A45 Daventry Development Link Road Highways Due for completion Spring 2018 Newsletter 2

Simon Levell Rebecca Miller Site liaison manager Communication [email protected] manager [email protected]

Welcome to the second edition of the Daventry Development Link Road Newsletter. Our first newsletter was issued in early Spring, and as with the first edition, we want this newsletter – and subsequent issues – Public Rights of Way to keep you informed. However, we would also welcome your views and comments so that we can make sure we are giving you the information For the time being all the Rights of Way inter-village footpaths and bridleways in and around you really want. the new road construction area will remain open. Over the months ahead we will continue to build-up a Frequently Asked At times we may have to divert these routes or restrict their use, but we will keep you up to Question (FAQ) section on the Northamptonshire County Council (NCC) date as we progress. The Rights of Way which interface the construction site are EU1 (Flore website. If you are unsure about anything or want to know more please Hill to Dodford footpath); EU 14 / EU2 (Flore to Brockhall bridleway/footpath); EU5 (Flore ask us. This will help to form the FAQ section and help to keep the High Street to Brington Road footpath); and EU7 (Flore to Harpole footpath). information we provide to you relevant and accurate. This newsletter is produced by the delivery team for the project For more information about the scheme you can visit the website at comprising Northamptonshire Highways and contractors Balfour Beatty www.northamptonshire.gov.uk Construction Services UK who, over the next 18-20 months, will continue to build the new A45 Daventry Development Link. Please advise people that they can join this mailing list and receive regular progress updates by emailing [email protected] and registering their email address. They will be added We will continue to issue these newsletters as we progress to keep to the mailing list and this information will remain confidential and will not be shared with any residents, affected land owners, local businesses and other interested third parties. groups informed about our work and the way we will carry it out. We aim to minimise disruption for our neighbours during construction. The A5 (trunk road) must be kept open at all times but, to construct in this We will do this by: area, we will be building a temporary route for the A5. This will take some • Carrying out as much of the construction work during the day months to complete and there will be a brief period of disruption as we time as we can transfer the traffic from the existing road to our new temporary road. Again, • Using clear diversion route signs when roads are closed we will keep you informed of timescales, etc. • Ensuring that site vehicles only use approved routes • Closely monitoring the impact of site operations The Scheme • Using techniques and machines designed to minimise noise and vibration Many of you will doubtless be familiar with this already…but the A45 Daventry • Keeping in regular contact with our neighbours so they are Development Link Road (formerly Weedon, Flore & Upper Heyford Bypass) informed as works progress will be a new 3.5 mile (5.7 km) single carriageway. The road will start at a new roundabout on the existing A45 between the settlements of Dodford and For road users we will ensure their safety by: Weedon (to the east of Globe Farm). It will then pass to the north of the • Operating a reduced speed limit through the road works; this communities of Weedon, Flore and Upper Heyford before re-joining the A45 makes it safer for the workforce and drivers, and gives drivers at a new roundabout between Upper Heyford and the at more time to react to the road conditions ahead junction 16. A roundabout will also be built to create a junction with the A5 • Keeping road closures to a minimum and avoiding peak hours trunk road. where possible The scheme will feature extensive earthworks (cuttings and embankments) and include the construction of eight structures as What have we done so far? follows: • A major combined bridge crossing of the Since Newsletter 1 was issued, we have now completed most of the Phase Railway and the One advance enabling works: Over the last few months site clearance • A bridge spanning the (Whilton Branch) (removal of hedges and trees), setting-out the fence lines for the road and • Bridges carrying Brockhall Road, Brington Road, a bridleway works on utilities have taken place along the route. A lot of work has been and a byway over the new road already been completed, with 99% of the tree and hedge removal • A stream culvert and farm access bridge complete and approximately 80% of the new boundary fencing erected. Consultation events were held in 2012 and as a result of these, an Preparation work for major utility diversions has also progressed. Most of the initial preferred route was taken to NCC’s Cabinet in January 2013. work has taken place away from public roads in nearby fields and has therefore not affected the travelling public apart from isolated temporary traffic Since then, consultation has been ongoing over the ensuing three years with signals (traffic management) installed for safety reasons when site clearance landowners and bodies such as Network Rail, Canal and River Trust, has had to take place adjacent to public roads. Highways and the Environment Agency.

