RAILWAY BUDGET-2018 HIGHLIGHTS for SOUTH WESTERN RAILWAY Function at Ginigera on 31.03.17
Total Page:16
File Type:pdf, Size:1020Kb
Search : Commercial ,Freight About Us News & Recruitment Tenders Construction Projects Information & Public For IR Personnel Contact Us Information Home QUICK LINKS Bookmark Mail this page Print this page Functions of Railway Minister Select Function at KSR Bengaluru on 15.05.16 Press Release No. 205 Dt. 06.02.2018 07-02-2018 Function at YPR on 23.07.2016 Press Release No. 205, RAILWAY BUDGET-2018 HIGHLIGHTS FOR SOUTH WESTERN RAILWAY Function at Ginigera on 31.03.17 Function at Hubballi & Mysuru on 23.05.2017 Function at YPR on 26.03.2017 News & Announcements Announcements SOUTH WESTERN RAILWAY Press Releases Recruitment Press Release No. 205 Dt. 06.02.2018 By RRB Active Recruitment on SW Rly RAILWAY BUDGET-2018 HIGHLIGHTS FOR SOUTH WESTERN Engagement of Act Apprentice RAILWAY Railway Recruitment Cell Train Accidents Inquiry Reports Public Information Regarding Train Accident After tabling of Summary of Works and Grants in Parliament the details of budget allocation and work sanctioned was available to Railway. Today Shri A.K. GUPTA, General Manager, South Western Railway has conducted press Conference and shared the details of work sanctioned to SWR &allocation of funds to SWR. In the current year Rs. 3353 Crore is sanctioned as against Rs. 3174 Crore last year. He was sharing the Union budget announcements with the media at Rail Soudha, Hubballi. Shri B.B. Singh, Additional General Manager; Shri G.J. Prasad, Principal Chief Operations Manager; Shri K. Shiva Prasad, Chief Commercial Manager; Shri Rajiv Kumar, Principal Chief Electrical Engineer; Shri D.L. Chowdhry, Principal Chief Mechanical Engineer; and other senior officers were present in conference. The details of funds allocation and various projects sanctioned to South Western Railway as follows:- I. ACHIEVEMENTS OF RAILWAYS IN KARNATAKA 252 Km of New Railway line completed– Including 2 long pending works of Connecting Bengaluru with Hassan via Shravanabelagola And Gulbarga to Bidar (2 important cities in North Karnataka) 277 Km of doubling completed including three major sections Bengaluru - Mysuru Guntakal - Wadi 665 Km of track electrified Yelahanka-Dharmavaram In last 5 years Budget outlay has been made four times All important lines in Karnataka are being doubled and Electrified including Bengaluru- Mumbai ,Bengaluru -Hyderabad routes 88 new trains introduced including Humsafar and trains with modern LHB coaches State of the art Manufacture facility for Bogies at Yadgir MEMU shed in Bengaluru All unmanned LC gates being eliminated 339 Road Over Bridges &Road Under Bridges constructed Passenger amenities at stations improved in a big way by providing escalators and lifts , improved station buildings, platforms, better catering facilities etc. Rs. 165 Cr. booked in last 3 years. Big impetus to Swachh Bharat Abhiyan by Railways adopting bio toilets, on Board House Keeping Services etc. Towards Green India Solar energy being harnessed in a big way LED fittings will be provided at all stations by Mar.2018 I. NEW WORKS APPROVED IN THE BUDGET 2018-19 Suburban for Bengaluru SL Name of Project Length