Listed below are the designated areas for the planned maintenance work as for May, 2019:

No. Day & Date Time Location Work Description Affected Areas for Outages

Replacement of Distribution Transformer and Wednesday 9.00am to 4.30 pm. Spg 49, Jln Sebakit Atas, , Spg 49, Jln Sebakit Atas, 1 feeder pillar at substation spg 49, Jln Sebakit 01st May 2019 Tutong. Mukim Tg Maya. Atas.

Saturday 9.00am to 4.30 pm. Kampong Panchong, Replacement of Distribution Transformer at A part of Kampong Biong 2 04th May 2019 Mukim , Tutong. Main intake station spg 4 Panchong. and a part of Kampong Panchong.

9.00am to 4.30 pm. Replacement of Distribution Transformer at Wednesday RPN, Bukit Beruang, Masjid RPN Bukit Beruang and Housing Development Office, 3 (Des will supply temporary electricity to the affected areas substation 08th May 2019 through mobile generator services at substation). Mukim Telisai, Tutong. Bukit Beruang. Masjid RPN Bukit Beruang.

Monday 9.00am to 4.30 pm. Replacement of Distribution Transformer at A part of Kampong Bukit 4 Kampong Bukit, Mukim Ukong, Tutong. 13th May 2019 substation Bukit #3. and surrounding area.

Kg Binturan and Kg Tanah Burok, Jalan Spg 17-23 Kg Binturan, Spg 148 Kg Tanah Burok, Jalan Monday 8.30am to 1.30 pm. Penanjong Tutong Replacement of of Bare Conductor to Aerial Penanjong Tutong 5 13th May 2019 Bundle Cable

Spg 114, Spg 88, Spg 75 Kg Tanah Burok, Jalan Penanjong Kg Tanah Burok, Jalan Penanjong Tutong Wednesday 8.30am to 1.30 pm. Replacement of of Bare Conductor to Aerial Tutong 6 15th May 2019 Bundle Cable

Monday 8.30am to 1.30 pm. Kg Tanah Burok, Jalan Penanjong Tutong Replacement of of Bare Conductor to Aerial Spg 42, Spg 60 Kg Tanah Burok, Jalan Penanjong Tutong 7 20th May 2019 Bundle Cable

Page 1 Bahasa Melayu

Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Mei, 2019:

Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik

Penggantian "Distribution Transformer" dan Rabu 9.00 pagi hingga 4.30 petang. Spg 49, Jln Sebakit Atas, Mukim Tanjong Maya, Keseluruhan Spg 49, Jln Sebakit Atas, 1 "feeder pillar" di stesen elektik spg 49, 01hb Mei 2019 Tutong. Mukim Tg Maya. Jln Sebakit Atas.

Sabtu 9.00 pagi hingga 4.30 petang. Kampong Panchong, Penggantian "Distribution Transformer " Sebahagian Kampong Biong dan sebahagian Kampong 2 04hb Mei 2019 Mukim Lamunin, Tutong. di Stesen Utama Spg 4 Panchong. Panchong .

9.00 pagi hingga 4.30 petang. (JPE akan membekalkan sementara bekalan tenaga elektrik Rabu RPN Bukit Beruang, Penggantian "Distribution Transformer " Masjid RPN Bukit Beruang dan Pejabat Kemajuan Perumahan 3 ke kawasan yang terlibat melalui perkhidmatan Janakuasa 08hb Mei 2019 Bergerak distesen elektrik berkenaan) Mukim Telisai, Tutong. di stesen elektrik Masjid RPN Bukit Beruang. Bukit Beruang.

Isnin 9.00 pagi hingga 4.30 petang. Kampong Bukit, Penggantian " Distribution Transformer" 4 Sebahagian Kampong Bukit dan kawasan sekitarnya. 13hb Mei 2019 Mukim Ukong, Tutong. di stesen elektik Bukit #3.

Kg Binturan and Kg Tanah Burok, Jalan Spg 17-23 Kg Binturan, Spg 148 Kg Tanah Burok, Jalan Isnin 8.30 pagi hingga 1.30 petang. Penanjong Tutong Kerja-kerja penyelenggaraan rangkaian kawat atas Penanjong Tutong 5 13hb Mei 2019 voltan rendah

Spg 114, Spg 88, Spg 75 Kg Tanah Burok, Jalan Penanjong Kg Tanah Burok, Jalan Penanjong Tutong Rabu 8.30 pagi hingga 1.30 petang. Kerja-kerja penyelenggaraan rangkaian kawat atas Tutong 6 15hb Mei 2019 voltan rendah

Isnin 8.30 pagi hingga 1.30 petang. Kg Tanah Burok, Jalan Penanjong Tutong Kerja-kerja penyelenggaraan rangkaian kawat atas Spg 42, Spg 60 Kg Tanah Burok, Jalan Penanjong Tutong 7 20hb Mei 2019 voltan rendah