17/10/2013 CONCEPT, BENEFIT AND STRATEGY TO PROVIDE HIGHGRADE HIGHWAY IN SUMATERA

1. HighHigh GradeGrade HighwayHighway isis aa conceptconcept 2. HGH is a limited access Higway in the new ROW which connect the Main Actiity center 3. Role of HGH:

a) Stimulate Economic Growthtoto and provideprovide stimulate expresswayexpressway Employment inin SumateSumate b) To improve access and reduce transport cost c) Stimulate and improve industry, Tourism, Job opportunity and regional growth 4. HGH Sumatera will be pass across eastern corridor of Sumatera (Masterplan Economic Corridor in Sumatera), total length 2.017 Km, Land clearing Cost estimaterara Island.Island. with minimum width 60 meter on 2011 price approximately : Rp. 9 Trillion while the estimateII construction cost Rp. 77.8 Trillion and investment cost around Rp. 136.8 Trillion 5. Support by 720 km feeder road (-Tebingtinggi, - and - ) with cost estimate for Land acquisition Rp. 8 Trillion, Construction cost around: Rp. 51.8 Trillion and Investment Cost Rp. 60 Trillion 6. HGH as a result of MARS Project assist by KOICA KOREA (2008-2010) and also part of Feasibility Study also done by KOICA-Korea. The Feasibility Study Output is the ROW Plan to be used for Land Acquisition and as well financial mechanism.

17/10/2013 1 HIGHGRADE HIGHWAY CORRIDOR OF SUMATERA

R Ó

Medan - Aceh R Ó

Pekanbaru - R

Ó Ó R Indralaya - CONSISTS OF: Pekanbaru o Bakahuni- corridor in the eastern corridor Sumatera with length ±2.017 KM Ó o Feeder with length + 720 KM R o Connected 8 metropolitan (Centre activity National), 8 airport and 6 international port o Interconnected with Sunda Strait bridge and Java Ó Ó Trans Toll o As an element of ASEAN/ASIAN Highways Bakaheuni - Indralaya o It can reduce the traffic burden in the current arterial road, and increase the travel speed R PKN Ó FACTOR VIABILITY ON TOLL ROAD

VIABILITY Pbusiness mech EXECUTION REFERENCE

BU PP 15/2005 A Psl 19, 20, P 21(1b), 22 ECONOMY (+) 1 P +BU FINANCIAL (‐) BU PP 15/2005 BPsl 19, 20, 21(1c), P BU 22

ECONOMY (+) BU PP 15/2005 2 BU Psl 19, 20, 21(1a) FINANCIAL (+) BU

Operation and Maintenance P Government Funding and or Technical Plan and or BU Private construction

Example : Scheme 1A : FIRR < 12% Æ Tol Akses Tanjung Priok Scheme 1 B: FIRR 12 –16 % ÆTol Solo – Kertosono Scheme 2 : FIRR > 17 % Æ other BOT Project

3 PREPARATION STAGE HIGH GRADE HIGHWAY SUMATERA

Kriteria Kesiapan Biaya Biaya Biaya Panjang EIRR FIRR Studi No Ruas Pengadaan Konstruksi Investasi AMDAL Pengadaan (km) (%) (%) Jaringan Pra FS FS/BD DED Tanah (Rp. M) (Rp. M) (Rp. M) /LARAP Tanah Jalan LINTAS UTAMA 1 Bakaheuni‐Terbanggi Besar 150 746 8,344 13,832 26.99 9.54 √√ √ 2012 2012 x 2 Terbanggi Besar‐Pematang Panggang 100 450 3,710 6,630 15.15 4.93 √‐2013‐2014 x x x 3 Pematang‐Indralaya 108 470 4,470 7,460 26.99 5.70 √‐2013‐2014 x x x SUB TOTAL 358 1,666 16,524 27,922 4Indralaya‐Palembang 22 64 618 1,053 33.04 10.72 √√2012 2012 x x 5Indralaya‐ 242 1,100 8,560 15,030 13.57 5.65 √‐2012‐2013 x x x 6Jambi‐Rengat 190 720 6,090 10,670 11.18 4.13 √‐2012‐2013 2013 x x 7Rengat‐Pekanbaru 178 730 6,020 10,570 10.12 5.88 √‐2012‐2013 2013 x x SUB TOTAL 632 2,614 21,288 37,323 8 Pekanbaru‐ 135 877 8,066 14,782 21.53 11.44 √√ √ 2012 2012 on‐going 9Dumai‐Rantau Rapat 175 790 6,890 12,000 11.56 5.99 √‐2013‐2014 x x x 10 Rantau Rapat‐Kisaran 118 320 2,530 4,600 12.00 8.32 √‐2013‐2014 x x x 11 Kisaran‐ 60 200 2,080 3,760 19.82 4.63 √‐2013‐2014 x x x 12 Tebing Tinggi‐Medan 62.4 441 3,700 5,670 22.02 12.40 √√ √ 2012 √ 60% SUB TOTAL 550.4 2,628 23,266 40,812 13 Medan‐ 16.8 269 640 2,033 27.97 12.26 √√ √ 2012 2012 x 14 Binjai‐Langsa 110 560 4,620 8,180 11.62 4.19 √‐2012‐2013 x x x 15 Langsa‐Lhoksumawe 135 570 4,340 7,740 11.85 5.97 √‐2012‐2013 x x x 16 Lhoksumawe‐Sigli 135 570 4,480 7,960 9.73 5.26 √‐2012‐2013 x x x 17 Sigli – Banda Aceh 80 360 2,660 4,850 11.57 1.00 √‐2012‐2013 x x x SUB TOTAL 476.8 2,329 16,740 30,763 TOTAL LINTAS UTAMA 2,017.2 9,237 77,818 136,820 LINTAS PENGHUBUNG 1 Palembang ‐ Muara Enim 110 810 5,103 5,913 15.13 n/a √‐ xxxx 2Muara Enim ‐ Lahat ‐ Lubuk Linggau 100 736 5,236 5,972 15.34 n/a √‐ xxxx 3 Lubuk Linggau ‐ Curup ‐ Bengkulu 93 684 7,704 8,389 15.53 n/a √‐ xxxx 4 Pekanbaru ‐ Bangkinang ‐ Payakumbuh ‐ Bukittinggi 187 2,963 14,231 17,194 15.57 n/a √‐ xxxx 5 Bukittinggi ‐ Padang Panjang ‐ Lubuk Alung‐ Padang 55 187 6,916 7,103 15.13 n/a √‐ xxxx 6Tebing Tinggi ‐ P. Siantar ‐ Prapat ‐ Tarutung ‐ Sibolga 175 2,532 12,595 15,127 15.04 n/a √‐ xxxx TOTAL LINTAS PENGHUBUNG 720.0 7,912 51,785 59,698 GRAND TOTAL 2,737.2 17,149 129,603 196,518

