Leicestershire County Council - Planned Road Works This edition of the bulletin as automatically generated on the 19 Mar 2020 HINCKLEY AND BOSWORTH District
For more information about roadworks call our Customer Service Centre: 0116 3050001
Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
STATION ROAD Boundary box Install & tap main for STW Water East 27/03/2020 27/03/2020 Traffic Control (Multi-Way Job in Footway (6mm Bitmac Signals) (Tarmac) ) BAGWORTH
THORNTON LANE Scaffolding - Licence- 787872 LCC (Permit Authority) 13/03/2020 26/03/2020 Some Carriageway 15:00:31 Incursion
BAGWORTH
BAGWORTH ROAD Remedial overband work in BT - Inc S81 22/03/2020 25/03/2020 Traffic Control (Two-Way carriageway Signals)
BARLESTONE
NEW STREET Replace 1 existing pole BT 23/03/2020 24/03/2020 Traffic Control (Give and Take)
BARLESTONE
NEWBOLD ROAD Replace 1 existing pole 0.5m x 0.5m BT 23/03/2020 23/03/2020 Traffic Control (Two-Way Signals)
BARLESTONE
NEWBOLD ROAD Replace 1 existing pole 0.5m x 0.5m BT 20/03/2020 20/03/2020 Traffic Control (Two-Way Signals)
BARLESTONE
NEWBOLD ROAD Replace 1 existing pole 0.5m x 0.5m BT 23/03/2020 23/03/2020 Traffic Control (Give and Take)
BARLESTONE
CHESTERFIELD WAY Traffic light head only - no Western Power, 6133 16/03/2020 08/05/2020 Traffic Control (Multi-Way excavation - for cable overlay. Works Hinckley & Nuneaton Signals) in conjunction with BARWELL DY633M61332177146ABDEFGHIJKL FRISBY ROAD 9m trenching in tarmac footway and Western Power, 6133 16/03/2020 08/05/2020 Traffic Control (Multi-Way tarmac road for cable overlay. Works Hinckley & Nuneaton Signals) in conjunction with BARWELL DY633M61332177146ABCEFGHIJKL Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
HIGH STREET Std Sew Rep 225mm 3m deep - STW Waste 23/03/2020 26/03/2020 Traffic Control (Multi-Way Await 13ex Job in Carriageway Signals) (10mm Bitmac (Tarmac) ) BARWELL
KERRY CLOSE UNBLOCK TEE IN FOOTWAY FOR Virgin Media - Kelly 20/03/2020 23/03/2020 No Carriageway Incursion CUSTOMER CONNECTION Communication
BARWELL
LEICESTER ROAD Replace drainage pipework at various LCC (Works Promoter) 16/03/2020 19/03/2020 Traffic Control (Two-Way locations. 09:34:41 Signals)
BARWELL
MEADOW ROAD 1 joint hole in tarmac footway and 1m Western Power, 6133 17/03/2020 11/05/2020 Traffic Control (Multi-Way trenching in tarmac footway and 7m Hinckley & Nuneaton Signals) road crossing in tarmac road for BARWELL cable overlay. Works in conjunction NEWLANDS ROAD 7m road crossing in tarmac road for Western Power, 6133 16/03/2020 08/05/2020 Traffic Control (Multi-Way cable overlay. Works in conjunction Hinckley & Nuneaton Signals) with BARWELL DY633M61332177146ABCDEFGHJK PENNY LANE Boundary box Install 25mm Job in STW Water East 19/03/2020 23/03/2020 Traffic Control (Give and Footway (6mm Bitmac (Tarmac) ) Take)
BARWELL
QUEENSWAY 2 joint holes in tarmac footway and Western Power, 6133 16/03/2020 08/05/2020 Traffic Control (Multi-Way 554m trenching in tarmac footway Hinckley & Nuneaton Signals) and tarmac road for cable overlay. BARWELL Works in conjunction with SHILTON ROAD Replace 1 existing pole 0.5m x 0.5m BT 19/03/2020 19/03/2020 Traffic Control (Two-Way Signals)
BARWELL
BROOKSIDE JUNCTION IMPROVEMENT WORKS LCC (Works Promoter) 06/01/2020 25/06/2021 Traffic Control (Multi-Way Signals)
