First 18 months Procurement Plan

I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan February 1, 2017 2. Date of General Procurement Notice: July 2017 3. Period covered by this procurement plan: first 18 months

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Category Prior Review Threshold Comments US$ Public Disclosure Authorized 1. Goods and >= US$ 4 million All 2. Works >= US$ 15 million All 3. (Non-Consultant Services) >= US$ 4 million All

2. Prequalification. Not applicable.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Construction of New school buildings (30 sites), additional classrooms (100 sites), teacher accommodations (30 sites), on-demand school rehabilitation (70 sites), and rehabilitation of 25 POE, 99 DOE, and three RTTCs would be procured following the community participation procedures set out in the project operational manual. Public Disclosure Authorized 4. Reference to (if any) Project Operational/Procurement Manual: As specified in the project legal agreement.

5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness.

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post)

Public Disclosure Authorized million nce (yes/no) Constructio 11.35 At least No Post Communi n of New 357 ty school contract participat buildings packages ion (30 sites), procedur additional e classrooms (100 sites), teacher accommod ations (30 sites), on- demand school rehabilitati on (70 sites), and rehabilitati on of 25 POE, 99 DOE, and three RTTCs Procureme 3.15 Multiple No Post To be nt of contracts procured vehicles, centrally office by equipment, MoEYS office furniture, motorcycle s, school furniture, etc.

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comment 1. Competitive Methods (Firms) >= US$2,000,000 2. Individual >= US$ 400,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Baseline and 0.4 1 Post CQS end line survey

Integrated 0.05 1 Post SSS financial audit and procurement post review consulting firm Individual 2.57 Multiple Post national and contracts international consultants for the project implementati on support at national level and school community level (finance, procurement, construction supervision, etc.) PROCUREMENT : Secondary Education Improvement Project PLAN General Information

Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2017-07-26 Revised Plan Date(s): (comma delineated, leave blank if none)2019-06-18 Project ID: P157858 GPN Date: 2017-08-02 Project Name: Secondary Education Improvement Project Loan / Credit No: IDA / 59780 Executing Agency(ies): Ministry of Education Youth and Sport

WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MOEYS-SEIP-NS-CW001 / Request for Single Stage - One Renovation of GSED office IDA / 59780 Post Open - National 0.00 Canceled 2018-04-06 2018-05-01 2018-06-15 Quotations Envelope and meeting room

MOEYS-FST-032 / School Community Facility Construction of Koh IDA / 59780 Post Driven Direct 65,429.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01 Dach Hun Sen Development School

MOEYS-FST-052 / School Community

Facility Construction of Prek IDA / 59780 Post Driven Direct 62,876.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01

Taten Development

MOEYS-FST-054 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 61,576.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01

Jayvaramann 7 School Development

MOEYS-FST-055 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 63,277.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01

Sampeuv Poun School Development

MOEYS-FST-051 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 62,112.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01

Porng Teuk School Development

MOEYS-FST-005 / School Community

Facility Construction of Prek IDA / 59780 Post Driven Direct 170,666.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-12-30

Prasap School Development

MOEYS-FST-001 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 63,176.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Mesar Chrey School Development

MOEYS-FST-002 / School Community Facility Construction of IDA / 59780 Post Driven Direct 81,159.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Chhin Lean-Hann Chey Development School

MOEYS-FST-003 / School Community Facility Construction of IDA / 59780 Post Driven Direct 120,682.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Hun Sen Samporng Chey Development School

MOEYS-FST-004 / School Community

Facility Construction of Prek IDA / 59780 Post Driven Direct 121,282.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Dambauk School Development

MOEYS-FST-034 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 117,282.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Samaki Meanchey School Development

MOEYS-FST-042 / School Community

Facility Construction of Ang IDA / 59780 Post Driven Direct 61,376.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Say School Development

MOEYS-FST-043 / School Community

Facility Construction of Slap IDA / 59780 Post Driven Direct 62,876.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Leng School Development

MOEYS-FST-044 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 117,882.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Toap Meanchey School Development

MOEYS-FST-048 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 63,612.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Kansoam Ark School Development