4 FINANCIAL STRATEGY • Funding will be rely on the private sector if it is possible • Refer to law no. 38/2004 on road, it is proposed to set up SOE on toll road (Government Reg no. 43/2013) to build sumatera • SOE toll Road will be eligible to be finance by Ministry of Finance thru VIABILITY GAP FUNDING(VGF).

* Pasal 50 ayat 5 UU No. 38/2004 tentang Jalan berbunyi : Dalam keadaan tertentu yang menyebabkan pengembangan jaringan jalan tol tidak dapat diwujudkan oleh badan usaha (BUMN, BUMD dan BUMS), Pemerintah dapat mengambil langkah sesuai dengan kewenangannya 17/10/2013 5 CONSTRUCTION OF BAKAUHENI – TERBANGGI BESAR

• STATED IN THE Minister of PW degree No. 567/2010 re General Planning on National Road Network • Have been twice goes in to tender (2005,2008)no private sector show up • Mention on PPP book 2012 as a priority project

• DEDDesign (Detail Engineering ) BABATAN

17/10/2013 6 PEMBANGUNAN JALAN TOL DI PALEMBANG DAN SEKITARNYA

• Mentioned in the Ministry of PW Bandara S. M. Badarudin decree 567/2010 re National Road II Network Plan Rencana • Put into tender in 2008 no private Jembatan Musi III sector show up • As a priority project in PPP book 2012

Indralay a Rencana Lintas Utama HGH koridor Kayu Agung – Indralaya – Jambi (Sesuai PP No 26 / 2008, Perpres No 13 / 2012, dan Kepmen PU No 567 / 2010) Rencana HGH Ruas Indralaya – Palembang (Sesuai PP No 26 / 2008, Perpres No 13 / 2012, dan Kepmen PU No 567 / 2010) Rencana Lintas Penghubung HGH Palembang – Muara Enim(Sesuai PP No 26 / 2008, Perpres No 13 / 2012, dan Kepmen PU No 567 / 2010) Usulan Perubahan Lintas Utama HGH Usulan Palembang Ring Road (Rencana Jembatan Musi III) Kayu Agung Jalan Nasional Eksisting 17/10/2013 7 PEMBANGUNAN JALAN TOL PEKANBARU – KANDIS ‐ DUMAI

Kandis

Dumai Pekanbaru

• Mentioned in the Minister of PW decree no. 567/2010 General Plan of the National Road • Tender 2 x no private sector show up • As a priority project 2012 in PPP book • DED (Detail Engineering Design) • Land acquisition start from 2012 17/10/2013 8 TOL MEDAN ‐ BINJAI

Length : 16.8 km Design speed : 100 km/jam Lanes : 2 x 3 Tj. Morawa Lanes width : 3,6 m Kota Binjai Median width : 5,5 Biaya Land Acquisition : Rp. 269 M Construction cost : Rp. 640 M

• Under the MOPW decree no. 567/2010 re General Plan on National Road Network • Tendering out 2 x no one show up • As a priority project in PPP book • DED (Detail Engineering Design) final process

17/10/2013 9 TOL MEDAN – KUALANAMU – TB. TINGGI • In the MOPW decree no. 567/2010 General Plan of National Road Network • Putting out to tender 2 x (2005, 2008) no one show up • As a ready for tender project and as a pilot project • DED (Detail Engineering Design) • Land Acquisition since 2009 dan current progress now is in 60%Pembebasan lahan dilakukan sejak tahun 2009 • Construction for segment Medan-Kualanamu with loan from China USD 137 million

Kebutuhan Dukungan Pemerintah • Seksi I.A Medan - Kualanamu (18.615 Km) dibangun dengan loan China – Rp. 1.350 Milyar • Seksi I.B Lubuk Pakam – Lubuk Pakam Barat (7.185 Km) belum teralokasi pembangunannya (kebutuhan konstruksi ±Rp. 540 M) 10 TERIMATERIMA KASIH KASIH