Our priority is keeping accesses open and allowing traffic to continue as it To reflect these responses the preferred route was amended twice, in March does now wherever possible. There will however be times where we may and October 2014. Planning permission for the scheme was granted in June have to temporarily close roads and divert traffic, but we will always let you 2015, and NCC’s preferred contractor – Balfour Beatty Construction Services know where and when these closures and diversions will be in advance of UK – appointed to work alongside Northamptonshire Highways to progress them becoming necessary. the scheme towards construction. What is happening in the next few weeks? For more information about the scheme you can visit the website at www.northamptonshire.gov.uk The start of the main works phase (Phase Two) from Monday 18th July means that there will be a marked upsurge in activity on site over the next few weeks. Please advise people that they can join this mailing list and receive regular progress updates by emailing rmiller@kierwsp. Whilst a few outstanding items of site clearance and permanent fencing works will co.uk and registering their email address. They will be added to be largely completed, the emphasis will switch to major diversions and protection operations for utilities, including the undergrounding of high voltage overhead will not be shared with any third parties. electricity cables and local diversions of gas, water and telecommunications apparatus. If you have any questions relating to these activities please do not hesitate to contact Simon Levell at [email protected] Under Phase Two, the temporary preparatory works will now continue in who will be your site-based liaison contact on day-to-day its impacts. advance enabling (Phase One) works, but which will now be upgraded to serve as the main centre of operations to manage the construction of the link road. Daventry Development Link Road works you should contact the Another key facility will be the establishment of a temporary stone haul road within Street Doctor service in Northamptonshire. the site boundary, running largely end-to-end and generally along the south side of the new road: This is necessary to ensure the maximum number of heavy vehicles Remember, you can also report highway faults online with our delivering materials and plant movements take place within the site to avoid use of Street Doctor service. public roads as far as possible, and so will also include temporary crossings of the Follow us on Twitter @nnhighways for all the latest transport two watercourses which bisect the site as well as local side roads. and highways updates and news. of the road within the permanent fence lines,. This topsoil will be stockpiled at A45 Daventry Development Link Road intervals along the route ready for re-use later in the scheme programme. Funded by: Major earthworks will also commence, involving the creation of cuttings, and the deposition of excavated material elsewhere in areas of embankment, thereby drainage works will also begin, to drain both the site operations and in anticipation of the requirements of the completed road.

In addition, a start will be made on preparatory works associated with some of the bridges and other structures to be built along the route. A 5

Pond Rights of Way - Key A 5 Brooks's Plantation M 1 Pond FB FB 98.1m 89.6m FB

97.2m Flore Fields Spinney Vicarage Farm DW Pond

Drain 96.3m 92.4m MP 71 94.5m Track 93.9m Targets BM 95.02m Existing Bridleway Tank BM 98.86m Cattle Grid

