Planned 12-Month Letting Schedule Page 1 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 13716 13716 6-0 Bucks 1012 BRC Bridge Rehabilitation Headquarters Road over Tinicum From 1,000,000 to 5,000,000 9/3/2020 Creek 105121 105121 10-0 Butler 19 29A Intersection ImprovementJackson Twp.Transp. ImprovementFrom 1,000,000 to 5,000,000 9/3/2020 MTF 104233 M 105121 10-0 Butler 19 29A Intersection ImprovementJackson Twp. Transp. From 1,000,000 to 5,000,000 9/3/2020 Improvement TIIF 104233 M 104233 10-0 Butler 19 29C Intersection ImprovementJackson Twp. Transp. From 1,000,000 to 5,000,000 9/3/2020 Improvement TIIF 68853 68853 4-0 Lackawanna 4005 270 Bridge Rehabilitation SR 4005 over D&H RR From 1,000,000 to 5,000,000 9/17/2020 17407 17407 6-0 Philadelphia 1004 PEC Bridge Removal Erie Avenue & 5th Street Bridge From 1,000,000 to 5,000,000 9/17/2020 Removals 17407 69914 6-0 Philadelphia 2003 P5R Bridge Removal Erie Avenue & 5th Street Bridge From 1,000,000 to 5,000,000 9/17/2020 Removals 111509 M 111509 6-0 Philadelphia 1 CAL Transportation City Avenue Lighting From 500,000 to 1,000,000 9/17/2020 Enhancement 110965 110965 6-0 Delaware 2024 SIP Safety Improvement Marshall Rd. Safety From 1,000,000 to 5,000,000 9/17/2020 Improvements: Design-Build 109599 109599 6-0 Chester 3003 HBU Bridge Replacement Bridge Group U From 5,000,000 to 10,000,000 9/17/2020 112428 112428 11-0 Allengheny 4032 A06 Slides Correction SR 4032, Little Sewickley Creek From 1,000,000 to 5,000,000 9/17/2020 Road Slide 113456 105403 12-0 Greene 4006 B10 Bridge Replacement SR 4005 over Polen Run-DFB From 100,000 to 200,000 9/17/2020 109154 P 109154 1-0 Mercer 173 A01 Widen PA 173: Kocher Rd - Main Street From 1,000,000 to 5,000,000 10/1/2020 110342 110342 1-0 Erie 6 S01 Safety Improvement Union City Signals From 1,000,000 to 5,000,000 10/1/2020 67434 67434 4-0 Luzerne 11 355 Bridge Rehabilitation US 11 Over RR And Mill CK From 1,000,000 to 5,000,000 10/1/2020 70274 M 70274 5-0 Berks 183 RRE New Roadway River Road Extension From 5,000,000 to 10,000,000 10/1/2020 111502 M 111502 5-0 Berks 2021 PAP Transportation Perkiomen Ave. Pedestrian From 1,000,000 to 5,000,000 10/1/2020 Enhancement Access 107995 P M 107995 6-0 Delaware 30 RRT Bicycle Facilities/ServicesRadnor Township Trail - Design From 1,000,000 to 5,000,000 10/1/2020 Activities Limited to: ADA Curb 90612 90612 6-0 Chester 2020 CBA Bridge Replacement Boot Road over Amtrak From 5,000,000 to 10,000,000 10/1/2020 50634 P 50634 6-0 Bucks 2038 M04 Widen/Resurfacing (no CountyLine Rd: Kulp Rd to PA From 5,000,000 to 10,000,000 10/1/2020 additional lanes) 611 102039 102040 1-0 Erie 90 A31 Reconstruct I-90: MP 3.5 to 10.5 Reconstruct From 50,000,000 10/22/2020 102039 102039 1-0 Erie 90 A30 Reconstruct I-90: MP 3.5 to 10.5 Reconstruct From 40,000,000 to 50,000,000 10/22/2020 111461 111461 2-0 Mifflin 1005 ENH Street Scapes Brown Township Streetscape From 500,000 to 1,000,000 10/22/2020

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 2 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 111458 M 111458 2-0 Clinton 2012 ENH Transportation Clinton County Rail Trail From 1,000,000 to 5,000,000 10/22/2020 Enhancement 110780 M 110780 6-0 Philadelphia 611 BV0 Pedestrian Facilities N Broad St. (Vision Zero) (ECMS From 1,000,000 to 5,000,000 10/22/2020 CITY BID# 3880) Design-Build 13249 M 13249 6-0 Bucks 7009 045 Bridge Replacement County Bridge #45: Stone Bridge From 1,000,000 to 5,000,000 10/22/2020 Rd o/ Deep Run 69919 69919 6-0 Chester 372 LVR Bridge Replacement Lower Valley Road over Officers From 1,000,000 to 5,000,000 10/22/2020 Run 80104 80104 6-0 Philadelphia 4001 SIP Corridor Safety Henry Ave Congested Corr1 From 5,000,000 to 10,000,000 10/22/2020 Improvement 108006 M 108006 6-0 Montgomery 4022 LKT Bicycle Facilities/ServicesLimerick Township Trail From 500,000 to 1,000,000 10/22/2020 97148 97148 8-0 Lebanon 22 070 Bridge Replacement Allentown Blvd over Beach-B From 1,000,000 to 5,000,000 10/22/2020 78965 78965 8-0 Lancaster 2009 016 Bridge Replacement SR 2009 Noble Rd Bridge From 1,000,000 to 5,000,000 10/22/2020 Replacement over WB Octoraro 97148 90999 8-0 Lebanon 934 010 Bridge Improvement Allentown Blvd over Beach-B From 1,000,000 to 5,000,000 10/22/2020 109156 109156 11-0 Allengheny 376 0 Bridge Preservation Tunnel Maintenance 2021-2024 From 1,000,000 to 5,000,000 10/22/2020 Activities 57104 M 57104 11-0 Lawrence 7206 LOC Bridge Replacement T-341 Burkey Road Bridge From 1,000,000 to 5,000,000 10/22/2020 26623 P 26623 11-0 Allengheny 2040 A22 Restoration Design activities are limited to: From 10,000,000 to 20,000,000 10/22/2020 Concrete curb ramps 63307 63307 11-0 Allengheny 366 A06 Bridge Preservation Tarentum BR Ramp 'B' From 5,000,000 to 10,000,000 10/22/2020 Activities 26623 P 106507 11-0 Allengheny 2040 A22 Safety Improvement Design activities are limited to: From 1,000,000 to 5,000,000 10/22/2020 Concrete curb ramps 74230 74230 12-0 Washington 2026 A10 Bridge Replacement SR 2026 over Trib Mon Riv-DFB From 100,000 to 200,000 10/22/2020 74230 90785 12-0 Washington 2019 B10 Bridge Replacement SR 2026 over Trib Mon Riv-DFB From 100,000 to 200,000 10/22/2020 113757 113757 12-0 Washington 136 FLB Safety Improvement SR 136/SR 1055 Flashing BeaconFrom 500,000 to 1,000,000 10/22/2020 113456 113456 12-0 Greene 4005 A10 Bridge Improvement SR 4005 over Polen Run-DFB From 100,000 to 200,000 10/22/2020 79387 79387 12-0 Washington 3027 B10 Bridge Replacement SR 3027 over Buffalo Ck From 1,000,000 to 5,000,000 10/22/2020 115617 115617 1-0 Erie 4034 A03 Safety Improvement Central Bayfront Project - S&S From 1,000,000 to 5,000,000 11/5/2020 98755 98755 3-0 Union 1003 032 Bridge Replacement SR 1003 over Tributary to Litttle From 100,000 to 200,000 11/5/2020 Buffalo Creek 93580 93580 3-0 Columbia 2003 005 Bridge Replacement SR 2003 over Mill Creek From 100,000 to 200,000 11/5/2020 83013 M 83013 4-0 Susquehanna 0 364 Bridge Replacement Carmalt Rd Brg T-695 From 500,000 to 1,000,000 11/5/2020 96806 F 96806 4-0 Pike 2002 SLD Restoration SR 2002 Slide From 1,000,000 to 5,000,000 11/5/2020

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 3 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 113696 113696 4-0 Luzerne 1043 PPR Bridge Improvement SR 1043/SR 1014 Pioneer Road From 1,000,000 to 5,000,000 11/5/2020 Pipe Replacement 112827 112831 4-0 Luzerne 2044 P18 Bridge Preservation SR 309 over Pine Run Bridge From 200,000 to 500,000 11/5/2020 Activities Preservation 112827 112829 4-0 Luzerne 309 P16 Bridge Preservation SR 309 over Pine Run Bridge From 200,000 to 500,000 11/5/2020 Activities Preservation 112827 112828 4-0 Luzerne 309 P15 Bridge Preservation SR 309 over Pine Run Bridge From 200,000 to 500,000 11/5/2020 Activities Preservation 112827 112827 4-0 Luzerne 309 P14 Bridge Preservation SR 309 over Pine Run Bridge From 500,000 to 1,000,000 11/5/2020 Activities Preservation 111444 M 111444 5-0 Lehigh 2045 CS4 Transportation Coopersburg Streetscape Phase 4From 1,000,000 to 5,000,000 11/5/2020 Enhancement 115546 115546 5-0 Berks 10 0 Miscellaneous District-wide Small Site Paint From 200,000 to 500,000 11/5/2020 Contract 2020 57433 57433 5-0 Lehigh 1004 03S Intersection ImprovementSECOND STREET EXTENSION From 5,000,000 to 10,000,000 11/5/2020 57625 57625 6-0 Bucks 232 BU1 Intersection ImprovementSecond Street Pike (PA 232) & From 1,000,000 to 5,000,000 11/5/2020 Swamp Road Intersection 79912 79912 6-0 Philadelphia 95 AF2 Widen I-95: Allegheny Ave Inter From 30,000,000 to 40,000,000 11/5/2020 93445 P 93445 6-0 Bucks 1 RC2 Corridor Safety US 1: I-276 to CSX: Design Build From 50,000,000 11/5/2020 Improvement