported during the Impacts on Indigenous People –Screening – reporting period. completed. No impacts (category C) - No IPDP / IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Multipurpose building Resettlement Screening – completed (category 17 Naula (Health Centre, Ayurvedic CP-NCB-NAU-12 100% C) - No IR impact- No resettlement issues. Clinic, Library, Computer (LKR 50.8Mn) Completed C Land belongs to the PS. No adverse social issues Centre). Impacts on Indigenous People –Screening – reported during the completed. No impacts (category C) - No IPDP / reporting period IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category 18 Rattota Development of Weekly Fair CP-NCB-RAT-18 100% C C) - No IR impact- No resettlement issues. No adverse social issues (LKR 12.7Mn) Completed. Land belongs to the PS. reported during the Impacts on Indigenous People –Screening – reporting period completed. No impacts (category C) - No IPDP / IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category 19 Rattota Water Supply Scheme. CP-NCB-RAT-16 99% C) - No IR impact. (LKR 33.3Mn) Completed C All lands are Government lands. No case of No adverse social issues (Due to resettlement. reported during the variation) Impacts on Indigenous People –Screening – reporting period completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C) - No IR impact- No resettlement issues. 20 Rattota Construction of Health and CP-NCB-RAT-17 100% C Land belongs to the PS. No adverse social issues Maternity Care Centre (LKR 15.6Mn) Completed Impacts on Indigenous People –Screening – reported during the completed. No impacts (category C) - No IPDP reporting period Local Government Enhancement Sector Project Page 26 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category CP-NCB-WIL-24 90% C C) - No IR impact. 21 Wilgamuwa Water supply project. (LKR 59.5Mn) Completed All lands are Government lands. No case of No adverse social issues resettlement. reported during the Impacts on Indigenous People –Screening – reporting period completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category Internal roads of weekly fair. CP-NCB-WIL-25 100% C C) - No IR impact- No resettlement issues. 22 Wilgamuwa Completed. Land belongs to the PS. No adverse social (LKR 9.9Mn) Impacts on Indigenous People –Screening – issues reported during completed. No impacts (category C)- No IPDP / the reporting period IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C) - No IR impact- No resettlement issues. Land belongs to the PS. 23 Wilgamuwa Construction of Crematorium. CP-NCB-WIL-26 100% C Impacts on Indigenous People –Screening –No adverse social issues (LKR 15.4Mn) Completed completed. No impacts (category C)- No IPDP /reported during the reporting IPDF or specific action required period Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category Construction of CommunityCP-NCB-WIL-23 100% C C) - No IR impact- No resettlement issues. 24 Wilgamuwa Centre on Existing PS office (LKR 11.7Mn) Completed. Land belongs to the PS. No adverse social issues Building. Impacts on Indigenous People –Screening – reported during the reporting completed. No impacts (category C) - No IPDP / period IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Construction of PS CP-NCB-YTW-27 Resettlement Screening – completed (category Yatawatta Building Upper Floor and 100% C) - No IR impact- No resettlement issues. 25 Library, Community Hall. (LKR 43.9Mn) Completed. C Land belongs to the PS. Local Government Enhancement Sector Project Page 27 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Impacts on Indigenous People –Screening – No adverse social issues completed. No impacts (category C) - No IPDP / reported during the reporting IPDF or specific action required. period Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category 26 Ambagamuwa Construction of the Internal CP-NCB-AMG-02 100% C C) - No IR impact. All lands are GovernmentNo adverse social issues Roads under the PS area (LKR 38.6Mn) Completed. lands. No case of resettlement. reported during the reporting Impacts on Indigenous People –Screening –period completed. No impacts (category C) - No IPDP / IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category No adverse social 27 Ambagamuwa Construction of Comfort CP-NCB-AMG- 100% C) - No IR impact- No resettlement issues. issues reported during Centre. 03 (LKR 6.9Mn) Completed. C Land belongs to the PS. the reporting period Impacts on Indigenous People –Screening – completed. No impacts (category C) - No IPDP / IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Construction of a Resettlement Screening – completed (category 28 Walapane Multipurpose building CP-NCB-WLP-28 100% C C) - No IR impact- No resettlement issues. (Library, Community Hall, (LKR 42.5Mn) Completed. Land belongs to the PS. No adverse social issues Day care center) Impacts on Indigenous People –Screening – reported during the completed. No impacts (category C) - No IPDP / reporting period IPDF or specific action required. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations. Resettlement Screening – completed (category 29 Wilgamuwa Extention of distribution CP-NCB-CKD- 72% C) - No IR impact. system water supply WS-06 LKR Completed C All lands are Government lands. No case of No adverse social issues scheme for Wilgamuwa PS. 67.6Mn) Works in resettlement. reported during the progress. Impacts on Indigenous People –Screening – reporting period completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

Local Government Enhancement Sector Project Page 28 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

2. North Central Province

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%)

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the Construction of PS) No adverse social Padaviya, Comfort Centre NCP/NCB/CC/01 100% Impacts on Indigenous People Screening issues and no loss of 1 Horowpothana Padaviya, C Completed – completed. No impacts (category C)- No livelihood or income Kebithigollewa Horowpothana (14.2Mn) IPDP / IPDF or specific action required during the and Kebithigollewa implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the Construction of PS) No adverse social Ipalogama, Comfort issues and no loss of NCP/NCB/CC/02 100% 2 PalagalaThirap CentresIpalogama C Impacts on Indigenous People Screening livelihood or income (11.5Mn) Completed pane , Palagala and – completed. No impacts (category C)- No during the Thirappane IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 29 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the PS) No adverse social Construction of NCP/NCB/CC/03 issues and no loss of 100% Impacts on Indigenous People Screening 3 Welikanda Comfort Centre - C livelihood or income Completed – completed. No impacts (category C)- No Welikanda (4.9 Mn) during the IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Resettlement Screening – completed No adverse social (category C) - No IR impact- No issues and no loss of resettlement issues (Land belongs to the livelihood or income Construction of PS) during the Weekly fair and NCP/NCB/GLN/09 100% Impacts on Indigenous People Screening 4 Galnewa C implementation comfort Centre - (17.0 Mn) Completed – completed. No impacts (category C)- No Bulnewa, Galnewa IPDP / IPDF or specific action required Constructed in a new Compliance to Sri Lankan Laws and location, no need of regulation - In compliance with Sri relocation arose during Lankan laws and regulation construction

Local Government Enhancement Sector Project Page 30 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the No adverse social Construction of Government) NCP/NCB/LAN/16 issues and no loss of Internal Road - 100% Impacts on Indigenous People Screening 5 Lankapura C livelihood or income Thalpotha, Completed – completed. No impacts (category C)- No (8.5Mn) during the Lankapura IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation During the construction period, existing weekly fair was temporarily Resettlement Screening – completed shifted to a close by (category C) - No IR impact- No Construction of location (nearly 100 m resettlement issues (Land belongs to the Weekly fair with away from the previous PS) toilet facility roads NCP/NCB/DIM/06 location) basic facilities 100% Impacts on Indigenous People Screening 6 Dimbulagala pavement & C were provided to the Completed – completed. No impacts (category C)- No Drainage System - (16.0Mn) temporary location by IPDP / IPDF or specific action required Aralaganwila, the PS Compliance to Sri Lankan Laws and Dimbulagala regulation - In compliance with Sri No adverse social Lankan laws and regulation issues and no loss of livelihood or income, during the implementation

Local Government Enhancement Sector Project Page 31 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) During the construction period existing weekly fair was temporarily Resettlement Screening – completed shifted to a close by (category C) - No IR impact- No location (nearly 250 m resettlement issues (Land belongs to the away from the previous Construction of PS) NCP/NCB/WKD/23 location). An abandon Agro Based 100% 7 Welikanda C Impacts on Indigenous People Screening bus stand was used for Economic Centre - Completed (38.8Mn) – completed. No impacts (category C)- No this with provision of Welikanda IPDP / IPDF or specific action required basic facilities. Compliance to Sri Lankan Laws and No adverse social regulation - In compliance with Sri issues and no loss of Lankan laws and regulation livelihood or income, during the implementation

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the PS) No adverse social Construction of issues and no loss of Multipurpose NCP/NCB/THI/25 100% Impacts on Indigenous People Screening 8 Thirappane C livelihood or income, Building - (38.5Mn) Completed – completed. No impacts (category C)- No during the Thirappane IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 32 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the No adverse social Construction of PS) issues and no loss of Multipurpose NCP/NCB/RAM/24 100% 9 Rambewa C Impacts on Indigenous People Screening livelihood or income Building - (15.3Mn) Completed – completed. No impacts (category C)- No during the Rambewa IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the Construction of PS) No adverse social Multipurpose issues and no loss of NCP/NCB/IPA/12 100% 10 Ipalogama Building - C Impacts on Indigenous People Screening livelihood or income, (38.3Mn) Completed Mahailuppallama, – completed. No impacts (category C)- No during the Ipalogama IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 33 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the No adverse social Construction of PS) NCP/NCB/PAD/17 issues and no loss of Internal Road - 100% 11 Padaviya C Impacts on Indigenous People Screening livelihood or income Parackramapura, Completed (17.8Mn) – completed. No impacts (category C)- No during the Padaviya IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

New fair building was Resettlement Screening – completed constructed in bare land (category C) - No IR impact- No of the existing fair resettlement issues (Land belongs to the premises therefor no PS) Construction of need to temporarily shift NCP/NCB/KEB/14 100% 12 Kebithigollewa Weekly fair - C Impacts on Indigenous People Screening to other location (13.2Mn) Completed – completed. No impacts (category C)- No Kebithigollewa No adverse social IPDP / IPDF or specific action required issues and no loss of Compliance to Sri Lankan Laws and livelihood or income, regulation - In compliance with Sri during the Lankan laws and regulation implementation

Local Government Enhancement Sector Project Page 34 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the No adverse social Construction of PS) issues and no loss of Multipurpose NCP/NCB/PAD/18 100% 13 Padaviya C Impacts on Indigenous People Screening livelihood or income Building - (16.6Mn) Completed – completed. No impacts (category C)- No during the Padaviya IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Resettlement Screening – completed (category C) - No IR impact- No Construction of resettlement issues (Lands belong to the Water Supply No adverse social NCP/NCB/DIM/4A, PS) Scheem - issues and no loss of 4B, 4C 98% 14 Dimbulagala (Aralaganwila, C Impacts on Indigenous People Screening livelihood or income (19.6Mn,28.4Mn,30 Completed Nuwaragala and – completed. No impacts (category C)- No during the .5Mn) Siripura) IPDP / IPDF or specific action required implementation Dimbulagala Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 35 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the PS) The land in question was allotted by Divisional Secretary to two parties by mistake - (i) Pradeshiya Sabha; and (ii) Renovation works did Government Pensioners trust fund. When not affect fair activity the PS started constructing the MP and hence there was building the trust fund complained to the Construction of no need to temporarily Human Rights Commission. A meeting Multipurpose shift the weekly fair to Galenbindunaw NCP/NCB/GAL/07 100% was held between all parties and the Trust 15 Building & C other location ewa (29.1Mn) Completed Fund and Human Rights Commission Refurbishment of agreed to the solution of the Divisional No adverse social weekly fair Secretary to give another land to trust issues and no loss of fund. This was agreed by all and the livelihood or income construction began after this and hence during the no case of Resettlement. implementation Impacts on Indigenous People Screening – completed. No impacts (category C)- No IPDP / IPDF or specific action required Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 36 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Land belongs to the No adverse social Construction of PS) NCP/NCB/HOR/11 issues and no loss of Multipurpose 100% 16 Horowpothana C Impacts on Indigenous People Screening livelihood or income Building - Completed (38.1Mn) – completed. No impacts (category C)- No during the Horowpothana IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

New PS building was constructed in PS Resettlement Screening – completed owned land nearly 800 (category C) - No IR impact- No m away from existing resettlement issues (Land belongs to the PS building therefor PS) Construction of new location is Balance work in NCP/NCB/KEB/13 100% 17 Kebithigollewa C Impacts on Indigenous People Screening convenient for both PS Building - (23.4Mn) Completed – completed. No impacts (category C)- No public and the staff Kebithigollewa IPDP / IPDF or specific action required No adverse social Compliance to Sri Lankan Laws and issues and no loss of regulation - In compliance with Sri livelihood or income Lankan laws and regulation during the implementation

Local Government Enhancement Sector Project Page 37 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%)

Resettlement Screening – completed New fair building was (category C) - No IR impact- No constructed in bare land resettlement issues (Land belongs to the of the existing fair PS) premises therefor no Construction of need to temporarily shift NCP/NCB/RAM/22 100% 18 Rambewa Weekly fair with C Impacts on Indigenous People Screening to other location (26.1Mn) Completed Toilet - Rambewa – completed. No impacts (category C)- No IPDP / IPDF or specific action required No adverse social issues and no loss of Compliance to Sri Lankan Laws and livelihood or income regulation - In compliance with Sri during the Lankan laws and regulation implementation

Resettlement Screening – completed New fair building was (category C) - No IR impact- No constructed in bare land resettlement issues (Land belongs to the of the existing fair Construction of PS) premises therefore no Weekly fair need to temporarily shift NCP/NCB/RAJ/20 97% 19 Rajanganaya building, Drainage C Impacts on Indigenous People Screening other location (33.8Mn) Completed & Pavement - – completed. No impacts (category C)- No No adverse social Rajanganaya IPDP / IPDF or specific action required issues and no loss of Compliance to Sri Lankan Laws and livelihood or income regulation - In compliance with Sri during the Lankan laws and regulation implementation

Local Government Enhancement Sector Project Page 38 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) New weekly fair building is constructed on bare land. But for the convenience of construction, a few Resettlement Screening – completed vendors are sifted to (category C) - No IR impact- No adjacent location with resettlement issues (Land belongs to the Construction of basic facilities. PS) Multipurpose Therefore, there has Building with NCP/NCB/PGL/19 100% Impacts on Indigenous People Screening been no case of loss of 20 Palagala C Weekly Fair - (40.2Mn) Completed – completed. No impacts (category C)- No livelihood or income. Andiyagala, IPDP / IPDF or specific action required These vendors could be Palagala accommodated back in Compliance to Sri Lankan Laws and the new weekly fair regulation - In compliance with Sri once completed Lankan laws and regulation No adverse social issues and no loss of livelihood or income during the implementation

Local Government Enhancement Sector Project Page 39 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%)

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong to the No adverse social Construction of Goverment) issues and no loss of Water Supply NCP/NCB/RAJ/21 98% 21 Rajanganaya C Impacts on Indigenous People Screening livelihood or income Project - (19.1Mn) Completed – completed. No impacts (category C)- No during the Rajanganaya IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong to the No adverse social Government) issues and no loss of Construction of NCP/NCB/GLN/10 78% livelihood or income 22 Galnewa Water Supply C Impacts on Indigenous People Screening (38.3Mn) Complete during the Scheem - Galnewa – completed. No impacts (category C)- No IPDP / IPDF or specific action required implementation as on date Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 40 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong to the Construction of Government) No adverse social Water Supply issues and no loss of Galenbindunaw NCP/NCB/GAL/08 100% 23 Scheam - C Impacts on Indigenous People Screening livelihood or income ewa (40.5Mn) Completed Galenbindunawew – completed. No impacts (category C)- No during the a IPDP / IPDF or specific action required implementation Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation Initially one family (unauthorized occupant opposedthe construction of fair in proposedland.The matter was referred to Resettlement Screening – completed GR committee. The (category C) - No IR impact- No GRC decided that PS resettlement issues (Lands belong to the has to go for alternative Construction of PS) Weekly fair, bus land for NCP/NCB/LAN/15 97% 24 Lankapura stand and C Impacts on Indigenous People Screening construction.Hence the (27.9Mn) Completed Community Centre – completed. No impacts (category C)- No issue of resettlement - Lankapura IPDP / IPDF or specific action required was avoided Compliance to Sri Lankan Laws and New weekly fair building regulation - In compliance with Sri was constructed in PS Lankan laws and regulation owned land nearly 900 m away from initially identified land. The new location was convenient for both venders and the public

Local Government Enhancement Sector Project Page 41 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Status Package No. and Name of (Physical Categor Social safeguard compliance SN Name of PS contract value Remarks Package Progress ization details (LKR) (%) New fair building was constructed in bare land of the existing fair premises therefore no need to temporarily shift to other location No adverse social issues and no loss of livelihood or income during the implementation

Local Government Enhancement Sector Project Page 42 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Package No. Status Categ and (Physical SN Name of PS Name of Package orizati Social safeguard compliance details Remarks contract Progress on value (LKR) (%) Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong No adverse social Supply and Laying of to the Government) issues and no loss Main Delivery Line for NCP - NCB – 70% of livelihood or 25 Mihinthale Mihinthale Water C Impacts on Indigenous People Screening – CKD-WS-01B Complete income during the Supply Scheme - completed. No impacts (category C)- No IPDP / implementation as Mihinthale IPDF or specific action required on date Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong No adverse social Water supply Scheme to the Government) issues and no loss Thamankaduw for Kalahagala Water NCP - NCB – 80% of livelihood or 26 C Impacts on Indigenous People Screening – a Supply scheem - CKD-WS-02 Complete completed. No impacts (category C)- No IPDP / income during the Thamankaduwa IPDF or specific action required implementation as on date Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong No adverse social Water supply Scheme to the PS) issues and no loss for Kumaragama NCP - NCB – 80% of livelihood or 27 Higurakgoda C Impacts on Indigenous People Screening – Water Supply Scheme CKD-WS-03 Complete completed. No impacts (category C)- No IPDP / income during the - Higurakgoda IPDF or specific action required implementation as on date Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 43 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