87.2m Vicarage Farm

Canal Lo 103.9m Spring 100.3m Existing Footway Weir T ra

wer Belt c Dundas Covert k

BM 93.40m Track Greenway Spinney  Issues Diverted Footway

Lower Glassthorpe Lodge

Towin Issues New Covert 92.0m Def g Drain P GP

a

t h Pond BM 104.47m Pond Skewbridge Dr Spinney ain

89.6m ok BM 97.28m

ilton Bro h W

Watling Street 96.3m 93.9m ROMAN R

Pond

OAD 96.3m Pond

G uide Post

Pond 102.7m

Sinks Drain

Posts 93.3m

Spring 91.4m Skew Bridge Pond PTP 99.1m

GP BM 95.01m Broamenthill Spinney MP 70.75 nal Pond

Ca

on i EU2 95.7m Un PTP 99.1m Track Grand The newPond road EU6

Track Cloverlea

ETL Landing Spinney M 1 101.8m Pond EU14 Pond Pond

Sand Pit 93.3m 95.4m Track

Drain Sinks 93.3m

Issues

Pond BM 92.26m 97.2m

BM 97.91m

Area of Archaeological Drain Interest

Issues

Issues Green Bridge Issues 94.8m Track

Pond SL 86.9m Ford BM

1 ck 01.10m Wagoners Cottage Track Issues

Willow Tra 96.3m 97.2m Issues

Def CS Pond BM 87.02m EU2 Pond

Spring

Track Pond

Ponds Issues FB Pond Pond Lay-by Oxhouse Farm

MP 70.5 95.4m

Pond 98.1m Sinks Pond 95.7m Drain PET CEMETERY Pump Flagstaff Brockhall Road Oxhouse Farm Cottages Issues Sinks 100.3m EU15 118.9m

Bridge Issues

107.0m Pond 101.8m

Collects

Drain Pond GP

EU14 127.4m Hobhill Spinney FB Def 108.5m

A 5

M 1

A 5 Track Drain

94.8m 99.4m Stone Hobhill Spinney Drain Track 135.0m 97.2m Collinshill Farm Track EU15 Tra

Drain ck

Pond SL Stone Hobhill Barn

84.4m

MP 1

MP 8 Pond Spring 122.5m

Dodmoor Farm Grounds Mast

Pond BM

EU6 118.99

Dodmoor Farm 122.5m m 93.3m BM 99.02m EU18

Pond EN9 99.4m

140.8m Trac Pond Riding Stables k Glassthorpehill Pond

Willow End 2 Foot Bridge Issues

Spring 1

Tra Pillar BM 141.45m ck Issues MP .25 EU1 Flag Staff Pond Tra M 1 c k The White House 86.3m GP Hadland House Farm 95.4m Dodmoor Farm M 82.3m 1 Bungalow GP BM 93.74m BM 82.02m

BM 100.04m 98.5m FB BM 82.12m 92.0m BM 108.36m

2 Honeymoon Cottage 8 97.8m

104.5m 109.4m Hadland House 1

CL 3 MUSCOTT Brington Road 101.8m HI

SEARS CL

L

LSIDE ROAD BM

1 12 14

3 95.1m 29 104.94m 3 Tanks 2 Bridge

OSE

Smallholding

9

1

6 20 103.9m 14 EU5

Reservoir 12

20

1

7 26

22

5 1 1

1 0 ETL BR 2 82.0m OC

12 KH THE CRESCENT31 th A EL Water Tower Pa LL 90.2m

22 ROAD

Towing Pat FLORE El Sub Sta 14

8 33kV

COLLINS HILL 1 h

11

7

23

1

11 15

Watling Stree 15 ROMAN ROAD 6a 11 100.3m EL 6 Drain

t EU7 Pond Police House Pond 2 14 3

Drain EL Drain CAPELL RISE 2

26 Garage 100.6m

11kV

1

3 EU18

2 15 11 Shelter EU7 EU7 EL 95.7m 93.6m EU5 33kV 2 KT5 1 Memorial HIGH STREET BM 94.24m 88.7m EL 82.0m Pond LB