activities limited to Sound Barrier 88400 P 88400 6-0 Delaware 1 PM1 Resurface Route 1 Paving & ADA's From 10,000,000 to 20,000,000 11/5/2020 110415 M 75804 6-0 Philadelphia 3003 UAR Bridge Replacement Schuylkill Banks From 5,000,000 to 10,000,000 11/5/2020 Trail-Chrstn-Crsnt 75804 75804 6-0 Philadelphia 3003 UAR Bridge Replacement University Av/CSX Rail From 5,000,000 to 10,000,000 11/5/2020 111493 111493 6-0 Montgomery 113 LSS Transportation Lower Salford Sidewalk From 500,000 to 1,000,000 11/5/2020 Enhancement 106420 M 106420 9-0 Huntingdon 7411 131 Bridge Replacement Hill Valley Creek Bridge From 1,000,000 to 5,000,000 11/5/2020 50725 50725 9-0 Huntingdon 26 016 Safety Improvement Jackson Corner Slide From 1,000,000 to 5,000,000 11/5/2020 78000 78000 10-0 Butler 2007 251 Bridge Replacement Saxonburg Boulevard Br #2, T-573From 500,000 to 1,000,000 11/5/2020 Wylie & T-554 Brickyard Hill 78000 95875 10-0 Butler 7209 250 Bridge Replacement Saxonburg Boulevard Br #2, T-573From 1,000,000 to 5,000,000 11/5/2020 Wylie & T-554 Brickyard Hill 78000 95872 10-0 Butler 7209 0 Bridge Replacement Saxonburg Boulevard Br #2, T-573From 1,000,000 to 5,000,000 11/5/2020 Wylie & T-554 Brickyard Hill 28520 A 28520 11-0 Allengheny 3005 A05 Bridge Replacement Mayview Road Bridge From 1,000,000 to 5,000,000 11/5/2020 89078 81947 12-0 Fayette 2003 02M Bridge Replacement SR 1051 over Butler Run-DFB From 100,000 to 200,000 11/5/2020

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 4 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 106405 M 106405 12-0 Westmoreland 7412 W29 Bridge Rehabilitation Westmoreland County #29 From 1,000,000 to 5,000,000 12/3/2020 113456 105330 12-0 Greene 4025 A10 Bridge Replacement SR 4005 over Polen Run-DFB From 100,000 to 200,000 12/3/2020 89078 89078 12-0 Fayette 1051 R10 Bridge Replacement SR 1051 over Butler Run-DFB From 100,000 to 200,000 12/3/2020 111433 111433 1-0 Venango 62 T21 Transportation Franklin Ped Streetscape Safety From 500,000 to 1,000,000 12/10/2020 Enhancement Project 97549 97549 3-0 Northumberland 180 117 Resurface I-180 from SR 54 to SR 147 From 10,000,000 to 20,000,000 12/10/2020 97549 113748 3-0 Northumberland 254 057 Drainage Improvement I-180 from SR 54 to SR 147 From 100,000 to 200,000 12/10/2020 88935 88935 5-0 Monroe 209 16S Intersection Improvement209/115 Int. Imp - Phase2 From 10,000,000 to 20,000,000 12/10/2020 72466 72466 5-0 Schuylkill 61 18S Safety Improvement SR61/209 Intersection From 1,000,000 to 5,000,000 12/10/2020 112129 M 112129 5-0 Northampton 1002 AMZ Intersection ImprovementAmazon Offsite Improvements From 5,000,000 to 10,000,000 12/10/2020 110884 110884 6-0 Montgomery 3031 MAC Restoration Valley Forge Granite Block From 200,000 to 500,000 12/10/2020 Restoration 103217 P 103217 6-0 Delaware 2005 383 Safety Improvement Main Street Darby Boro. From 5,000,000 to 10,000,000 12/10/2020 106068 106068 6-0 Montgomery 3020 530 New Roadway Barbadoes St Connector Road From 5,000,000 to 10,000,000 12/10/2020 63486 P 63486 6-0 Montgomery 202 61S Widen US 202 Reconstruction/Widening:From 40,000,000 to 50,000,000 12/10/2020 Johnson Highway to Swede 16741 P 16741 6-0 Montgomery 663 S02 Bridge Deck ReplacementPA 663 o/Ministers Crk From 1,000,000 to 5,000,000 12/10/2020 13727 13727 6-0 Bucks 2025 001 Intersection ImprovementBrstl Rd: Hulm-Old Linc From 10,000,000 to 20,000,000 12/10/2020 63493 63493 6-0 Montgomery 309 71A Intersection ImprovementPA 309/463 (5 Points) IntersectionFrom 5,000,000 to 10,000,000 12/10/2020 Improvement 23434 23434 9-0 Somerset 160 08B Bridge Replacement Dark Shade Creek Bridge From 1,000,000 to 5,000,000 12/10/2020 74400 74400 9-0 Blair 4002 02B Bridge Replacement Sugar Run Bridge Seg 110 From 1,000,000 to 5,000,000 12/10/2020 96398 96398 9-0 Blair 22 054 Resurface SR 3012 to Turkey Vlly Rd From 1,000,000 to 5,000,000 12/10/2020 91288 91288 10-0 Butler 228 270 Relocation/Realignment Balls Bend Safety Improve From 30,000,000 to 40,000,000 12/10/2020 112528 P 112528 10-0 Butler 3020 297 New Roadway SR 3020 Haine School Road to From 5,000,000 to 10,000,000 12/10/2020 Commonwealth Drive 107793 M 107793 11-0 Beaver 288 B08 Safety Improvement MTF Relocation of SR 288 From 1,000,000 to 5,000,000 12/10/2020 96654 96654 12-0 Westmoreland 356 F10 Safety Improvement PA 356 Safety Improvement From 10,000,000 to 20,000,000 12/10/2020 115568 115568 12-0 Westmoreland 136 04M Bridge Improvement Westmoreland County Epoxy From 1,000,000 to 5,000,000 12/10/2020 Overlay- 2020 82927 82927 1-0 Erie 3105 B00 Bridge Replacement Beckman Road/I-90 From 100,000 to 200,000 12/12/2020 109821 109821 1-0 Venango 80 A11 Surface Treatment I-80 MM27 to MM34 From 10,000,000 to 20,000,000 12/12/2020 Micro-surfacing 104365 104365 6-0 Bucks 2006 SIP Miscellaneous New Falls Rd HSIP From 500,000 to 1,000,000 12/20/2020 109587 109587 3-0 Columbia 339 06A Resurface SR 339 from Smith Hollow Rd to From 5,000,000 to 10,000,000 1/9/2021 Nescopeck Boro

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 5 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 111167 P 111167 6-0 Delaware 2005 SIP Safety Improvement Lansdowne Avenue Safety From 1,000,000 to 5,000,000 1/9/2021 Improvements: Design-Build 84316 84316 1-0 Forest 62 311 Restoration SR 62/'09-'10 Betterment From 200,000 to 500,000 1/14/2021 109134 109134 1-0 Forest 66 10M Restoration PA 66: PA 899 to Forest St. From 1,000,000 to 5,000,000 1/14/2021 106321 106321 2-0 Mifflin 103 P27 Bridge Improvement 2020 SEDACOG Bridge From 1,000,000 to 5,000,000 1/14/2021 Preservation 114197 114282 2-0 Centre 477 EPX Bridge Preservation Centre Region Bridge Epoxy From 100,000 to 200,000 1/14/2021 Activities Surface Treatment 114197 114281 2-0 Centre 255 EPX Bridge Preservation Centre Region Bridge Epoxy From 100,000 to 200,000 1/14/2021 Activities Surface Treatment 114197 114197 2-0 Centre 26 EPX Bridge Preservation Centre Region Bridge Epoxy From 100,000 to 200,000 1/14/2021 Activities Surface Treatment 91526 81996 2-0 McKean 46 A10 Bridge Replacement SR 46 Lost Run Bridge From 500,000 to 1,000,000 1/14/2021 4913 4913 2-0 Potter 4009 A01 Bridge Replacement Baker Creek BOX From 200,000 to 500,000 1/14/2021 4354 4354 2-0 Elk 555 P23 Bridge Rehabilitation 2019 N. Central Bridge From 1,000,000 to 5,000,000 1/14/2021 Preservation 91526 91526 2-0 McKean 46 A09 Bridge Replacement SR 46 Lost Run Bridge From 500,000 to 1,000,000 1/14/2021 91509 91509 2-0 Clearfield 3016 A03 Bridge Replacement SR 3016 Campbell Run BOX From 200,000 to 500,000 1/14/2021 91416 91416 2-0 Centre 1006 A01 Bridge Replacement SR 1006 Trib Bald Eagle BOX From 200,000 to 500,000 1/14/2021 81411 81411 2-0 McKean 346 A11 Bridge Replacement Windfall Run BOX From 200,000 to 500,000 1/14/2021 112076 112076 2-0 Juniata 3010 A01 Bridge Improvement Trib to Tuscarora Creek BOX From 200,000 to 500,000 1/14/2021 110330 110330 2-0 Potter 6 P31 Bridge Rehabilitation 2020 Bridge Preservation From 1,000,000 to 5,000,000 1/14/2021 110185 110185 3-0 Bradford 4034 004 Bridge Replacement SR 4034 over Trib to Roaring RunFrom 100,000 to 200,000 1/14/2021 96679 96679 3-0 Sullivan 154 63S Slides Correction SR 154 Soil Slide Repair From 1,000,000 to 5,000,000 1/14/2021 102014 102014 3-0 Tioga 6 066 Bridge Rehabilitation US6 ov Morris Branch From 1,000,000 to 5,000,000 1/14/2021 101971 101971 3-0 Lycoming 2069 004 Bridge Replacement SR 2069 over Broad Run From 100,000 to 200,000 1/14/2021 79243 98916 3-0 Bradford 187 069 Bridge Improvement SR187ovTribWappasening Cr From 500,000 to 1,000,000 1/14/2021 99367 99367 3-0 Tioga 1022 025 Bridge Replacement SR1022 ov Allen Creek #2 From 200,000 to 500,000 1/14/2021 