BURBAGE
LUTTERWORTH ROAD Carriageway resurface on previously LCC (Section 50/278/184) 23/03/2020 26/03/2020 Road Closure done 278 works, material failure on laid tarmac BURBAGE
TILTON ROAD Install 2m of 1 way poly duct in BT 22/03/2020 22/03/2020 No Carriageway Incursion Footway
BURBAGE Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
BOSWORTH ROAD Replace 1 existing pole 0.5m x 0.5m BT 20/03/2020 20/03/2020 Traffic Control (Give and Take)
CARLTON
FROM END TO UNNAMED Replace 1 existing pole BT 23/03/2020 25/03/2020 Traffic Control (Give and Take)
CARLTON
BARTON ROAD Boundary box Install & tap main for STW Water East 18/03/2020 20/03/2020 Traffic Control (Two-Way logg Job in Footway (6mm Bitmac Signals) (Tarmac) ) CONGERSTONE
ALEXANDER AVENUE M J Quinn to fit Left stand-off with 1m BT - Inc S81 26/03/2020 27/03/2020 Traffic Control (Multi-Way duct into JUF10. 25m duct in footway Signals) and soft from JUF10 into DSLAM EARL SHILTON
BELLE VUE ROAD Locate and excavate 2 blockage in BT 17/03/2020 19/03/2020 No Carriageway Incursion existing duct
EARL SHILTON
FOOTPATH U26 TTRO application for temp closure of LCC (Section 50/278/184) 03/10/2019 02/04/2021 Road Closure footpath whilst development is built
EARL SHILTON
HEATH LANE Excavate 40m trench in FW and UK Power Soultions on 13/03/2020 26/03/2020 Traffic Control (Multi-Way CSEP for installation of gas mains. behalf of Energetics Gas Signals) UKPS to carry out gas connection. EARL SHILTON
HIGH STREET M J Quinn to fit Left stand-off with 1m BT - Inc S81 26/03/2020 27/03/2020 Traffic Control (Multi-Way duct into JUF10. 25m duct in footway Signals) and soft from JUF10 into DSLAM EARL SHILTON
HINCKLEY ROAD Scaffolding permit approved LCC (Permit Authority) 16/03/2020 29/03/2020 Some Carriageway 06:37:13 Incursion
EARL SHILTON
HOLLYDENE CRESCENT Replace 1 existing pole 0.5m x 0.5m BT 23/03/2020 23/03/2020 Traffic Control (Give and Take)
EARL SHILTON
MELTON STREET Skip permit approved LCC (Permit Authority) 14/03/2020 20/03/2020 Some Carriageway 09:45:39 Incursion
EARL SHILTON Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
CHURCH LANE Trans Std Sew Rep 225mm 3m - STW Waste 25/03/2020 27/03/2020 Traffic Control (Multi-Way AWAIT DATE CREW TO DIG DOWN Signals) LOCATED 100mm V/C PIPE FENNY DRAYTON REMOVE OBSTRUCTION AND LAYBY OFF A444 SOUTHBOUND SD stone storage if required. LCC (Works Promoter) 01/03/2020 31/08/2020 Road Closure ATHERSTONE ROA
FENNY DRAYTON
OLD FORGE ROAD Boundary box Reset lid Job in Verge STW Water East 25/03/2020 25/03/2020 Traffic Control (Give and (Grass ) Take)
FENNY DRAYTON
LEICESTER ROAD Re-cabling & lighting column LCC (Works Promoter) 29/01/2020 27/03/2020 Lane Closure replacement works 09:00:00
FIELD HEAD
LEICESTER ROAD SERVICE ROAD FOR Welfare unit for A50 re-cabling & LCC (Works Promoter) 29/01/2020 27/03/2020 Traffic Control (Give and NUMBERS lighting column replacement works 09:00:00 Take)
FIELD HEAD
ANSTEY LANE NMA Defect CLO - Remedial Rein STW Water East 23/03/2020 23/03/2020 Traffic Control (Give and by CLO Job in Carriageway (Hot Take) Rolled Asphalt-30/14 ) GROBY
BRADGATE HILL Install 12m of 1 way poly duct in BT 23/03/2020 25/03/2020 No Carriageway Incursion Verge
GROBY