Package No. Status Categ and (Physical SN Name of PS Name of Package orizati Social safeguard compliance details Remarks contract Progress on value (LKR) (%)

Resettlement Screening – completed (category C) - No IR impact- No resettlement issues (Lands belong No adverse social to the PS) issues and no loss Water supply Scheme NCP – NCB - 70% of livelihood or 28 Welikanda for Welikanda - C Impacts on Indigenous People Screening – CKD- WS - 04 Complete income during the Welikanda completed. No impacts (category C)- No IPDP / IPDF or specific action required implementation as on date Compliance to Sri Lankan Laws and regulation - In compliance with Sri Lankan laws and regulation

Local Government Enhancement Sector Project Page 44 ADB Loan Number: Loan 2790-SRI Ministry of Provincial Councils and Local Government

3. North Western Province

S. Name of Name of Package Package No. Status Categor Social safeguard assessment / compliance Remarks/Further No Pradeshiya (physical ization details action required (if sabha Cost (LKR progress) any) Mn.) % No adverse social Resettlement Screening - Completed (Category - NWP-NCB- issues reported Improvements to roads C) - No IR Impact - No resettlement issues. 01 Alawwa ALA-04 100% during the reporting for Alawwa C Impact on Indigenous People - Screening - (LKR 33.02 Completed period. Completed. - No Impact. (Category C) - No IPDP / Mn) IPDF or specific action required Resettlement Screening - Completed (Category - NWP-NCB- No adverse social Construction of PS C) - No IR Impact - No resettlement issues. BIN-01 100% issues reported 02 Bingiriya Office Building C Impact on Indigenous People - Screening - (LKR 27.72 Completed during the reporting (Phase2) Completed. - No Impact. (Category C) - No IPDP / Mn) period. IPDF or specific action required NWP-NCB- Resettlement Screening - Completed (Category - No adverse social BIN-06 C) - No IR Impact - No resettlement issues. Construction of weekly 100% issues reported 03 Bingiriya (LKR 14.05 C Impact on Indigenous People - Screening - fair & Toilet Block Completed during the reporting Mn) Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required Resettlement Screening - Completed (Category - NWP-NCB- No adverse social C) - No IR Impact - No resettlement issues. Construction of PS GIR-03 (LKR 100% issues reported Giribawa C Impact on Indigenous People - Screening - Office Building 21.64 Mn) Completed during the reporting Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required 04 Resettlement Screening - Completed (Category - No adverse social NWP-NCB- C) - No IR Impact - No resettlement issues. Construction of Bus 100% issues reported 05 Giribawa GIR-09 (LKR C Impact on Indigenous People - Screening - Stand and Drainage Completed during the reporting 15.67 Mn) Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required No adverse social Construction of Weekly NWP-NCB- 100% Resettlement Screening - Completed (Category - issues reported 06 Giribawa fair & Public Toilet GIR-10 (LKR C Completed C) - No IR Impact - No resettlement issues. during the reporting facility 1.39 Mn) period.

P a g e 45 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Package No. Status Categor Social safeguard assessment / compliance Remarks/Further No Pradeshiya (physical ization details action required (if sabha Cost (LKR progress) any) Mn.) % Impact on Indigenous People - Screening - Completed. - No Impact. (Category C) - No IPDP / IPDF or specific action required Resettlement Screening - Completed (Category - No adverse social Construction of PS NWP-NCB- C) - No IR Impact - No resettlement issues. 100% issues reported 07 Building with library KUL-13 (LKR C Impact on Indigenous People - Screening - Completed during the reporting and Health Center 12.52 Mn) Completed. - No Impact. (Category C) - No IPDP / period IPDF or specific action required Construction of Bus Resettlement Screening - Completed (Category - No adverse social Stand with Service C) - No IR Impact - No resettlement issues. 08 Mawathagam NWP-NCB- 100% issues reported Facility Building and C Impact on Indigenous People - Screening - a MAW-14 (LKR Completed during the reporting improvement of drains, Completed. - No Impact. (Category C) - No IPDP / 44.23 Mn) period toilet facility IPDF or specific action required Resettlement Screening - Completed (Category - No adverse social Construction of the NWP-NCB- C) - No IR Impact - No resettlement issues. 09 100% issues reported Polpithigama Library Building 2 nd POL-16 (LKR C Impact on Indigenous People - Screening - Completed during the reporting phase 17.55 Mn) Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required Resettlement Screening - Completed (Category - No adverse social Construction of NWP-NCB- C) - No IR Impact - No resettlement issues. 100% issues reported 10 Polpithigama Multipurpose Building POL-17 (LKR C Impact on Indigenous People - Screening - Completed during the reporting with Public Toilet 25.74Mn) Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required Resettlement Screening - Completed (Category - No adverse social Construction of Bus NWP-NCB- C) - No IR Impact - No resettlement issues. issues reported 96% 11 Rideegama Stand & Multipurpose RID-18 (LKR C Impact on Indigenous People - Screening - during the reporting Completed Buildinfg 48.5 Mn) Completed. - No Impact. (Category C) - No IPDP / period IPDF or specific action required

P a g e 46 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Package No. Status Categor Social safeguard assessment / compliance Remarks/Further No Pradeshiya (physical ization details action required (if sabha Cost (LKR progress) any) Mn.) % Resettlement Screening - Completed (Category - C) - No IR Impact - No resettlement issues. No adverse social NWP-NCB- Construction of 100% Impact on Indigenous People - Screening - issues reported 12 Udubaddawa UDU-19 (LKR C Multipurpose Building Completed Completed. - No Impact. (Category C) - No IPDP / during the reporting 42.00Mn) IPDF or specific action required period.

Resettlement Screening - Completed (Category - Construction of Weekly C) - No IR Impact - No resettlement issues. No adverse social Arachchikattu fair and drainage NWP-NCB- 100% Impact on Indigenous People - Screening - issues reported 13 C wa system, toilets and ARA-05 (LKR Completed Completed. - No Impact. (Category C) - No IPDP / during the reporting PS Library Building 39.23 Mn) IPDF or specific action required period.

Resettlement Screening - Completed (Category - No adverse social NWP-NCB- C) - No IR Impact - No resettlement issues. Construction of Weekly 100% issues reported 14 CHI-08 (LKR C Impact on Indigenous People - Screening - fair at Madampe Completed during the reporting 14.89 Mn) Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required Construction of Resettlement Screening - Completed (Category - No adverse social Madampe Bus Stand, NWP-NCB- C) - No IR Impact - No resettlement issues. 100% issues reported 15 Chilaw Public toilet facility, CHI-07 (LKR C Impact on Indigenous People - Screening - Completed during the reporting Health Centre & library 32.79 Mn) Completed. - No Impact. (Category C) - No IPDP / period. Building IPDF or specific action required Resettlement Screening - Completed (Category - NWP-NCB- No adverse social Construction of Library C) - No IR Impact - No resettlement issues. KAL-11 100% issues reported 16 Kalpitiya Building and Public C Impact on Indigenous People - Screening - (LKR18.62 Completed during the reporting Toilet Completed. - No Impact. (Category C) - No IPDP / Mn) period. IPDF or specific action required Resettlement Screening - Completed (Category - Construction of PS No adverse social NWP-NCB- C) - No IR Impact - No resettlement issues. Office Building & 100% issues reported 17 Kalpitiya KAL-12 (LKR C Impact on Indigenous People - Screening - Drainage and Completed during the reporting 26.11Mn) Completed. - No Impact. (Category C) - No IPDP / Pavement period. IPDF or specific action required

P a g e 47 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Package No. Status Categor Social safeguard assessment / compliance Remarks/Further No Pradeshiya (physical ization details action required (if sabha Cost (LKR progress) any) Mn.) % Improvement to Weekly fair, Drainage Resettlement Screening - Completed (Category - System, Bus Stand No adverse social C) - No IR Impact - No resettlement issues. Nawagaththeg and Public Toilet, NWP-NCB- 100% issues reported 18 C Impact on Indigenous People - Screening - ama Construction of NAW-15 (LKR Completed during the reporting Completed. - No Impact. (Category C) - No IPDP / Multipurpose Building 39.38 Mn) period. IPDF or specific action required for Nawagaththegama PS Resettlement Screening - Completed (Category - No adverse social Construction of Office NWP-NCB- C) - No IR Impact - No resettlement issues. Wanathawillu 100% issues reported 19 Building for VAN-20 (LKR C Impact on Indigenous People - Screening - wa Completed during the reporting Wanathavilluwa 14.05 Mn) Completed. - No Impact. (Category C) - No IPDP / period. IPDF or specific action required No adverse social Resettlement Screening - Completed (Category - issues reported Construction of Water NWP-NCB- C) - No IR Impact - No resettlement issues. Wanathawillu 75% during the 20 Supply Scheme for VAN-21 (LKR C Impact on Indigenous People - Screening - wa Completed implementation Wanathavilluwa PS 58.95 Mn) Completed. - No Impact. (Category C) - No IPDP / until the reporting IPDF or specific action required period. Supplying and Laying of Pipes for the Resettlement Screening - Completed (Category - No adverse social extension of NWP-NCB- C) - No IR Impact - No resettlement issues. issues reported Nikaweratiya water Maho/ CKD/WS/05A 50% Impact on Indigenous People - Screening - during the 21 supply scheme in C Polpithigama (LKR 58.32 Completed Completed. - No Impact. (Category C) - No IPDP / implementation Maho and Mn) IPDF or specific action required until the reporting Polpithigama period. Pradeshiya Sabha Areas

P a g e 48 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Package No. Status Categor Social safeguard assessment / compliance Remarks/Further No Pradeshiya (physical ization details action required (if sabha Cost (LKR progress) any) Mn.) % Supplying &Installation of Pumps and Resettlement Screening - Completed (Category - No adverse social Accessories for NWP-NCB- C) - No IR Impact - No resettlement issues. issues reported Extension of 95% Maho/ CKD/WS/05B Impact on Indigenous People - Screening - during the 22 Nikaweratiya Water Complete C Polpithigama (LKR 49.28 Completed. - No Impact. (Category C) - No IPDP / implementation Supply Scheme in Mn) d IPDF or specific action required until the reporting Maho & Polpithigama period Pradeshiya Sabha Areas Supplying and laying of Resettlement Screening - Completed (Category - pipe for the C C) - No IR Impact - No resettlement issues. Ibbagamuwa NWP/AF/WS/ Constructions not 23 Ibbagamuwa - Impact on Indigenous People - Screening - CKD/ 05A yet started Pradeshiya Sabha Completed. - No Impact. (Category C) - No IPDP / (LKR 425 Mn) Areas IPDF or specific action required Supplying and Resettlement Screening - Completed (Category - Installation of pumps NWP/AF/WS/ C) - No IR Impact - No resettlement issues. and Accessories for CKD/ 05B Constructions not 24 Ibbagamuwa -C Impact on Indigenous People - Screening - Ibbagamuwa (LKR 40.64 yet started Completed. - No Impact. (Category C) - No IPDP / Pradeshiya Sabha Mn) IPDF or specific action required Areas Resettlement Screening - Completed (Category - Design works are in C) - No IR Impact - No resettlement issues. Water supply scheme (LKR 354.00 progress. 25 Galgamuwa -C Impact on Indigenous People - Screening - Galgamuwa Mn) Constructions not Completed. - No Impact. (Category C) - No IPDP / yet started IPDF or specific action required Resettlement Screening - Completed (Category - C) - No IR Impact - No resettlement issues. Water supply scheme (LKR 336.00 Impact on Indigenous People - Screening - Constructions not 26 Ambanpola -C Ambanpola Mn) Completed. - No Impact. (Category C) - No IPDP / yet started IPDF or specific action required

P a g e 49 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Package No. Status Categor Social safeguard assessment / compliance Remarks/Further No Pradeshiya (physical ization details action required (if sabha Cost (LKR progress) any) Mn.) % Resettlement Screening - Completed (Category - C) - No IR Impact - No resettlement issues. Karuwalagasw Water supply scheme (LKR 280.00 Impact on Indigenous People - Screening - Feasibility study is 27 -C ewa Karuwalagaswewa Mn) Completed. - No Impact. (Category C) - No IPDP / in progress IPDF or specific action required

4.

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Land belongs to PS Livelihood or Construction of 100% SAB-NCB- C Impact on Indigenous People- Screening- income Pradeshiya Sabha Completed 1 Ruwanwalla RUW-28 Completed Building at (LKR 50.4 Mn) No Impact (Category C) No IPDP/IPDF or specific No adverse social Ruwanwella action required issues during the Compliance to Sri Lanka Laws & Regulation - implementation Compliance with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Land belongs to PS Livelihood or SAB-NCB- 100% 2 Aranayaka Construction of C Impact on Indigenous People- Screening- income ARN-01 Completed Multipurpose Building Completed (LKR 45.53 at Dippitiya No Impact (Category C) No IPDP/IPDF or specific No adverse social Mn) action required issues during the Compliance to Sri Lanka Laws & Regulation - implementation Compliance with Sri Lanka Laws & Regulations Construction of SAB-NCB- 95% Resettlement Screening Completed (Category C) No Loss of 3 C Multipurpose Building PEL-26 completed No IR impact- No resettlement issues Livelihood or

P a g e 50 | 119 Ministry of Provincial Councils and Local Government

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) with Weekly Fair at (LKR 41.7 Mn) Land belongs to PS income Pelmadulla Town Impact on Indigenous People- Screening- Palmadulla Completed No adverse social No Impact (Category C) No IPDP/IPDF or specific issues during the action required implementation till Compliance to Sri Lanka Laws & Regulation - the date Compliance with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No Loss of No IR impact- No resettlement issues Livelihood or Construction of SAB-NCB- Land belongs to PS 4 100% income Embilipitiya Weekly Fair & Public EMB-15 C Impact on Indigenous People- Screening- Completed Toilet at Udawalawa (LKR 28.33 Completed No adverse social Mn) No Impact (Category C) No IPDP/IPDF or specific issues during the action required implementation. Compliance to Sri Lanka Laws & Regulation - Compliance with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No Loss of No IR impact- No resettlement issues Livelihood or Land belongs to PS income Construction of SAB-NCB- 5 Kahawatta Impact on Indigenous People- Screening- Weekly Fair & KAH-22 100% C Completed No adverse social Drainage System LKR 36.99 Completed No Impact (Category C) No IPDP/IPDF or specific issues during the Kahawatta Town Mn) action required implementation. Compliance to Sri Lanka Laws & Regulation - Compliance with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Land belongs to PS Livelihood or SAB-NCB- Daraniyagala Construction of Impact on Indigenous People- Screening- income DER-11 100% 6 Multipurpose Building C Completed (LKR 41.08 Completed at Town No Impact (Category C) No IPDP/IPDF or specific No adverse social Mn) action required issues during the Compliance to Sri Lanka Laws & Regulation - implementation Compliance with Sri Lanka Laws & Regulations

P a g e 51 | 119 Ministry of Provincial Councils and Local Government

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of 7 Ayagama Construction of Bus Land belongs to PS Livelihood or SAB-NCB- Stand, Multipurpose Impact on Indigenous People- Screening- income AYA-04 100% Building and Public C Completed (LKR 34.65 Completed Toilet at Ayagama No Impact (Category C) No IPDP/IPDF or specific No adverse social Mn) Town action required issues during the Compliance to Sri Lanka Laws & Regulation - implementation Compliance with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Lands belongs to PS Livelihood or Rehabilitation of SAB-NCB- Impact on Indigenous People- Screening- income 8 Daduhathakma - EMB-16 100% Embilipitiya C Completed Kaparella Road at (LKR 11.13 Completed No Impact (Category C) No IPDP/IPDF or specific No adverse social Muladiyawala Mn) action required issues during Compliance to Sri Lanka Laws & Regulation - implementation Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Bulathkohupiti Lands belongs to PS Improvements to the SAB-NCB- Livelihood or ya Impact on Indigenous People- Screening- Road Lead to the BUL-09 100% income 9 C Completed Compost Plant of LKR 18.15 Completed No adverse social No Impact (Category C) No IPDP/IPDF or specific Bulathkohupitiya Mn) issues during the action required implementation Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations Construction of Resettlement Screening Completed (Category C) No Loss of Pradeshiya Sabha No IR impact- No resettlement issues SAB-NCB- Livelihood or Office Building with Land belongs to PS RTP-27 100% income 10 Rathnapura Health Centre, C Impact on Indigenous People- Screening- LKR 40.14 Completed No adverse social Community Centre Completed Mn) issues during and Auditorium at No Impact (Category C) No IPDP/IPDF or specific implementation New Town action required