98166 M 98166 3-0 Lycoming 2045 03L Intersection ImprovementFairfield Crossing From 1,000,000 to 5,000,000 1/14/2021 97669 97669 3-0 Tioga 6 127 Bridge Rehabilitation US 6 over Marsh Creek From 500,000 to 1,000,000 1/14/2021 87973 87973 3-0 Bradford 6 M36 Resurface Sugar Creek to Gulf Rd From 1,000,000 to 5,000,000 1/14/2021 79243 79243 3-0 Bradford 187 068 Bridge Replacement SR187ovTribWappasening Cr From 1,000,000 to 5,000,000 1/14/2021 70467 70467 4-0 Luzerne 424 390 New Roadway Ext of 424 to SR 924 From 10,000,000 to 20,000,000 1/14/2021 9462 9462 4-0 Susquehanna 3029 10S Bridge Replacement SR 3029 over East Branch From 1,000,000 to 5,000,000 1/14/2021 102007 102007 4-0 Luzerne 2015 D51 Safety Improvement SR 2015 / 2004 Int Imprv From 1,000,000 to 5,000,000 1/14/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 6 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 9462 100532 4-0 Susquehanna 3029 D51 Replace/Rehab SR 3029 over East Branch From 200,000 to 500,000 1/14/2021 Wyalusing Creek 93104 93104 4-0 Luzerne 2007 350 Bridge Deck ReplacementSR 2007 ov Branch Spring Run From 500,000 to 1,000,000 1/14/2021 Creek 85008 85008 4-0 Luzerne 81 308 Miscellaneous Blackman St SB Ramp From 5,000,000 to 10,000,000 1/14/2021 109543 M 109543 4-0 Luzerne 6309 MTM Intersection ImprovementSR 309 Safety Improvement From 1,000,000 to 5,000,000 1/14/2021 Project 111478 M 111478 4-0 Luzerne 2007 IMP Transportation Wilkes University Pedestrian From 1,000,000 to 5,000,000 1/14/2021 Enhancement Safety Imp PH III 107970 M 107970 4-0 Wyoming 1019 TAP Transportation Nicholson Streetscape Project From 500,000 to 1,000,000 1/14/2021 Enhancement 107968 M 107968 4-0 Pike 6 TAP Transportation MEC Phase 14 - Completing the From 500,000 to 1,000,000 1/14/2021 Enhancement Connection 72822 87645 5-0 Lehigh 78 ASR Resurface I-78 EB - 309 S to Saucon ViaductFrom 5,000,000 to 10,000,000 1/14/2021 ASR 72822 11551 5-0 Lehigh 78 ASR Restoration I-78 EB - 309 S to Saucon ViaductFrom 5,000,000 to 10,000,000 1/14/2021 ASR 72822 72822 5-0 Lehigh 78 13M Restoration I-78 EB - 309 S to Saucon ViaductFrom 10,000,000 to 20,000,000 1/14/2021 ASR 85818 85818 5-0 Monroe 3010 01B Bridge Rehabilitation SR 3010 over Pohopoco Crk From 1,000,000 to 5,000,000 1/14/2021 92637 92637 6-0 Montgomery 4028 NR1 Bridge Replacement Pleasant View Rd/Sanatoga From 1,000,000 to 5,000,000 1/14/2021 16239 16239 6-0 Montgomery 4030 NHS Bridge Replacement New Hanover Sqr Rd Bridge From 1,000,000 to 5,000,000 1/14/2021 110660 110660 6-0 Bucks 4059 HBV Bridge Replacement Bridge Group V From 1,000,000 to 5,000,000 1/14/2021 113391 113391 8-0 Dauphin 3012 030 Existing Signal Paxton/Derry Signal ImprovementsFrom 1,000,000 to 5,000,000 1/14/2021 Improvement 112966 112966 8-0 Lancaster 222 081 Resurface US 222 Resurf 2 From 5,000,000 to 10,000,000 1/14/2021 113261 113261 8-0 Perry 34 055 Resurface PA 34 Keystone Way Resurface From 1,000,000 to 5,000,000 1/14/2021 101156 101156 8-0 Perry 22 096 Resurface William Penn Hwy Resurf From 10,000,000 to 20,000,000 1/14/2021 87435 87435 8-0 Adams 3017 028 Bridge Replacement Mummasburg Road Bridge From 500,000 to 1,000,000 1/14/2021 94897 94897 8-0 Adams 94 026 Intersection Improvement94 & 234 Intersection Imp From 1,000,000 to 5,000,000 1/14/2021 91030 91030 8-0 Lancaster 300 024 Restoration PA 283 Diamond Grinding 1 From 1,000,000 to 5,000,000 1/14/2021 92665 92665 9-0 Blair 4029 03B Bridge Replacement Clay Ave Sinking Run Br From 1,000,000 to 5,000,000 1/14/2021 22990 22990 9-0 Huntingdon 305 01B Bridge Replacement Herod Run Bridge From 1,000,000 to 5,000,000 1/14/2021 96607 96607 9-0 Somerset 403 001 Resurface Wilbur Rd-Cambria Co Line From 5,000,000 to 10,000,000 1/14/2021 113937 113937 9-0 Bedford 1011 001 Resurface SR 1011 - US 30 to US 30 From 1,000,000 to 5,000,000 1/14/2021 99282 99282 9-0 Cambria 3011 01T Intersection ImprovementFranklin Street Improvements From 1,000,000 to 5,000,000 1/14/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 7 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 94476 94476 9-0 Cambria 3016 009 Corridor Safety SR 3016 Lulay St to Demuth St From 5,000,000 to 10,000,000 1/14/2021 Improvement 94478 94478 9-0 Cambria 3055 02B Bridge Rehabilitation Franklin Street Br Rehab From 1,000,000 to 5,000,000 1/14/2021 92665 92646 9-0 Blair 4027 01B Bridge Replacement Clay Ave Sinking Run Br From 1,000,000 to 5,000,000 1/14/2021 113937 110279 9-0 Bedford 4009 021 Resurface SR 1011 - US 30 to US 30 From 500,000 to 1,000,000 1/14/2021 113937 107206 9-0 Bedford 2008 DF1 Resurface SR 1011 - US 30 to US 30 From 500,000 to 1,000,000 1/14/2021 105978 105978 9-0 Huntingdon 22 01M Resurface US 22 - Mifflin Line to SR 1010 From 10,000,000 to 20,000,000 1/14/2021 113937 108158 9-0 Bedford 2010 DF1 Resurface SR 1011 - US 30 to US 30 From 1,000,000 to 5,000,000 1/14/2021 108201 108201 9-0 Blair 1009 10S Resurface SR 1009 - SR 1021 to PA 36 From 1,000,000 to 5,000,000 1/14/2021 103146 103146 10-0 Armstrong 56 156 Bridge Replacement SR 56 Apollo Group Bridges From 1,000,000 to 5,000,000 1/14/2021 114715 114715 10-0 Jefferson 322 503 Restoration US 322 Roseville PM From 5,000,000 to 10,000,000 1/14/2021 110464 110464 10-0 Butler 8 273 Existing Signal PA 8 Main Street Signal From 1,000,000 to 5,000,000 1/14/2021 Improvement Improvements 109627 109627 10-0 Butler 19 213 Resurface Cranberry North Resurfacing From 5,000,000 to 10,000,000 1/14/2021 109617 109617 10-0 Armstrong 2033 150 Bridge Replacement Baker Hollow Bridge From 500,000 to 1,000,000 1/14/2021 109533 109533 11-0 Allengheny 1032 A06 Slides Correction Oak Manor Road Slide From 1,000,000 to 5,000,000 1/14/2021 113415 P 113415 11-0 Allengheny 30 A38 Restoration Ardmore Blvd/Brinton Road - From 1,000,000 to 5,000,000 1/14/2021 Bevington Road 27159 27159 11-0 Allengheny 7118 LOC Bridge Replacement Pine Creek Br. #6 (PS06) From 1,000,000 to 5,000,000 1/14/2021 113415 P 28155 11-0 Allengheny 30 A31 Bridge Replacement Ardmore Blvd/Brinton Road - From 1,000,000 to 5,000,000 1/14/2021 Bevington Road 57074 M 57074 11-0 Allengheny 7202 LOC Bridge Replacement Bull Creek Br No 7 (BF07) From 1,000,000 to 5,000,000 1/14/2021 113415 P 28593 11-0 Allengheny 30 A30 Bridge Replacement Ardmore Blvd/Brinton Road - From 1,000,000 to 5,000,000 1/14/2021 Bevington Road 27753 M 27753 11-0 Allengheny 7115 LOC Bridge Replacement CM05 Campbells Run From 1,000,000 to 5,000,000 1/14/2021 26546 26546 11-0 Allengheny 3039 A05 Bridge Rehabilitation Nike Site Road Bridge From 5,000,000 to 10,000,000 1/14/2021 Rehabilitation 109388 P 26454 11-0 Allengheny 19 A75 Existing Signal Design activities are limited to: From 500,000 to 1,000,000 1/14/2021 Improvement Concrete curb ramps 106388 106388 11-0 Allengheny 885 A49 Safety Improvement 2020 ADA Curb Ramp Project From 1,000,000 to 5,000,000 1/14/2021 100607 A 100607 11-0 Allengheny 50 A28 Add Lane PA 50/Chartiers Street From 10,000,000 to 20,000,000 1/14/2021 113415 P 100604 11-0 Allengheny 30 A32 Bridge Replacement Ardmore Blvd/Brinton Road - From 1,000,000 to 5,000,000 1/14/2021 Bevington Road 93922 M 93922 11-0 Allengheny 7301 LOC Bridge Improvement AR01 - Armstrong Tunnel From 10,000,000 to 20,000,000 1/14/2021 94812 94812 11-0 Allengheny 79 A67 Restoration I-79, Neville Island to I-279 From 40,000,000 to 50,000,000 1/14/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 8 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 93419 M 93419 11-0 Allengheny 885 LOC Bridge Preservation MA08 - Glenwood Bridge From 1,000,000 to 5,000,000 1/14/2021 Activities 88401 M 88401 11-0 Allengheny 7115 LOC Bridge Rehabilitation CM06 Campbells Run From 1,000,000 to 