BRADGATE HILL Extended Entry and Exit tapers LCC (Works Promoter) 29/01/2020 27/03/2020 Lane Closure around roundabout and onto 09:00:00 Bradgate Hill for safety reasons, for GROBY works on Ref: A50CABLING LEICESTER ROAD Gas connection within the verge 1m x S&R Construction Ltd on 20/03/2020 20/03/2020 No Carriageway Incursion 1m hand dig, no vans to be parked by behalf of Energetics Gas excavation - works to be discussed at GROBY Thursdays meeting MARKFIELD ROAD Build 1 precast chamber in 915mm x BT 23/03/2020 25/03/2020 Some Carriageway 445mm x 965mm deep in Incursion Footway,Install 2m of 1 way poly duct GROBY in Footway,Install 5m of 1 way poly MARTINSHAW LANE LAY 2X NEW DOMESTIC SERVICE East of England Network 19/03/2020 25/03/2020 Traffic Control (Give and FROM MAIN IN THE NEARSIDE EMLDZ S81 Take) FOOTWAY FEEDING TO8 GROBY MARTINSHAW LANE PLOTS 1 AND Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
MAIN STREET Demolition of garage and erection of LCC (Section 50/278/184) 28/02/2020 28/08/2020 Road Closure a new house. PROW T49F temp closure required HIGHAM ON THE HILL
NUNEATON LANE REPLACE WOODEN PLANKS New Maintenance District 26/03/2020 01/04/2020 No Carriageway Incursion OVER DITCH WITH ACCESS PLATFORM HIGHAM ON THE HILL
ALMA ROAD Installation of Event Duration Monitor Capital Delivery - Manhole 24/03/2020 24/03/2020 Traffic Control (Give and in MH SP42948301 estimated 20 min and CCTV surveys Take) duration HINCKLEY
BRADGATE ROAD Small Washout Install In-line 6" Job STW Water East 26/03/2020 27/03/2020 Traffic Control (Multi-Way in Carriageway (10mm Bitmac Signals) (Tarmac) ) HINCKLEY
COVENTRY ROAD NMA Defect CLO - Remedial Rein STW Water East 26/03/2020 27/03/2020 Traffic Control (Two-Way by CLO Excavate in f/w and reinstate Signals) to HAUC Spec also reset stop tap lid HINCKLEY FW 6mm Bit Mac 0.50 0.50 2 Way DODWELLS ROAD Replace gully and Paco patch 1.70 x LCC (Works Promoter) 19/03/2020 19/03/2020 Traffic Control (Give and 0.30 (C/WAY Iron work) Take)
HINCKLEY
DRAKE WAY Install external meter in boundary Integra Utility Services 24/03/2020 24/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement HAWLEY ROAD MR2 works. Working in the F/Way & West Midlands Network 25/02/2020 08/05/2020 Road Closure C/Way. Abandon 288m of 9" WMLDZ CastIronMain& 325m of 10" Cast Iron HINCKLEY Main. Lay 612m of 180mm PE via HAWLEY ROAD JUNCTION IMPROVEMENTS LCC (Works Promoter) 06/01/2020 25/06/2021 Traffic Control (Multi-Way Signals)
HINCKLEY
KENT DRIVE Install external meter in boundary Integra Utility Services 25/03/2020 25/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement KIRFIELD DRIVE Install external meter in boundary Integra Utility Services 25/03/2020 25/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
LANESIDE DRIVE Install external meter in boundary Integra Utility Services 25/03/2020 25/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement LONDON ROAD Install external meter in boundary Integra Utility Services 24/03/2020 24/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement LUNDY CLOSE Install external meter in boundary Integra Utility Services 25/03/2020 25/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement MIDDLEFIELD LANE SOW 30m of 90mm Barrier pipe to New Connections Req 16/03/2020 20/03/2020 Some Carriageway connect onto existing 125mm HPPE East Incursion main via UPT with 80mm outlet & SV HINCKLEY