43

44 4a 4

a

6 46

5

41 46 White Hart 50

4 8

56a

New A5 52 (PH) 1 53 PO

Whilton Brook 27 49 40 Hall

EL Pond 2 36

MP 70 Flore Hill Farm Pond 4 Works 58

10 a Track

6 2 34

Dismantled Rai Bridge 79m 58 a

A 45 5 Pond BM 100. 96.6m

2 1 60 28 32 EL LB 101.2m 10

14 62 T

r Royal Oak BM 97.12m ack

lway Grand Union Canal 16 LB (PH) 64 1 The Firs El Sub Sta EU7 FLORE HIL ARDENS

EL BM 1 106.1m YEW TREE G 4

El 25 1 0 3 68 Sub 11 7.95m L 119 Sta Pp 15

2

1

EU1 3 8 19 11kV 1 4 20

MP .25 106.4m 6 14 TCB 72 Roundabout 21 El Sub Sta

Flore 1a 87.2m

EL 1 Pond 1 2

94.2m 2

3 2 116.4m SUTTON ACRE 1 3

Russell Rise EL 7

118.6m Surgery 1 10 a

24 1 7 2 3 1 1 Hollandstone 4

11kV 12

1 EL 11kV EL 2 5 7 A ILL BM 102.72m 5

Grange Farm 1

5 2

11 87.8m 4 1a

87.8m 3 Farm Culvert Dodmoor Canal Pond

FLORE H STREET 1b

18

2 15 30 5 EL 2 5

ON 2 9

Globe Farm 5

102.1m THE GREEN 11kV 11 4

a BLISS LANE

25a 2 24 8

Mile Stone and Rail Bridge 8 SUTT Globe Farm

ANE

122.5m 11

27 11 19 10 13 NE

Stone Track 29 Hollandstone G'S L 1 15 MEADOW LA

IN

12

LANE 3 K

1 14 1 Approximate Location of 2b 6 S Lilac FARM ING

Cottage BM 1 6 SPRINGFIEL 2 4 Farm Crossing SPR Highgrove Flore D CL A 45 23 .01m 12 House A 45

1 BRICKETT 19

Proposed Office Blocks BM The Lilacs Farm 76

Grove 5

16

0

87.79m 15

House 2

4 15

Cattle Grid 14 23

96.9m 2 12

T 4

1 Tennis 39 HE AVENUE 85.3m

Court 2 84.7m 3 6

122.5m 5 47

24 11 0

6 6

LANE 11 4

86.9m Green 15 1 BM 85.07m Issues Ch 0W Pond Hotel M 1 Country 9 Meadow Rosea 29 W 2 3 AT THE ORCHARD

CHAPEL Farm

ROMANLIN ROAD 6 THORNTON CLOSE 8

ORDN 32

Dodford Wharf 34 8

Flore 10 G ST 2

Gas Cylinder 51

Ashlawn Cott 15 SL Farm 66 ANCE Filling Depot REET

3

Oaklands m LB

a 4

h 4 1

ng 3 ROAD 8

The Cony 12 25

16 Nene View

Living Stones Glebe The Vicarage 35

2

Ashley 1 Hollandstone Farm 2

89.3m 17 House Weedon 1 Spring

MP .75 ouse Lay-by 4 Spring Junction The Bungalow Bungalows Pond H 23 Church

The 55 119.8m 1 A 45 37 77.1m ck Tra

12

41 83.8m

Tel Ex Flore C of E NETHER LANE 41

9 EU10 4

1 Pond 45

1 4

A 45 Primary School 72 Greyleys Pond

43 SPRING LAN SUTTO 43 1 A 5 59

Dodford ows Pond 46

46 A 4 M 1 he gal NETHER L

Wharf T Flore C of E Pond ANE 5 B Bun B

74

RI RI

6 6

48 Tel 48 N STREET

4

Controlled 4

C Farm C 5

92.1m WATLING 84.3m 5 5

61 K

Ex K 1

ETTS LANE ETTS

ETTS LANE ETTS Issues 42 42 44

School 11 44 Grand Un

E 9

47 Weedon 47 Towi 76 EU9 Hollandstone Farm Junction Langhley Lay- ng THE AVENUE by Track D Pa 85.7m

STREET

rain

1 1 ANE Posts Posts L t NETHER BM h i o

91.55m n Canal New PH The House Posts Pond Lodge 77.3m FLORE HILL 117.9m 119.2m Weedon House Works 97.1m Issues Gas Gove 103.1m Lake Little Nearton rnor HIGH STREET A 45 BM 109.65m Flore House Track

29 25 35

112.4m Footbr 35 82.2m

68 23 17 66a 66a

6 6 6

Gas idge 6 HIGH STR Globe Hotel

E Station EET Lake 0 0 6

Governor S 6 3

5 5 5 Issues

LO House Path 2

El C Bank 2 81.8m 40

SOR 40

Strawberry 12 36 Depot Sub 36

Depot Fields 10 WIND

26

Sta 5 PH 26 Gas Gov Pond

6 3 Path

14 PO

2 1 28 22

30 30 20 Magpie 20 Road Weedon Police House 15 47 18 Tennis 17 16 House THE GRE 44 1 to 6 Court