P a g e 52 | 119 Ministry of Provincial Councils and Local Government

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) Rathnapura Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Lands belongs to PS Rehabilitation of Livelihood or SAB-NCB- Impact on Indigenous People- Screening- Ahakiyatha Road up 100% income Galigamuwa GLG-19 C Completed 11 to Galigamuwa Completed No adverse social (LKR 9.08 Mn) No Impact (Category C) No IPDP/IPDF or specific Crematorium issues during the action required implementation Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Land belongs to PS Livelihood or SAB-NCB- Construction of Impact on Indigenous People- Screening- income KEG-23 100% 12 Kegalla Multipurpose Building C Completed (LKR 41.41 Completed at Moronthota No Impact (Category C) No IPDP/IPDF or specific No adverse social Mn) action required issues during Compliance to Sri Lanka Laws & Regulation - implementation Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Construction of Land belongs to PS Livelihood or Multipurpose Building SAB-NCB- Impact on Indigenous People- Screening- income 100% 13 Imbulpe and Internal Road IMB-20 C Completed Completed with Drainage System (LKR 33.8 Mn) No Impact (Category C) No IPDP/IPDF or specific No adverse social at Belihuloya action required issues during Compliance to Sri Lanka Laws & Regulation - implementation Compliances with Sri Lanka Laws & Regulations Construction of Resettlement Screening Completed (Category C) No Loss of SAB-NCB- Multipurpose No IR impact- No resettlement issues Livelihood or KOL-25 100% 14 Kollonna Building, Public Toilet C Land belongs to PS income (LKR 45.18 Completed and Weekly Fair at Impact on Indigenous People- Screening- Mn) Kolonna Completed No adverse social

P a g e 53 | 119 Ministry of Provincial Councils and Local Government

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) No Impact (Category C) No IPDP/IPDF or specific issues during action required implementation Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No Loss of No IR impact- No resettlement issues Livelihood or Lands belongs to PS income Improvements to SAB-NCB- Impact on Indigenous People- Screening- 100% 15 Dehiovita Drainage System at DEH-10 C Completed Completed No adverse social Dehiovita (LKR 27.5 Mn) No Impact (Category C) No IPDP/IPDF or specific issues during action required implementation Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) Rehabilitation of No IR impact- No resettlement issues No Loss of Pavement and Lands belongs to PS Livelihood or Drainage System of SAB-NCB- Impact on Indigenous People- Screening- income 100% 16 Daraniyagala Link Road between DER-13 C Completed Completed Main Road and (LKR 5.59 Mn) No Impact (Category C) No IPDP/IPDF or specific No adverse social Mosque Road at action required issues during Deraniyagala Compliance to Sri Lanka Laws & Regulation - implementation Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No Loss of No IR impact- No resettlement issues Livelihood or Land belongs to PS income Construction of SAB-NCB- Impact on Indigenous People- Screening- Weekly Fair & Public 95% 17 Yatiyantota YAT-29 C Completed No adverse social Toilet at Yatiyantota completed (LKR 39.0 Mn) No Impact (Category C) No IPDP/IPDF or specific issues during Town action required implementation till Compliance to Sri Lanka Laws & Regulation - date Compliances with Sri Lanka Laws & Regulations

P a g e 54 | 119 Ministry of Provincial Councils and Local Government

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) Resettlement Screening Completed (Category C) No Loss of No IR impact- No resettlement issues Livelihood or Land belongs to PS SAB-NCB- income Construction of Impact on Indigenous People- Screening- 18 Bulathkohupiti BUL-08 100% Multipurpose Building C Completed ya (LKR 28.05 Completed No adverse social at Bulathkohupitiya No Impact (Category C) No IPDP/IPDF or specific Mn) issues during action required implementation. Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations

Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Land belongs to PS Livelihood or Construction of Bus SAB-NCB- Impact on Indigenous People- Screening- income 19 Stand & Multi- BAL-05 95% Balangoda C Completed No adverse social Purpose Building at (LKR 32.52 Completed No Impact (Category C) No IPDP/IPDF or specific issues during Welioya Mn) action required implementation till Compliance to Sri Lanka Laws & Regulation - date Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Land belongs to PS Livelihood or SAB-NCB- Rehabilitation of Impact on Indigenous People- Screening- income IMB-21 100% 20 Imbulpe Samanalagama Road C Completed (LKR 10.57 Completed at Rathmalavinna No Impact (Category C) No IPDP/IPDF or specific No adverse social Mn) action required issues during Compliance to Sri Lanka Laws & Regulation - implementation Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No Loss of No IR impact- No resettlement issues Livelihood or Construction of Sub SAB-NCB- 100% Land belongs to PS income 21 Embilipitiya Office & Library at EMB-14 C Completed Impact on Indigenous People- Screening- Udawalawa Town (LKR 3.48 Mn) Completed No adverse social No Impact (Category C) No IPDP/IPDF or specific issues during

P a g e 55 | 119 Ministry of Provincial Councils and Local Government

Package No Physical Remarks Further Name of the & Contract Categori S/No Name of Package Progress Social Safeguard Compliance Details action requires (If PS Amount (LKR zation % any) Mn) action required implementation Compliance to Sri Lanka Laws & Regulation - Compliances with Sri Lanka Laws & Regulations Resettlement Screening Completed (Category C) No IR impact- No resettlement issues No Loss of Construction of Land belongs to forest department & Least from PS Livelihood or Galigamuwa Proposed Solid SAB-NCB- Impact on Indigenous People- Screening- income 100% 22 Waste Management GLG-18 C Completed Completed Project at (LKR 8.5 Mn) No Impact (Category C) No IPDP/IPDF or specific No adverse social Pitagaldeniya action required issues during Compliance to Sri Lanka Laws & Regulation - implementation Compliances with Sri Lanka Laws & Regulations

P a g e 56 | 119 Ministry of Provincial Councils and Local Government

1. Annex S.N. 7 Pitagaldeniya Weekly Fair of Galigamuwa PS

P a g e 57 | 119 Ministry of Provincial Councils and Local Government

Meeting with PS officers, Galigamuwa PS Udawalawa Weekly fair, Embilipitiya PS

P a g e 58 | 119 Ministry of Provincial Councils and Local Government

Kahawatta PS Weekly Fair

P a g e 59 | 119 Ministry of Provincial Councils and Local Government

5. Southern Province

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or income Construction of SP - NCB - Land belongs to the PS Bus Stand and IMA - 10 100% Impacts on Indigenous People –Screening – completed. No adverse social issues 1 Imaduwa C Public Toilet at (LKR 14.54 Completed No impacts (category C)- No IPDP / IPDF or specific during the implementation. Imaduwa Mn) action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or income (Land belongs to the central government - Handed over Construction of SP - NCB - to PS for construction of comfort center.) No adverse social issues Karandeniy Comfort Center at KAR- 14 100% 2 C Impacts on Indigenous People –Screening – completed. during the implementation a Uragasmanhandi (LKR3.73 Completed No impacts (category C)- No IPDP / IPDF or specific ya Mn) action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or income impact- No resettlement issues Construction of SP - NCB - (Land belongs to the PS) No adverse social issues multipurpose Karandeniy KAR - 13 100% Impacts on Indigenous People –Screening – completed. during the implementation 3 building at C a (LKR 34.13 Completed No impacts (category C)- No IPDP / IPDF or specific Uragasmanhandi Mn) action required ya Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 60 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) No loss of livelihood or income No adverse social issues Resettlement Screening – completed (category C)- No IR during the implementation to Construction of SP - NCB - impact- No resettlement issues date weekly fair and NAG - 100% (Land belongs to the PS) construction in a vacant place 4 Nagoda Multipurpose C 20(LKR Completed Impacts on Indigenous People –Screening – completed. - vendor shifting not involved Building at 49.30 Mn) No impacts (category C)- No IPDP / IPDF or specific Some ridge capping was Udugama action required removed at the toilet block Compliance to Sri Lankan Laws and regulation - complies (Fair) due to wing & rectify the with Sri Lankan laws and regulations issue No loss of livelihood or income No adverse social issues Public consultation meetings Resettlement Screening – during the implementation. Construction of completed (category C)- No IR impact- No resettlement Renovation of the fair only. SP - NCB - PS office building issues Vendors were not shifted NEL - 21 100% 5 Neluwa and weekly fair by C (Land belongs to the PS) during the construction period. (LKR 41.60 Completed protection wall at Impacts on Indigenous People –Screening – completed. Pigeons entering in to the Mn) Neluwa No impacts (category C)- No IPDP / IPDF or specific building through the open area action required at the center of the PS office Compliance to Sri Lankan Laws and regulation- complies building. Rectify the issue with with Sri Lankan laws and regulations glass frame. Resettlement Screening – completed (category C)- No IR No loss of livelihood or income impact- No resettlement issues Development of SP - NCB - (Land belongs to the PS) No adverse social issues Internal Roads NEL - 22 100% Impacts on Indigenous People –Screening – completed. during the implementation. 6 Neluwa along with three - C (LKR 7.68 Completed No impacts (category C)- No IPDP / IPDF or specific wheeler park at Mn) action required Neluwa Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 61 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) No loss of livelihood or income Resettlement Screening – completed (category C)- No IR No adverse social issues impact- No resettlement issues (Land belongs to the PS) during the implementation to Construction of SP - NCB - Impacts on Indigenous People –Screening – completed. date weekly fair and TWM - 28 100% 7 Thawalama C No impacts (category C)- No IPDP / IPDF or specific All vendors shifted to nearby PS office Building (LKR 46.03 Completed action required place and PS has provided at Thawalama Mn) Compliance to Sri Lankan Laws and regulation - complies adequate spaces to continue with Sri Lankan laws and regulations business during the construction period. Resettlement Screening – completed (category C)- No IR impact- No resettlement issues (Land belongs to the PS) No loss of livelihood or Construction of SP - NCB - Impacts on Indigenous People –Screening – completed. income& Welivitiya multipurpose WEL - 29 100% 8 C No impacts (category C)- No IPDP / IPDF or specific No adverse social issues Divithura building at (LKR 39.67 Completed action required during the implementation to Ethkandura Mn) Compliance to Sri Lankan Laws and regulation - complies date with Sri Lankan laws and regulations No loss of livelihood or income Resettlement Screening – completed (category C)- No IR No adverse social issues impact- No resettlement issues (Land belongs to the PS) during the implementation to SP - NCB - Construction of Impacts on Indigenous People –Screening – completed. date AKU - 02 100% 9 Akuressa PS Building at C No impacts (category C)- No IPDP / IPDF or specific Access for differently able (LKR 34.03 Completed Akuressa action required people to the PS office building Mn) Compliance to Sri Lankan Laws and regulation - complies was not constructed, Rectify with Sri Lankan laws and regulations the issue with constructed Ramp Resettlement Screening – completed (category C)- No IR impact- No resettlement issues (Land belongs to the PS) No loss of livelihood or income SP - NCB - Construction of Impacts on Indigenous People –Screening – completed. ATH - 05 100% 10 Athuraliya weekly fair at C No impacts (category C)- No IPDP / IPDF or specific No adverse social issues (LKR 24.32 Completed Thibbotuwawa action required during the implementation to Mn) Compliance to Sri Lankan Laws and regulation - complies date with Sri Lankan laws and regulations

P a g e 62 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) Resettlement Screening – completed (category C)- No IR Construction of impact- No resettlement issues SP - NCB - existing Impacts on Indigenous People –Screening – completed. No loss of livelihood or income ATH - 04 100% 11 Athuraliya Suspension C No impacts (category C)- No IPDP / IPDF or specific No adverse social issues (LKR 11.71 Completed building at action required during the implementation Mn) Thibbotuwawa Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or income impact- No resettlement issues No adverse social issues Refurbishing of SP - NCB - (Roads are under the control of PradeshiyaSabha) during the implementation - HAK - 06 100% Impacts on Indigenous People –Screening – completed. Proposed Road already 12 Hakmana Muruthamuraya C (LKR 16.85 Completed No impacts (category C)- No IPDP / IPDF or specific demarcated. Rural Road at Mn) action required No encroachment of land for Hakmana Compliance to Sri Lankan Laws and regulation - complies project implementation. with Sri Lankan laws and regulations No loss of livelihood or income No adverse social issues Resettlement Screening – completed (category C)- No IR during the implementation to impact- No resettlement issues. date Construction of SP - NCB - All lands are government land and lands belong to PS. Construction of boundary wall water supply HAK - 07 100% 13 Hakmana C Impacts on Indigenous People –Screening – completed. with protective fence project at (LKR 72.78 Completed No impacts (category C)- No IPDP / IPDF or specific completed to mitigate the risk Kurudupiyasa Mn) action required to a neighboring house which Compliance to Sri Lankan Laws and regulation - complies was occurred with the land with Sri Lankan laws and regulations preparation at the treatment plant.

P a g e 63 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or income SP - NCB - (Land belongs to the PS) No adverse social issues Construction of Kamburupit KAM - 12 100% Impacts on Indigenous People –Screening – completed. during the implementation to 14 bus Stand at C iya (LKR 49.99 Completed No impacts (category C)- No IPDP / IPDF or specific date Kamburupitiya Mn) action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations The weekly fair was shifted to Resettlement Screening – completed (category C)- No IR adjacent land with basic Construction of impact- No resettlement issues facilities to accommodate SP - NCB - bus stand and (Land belongs to the PS) vendors during construction. Kirinda KIR - 16 100% 15 weekly fair at C Impacts on Indigenous People –Screening – completed. Now all vendors are relocated Puhulwella (LKR 36.83 Completed KirindaPuhulwell No impacts (category C)- No IPDP / IPDF or specific in new weekly fair. Mn) a action required No loss of livelihood or income Compliance to Sri Lankan Laws and regulation - complies No adverse social issues with Sri Lankan laws and regulations during the implementation Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues income& (Land belongs to the PS) No adverse social issues Construction of SP - NCB - Impacts on Indigenous People –Screening – completed. during the implementation to Multipurpose KOT - 17 100% 16 Kotapola C No impacts (category C)- No IPDP / IPDF or specific date. building at (LKR 45.09 Completed action required Constructed a safety fence to Deniyaya Mn) Compliance to Sri Lankan Laws and regulation - complies the disable entrance of the with Sri Lankan laws and regulations building and rectify the safety issue. Resettlement Screening – completed (category C)- No IR No loss of livelihood or income SP - NCB - impact- No resettlement issues Construction of MAL - 18 100% (Land belongs to the PS) No adverse social issues 17 Malimbada PS Office building C (LKR 41.73 Completed Impacts on Indigenous People –Screening – completed. during the implementation to at Malimboda Mn) No impacts (category C)- No IPDP / IPDF or specific date action required

P a g e 64 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations No loss of livelihood or income Resettlement Screening – completed (category C)- No IR No adverse social issues Construction of SP - NCB - impact- No resettlement issues (Land belongs to the PS) during the implementation to bus stand and MUL - 19 100% Impacts on Indigenous People –Screening – completed. date 18 Mulatiyana C weekly fair at (LKR 50.00 Completed No impacts (category C)- No IPDP / IPDF or specific New fair construction in vacant Mulatiyana Mn) action required place, vendor shifting not Compliance to Sri Lankan Laws and regulation - complies involved. with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or income Construction of SP - NCB - (Land belongs to the PS) Multipurpose PAS - 23 100% Impacts on Indigenous People –Screening – completed. No adverse social issues 19 Pasgoda C building at (LKR 48.25 Completed No impacts (category C)- No IPDP / IPDF or specific during the implementation Urubokka Mn) action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations No loss of livelihood or Resettlement Screening – completed (category C)- No IR income& impact- No resettlement issues No adverse social issues Construction of SP - NCB - (Land belongs to the PS) during the implementation to Pitabeddar Weekly Fair & PIT - 24 100% Impacts on Indigenous People –Screening – completed. date 20 C a Multipurpose (LKR 49.00 Completed No impacts (category C)- No IPDP / IPDF or specific Rectify the unprotected rain Building. Mn) action required water disposal drain issue Compliance to Sri Lankan Laws and regulation - complies constructing gratings with Sri Lankan laws and regulations (Annexure 01 -Picture 01& 02)

P a g e 65 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) No loss of livelihood or income Resettlement Screening – completed (category C)- No IR No adverse social issues impact- No resettlement issues during the implementation (Land belongs to the PS) Earlier design of drains in Construction of SP - NCB - Impacts on Indigenous People –Screening – completed. weekly fair caused the PS building and THI - 26 100% No impacts (category C)- No IPDP / IPDF or specific rainwater to enter adjacent 21 Thihagoda C weekly fair at (LKR 44.44 Completed action required land. After the complaint from Thihagoda Mn) Compliance to Sri Lankan Laws and regulation - complies the relevant persons, the with Sri Lankan laws and regulations design of drainage was revised to address the concern. The concern has since been addressed. Resettlement Screening – completed (category C)- No IR No loss of livelihood or income impact- No resettlement issues No adverse social issues (Land belongs to the PS) during the implementation to SP - NCB - Impacts on Indigenous People –Screening – completed. date Construction of Hambantho HAM - 08 100% No impacts (category C)- No IPDP / IPDF or specific Unsafe open spaces in the 22 PS Building at C ta (LKR 3.28 Completed action required main entrance, informed to Hambanthota Mn) Compliance to Sri Lankan Laws and regulation - complies contractor and constructed with Sri Lankan laws and regulations safety fences to rectify the issue (Annexure 01 -Picture 03 &04) Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or income SP - NCB - (Land belongs to the PS) Construction of Hambantho HAM - 09 100% Impacts on Indigenous People –Screening – completed. No adverse social issues 23 Compost Plant at C ta (LKR 3.91 Completed No impacts (category C)- No IPDP / IPDF or specific during the implementation to Bellagaswewa Mn) action required date Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 66 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) No loss of livelihood or income Resettlement Screening – completed (category C)- No IR No adverse social issues impact- No resettlement issues during the implementation to (Land belongs to the PS) date SP - NCB - Construction of Since the hand railing in the up KAT - 15 100% 24 Katuwana Bus stand with C Impacts on Indigenous People –Screening – completed. stair is not strength enough to (LKR 36.29 Completed upstairs at Kirama No impacts (category C)- No IPDP / IPDF or specific withstand the loads during the Mn) action required operation phase, contactor has rectified the issue constructing Compliance to Sri Lankan Laws and regulation - complies concreate column, to the with Sri Lankan laws and regulations. fence. Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or income Construction of SP - NCB - (Land belongs to the PS) Lunugamw PS office building LUN - 100% Impacts on Indigenous People –Screening – completed. No adverse social issues 25 C ehera at 01(LKR Completed No impacts (category C)- No IPDP / IPDF or specific during the implementation Lunugamwehera 45.75 Mn) action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations No loss of livelihood or income Resettlement Screening – completed (category C)- No IR No adverse social issues impact- No resettlement issues (Land belongs to the PS) during the implementation to Improvement of SP - NCB - Impacts on Indigenous People –Screening – completed. date Sooriyawe weekly fair with SOO - 100% 26 C No impacts (category C)- No IPDP / IPDF or specific Vendors shifting not involved wa entering road at 25(LKR Completed action required during the construction period Sooriyawewa 45.49 Mn) Compliance to Sri Lankan Laws and regulation - complies as this involved in with Sri Lankan laws and regulations improvement of internal roads of weekly fair.