5,000,000 1/14/2021 73051 A 73051 11-0 Allengheny 3035 A03 Bridge Replacement 3035/WeymanBRovSawMillRun From 1,000,000 to 5,000,000 1/14/2021 57074 M 79252 11-0 Allengheny 7202 LOC Bridge Replacement Bull Creek Br No 7 (BF07) From 500,000 to 1,000,000 1/14/2021 109388 P 109388 11-0 Allengheny 19 A75 Resurface Design activities are limited to: From 5,000,000 to 10,000,000 1/14/2021 Concrete curb ramps 111021 111021 6-0 Delaware 3017 SIP Safety Improvement Bethel Rd. Roundabout From 1,000,000 to 5,000,000 1/21/2021 14541 14541 6-0 Chester 1 H02 Add Lane US1 PARTNERSHIP PH 2 From 5,000,000 to 10,000,000 1/21/2021 99765 99765 1-0 Erie 5 202 Resurface PA 5: SR 4029 to PA 89 From 1,000,000 to 5,000,000 1/28/2021 99363 99363 3-0 Sullivan 4006 013 Bridge Replacement SR4006ovPorterCreek From 100,000 to 200,000 1/28/2021 5637 5637 3-0 Columbia 2005 006 Bridge Replacement SR 2005 over Tributary to RoaringFrom 100,000 to 200,000 1/28/2021 Creek 114387 114387 3-0 Northumberland 1025 016 Resurface SR 1025 Mill and Resurface From 200,000 to 500,000 1/28/2021 106285 106285 3-0 Northumberland 4010 009 Resurface SR 4010 from SR 147 to EleventhFrom 500,000 to 1,000,000 1/28/2021 St 106284 106284 3-0 Northumberland 147 119 Resurface SR 147 from Blacksmith Hill St to From 200,000 to 500,000 1/28/2021 Toad Valley Rd 98931 P 99410 3-0 Lycoming 2014 097 Resurface SR 2014 to SR 2057. "Design" From 1,000,000 to 5,000,000 1/28/2021 component is for ADA Curb 98931 P 98938 3-0 Lycoming 2014 098 Resurface SR 2014 to SR 2057. "Design" From 500,000 to 1,000,000 1/28/2021 component is for ADA Curb 98931 P 98931 3-0 Lycoming 405 094 Resurface SR 2014 to SR 2057. "Design" From 500,000 to 1,000,000 1/28/2021 component is for ADA Curb 9745 96717 4-0 Susquehanna 3037 550 Replace/Rehab Bradford to Rush From 1,000,000 to 5,000,000 1/28/2021 8242 8242 4-0 Lackawanna 407 251 Bridge Rehabilitation SR 407 over Lackawanna Lake From 1,000,000 to 5,000,000 1/28/2021 9745 9745 4-0 Susquehanna 706 501 Restoration Bradford to Rush From 1,000,000 to 5,000,000 1/28/2021 113372 M 113372 4-0 Luzerne 8031 MTM Street Scapes WB Area High School Acces From 100,000 to 200,000 1/28/2021 96909 F 96909 4-0 Wyoming 87 REP Restoration SR 87 Slide From 1,000,000 to 5,000,000 1/28/2021 85766 85766 4-0 Pike 84 494 Reconstruct I-84 E&W I-4R MP 40 - E46 From 50,000,000 1/28/2021 79534 79534 4-0 Luzerne 3019 351 Bridge Rehabilitation SR 3019 over Hazle Creek From 200,000 to 500,000 1/28/2021 91990 91990 5-0 Carbon 209 13B Bridge Removal US 209 over NRR Removal From 500,000 to 1,000,000 1/28/2021 114328 114328 5-0 Monroe 4002 HFS Safety Improvement NEPA High Friction Surfa From 100,000 to 200,000 1/28/2021 114328 114343 5-0 Monroe 3008 HFS Safety Improvement NEPA High Friction Surfa From 200,000 to 500,000 1/28/2021 91112 91112 5-0 Schuylkill 61 13M Restoration SR 61 Roadway Restoration From 5,000,000 to 10,000,000 1/28/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 9 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 77211 P 77211 6-0 Montgomery 1008 HT2 New Roadway PA63/PA309 Connector: Phase 2 From 30,000,000 to 40,000,000 1/28/2021 (Allentown Rd to Souderton Pk) 103555 103555 6-0 Philadelphia 95 GR8 Traffic System I-95 Corridor ITS From 30,000,000 to 40,000,000 1/28/2021 Management 110961 110961 6-0 Montgomery 1017 SIP Safety Improvement Old Skippack Rd. Roundabout From 500,000 to 1,000,000 1/28/2021 78893 78893 8-0 Lancaster 1024 007 Bridge Rehabilitation Br Rpl SR 1024-Hammer Crk From 1,000,000 to 5,000,000 1/28/2021 91350 91350 8-0 Lebanon 4010 012 Bridge Replacement Syner Road Bridge-B From 1,000,000 to 5,000,000 1/28/2021 90321 90321 8-0 York 216 020 Bridge Replacement Pierceville Run Tributary-C From 500,000 to 1,000,000 1/28/2021 87413 87413 8-0 Cumberland 2033 009 Bridge Replacement Creek Road Bridge-C From 1,000,000 to 5,000,000 1/28/2021 91659 91659 9-0 Huntingdon 655 008 Resurface Wall St to Front Mtn Road From 1,000,000 to 5,000,000 1/28/2021 114550 114550 10-0 Clarion 322 354 Bridge Preservation Walls Memorial Bridge Epoxy From 500,000 to 1,000,000 1/28/2021 Activities Overlay 114551 114551 10-0 Butler 422 25B Bridge Preservation Meridian Road Bridge WB Epoxy From 200,000 to 500,000 1/28/2021 Activities Overlay 107616 107616 10-0 Jefferson 3039 553 Bridge Replacement Beech Hollow Bridge From 200,000 to 500,000 1/28/2021 112494 112494 11-0 Beaver 588 B22 Slides Correction SR588 Bennett Run Rd Slide From 1,000,000 to 5,000,000 1/28/2021 28525 28525 11-0 Allengheny 3027 A05 Bridge Preservation Smithfield Street Bridge From 1,000,000 to 5,000,000 1/28/2021 Activities 112429 112429 11-0 Allengheny 3059 A02 Slides Correction SR 3059 North Road Slide From 1,000,000 to 5,000,000 1/28/2021 112426 112426 11-0 Beaver 4018 B02 Slides Correction SR 4018, Park Road Slide From 1,000,000 to 5,000,000 1/28/2021 112417 112417 11-0 Allengheny 2017 A11 Slides Correction SR 2017, Blythedale Road Slide From 500,000 to 1,000,000 1/28/2021 112404 112404 11-0 Allengheny 2035 A03 Slides Correction SR 2035 McKee Road Slide From 1,000,000 to 5,000,000 1/28/2021 100525 100525 1-0 Warren 426 611 Resurface Warren County Group 601 From 1,000,000 to 5,000,000 2/11/2021 58082 58082 1-0 Mercer 2007 B01 Bridge Replacement SR 2007: Mill Ck Brdg From 500,000 to 1,000,000 2/11/2021 90152 90152 1-0 Crawford 4009 B01 Bridge Replacement SR 4009 over Hubert Run From 500,000 to 1,000,000 2/11/2021 78872 78872 1-0 Venango 2004 B00 Bridge Rehabilitation SR 2004 over Tarklin Run From 200,000 to 500,000 2/11/2021 93274 93274 2-0 Clinton 1008 A02 Bridge Improvement Plum Run BOX From 200,000 to 500,000 2/11/2021 3784 3784 2-0 Clinton 477 A01 Bridge Replacement SR 477 Fishing Ck Br. From 1,000,000 to 5,000,000 2/11/2021 94693 94693 2-0 Cameron 46 A04 Replace/Rehab North Creek Bridge From 1,000,000 to 5,000,000 2/11/2021 104615 111455 3-0 Northumberland 4051 002 Surface Treatment SR 54 from Shaners Ln to SR 44 Less than 100,000 2/11/2021 Micro-surfacing 99418 99418 3-0 Bradford 6 125 Safety Improvement Wonder View Lane to Sugar CreekFrom 1,000,000 to 5,000,000 2/11/2021 114727 114727 3-0 Lycoming 180 144 Guiderail Improvement I-180 HTCMB UPGRADE From 1,000,000 to 5,000,000 2/11/2021 98542 98542 3-0 Northumberland 4019 002 Bridge Replacement SR 4019 over Tributary to From 100,000 to 200,000 2/11/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 10 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 104615 106733 3-0 Northumberland 1025 014 Surface Treatment SR 54 from Shaners Ln to SR 44 From 100,000 to 200,000 2/11/2021 Micro-surfacing 110958 110958 6-0 Philadelphia 1005 SIP Safety Improvement Castor Ave. Roundabout From 500,000 to 1,000,000 2/11/2021 109713 109713 8-0 Dauphin 22 078 Bridge Preservation I-81 River Relief Bridge 2 From 5,000,000 to 10,000,000 2/11/2021 Activities 113260 113260 8-0 Adams 1015 017 Resurface SR 1015 Hanover Street From 1,000,000 to 5,000,000 2/11/2021 Resurface 113269 113269 8-0 Franklin 16 052 Resurface Buchanan Trail Resurf From 1,000,000 to 5,000,000 2/11/2021 113264 113264 8-0 Cumberland 11 120 Resurface Carlisle Pike Resurf From 1,000,000 to 5,000,000 2/11/2021 100167 100167 8-0 Perry 17 016 Bridge Preservation Raccoon Val Rd over Juni From 1,000,000 to 5,000,000 2/11/2021 Activities 87680 100237 8-0 Franklin 30 118 Bridge Preservation Falling Spring Run Bridge-A From 200,000 to 500,000 2/11/2021 Activities 87680 87680 8-0 Franklin 11 094 Bridge Replacement Falling Spring Run Bridge-A From 1,000,000 to 5,000,000 2/11/2021 96599 96599 9-0 Somerset 30 016 Resurface PA 160 to Bedford Co Line From 1,000,000 to 5,000,000 2/11/2021 22816 P 114177 9-0 Bedford 30 37T Signing