1

6 3 Red House

2

56

Wharf 56 Brodie Lodge

8 8

1

1

Depot 1 1

16 16 Y Playing Field

S 19 1

5

45 0 5 22 8

41 8 Trelawny

12 York Crossroads

2

4 2 1

Depot 1 Track

38 Hotel All Saints' Church 8 8

0 32 2

4 2 WAY

4 R 15 4 2 HARMANS ide 14 BM 84.67m

21 2 2 1 2

5 2 Flore Park 80.3m

10 30 A 45

4 REGENCY 6 2 2 8 TCB 10 12 16

CLOSE 10 EU12 26 15 19 10 CLOSE

16 9

7 FB

7

EQUESTRIAN WAY 10 3 8

12 18 3 3

26 26

o o

1

17 ETON 1

t

15 t o o 0 t t 0 0 2

11 2

4 4

4

3

1 3

1

to

7 to Issues Upper Heyford

5 The Croft 28

1 Boat 28

CAVALRY HILL 9 Track 1 1

1 1

4 York Ride Yard

3 2 5 6

OR 6 38 38

3 4 3 BM

CLOSE

48

1 48

D

2 82.59m to

21 to

0 0

NA 0

47 47 4 4 1 1 MP Drain Farm Bridge

9 Path

N 18 81.3m

CE EU11

36 5 20 5

28 27

o o 4 8 LOUCESTER 4

38 18

18a 14 G 31 ROAD

35 t t 35 35

3 3

o o 3 3

t t 24 24

23 23 25 6 HARMANS WAY Garage

2

40

15 1

15 1

1 9 77.2m

19 Ordnance 77.1m 7 25

0 EL ROAD 42

1 House LITTLE PRI

25

21

1 21 15 to to 15 15 1 1

2 3 The existing A45 8 18 12 16 2 20 CAVALRY FIELDS 10 35 85.3m L CLOSE 4 Redlynch CAMPBEL LANCERS WAY Manor

2 M 1

8 Farm 18 1

12 24 81.3m A 45

53 45 TCB

2 FB Piers LB

15 9 FB

The Mill Farm BM 81.50m 11 rack

T 83.4m 80.5m EU9 Pond Fir Lea Foot Bridge 82.2m MAIN ROAD Chy 79.2m Water Bollards Foxwood El Sub Sta 75 (Units 1 to 11) Path (um) 88.6m BM 88.21m 15 Works 77 79 86 87 Ebenezer House

78 Gantry 88.8m 75.3m 3 1 9

14 5 The Old Depot FG10 KT4 FUSILIER WAY 1 WB 81.8m 3 The East Lodge Grand Union Can A 45 70 5 .65m Towing Pa BM Depot 7 BM 85 ROMAN R Issues Dovecote 79.21m Water 87.1m 77.3m t El Sub Sta h OAD Farm Water STREET Park View Hill Farm Water BRIDGE 79.5m 2 Issues al 4 Home Water Pond 79.2m 6 Farm BRIDGE ST BM 81.11m 8 86.0m River Nene Tip 6 3 (dis) 1 4 4a Tip The White (disused) FB Gates Issues The Flats

ETL Issues Flats The Close BRIDGE ST Issues River Nene

8 6 16 Issues 30 20 17

32 18 R 8 3 14 12 2 EE Upper Heyford T The Stables A 45 24 81.1m 77.6m

26 Foot Bridge 42 36

Pond

RIVERSIDE DRIVE 1

Pond 23

4 52

54 The

46 Path (u

4 Lay-by

19 11 Pond FB

15 17 27 Barn

Drain WEEDON

Track

58 25

8

56 50

ne 4 m) 21 Pond

EU12

River Ne 19 Coach House

18 60 33 Weir 80.2m Heyford Mill BRID Pump House Hipwells

GE

in 22

16 STREET a BROOKSIDE 70

r The 8

D

Allotment Bungalow

2

20 12 Riverside Brooklyn NENESIDE CLOSE Gardens Track

Court KT2 7

11 15 Allotment Gardens FG16 5 FB Weir

3

Church A

75 ba 2 t t oi Ho l 103 Plume of r Track Issues

1 Feathers Wel Middle 91 (PH) 1

FG5 KS5 43a 89 5 2 85 67 Issues ORDNANCE ROAD 6 1b 1a 1 Path (um) FG16 71 4 (Track) 51 13b 13a 11b 11a 9 12