P a g e 67 | 119 Ministry of Provincial Councils and Local Government

S. Name of Name of Package Status Cat N Pradeshiy Package No & (physical ego Remarks Further action a Sabha Contract progress rizat Social Safeguard compliance details requires (if any) value %) ion (LKRMn) Resettlement Screening – completed (category C)- No IR No loss of livelihood or income impact- No resettlement issues (Land belongs to the PS) No adverse social issues Construction of SP - NCB - Impacts on Indigenous People –Screening – completed. during the implementation Tissamahar weekly fair with TMR - 100% No impacts (category C)- No IPDP / IPDF or specific Traders moved temporarily 27 C amaya Economic Centre 27(LKR Completed action required during the construction period at Debarawewa 50.56 Mn) Compliance to Sri Lankan Laws and regulation - complies and now they have restarted with Sri Lankan laws and regulations their business as usual after construction. Resettlement Screening – completed (category C)- No IR impact- No resettlement issues (Land belongs to the PS) No loss of livelihood or income Construction of SP - NCB - Impacts on Indigenous People –Screening – completed. Multipurpose IMA – 10-A 100% 28 Imaduwa No impacts (category C)- No IPDP / IPDF or specific No adverse social issues during Building at (LKR 33.95 Completed action required the implementation Kodagoda Mn) Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 68 | 119 Ministry of Provincial Councils and Local Government

Location: Pitabeddara Weekly fair

P a g e 69 | 119 Ministry of Provincial Councils and Local Government

Location: Hambanthota

PS building without safety fences Completion of safety fence at main entrance

P a g e 70 | 119 Ministry of Provincial Councils and Local Government

6. Uva Province

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or 01 Badulla Construction of a C (Land belongs to the PS) income UVA-NCB- Multi-Purpose 100% Impacts on Indigenous People –Screening – completed. BDL-03 Building (PS office, Completed No impacts (category C)- No IPDP / IPDF or specific No adverse social issues (44.0 LKR mn) Library, Ayuruweda,) action required during the Compliance to Sri Lankan Laws and regulation - complies implementation with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR C impact- No resettlement issues (an unoccupied No loss of livelihood or government land belongs to Sri Lanka Railway has been income 02 Bandaraw Construction of a PS transferred to PS on request. (At present, Land is owned UVA-NCB- ela Office Building with a 100% by PS) No adverse social issues BAN-04 Library + Weekly fair completed. Impacts on Indigenous People –Screening – completed. during the (35.8 LKR mn) + Public Toilet No impacts (category C)- No IPDP / IPDF or specific implementation during action required construction Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or UVA-NCB- (Land belongs to the PS) income 03 Haldummu Construction of a PS HAL-01 100% C Impacts on Indigenous People –Screening – completed. lla office building (34.9 LKR mn) completed No impacts (category C)- No IPDP / IPDF or specific No adverse social issues action required during the Compliance to Sri Lankan Laws and regulation - implementation complies with Sri Lankan laws and regulations

P a g e 71 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) 4 Haldummu Completion of Resettlement Screening – completed (category C)- No IR No loss of livelihood or lla Multipurpose Building impact- No resettlement issues income (Health Centre, C (Land belongs to the PS) UVA-NCB- Maternity Clinic, Impacts on Indigenous People –Screening – completed. No adverse social issues HAL-08 100% Ayurvedic clinic, No impacts (category C)- No IPDP / IPDF or specific during the (13.2 LKR mn) completed Community Hall) for action required implementation Haldummulla PS Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues income Construction of a PS (Land belongs to the PS) UVA-NCB- 05 Haputale Office Building with 100% Impacts on Indigenous People –Screening – completed. No adverse social issues HAP-09 Community Hall for completed No impacts (category C)- No IPDP / IPDF or specific during the (36.9 LKR mn) Haputale PS action required implementation Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues (Existing road and income 06 Haputale playground used for improvements,) Construction of Road UVA-NCB- 100% Impacts on Indigenous People –Screening – completed. No adverse social issues & Retaining wall and HAP-10 completed No impacts (category C)- No IPDP / IPDF or specific during the pedestrian Walk way (7.8 LKR mn) action required implementation Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR C impact- No resettlement issues No loss of livelihood or 07 Kandaketi Construction of a PS UVA-NCB- 100% (Land belongs to the PS) income ya Office Building with a KAN-05 completed Impacts on Indigenous People –Screening – completed. Library Kandaketiya No impacts (category C)- No IPDP / IPDF or specific No adverse social issues PS (44.1 LKR mn) action required reported during Compliance to Sri Lankan Laws and regulation - complies construction. with Sri Lankan laws and regulations

P a g e 72 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) Weekly fair activities Resettlement Screening – completed (category C)- No IR resumed in the new C impact- No resettlement issues buildings (Land belongs to the PS) Construction of UVA-NCB- 100% 08 Kandaketi Impacts on Indigenous People –Screening – completed. No loss of livelihood or weekly fair Building KAN-05 completed ya No impacts (category C)- No IPDP / IPDF or specific income action required No adverse social Compliance to Sri Lankan Laws and regulation - complies issues during the with Sri Lankan laws and regulations implementation Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues income Construction of (Land belongs to the PS) Multipurpose Building UVA-NCB- . 09 Lunugala Impacts on Indigenous People –Screening – completed. No adverse social issues Library, Community LNG-06 90% No impacts (category C)- No IPDP / IPDF or specific during the Hall) and PS building (47.8 LKR mn) completed action required implementation until the (for Lunugala PS Compliance to Sri Lankan Laws and regulation - date of reporting complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues income 09 Meegahak C (Land belongs to the PS) Public Toilet (Comfort UVA-NCB- iula 100% Impacts on Indigenous People –Screening – completed. No adverse social issues Centre) for MEE-07 completed No impacts (category C)- No IPDP / IPDF or specific during the MeegahakivulaPS (3.7 LKR mn) action required implementation Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues income 10 Meegahak (Land belongs to the PS) iula Impacts on Indigenous People –Screening – completed. No adverse social issues Weekly Fair for UVA-NCB- 100% No impacts (category C)- No IPDP / IPDF or specific during the Meegahakivula PS MEE-28 completed action required implementation (17.8 LKR mn) Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 73 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues income C (Land belongs to the PS) UVA-NCB- Bus stand for 80% Impacts on Indigenous People –Screening – completed. No adverse social issues MEE-11 11 Meegahak MeegahakivulaPS completed No impacts (category C)- No IPDP / IPDF or specific during the iula (22.7 LKR mn) action required implementation until the Compliance to Sri Lankan Laws and regulation - complies date of reporting with Sri Lankan laws and regulations Construction of Resettlement Screening – completed (category C)- No IR 12 Rideemali Multipurpose Building C impact- No resettlement issues (Land belongs to the PS) No loss of livelihood or yadda (Health Centre, UVA-NCB- Impacts on Indigenous People –Screening – completed. income 100% Community Hall) & RDM-12 No impacts (category C)- No IPDP / IPDF or specific completed Entrance roads to the (39.7 LKRmn ) action required No adverse social issues weekly fair for Compliance to Sri Lankan Laws and regulation - complies during the Rideemaliyadda PS with Sri Lankan laws and regulations implementation Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues (Land belongs to the PS) income 13 Rideemali Construction of UVA-NCB- Impacts on Indigenous People –Screening – completed. 100% yadda Weekly Fair for RDM-14 No impacts (category C)- No IPDP / IPDF or specific No adverse social issues completed Rideemaliyadda PS (4.5 LKR mn) action required during the Compliance to Sri Lankan Laws and regulation - complies implementation. with Sri Lankan laws and regulations 14 Uva Resettlement Screening – completed (category C)- No IR No loss of livelihood or Paranaga C impact- No resettlement issues (the Land belongs to the income Construction of ma UVA-NCB- PS) internal roads, 90% UPG-15 Impacts on Indigenous People –Screening – completed. No adverse social issues drainage system, completed (37.2 LKR mn) No impacts (category C)- No IPDP / IPDF or specific during the Pavements action required implementation Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR Construction of a PS UVA-NCB- 100% C impact- No resettlement issues (Land belongs to the PS No loss of livelihood or Sub office + Weekly BAD-16 15 Badalkum completed Impacts on Indigenous People –Screening – completed. income fair for Badalkumbura (33.5 LKRmn) bura

P a g e 74 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) No impacts (category C)- No IPDP / IPDF or specific No adverse social issues action required during the construction. Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR impact- No resettlement issues (Existing road in in the No loss of livelihood or C jurisdiction of PS and used for improvements, no land income Construction of 16 Badalkum UVA-NCB- acquisition required) Ranugalla 100% bura BAD-21 Impacts on Indigenous People –Screening – completed. No adverse social issues Kirigalpotta Bogas- completed (12.8 LKRmn) No impacts (category C)- No IPDP / IPDF or specific during the construction. Ella Road action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR C impact- No resettlement issues (Land belongs to the PS) No loss of livelihood or 17 Katharaga UVA-NCB- Impacts on Indigenous People –Screening – completed. income PS Building for 100% ma KTG-17 No impacts (category C)- No IPDP / IPDF or specific PS completed (49.4 LKR mn) action required No adverse social issues Compliance to Sri Lankan Laws and regulation - complies during the construction with Sri Lankan laws and regulations 18 Madulla Construction of Bus Resettlement Screening – completed (category C)- No IR No loss of livelihood or stand with Public C impact- No resettlement issues (Land belongs to the PS) income UVA-NCB- toilet and Three- 100% Impacts on Indigenous People –Screening – completed. MDL-18 Wheeler Park & completed No impacts (category C)- No IPDP / IPDF or specific No adverse social issues Public Toilet and action required during the construction (41.7 LKR mn) Children Park at Compliance to Sri Lankan Laws and regulation - complies Makulla with Sri Lankan laws and regulations

P a g e 75 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues income 19 Madulla Construction of the (Land belongs to the PS) UVA-NCB- Drainage system & Impacts on Indigenous People –Screening – completed. No adverse social issues MDL-19 100% the Pavement for No impacts (category C)- No IPDP / IPDF or specific during the (6.7 LKR mn) complete Madulla PS action required implementation Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations 20 Medagam Resettlement Screening – completed (category C)- No IR No loss of livelihood or a UVA-NCB- impact- No resettlement issues income Construction of the MDG-20 C (Land belongs to the PS) Library Building for 100% Impacts on Indigenous People –Screening – completed. No adverse social issues Medagama PS complete (24.6 LKR mn) No impacts (category C)- No IPDP / IPDF or specific during the action required implementation Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues income 21 Medagam C (Land belongs to the PS) Construction of UVA-NCB- a Impacts on Indigenous People –Screening – completed. No adverse social issues Comfort Centre for MDG-27 100% No impacts (category C)- No IPDP / IPDF or specific during the construction Medagama PS (3.1 LKR mn) complete action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues income 22 Medagam Improvement to (Land belongs to the PS) UVA-NCB- a Weekly Fair with 55% Impacts on Indigenous People –Screening – completed. No adverse social issues MDG-02 Retaining wall for completed No impacts (category C)- No IPDP / IPDF or specific during the construction (13.4 LKR mn) Medagama PS action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 76 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues income 23 Siyambala C (Land belongs to the PS) Construction of a PS UVA-NCB- nduwa Impacts on Indigenous People –Screening – completed. No adverse social issues Office Building at SIY-22 100% No impacts (category C)- No IPDP / IPDF or specific during the construction Siyambalanduwa (36.5 LKR mn) completed action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues income 24 Siyambala Bus stand with Public (Land belongs to the PS) UVA-NCB- nduwa Toilet at 75% Impacts on Indigenous People –Screening – completed. No adverse social issues SIY-23 Siyambalanduwa completed No impacts (category C)- No IPDP / IPDF or specific during the (18.7 LKR mn) action required implementation until the Compliance to Sri Lankan Laws and regulation - date of reporting complies with Sri Lankan laws and regulations “C” Resettlement Screening – completed (category C)- No IR impact- No resettlement issues No loss of livelihood or 25 Thanamal (Land belongs to the PS) income Construction of a PS UVA-NCB- wila Impacts on Indigenous People –Screening – completed. Office Building for THA-24 85% No impacts (category C)- No IPDP / IPDF or specific No adverse social issues Thanamalwila PS (43.2 LKRmn) completed action required during the Compliance to Sri Lankan Laws and regulation - implementation until the complies with Sri Lankan laws and regulations date of reporting 26 Wellawaya C Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues income (Land belongs to the PS) UVA-NCB- Impacts on Indigenous People –Screening – completed. No adverse social issues PS office Building for WLW-25 100% No impacts (category C)- No IPDP / IPDF or specific during the construction Wellawaya PS (30.8 LKR mn) complete action required Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

P a g e 77 | 119 Ministry of Provincial Councils and Local Government

S. Name of Cate Social safeguard compliance detail Remarks Package No Status No Pradeshiy goriz Name of Package & contract (Physical a sabha ation value progress %) (PS) Resettlement Screening – completed (category C)- No IR No loss of livelihood or impact- No resettlement issues (Part of the existing income cemetery land belongs to PS was used for construction) No adverse social issues Construction of UVA-NCB- , 90% Impacts on Indigenous People –Screening – completed. during the Crematorium for WLW-26 27 Wellawaya completed C No impacts (category C)- No IPDP / IPDF or specific implementation until the Wellawaya PS (15.6 LKR mn) action required date of reporting Compliance to Sri Lankan Laws and regulation - complies with Sri Lankan laws and regulations

Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues (Part of the existing income cemetery land belongs to PS was used for construction) Construction of UVA-NCB- 28 Meegahak 55% Impacts on Indigenous People –Screening – completed. No adverse social issues access road to new MEE-29 iula Completed No impacts (category C)- No IPDP / IPDF or specific during the bus stand (25.3 LKR mn) action required implementation until the Compliance to Sri Lankan Laws and regulation - complies date of reporting with Sri Lankan laws and regulations Resettlement Screening – completed (category C)- No IR No loss of livelihood or C impact- No resettlement issues (Part of the existing income cemetery land belongs to PS was used for construction) UVA-NCB- 29 Mahiyang Pahala Rathkinda 75% Impacts on Indigenous People –Screening – completed. No adverse social issues CKD-WS-07 ana PS water project Completed No impacts (category C)- No IPDP / IPDF or specific during the (98.2 LKR mn) action required implementation until the Compliance to Sri Lankan Laws and regulation - complies date of reporting with Sri Lankan laws and regulations