Breezewood-Fulton Co Line From 200,000 to 500,000 2/11/2021 22816 P 22816 9-0 Bedford 70 021 Restoration Breezewood-Fulton Co Line From 20,000,000 to 30,000,000 2/11/2021 96648 96648 9-0 Somerset 4009 DF1 Resurface Edgewood Ave to Byers Rd From 1,000,000 to 5,000,000 2/11/2021 92702 92702 9-0 Somerset 31 01B Bridge Replacement PA31 Trib Stonycreek Br 1 From 1,000,000 to 5,000,000 2/11/2021 106224 106224 10-0 Jefferson 80 54F Resurface I-80 Brookville East PM From 10,000,000 to 20,000,000 2/11/2021 114556 114556 10-0 Jefferson 80 J20 Pavement Preservation I 80 Joint Repair From 1,000,000 to 5,000,000 2/11/2021 114558 114558 10-0 Butler 79 BPR Bridge Preservation District 10 Interstate Epoxy From 1,000,000 to 5,000,000 2/11/2021 Activities Overlay 114557 114557 10-0 Clarion 80 RPR Resurface I 80 Strattenville Resurfacing From 1,000,000 to 5,000,000 2/11/2021 100118 100118 10-0 Indiana 119 402 Resurface US119-MarshallRd.toJeffCo From 1,000,000 to 5,000,000 2/11/2021 110826 110826 10-0 Butler 68 273 Safety Improvement PA 68 Zelienople Curve From 1,000,000 to 5,000,000 2/11/2021 97934 P 97934 11-0 Allengheny 65 A56 Resurface PA 65/Glenfield to Sewickly From 5,000,000 to 10,000,000 2/11/2021 27316 M 27316 11-0 Allengheny 7113 LOC Bridge Preservation AL Local BPRS Group 2 From 1,000,000 to 5,000,000 2/11/2021 Activities 92274 92276 11-0 Allengheny 28 A62 Restoration PA 28: Highland Park - RIDC From 20,000,000 to 30,000,000 2/11/2021 92274 92274 11-0 Allengheny 28 A58 Resurface PA 28: Highland Park - RIDC From 10,000,000 to 20,000,000 2/11/2021 108241 108241 11-0 Allengheny 19 A79 Resurface GRP 111-21-7135-3 From 5,000,000 to 10,000,000 2/11/2021 104343 P 104343 6-0 Delaware 322 CSX Bridge Replacement US 322 over CSX From 40,000,000 to 50,000,000 2/15/2021 97086 97086 1-0 Crawford 1037 DF1 Bridge Replacement SR 1037 Brdg/Lil Fed Run From 200,000 to 500,000 2/25/2021 97444 97444 1-0 Warren 4007 DF1 Bridge Replacement SR 4007/Lil Brkstrw Trib From 100,000 to 200,000 2/25/2021 93590 93590 1-0 Crawford 18 B13 Bridge Replacement PA 18 ov Conneaut Ck Trib From 500,000 to 1,000,000 2/25/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 11 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 84946 84946 1-0 Venango 62 B07 Bridge Replacement US 62 over Lil Sandy Ck From 1,000,000 to 5,000,000 2/25/2021 106721 106461 3-0 Snyder 15 189 Surface Treatment SR 15 to Union Co Line From 100,000 to 200,000 2/25/2021 Micro-surfacing 106721 106462 3-0 Snyder 15 190 Surface Treatment SR 15 to Union Co Line From 100,000 to 200,000 2/25/2021 Micro-surfacing 93006 F 93006 4-0 Luzerne 309 355 Bridge Replacement SR 309 over Nescopeck Ck From 5,000,000 to 10,000,000 2/25/2021 67298 67298 4-0 Luzerne 4010 D51 Replace/Rehab SR 4010 over Tributary HuntingtonFrom 1,000,000 to 5,000,000 2/25/2021 Creek 67298 67290 4-0 Luzerne 4033 D50 Replace/Rehab SR 4010 over Tributary HuntingtonFrom 1,000,000 to 5,000,000 2/25/2021 Creek 115384 115384 5-0 Carbon 80 GR2 Guiderail Improvement Interstate Guide Rail Upgrade - 5-0From 5,000,000 to 10,000,000 2/25/2021 - Phase 2 101836 P 101836 5-0 Lehigh 2002 M89 Resurface Broadway Resurface From 1,000,000 to 5,000,000 2/25/2021 102134 102134 6-0 Philadelphia 4001 SI2 Corridor Safety Henry Ave Congested Corr2 From 1,000,000 to 5,000,000 2/25/2021 Improvement 111173 M 111173 6-0 Bucks 663 MTF Intersection Improvement663 & Portzer/Hickory From 1,000,000 to 5,000,000 2/25/2021 111169 M 111169 6-0 Montgomery 2016 MTF Safety Improvement GMU Access & Safety From 500,000 to 1,000,000 2/25/2021 111394 111394 8-0 Franklin 16 TAP Bike/Ped Safety Waynesboro Ped Safety Project From 200,000 to 500,000 2/25/2021 Education 64767 64767 8-0 Lancaster 4057 002 Interchange ImprovementCenterville Road Interchange From 10,000,000 to 20,000,000 2/25/2021 18049 M 18049 8-0 Adams 7207 BRG Bridge Replacement Mengus Mill Rd Bridge From 500,000 to 1,000,000 2/25/2021 94754 M 94754 8-0 Lancaster 7219 BRG Bridge Replacement T-325 over Peters Creek From 200,000 to 500,000 2/25/2021 113259 113259 9-0 Somerset 601 012 Drainage Improvement SR 601 Drainage Improvements From 100,000 to 200,000 2/25/2021 114037 114037 9-0 Cambria 53 034 Resurface SR 53 - SR 2014 to High Level From 1,000,000 to 5,000,000 2/25/2021 Bridge 114037 113945 9-0 Cambria 3017 001 Resurface SR 53 - SR 2014 to High Level From 100,000 to 200,000 2/25/2021 Bridge 106472 106472 9-0 Somerset 4002 002 Resurface SR 4002 - SR 4013 to SR 4015 From 1,000,000 to 5,000,000 2/25/2021 114037 108171 9-0 Cambria 2014 008 Resurface SR 53 - SR 2014 to High Level From 1,000,000 to 5,000,000 2/25/2021 Bridge 114037 107225 9-0 Cambria 3019 001 Resurface SR 53 - SR 2014 to High Level From 200,000 to 500,000 2/25/2021 Bridge 29474 29474 11-0 Lawrence 2009 L02 Bridge Replacement Tower Road Br/Funk Run From 1,000,000 to 5,000,000 2/25/2021 57106 M 57106 11-0 Lawrence 7206 000 Bridge Replacement Bartholomew Road Bridge From 1,000,000 to 5,000,000 2/25/2021 109812 109812 1-0 Crawford 79 A28 Restoration I-79 MM 154 - 165 - #12 From 20,000,000 to 30,000,000 3/11/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 12 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 106034 106034 2-0 Centre 64 N38 Safety Improvement SR 64/550 Intersection From 1,000,000 to 5,000,000 3/11/2021 Improvement 102502 M 102502 2-0 Clinton 7405 LOC Bridge Replacement Peale Avenue Bridge From 1,000,000 to 5,000,000 3/11/2021 97489 97489 3-0 Lycoming 118 11M Resurface Cemetery Rd to Mill Lane From 1,000,000 to 5,000,000 3/11/2021 98510 98510 3-0 Montour 642 025 Bridge Replacement SR 642 over Beaver Run From 100,000 to 200,000 3/11/2021 112837 113491 4-0 Luzerne 29 P30 Bridge Preservation SR 29 over Susq River and RR From 200,000 to 500,000 3/11/2021 Activities Bridge Preservation 8040 M 8040 4-0 Lackawanna 7301 BRG Bridge Replacement 6 TH AVE. BRG.,CARBONDALE From 1,000,000 to 5,000,000 3/11/2021 8312 8312 4-0 Lackawanna 307 D54 Replace/Rehab SR 307 over Green Run From 500,000 to 1,000,000 3/11/2021 94737 94740 4-0 Susquehanna 11 RS1 Safety Improvement SR 11 Shoulders / ELRS From 1,000,000 to 5,000,000 3/11/2021 94737 94737 4-0 Susquehanna 11 ERS Safety Improvement SR 11 Shoulders / ELRS From 1,000,000 to 5,000,000 3/11/2021 112837 112837 4-0 Luzerne 29 P22 Bridge Preservation SR 29 over Susq River and RR From 10,000,000 to 20,000,000 3/11/2021 Activities Bridge Preservation 86370 M 86370 6-0 Delaware 7023 237 Bridge Replacement County Bridge #237: Tribbett Ave From 1,000,000 to 5,000,000 3/11/2021 o/ Hermesprota Ck 57849 57849 6-0 Montgomery 29 BRR Bridge Replacement Main Street (PA 29) Bridge From 1,000,000 to 5,000,000 3/11/2021 Removal 90923 90926 8-0 York 2002 023 Resurface Hollywood Drive From 1,000,000 to 5,000,000 3/11/2021 91267 91267 8-0 Lancaster 1035 006 Bridge Replacement Kleinfeltersville Road BR From 500,000 to 1,000,000 3/11/2021 90923 90923 8-0 York 3023 013 Resurface Hollywood Drive From 1,000,000 to 5,000,000 3/11/2021 111653 M 111653 8-0 Dauphin 7206 BRG Bridge Rehabilitation Dauphin Co Bridge Bundle From 1,000,000 to 5,000,000 3/11/2021 101036 101036 8-0 Lancaster 1901 001 Bridge Replacement Grist Mill Road Bridge From 1,000,000 to 5,000,000 3/11/2021 114602 114602 9-0 Bedford 3007 002 Slides Correction SR 3007 - Black Valley Road From 200,000 to 500,000 3/11/2021 Slide 23566 23566 9-0 Somerset 601 01B Bridge Replacement PA 601/Shade Creek From 1,000,000 to 5,000,000 3/11/2021 67016 67016 11-0 Beaver 2004 B06 Relocation/Realignment Freedom Rd Upgrade From 30,000,000 to 40,000,000 3/11/2021 100743 F 100743 11-0 Lawrence 2006 L03 Bridge Replacement East Washington Street Br From 5,000,000 to 10,000,000 3/11/2021 79894 