MOEYS-FST-049 / School Community

Facility Construction of Prey IDA / 59780 Post Driven Direct 63,312.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Khley School Development

MOEYS-FST-050 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 64,812.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Trasek Koang School Development

MOEYS-FST-022 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 121,354.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Samrong Ponley School Development

Page 1 MOEYS-FST-023 / School Community

Facility Construction of Sok IDA / 59780 Post Driven Direct 120,554.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

An-Tram Khnar School Development

MOEYS-FST-024 / School Community

Facility Construction of Kiri IDA / 59780 Post Driven Direct 63,012.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Vong School Development

MOEYS-FST-026 / School Community

Facility Construction of Sok IDA / 59780 Post Driven Direct 63,212.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

An-Prey Melorng School Development

MOEYS-FST-027 / School Community

Facility Construction of Sok IDA / 59780 Post Driven Direct 128,752.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

An-Prey Sandek School Development

MOEYS-FST-028 / School Community

Facility Construction of Prey IDA / 59780 Post Driven Direct 64,712.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Tub School Development

MOEYS-FST-008 / School Community

Facility Construction of Hun IDA / 59780 Post Driven Direct 61,876.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sen Char Thmei School Development

MOEYS-FST-009 / School Community

Facility Construction of Hun IDA / 59780 Post Driven Direct 62,076.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sen Dambe School Development

MOEYS-FST-010 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 121,282.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Krek School Development

MOEYS-FST-011 / School Community Facility Construction of IDA / 59780 Post Driven Direct 61,476.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Hun Sen Trapaing Russey Development School

MOEYS-FST-038 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 168,400.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-12-30

Anlung Vil School Development

MOEYS-FST-039 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 135,550.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Roung Chrey School Development

MOEYS-FST-035 / School Community

Facility Construction of Ta IDA / 59780 Post Driven Direct 118,682.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Lo School Development

MOEYS-FST-036 / School Community

Facility Construction of Hun IDA / 59780 Post Driven Direct 118,054.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sen 10 Makara School Development

MOEYS-FST-037 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 62,077.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Thlok Dangkor School Development

MOEYS-FST-012 / School Community

Facility Construction of Chea IDA / 59780 Post Driven Direct 66,230.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sim Reak Chey School Development

MOEYS-FST-013 / School Community

Facility Construction of Bun IDA / 59780 Post Driven Direct 62,977.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Rany H.S-Prey Paun School Development

MOEYS-FST-014 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 117,884.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Mesang School Development

MOEYS-FST-015 / School Community

Facility Construction of Prek IDA / 59780 Post Driven Direct 62,877.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Krabao School Development

MOEYS-FST-016 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 61,277.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Prey Pneuv School Development

MOEYS-FST-017 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 63,077.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Pramol Prum School Development

MOEYS-FST-018 / School Community

Facility Construction of Prek IDA / 59780 Post Driven Direct 81,159.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sandek School Development

MOEYS-FST-041 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 66,206.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sangkum Thmey School Development

MOEYS-FST-047 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 70,239.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Stung Hav School Development

MOEYS-FST-006 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 133,744.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Vireak Chey School Development

Page 2 MOEYS-FST-031 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 65,112.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Samrong School Development

MOEYS-FST-020 / School Community

Facility Construction of Hun IDA / 59780 Post Driven Direct 61,676.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Sen Kampong Ro School Development

MOEYS-FST-021 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 61,576.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01

Kraol Ko School Development

MOEYS-FST033 / School Community

Facility Construction for Tuol IDA / 59780 Post Driven Direct 145,115.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Prasat Sen Sok School Development

MOEYS-FST040 / School Community

Facility Construction for IDA / 59780 Post Driven Direct 68,371.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Phnom Yat School Development

MOEYS-FST053 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 65,824.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Hunsen Kampong Kantuot Development

MOEYS-FST025 / School Community

Facility Construction of Sok IDA / 59780 Post Driven Direct 69,220.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

An Ton loap school Development

MOEYS-FST045 / School Community

Facility Construction of IDA / 59780 Post Driven Direct 145,345.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Thmar Sar School Development