P a g e 78 | 119 Ministry of Provincial Councils and Local Government

7. Western Province

Remarks S. Name of Name of Package Package No. Status Catego Social safeguard assessment / compliance further action No Pradeshiyasabh Cost (LKR Mn.) (physical rizatio details requires (if a progress) n any) % Resettlement Screening - Completed (Category -C) - No adverse No IR Impact - No resettlement issues. Construction of WP-NCB-PAL-01 100% social issues 01 Palindanuwara C Impact on Indigenous People - Screening - Toilet Block (LKR 10.09 Mn) Completed during Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required Resettlement Screening - Completed (Category -C) - No adverse 100% Water Project No IR Impact - No resettlement issues. social issues WP-NCB-PAL-14 completed 02 Palindanuwara Improvement C Impact on Indigenous People - Screening - during (LKR 26.04 Mn) . Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required . Resettlement Screening - Completed (Category -C) - No adverse Construction of No IR Impact - No resettlement issues. social issues WP-NCB-PAL-15 100% 03 Palindanuwara Internal Town C Impact on Indigenous People - Screening - during (LKR:28.07 Mn) completed Roads Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required . Resettlement Screening - Completed (Category -C) - No adverse 04 Construction of No IR Impact - No resettlement issues. social issues WP-NCB-DIV-03 100% Diulapitiya the PS office C Impact on Indigenous People - Screening - during (LKR: 54.59 Mn) completed building Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required . Construction of Resettlement Screening - Completed (Category -C) - No adverse Multipurpose WP-NCB-AGA- No IR Impact - No resettlement issues. 100% social issues 05 Agalawatta building (Library, 04 C Impact on Indigenous People - Screening - Completed during Health Centre, (LKR: 15.83Mn) Completed. - No Impact. (Category C) - No IPDP / implementation Maternity Clinic) IPDF or specific action required Resettlement Screening - Completed (Category -C) - No adverse Improvements to WP-NCB-AGA- No IR Impact - No resettlement issues. 100% social issues 06 Agalawatta the waste 05 C Impact on Indigenous People - Screening - completed during management enter (LKR: 26.13Mn) Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required

P a g e 79 | 119 Ministry of Provincial Councils and Local Government

Construction of a Multi-Purpose Resettlement Screening - Completed (Category -C) - No adverse Building (Library, WP-NCB-BIY-06 100% No IR Impact - No resettlement issues. social issues 07 Biyagama Montessori with a completed C Impact on Indigenous People - Screening - during children’s park in (LKR 50.73 Mn) Completed. - No Impact. (Category C) - No IPDP / implementation the vicinity, IPDF or specific action required Community Hall) Indigenous people screening - for both PS office and No adverse Weekly Fair social issues Impact on Indigenous People - Screening - during Completed. - No Impact.(Category C) - No IPDP / implementation Construction of IPDF or specific action required . WP-NCB-DOD- the PS office Resettlement Screening done separately for PS office 08 . 100% 08 Dodangoda building + C and Weekly Fair: All vendors of Completed Construction of PS Office: weekly fair are (LKR: 44.87 Mn) Weekly fair Resettlement Screening - Completed (Category -C) - allocated No IR Impact - No resettlement issues. places in the Weekly Fair: new weekly fair. Resettlement Screening - Completed (Category -C) - No IR Impact - No resettlement issues. Resettlement Screening - Completed (Category -C) - Multipurpose WP-NCB-MAD- No adverse 100% No IR Impact - No resettlement issues. 09 Building (Health 09 social issues completed. C Impact on Indigenous People - Screening - Clinic and during Completed. - No Impact.(Category C) - No IPDP / community hall) (LKR 22.32 Mn) implementation IPDF or specific action required Resettlement Screening - Completed (Category -C) - No adverse WP-NCB-MAD- No IR Impact - No resettlement issues. social issues 10 Construction of 100% Madurawela 10 C Impact on Indigenous People - Screening - during Library Building Completed (LKR:15.53 Mn) Completed. - No Impact.(Category C) - No IPDP / implementation IPDF or specific action required . Resettlement Screening - Completed (Category -C) - No adverse 100% Water Supply WP-NCB-MAD- No IR Impact - No resettlement issues. social issues completed. 11 Project 11 C Impact on Indigenous People - Screening - during (LKR: 25.13 Mn) Completed. - No Impact.(Category C) - No IPDP / implementation IPDF or specific action required Construction of WP-NCB-MAT- 100% Resettlement Screening - Completed (Category -C) - No adverse 12 Matugama weekly fair 13 Completed C No IR Impact - No resettlement issues. social issues Impact on Indigenous People - Screening - during

P a g e 80 | 119 Ministry of Provincial Councils and Local Government

(LKR 46.21 Mn) Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required Resettlement Screening - Completed (Category -C) - No adverse No IR Impact - No resettlement issues. Impact on PS sub office & WP-NCB-MIR-02 100% social issues 13 Mirigama C Indigenous People - Screening - Completed. - No library building (LKR 21.67 Mn) Completed during Impact. (Category C) - No IPDP / IPDF or specific implementation action required Resettlement Screening - Completed (Category -C) - No adverse Construction of a No IR Impact - No resettlement issues. WP-NCB-MIR-16 100% social issues 14 Mirigama water supply in the C Impact on Indigenous People - Screening - (LKR: 24.34 Mn) completed during market area. Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required Construction of the Resettlement Screening - Completed (Category -C) - second phase of No IR Impact - No resettlement issues. No adverse the PS office WP-NCB-SEE-17 100% social issues 15 Seetawaka C building which (LKR:36.69 Mn) completed Impact on Indigenous People - Screening - during include a Library at Completed. - No Impact. (Category C) - No IPDP / implementation Hanwella IPDF or specific action required Resettlement Screening - Completed (Category -C) - No adverse Construction of WP-NCB-WLT- No IR Impact - No resettlement issues. 100% social issues 16 Walallawita Weekly fair and 18 C Impact on Indigenous People - Screening - Completed during Public Toilet facility (LKR:25.99 Mn) Completed. - No Impact. (Category C) - No IPDP / implementation IPDF or specific action required Resettlement Screening - Completed (Category -C) - Construction of a No adverse WP-NCB-WLT- 100% No IR Impact - No resettlement issues. Multi-Purpose social issues 17 Walallawita 19 Completed. C Impact on Indigenous People - Screening - Building (Library, during LKR:23.35 Mn) Completed. - No Impact. (Category C) - No IPDP / Montessori) implementation IPDF or specific action required

P a g e 81 | 119 Ministry of Provincial Councils and Local Government

Attachment 3 Grievance Redressal – Status Summary, December -2016

P a g e 82 | 119 Ministry of Provincial Councils and Local Government

Local Government Enhancement Sector Project – Pura Neguma (LGESP) Grievance Redressal – Status Summary as at 31 December 2016 1. Central Province Process of redressal Name of Regi: N Summary of Detail of Date of GRC or other Redres LA’s & Sub Numb Date of Outcome or sed Remarks / o. Grievances complainant Receipt stakeholders/ project er meeting solution further details Participated Yes / No Rattota The new scheme Current water Installed 4” pipe Drinking water affecting the users in 08-03-2015 SM,TO& Changed the outlets for both 01 scheme distribution in Ambanganga 19.02.2015 RAT/D Elagala Complainant design according Yes sides and (Ambanganga Ambanganga Korale (estate WS/01 estate Estate workers to their request. redressed the Korale area) Korale area workers) issue. SE, SM, RM- Canceled the Sub project has Made objections SPCU) proposed changed. Medadumbara against Activist group in 18.02.2015 MDM/C 26-03-2015 chairman-PS subproject. Developing 02 PS construction of the village. /01 Theldeniya CEA officials, Decided to find Yes internal roods- Crematorium crematorium in DS office D&S Consultant, another suitable Teldeniya was proposed village. Villagers with site or alternative taken as an activist group sub project. alternative priority members. subproject. PS unable to provide Existing 16-02-2015 SM, PS Staff and PS agreed to Shifted the land to 03 Pathahewahet alternative vendors in the 16.02.2015 PHH/M existing venders. Chang the land Yes another place a PS (MPB) business place proposed site. PB/01 Proposed of weekly fair to which has no for current site another place. issues of vendors during resettlement. construction.

A doubt that soil G.G. HAR/P 29-04-2015 SM&RM, Informed Constructed a 04 Harispattuwa excavation of PS Dharmadasa. 22.4.2015 SB Thiththapajja PS Secretary PS contractor to Yes retaining wall PS Building building Thiththapajjala, /01 la Temple - Env. Officer take prompt (100% construction may Werellagama. and Complainant action to mitigate Complete) affect to the the risk situation. adjacent house.

P a g e 83 | 119 Ministry of Provincial Councils and Local Government

Process of redressal Name of Regi: Redres N Summary of Detail of Date of GRC or other LA’s & Sub Numb Date of Outcome or sed Remarks / o. Grievances complainant Receipt stakeholders/ project er meeting solution further details Participated Yes / No Examined Yes Finally, site was 08-05-2015 SM, DS-Laggala, ownership shifted to new Laggala Land boundary K.V.M.De Silva, 08.05.2015 LAG/W Nuwarakade GN&TO(DS documents. DS adjacent land with 05 Pallegama, issues of weekly Nuwara kade. F/01 ,Kaluganga Office) Gvt. demarcated land no issues of land PS fair. Surveyor. & boundaries and resettlement. weekly Fair complainant, accordingly. Informed to CEB Udadumbara Interruptions in E.M.Wijeratne 12.06.2015 UDA/W 12-06-2015 SM,TO& through PS to CEB rectified the 06 PS electricity when Hunnasgiriya. F/04 Hunnasgiriy Complainant rectify the Yes problem. (100% weekly Fair replacing existing a situation Complete) lines at weekly immediately. fair. G.M.T.Jayathila Redesigned and Constructed man- 07 Ambagamuwa Drain issue in ka, 216 18-06-2015 SE, Team shifted the hole at another Korale PS front of a shop. New 09.06.2015 AMG/I Maskeliya Leader- location of Yes place without Internal town,Maskeliya R/01 Town Greentech, SM, proposed man- disturbance to Roads. . Complainant hole to another shop. place. Damage of waste 18-06-2015 SE, Team Informed TO to Waste water drain Ambagamuwa water drainage S.Rajammale 18.06.2015 AMG/I Maskeliya Leader-Green- correct the repaired and linked 08 Korale PS line during Main street R/03 Town tech, SM, situation Yes to main line and Internal Roads internal road Maskeliya Complainant immediately. now functioning construction Secretory PS, Decided to divert Medadumbara Drain water flow Rev.Werapitiye MED/I 19-06-2015 Team Leader the drain water 09 PS Internal through a temple Ratanapala 15.05.2015 R/02 Medadumba Green-tech, SM by constructing Yes Work completed Roads owned land and Thero. ra PS & Public in the another cross fear of soil Town. drain to the other erosion side of main drain.

P a g e 84 | 119 Ministry of Provincial Councils and Local Government

Process of redressal Name of Regi: Redres N Summary of Detail of Date of GRC or other LA’s & Sub Numb Date of Outcome or sed Remarks / o. Grievances complainant Receipt stakeholders/ project er meeting solution further details Participated Yes / No Secretory PS, Decided to Placed concrete 10 Meda Blocking access Public in town. 19.06.2015 MED/I 19.06.2015 Team Leader provide concrete plates over the dumbara PS to a school due to R/03 Medadumba Green-tech, SM slabs over the drain access to internal internal road ra PS & Public in the drain to facilitate Yes the building. road s construction Town. access to the building. (100%Completed) Udapalatha Proposed water Safeguard PS project missed Manager, PS agreed to N/A Since PS has Construction essential area UDA/ 22.11.2015, Secretary - PS, provide separate agreed to provide of Intakes & adjacent to the Mr .M.Jaleel. 22.11.2015 DWP/ Watthehena TO, PS distribution through its funds 11 Raw water main road. 42 Delpitiya 04 Temple Representative system for the mains for villagers . of contractor & suggested issue is no more Drinking water requested a water area using PS with the project roject line extension for Beneficiary funds. their village. group. Installation of the Safeguard Soakage pit Yes Distance between RattotaPS soakage pit (Care Mr.T.M.N.Kum Manager, shifted to another well and the earlier Rattota taker house toilet) arasinghe. RAT/ 24.06.2016 Reform Manager, location near the proposed place close to the Polwaththakan 13-06-2016 DWS/ 12 Drinking water Polwaththa Representative care taker house, was 17 m. Now the unprotected well da, 02 kanda site. which is agreed distance is about scheme of contractor & which is using the Dankanda,Mat Complainant. by the 25 m. neighboring ale. complainant house. SE, Safeguard Manager, 13 Udapalatha Proposed line for Mr. N.G. 06-06-2016 UDA/ 07-06-2016 Team Leader Yes the laying of the Madanayaka DWP/ PS Matthaean. Green-tech Redesign the line pipe may Kandegedara 05 Land of the Secretary - according to the - disturbed his tea Waththehena complainant consent with the smallholding. Atabage. PS, TO- PS . Representative complainant. of contractor & Complainant

P a g e 85 | 119 Ministry of Provincial Councils and Local Government

Process of redressal Name of Regi: Redres N Summary of Detail of Date of GRC or other LA’s & Sub Numb Date of Outcome or sed Remarks / o. Grievances complainant Receipt stakeholders/ project er meeting solution further details Participated Yes / No Complainant Mr. N.G. 01-12-2016 Safeguard Deviated from Udapalatha refused pipe Madanayaka UDA/ Waththehen Manager, complainant land 14 PS laying across his Kandegedara 30-11-2016 DWP/ a. Land of Secretary - and took action to Yes - land. He Waththehena 06 the PS, TO- PS divert line across demands many Atabage. complainant Representative other adjacent compensations . of contractor & land which was which are not Committee given written affordable to the members. PS or the Project. consent. (Picture No: 01)

P a g e 86 | 119 Ministry of Provincial Councils and Local Government

Demarcation of alternative pipe line with the participation of relevant parties.

P a g e 87 | 119 Ministry of Provincial Councils and Local Government

2. North Central Province

Process of redressal Name and Outcome or Sl. Name of LA’s & Summary of Date of Register Details of GRC or Redressed address of Date of Solution Remarks/ further No Sub project Grievance complainant Receipt Number other stakeholders/ meeting Yes/No details participated

Chairman,Secretary, Land issue made by Technical Officer-PS, WSB Rathnayake Mr. W.S.B. W.S.B. DS- agreed to allow Yes Rathnayake against Rathnayake 01.12.2014 NCP/GR/GA 23.03.2015 Galenbindunawewa commencement of The DS has allotted 01 Galenbindunawe the proposed land of Palugolagama L/PS/01 Chief Engineer, construction as another land for wa PS multipurpose building Getalawa Safeguard Manager, Human right Pensioners Fund. Assistant Engineer – commission SPCU& DS agreed to provide W.S.B. Rathnayake- alternative land for State Service State Service Pensioners Fund Pensioners Fund Chairman, PS Mrs. R. Pathirani Commissioner of objected to NCP/GR/LA Local Government – Decision has taken Yes Alternative land 02 Lankapura construction of fair No. 271, BOP 09.01.2015 N/PS/01 30.01.2015 NCP, Divisional that PS has go for was provided & PS building at proposed 316, Secretary - alternative land for construction in land due to her family Thalpotha Lankapura, Chief weekly fair. progress. residing at this land Engineer,Safeguard Manager,Assistant Engineer,Reform manager – SPCU Mr. P. Gunawardane Dutuwewa, 27.01.2015 NCP/GR/HO Safeguard Manger, The septic tank was Yes construction 100% 03 Horowpothana PS observed that the Kapugollewa R/PS/01 27.01.2015 Assistant closed using concrete completed septic tank of comfort EngineerSPCU, Site slab. center was opened Manager of and unproductive Contactor

]

P a g e 88 | 119 Ministry of Provincial Councils and Local Government

Safeguard Manager, 04 Lankapura Mr. G.C.D. Perera No. 312, BOP 31.01.2015 NCP/GR/GA 06.02.2015 Assistant Engineer The complainant Yes The complainant PS requested to 316, L/ST/01 SPCU, Technical was explained that was convinced and straighten the road Thalpotha officer – PS, Site the alignment agreed to the alignment. Manager of designed was decision. Contractor correct. Wijebanda, PS Secretary- TahamaraKu Galnewa, Technical Extend water supply mari, Mahinda Officer – PS Yes As per the request, line. (Wije Banda, Kumara, 21.04.2015 NCP/GR/GA 08.05.2015 Galnewa, Safeguard Decision was taken water line was 05 Galnewa Herath Banda L/PS/01 Manager – SPCU, to extend water line extended. PS &Amarasingh Reform Manger – e) SPCU, Team Leader – RDC, Technical Officer – RDC, Site Manager – Shakthi Civil Construction, Technical officer- Shakthi Civil Construction S.A Representative from Senewirathne PS Secretary, Decision taken to Earth filed low Rain water flooding No. 10, BOP- NCP/GR/LA Safeguard Manager fill the low area and Yes area & 06 Lankapura PS 316, 06.09.2015 N/PS/02 11.09.2015 and Assistant block water coming Constructed Thalpotha engineer– SPCU, from good shed, & causeway Team leader- and Construct towards side of Technical Officer – causeway side of land. RDC, Site Manager – Mr. Senewirathna’s KMC construction shop Lanka (pvt). Limited

P a g e 89 | 119 Ministry of Provincial Councils and Local Government

Commissioner of Local Government – Extend water supply A.G. Punchi NCP, Yes line Banda 02.09.2016 NCP/GR/HIG09.09.2016 Chief Engineer Decision was taken to 07 Higurakgoda No. 06 /Site/1 (Design) – NWSDB, extend water line Kumaragama Senior Engineer, Higurakgoda Senior Engineer (com.) Safeguard Manager,Assistant Engineer,Reform manager – SPCU

