Pimlico Neighbourhood Plan 2019-2040
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
(Public Pack)Cycle Superhighway Supplement Agenda Supplement
Public Document Pack Planning and Transportation Committee Date: TUESDAY, 24 FEBRUARY 2015 Time: 11.00 am Venue: LIVERY HALL - GUILDHALL ITEM 10 CYCLE SUPERHIGHWAYS - APPENDIX John Barradell Town Clerk and Chief Executive This page is intentionally left blank Board Date: 4 February 2015 Item 7: Proposed Cycle Superhighways Schemes This paper will be considered in public 1 Summary 1.1 TfL’s Road Modernisation Plan is designed to get more from the road network and help London grow. It contains five core portfolios, which together make up the £4bn roads investment in Surface Transport’s ten year business plan. The Cycle Superhighways (CS) programme is a key element within the £0.9bn cycling portfolio to deliver the ‘Mayor’s Vision for Cycling in London’, which seeks to double cycling over the next 10 years and transform London’s streets and spaces to places where cyclists feel they belong and are safe. £0.2bn from the cycling budget has been committed to the CS programme, to provide TfL with the resources to deliver significant improvements, including the proposed East-West route. 1.2 The CS programme is essential for improving the levels of service experienced by the hundreds of thousands of people already cycling daily in London, as well as driving future demand for cycling. The proposed routes deliver the backbone for the wider cycling infrastructure proposals, linking Quietways and existing London Cycle Network (LCN) routes to key home and workplace destinations, providing attractive high-capacity routes for commuters and leisure users alike. 1.3 This paper seeks Board approval for the construction of four new Cycle Superhighways (CS), and upgrades to the four existing CS routes. -
Mayor's Report August 2019
34th Mayor’s Report to the Assembly Mayor’s Question Time – 12th September 2019 This is my Thirty-Fourth Mayor’s Report to the Assembly, fulfilling my duty under Section 45 of the Greater London Authority Act 1999. It covers the period from 5th July – 29th August 2019. Executive Summary Cycleway 4 construction to start ahead of schedule On 27 August, I announced that the next section of Cycleway 4 will start ahead of schedule. Once complete, Cycleway 4 will add 10km of segregated cycle route to London’s network – enabling thousands more people to enjoy the benefits of this major new route between Tower Bridge and Greenwich sooner. New pedestrian crossings are set to make the area much easier for people walking to get around. Notting Hill Carnival On Sunday 25 August, I spent the afternoon enjoying the music, magnificent parade costumes and sunshine at Notting Hill Carnival. Currently in its 53rd year, it is a celebration of Caribbean culture, that attracted an estimated 1 million people across the weekend. The event would not have been the success it was without the hard work of Notting Hill Carnival Ltd, the public and the voluntary agencies involved, and I thank them for their dedication. New figures show year of stability for London’s pubs On 24 August, new City Hall research shows the number of pubs in London remained stable between 2017 and 2018 after falling by more than a quarter since 2001 London pubs have been a key part of our capital’s heritage for generations, helping to unite Londoners and acting as a vital hub in the community. -
Victoria Embankment Foreshore Hoarding Commission
Victoria Embankment Foreshore Hoarding Commission 1 Introduction ‘The Thames Wunderkammer: Tales from Victoria Embankment in Two Parts’, 2017, by Simon Roberts, commissioned by Tideway This is a temporary commission located on the Thames Tideway Tunnel construction site hoardings at Victoria Embankment, 2017-19. Responding to the rich heritage of the Victoria Embankment, Simon Roberts has created a metaphorical ‘cabinet of curiosities’ along two 25- metre foreshore hoardings. Roberts describes his approach as an ‘aesthetic excavation of the area’, creating an artwork that reflects the literal and metaphorical layering of