Tecnomatix Plant Simulation Worldwide User Conference 2015
Teamcenter Logistics Combining Teamcenter with Plant Simulation Samuel Schäfer, MBG Europe
© Siemens AG 2015 Realize innovation.
Content
Motivation
Introduction to Teamcenter Logistics
Data exchange workflow
Conclusion
© Siemens AG 2015 Page 2 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Teamcenter Manufacturing
© Siemens AG 2015 Page 3 2015-06-17 Siemens PLM Software
Teamcenter Simplifying PLM
© Siemens AG 2015 Page 4 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Teamcenter Manufacturing process management
© Siemens AG 2015 Page 5 2015-06-17 Siemens PLM Software
© Siemens AG 2015 Page 6 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Manufacturing Environment Interfaces Points
Reach and Logistics Cycle Time/ Clearance Throughput
Tooling Time Analysis
Ergonomics
Regulatory – Comply with geographic facility requirements Customer – Meet volume production and quality targets
System Build Quality Layout © Siemens AG 2015 Page 7 2015-06-17 Siemens PLM Software
Teamcenter Manufacturing for Assembly Planning results
© Siemens AG 2015 Page 8 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Interaction between Assembly and Logistics planning
Assembly planning Define assembly Assign parts Assign operations Material Zone Line Balancing operations to operations to stations Planning
Container Part provision Material provision planning Information information
Logistics planning Define Logistic Define Define Material Zone processes Supply chain Container Planning
© Siemens AG 2015 Page 9 2015-06-17 Siemens PLM Software
Teamcenter Logistics planning
© Siemens AG 2015 Page 10 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Logistics Fields
Inbound Logistics
Supplier A Supplier B Supplier C
Outbound In-Plant Logistics Logistics
Distribution Center Customer
OEM Plant A © Siemens AG 2015 Page 11 2015-06-17 Siemens PLM Software
Logistics Planning Phases
Strategic/Concept Rough Planning Detailed Planning Production Planning g n i Outbound Logistics
Inbound Logistics n o i p s U s - i p m m m a o R
C Continuous logistics In-Plant Logistics process optimization
-42 -25 -18 -12 SOP
© Siemens AG 2015 Page 12 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Logistics Solution Set
TcMfg Logistics
Supply Chains Part Families Network and Scenario Planning
Tc Classification & Teamcenter Resource Mgmt.
Product Data Container, Supplier, Transportation Equipment Management
Tc Reporting & Plant Analytics Factory Flow Simulation IPO.Log Reports Material flow Simulation Layout/Material provision © Siemens AG 2015 Planning Page 13 2015-06-17 Siemens PLM Software
Logistics Planning structure
Part Family structure Part Family
Part Families define the logistics process of parts In Bound Supply Chain that are similar and do require the same containers Delivery Container and supply chains. Supplier
Common criteria for grouping parts are In Plant Supply Chain - identical resources (trailer, container) - Same supply chains Flow Container - Same supplier In Plant Supply Chain
Part Families are organized in the Logistics BOP Provision container
Parts
© Siemens AG 2015 Page 14 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Supply Chain
A Supply Chain can be defined as a combination of storage / provision locations and transportation in between.
- In Bound Supply Chains are describing the way a Part Family is delivered from the supplier to the first warehouse.
- In Plant Supply Chains are describing the way a Part Family is delivered from the first warehouse to the provision area at the production line.
© Siemens AG 2015 Page 15 2015-06-17 Siemens PLM Software
Logistics Resources Management
Resources such as Container, Supplier or Transportation Equipment are organized in TC Classification
© Siemens AG 2015 Page 16 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Materialzone Planning IPO.Log
Material Supply Planning • Container Positioning • Container Space Consumption • # Shelf's required • Shelf packaging
Walk Path Calculation • Considering Product Movement • Considering Material Provision
© Siemens AG 2015 Page 17 2015-06-17 Siemens PLM Software
Data created in TC Manufacturing for Logistics
- In which container will the part be delivered?
- How is it delivered from the gate to the station?
- Which resources are involved?
© Siemens AG 2015 Page 18 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Teamcenter – Plant Simulation Data Exchange
© Siemens AG 2015 Page 19 2015-06-17 Siemens PLM Software
Interaction between Teamcenter and Plant Simulation
Validate • delivery concepts • buffer/storage sizes • resource utilization (i.e. transport units)
Utilize Simulation results to improve planning results
© Siemens AG 2015 Page 20 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Teamcenter – Plant Simulation Data exchange workflow
Create Data Prepare Data Package Open/Create in Teamcenter for Plant Simulation Simulation Model Manufacturing
Import selected Process imported data Execute Simulation Data Package
Document Simulation Store HTML Report Utilize Simulation results result in HTML Report in Teamcenter to improve planning data
© Siemens AG 2015 Page 21 2015-06-17 Siemens PLM Software
Demonstrator
© Siemens AG 2015 Page 22 2015-06-17 Siemens PLM Software
Siemens Industry Software Tecnomatix Plant Simulation Worldwide User Conference 2015
Thank you
© Siemens AG 2015 Page 23 2015-06-17 Siemens PLM Software
Siemens Industry Software