Commissioner of Local Government – Request PS water Chairman, NCP, Yes line for Magulpokuna Rural water NCP/GR/WE Chief Engineer Decision was taken 08 Welikanda willage villages supply 02.09.2016 L/PS/1 09.09.2016 (Design) – NWSDB, to distribution lones scheme, Secretory PS, Senior extend to Magulpokun Engineer, Senior magulpokuna a, Welikanda Engineer (com.) village Safeguard Manager,Assistant Engineer,Reform manager – SPCU Two Representative Decision was taken Some Paddy field Chairman, from NWSDB (Chief to provide three access points are Farmers engineer and temporary ramps Yes 09 Thamankaduwa blocked by the pipe Association, 28.10.2016 NCP/GR/SP 11.11.2016 engineer) and eight line Swarnapalig CU/01 Team leader DSC permanent ramps ama, Technical Officer pass over the pipe Kalahagala DSC Site Manager line and the three (Contractor) temporary ramps Safeguard manager should be provided SPCU and before the “Maha” community cultivation season

P a g e 90 | 119 Ministry of Provincial Councils and Local Government

3. North Western Province Process of redressal Detail of Regi: Name of LA’s & Sub Summary of Date of Date of GRC or other Redres No. complaina Num Outcome or sed Remarks / project Grievances Receipt meeting & stakeholders/ nt ber solution further details Venue Participated Yes / No Supplying and Laying Damaged to the W.M.A.Band Maho- 01.12.2016, PS Secretary, Decided to Repaired the of Pipes for the runoff drain ara, 18.11.2016 Pol/W PS Ofice Senior Engineer, reconstruct the Yes runoff drain and 01 extension of adjacent to his Kattambuwa S/04 Maho Contractor, damaged runoff now it is Nikaweratiya water boutique and wa Junction, Team Leader drain after functioning well. supply scheme in residence due to Koonwewa RDC Safeguard pressure testing. Maho and pipe laying Manager, Polpithigama activities in Complainer Pradeshiya Sabha Kattambuwawa Areas Junction

4. Sabaragamuwa Province

SN Name of LA’s & Summary of Date of Regi: Process of solution Remarks / Sub project Grievances Detail of Receipt Number Date of Details of GRC Outcome or Redr further details complaina meeting or other solution esse nt stakeholders / d Participated Y/N Lack of sanitary PS Chairman, 01 Weekly Fair, facilities for W.Karunada SAB/NCB Secretary, subject To provide water Embilipitiya temporary weekly sa, /EMB/001 28/10/14 officers & and sanitation Yes Provided fair. Udawalawe 14/1/14 Safeguard facilities by PS as facilities as Manager (SM) early as possible required. The wastes of the W.Karunada SAB/NCB Secretary, subject Decision was Collection of 02 Weekly Fair, fair was not sa, 14/1/14 /EMB 002 21/1/14 officers & taken to collect Yes waste is being Embilipitiya collected by PS Udawalawe Safeguard waste on weekly made on a regularly Manager (SM) basis. weekly basis. Problem of Police officers temporary Location 22/10/14 30/10/14 were assigned

P a g e 91 | 119 Ministry of Provincial Councils and Local Government

SN Name of LA’s & Summary of Date of Regi: Process of solution Remarks / Sub project Grievances Detail of Receipt Number Date of Details of GRC Outcome or Redr further details complaina meeting or other solution esse nt stakeholders / d Participated Y/N 03 Weekly Fair & MPB & safety for vendors A.M. Thusari SAB/NCB Secretary, subject Decision taken to Yes duties in the fair Galigamuwa & customers at PS, /GLG/001 officers & request police by the Police to weekly fair. Galigamuwa Safeguard officers to control control traffic and Manager (SM) traffic problem & provide security safety for the venders. The culvert Kaparalla Road constructed was not W.S.Chanak Secretary, subject Decision was Additional culvert 04 Embilipitiya adequate to carry a Ruchira SAB/NCB officers & taken to construct Yes constructed to water during the Kumara 18/11/14 /EMB/001 18/1/014 Safeguard an extra culvert to control flooding rainy season. Mulaniyawal Manager (SM) avoid flooding to Therefore, the a the lands adjoining lands get adjoining to the flooded during the culvert. rain. Land erosion due to SAB/NCB PS Staff, Decision was The Retaining 05 MPB, Kollonna construction of the S.N. 16/1/15 /KOL/001 16/1/15 Contractor & taken to Yes wall is building Abynayaka Owner, SM SPCU Construct a constructed and Retaining wall the issue is solved. Link Road with Problem of the land W.A. SAB/NCB PS subject drainage system telephone line of the Wickramasin 18/2/15 /DER/001 18/2/15 officers, Decided to Road 06 Daraniyagala road ghe Contractor, Green Remove the Yes construction tech & SM existing telephone Completed. line No Toilet facilities Nimal SAB/NCB Secretary PS, 07 Weekly Fair, provided in the 1st Karunarathn 1/1/15 /KAH.001 01/1/15 Contractor, SE SM Decided to Yes Toilet facilities Kahawatta floor of the building a provide toilet provided. facilities required

P a g e 92 | 119 Ministry of Provincial Councils and Local Government

SN Name of LA’s & Summary of Date of Regi: Process of solution Remarks / Sub project Grievances Detail of Receipt Number Date of Details of GRC Outcome or Redr further details complaina meeting or other solution esse nt stakeholders / d Participated Y/N Advice the MPB Aranayaka Dust due to the M. Nisantha contractor to Yes Action is taken to 08 Aranayaka construction of MP PS 5/1/15 SAB/NCB 5/1/15 PS Staff, follow cover up the Building Aranayaka /ARN/001 Contractor & environmental construction side. SPCUSM safety measures during the construction. A Private lands and PS Subject 9 Weekly Fair, a houses affected by H.B. officer, Decided to extend Extended Embilipitiya the flood due to Gunapala 26/2/15 001 10/4/15 Contractor, Land the drainage Yes drainage insufficient drainage owners, SM channel channel system constructed and the problem is solved. SAB/NCB Decided to 10 Kollonna-PS House is affected by W.K. Asilin 30/3/15 /KOL 002 30/3/15 PS TO, SPCU construct drain Yes Constructed an MPB the flood due to staff (CI, SM), canal to stop earth bund to construction Contractor, TL. flooding. prevent flooding. Galigamuwa-PS Access to three Ahakiyatha Road, houses been K.A. 20/5/15 SAB/NCB 22/5/15 PS TO, SPCU Decided to New access 11 disturbed due to the Somawathi GLG/002 staff (CI, SM), provide new Yes provided for three construction Contractor & access. houses. activities. Team Leader Contractor, TO, Decided to 12 Dehiovita A well got damaged Amitha 5/6/15 SAB/NCB 22/6/15 SPCU, SM, Green provide protective Drainage Channel due to the Harsana /DER/002 tech Team Leader concrete cover Yes Being construction. Perera over the well re- Completed. establish the well Access to the Contractor, SPCU Advice the adjoining shops 19/6/15 GM, contractor to

P a g e 93 | 119 Ministry of Provincial Councils and Local Government

SN Name of LA’s & Summary of Date of Regi: Process of solution Remarks / Sub project Grievances Detail of Receipt Number Date of Details of GRC Outcome or Redr further details complaina meeting or other solution esse nt stakeholders / d Participated Y/N 13 Ayagama Bus Stand being blocked due to H.A. SAB/NCB 19/6/15 greentech remove materials Yes Cleared the & MPB, dumping the Leelarathna /AYA/001 enabling people access of the construction to access the shops materials shops. Embilipitiya-PS Few families W.A.Saman Contractor, PS PS and the The pit is to be Construction of objected to the kumara SAB/NCB TO & SPCU Contractor agreed constructed in 14 Weekly Fair & Public location where the And other 23/10/15 /EMB/004 18/11/15 SM. to change the Yes new (Place) land Toilet at Udawalawe toilet pit is planned. three location of the as agreed by all Person. toilet pit. parties. The road got badly Dehiovita- PS affected with muddy Contractor, 15 during the rainy M.R.M. SAB/NCB PS TO & Advice the Contractor clean Improvements to seasons due to the Issam /DEH/003 SPCU SM contractor to clean Yes the road daily and Drainage System construction of Dehiovita. 13/11/15 23/11/15 Team leader, road daily until the the grievance is drainage canal. It DSC construction is being solved caused for over unnecessary traffic jam on the road. Imbulpe- PS O.G Rehabilitation of Access to a house is Karunarathn SAB/NCB Contractor, SPCU Change the design Samanalaga ma Blocked due to the a 5/11/15 /IMB/001 15/12/15 SM Team leader, in order to make Yes Construction is 16 Road at construction Neluwel DSC access easy to the being complete. Rathmalavinna Balangoda. family. Contractor Advised the Balangoda PS- Delaying of handing By Pre-school SPCU SM Team contractor to 17 Construction of MPB over of pre-school teacher SAB/NCB 18/3/16 leader (DSC), TO complete and Completed and with Pre-School building 18/3/16 /BAL/001 (PS) handover the pre- Yes handed over to SPCU (PPD, SE, school building PS. 27/5/16 SM), DSC, TO & before the end of secretory, April 2016. Contractor

P a g e 94 | 119 Ministry of Provincial Councils and Local Government

SN Name of LA’s & Summary of Date of Regi: Process of solution Remarks / Sub project Grievances Detail of Receipt Number Date of Details of GRC Outcome or Redr further details complaina meeting or other solution esse nt stakeholders / d Participated Y/N An optical shop is Mr. B, Contractor Advised the The 18 Yatiyantota PS- been affected due to Devagedara, SAB/NCB SPCU SM, ASS. contractor to pay compensation Construction of the construction of Owner of the 10/2/16 /YAT/001 8/3/16 Eng. Team compensation for Yes being paid and Weekly Fair weekly fair. optical shop, leader (DSC), TO the damage redressed the Yatiyantota (PS & DSC), before 20.4/16 grievance. Complainer

Provincial Council 19 Palmadulla PS- construct a stage, Mr Waruna SAB/NCB 27.5.16 member, SPCU Agreed on the Yes The grievance Construction of fish and meat stalls in Liyanage, 5/5/16 /PAL/001 and 8.6.16 (PPD, SE, ASSE., locations to be being addressed Weekly Fair the weekly fair. Member of SM) & PS staff, construct the stage PC Contractor and stalls.

5. Southern Province:

N Name of Summary of Date Regi Process of solution o LA’s Grievances of : Date of Details of Outcome or Redressed Remarks / Detail of Recei Num meetin GRC or solution farther details yes no complaina pt ber g other nt stakeholder s/ Participated 01 Hakmana Around 03 meters’ deep Household 2016 NA 2016 NA Safety measures Yes Temporary protection excavation observed by members, June June incorporated (Retaining fence installed until the the side of adjoining especially wall constructed and retaining wall is household in the children are chain link fence plan to constructed. boundary line which may at risk install for protection) cause for high risk for the residents. .

P a g e 95 | 119 Ministry of Provincial Councils and Local Government

6. Uva Province

Date Regi: Process of solution No Name of Summary of Detail of of Number Date Details of GRC Outcome or Redressed Remarks / LA’s Grievances complai Recei of or other solution further details yes no nant pt meetin stakeholders/ g Participated 05 Meegaha A culvert at the bus Mrs. 21/9/16 2016/UP/ 23/9/16 Site was inspected Construction of a Not yet The issue is kiula stand is directed to a LWL.Sa GRM/05 by TO and drain with concrete addressed and the Constructi natural and open manthi Safeguard walls would facilitate drainage system will on of drain of which only a Pahalage Manager of the runoff water flow be functioning well access part is constructed dera LGESP and without blocking to once the drainage road to with concrete. Land Meegaha Technical Officer the end. It was system is completed bus stand at the downstream is kiula and Engineer of decided to design a as proposed. So, more vulnerable to Badulla consultants to take drain for the there will be no any get more waste a decision on purpose. impact on the people water from the upper appropriate and the environment area specially town solution for the and the bus stand problem during rainy season. Hence, requested to prepare a proper drain to lead the water to the downstream without clogging on the way.

P a g e 96 | 119 7 Western Province No Name of Summary of Date of Regi: Process of redressal LA’s & Grievances Receipt Numb Date GRC or Outcome or Redres Remarks / Ministry of Provincial Councils and Local Government Sub Detail of er of other solution sed further details project complain meeti stakeholde Yes/ ant ng rs/ No Participate d 1. Representation was made by a resident two of the instructed to Yes Estimates are being 1.Anura PS Road under construct a prepared & work will be Palindanuw Construction to Wijetunga 2016.01. Pal-01 2016.0 Secretary, Attended. Retaining wall and 05 ara Prevent them land 2.Salman 11 1.19 Contractor, Road from Slippages and Samaratu Consultant side drainage Waiting for approval for Project broken fence on nga Officer, TO, system changing from DBST to Construction of Road. 3.Village SPCU Asphalt. 2. Village Developm Development society ent society said road construction change from DBST to Asphalt 06 Madurawal Delay of opening the PS Advice the Yes a-PS constructed water Village 2016.02. Mad - 2016.0 Secretary, contractor to Water project for welfare 11 04 2.19 Contractor, Accelerate Laying Being pursed with society Consultant Supply beneficiaries water lines and PS and contractor Project Officer, TO, SPCU complete the project as soon as possible. Following reasons cause to made damages to concrete road constructed in 2014 1. Using J.C.B. machines Although the Yes PS Now functioning well. 07 Madurawal along the road for laying Dicklanda 2016.05. Mad - 2016.0 Secretary, contractor has a-PS water lines. villagers 18 05 5.26 DS, promised to repair Water 2. Moving of 20 Ton ten- Contractor, the above- Supply wheel concrete mixer Consultant mentioned damages Project machines during the Officer, TO, construction of water tank. SPCU The maximum withstand load of a concreted road is 5 Ton. 3. Using J.C.B. machines to transport concrete along

P a g e 97 | 119 Ministry of Provincial Councils and Local Government

the road. 45. The damages of the road is continuously spreading and widening form cracks made due to above reasons. Constructio According to the Public 18.08.20 Mad - 01.09. PS The above site has Although there is not n of Weekly complaints made by the Health 16 06 2016 Secretary, inspected by a team much anomalies in the Fair & Toilet PHI & vendors of the Inspector Consultant of experts lead by Yes designs of the toilet and Officer Block – market, there is a bad P.H.I. Matugama. block. The contractor has Venders (UDA), SW, Matugama odour release to the Contractor, According to the been advised by the Pradeshiya environment due to the TO, observations made, Provincial Director Sabha effluent release from the SPCU(SE) the range pipe from (Engineering) to rectify toilet block which can the anaerobic unit of the defects according to cause health problems. the toilet directly following specifications. open to the common I. Fixing Vent tube canal of the market II. To replace the “Filter which cause tp Bed” of Anaerobic filter release the bad III. Fixing of “T” shape smelling odor. pipes to the end of the pipe from the septic tank IV. Contractor has been advised to carry out all of above repair works under their supervision of Technical Officer at Engineering office of Matugama.

P a g e 98 | 119 S/N Name of SummaryMinistry of of Provincial Councils andDate Local of GovernmentRegi: Process of redressal LA’s & Sub Grievances Receipt Numb Redressed Detail of Date of GRC or other Outcome or Remarks / project er meeting stakeholder solution further details complainant Yes/ No s/ Participated supplying of Water PS Secretary, pump electricity 01 Delay of opening the Villagers 1/10/16 Mad - 12/10/16 DS,CEB supplying not Yes 06 (UDA), SW, Being addressed Madurawala water project for completed. An issue PS, Water beneficiaries TO, the grievance. supply SPCU(SE) raised by CEB for a Now functioning Project requirement of transformer to operate water pump.