Cost (Km) (Rs. Cr) 1 Bengaluru Suburban-Construction of 142 12,000 elevated/at grade corridors for augmentation of line capacity Doubling SL Name of Project Length Cost (Km) (Rs. Cr) 1 Doubling between Baiyyappannahalli to 48 375.67 Hosur 2 Doubling between Yesvantpur to 21.7 169.65 Channasandra 3 Doubling Pennukonda to Dharmavarm excl. 41.5 294.67 Dharmavaram Total 212.54 840 Cr Electrification works SL Name of Project Rkm Total Cost No. (Rs. Cr) 1. Hospet-Swamihalli 59 61.81 2. Birur-Talguppa 161 151.99 3. Mysuru- Hassan-Mangalore 347 315.81 (incl. Arsikere –Hassan) 4. Mysuru-Chamarajanagar 61 56.71 5. Kadur-Chikmaglur 46 39.74 6. Chikbanavar-Hasan 166 155.17 7. Bangarpet-Yelehanka 149 138.21 Total 989 919.44 Survey Sl. No. Name of Project Length Cost (Km (Rs. Cr) 1 Gadag-Krishnar via Kotumachagi, Naregal, 216 0.54 Gajendragada, Hanumasagar, Ilkal & Lingasur 2 4 Nos. Flyovers at Chandargao-Cansaulim, 88 0.44 Salem-Channasandra, Salem-Baiyyappanahalli & Krishnarajpuram-Channasandra New ROB/RUBs/Subways Sanctioned No. of ROBs No. of RUBs/ Subway Total Total Cost(In Rs. Crore) 5 23 28 131.89 PH-30- ROB PROPOSALS NAME OF WORK Penukonda-SatyaSaiPrasahanti Nilayam –Dharmavaram :- RUBs & ROBs in lieu of 3 LCs (LC No. PD1-LROB, PD2-LHS & PD6-LROB) in Hubballi- Hosapete Section : Proposed construction of ROB in lieu of LC No.66 between Koppal & Ginigera stations (1x36m bowstring girder ) Proposed construction of ROB in lieu of LC No 72 between Ginigera- Munirabad station Hubli Division - Proposed construction of ROB in lieu of LC No.79 between Munirabad & Hosapete PH-30- RUB/Subway Bengaluru- Division:- RUBs & ROBs in lieu of 4 LCs (LC No. 74,87,97 &107) in Baiyyappanahalli section (All Subways) Bengaluru Division:- RUBs in lieu of 4 LCs (LC No. 11 of Bangarpet-Marikuppam & LC No. 111,113,114 of Yelahanka –Bangarapet Section) Londa-Miraj section : Proposed construction of Limited height subway of size 4.50mx5.0m in lieu of LC No 332,443,457,459 by RH girder method Arsikere-Harihar section .: Elimination of Manned LC No. 135 , 139 , 160 & 164 by construction of Subway Chikjajur –Rayadurg section : Elimination of Manned LC No.43,56,66 & 86 by construction of subway Arsikere-Harihar section: Elimination of LC No. 106 & 116 by construction of Subway Other important works approved in budget 2018-19 Cost in Rs. Sl. No. Name of work Cr. Traffic facilities South Western Railway - New works for development of coaching 1 terminal, automatic signalling, yard remodelling & addl loop / 250.0 stabling / running lines 2 Naganahalli - Development of satellite terminal 789.3 Passenger amenities South Western Railway - Provision of foot over bridges and/or high 3 400.0 level platforms at stations as per requirement 4 South Western Railway - Soft upgrades improvements at stations 125.0 Work Shop Hubli - Linke Hofmann Busch coach periodical overhauling facility, 5 documentation & work centre with staff facilities & expansion of 33.9 DV & RB section Mysore - Augmentation of coaching facilities for intermediate 18.1 6 overhauling maintenance (Phase-2) Yeshvanthpur (Coaching Depot) improvement of coach 3.9 7 maintenance activities Yeshwantpur - Manufacturing, supply & commissioning of pre- 15.2 8 fabricated all weather covered shed for pit lines 1-4 Krishnarajapuram - Homing of electric locomotives in diesel shed 10.8 9 &infrastructure requirement Signalling and telecommunication 10 Castle Rock-Kulem - Tunnel radio system 8.1 11 Hubli-Alnavar - Replacement of quad cable 2.7 Penukonda-Dharmavaram - 2nd distant signal arrangements on B 12 route incl. level crossings gates via Nagasamudram & Sri Satya Sai 4.6 Prasanthi Nilayam Mysore Division - Block proving axle counter high availability single 2.9 13 section digital axle counter (7 sections) Hubli Division - Provision of BPAC (5 sections) & dual detection 7.2 14 (22 blocks) Hubli Division - Earth leakage detector (70 stations) & fuse auto 4.7 15 changeover system (114 stations/cabins) Bangalore Division - Smoke & fire detection and fire extinguisher 4.0 16 (59 stations) Hubli - Smoke & fire detection and fire extinguisher system (107- 17 stations) & provision of smoke, fire suppression system at Hubli 5.6 West cabin Track renewals 18 Bangalore city-Jolarpettai (UP) - TRR(P) - 4.80 Km 4.5 19 Tumakuru-Arsikere Jn.(SL) - CTR(P) - 24.28 km 47.9 20 Yesvantpur Jn.-Yelahanka Jn.(SL) - CTR (P) - 1.90 Km 3.7 21 Bengaluru-Mysore - CTR (P) - 13.38 Km 26.4 Hosapete jn-Ballari Jn. - CTR(S) - 11.0 KM & Londa Jn-Vasco-Da- 32.6 22 Gama - CTR(S) - 10.40 KM 23 Gadag Jn.-Hosapete jn(DN) - CTR(P) - 5.90 Km. 11.6 24 Bengaluru-Jolarpettai - CTR(P) - 3.45 kms 6.8 25 Bengaluru-Jolarpettai Jn.(DN) - CTR(P) - 10.33 Km 20.4 26 Bangalore city-Jolarpettai (DN) - CTR(P) - 22.80 kms 44.9 27 Hubballi jn-Gadag Jn.(SL) - CTR(P) - 27 Km. 53.2 28 Mysuru Jn.-Chamarajanagar - TRR(S) - 7.50 km 5.3 29 Bangalore city-Dharmavaram - TRR(S) - 9.086 Km 6.4 Londa Jn.-Vasco-Da-Gama(SL) - TRR(P) - 5.00 KM & CTR(P) - 9.30 22.6 30 km 31 Tumakuru-Arsikere Jn. - TRR (P) - 41.82 km 39.4 32 Arsikere Jn.-Hubballi jn (UP) - TRR(P) - 7.73 km 7.3 33 Arsikere Jn.-Hubballi jn (UP) - TRR(P) - 8.343 km 7.9 34 Londa Jn.-Miraj Jn(SL) - Through Ballast Renewal - 113.50 km 26.0 35 Badami-Vijayapura (SL) - Through Ballast Renewal - 102.89 Km 23.6 36 Bengaluru-Salem(SL) – Through Weld Renewal - 16.20 kms 4.0 37 Ballari Jn.-Tornagallu – Through Ballast Renewal - 15.50 KM 3.6 38 Bengaluru-Tumkur - Through Ballast Renewal - 40.50 km 9.3 *TBR-Through Ballast Renewal *TWR-Through Weld Renewal Bridge works 39 Bangalore Division - Repl. of steel girders (9 bridges) 8.2 Bangalore Division - Repl. of stone slab bridges & minor girder 4.7 40 bridges (30 bridges Mysore Division - Repl. of steel girders (Bridge No.138/B, 92, 33 & 2.7 41 119/A) Hubli Division - Repl. of steel girders with precast PSC slabs 2.8 42 (Bridge No.13, 21 & 45) Bangalore Division - Repl. of stone slab bridges & minor girder 6.8 43 bridges (19 Nos) Mysore Division - Repl. of steel girders with PSC slabs (Bridge 9.8 44 No.111, 244 & 15/A) Bangalore Division - Repl. of steel girders on span bridges (11 11.7 45 bridges) Londa-Miraj - Rebuilding (Bridge No.55, 58, 93 & 104) & Londa- 2.7 46 Vasco (Bridge No.228) Other Specified Works 3.1 47 Bengaluru-Construction of RPSF Barrack Bangalore Division - Remote terminal units at inter locked level 2.7 48 crossings gates (100 nos) ROB/RUB 49 Construction of road over/under bridges in South Western Railway 100.0 I.