MOUNT ROAD Install tee and lay duct in footway 1m Virgin Media - Comex 24/03/2020 26/03/2020 Some Carriageway 2000 (UK) Ltd Incursion
HINCKLEY
PADDOCK WAY Install 17m of 1 way poly duct in BT 23/03/2020 25/03/2020 No Carriageway Incursion Footway
HINCKLEY
RIBBLESDALE AVENUE Replace 2 no. 6 x 5 kerbs to provide LCC (Works Promoter) 26/03/2020 26/03/2020 Traffic Control (Stop/Go 25mm upstand, Fway patch reduce Boards) angle, 2.70 x 1.0, cway patch 2.0 x HINCKLEY 0.50 concrete road surface layer only. ROSTON DRIVE Install external meter in boundary Integra Utility Services 25/03/2020 25/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement RUGBY ROAD JUNCTION IMPROVEMENT WORKS LCC (Works Promoter) 06/01/2020 25/06/2021 Some Carriageway Incursion
HINCKLEY
RUGBY ROAD JUNCTION IMPROVEMENTS LCC (Works Promoter) 06/01/2020 25/06/2021 Traffic Control (Multi-Way Signals)
HINCKLEY
RUGBY ROAD JUNCTION IMPROVEMENT WORKS LCC (Works Promoter) 06/01/2020 25/06/2021 Traffic Control (Multi-Way Signals)
HINCKLEY Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
RUGBY ROAD JUNCTION IMPROVEMENT WORKS LCC (Works Promoter) 06/01/2020 25/06/2021 Traffic Control (Multi-Way Signals)
HINCKLEY
ST GEORGES AVENUE Supply new gas service to property West Midlands Network 16/03/2020 20/03/2020 Some Carriageway due to poor condition of Cadent WMLDZ 15:46:00 Incursion Gasplant to prevent loss of supply HINCKLEY
STONEYGATE DRIVE Urgent excavation in highway to Western Power, 6133 18/03/2020 24/03/2020 No Carriageway Incursion locate and repair LV cable fault. Hinckley & Nuneaton 15:00:00
HINCKLEY
TRAFFORD ROAD Replace 1 jointbox frame and BT 17/03/2020 19/03/2020 No Carriageway Incursion cover(s) (915mm x 445mm) in 14:00:00 Footway HINCKLEY
UPPER BOND STREET Defect CLO - Remedial Rein by CLO STW Water East 26/03/2020 27/03/2020 Traffic Control (Two-Way Job in Carriageway (10mm Bitmac Signals) (Tarmac) ) HINCKLEY
WENSUM CLOSE Install external meter in boundary Integra Utility Services 24/03/2020 24/03/2020 Some Carriageway box at depth of under 1.5 meters by Incursion Minimum dig with Permanent HINCKLEY Reinstatement WESTFIELD ROAD JUNCTION IMPROVEMENT WORKS LCC (Works Promoter) 06/01/2020 25/06/2021 Traffic Control (Multi-Way Signals)
HINCKLEY
WESTRAY DRIVE Urgent excavation in highway to Western Power, 6133 18/03/2020 24/03/2020 Traffic Control (Two-Way locate and repair LV cable fault. Hinckley & Nuneaton 14:00:00 Signals)
HINCKLEY
NEWBOLD ROAD Boundary box Renew 25mm Job in STW Water East 19/03/2020 23/03/2020 Traffic Control (Two-Way Verge (Grass ) Signals)
KIRKBY MALLORY
ASHBY ROAD Create 3 entrances to new build site LCC (Section 50/278/184) 16/03/2020 26/03/2020 Traffic Control (Two-Way on Ashby Road, install radius kerbs Signals) and drop kerbs and tarmac. MARKFIELD
CLIFFE LANE NMA Defect CLO - Remedial Rein STW Water East 19/03/2020 19/03/2020 Traffic Control (Two-Way by CLO Job in Verge (Grass ) Signals)
MARKFIELD Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
FOREST ROAD Boundary box Install & tap main for STW Water East 25/03/2020 27/03/2020 Traffic Control (Two-Way logg Job in Carriageway (10mm Signals) Bitmac (Tarmac) ) MARKFIELD