MOEYS-FST007 / School Community

Facility Construction of Hun IDA / 59780 Post Driven Direct 69,401.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Sen Keo Seima School Development

MOEYS-FST029 / School Community

Facility Construction 28 IDA / 59780 Post Driven Direct 64,944.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Makara School Development

MOEYS-FST030 / School Community

Facility Construction of Hun IDA / 59780 Post Driven Direct 69,478.00 Signed 2018-04-03 2018-04-09 2018-04-18 2018-11-14

Sen Prasat Bakorng School Development

SEIP-FST-63 / Renovation of School Building and Community Pending

Standard 8 Classroom at IDA / 59780 Post Driven Direct 0.00 Implementati 2018-11-20 2018-11-27 2019-07-01 2019-09-29

Krong Development on

Lower Secondary School

SEIP-FST-077-A /

Renovation of Standard 8

Classroom at Chhnour Community Pending Meanchey Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 School, Chhnour Meanchey Development on Village, Chhnour Meanchey

Commune, Preah NetPreah

District

SEIP-FST-083-A / New

Construction of School

Building at Prasat Community Pending

Higher Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Orv Lok Village, Bakong Development on

Commune, Brasat Bakong

District

SEIP-FST-056-A /

Renovation of Education

Facility and Standard 8

Classroom at Chea Sim Community Pending

Chroy Changva Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Secondary School, Chroy Development on

Changva 3 Village, Sangkat

Chroy Changva, Khan Chroy

Changva,

SEIP-FST-058-A /

Renovation of Education

Facility and Standard 8 Community Pending Classroom at Bak Touk IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-11-05 Lower Secondary School, Development on Phum 1 Village, Sang Kat

Veal Vong , Khan 7 Makara,

Phnom Penh

SEIP-FST-59-A / Renovation of Education Facility and

Standard 8 Classroom at Community Pending Hun Sen Chak Angre Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-11-05 Secondary School, Toul Roka Development on Village, Sangkat Chak Angre

Krom, ,

Phnom Penh

Page 3 SEIP-FST-060-A /

Renovation of Education

Facility and Standard 8 Community Pending

Classroom at Boribo Tbong IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Lower Secondary School, Development on

Phneat Village, Phsar

Commune, Boribo District

SEIP-FST-061-A /

Renovation of Standard 8

Classroom at Khmer Japan Community Pending Samaki Meanchey Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Secondary School, Torp Bos Development on Village, Thlork Ven

Commune, Samki Mean

Chey District

SEIP-FST-062-A /

Renovation of Standard 8 Community Pending Classroom at Tuol Kpous IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Lower Secondary School, Lo Development on Village, Toul Kpous

Coomune, Toek Phos

SEIP-FST-064-A / New

Construction Teacher House and Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Classroom at Ta Lo Lower Development on Secondary School, Ta lo

Village, Ta Lo Commune,

Bakan District

SEIP-FST-065-A /

Renovation of Standard 8

Classroom at Hun Sen 10 Community Pending

Makara Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, Tropaing Kantout Development on

Village, Beong Kantout

Commune, Krokor District

SEIP-FST-066-A /

Renovation of School

Building and Standard 8 Community Pending

Classroom at Cher Tom IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Lower Secondary School, Development on

Bamnak Village, Cher Tom

Commune, Krokor District

SEIP-FST-067-A /

Renovation of School

Building and Standard 8 Community Pending

Classroom at Thlok Dangkor IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Lower Secondary School, Bos Development on

Pouy Village, Phteah Rong

Commune, Krovanh District

SEIP-FST-068-A /

Renovation of Standard 8

Classroom at Pich Chenda Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Phnom Toch Village, Pich Development on

Chenda Commune, Phnom

Prek District.