P a g e 99 | 119 Ministry of Provincial Councils and Local Government

Annexure 4 – Other Safeguards related Reports

P a g e 100 | 119 Ministry of Provincial Councils and Local Government

Gender Composition of Planning Committee as at 31st December 2016

1. Central Province

Composition Serial No. LA Male Female Total 01 Udadumbara 04 02 06 02 Panwila 03 05 08 03 Thumpane 03 07 10 04 Pathahewaheta 06 04 10 05 Udapalatha 04 04 08 06 Medadumbara 02 03 05 07 Harispattuwa 03 04 07 08 Gangawata Korale 04 07 11 09 Minipe 03 05 08 10 Walapane 03 02 05 11 Ambagamuwa Korale 04 06 10 12 Naula 05 03 08 13 Yatawatta 03 11 14 14 Laggala Pallegama 04 03 07 15 Ambanganga Korale 04 06 10 16 Wilgamuwa 04 01 05 17 Dambulla 04 02 06 18 Rattota 05 05 10 Total 68 80 148

2. North Central Province

Composition Serial No. LA Male Female Total 1 Galenbindunawewea 5 2 7 2 Galnewa 2 3 5 3 Horowpothana 4 1 5 4 Ipalogama 4 1 5 5 Kebithigollewa 4 1 5 6 Padaviya 4 1 5 7 Palagala 4 1 5 8 Rajangane 3 2 5 9 Rambewa 3 2 5 10 Thirappane 3 3 6 11 Dimbulagala 3 3 6 12 Lankapura 4 1 5 13 Welikanda 4 2 6 14 Mihinthale 5 2 7 15 Thamankaduwa 5 1 6 16 Higurakgoda 4 1 5 Total 61 27 88

P a g e 101 | 119 Ministry of Provincial Councils and Local Government

3. North Western Province

Serial Composition LA No. Male Female Total 1 Alawwa 3 8 11 2 Bingiriya 4 3 7 3 Galgamuwa 3 4 7 4 Giribawa 1 6 7 5 Ibbagamuwa 1 9 10 6 Kuliyapitiya 4 3 7 7 Mawathagama 2 4 6 8 Maho 4 3 7 9 Nikaweratiya 3 7 10 10 Polpithigama 3 3 6 11 Rideegama 2 3 5 12 Udubaddawa 1 9 10 13 Arachchukattuwa 4 3 7 14 Chilaw 3 7 10 15 Kalpitiya 6 4 10 16 Karuwalagaswewa 5 0 5 17 Nawagattegama 3 3 6 18 Wanathawilluwa 7 1 8 Total 59 80 139

4. Sabaragamuwa Province

Composition Serial No. LA Male Female Total 1 Embilipitiya 4 1 5 2 Palmadulla 4 3 7 3 Kahawatta 4 3 7 4 Kollonna 2 3 5 5 Balangoda 4 1 5 6 Imbulpe 4 1 5 7 Rathnapura 4 1 5 8 Ayagama 2 3 5 9 Dehiovita 5 3 8 `10 Yatiyantota 2 4 6 11 Ruwanwalla 3 3 6 12 Bulathkohupitiya 3 3 6 13 Galigamuwa 5 4 9 14 Kegalla 3 3 6 15 Aranayaka 3 2 5 16 Daraniyagala 3 3 6 Total 55 41 96

P a g e 102 | 119 Ministry of Provincial Councils and Local Government

5. Southern Province

S. Composition LA No Male Female Total 1Akuressa 3 3 6 2 Athuraliya 2 4 6 3 Hakmana 3 4 7 4 Kamburupitiya 2 4 6 5 Kirinda - Puhulwella 1 4 5 6 Kotapola 2 3 5 7 Malimbada 3 5 8 8 Mulatiyana (041 2268275) 3 3 6 9 Pasgoda 4 3 7 10 Pitabeddara 2 2 4 11 Thihagoda 3 4 7 12 Imaduwa 2 3 5 13 Karandeniya 0 5 5 14 Nagoda No planning committee 15 Neluwa No Planning committee 16 Thawalama No Planning committee 17 Welivitiya – Divithura 3 2 5 18 Hambantota 3 2 5 19 Katuwana 4 3 7 20 Lunugamwehera 2 2 4 21 Sorriyawewa 3 2 5 22 Thissamaharamaya 6 2 8 Total 51 60 111

6. Uva Province

Composition Serial No. LA Male Female Total 1 Badulla 06 01 07 2 Badalkumbura 04 02 06 3 Bandarawela 04 02 06 4 Haldummulla 04 01 05 5 Haputale 04 02 06 6 Lunugala 07 02 09 7 Kandeketiya 05 01 06 8 Katharagama 06 01 07 9 Madulla 06 01 07 10 Medagama 05 01 06 11 Meegahakiula 06 01 07 12 Rideemaliyadda 05 01 06 13 Siyambalanduwa 04 01 05 14 Thanamalwila 07 01 08 15 UvaParanagama 07 02 09 16 Wellawaya 06 01 07 17 Passara 04 02 06 18 Mahiyangana 04 01 05 19 Buttala 03 02 05 Total 97 26 123

P a g e 103 | 119 Ministry of Provincial Councils and Local Government

7. Western Province

Serial Composition LA No. Male Female Total 1 Mirigama 1 4 5 2 Agalawatta 3 2 5 3 Diulapitiya 3 2 5 4 Biyagama 2 3 5 5 Seetawaka 3 2 5 6 Dodangoda 4 2 6 7 Matugama 5 3 8 8 Walallawita 5 1 6 9 Madurawala 3 2 5 10 Palindanuwara 03 01 04 Total 32 22 54

Gender Compositions of Local Authorities (LAs) Staff as at 31 December 2016

1. Central Province

Serial Composition No. LA Male Female Total 1 Udadumbara 29 17 46 2 Panwila 16 26 42 3 Thumpane 42 43 85 4 Pathahewaheta 56 32 88 5 Udapalatha 52 26 78 6 Medadumbara 32 40 72 7 Harispattuwa 38 31 69 8 Gangawata Korale 44 36 80 9 Minipe 35 20 55 10 Walapane 91 29 120 11 Ambagamuwa 91 50 141 12 Naula 27 17 44 13 Yatawatta 21 15 36 14 Laggala Pallegama 16 19 35 15 Ambanganga Korale 15 22 37 16 Wilgamuwa 30 15 45 17 Dambulla 39 19 58 18 Rattota 49 35 84 Total 723 492 1215

P a g e 104 | 119 Ministry of Provincial Councils and Local Government

2. North Central Province

Serial Composition LA No. Male Female Total 1 Galenbindunawewea 5 2 7 2 Galnewa 2 3 5 3 Horowpothana 4 1 5 4 Ipalogama 4 1 5 5 Kebithigollewa 4 1 5 6 Padaviya 4 1 5 7 Palagala 4 1 5 8 Rajangane 3 2 5 9 Rambewa 3 2 5 10 Thirappane 3 3 6 11 Dimbulagala 3 3 6 12 Lankapura 4 1 5 13 Welikanda 4 2 6 14 Mihinthale 5 2 7 15 Thamankaduwa 5 1 6 16 Higurakgoda 4 1 5 Total 61 27 88

3. North Western Province

Serial Composition L Male Female Total No. A 1 Alawwa 3 8 11 2 Bingiriya 4 3 7 3 Galgamuwa 3 4 7 4 Giribawa 1 6 7 5 Ibbagamuwa 1 9 10 6 Kuliyapitiya 4 3 7 7 Mawathagama 2 4 6 8 Maho 4 3 7 9 Nikaweratiya 3 7 10 10 Polpithigama 3 3 6 11 Rideegama 2 3 5 12 Udubaddawa 1 9 10 13 Arachchukattuwa 4 3 7 14 Chilaw 3 7 10 15 Kalpitiya 6 4 10 16 Karuwalagaswewa 5 0 5 17 Nawagattegama 3 3 6 18 Wanathawilluwa 7 1 8 Tota 59 80 139

P a g e 105 | 119 Ministry of Provincial Councils and Local Government

4. Sabaragamuwa Province

Composition SNLA Male Female Total 1 Embilipitiya 37 29 67 2 Palmadulla 51 33 84 3 Kahawatta 37 23 60 4 Kollonna 27 17 44 5 Balangoda 33 28 61 6 Imbulpe 35 20 55 7 Rathnapura 27 16 43 8 Ayagama 25 14 39 9 Dehiovita 54 55 109 10 Yatiyantota 34 43 77 11 Ruwanwalla 75 53 128 12 Bulathkohupitiya 37 15 52 13 Galigamuwa 49 38 87 14 Kegalla 40 34 74 15 Aranayaka 36 34 70 16 Daraniyagala 39 25 64 Total 636 477 1113

5. Southern Province Composition No. LA Male Female Total 1 Akuressa 46 33 79 2 Athuraliya 24 21 45 3 Hakmana 35 37 72 4 Kamburupitiya 48 39 87 5 Kirinda - Puhulwella 31 25 56 6 Kotapola 48 24 72 7 Malimbada 20 23 43 8 Mulatiyana 34 28 62 9 Pasgoda 34 21 55 10 Pitabeddara 29 30 59 11 Thihagoda 24 25 49 12 Imaduwa 41 36 77 13 Karandeniya 44 31 75 14 Nagoda 27 34 61 15 Neluwa 20 12 32 16 Thawalama 26 12 38 17 Welivitiya - Divithura 21 18 39 18 Hambantota 26 22 48 19 Katuwana 58 50 108 20 Lunugamwehera 24 11 35 21 Sorriyawewa 40 23 63 22 Thissamaharamaya 48 48 96 Total 748 603 1351

P a g e 106 | 119 Ministry of Provincial Councils and Local Government

6. Uva province

Composition SNLA Male Female Total 01 Badulla 51 17 68 02 Bandarawela 21 18 39 03 Haputale 42 31 73 04 Haldummulla 28 19 47 05 Kandaketiya 24 15 39 06 Lunugala 39 20 59 07 Meegahakiula 30 14 44 08 Rideemaliyadda 25 16 41 09 Uvaparanagama 29 19 48 10 Badalkumbura 34 23 57 11 Kataragama 87 35 122 12 Madulla 51 25 76 13 Medagama 38 18 56 14 Siyabalnduwa 46 19 65 15 Thanamalvila 49 54 103 16 Wellawaya 45 44 89 17 Passara 62 51 113 18 Mahiyangana 72 36 108 Total 773 474 1247

7. Western Province

Composition Serial LA No. Male Female Total 1 Mirigama 160 76 236 2 Diulapitiya 164 37 201 3 Biyagama 129 64 193 4 Seetawaka 126 88 214 5 Dodangoda 60 35 95 6 Matugama 143 95 238 7 Walallawita 53 28 81 8 Palindanuwara 48 28 76 9 Madurawala 77 34 111 10 Agalawatta 58 42 100 Total 1018 527 1545

P a g e 107 | 119 Ministry of Provincial Councils and Local Government

Gender sensitization awareness programs for PSs as at 31 December 2016 6. Central Province

Participation of LA Personnel / Gender Date of S Contractors Composition LA Training N Program Chair Technical/ person Members Other staff Total Male Female 01 18 PSs 2014-01-07 11 00 77 88 55 33 02 Rattota 2014-03-20 Yes 04 15 20 09 11 03 Minipe 2014-03-27 Yes 02 22 25 10 15 04 Udadumbara 2014-03-28 Yes 00 23 24 09 15 05 Naula 2014-05-05 Yes 00 18 19 11 08 06 Pathahewaheta 2015-03-15 Yes 00 19 20 07 13 07 Udapalatha 2015-03-20 Yes 00 11 12 05 07 08 Medadumbara 2015-03-16 Yes 00 20 21 05 16 09 Udadumbara 2015-03-16 No 00 08 08 04 04 10 Dambulla 2015-06-05 No 00 18 18 07 11 11 Thumpane 2015-09-15 No 00 28 28 04 24 12 Wilgamuwa 2015-07-10 No 00 11 11 05 06 13 Panwila 2015-07-22 No 00 16 16 07 09 Laggala 14 2015-07-23 No 00 15 15 03 12 Pallegama Ambagamuwa 15 2015-09-01 No 00 22 22 12 10 Korale Gangawata 16 2015-09-02 No 00 14 14 04 10 Korale 17 Yatawatta 2015-11-05 No 00 25 25 14 11 18 Walapane 2015-12-11 No 00 15 15 06 09 19 Harispattuwa 2016-02-09 No 00 27 27 10 17 Total 18 06 404 428 187 241

North Central Province Gender Participation of LA Personnel S. Name of Date of composition No Pradeshiya Training Chai Other Memb Technic . Sabha Program rpers Staff Total Male Female ers al staff on 01 Horowpothana 14.11.2014 1 2 1 18 22 15 8 02 Padaviya 16.12.2014 1 3 1 13 17 17 0 03 Rajanganaya 25.03.2015 1 3 1 12 17 09 08 04 Galnewa 08.05.2015 1 1 2 18 22 11 11 05 Ipalogama 29.07.2015 - - 1 15 16 05 11 06 Thirappane 30.07.2015 - - 1 15 16 07 13 07 Welikanda 13.10.2015 - - 1 14 15 08 07 08 Rambewa 12.01.2016 - - 1 14 15 06 09 09 Galenbindunaw 24.02.2016 - - 2 19 21 12 09 ewa 10 Lankapua 04.03.2016 - - 2 17 19 10 09 11 Kebithigollewa 23.06.2016 - - - 21 21 13 08 12 Palagala 02.11.2016 - - 1 21 22 16 6 13 Mihinthale 05.12.2016 - - 1 35 36 31 5 14 Thamankaduwa 06.12.2016 - - 1 65 66 35 25 15 Higurakgoda 06.12.2016 - - 1 53 54 25 25 16 Dimbulagala 21.12.2016 - - 2 40 42 34 08 Total 4 9 18 431 389 234 162

P a g e 108 | 119 Ministry of Provincial Councils and Local Government

2. North Western Province Gender sensitization awareness for all PSs being completed. Therefore, no programmes conducted during the reporting period.

3. Sabaragmuwa Province

Gender Participation of LA Personnel S. Date of composition No LA Training Chair Technic . Program perso Members Total Male Female al staff n 1 Kahawatta 16.10.2013 1 1 10 12 4 8 2 Ayagama 24.10.2013 1 2 8 12 5 7 3 Ruwanwalla 25.10.2014 1 32 33 9 24 4 Yatiyantota 8.11.2013 1 1 20 22 3 19 5 Kegalla 22.11.2013 1 2 23 26 8 18 6 Galigamuwa 23.09.2016 0 0 32 32 12 20 7 Bulathkohupitiya 24.11.2016 0 0 21 21 12 9 8 Dehiovita 25.11.2016 0 0 23 23 4 19 9 Daraniyagala 25.11.2016 0 0 21 21 9 12 10 Aranayaka 23.12.2016 0 0 22 22 4 18 11 Palmadulla 29.12.2016 0 0 19 19 5 14 Total 5 6 210 243 75 168

P a g e 109 | 119 Ministry of Provincial Councils and Local Government

4. Southern Province Gender Date of Participation of LA Personnel S. composition LA Training No Chairp Member Technica Femal Program Total Male erson s l staff e 1 Akuressa 05.08.2016 Y NA NA 08 04 04 2 Athuraliya 3 Hakmana 05.08.2016 Y NA NA 08 06 02 4 Kamburupitiya 05.08.2016 Y NA NA 04 02 02 Kirinda - 5 05.08.2016 Y NA NA 07 04 03 Puhulwella 6 Kotapola 05.08.2016 NA NA NA 08 04 04 7 Malimbada 05.08.2016 Y NA NA 04 01 03 8 Mulatiyana 05.08.2016 Y NA NA 06 04 02 9 Pasgoda 05.08.2016 Y NA NA 04 01 03 10 Pitabeddara 05.08.2016 Y NA NA 08 05 03 11 Thihagoda 05.08.2016 Y NA NA 06 02 04 12 Imaduwa 16/06/2016 No NA Y 55 26 29 13 Karandeniya 21/06/2016 Y NA Y 22 10 12 14 Nagoda 07/06/2016 Y NA Y 15 04 11 15 Neluwa 27/06/2016 Y NA NA 16 06 10 16 Thawalama 18/09/2013 Y 03 Y 21 16 5 Welivitiya - 17 03/10/2013 Y 05 Y 13 8 5 Divithura 18 Hambantota 22 /12/2016 Y NA NA 14 08 06 19 Katuwana 14/06/2016 No No Y 23 06 17 20 Lunugamwehera 22 /12 /2016 Y NA NA 08 00 08 21 Sorriyawewa 05.08.2016 NA NA NA 05 01 05 Thissamaharama 22 22 /12 /2016 NA NA Y 08 05 03 ya Total 16 08 08 263 123 141

5. Uva Province

Gender Name of Date of Participation of LA Personnel S. composition Pradeshiya Training No. Chair Technical Other Sabha Program Members Total Male Female person staff Staff 1 Meegahakiula 2014/04/29 01 02 02 08 13 07 06 02 Rideemaliyadda 2014/05/22 01 01 02 12 16 06 10 03 Haldummulla 2015/02/26 01 01 02 11 15 06 09 04 Badalkumbura 2015/03/04 01 02 01 16 20 06 14 05 Badulla 2015/06/16 - - 02 19 21 10 11 06 Thanamalwila 2015/06/17 - - 02 20 22 09 13 07 Haputale 2015/06/24 - - 03 22 25 11 14 08 SPCU staff-Uva 2015/06/25 - - 04 04 08 07 01 09 Medagama 2015/07/15 - - 02 17 19 10 09 10 Kandaketiya 2015/07/30 - - 02 10 12 05 07 11 Madulla 2015/09/02 - - 03 32 35 05 30 12 Katharagama 2015/12/02 - - 02 24 26 08 18 13 Wellawaya 2015/12/02 - - 02 17 19 07 12 14 Uvaparanagama 2015/12/08 - - 01 19 20 06 14 15 Bandarawela 2016/05/27 - - 02 10 12 05 07 16 Lunugala 2016/06/01 - - 03 16 19 06 13 17 Siyambalanduwa 2016/06/28 - - 02 11 13 04 09 Total 04 06 37 268 315 118 197

P a g e 110 | 119 Ministry of Provincial Councils and Local Government

7. Western Province

Gender Participation of LA Personnel Name of Date of compositi S. Pradeshiya Training Chair Other No. Members Technic Total Sabha Program person Staff Male Female al staff