M 79894 11-0 Allengheny 7203 LOC Bridge Replacement MC07 McClarens Run #7 From 1,000,000 to 5,000,000 3/11/2021 78427 A 78427 11-0 Allengheny 4070 A19 Bridge Rehabilitation Wildwood Rd over Buffalo Pgh RRFrom 5,000,000 to 10,000,000 3/11/2021 108251 108251 11-0 Beaver 151 B11 Resurface GRP 112-21-7135-1 From 1,000,000 to 5,000,000 3/15/2021 2685 2685 2-0 Cameron 120 A07 Bridge Improvement PA 120 Grove Run Br. From 500,000 to 1,000,000 3/17/2021 112232 P 112232 6-0 Montgomery 76 SLP Slope Failure Slope Repair I-76 W.B From 1,000,000 to 5,000,000 3/18/2021 109138 109138 1-0 Crawford 19 04M Restoration US 19: Mercer Co Line - PA 285 From 1,000,000 to 5,000,000 3/25/2021 106297 106297 1-0 Erie 90 A36 Restoration I-90: MP 35 to 46, Preservation - From 10,000,000 to 20,000,000 3/25/2021 #11 99729 99729 1-0 Erie 20 22M Resurface US/SR 20 : Zuck to Chestnut From 10,000,000 to 20,000,000 3/25/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 13 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 97907 97907 1-0 Mercer 19 14M Restoration US 19 Corridor Improvements From 1,000,000 to 5,000,000 3/25/2021 100503 100503 2-0 Cameron 120 406 Resurface Trib Sinmh to Drftwd Boro From 1,000,000 to 5,000,000 3/25/2021 3127 3127 2-0 Centre 879 P34 Bridge Improvement 2021 Centre Br. Preserv. From 1,000,000 to 5,000,000 3/25/2021 4190 4190 2-0 Juniata 75 A03 Bridge Improvement Bridge over NS Railroad From 1,000,000 to 5,000,000 3/25/2021 113241 M 113241 2-0 Clearfield 4014 ARC Restoration Penn Highlands DuBois Access From 1,000,000 to 5,000,000 3/25/2021 Road 109872 109872 2-0 Clinton 150 SIG Existing Signal SR 150 Lock Haven Signals From 1,000,000 to 5,000,000 3/25/2021 Improvement 68833 68833 4-0 Pike 390 473 Bridge Replacement Fairview outlet Bridge From 1,000,000 to 5,000,000 3/25/2021 57921 57921 5-0 Monroe 80 05S Interchange ImprovementI-80/Exit 308 Realignment From 50,000,000 3/25/2021 57921 113462 5-0 Monroe 80 CTV Video Cameras I-80/Exit 308 Realignment Less than 100,000 3/25/2021 87646 87646 5-0 Lehigh 78 16M Resurface I-78 PM 2 - Lehigh From 10,000,000 to 20,000,000 3/25/2021 86336 86336 6-0 Montgomery 1050 MC1 Bridge Replacement Congo Road over Middle Creek From 1,000,000 to 5,000,000 3/25/2021 86302 86302 6-0 Chester 3044 CBA Bridge Replacement EwingRd/whiteClayCreek From 1,000,000 to 5,000,000 3/25/2021 66952 66952 6-0 Montgomery 23 2NG Interchange ImprovementPA23/US422 Int & N Gulph From 10,000,000 to 20,000,000 3/25/2021 17697 M 17697 6-0 Philadelphia 3013 TF2 Existing Signal Island Ave: Woodland Ave to From 10,000,000 to 20,000,000 3/25/2021 Improvement Bartram Ave 111194 111194 6-0 Philadelphia 1005 SP2 Safety Improvement Castor Ave:Comly to Rhawn From 1,000,000 to 5,000,000 3/25/2021 98224 M 98224 6-0 Chester 7015 205 Bridge Rehabilitation County Bridge #205: Spring City From 1,000,000 to 5,000,000 3/25/2021 Rd o/ Stony Run 108933 108933 8-0 York 3065 005 Pedestrian Facilities N. George St.Ped & Bike Safety From 1,000,000 to 5,000,000 3/25/2021 Improvements 103081 103081 8-0 Dauphin 39 034 Resurface Hershey Park Dr Improv From 5,000,000 to 10,000,000 3/25/2021 89288 M 89288 8-0 Lancaster 7101 BRG Bridge Replacement Rohrerstown Rd Bridge From 1,000,000 to 5,000,000 3/25/2021 94747 M 94747 8-0 Lancaster 7409 BRG Bridge Replacement Cedar St over Lititz Run From 1,000,000 to 5,000,000 3/25/2021 108933 112069 8-0 York 3065 006 Pedestrian Facilities N. George St.Ped & Bike Safety From 1,000,000 to 5,000,000 3/25/2021 Improvements 105937 107213 9-0 Somerset 4053 001 Resurface SR 4016 - PA 985 to SR 4035 Less than 100,000 3/25/2021 105937 105939 9-0 Somerset 4028 001 Resurface SR 4016 - PA 985 to SR 4035 From 200,000 to 500,000 3/25/2021 105937 105937 9-0 Somerset 4016 DF1 Resurface SR 4016 - PA 985 to SR 4035 From 1,000,000 to 5,000,000 3/25/2021 91662 91662 9-0 Huntingdon 35 003 Resurface Richvale Rd to Juniata Co From 1,000,000 to 5,000,000 3/25/2021 76388 M 76388 11-0 Allengheny 7301 0 Bridge Rehabilitation 6th Street Bridge Rehab From 30,000,000 to 40,000,000 3/25/2021 88414 M 88414 11-0 Allengheny 7123 0 Bridge Rehabilitation PA03 - Painters Run No. 3 From 500,000 to 1,000,000 3/25/2021 28010 28010 11-0 Allengheny 50 A26 Widen 50 -Thoms Run to Mayer St From 10,000,000 to 20,000,000 3/25/2021 27770 M 27770 11-0 Allengheny 7103 LOC Bridge Replacement SN02 SPRING RUN NO2 From 1,000,000 to 5,000,000 3/25/2021 105201 105201 11-0 Allengheny 51 10A Resurface GRP 111-21-7135-1 From 5,000,000 to 10,000,000 3/25/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 14 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 109352 109352 11-0 Beaver 51 B53 Resurface Constitution Boulevard - B53 From 5,000,000 to 10,000,000 3/25/2021 111650 111650 12-0 Westmoreland 1030 03R Resurface Roseytown Road RR Tunnel From 200,000 to 500,000 3/25/2021 Repairs 108311 108311 12-0 Fayette 40 SIP Resurface SIP 12-20-SI1-1 From 1,000,000 to 5,000,000 3/25/2021 102069 102069 1-0 Erie 4008 S01 Safety Improvement Hamot Rd/Oliver Rd Intersection From 1,000,000 to 5,000,000 4/8/2021 106721 106457 3-0 Snyder 11 132 Resurface SR 15 to Union Co Line Less than 100,000 4/8/2021 113688 113688 3-0 Lycoming 2014 DOP Miscellaneous Baker Estate Aquisition From 200,000 to 500,000 4/8/2021 9379 9379 4-0 Pike 507 450 Replace/Rehab SR 507 over Tributary to Lake From 1,000,000 to 5,000,000 4/8/2021 Wallenpaupack 1 114351 114351 5-0 Northampton 33 09M Resurface PA 33 Resurface - Chrin to US 22From 5,000,000 to 10,000,000 4/8/2021 114350 114350 5-0 Northampton 22 14M Resurface SR 22 Resurface - Bethman Rd toFrom 1,000,000 to 5,000,000 4/8/2021 25th St 101571 101571 5-0 Northampton 512 10M Resurface SR 512 Resurface S. Main St to From 1,000,000 to 5,000,000 4/8/2021 SR 611 110082 110082 5-0 Berks 4040 01M Resurface SR 4040 Old Route 22 - From 1,000,000 to 5,000,000 4/8/2021 Tulpehocken 85907 112292 5-0 Monroe 380 05M Interchange ImprovementSR 940 to Lackawanna County From 5,000,000 to 10,000,000 4/8/2021 Line 112292 P 112292 5-0 Monroe 380 05M Interchange ImprovementSR 380 Tobyhanna Ramps and I/CFrom 5,000,000 to 10,000,000 4/8/2021 110009 110009 5-0 Berks 222 32M Resurface 222 from 61 to BUS 222 From 1,000,000 to 5,000,000 4/8/2021 111510 M 111510 6-0 Philadelphia 2007 FBI Transportation Frankford & Belgrade From 200,000 to 500,000 4/8/2021 Enhancement Improvements 114114 M 114114 6-0 Montgomery 3032 LMT Intersection ImprovementConshohocken & Spring Mill Rd From 500,000 to 1,000,000 4/8/2021 111492 M 111492 6-0 Montgomery 152 LPM Transportation Limekiln Pike Sidewalk From 500,000 to 1,000,000 4/8/2021 Enhancement 108979 108979 6-0 Philadelphia 2115 0 Resurface Township Line Rd Resurfacing (SRFrom 500,000 to 1,000,000 4/8/2021 2115) 108975 108975 6-0 Philadelphia 2045 0 Resurface Old Lincoln Hwy Resurfacing (SR From 500,000 to 1,000,000 4/8/2021 2045) 108530 108530 8-0 Lancaster 1003 025 Resurface Horseshoe Road Resurfacing From 5,000,000 to 10,000,000 4/8/2021 112809 112809 8-0 York 1037 ACC Reconstruct Accomac Road Emergency From 1,000,000 to 5,000,000 4/8/2021 18998 M 18998 8-0 Dauphin 7208 BRG Bridge Replacement Red Top Road Bridge From 1,000,000 to 5,000,000 4/8/2021 96412 96412 9-0 Blair 2014 005 Resurface Bedford St - Reservoir Rd From 500,000 to 1,000,000 4/8/2021 96412 108206 9-0 Blair 2010 002 Resurface Bedford St - Reservoir Rd From 200,000 to 500,000 4/8/2021 106052 106052 9-0 Cambria 56 006 Resurface PA 56 - US 219 to T-346 From 1,000,000 to 5,000,000 4/8/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 15 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 111447 M 111447 9-0 Bedford 1044 003 Intersection ImprovementEverett Bus. Dist. Access Improv. From 