the landscape, in which objects from the past and present are juxtaposed to evoke new meanings. Monumental statues are placed alongside items that are more ordinary; diverse elements, both man-made and natural, co-exist in new ways. All these components symbolise the landscape’s complex history, culture, geology, and development. Credits Artist: Simon Roberts Images: details from ‘The Thames Wunderkammer: Tales from Victoria Embankment in Two Parts’ © Simon Roberts, 2017. Archival images: © Copyright Museum of London; Courtesy the Trustees of the British Museum; Wellcome Library, London; © Imperial War Museums (COM 548); Courtesy the Parliamentary Archives, London. Special thanks due to Luke Brown, Demian Gozzelino (Simon Roberts Studio); staff at the Museum of London, British Museum, Houses of Parliament, Parliamentary Archives, Parliamentary Art Collection, Wellcome Trust, and Thames21; and Flowers Gallery London. 1 About the Artist Simon Roberts (b.1974) is a British photographic artist whose work deals with our relationship to landscape and notions of identity and belonging. He predominantly takes large format photographs with great technical precision, frequently from elevated positions. -
A4 Web Map 26-1-12:Layout 1
King’s Cross Start St Pancras MAP KEY Eurostar Main Starting Point Euston Original Tour 1 St Pancras T1 English commentary/live guides Interchange Point City Sightseeing Tour (colour denotes route) Start T2 W o Language commentaries plus Kids Club REGENT’S PARK Euston Rd b 3 u Underground Station r n P Madame Tussauds l Museum Tour Russell Sq TM T4 Main Line Station Gower St Language commentaries plus Kids Club q l S “A TOUR DE FORCE!” The Times, London To t el ★ River Cruise Piers ss Gt Portland St tenham Ct Rd Ru Baker St T3 Loop Line Gt Portland St B S s e o Liverpool St Location of Attraction Marylebone Rd P re M d u ark C o fo t Telecom n r h Stansted Station Connector t d a T5 Portla a m Museum Tower g P Express u l p of London e to S Aldgate East Original London t n e nd Pl t Capital Connector R London Wall ga T6 t o Holborn s Visitor Centre S w p i o Aldgate Marylebone High St British h Ho t l is und S Museum el Bank of sdi igh s B tch H Gloucester Pl s England te Baker St u ga Marylebone Broadcasting House R St Holborn ld d t ford A R a Ox e re New K n i Royal Courts St Paul’s Cathedral n o G g of Justice b Mansion House Swiss RE Tower s e w l Tottenham (The Gherkin) y a Court Rd M r y a Lud gat i St St e H n M d t ill r e o xfo Fle Fenchurch St Monument r ld O i C e O C an n s Jam h on St Tower Hill t h Blackfriars S a r d es St i e Oxford Circus n Aldwyc Temple l a s Edgware Rd Tower Hil g r n Reg Paddington P d ve s St The Monument me G A ha per T y Covent Garden Start x St ent Up r e d t r Hamleys u C en s fo N km Norfolk -
S011630 Brettenham House Brochure V10.Indd
Striking. The Thames & Covent Garden on your doorstep. Brettenham House is a magnificent building adjacent to Waterloo Bridge overlooking the Thames. Its powerful presence is accentuated by its Art Deco façade and positioning on the west side of Lancaster Place. Hyde Park Green Park Mayfair Oxford Street Regent Street Tottenham Court Road St James’s Charing Cross Station Covent Garden Holborn Waterloo Temple CHANCERY LANE HOLBORN CULTURE O R N H O L B H I G H 1 Adelphi Theatre 9 Theatre Royal, Drury Lane 10 M Lincoln’s I 2 Savoy Theatre 10 National Theatre TOTTENHAM COURT ROAD N Inn Fields U 4 Place. T A 3 London Coliseum 11 S E T E Royal Festival Hall T R E S A G S T 4 I L H E S H I G K 4 Noël Coward Theatre 12 Cambridge Theatre 0 The area benefi ts from I 0 N G 5 Garrick Theatre 13 Proud Galleries 15 S W London’s most historic A 6 14 6 Y Lyceum Theatre National Portrait Gallery 5 M theatres, galleries and 7 The Duchess Theatre 15 Southbank Centre IN Seven U 4 8 Dials T A Fortune Theatre E opera houses that are 12 12 S A 4 COVENT GARDEN 8 8 steeped in tradition A 9 7 WINE & DINE 4 0 10 13 16 0 and history. 1 Savoy Kaspar’s 10 Ivy COVENT D Seafood Bar & Grill 11 N 11 R A Inner Cucina Asellina GARDEN 7 4 S T 6 A Temple 2 Savoy American Bar 3 6 5 12 Hawksmoor Seven Dials LEICESTER SQUARE 17 7 Gardens Amenities are unrivalled with some 14 15 4 3 Gordon’s Wine Bar 13 Dishoom 4 8 Somerset House TEMPLE A 3 2 1 1 of the best eateries, hotels and cafés 5 4 Polpo Covent Garden 4 14 Petersham Nurseries Leicester the city has to off er on your doorstep. -