01 SPCU/WP Staff 13.11.2013 00 00 0 07 07 03 04 0 02 Matugama 27.10.2014 01 02 0 23 30 11 19 4 03 Seethawaka 28.04.2014 00 01 0 08 12 04 08 3 04 Biyagama 28.04.2014 00 00 0 10 14 07 07 05 Madurawala 28.04.2014 00 01 04 11 15 08 07 3 06 Agalawatta 10.03.2015 01 00 0 08 11 07 04 2 07 Diulapitiya 18.03.2015 01 00 0 11 13 07 06 1 08 Palindanuwara 28.10.2016 00 00 0 14 16 04 12 2 09 Mirigama 21.12.2016 00 00 0 19 21 04 17 10 Walalalawita 18.12.2016. 00 00 0 36 39 21 18 3 11 Dodangoda 27.11.2016 00 00 0 14 16 04 12 2 Total 03 04 2 161 194 80 114 6

Sex-disaggregated information of beneficiary of project facilitation - as at December 2016 1. Central Province Weekly Fair Water Supply Comfort Centre S N Pradeshiya Sabha Male Female Total Male Female Total Male Female Total toilets toilets toilets 01 Udadumbara - - - 700 900 1600 03 03 07 02 Ambagamuwa ------02 02 05 03 Udadumbara 125 200 325 ------04 Wilgamuwa 151 170 321 1900 1850 3750 - - - 05 Wilgamuwa(CKD) - - - 512 544 1056 - - - 06 Laggala Pallegama 75 60 135 230 220 450 03 03 06 07 Rattota 10 02 12 1500 1700 3200 - - - 08 Udapalatha - - - 3200 3000 6200 - - - Total 361 432 793 7530 7670 15200 08 08 18

2. North Central Province Weekly Fair Water Supply Comfort Centre S/ Pradeshiya Sabha Male Female Total No Male Female Total Male Female Total toilet toilet toilet Galenbindunawewea 132 20 152 2205 2295 4500 - - - Galnewa - - - 1543 1607 3150 2 2 5 Horowpothana ------2 3 6 Ipalogama ------2 2 5 Kebithigollewa 157 37 194 - - - 2 2 5 Padaviya ------2 3 6 Palagala 59 7 66 - - - 2 2 5 Rajangane 121 51 172 441 459 900 - - - Rambewa 110 17 127 ------Thirappane ------4 5 10

P a g e 111 | 119 Ministry of Provincial Councils and Local Government

Dimbulagala 127 17 144 16537 17213 33750 - - - Lankapura 20 10 30 - - - 3 3 7 Welikanda 285 56 341 - - - 2 2 5 Total 1011 215 1226 20726 21574 41300 21 24 54

3. North Western Province S/ Water Supply Pradeshiya Sabha No Male Female Total 1 Polpithigama 4048 4947 8995 2 Ibbagamuwa 15321 18726 34047 3 Maho 1665 2035 3700 4 Nikaweratiya 4275 5225 9500 5 Galgamuwa 2745 3355 6100 6 Karuwalagaswewa 3600 4400 8000 7 Wanathawilluwa 1688 2062 3750 Total 33342 40750 74092

4. Sabaragamuwa Province

Weekly Fair Water Supply Public Toilet Number/unit Disable Male toilet Toilet S/ Pradeshiya Female Total N Sabha Male Female Total Male Female Total Com Urin toilet toilet mode ary Unit 1 Embilipitiya 90 57 147 - - - 2 3 2 1 8 2Ayagama 17 13 33 - - - 2 3 2 1 8 3 Galigamuw 43548------a 4 Yatiyantota 112 25 137 - - - 3 3 2 1 9 5 Kahawatta 76 88 164 - - - 6 Palmadulla 68 65 133 - - - 2 3 2 1 8 7Kollonna - - - 233 1 9 Total 406 253 659 --- 11 15 11 5 42

5. Southern Province

Weekly Fair Water Supply Comfort Centre S/ Pradeshiya Sabha Male Female No Male Female Total Male Female Total Total toilet toilet toilet 01 Thissamaharamaya 379 210 589 ------DebarawewaFair 02 Kirinda Puhulwela 37 02 39 ------03 Sooriyawewa 169 388 557 ------04 Neluwa 263 38 301 ------05 Athuraliya 13 01 14 ------06 Hakmana - - 397 - - - Total 848 638 1486 -- 397 ---

P a g e 112 | 119 Ministry of Provincial Councils and Local Government

6. Uva Province

Weekly Fair Water Supply Comfort Centre S/ Pradeshiya Male Female Total No Sabha Male Female Total Male Female Total toilet toilet toilet 01 Meegahakiula 108 41 149 - - - 02 02 04 02 Medagama 27 56 83 - - - 03 02 05 04 Kandeketiya 76 24 100 ------05 Rideemaliyadda 73 32 105 ------06 Madulla ------02 03 05 07 Bandarawela ------02 02 04 08 Thanamalwila 78 24 102 ------Total 362 177 539 - - - 09 09 18

7. Western Province

Weekly Fair Water Supply Toilet Block S/ Pradeshiya Femal Male Female desirabl Total No Sabha Male Female Total Male Total e toilet toilet e toilet 1 Matugama 145 12 157 - - - 3 3 1 7 2 Dodangoda 140 70 210 ------3 Walallawita 70 10 80 - - - 3 2 1 6 Walallawita MPB ------3 3 2 8 4 Palindanuwara - - - 310 435 745 4 3 1 8 Madurawala - - - 84 36 120 5 Madurawala library ------3 3 1 7 MadurawalaMPB ------5 3 1 9 Mirigama - - - - - 150 - - - - 6 Mirigama Library ------3 2 1 6 7 Diulapitiya PS ------5 6 1 12 8 Agalawatta Library ------3 3 1 7 9Biyagama ------6 6 1 13 Total 355 92 447 394 471 1050 38 34 11 85

P a g e 113 | 119 Ministry of Provincial Councils and Local Government

Attachment 5 Social Safeguard Monitoring Checklist

P a g e 114 | 119 Ministry of Provincial Councils and Local Government

LOCAL GOVERNMENT ENHANCEMENT SECTOR PROJECT (LOAN 2790 SRI) SOCIAL SAFEGUARDS MONITORING CHECKLIST1

Project Data Name of Project & Local Government Enhancement Sector Project Subproject: 184 Civil Works of small value without any significant impacts. Project Disbursement Status (%): : 91% (Including imprest amount) Type of contracts  Regular  Design-Build  Combined : Safeguards A B C Categorization IR (individual C * NA NA subprojects) IP (Individual C* NA NA subprojects) * All individual sub-projects are categorized “C”. But overall Project has been categorized as “B”

A. Design and Engineering Status

Item Status Follow up Type of Required Action (Y/N) required (Y/N) Final detailed engineering design of Yes NO  Updated draft IR/IP - NA the sub project completed  New RP/IPP preparation - NA Changes in project design/ scope NO NO  Project re-categorization (IR/IP) - (occurred or envisaged) NA  IR/IP Impact assessment - NA  New RP/IPP preparation - NA

B. Institutional Status Readiness No Item Status Follow up Completion (Ready/Not required Deadline ready/NA) (Y/N) 1 Mobilizationofcivilworks Ready - Contractors NO All works scheduled to contractor mobilized for all be completed by 31 Contracts March 2017 NO Will serve through the Ready - Mobilized – project - Safeguard 2 Mobilization of Project Supervision one per province specialists assisted in Consultant design phase - SPCU staff manages the monitoring during construction stage. Ready – This 3 EA’s Safeguards Unit with responsibility is Additional Training designated staff looked after by the through Project Will serve through the Safeguards Manager Management project (Environment) on an Consultants as acting basis suggested by ADB. Section G – Institutional Status 4 Recruitment of External NA NA NA Monitoring Agency

1 The checklist is to provide a snapshot/ guidance on the policy compliance of the project components/subprojects that have social safeguards issues. Not intended to replace the semiannual social safeguards monitoring report. P a g e 115 | 119 Ministry of Provincial Councils and Local Government

C. Safeguards Requirements

No Item Status Follow up Completion (Ready/Not ready/NA) required Deadline (Y/N) 1 Safeguardsmonitoringincluded in the Yes NO Untilprojectclosure project progress report 2 Final/ updated RP/IPP2 prepared and Prepared by PPTA NO NA submitted Consultants and adapted the same 3 Project’s Grievance Redress Mechanism Ready NO Until Project closure established 4 Recruitment ofthird independent party for NA NA NA negotiated land acquisition 5 Project’s ESMS (for FI) established NA NA NA

D. RP/ IPP Monitoring Checklist3

Item Safeguards Related Requirements Status Completion Progress to Date/ No. (Ready/Not ready/ NA) Deadline Remarks

1.0 MANAGEMENT Institutional and Financing Arrangements

Financing and budget: (i) safeguard office (i) Budgeted for safeguard staff. (i) Through project Staff salaries related to 1.1 and staff; (ii) RP/IPP cost (ii) RP / IPP cost (But DSC completion safeguards being paid and costs include preparation of consultants’ agreements such plans). include hiring of safeguard experts. (i) Safeguard officers stationed in Project Period Establish Safeguard Unit: (i) resettlement PMU and SPCUs. Safeguard issues offices (ii) (ii) NA; continuously monitored 1.2 resettlement staff as in RP (iii) safeguards’ (iii) Safeguard managers in PMU database (iv) facilities (v) safeguards and SPCUs; training (iv) Yes; (v) Trained by ADB SLRM staff during 2013. Updating of DD/RP/IPP based on Detailed 1.3 Update DD/RP/IPP: (i) revise based on NA NA NA DMS (ii) revise implementation schedule 1.4 Compensation rates: (i) approved by NA NA NA Government; (ii) Disclosure and Grievance Redress 1.5 Disclose final/updated RP/IPP: (i) to the NA NA NA APs in local language; (ii) in ADB website; (iii) in EA’s website 1.6 Disclose project activities to affected GRM published in project website Through the project GRM approved and communities: (i) put up a project sign and published in PS office and published in website. All boards; (ii) distribution of project leaflets subproject sites Grievances being and GRM to affected communities attended.

1.7 Grievance redress committees: (i) clear GRM provides constitution of Will be active GRM approved and terms of reference; (ii) appointment decree; Grievance redress committees and through the project published in website. (iii) publicly disclosed among APs. terms of reference

2 Detail checklist for RP/IPP supervision provided in section D. 3 For project with multiple RPs/IPPs provide the status of each RP/IPP progress separately. P a g e 116 | 119 Ministry of Provincial Councils and Local Government

Item Safeguards Related Requirements Status Completion Progress to Date/ No. (Ready/Not ready/ NA) Deadline Remarks

1.8 Grievance redress records: (i) list and (i) and (ii) Listed in Attachment 2 numbers of grievances received; (ii) (iii) Almost all cases attended. numbers of resolved issues; (iii) numbers of (iv) No cases filed in court NA NA cases under GRC review; (iv) outstanding cases (filed to court) Monitoring and Reporting Arrangements 1.9 Set up internal monitoring system: (i) (I) Safeguard officers works Throughout the Capacity of staff assessed assessment on regularly monitored by Project project and training program capacity and staff requirements; (ii) criteria Director. arranged through ADB of (II) Verifications of reports. SLRM staff and regular on safeguards assessment; (iii) reporting (III) Standardized reporting formats. job training by Project mechanism Management Consultants. 1.10 Appoint external monitoring agency (as relevant): (i) recruitment schedule; (ii) TOR; NA NA NA (iv) baseline survey (v) reporting mechanism 1.11 Reporting: (i) frequency; (ii) timeliness; (iii) (i) Quarterly; Will be reported Safeguard issues being identified issues; (iv) action taken (ii) Mostly on time; regularly through monitored regularly. and/recommendation. (iii) No major issues in reporting; the project (iv) NA 2.0 RP/IPP IMPLEMENTATION No resettlement and IP issues. Consultation 2.1 Consultation: (i) responsibility; NA NA NA (ii)stakeholders MappingIdentified; and Assets (iii) consultation Inventory and process; (iv) 2.2 AP Identity cards &affected assets NA NA NA records: (i) issuance and distribution of AP ID cards, (ii) detail measurements survey of 2.3 Land acquisition activities: (i) maps of NA NA NA affected and relocation sites; (ii) acquisition & relocation schedule; (iii) coordination with 2.4 Commonthe asset’s property/ acquiring, public transfer assets: and (i) final NA NA NA inventory; (ii) restoration plan and schedule; (iii) funding sources

Compensation, Relocation and 2.5 Payment of compensation and entitlements NA NA NA (as stated in the RP): (i) schedule of 2.6 Relocationpayment; (ii) of records/ process receipts (relocation of payment site NA NA NA readiness): (i) housing & associated facilities established; (ii) transfer of new land/plot/ house ownerships 2.7 Provision of (a) income restoration, (b) NA NA NA additional assistance for vulnerable APs, (c) training, etc. (as stated in the RP): (i) Monitoring and Reporting 2.8 Submission of the reports: (i) semiannual NA NA NA monitoring reports; (ii) external monitoring and evaluation reports (as required); (iii) completion report 2.9 Transfer of acquired assets to the acquiring NA NA NA agency

P a g e 117 | 119 Ministry of Provincial Councils and Local Government

E. Safeguards Loan Covenants Item No. Covenant Status of Compliance Schedule 5; The Borrower shall ensure, or cause the Project Executing Agency to ensure, that all Para 12 land and all rights-of-way required for an Eligible Subproject are made available to the Works contractor in accordance with the schedule agreed under the related Works contract and all land acquisition and resettlement activities are implemented in compliance with (a) all applicable laws and regulations of the Borrower relating to land acquisition and involuntary resettlement; (b) the Involuntary Resettlement Safeguards and Resettlement Framework; and (c) all measures and requirements set forth in any RP, and any corrective or preventative actions set forth in the Safeguards Monitoring Report. The Borrower shall ensure that any subproject causing or likely to cause a Being Complied significant resettlement impact on 200 or more people shall not be financed under the Project. Schedule 5; Without limiting the application of the Involuntary Resettlement Safeguards, Para 13 Resettlement Framework or the RP, the Borrower shall ensure, or cause the Project Executing Agency to ensure, that no physical or economic displacement takes place in connection with on Eligible Subproject until: (a) compensation and other entitlements have been provided to affected people in accordance with the RP; and

(b) a comprehensive income and livelihood restoration program has been established in accordance with the RP.

Will be complied as required Schedule 5; The Borrower shall ensure, or cause the Project Executing Agency to ensure, that the Para 14 preparation, design, construction, implementation and operation of the Project and all Project facilities comply with (a) all applicable laws and regulations of the Borrower relating to indigenous peoples; (b) the Indigenous Peoples Safeguards and IPPF; and (c) all measures and requirements set forth in any IPP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report. Will be complied as necessary Schedule 5; The Borrower shall make available, or cause the Project Executing Agency to make Para 15 available, necessary budgetary and human resources to fully implement the EMP, the RP and the IPP. Being complied

The Borrower shall cause the Project Executing Agency to ensure, that all bidding documents and contracts for Works contain provisions that require contractors to: Being complied (a) comply with the measures relevant to the contractor set forth in any IEE or EIA, EMP, RP and IPP (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in a Safeguards Monitoring Report; Being complied

Schedule 5; (b) make available a budget for all such environmental and social measures; Para 16 Will be complied as required (c) provide the Borrower with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in any IEE or EIA, EMP, RP and IPP; Will be complied as required

(d) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and Will be complied as required

(e) reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the completion of construction. The Borrower shall cause the Project Executing Agency to do the following: (a) submit semiannual Safeguards Monitoring Reports to ADB and disclose relevant No affected person in project information from such reports to affected persons promptly upon submission; – However will comply as (b) if any unanticipated environmental and/or social risks and impacts arise during required Schedule 5; construction, implementation or operation of the Project that were not considered in any Para 17 EIA or IEE, EMP, RP and IPP, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; and Will be complied (c) report any actual or potential breach of compliance with the measures and requirements set forth in any EMP, RP or IPP promptly after becoming aware of the breach. Will be complied Schedule 5; The Borrower shall ensure that no proceeds of the Loan are used to finance any activity Para 18 included in the list of prohibited investment activities provided in Appendix 5 of the SPS. Being complied Schedule 5; The Borrower shall ensure that Works contracts follow applicable labor laws of the

P a g e 118 | 119 Ministry of Provincial Councils and Local Government

Item No. Covenant Status of Compliance Borrower and that these further include provisions to the effect that contractors (i) carry out HIV/AIDS awareness programs for labor and disseminate information at worksites on risks of sexually transmitted diseases and HIV/AIDS as part of health and safety Para 19 measures for those employed during construction; (ii) follow and implement all statutory provisions on labor (including not employing or using children as labor, equal pay for Being complied equal work), health, safety, welfare, sanitation, and working conditions; and (iii) maximize employment of females and local poor and disadvantaged persons for construction purposes, provided that the requirements for efficiency are adequately met. Such contracts shall also include clauses for termination in case of any breach of the stated provisions by the contractors. The Borrower shall ensure that the Gender Action Plan is effectively implemented in a timely manner over the entire Project period, and that adequate resources are allocated Schedule 5; for this purpose. The Borrower shall ensure that in implementing the Project, gender issues are appropriately addressed, including addressing the needs of women when Being complied selecting Eligible Subprojects in infrastructure, making local authorities more gender responsive and socially inclusive, and creating an enabling environment for gender and social inclusion and empowerment within the scope of the Project. Overall Status of Compliance    Not complied – Redressed action & monitoring Being Complied Fully complied – no further action required

P a g e 119 | 119