200,000 to 500,000 4/8/2021 Project 96412 112551 9-0 Blair 4025 DF1 Resurface Bedford St - Reservoir Rd From 1,000,000 to 5,000,000 4/8/2021 91555 91555 12-0 Washington 79 18R Resurface I79: Marianna to Laboratory Hill From 10,000,000 to 20,000,000 4/8/2021 14236 14236 6-0 Chester 4006 CWB Bridge Replacement Little Washington Road over From 1,000,000 to 5,000,000 4/15/2021 Culbertson Run 47505 47505 1-0 Erie 699 B01 Bridge Replacement PA 699: Edinboro Rd/I-90 Br From 1,000,000 to 5,000,000 4/22/2021 89347 89347 2-0 Elk 949 A01 Bridge Replacement Maxwell Run From 1,000,000 to 5,000,000 4/22/2021 110331 110331 2-0 Cameron 2001 P32 Bridge Preservation 2021 Bridge Preservation From 1,000,000 to 5,000,000 4/22/2021 Activities 110354 110354 2-0 Clinton 120 P40 Bridge Improvement 2021 Bridge Preservation From 1,000,000 to 5,000,000 4/22/2021 9181 9181 4-0 Luzerne 315 D52 Bridge Rehabilitation SR315 over Trib Gardners Creek From 500,000 to 1,000,000 4/22/2021 11140 11140 5-0 Carbon 7211 B12 Bridge Replacement T-516 County Bridge #12 From 1,000,000 to 5,000,000 4/22/2021 110247 110247 5-0 Berks 7212 LBF Bridge Replacement Glendale Bridge From 1,000,000 to 5,000,000 4/22/2021 101572 101572 5-0 Northampton 611 09M Resurface Lackawanna Tr Resurface From 1,000,000 to 5,000,000 4/22/2021 101868 101868 5-0 Lehigh 1004 01M Resurface Race Street Resurface From 1,000,000 to 5,000,000 4/22/2021 57433 101868 5-0 Lehigh 1004 01M Resurface SECOND STREET EXTENSION From 1,000,000 to 5,000,000 4/22/2021 111446 M 111446 5-0 Monroe 940 0 Transportation Tobyhanna Hike & Bike From 500,000 to 1,000,000 4/22/2021 Enhancement 109334 109334 5-0 Carbon 80 BRM Bridge Preservation NEPA Brg Preserve & Repair 6 From 5,000,000 to 10,000,000 4/22/2021 Activities 98036 98036 6-0 Chester 1023 CB6 Bridge Replacement Merlin Rd o/ Pigeon Run From 1,000,000 to 5,000,000 4/22/2021 105845 M 105845 6-0 Bucks 32 BSC Pedestrian Facilities BridgeStCrossing-D&L Canal From 500,000 to 1,000,000 4/22/2021 Towpath 111501 M 111501 6-0 Philadelphia 611 BLU Transportation Broad & Locust Intersection From 1,000,000 to 5,000,000 4/22/2021 Enhancement 106993 106993 6-0 Philadelphia 13 SIP Safety Improvement Frankford Avenue Signal From 1,000,000 to 5,000,000 4/22/2021 Improvements 111664 111664 8-0 York 462 052 Bridge Replacement Market Street Bridge over Mill From 5,000,000 to 10,000,000 4/22/2021 Creek 112565 112565 9-0 Fulton 655 007 Drainage Improvement PA 655 Under 8ft Culverts From 500,000 to 1,000,000 4/22/2021 96647 96647 9-0 Somerset 4005 001 Resurface PA 31 to Westmoreland County From 1,000,000 to 5,000,000 4/22/2021 109557 109557 11-0 Allengheny 910 A42 Bridge Deck ReplacementPA 910 over 3 From 1,000,000 to 5,000,000 4/22/2021 79306 79306 12-0 Fayette 21 B10 Bridge Improvement PA 21 over PA 166 From 5,000,000 to 10,000,000 4/22/2021 113277 113277 8-0 Dauphin 230 043 Resurface Cameron St Resurf 2 From 1,000,000 to 5,000,000 5/5/2021 110828 110828 3-0 Union 304 018 Resurface SR 45 to Orchard Ln From 500,000 to 1,000,000 5/6/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 16 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 9174 9174 4-0 Luzerne 309 D56 Bridge Rehabilitation SR 309 over Branch Fern Creek From 500,000 to 1,000,000 5/6/2021 87649 87649 5-0 Monroe 80 23M Resurface I-80 - I-380 to Tannersville From 10,000,000 to 20,000,000 5/6/2021 Resurface 92809 92809 6-0 Philadelphia 13 RBR Bridge Rehabilitation Roosevelt Blvd Exit From 1,000,000 to 5,000,000 5/6/2021 78662 78662 8-0 Adams 3005 011 Bridge Rehabilitation Millerstown Road Bridge From 500,000 to 1,000,000 5/6/2021 19188 63175 8-0 Franklin 4018 009 Bridge Replacement Maclays Mill Road Bridges From 500,000 to 1,000,000 5/6/2021 19188 19188 8-0 Franklin 4018 007 Bridge Replacement Maclays Mill Road Bridges From 1,000,000 to 5,000,000 5/6/2021 108450 108450 8-0 Cumberland 1010 026 Pavement Preservation Carlisle Pike Resurfacing From 1,000,000 to 5,000,000 5/6/2021 112566 112566 9-0 Fulton 4013 001 Drainage Improvement Fulton&Huntingdon Co. Under 8ft From 200,000 to 500,000 5/6/2021 Clvrts 107957 107957 12-0 Westmoreland 981 Q20 Corridor Safety LVTIP: PA 819 to Norvelt (PA From 50,000,000 5/6/2021 Improvement 981-Q20) 113222 113222 5-0 Lehigh 3022 01M Restoration SR 3022 from Old 22 to Main From 500,000 to 1,000,000 5/20/2021 Street 113221 113221 5-0 Berks 4028 03M Resurface SR 4028 Resurface Krumsville RdFrom 200,000 to 500,000 5/20/2021 to Old 22 107642 M 107642 6-0 Delaware 3046 OFF Pedestrian Facilities Smithbridge Rd. Corridor From 1,000,000 to 5,000,000 5/20/2021 107634 M 107634 6-0 Delaware 3021 PEM Pedestrian Facilities Media Boro Pedestrian From 500,000 to 1,000,000 5/20/2021 Enhancements 112213 M 112213 6-0 Montgomery 463 MTF Widen Horsham Rd. at Limekiln Pk. From 1,000,000 to 5,000,000 5/20/2021 113276 113276 8-0 Dauphin 22 093 Resurface Cameron St Resurf From 1,000,000 to 5,000,000 5/20/2021 78816 78816 8-0 York 3073 003 Bridge Replacement Westminster Ave Bridge From 1,000,000 to 5,000,000 5/20/2021 96544 96544 9-0 Fulton 16 02S Safety Improvement US 522 - Franklin Co Line From 1,000,000 to 5,000,000 5/20/2021 29327 M 29327 11-0 Lawrence 7203 LOC Bridge Rehabilitation Wallace Road BridgeT-356 From 1,000,000 to 5,000,000 5/20/2021 94953 94953 12-0 Fayette 21 SIG Traffic System FACO Signals-1 From 1,000,000 to 5,000,000 5/20/2021 Management 111504 M 111504 5-0 Berks 1010 0 Transportation Topton Pedestrian Connectivity From 500,000 to 1,000,000 5/27/2021 Enhancement 108175 108175 9-0 Cambria 3008 003 Resurface SR 3008 - PA 756 to SR 3016 From 1,000,000 to 5,000,000 6/3/2021 31979 31979 12-0 Westmoreland 4075 01M Bridge Improvement SR 4075 ov Pucketa Creek From 100,000 to 200,000 6/3/2021 89078 105390 12-0 Fayette 1051 S10 Bridge Replacement SR 1051 over Butler Run-DFB From 100,000 to 200,000 6/3/2021 74230 90824 12-0 Washington 2047 D10 Bridge Replacement SR 2026 over Trib Mon Riv-DFB From 100,000 to 200,000 6/3/2021 94567 94567 4-0 Lackawanna 348 IMP Safety Improvement SR 348 Intersection Imp From 1,000,000 to 5,000,000 6/10/2021 112656 112656 5-0 Monroe 940 M89 Resurface SR 940- M89 From 1,000,000 to 5,000,000 6/10/2021 101802 P 101802 5-0 Berks 2009 M89 Resurface SR 2009 Resurfacing From 1,000,000 to 5,000,000 6/10/2021 101802 P 101798 5-0 Berks 2085 M89 Resurface SR 2009 Resurfacing Less than 100,000 6/10/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 17 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 106264 106264 6-0 Philadelphia 95 CAP Reconstruct Penn's Landing Project From 50,000,000 6/10/2021 Development 106229 106229 8-0 York 2051 001 Bridge Replacement Miller Road Bridge From 500,000 to 1,000,000 6/10/2021 21144 21144 8-0 York 7205 BRG Bridge Rehabilitation Baker Road Bridge From 1,000,000 to 5,000,000 6/10/2021 113263 113263 8-0 Cumberland 34 057 Resurface Holly Pike Resurfacing From 1,000,000 to 5,000,000 6/10/2021 113293 113293 8-0 Lebanon 419 010 Resurface PA 419 Main St Resurface From 1,000,000 to 5,000,000 6/10/2021 91070 91070 8-0 York 114 031 Resurface Lewisbury Road Resurface From 1,000,000 to 5,000,000 6/10/2021 91346 91346 8-0 Lebanon 501 029 Bridge Replacement PA 501 Bridge-B From 1,000,000 to 5,000,000 6/10/2021 91066 91066 8-0 Lancaster 3030 007 Resurface Water Street Resurface From 1,000,000 to 5,000,000 6/10/2021 92613 92613 9-0 Cambria 1021 005 Resurface SR1021 - PA36 to PA 53 From 5,000,000 to 10,000,000 6/10/2021 76010 76010 12-0 Fayette 1037 B10 Bridge Rehabilitation SR 1037 over Trump Run From 1,000,000 to 5,000,000 6/10/2021 99668 99668 6-0 Delaware 291 FLB Drainage Improvement SR 291 Drainage Improvmnt From 1,000,000 to 5,000,000 6/17/2021 