63 3 TCB 8

83.6m 59 80.2m

4

53 33 7 4 SL KS5 41 6 6

1

15 1 83.1m

3 3

WEST STREET 43 10 GP 14 FG10 1

37 14 a

5

10 5

16

WAY

80.4m 17

14

7 7

20

22

m 24 Lay-by

BM 80.99 30

5 5

36

40

54 9 9

48 80.6m 80.7m

38a 38 WEST 42

4 18

1

2 2 2 PH

PO KT1

4 6 56

12 KS5 Riv 54

2

15 6 15 15 BM 82.37m

er 6a 20 1 Works

4 Path (um)

17 17 46 FG4 CHURCH St Peter's Church 2 17 CLOSE 21 22 42

Community 11 15 3

9 L Weedon 40 Nene 5 55

21 KINGS PARK Weedon Bec 55 KS12

KT6 41 Centre U Ref Ch 41 BUSWEL 24 Drain

Primary School 30

1 21

10 10 7

15 6 2 11 2 FG15

39

STREET 39 1 19

19 82.5m

29 29

25 25

31

25 31

23 23

2 8 ET

FG14 E

28 WAY 90.2m

21a 21a

21 11 21 6 22 29 82.4m

STR Grand

12 12 Union Spring 12 3 15 1 EW Canal YN'S 1 N 1 1 T FG11 1 CROFT R KS11 Tr 11 5 Path (Um) A BILLING 80.8m ac 3 1 M 30

k Club SCHOOL PL

MANO ST ST MARY'S

WA 35 3a Issues

2 12 2 12 14 WAY 1 12 Y 5

2 Pond Jetties

2 m) R 8 8

12

5a 12 Pond 7

Recreation Ground 7 u

20 2 5d

3 3

12 Stanton's Barn 14

SOUTH STREET14

8

18 18 7

7 Camping Site FG5 Garage

WAY ROA Path ( 2 PETER'S 14 41 ST Cemetery Pond 14 2 The 5 FG8

BM KS5

D Hollies

30 30

15

27 79.77m

15 El

11

19 QUEEN'S PARK 1 Sub 80.0m

17 90.1m 91.5m Sta Ponds

ack 1 86.6m r

Path Drain 27 3

3 The Path (um) T 6 6

15

14

7 Vicarage Spring 11 110 FG9 118 78 100 20 76 Whitehall KT3

Towing FG8 46 FG1 Cottage Path (um) 28 Pine Reach Hillside KT4 View Tra

c 146 High-house Wharf k Pump BM 72.50m 16 56 83.4m Pond House 71.9m 12 E 38 S 86 BM 90.75m O 36 66 92 FG4 L 5 156 10 Track 95.3m Upper Weedon 140 Flore Lane CES C 6 86.0m 2 134 Wharf

N NEW CROFT 132 KS11 Whitehall Farm 24 39

PRI

2 2 4 25 Wharf TITHE RO 37 Sluice Simon's

Upper Weedon 6 House 49 23 Weedon Wharf

4 BM 93.09m Overflow Cottage

Tk Gran Ponds 59

The Firs Track 7

A LB 15 d Union Ca

1 11a Surgery Ingledell

D MP 14 11 55 81 GP

Sinks 12 Cottage TCB 1 69 A 5 Stowehill Wharf 90.6m Pond

1 Track STREET 69 REET Sewage Works 72.1m BM Kingfishers nal 22 O River Nene DUKELANDS QUEEN 99.3m Stowehill Pond KT1 98.75m AK ST The Grange 3

ft Path (um)

3 House Foot Bridge

4 2 7 cro Track

l NEW ST l 2a Spring 9 River Nene

Hi Tk 8

6 FG11

The Bungalow A 5

9 The Old Priory 90.3m Water Spring Pond FB Track 11

15 Lower Weedon

Track 15 17 11 98.0m Builder's FG1 The Grange KT6 Path (um)