SHAW LANE Safe access to 2 carriageway boxes BT - Inc S81 22/03/2020 22/03/2020 Lane Closure using Temp Lane closure to manage the site, we will be repairing a faulty MARKFIELD cable. WOOD ROAD RRI P647. Please install signage as LCC (Works Promoter) 23/03/2020 24/03/2020 Traffic Control (Stop/Go per linked plan as marked on site. Boards) This is for a TRO which comes into NAILSTONE effect on 2nd Mar 2020. Please install WOOD ROAD Remove 2no. damaged posts and LCC (Works Promoter) 19/03/2020 19/03/2020 Traffic Control (Multi-Way install 2no. new 89mm posts and 09:20:18 Signals) transfer 5no. direction signs to new NAILSTONE posts. COCK LANE Replace 1 existing pole 0.5m x 0.5m BT 23/03/2020 23/03/2020 Traffic Control (Give and Take)
NORTON JUXTA TWYCROSS
ASHBY ROAD Replace 1 existing pole 0.5m x 0.5m BT 20/03/2020 20/03/2020 Traffic Control (Give and Take)
OSBASTON
BARTON ROAD EMGC200226 - Lay 18m x 63mm PE East of England Network 17/03/2020 22/03/2020 Traffic Control (Two-Way LP Main and Lay 5.2m x 32mm PE EMLDZ S81 Signals) LP Servicefrom main nearside OSBASTON carriageway FOOTPATH T70 Boundary box Install & tap main for STW Water East 24/03/2020 26/03/2020 Some Carriageway logg Other Footways Job in Footway Incursion (10mm Bitmac (Tarmac) ) PECKLETON
TAVERNER DRIVE Boundary box Install & tap main for STW Water East 22/03/2020 25/03/2020 Traffic Control (Give and Job in Footway (6mm Bitmac Take) (Tarmac) ) RATBY
CONGERSTONE LANE 6m trenching in tarmac road for Western Power, 6135 NW 23/03/2020 26/03/2020 Traffic Control (Two-Way reinforcement scheme Leicestershire Signals)
SHACKERSTONE
MILL LANE Installation of Event Duration Monitor Capital Delivery - Manhole 24/03/2020 24/03/2020 Traffic Control (Give and in MH 207864531 and 207864550 and CCTV surveys Take) estimated 20 min duration per MH SHEEPY PARVA Road Name/ Number & Description Contractor/Client Estimated Expected Traffic Notes Location Start Date End Date Management
WELLSBOROUGH ROAD SD stone storage if required. LCC (Works Promoter) 01/03/2020 31/08/2020 Road Closure
SHEEPY PARVA
FOOTPATH FROM LOVELACE CLOSE Replace 1 existing pole BT 19/03/2020 19/03/2020 Traffic Control (Give and Take)
SIBSON
SHENTON LANE Rep R/M to 225mm In H'way to STW Waste 18/03/2020 31/03/2020 Road Closure 1.5m deep Urgent dig required to 11:30:00 repair burst rising main Urgent due to SIBSON severe risk of flooding Job in FOOTPATH N47 Joint holes to be dug to access Western Power, 6161 09/03/2020 20/03/2020 No Carriageway Incursion cables to find a fault on the cables Major Projects Hinckley 11:28:00
STANTON-UNDER-BARDON
MAIN ROAD Boundary box Install & tap main for STW Water East 23/03/2020 25/03/2020 Traffic Control (Two-Way logg Job in Verge (Grass ) Signals)
UPTON
ATTERTON LANE ROAD CLOSURE URGENT ROAD STW Waste 06/01/2020 20/03/2020 Traffic Control (Give and CLOSURE REQIURED DUE TO 11:58:00 Take) SEVERE FLOODING URGENT DUE WITHERLEY TO HIGH RISK FLOODING Job in KENNEL LANE Std Sew Rep to 225mm and 3.0m STW Waste 03/03/2020 27/03/2020 Road Closure deep Emergency dig to repair 12:00:00 collapsed pipe Job in Carriageway WITHERLEY
KENNEL LANE X Exceptional Items Urgent dig STW Waste 06/03/2020 27/03/2020 Traffic Control (Give and required to remove damaged pitch 07:39:00 Take) fibra pipe Urgent due to internal WITHERLEY flooding Job in Carriageway