111435 111435 1-0 Mercer 208 T19 Transportation Springfield Twp Multimodal Trail From 500,000 to 1,000,000 6/24/2021 Enhancement Ph 2 94686 94686 4-0 Pike 739 WID Safety Improvement SR 739 Should / Widening From 1,000,000 to 5,000,000 6/24/2021 95454 95454 4-0 Lackawanna 11 D50 Bridge Preservation US 11 over Railroad From 500,000 to 1,000,000 6/24/2021 Activities 96387 96387 5-0 Lehigh 145 08M Resurface MacArthur Road Resurface From 1,000,000 to 5,000,000 6/24/2021 107653 107653 5-0 Monroe 209 29M Resurface SR 209 Betterment Project From 1,000,000 to 5,000,000 6/24/2021 110007 110007 5-0 Berks 222 31M Resurface 222 Warren Street Wyomissing From 5,000,000 to 10,000,000 6/24/2021 109264 P 109264 5-0 Schuylkill 895 M89 Resurface SR 895 Resurface- A-409 - From 1,000,000 to 5,000,000 6/24/2021 Contract 110966 110966 6-0 Bucks 2037 SIP Safety Improvement Old Lincoln/Hulmeville Int Improv From 200,000 to 500,000 6/24/2021 111487 M 111487 6-0 Delaware 1 WCF Transportation Walkable Chadds Ford From 1,000,000 to 5,000,000 6/24/2021 Enhancement 113226 113226 8-0 Adams 116 052 Resurface PA 116 Fairfield Rd Resurface From 1,000,000 to 5,000,000 6/24/2021 113071 113071 8-0 Adams 116 051 Bridge Replacement SR 116 Bridge over Conewago From 1,000,000 to 5,000,000 6/24/2021 Creek 94751 94751 8-0 Lancaster 7226 BRG Bridge Replacement Pequea Val over Pequea Cr From 1,000,000 to 5,000,000 6/24/2021 91359 91359 8-0 York 2002 019 Bridge Replacement Springwood Road Bridge ovr Trib From 500,000 to 1,000,000 6/24/2021 Mill Creek 91336 91336 8-0 Lancaster 3018 003 Bridge Replacement Martic Heights Drive Bridge From 100,000 to 200,000 6/24/2021 73854 73854 8-0 Adams 1005 009 Bridge Rehabilitation Latimore Valley Road Brg-C From 500,000 to 1,000,000 6/24/2021 78906 78906 8-0 Lancaster 1044 001 Bridge Replacement Little Muddy Creek Bridge From 1,000,000 to 5,000,000 6/24/2021 85830 85830 5-0 Schuylkill 443 01B Replace/Rehab Columbia Street Arch Br From 1,000,000 to 5,000,000 7/15/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 18 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 12931 12931 6-0 Bucks 2081 BWR Bridge Replacement Worthington Mill Road over From 5,000,000 to 10,000,000 7/15/2021 Neshaminy Creek 15306 15306 6-0 Delaware 2031 DBR Bridge Replacement Sellers Ave O/AMTRAK From 5,000,000 to 10,000,000 7/15/2021 107989 107989 8-0 Lancaster 1010 TAP Pedestrian Facilities Main St Curb and Sidewalk From 500,000 to 1,000,000 7/15/2021 19862 19862 8-0 Lancaster 772 034 Bridge Replacement Rife Run Bridge From 1,000,000 to 5,000,000 7/15/2021 100292 100292 8-0 Lebanon 419 009 Bridge Rehabilitation PA-419 over Hammer Cr-B From 500,000 to 1,000,000 7/15/2021 78888 78888 8-0 York 1019 010 Bridge Rehabilitation Wago Road Bridge From 1,000,000 to 5,000,000 7/15/2021 107031 107031 8-0 Lancaster 772 056 Resurface Mt Joy Rd Resurface From 1,000,000 to 5,000,000 7/15/2021 87564 87564 8-0 Lancaster 1026 006 Bridge Replacement HopeLand Road Bridge From 500,000 to 1,000,000 7/24/2021 85930 85930 5-0 Northampton 1015 03B Bridge Rehabilitation SR 1015 o/Martins Creek From 1,000,000 to 5,000,000 7/29/2021 12310 12310 5-0 Northampton 3016 01B Replace/Rehab Indian Trail Road ov'r From 1,000,000 to 5,000,000 7/29/2021 Hokendauqua Creek 10588 10588 5-0 Berks 1017 03B Replace/Rehab SR 1017 over Kistlers Crk From 1,000,000 to 5,000,000 7/29/2021 78846 78846 8-0 York 177 007 Bridge Rehabilitation SR 177 Over Beaver Creek From 500,000 to 1,000,000 7/29/2021 76401 76401 3-0 Snyder 15 88D New Roadway CSVT Southern Section From 50,000,000 8/1/2021 92711 92711 9-0 Somerset 40 002 Resurface Addison Resurface From 5,000,000 to 10,000,000 8/2/2021 105050 105050 4-0 Luzerne 2002 STR Transportation Nanticoke Streetscaping From 1,000,000 to 5,000,000 8/9/2021 Enhancement 74761 M 74761 4-0 Luzerne 2002 ENH Transportation Nanticoke Streetscape From 1,000,000 to 5,000,000 8/12/2021 Enhancement 8245 8245 4-0 Lackawanna 438 251 Bridge Preservation SR 438 over South Branch From 500,000 to 1,000,000 8/12/2021 Activities Tunkhannock Creek 84368 84368 4-0 Lackawanna 6011 251 Bridge Replacement SR 6011 Green Ridge Street overFrom 5,000,000 to 10,000,000 8/12/2021 102162 102162 5-0 Berks 2014 01S Corridor Safety SR 2014 Corridor Improvem From 1,000,000 to 5,000,000 8/12/2021 Improvement 16738 16738 6-0 Montgomery 422 M1B Reconstruct US 422:Park to Norfolk From 50,000,000 8/12/2021 74452 74452 9-0 Somerset 1007 03B Bridge Replacement North Shanksville Trib From 500,000 to 1,000,000 8/12/2021 74452 106000 9-0 Somerset 4004 02B Bridge Replacement North Shanksville Trib From 500,000 to 1,000,000 8/12/2021 105996 105996 9-0 Bedford 56 01B Bridge Replacement Trib Barefoot Run From 1,000,000 to 5,000,000 8/12/2021 74452 91444 9-0 Somerset 1007 04B Bridge Replacement North Shanksville Trib From 500,000 to 1,000,000 8/12/2021 100728 100728 11-0 Allengheny 8004 A03 Bridge Preservation Boulevard of Allies Ramps From 30,000,000 to 40,000,000 8/12/2021 Activities 111495 M 111495 6-0 Montgomery 29 MSP Transportation Main Street/SR 29 Ped From 500,000 to 1,000,000 8/16/2021 Enhancement Improvements 110963 110963 6-0 Chester 82 SIP Safety Improvement Manor Rd. Roundabout From 1,000,000 to 5,000,000 8/20/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly. Planned 12-Month Letting Schedule Page 19 of 19 From 9/1/2020 to 9/1/2021

Excludes projects currently advertised in ECMS. Partial D/B projects are signified with a "P", Full D/B September 01, 2020 projects are signified with a "F", A+Bx projects are signified with an "A", Alternate Pavement (C-Factor) projects are signified with a "C", Municipal projects are signified with a "M" following the ECMS #. Anticipated ECMS # MPMS # District County SR Sec Improvement Type Project Description Cost Range Let Date** 76136 76136 2-0 Centre 26 N37 Safety Improvement SR 26/45 Shingletown IntersectionFrom 5,000,000 to 10,000,000 8/26/2021 79594 79594 4-0 Luzerne 309 363 Bridge Rehabilitation SR 309 ov SR 2022 From 1,000,000 to 5,000,000 8/26/2021 8999 8999 4-0 Luzerne 2005 351 Bridge Preservation SR 2005 over Bowman Spring RunFrom 500,000 to 1,000,000 8/26/2021 Activities 92949 92949 4-0 Lackawanna 8002 290 Park and Ride Lot Tigue Street Park N Ride From 500,000 to 1,000,000 8/26/2021 110971 110971 6-0 Montgomery 3009 SIP Safety Improvement Main St. Safety Improv From 1,000,000 to 5,000,000 8/26/2021 100340 100348 8-0 Lebanon 22 069 Bridge Rehabilitation Allentown Blvd/Kevins Run-B From 1,000,000 to 5,000,000 8/26/2021 100340 100340 8-0 Lebanon 22 068 Bridge Rehabilitation Allentown Blvd/Kevins Run-B From 500,000 to 1,000,000 8/26/2021 100340 100314 8-0 Lebanon 72 055 Bridge Rehabilitation Allentown Blvd/Kevins Run-B From 500,000 to 1,000,000 8/26/2021 90856 93208 8-0 Franklin 2031 013 Bridge Rehabilitation W Branch of Antietam Ck-A From 500,000 to 1,000,000 8/26/2021 20503 M 20503 8-0 Perry 7212 BRG Bridge Replacement Linton Hill Road Bridge From 1,000,000 to 5,000,000 8/26/2021 93208 93208 8-0 Franklin 2031 013 Bridge Rehabilitation Mont Alto Road Bridge-A From 500,000 to 1,000,000 8/26/2021 90856 90856 8-0 Franklin 997 034 Bridge Replacement W Branch of Antietam Ck-A From 500,000 to 1,000,000 8/26/2021 63515 63515 11-0 Allengheny 1038 A01 Bridge Preservation New Kensington Bridge From 10,000,000 to 20,000,000 8/26/2021 Activities 76137 M 76137 12-0 Fayette 7202 MOY Bridge Replacement Moyer Road Bridges From 1,000,000 to 5,000,000 8/26/2021 103208 103208 12-0 Fayette 7301 YAB Bridge Rehabilitation York Avenue Bridge From 1,000,000 to 5,000,000 8/26/2021

** Actual let date may differ as a result of unforeseen issues. This document will be revised monthly.