SEIP-FST-069-A / New

Construction of Teacher

House and Renovation of Community Pending School Building at Roung IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Chrey Lower Secondary Development on School, Brakeap Village,

Roung Chrey Commune,

Thmar Kol District

SEIP-FST-071-A / New

Construction of School Community Pending Building at Bavel Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Secondary School, Bavel 1 Development on Village, Bavel Commune,

Bavel District, Battambanng

SEIP-FST-072-A /

Renovation of Standard 8

Classroom at Sala Krao Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Thnol Keng Village, O Development on

Andoung Commune, Sala

Krao

SEIP-FST-073-A / New

Construction of Teacher

House and Renovation of Community Pending School Building and IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Standard 8 Classroom at Development on Phnom Yat Lower Secondary

School, Wat Village, Pailin

Commune, .

SEIP-FST-074-A /

Renovation of Standard 8

Classroom at Mongkul Borei Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

RUssey Krok Village, Russey Development on

Krok Commune, Monkul Boei

District

Page 4 SEIP-FST-075-A /

Renovation of Standard 8

Classroom at Samdech K.P Community Pending

O Ambel Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, O Ambel Village, O Development on

Ambel Commune, Serei

Sophorn District

SEIP-FST-076-A /

Construction/Renovation of

School Building and Community Pending Standard 8 Classroom at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Tmor Pouk Lower Secondary Development on School, Thmar Pouk Village,

Thmar Pouk Commune,

Thmar Pouk District

SEIP-FST-079-A /

Renovation of Standard 8

Classroom at Samdech Community Pending

Tekcho Hun Sen Samrong IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Lower Secondary School, Development on

Chhuk Village, Samrong

Commune, Samrong District

SEIP-FST-080-A /

Renovation of School

Building and Standard 8

Classroom at Samdech Community Pending

Tekcho Hun Sen IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Thom Lower Secondary Development on

School, Leang Dai Village,

Bompenh Reach Commune,

Angkor Thom District

SEIP-FST-081-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Samrong Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Secondary School, Samrong Development on Khang Tbong Village,

Samrong Commune,

Sotnikoum District

SEIP-FST-082-A / New

Construction of Teacher

Accommodation and

Renovation of School Community Pending

Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Classroom at 28 Makara Development on

Lower Secondary School,

Chroy Neang Ngoun Village,

Srey Snom District.

SEIP-FST-084-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Sangkum IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Thmey Lower Secondary Development on School, Bratheat Village,

Chamroeun Commune,

Sangkum Thmey District

SEIP-FST-086-A /

Renovation of Standard 8

Classroom at Hun Sen Taing Community Pending

Kauk Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, Soyoung Village, Development on

Soyoung Commune, Baray

District, Kompong Thom

SEIP-FST-087-A /

Renovation of School

Building and Standard 8

Classroom at Chea Sim Community Pending

Kampong Thmar Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Secondary School, Tropaing Development on

Svay Village, Balaing

Commune, ,

Kompong Thom

SEIP-FST-088-A / New

Construction of Teacher

Accommodation and

Renovation of School Community Pending

Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Classroom at Tuol Kbel Development on

Lower Secondary School,

Tnout Team Chas Village,

Kompong Svay

SEIP-FST-089-A /

Renovation of School

Building at Taing Krasaing Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Sang Khlaing Village, Taing Development on

Krosang Commune, Santok

District, Kompong Thom

Page 5 SEIP-FST-090-A /

Renovation of School

Building and Standard 8

Classroom at Chhin Lean Community Pending

Hann Chey Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

School, Mann Heur Village, Development on

Han Chey Coomune,

Kompong Siem District,

Kompong Cham

SEIP-FST-091-A /

Renovation of Standard 8

Classroom at Prek Dambauk Community Pending Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Prek Dambauk Krom Village, Development on Prek Dambauk Commune,

Srey Santhor District,

Kamong Cham.