Byz DOVC.Indd
WESTBROOK PARTNERS Dear Residents, Neighbours and Friends, 15 March 2018 Dolphin Square: The Next 100 Years Frequently Asked Questions and Our Responses As you may be aware, we have submitted a Planning Application to Westminster City Council setting out how we plan to invest in Dolphin Square to rejuvenate it and to secure its future for The Next 100 Years. This application followed a series of meetings with residents, neighbours and other local stakeholders about our Proposals, together with two public exhibitions, in a process which started back in April 2017. Many of you attended our meetings and exhibitions and we are grateful to everyone who has taken part in our consultation, provided feedback and kept in touch. We very much appreciate the contributions to date which will help to shape the future of Dolphin Square. We want to get in touch again to make sure that the residents and neighbours of Dolphin Square are clear about our Proposals and to reaffi rm our reassurances to you. We would like to reiterate that all tenants will have the opportunity to remain as residents of Dolphin Square during construction and after completion of the works, if they wish to, but it is likely that they will need to move fl ats for a period of time during the works (see page 8 for further details). If we are successful with our Planning Application, then we do not expect to start moving residents before 2020. Our current view is that the works will take approximately 5 years to complete. Once we have an approval from the Council, which we expect in the third quarter of this year, we will be able to develop detailed construction management and sequencing plans and talk to you about how the project will affect you individually. -
15.BYZ Summary Booklet 180201.Indd
DOLPHIN SQUARE THE NEXT 100 YEARS www.dolphinsquare.co.uk/future-planning 1 Introduction to the Dolphin Square Estate This document summarises the Planning Application submitted to Westminster City Council in early 2018 for the Refurbishment, Unit Mix Adaptation and Further Development of the Dolphin Square Estate. It explains why this project is necessary to secure the Estate for the next 100 years and introduces the vision for its future created by Eric Parry Architects (www.ericparryarchitects.co.uk) The Dolphin Square Estate is home to over 2,500 people and is the UK’s largest private residential rented apartment block. Set within a 7.4 acre estate in the heart of Pimlico, it comprises: 1106 Residential Flats 3.4 acre gardens • 222 x Studios 124 serviced apartments • 564 x 1 Bed A retail arcade • 264 x 2 Bed A spa • 41 x 3 Bed A gym, including a pool & squash courts • 12 x 4 Bed Riverside tennis court • 3 x 5 Bed A restaurant 251 car parking spaces The Estate is owned by The Dolphin Square Estate Limited and managed by Dolphin Square Limited, which are companies controlled by Westbrook Partners, a US real estate investment management company www.westbrookpartners.com 1 The Next 100 Years Since acquiring the Square in 2006, Westbrook has invested over £40 million in a comprehensive maintenance and improvement programme However, at 80 years old, much of the fabric and structure of the building is out of date and in need of significant investment to secure the future of the Square for the next 100 years 2 History Dolphin Square was designed -
London and Its Main Drainage, 1847-1865: a Study of One Aspect of the Public Health Movement in Victorian England