Yard 16

Trac 1 KS3

Water ck 8

ET 39 72 OSE 24 Tra L 5 k 9 Spring

C Pond TITHE STRE Pond ROAD

LM 3 1 The 4 River Nene 2 8 Canal HO

NEW

Firs 28 26 Priory 1 BM 90.69m

16 7 KS10 8 FG13 38 Court 97.4m Sewage Works Union

Issues FG18 TREET FG2 BM 73.07m 72.8m 102.6m

1 OAK S Towing Path 9 22 25

4 Grand

Track 50 BM 105.0 Chapmans Close KS14 Porch 4m 41 Stowehill

52 83.4m House 76 58b 58a QUEEN STREET 35 97.1m Sluice

78 56 104.9m 37 Towing Path Wharf

15

39 Stowehill Home 27

0

70 2 31 4 Farm House 68 21 Cottage

The Narrow Boat 64 60

Grand Union Canal (PH) 38 75 Sinks

102.4m 12 Tank I 01/09/15/ SMT Earthworks Amended Ch1500-Ch2500 MFH SL GP 36

1

QUEEN S 67 Butterfields

TREET 59

49

b

47 57

67 OAKLANDS 24

55 Dairy 51 Upper Weedon LB RK 30 H 29/04/15 SMT Access Tracks Amended. Other Minor Amendments MFH SL

Farm A 48 Upper Weedon 63

R P 7 Stowehill NO Pit SL Swingbridge House 22 MA

(disused) 97.1m 1 G 10/03/15 SMT Access Tracks Removed. Green Bridge Widened MFH SL

Greenacres 6 KS2

Pit 75 Issues

(disused) The Bungalow MP

71

16 12 1 Track 8 Fernhollow KS5 F 19/12/14 SMT Various Scheme Amendments MFH SL Farm

FG11

Heyford Lodge ARK Bridge E 03/11/14 SMT A5 Roundabout and Carriageway Amended MFH SL

102.9m MANOR P 1 FG2 5 Lodge

MP .75 9 D 21/08/14 SMT A5 to A45 Link Route Amended

112.5m 2 1

1 Pump

22 1 House 12 KS14 23 Earthworks amended Ch1600 to Ch2500 MFH SL 2 15 85.5m Issues

ROMAN ROA 27

5

KS21 2 C 24/07/14 SMT Balancing Ponds Added MFH SL

31

21 Hall The Rectory 8 17 KS19 43

LANE

Spring 19

21 CHURCH

11 1

15

23 53 B 01/05/14 SMT Vertical Alignment Amended Ch1700 - Ch2600 MFH MH 49 D White 16 9 House 1

BM 106.69m 55 St Peter and Allotment Gardens St Paul's Church White A 29/01/14 SMT Original MFH SL Benns

Hall 5 Orchard Sinks 6 28 7 Sports Field 1 102.8m 5 4

47 KS19

Tennis Path (um) 14

39 CHUR 3 LK Court 4 Pa 15 REV DATE BY DESCRIPTION CHK APD 26 th

WA Pavilion

2

Cemetery CH 0 12a 14

STREET a ANOR 15

41 Tennis 1 KS18 110.3m

8 M

73.9m

35 Court 24 2 12

126.6m 1

1

3

3 1 1

0c

1

FB 0

7 22 d

2 11 T

2 16 1

2 4

EE 10b 29 25 11 1

Drain 5 DRAWING STATUS:

TR 19 Issues S Track 9 BROOKSIDE PLACE

9 Spring 3

10

1

2

10a 2 2

NE Spring 3 MIDDLE KS1 7 WEEDO 1

Posts 12 FOR INFORMATION ONLY The Issues N ROAD 16 PARSONS CL Spring 5 Old Sun 5a

