REPUBLIC OF

MINISTRY OF WATER AND SANITATION

STATE DEPARTMENT FOR WATER

TANATHI WATER SERVICES BOARD ( PROJECTS)

BRIEF SUMMARY OF TANATHI WATER SERVICES BOARD RECENTLY COMPLETED, ON-GOING AND PLANNED PROJECTS WITHIN MAKUENI COUNTY

7TH AUGUST 2018

Page 1 of 13

SUMMARY TABLE OF COMPLETED BOREHOLES IN MAKUENI COUNTY (See Annex 1)

STATUS OF NO. OF COST IN KSHS. POPULATION WATER PROJECTS BOREHOLE SERVED ADDED IN S M3/HR

Completed by 42 268,651,182.00 102,000 people & 1,000 294 TAWSB and LU JICA B/Hs SUMMARY TABLE OF AND ONGOING BOREHOLES IN MAKUENI COUNTY

Ongoing 17,500 people, 1,400 12 86,549,960.47 LU 60

Completed Projects

S/N Name Of Constituenc Cost Of Populatio Scope Of Works Safe Status o Project y Project n Served Water (Million) Produced (M3/D) 1. Nzai-Emali 5.8 5,000  6km pipeline 360 Complete tank water  4 No. Water kiosks. supply project. 2. Kamunyolo Makueni 41 8,000  Dam de-silting. 200 Complete Dam Water  Composite infiltration but the dam Supply unit bleached Project  2No. Grade 9 houses during the  2No. pump houses recent  50m3 clear water sump. floodings  4Km rising main  225m3 masonry tank.  Water kiosk and cattle trough. 4 Kaiti BH Kaiti 33 5,000  2No. pump houses 55 Complete Water Supply  Installation of (2 No) Project pumping units at intake and booster station  2No. grade 9 houses  225m3 and 100m3 tanks at Unoa and booster station.  6km raising main 5 Mwaani 2 Makueni 44 10,000  Rehabilitation of 140 Complete BH Water 6.4km rising main. Supply  2 No. 225m3 tank Project  2km distribution line for the town.

Page 2 of 13

S/N Name Of Constituenc Cost Of Populatio Scope Of Works Safe Status o Project y Project n Served Water (Million) Produced (M3/D)  Rehabilitation of 3 No. grade 9 houses  2No. water kiosks  Installation of 2 No pumping units. 6 Umanyi- 120 70,000 Construction of: 4,700 Complete Mtito Andei Water intake. Water Water storage tanks (100, 200 and 500m3) Supply Water laboratory.

20 No water kiosks.

Laying of a gravity pipeline 50Km 7 Equipping Kilome 76.5 N/A 17km raising main, 2 No Complete of 4No. (Within steel elevated tanks Konza 4 No. pump houses boreholes Techno City 8 Thwake and Makueni. It is one of the Vision 2030 Flagship The Dam construction Multipurpos Projects. The Dam component is the first phase of the Thwake component is ongoing e Dam Multipurpose Water development program that comprises of and its being four phases namely; dam component, irrigation, hydropower implemented by generation, water supply & sanitation Ministry of Water and Sanitation.

TANATHI WSB SMALL DAMS AND WATER PANS COMPLETED WITHIN MAKUENI COUNTY

S/No NAME OF DAM CONSTITUENCY WARD CURRENT STATUS

1 Kwa Mutaki Dam Mbooni Tulimani Complete

2 Kwa Ndia Dam Mbooni Kako/Waia Complete

3 Ngunini Dam Mbooni Kalawa Complete

4 Kyuasini Kibwezi East Masongaleni Complete

5 Yikuiku /Kwa Tundu Kibwezi East Nguumo Complete

Page 3 of 13

S/No NAME OF DAM CONSTITUENCY WARD CURRENT STATUS

6 Syaathi Kibwezi East Masongaleni Complete

7 Masaku Ndogo Kibwezi East Masongaleni Complete

8 Mikoini Kaiti Kee Complete Kee Complete 9 Mwea Sand Dam Kaiti

10 Kyenini Kibwezi West Makindi/Kiboko/T Complete waandu

11 Mamu Kibwezi West Complete

12 Muaa Muasa Makueni Kikumini/Muvau Complete Complete 13 Kwa Kaluku Makueni Kitise Complete 14 Ngomano Makueni Mavindini 15 Ikuutani-Mboloti Kilome Kasikeu/Kiou Complete

16 Kwa Mbeu Kilome Kasikeu Complete

17 Kemaasya Kilome Kilome Complete

18 Nguuni Kilome Kasikeu Complete

19 Kwa Mutaki Mbooni West Tulimani Complete

Page 4 of 13

Drought Mitigation Programme - Phase III Ongoing Works Summary of Drilling/Equipping of Boreholes

Name of Project Cost (Kshs.) County (if Constituency Major Activities Population Served cross-county indicate)

MAKUENI COUNTY

Kwa Kilungu B/H 5,000,000 Makueni Kilome Drilling and equipping borehole 2,000 people at 5m3/hr

Kwa Mbeu B/H 5,000,000 Makueni Kilome Drilling and equipping borehole 2,000 people at 5m3/hr

Matooi B/H 5,000,000 Makueni Kilome Drilling and equipping borehole 2,000 people at 5m3/hr

Sub-Total 15,000,000 Makueni 6,000 people at 15m3/hr County

Page 5 of 13

ONGOING PRIORITY PROJECTS IN MAKUENI COUNTY

N NAME OF CONSTI SCOPE COST(KES) FINANC STATUS OUTCOME EXPECTED o. PROJECT/ TUENCY ‘000 000 IER COMPLETI PROGRAM ON DATE 1 Usalama Kibwezi  Drilling and equipping of 1 No. 5 GoK  Drilling Will serve 3,000 March, 2018 Borehole east Borehole complete people with clean  Construction of 1 no. water kiosk  Equipping drinking water with 1 No. 10m3 plastic water tank ongoing 2 Kwa Mamuu Kilome Laying of 9KM 2” dia. pipeline 5.97 GoK Contract 1,100 people to be Jun-17 to Pipeline Rehabilitation of 1No water kiosk awarded served with 5m3/hr May-18

3 Kautandini Kilome Rehabilitation of 8 Km pipeline. 5.99 GoK pipeline repairs 2,500 People and 700 Jun-17 to Water Project at 90% livestock with 5m3/hr Apr-18

4 Kwa Muloi Kilome Construction of 3No. 50m3 Masonry 5.8 GoK Contract To serve 650 people Jun-17 to Tanks tanks. awarded with 5m3/hr May-18

5 Kwa Robert Kilome Construction of 2 no. water kiosk with 5.97 GoK Contract To serve 850 people Jun-17 to 2No. 10m3 plastic water tank. awarded with 5m3/hr Jun-18

6 Kwa Kilungu Kilome Drilling and equipping borehole 2.96 GoK Hydrogeological To serve 900 people Feb-18 to Borehole surveys to be served with Jun-18 complete. 5m3/hr Preparation of tender documents for drilling ongoing

TOTAL COST 31.69

Page 6 of 13

PROPOSED MAJOR DAM AND WATER SUPPLY PROJECT IN ALIGNMENT WITH THE BIG FOUR AGENDA;

Est. EXPECTED Project Cost START AND S/no Constituency Target Areas Status Capacity COMPLETION Name (kshs. DATE Million) Mbondoni Preliminary Design 2018 Community Machinery market and Complete and proposal 72m3/day to serve 10,000 1 Kibwezi East 15 Water its environs forwarded to Ministry of people Project Water To store 1,500,000 2019 – 2022 Water for irrigation, Design Complete and Kilome- million cubic and supply livestock and domestic proposal forwarded to 2 Mikuyu Kilome 4,000 15,000m3/day of water to use for Kilome ADF 14 and World Dam Kilome to serve 74,000 constituency Bank for funding people Thwake- 2019 – 2022 Preliminary Design Konza Water supply to the To supply 15,000m3/day Makueni and Complete and proposal 3 Water 8,000 proposed Konza of water to Kilome to Kilome forwarded to ADB for Supply Techno-City serve 274,000 people funding Project Nzai- 2019 – 2022 Ithumba- Preliminary Design To supply 518 m3/day of Nguu, Kikumini Masumba Kibwezi Complete and proposal water to Kibwezi West 4 181 Masumba, Kakili na Water West forwarded to Ministry of constituency to serve Mii Supply Water 24,000 people Project

Page 7 of 13

OTHER PROPOSED WATER AND SANITATION PROJECTS WITHIN OUR 2017-2022 STRATEGIC PLAN

No. NAME OF COUNTY/ SCOPE COST(KES) OUTCOME EXPECTED PROJECT/ Constituen ‘000 000 COMPLETION PROGRAM cy DATE 1. Manooni water Makueni/ Improve access to water supply 150 1,500 m3/day of water to be produced to 2017 – 2019 supply project Kilome to 13,000 people in Manooni serve 35,000 people and Matiliku areas

2. Mzima springs Makueni/ Improve access to water 3,000 5,000m3/day of water to serve 55,000 2017 – 2021 Mtitu Andei water Kibwezi produced to serve 34,000 people people supply project East in Mtitu Andei town 3. , Makindu Makueni/ Increase Waste water treated in 3,300 2017 – 2022 At least 25,000M3/day of waste water Kibwezi and Kibwezi Wote, Makindu, Kibwezi and treated for 100,000 people Matuu Towns East & Matuu towns covering 40,000

Sewerage Project West people 4. Wote Town Water Improve access to water 1,500 Improve access to water supply by 2017 – 2022 supply project produced to serve 55,000 people 5,000m3/day construct 33km pipeline in Wote town 5. Nor-turesh bulk Makueni/ Improve access to water 2,040 Improve access to water supply by 2017 – 2022 w/supply – Kasikeu & produced to serve 145,000 4,000m3/day and construct 110 km rehabilitation Kilome people in Simba, Emali, Sultan pipeline project Hamud and Salama towns 6. Drilling and Makueni/ Improve access to water 200 2017 to 2022 Equipping of 50 all produced to serve 50,000 people Increase water supply by 5,000m3/day. boreholes Constituen in Makueni county Drill and equip boreholes cies

Page 8 of 13

Annex 1 - TABLE OF COMPLETED BOREHOLES BY TAWSB, DROUGHT, UNICEF AND JICA PER COUNTY

S/ Name of County Ward/ New or Funded Cost (Kshs.) Populatio Total Date Current Status No Project Constituen Rehabilit Components n Served Water Started/ cy ation Producti Date on Completed

1 Kalimbini Makueni Kasikeu New Borehole water 8,151,210 5,200 7.2 complete and Watsan Loc.- source system operational Project Makueni District

2 Ndovoini Makueni Ithumba New Borehole water 6,437,460 7,000 9.6 complete and Watsan Loc- source system operational Project Makueni District

3 New matutu Makueni Nguu loc- New Borehole Water 8,354.640 5,200 19.2 Complete and B/H Nzaui project operational.

4 Nthungui Makueni Utithi loc New Boreholes water 7,345,000 2300 12 complete and Ivovoani W/P Kibwezi project operational

5 Ulu B/H3 Makueni Rehabilita Ulu B/H 3 3,038,621 Ulu B/H3 40m3/hr 26/01/2017 - Complete and borehole and tion replacement and re- – 3,000 9/02/2017 operational Kwa Ndiki equipping with the people B/H projects old pump.

Kwa Ndiki B/H – Kwa supply & installation Ndiki of draw pipes B/H – 3,000

Page 9 of 13

S/ Name of County Ward/ New or Funded Cost (Kshs.) Populatio Total Date Current Status No Project Constituen Rehabilit Components n Served Water Started/ cy ation Producti Date on Completed

people 5m3/hr

6 Mutulani B/H Makueni Rehabilita Installation of pump, 1,294,309 3,000 2m3/hr 25/01/2017 - Complete and Project tion draw pipes, airline people 17/03/2017 operational and servicing of the genset.

7 Sultan Makueni Sultan Rehabilita Equipping the B/H 2,421,942 2,000 2m3/hr 26/04/2017 - Complete and Community B/H Hamud tion with a submersible people 20/09/2017 operational pump, control panel, installation of 2No. 10m3 plastic tanks on existing steel elevated towers, repair of a water kiosk & a repair of cattle trough, fencing / gate installation & pipeline repairs.

8 Kayatta B/H, Makueni Rehabilita Kayatta B/H surface 2,929,649 3,000 10m3/hr 26/04/2017 - Complete and Kwa Ngumu tion pump replacement, people 17/07/2017 operational B/H and Muani B/H Project Kwa Ngumu B/H surface pump replacement and Muani B/H surface & submersible

Page 10 of 13

S/ Name of County Ward/ New or Funded Cost (Kshs.) Populatio Total Date Current Status No Project Constituen Rehabilit Components n Served Water Started/ cy ation Producti Date on Completed

pumps replacement together with their control panels Project

9 Kyumani Makueni Rehabilita Rehabilitation of 5,472,912 15,000 20m3/hr 26/04/2017 - Complete and pipeline tion 192m GI rising main people 26/09/ 2017 operational rehabilitation and 60m gravity line, Project construction of a composite filtration unit at the weir on a river.

10 Konza-Techno Makueni New -Equipping of 4 No. 76, 1,000 37m3/hr Complete and city water Boreholes. 000,000.00 workers. operational. supply -Construction of 4No. Pump Control rooms.

-Laying of a 5km rising main of assorted sizes.

-Fabrication and erection of 2No. 250m3 Elevated Steel

Page 11 of 13

S/ Name of County Ward/ New or Funded Cost (Kshs.) Populatio Total Date Current Status No Project Constituen Rehabilit Components n Served Water Started/ cy ation Producti Date on Completed

Tanks.

-Laying of a 7Km 110mm dia. Gravity line and water bowser stands.

11 26No. JICA Makueni New Drilling and 155,551,724. 53,000 130m3/hr Complete and funded equipping 26 00 operational. Boreholes boreholes

Makueni Makueni County 268,651,182. 102,000 294m3/hr County Sub- 00 people Total

Page 12 of 13

COMPLETED AND ONGOING PROJECTS UNDER WORLD BANK PROGRAMME BY AWSB

Total of 3 boreholes and associated works of approximately Ksh. 38m were done.

County To Be Current Status Operated By S/No Name of Borehole GPS Coordinates Community or WSP

02020’31”S Makueni 1 Kibwezi Farmers Community 37058’06”E All activities completed and functional, awaiting community management training and commissioning 0 Kanyango Primary 01 37’21”S Makueni which is almost starting. 2 Community School at Kalama 37019’18”E

Makueni The B/H was complete but was washed away by floods o S-02 00’39.1’’ during the Elnino rains. Reconstruction done to 3 Matooi at Nzaui in Community E-037o31’37.5’’ completion. Commissioning will be done on 12/07/2017 then training will be done later.

 All the 3 boreholes were drilled and are equipped with solar pumps

Page 13 of 13