University of Nebraska at Omaha DigitalCommons@UNO Student Work 6-1-1971 London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England Lester J. Palmquist University of Nebraska at Omaha Follow this and additional works at: https://digitalcommons.unomaha.edu/studentwork Recommended Citation Palmquist, Lester J., "London and its main drainage, 1847-1865: A study of one aspect of the public health movement in Victorian England" (1971). Student Work. 395. https://digitalcommons.unomaha.edu/studentwork/395 This Thesis is brought to you for free and open access by DigitalCommons@UNO. It has been accepted for inclusion in Student Work by an authorized administrator of DigitalCommons@UNO. For more information, please contact [email protected]. LONDON .ML' ITS MAIN DRAINAGE, 1847-1865: A STUDY OF ONE ASPECT OP TEE PUBLIC HEALTH MOVEMENT IN VICTORIAN ENGLAND A Thesis Presented to the Department of History and the Faculty of the Graduate College University of Nebraska at Omaha In Partial Fulfillment of the Requirements for the Degree Master of Arts by Lester J. Palmquist June 1971 UMI Number: EP73033 All rights reserved INFORMATION TO ALL USERS The quality of this reproduction is dependent upon the quality of the copy submitted. In the unlikely event that the author did not send a complete manuscript and there are missing pages, these will be noted. Also, if material had to be removed, a note will indicate the deletion. Dissertation Publishing UMI EP73033 Published by ProQuest LLC (2015). Copyright in the Dissertation held by the Author. Microform Edition © ProQuest LLC. -
Proceedings of the Society for Psychical Research
Digitized by tlie Internet Arcliive in 2015 littps://arcliive.org/details/proceedingsofsoc49soci . PROCEEDINGS of the Society for Psychical Resear VOLUME XLIX 1949 - 52 (Containing Parts 177- 181) SOCIETY FOR PSYCHICAL RESEARCH 31 Tavistock Square • London • WCi The purpose of the Society for Psychical Research, which was founded in 1882, is to examine without prejudice or prepossession and in a scientific spirit those facukies of man, real or supposed, which appear to be inexplicable on any generally recognized hypo- thesis. The Society does not hold or express corporate views. The responsibility for both the facts and the reasoning in papers published in the Pvoceedings rests entirely with their authors. The Council desire that material printed in the Society's publications shall be put to the fullest possible use by students of psychical research. Permission to reproduce or translate material published in this Journal must, however, lirst be obtained from the Society and from the author. Applications should be addressed to the Editor in the first instance. PRINTED IN GREAT BRITAIN BY ROBERT MACLEHOSE AND CO. LTD. THE UNIVERSITY PRESS, GLASGOW CONTENTS PART 177 Psychical Research and Personality. Presidential Address BY Professor Gardner Murphy ----- i the Experimental Object-reading : A critical Review of Christopher Scott - 16 WORK of Dr J. Hettinger. By 'Matter, Mind and Meaning'. By W. Whately Carington. Reviewed by Professor C. D. Broad - - - - 51 PART 178 - - - - - - Obituary : Miss Isabel Newton 53 The Experimental Evidence for PK and Precognition. By C. W. K. Mundle ------- 61 Immanuel Kant and Psychical Research. By C. D. Broad 79 A FURTHER Test for Survival. -
Victoria Embankment Between Waterloo and Westminster Bridges 177
20 River Prospect: Victoria Embankment 175 between Waterloo and Westminster Bridges 341 This River Prospect is a continual experience from Westminster Bridge to Waterloo Bridge. Sir Joseph Bazalgette, the Victorian engineer, embanked the Thames here in 1864-70 providing for the London Underground and upgraded sewers. A broad thoroughfare for vehicles and pedestrians was also created. Gardens were established on the landward side and avenues of trees planted. The Viewing Place provides a promenade when walking between the Palace of Westminster and Somerset House and via Waterloo Bridge to the cultural attractions of the South Bank. 176 London View Management Framework 342 There are two Viewing Locations between Waterloo Bridge and Westminster Bridge. The first of these, 20A, is located between Westminster Bridge and the Golden Jubilee/Hungerford Footbridges. The second, 20B, is located further north between the Golden Jubilee/Hungerford Footbridges and Waterloo Bridge. Viewing Location 20A Victoria Embankment: between Westminster and Hungerford Bridges N.B for key to symbols refer to image 1 Panorama from Assessment Point 20A.1 Victoria Embankment: between Westminster and Hungerford Bridges – axial to County Hall 20 River Prospect: Victoria Embankment between Waterloo and Westminster Bridges 177 Description of the View 343 A single Assessment Point (20A.1) is located at a position Landmarks include: axial to the former County Hall. Golden Jubilee and Hungerford Footbridges 344 The river dominates the foreground. The view is of a County Hall (II*) series of buildings, which have visual strength as separate The London Eye objects, rather than continuity. The principal elements Westminster Bridge (II*) are the former County Hall, the Shell Centre, the London The Shard Eye and the two bridges. -
Heart of London Board Meeting Thursday 7 June 2018
WELCOME HEART OF LONDON BOARD MEETING THURSDAY 7 JUNE 2018 COMPANY MATTERS HEART OF LONDON MASTER PLAN ANNA MANSFIELD, PUBLICA DIRECTOR OF STRATEGY & RESEARCH RECENT AWARDS AND ACCREDITATIONS Mayor’s Design Advocate, The Mayor of London’s Night Time Commission, Sounding Board for the Mayor of London’s Public London Charter, The Board for Public Practice London First Champions Publica’s Aldwych, Hanover Square And East Mayfair Projects Publica Is Selected For Three Of The Mayor Of London’s Architecture Design And Urbanism Panels (Public Realm & Landscape; Urban Strategies, Spatial Policy & Research; Cultural Strategy) National Infrastructure Commission Expert Advisory Group National Infrastructure Commission Design Panel 2017 Seoul Biennale Of Architecture And Urbanism Cities Exhibition PUBLICA PROJECTS OXFORD STREET HANOVER SQUARE BOND STREET EAST CROSSRAIL STATION BOND STREET SACKVILLE STREET EAST MAYFAIR REGENT STREET CONDUIT STREET BOYLE STREET SAVILE ROW OLD BURLINGTON STREET BOND STREET CLIFFORD STREET CORK STREET BURLINGTON GARDENS ROYAL ACADEMY BURLINGTON ARCADE NORTHBANK REF DESCRIPTION TIMESCALE IMPACT COMPLEXITY RELATED PROJECTS ST MARY-LE-STRAND, ST CLEMENT DANES, KINGSWAY, INDIA ALDWYCH GYRATORY Long term PLACE / MONTREAL PLACE, ARUNDEL STREET, TEMPLE PLACE ST MARY-LE-STRAND Medium term ALDWYCH GYRATORY ST CLEMENT DANES Long term ALDWYCH GYRATORY BUSH HOUSE COURTYARD WEST Long term INDIA PLACE / MONTREAL PLACE BUSH HOUSE COURTYARD EAST Medium term MELBOURNE PLACE INDIA PLACE / MONTREAL PLACE Short term ALDWYCH GYRATORY, BUSH -
Dolphin Square
CONSERVATION AREA AUDIT 45 AND MANAGEMENT PROPOSALS DOLPHIN SQUARE Date: 23 October 008 Status: Adopted Supplementary Planning Document Document ID No: 3010 Representations to: Conservation Area Audit, Department of Planning and City Development, Westminster City Council, 64 Victoria Street, London SW1E 6QP E-mail: [email protected] Direct Tel: 00 7641 850/8705/8019 Department of Planning and City Development Development Planning Services City Hall, 64 Victoria Street, London SW1E 6QP www.westminster.gov.uk CONSERVATION AREA AUDIT | DOLPHIN SQUARE P PREFACE The second stage involved the production of conservation area directories for Since the designation of the first each conservation area. A directory has conservation areas in 1967 the City now been adopted for 51 of the City’s Council has undertaken a comprehensive conservation areas and includes copies of programme of conservation area designation reports, a detailed evaluation designation, extensions and policy of the historical development of the area development. There are now 55 and analysis of listed buildings and key conservation areas in Westminster, townscape features. covering 76% of the City. These conservation areas are the subject The City Council is now working on a of detailed policies in the Unitary programme to prepare conservation area Development Plan and in Supplementary audits for each of its conservation areas. Planning Documents. In addition to This will form the third and final stage of the basic activity of designation and the appraisal process. As each audit is the formulation of general policy, the adopted as a Supplementary Planning City Council is required to undertake Document, it will incorporate the directory conservation area appraisals and to devise for that conservation area.