KS16 T 1 BM 75.50m 2 4 (PH) REE WATERY LA

5 10

12 4 5 8

132.4m 5

CHURCH ST 3a KS6 6

74.1m 16 106.8m 15 8

1

8 11 6 3

Issues 30 Club 27 3 8 9 Bliss 2 Charity Aided

Reservoir School 6 Pond

(covered) 25

1a 4 a 1 24 PH SL 28 122.8m PO

War Meml 4 26 1 Heyford

24 20 18

16 2 14 Cottage a

Spring 10 8

2 1 2 KD14 TCB KS6 Denbrook KS7 GP 5 5 76.7m 1 2 AY

11

29 6 BM 76.66m 6 14

139.2m 8 27

EFIELD W 0 1 73.7m Track FG11 GP KS17 The Green 2 6 WAK 10 1 Nether Heyford Baptist Church 12 9 14

Pond 15 1 1 ETL The Green

24 3 BUGBRO

28

17

2

2 OKE ROAD

1 Mile Stone 2 6 PROJECT:

Lay-by

BM 112.89m 9 Halls 40 11 75.5m 134.8m Hall RO

BE

3

8

1 8 RT 3

STONE ROAD S 2

FIELD 3

5

FARTHING g Path 7 52

36 1

1a 9 Pond

Towin 11 KS10 Grand Union Canal The Pound 15 Foot Bridge 1

FE1 Nether b

FG3 16

1

1 A45 Daventry Development Link 2 41

BM 138.74m El Sub Sta 5 1

3 9 4 Stowehill Tunnel 3

Heyford Posts 5

HILLSIDE ROAD 7 36 42 141.9m 7 6 35 HILLSIDE ROAD The Hillcrest Cottage 48

Pound 2

22

4 1 2

148.0m 4 7 25 20

15

39 21

151.7m 19 29

1 14 60

3 2 73.7m

3 12

9 OAD

2 43 R

9 Foot Bridge 117.9m 2 10 1 25

152.3m T 38 LOSE 6 Weedon Hill 2 HE TITLE: 7 C a 2 7 6

PEAK

Track 5

1

7 4 Pond 23 2 11

WINSTON CLOSE 7

8 1

2

15

11 59 2 CRESCENT Base Plan This map is reproduced from Ordnance Survey material with 1 154.0m 78

Weedon Hill 6

3

0 1 15 HILLSIDE 1 Tanborough 2 1

Path LANE 1 GP 11

CE 15 A

Oaktreehill Barn 1

12

69 17 the permission of Ordnance Survey on behalf of the Controller FURN 14

86

71

2

6 4

BM 154.37m 2

Weedon Hill Farm 11 1 ESTERN AVENUE 26a W

NT of Her Majesty's Stationery Office Crown copyright. 2 1 © 4 59 5 6 Spring CE S

Pillar 30

RE 17

18 3 1 FE C 4 BM 162.32m 2

Track 88

7

5 ROL T 158.5m 81 N Unauthorised reproduction infringes Crown copyright and may 8 5 E

28 5 24

C BM 76.60m 1

9 FB RES 28a

30 16 FE C Sewage SCALE @ A0 CHECKED: APPROVED:

14

ROL Works lead to prosecution or civil proceedings. SL 2 22 KS8 SOUTH VIEW

18 36 19

MP 68

15 1/5000 MFH SL

11

2

1

2

9

53 NE ROAD 51

41 79.7m DESIGN/DRAWN: DATE: Spring Cattle Grid FARTHINGSTO Northamptonshire County Council: Licence No. 100019331. Posts 39 SMT 29/01/14 L:\GROWTH\HIGHWAY DESIGN\2015-16\A45 DAVENTRY DEVELOPMENT LINK\AUTOCAD\BASE PLAN AND LONG SECTIONS DWG NO 03I & 04I.DWG L:\GROWTH\HIGHWAY DESIGN\2015-16\A45 DAVENTRY DEVELOPMENT LINK\AUTOCAD\BASE PLAN AND LONG SECTIONS DWG NO 03I & 04I.DWG Track Pond

Published 2014. Greenacres KD12 Track PROJECT No: DRAWING No: REV:

156.5m 114.4m Burnham Fern Hollow Cottage 77.2m Spring Coal Yard S1265 R1999/03 I CAD File: CAD File: