ITEM 7

Hampshire County Council Traffic Management Programme 2011 / 12 - Proposed

All proposed schemes are subject to funding allocated in 2011 / 12 financial year.

Table 3a - County Council Traffic Management Programme 2011 / 12 ( and Deane)

County Division Scheme Parish Location Scheme Works Ranking cost Whitchurch and Clere 1 St Mary Bourne parish Review of speed limits and warning signs in village - (Cllr Thacker) 2 Newtown B3400 Implementation of scheme designed in 2010 / 11 - which aims to alert motorists to driveways and other private accesses. 3 Candovers (Cllr 1 Investigate 30mph speed limit on B3400 - McNair Scott) 2 Overton Various road south of Investigate HGV routes between Overton and A303 / - Overton M3 2 Loddon (Cllr Still) 1 Sherfield on A33 Taylors Farm Implementation of measures designed in 2010 / 11 - Loddon Roundabout 2 & Greywell Road, Implementation of measures designed in 2010 / 11 - 3 and Hatch Lane / Byfleet Review and improvements to speed limit signage. - Lynchpit Avenue / Park Lane, Old Basing Calleva and 1 Kingsclere village Implement recommendations from HGV and speed - Kingsclere (Cllr limit study completed in 2010 / 11 Chapman 2 Wooton St Wooton St Lawrence Review of speed limit / implementation of warning - Lawrence parish signs designed in 2010 / 11 3 Byes Lane Review of speed limit extents -

Tadley and 1 Tadley Hill/Rowan Pedestrian crossing improvements for access to local - (Cllr Rd/New schools and swimming pool Tucker) Road/Mulfords Hill Roundabout

1 ITEM 7

County Division Scheme Parish Location Scheme Works Ranking cost 2 Tadley Junction of Rowan Road Junction improvements aiming to reduce vehicle - with Fairlawn Road speed through the junction 3 Tadley Burnham Copse Primary, Investigate options for speed reduction measures - Newchurch Road, Tadley (including a 20mph speed limit) outside school. Primary, Bishopswood schools Basingstoke North 1 - Oakridge 20mph zone and improvements to warning signs - (Cllr Frankum) 2 3 Basingstoke North 1 - Parklands / The North Traffic management measures to prevent rat running - West (Cllr Reid) Hampshire hospital site between A339 and A340. 2 - Road Investigate improvements to pedestrian crossing - facilities 3 - Wellington Terrace Improve pedestrian crossing facilities near pedestrian - bridge exit Basingstoke South 1 - Venture roundabout Investigate skidding damage only accidents - East (Cllr Gurden) 2 Hackwood Road Monitoring of proposed measures and further - roundabout investigation if required 3 Basingstoke Central 1 - Grove Road Traffic management measure to reduce high speed. - (Cllr Hussey) 2 Hackwood Road Monitoring of proposed measures and further - roundabout investigation if required 3 London Road Monitoring of proposed measures and further - investigation if required Basingstoke South 1 - Wallop Drive Investigate pedestrian crossing request. - West (Cllr Burgess) 2 3

2 ITEM 7

Table 3b - Hampshire County Council Additional Traffic Management Issues 2011 / 12 ()

Scheme / Programme Location Cost

A & B Road Review works Basingstoke area. As directed by A & B £20,000 Road Review Casualty Reduction Partnership works Fatal and potential fatal accident locations £2,000 Response funding for traffic management Basingstoke area, as queries are raised. £5,000 issues raised in year

3