SEIP-FST-092-A /

Renovation of Standard 8

Classroom at Mesar Chrey Community Pending

Lower Secondary School, O IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Beng Village, Mesar Crey Development on

Commune, Steong Trorng

District, Kompong Cham

SEIP-FST-093-A /

Renovation of Standard 8

Classroom at Hun Sen Community Pending Samporng Chey Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Secondary School, Bakhorm Development on Village, Sampong Chey

Commune, Cherng Prey

District,

SEIP-FST-094-A / New

Construction of Teacher

Accommodation, New

Construction of School

Building and Renovation of Community Pending School Building and IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-06-02 Standard 8 Classroom Hun Development on Sen Char Thmey Lower

Secondary School, Char

Thom Village, Chong Thach

Commune, Tam Bae District,

Tbong Khmum

SEIP-FST-095-A / New

Construction of Teacher

Accommodation and

Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Classroom at Hun Sen Tam Development on Bae Lower Secondary School,

Tam Bae Village, Tam Bae

Commune, Tam Bae District,

Tbung Khmum

SEIP-FST-097-A /

Construction of Teacher

Accommodation and

Renovation of School

Building and Standard 8 Community Pending

Classroom atHun Sen IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-10 2020-01-06

Trapaing Russey Lower Development on

Secondary School, Trapaing

Russey Village, Roka 5

Commune, Thbung Khmum

District, Tbung Khmum

SEIP-FST-098-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Thmar Kre IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Lower Secondary School, Development on Thmar Kre Kandal Village,

Thmar Kre Commune, Chet

Borei District, Katie

SEIP-FST-100-A / New

Construction of Teacher

Accommodation, New

Construction of School

Building and Renovation of Community Pending

School Building and IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-07-02

Standard 8 Classroom at Development on

San DannLower Secondary

School, Sandan 2 Village,

Sandan Commune, District,

Kratie

SEIP-FST-099-A /

Renovation of Standard 8

Classroom at Prek Prasap Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Prek Prasap Village, Prek Development on

Prasap Coomune, Prek

Prasap District, Kratie

SEIP-FST-101-A /

Renovation of Standard 8

Classroom at Hun Sen Community Pending

Stung Treng Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Secondary School, Sre Por Development on

Village, Sre Resei Commune,

Stung Treng District

Page 6 SEIP-FST-102-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Tala Borivat IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Lower Secondary School, Development on Tala Borivat Village, Tala

Commune, Tala Borivat

District, Stung Treng

SEIP-FST-103-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Hun Sen Phom IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Thmey Lower , Secondary Development on School , Phum 1 Village, La

Ban Seak Commune, Ban

Lung District, Ratanakiri

SEIP-FST-104-A /

Renovation of Standard 8

Classroom at Vireak Chey Community Pending

Lower Secondary School, Ban IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Fang Village, Pong Development on

Commune, Veun Say

District, Ratanakiri

SEIP-FST-105-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Koh Nhek IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Lower Secondary School , 9 Development on Village, Sre Sangkum

Commune, Koh Nhek

District

SEIP-FST-106-A /

Renovation of Standard 8

Classroom at Hun Sen Keo Community Pending

Seima Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, O Arm Village, Sre Development on

Khtum Commune, Keo

Seima District

SEIP-FST-110-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Chea Sim IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Reak Chey Lower Secondary Development on School, Chher Treng Village,

Rak Chey Commune, Ba

Phnom District,

SEIP-FST-111-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Cheach Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-11-05 Secondary School, Svay Tre Development on Village, Cheach Commune,

Kamchay Mear District, Prey

Veng

SEIP-FST-112-A /

Renovation of Standard 8

Classroom at Mesang Lower Community Pending

Secondary School, Chi Phoch IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Village, Chi Phoch Development on

Commune, Mesang District,

Prey Veng

SEIP-FST-113-A /

Renovation of School

Building and Standard 8

Classroom at Bun Rany Hun Community Pending

Sen Prey Paun Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Secondary School, Prey Poun Development on

Village, Prey poun

Commune, Kompong Trobek

District

SEIP-FST-114-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Prek Krabao IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-12-05 Lower Secondary School, Development on Odom Village, Prek Krobao

Commune, Peam Chor, Prey

Veng.

SEIP-FST-116-A /

Renovation of School

Building and Standard 8 Community Pending

Classroom at Poreang Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-11-05

Secondary School, Poreang Development on

Village, Poreang Commune,

Poreang District, Prey Veng.

Page 7 SEIP-FST-117-A /

Construction of Teacher

Accommodation and

Renovation of School

Building and Standard 8 Community Pending

Classroom at Pramol Prum IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Lower Secondary School, Development on

Krosang Torng Village,

Angkor Reach Commune,

Preah Sdach District, Prey

Veng.

SEIP-FST-118-A /

Renovation of School

Building and Standard 8

Classroom at Prek Sandek Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Prek Sandek Village, Prek Development on

Changkran Commune, Si

Thokandal District, Prey

Veng

SEIP-FST-119-A /

Renovation of School

Building and Standard 8

Classroom at Hun Sen Community Pending

Kampong Kantuot Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Secondary School, Svay Ming Development on

Village, Baku Commune,

Kandal Steong District,

Kandal

SEIP-FST-120-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Serei Mongkol IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Lower Secondary School, Development on Prek Chrouv Village,

Rokakong 2 Commune, Mok

Kompul District, Kandal

SEIP-FST-130-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Sok An Prey IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Melorng Lower Secondary Development on School, Pey Melorng Village,

Prey Kla Commune, Koh

Andeth District, Takeo

SEIP-FST-131-A /

Renovation of Standard 8

Classroom at Sok An Prey Community Pending

Sandek Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, Prey Sandek Village, Development on

Prey Slek Commune, Traing

District, Takeo

SEIP-FST-151-A / New

Construction of School

Building and Renovation of Community Pending Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Veal Chambang Lower Development on Secondary School, Prey Thom

Village, Kompong Lapov

Commune, Samlot District.

SEIP-FST-152-A / New

Construction of School

Building at Boeung Rang Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Beoung Rieng Village, Development on

Beoung Rieng Commune,

Kom reang District

SEIP-FST-153-A / New

Construction of school

Building at Tuol Snuol Community Pending Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Toul Snoul Village, Kliang Development on Meas Commune, Bovel

District

SEIP-FST-154-A / New

Construction of School Community Pending Building at Sambuor Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Secondary School, Doun Lek Development on Village, Sambo Commune,

Monkol Borei District.

SEIP-FST-155-A / New

Construction of School

Building at Bou Sbov Community Pending

Lower Secondary School, Bos IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Sbov Village, Bos Sbov Development on

Commune, Preah Neat Preah

District.

SEIP-FST-156-A / New

Construction of School

Building at Sras Reang Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Sras Reang Village, Sras Development on

Reang Commune, Monkol

Borei District.

Page 8 SEIP-FST-157-A / New

Construction of School

Building at Prasat Bei Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Prasat 3 Village, Beng Development on

Commune, Bantay Ampil

District.

SEIP-FST-158-A / New

Construction of School

Building and Renovation of Community Pending Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Kork Plok Lower Secondary Development on School, Kork Plok Village,

Kon Krel Commune,

Samrong District.

SEIP-FST-159-A / New

Construction of School

Building and Renovation of Community Pending

Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Mlu Prey Lower Secondary Development on

School, Mlu Prey Village,

Mlu Prey Commune, Chheb

SEIP-FST-161-A / New

Construction of School

Building and Renovation of Community Pending Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Chrob Lower Secondary Development on School, Crob Village, Kbal

Romeas Coomune, Sesan

District.

SEIP-FST-162-A / New

Construction of School

Building at Rithi Sen Chey Community Pending

2 Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Rithi Sen Chey 2 Village, Development on

Rithi sen Chey 2 Commune,

Steong Treng District.

SEIP-FST-163-A / New

Construction of School

Building and Renovation of Community Pending Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 O Sieng Le Lower Secondary Development on School, O Sieng Le Village,

Kaleng Commune, Lum Phat

District.

SEIP-FST-164-A / New

Construction of School

Building at Trapeang Chres Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Phum 2 Village , Tropiang Development on

Chres Commune, Kon Mom

District,

SEIP-FST-165-A / New

Construction of School

Building and Renovation of

Teacher Accommodation at Community Pending

Kranhong Senchey Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Secondary School, Kronhong Development on

Sen Chey Village, Kronhong

Sen Chey Commune, Snoul

District.

SEIP-FST-166-A / New

Construction of School

Building and Renovation of Community Pending Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Sre Chis Lower Secondary Development on School, Sre Chis Village, Sre

Chis Commune, Sambo

District

SEIP-FST-167-A / New

Construction of School Community Pending Building at Prek Kroeung IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Lower Secondary School, Development on Prek Krieng Village, Vatanak

Commune, Sambo District.

SEIP-FST-168-A / New

Construction of School

Building and Renovation of Community Pending Teacher Accommodation at IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Prek Krama Primary School, Development on Broma Village, Kompong

Domrei Commune, Chlong

District.

SEIP-FST-169-A / New

Construction of School Community Pending Building at Koh Trung IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Lower Secondary School, Development on Kbal Koh Village, Koh

Trung Commune, Chet Borei

Page 9 SEIP-FST-170-A / New

Construction of School at

Dei Dos Lower Secondary Community Pending

School, Wat Dei Dos IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Village, Prek Prosob Development on

Commune, Prek Prosob

District.

SEIP-FST-171-A / New

Construction of School of Community Pending Mean Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 School, Mean Village, Mean Development on Commune, O Rieng Ov

District

SEIP-FST-070-A /

Renovation of Standard 8

Classroom at Anlung Vil Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

Anlung Vil Village, Anlung Development on

Vil Commune, Sangke

District

SEIP-FST-085-A /

Renovation of Standard 8

Classroom at Hun Sen Community Pending Tbeng Meanchey Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Secondary School, Andoung Development on Por Village, Kompong

Branak Commune, Preah

Vihear District,

SEIP-FST-096-A / New

Construction of Teacher

Accommodation and

Renovation of School Community Pending

Building at Krek Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Secondary School, Andoung Development on

Chey Village, Krek

Commune, Punhea Krek

District, Tbung Khmum

SEIP-FST-108-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Kampong Ro IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Lower Secondary School, Development on Svay Annat Village, Nhor

Commune, Kompong Roar

District,

SEIP-FST-115-A /

Construction of Teacher

Accommodation and

Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Classroom at Prey Pneuv Development on Lower Secondary School,

Prey Pneuv Village, Prey

Pneuv Commune, Peariang

District

SEIP-FST-144-A /

Renovation of School Community Pending Building at Bak Klong IDA / 59780 Post Driven Direct 0.00 Implementati 2018-11-20 2018-11-27 2019-07-01 2019-09-29 Lower Secondary School, Development on Mondul Seima District, Koh

Kong Province, Cambodia.

SEIP-FST-150-A / New

Construction of School

Building and Renovation of Community Pending Samrong Sen Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Secondary School , Bobrok Development on Village, Samrong Sen

Commune, Kompong Leng

District.

SEIP-FST-178-A / New

Construction of School

Building at Wat Tbeng Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Toul Thmei Village, Yery Development on

Ang Commune, Thpong

District

SEIP-FST-107-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Bun Rany Hun IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Sen Chantrea Lower Development on Secondary School, Bos

Village, Mesor Phngork

Commune,

SEIP-FST-109-A / New

Construction of Teacher

Accommodation and

Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04 Classroom at Kraol Ko Development on Lower Secondary School,

Kraol Kor Village, Kraol Kor

Commune, Svay Chrum

District, Svay Rieng

Page 10 SEIP-FST-121-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Jayavarman IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 VII Lower Secondary Development on School, Dei Ed Village, Dei

Ed Commune, Keang Svay

District, Kandal.

SEIP-FST-122-A /

Renovation of School

Building and Standard 8

Classroom at Bun Rany Hun Community Pending

Sen Prek Ta Duong IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Secondary School, Prek Ta Development on

Doung Village, Prek Thmei

Commune, Koh Thom

District

SEIP-FST-123-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Sampov Poun IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Lower Secondary School, Development on Khpoub Village, Sampov

Poun Commune, Koh Thom

District, Kandal

SEIP-FST-125-A /

Renovation of Standard 8

Classroom at Samdech Community Pending Tekcho Hun Sen Trery Sla IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Lower Secondary School, Development on Prek Ban Village, Trery Sla

Commune, Sa Ang District,

Kandal

SEIP-FST-126-A /

Renovation of Standard 8

Classroom at Samrong Community Pending

Ponley Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, Samrong Village, Development on

Ponley Commune, Angkor

Borei District, Takeo

SEIP-FST-127-A /

Renovation of Standard 8

Classroom at Sok An Tram Community Pending

Khnar Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, Tram Khna Village, Development on

Ang Sophy Commune, Bati

District, Takeo

SEIP-FST-172-A / New

Construction of School

Building at Mream Lower Community Pending

Secondary School, Mream IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Khang Tbong Village, Mream Development on

Commune, Romeas Hek

District.

SEIP-FST-173-A / New

Construction of School Community Pending Building at Reab Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Secondary School, Vai Vet Development on Village, Reab Commune,

Peariang District

SEIP-FST-174-A / New

Construction of School

Building at Prey Toab Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

Prey Toab Village, Preah Development on

Sdach Commune, Preah

Sdach District

SEIP-FST-176-A / New

Construction School Building and Renovation of Teacher Community Pending Accommodation at Phnom IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Banteay Lower Secondary Development on School, Prey Kla Viallage,

Peakdei Commune, Boset

District

SEIP-FST-175-A / New

Construction of School

Building at Koh Ksach Community Pending

Tonlea Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04

School, Kbal Koh Village, Development on

Koh Ksach Tonle Commune,

Sa Ang District

SEIP-FST-128-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Kiri Vong IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Lower Secondary School, Development on Kompong Village, Phreak

Bat Chan Chum Commune,

Kiri Vong District, Takeo

Page 11 SEIP-FST-129-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Sok An IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Tunloap Lower Secondary Development on School, Bour Village, Prey

Romdeng Commune, Kiri

Vong District, Takeo

SEIP-FST-132-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Prey Tub IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Lower Secondary School, Development on Prey Tub Village, Srogner

Commune, Traing District,

Takeo

SEIP-FST-133-A /

Construction of Teacher

Accommodation and

Renovation of School

Building and Standard 8 Community Pending

Classroom at Ang Rokar IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Lower Secondary School, Development on

Prey Romdoul Village,

Tropiang Thom Khang

Thbong Commune, Tram Kok

District, Takeo

SEIP-FST-134-A /

Renovation of Standard 8

Classroom at Hun Sen Chak Community Pending

Riya Vong Lower Secondary IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06

School, Domnak Chambork Development on

Village, O Krosa Commune,

Kep District,

SEIP-FST-135-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Porng Teuk IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Lower Secondary School, Development on Phnom Leav Village, Porng

Teuk Commune, Domnak

Chang Er District,

SEIP-FST-136-A /

Renovation of School

Building and Standard 8 Community Pending Classroom at Angkor Chey IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Lower Secondary School, Development on Samki Village, Angkor Chey

Commune, Angkor Chey

District,

SEIP-FST-137-A /

Renovation of School

Building and Standard 8

Classroom at Kansom Ark Community Pending

Lower Secondary School, IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Kansom Ark Village, Bantay Development on

Meas Khang Lech Commune,

Bantay Meas District,

Kampot.

SEIP-FST-138-A /

Renovation of School Community Pending

Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Classroom at Prey Khley Development on

Lower Secondary School

SEIP-FST-139-A /

Renovation of School

Building and Standard 8 Community Pending

Classroom at Hun Sen Ank IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21

Sorphy Lower Secondary Development on

School, Kom Pong Trach

District.

SEIP-FST-140-A /

Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-21 Classroom at Hun Sen Development on Trasek Koang Lower

Secondary School

SEIP-FST-141-A / Community Pending Renovation of Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2019-10-06 Classroom at Hun Sen Prey Development on Nup Lower Secondary School

SEIP-FST-142-A /

Construction of Teacher

Accommodation and Community Pending

Renovation of School IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-01-04

Building and Standard 8 Development on

Classroom at Stung Hav

Lower Secondary School

SEIP-FST-143-A /

Construction of Teacher Community Pending Accommodation and IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-01 2019-07-01 2019-07-01 2019-12-28 Renovation of Standard 8 Development on Classroom at Thmar Sar

Lower Secondary School

Page 12 SEIP-FST-124-A /

Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-01 2019-07-01 2019-07-01 2019-10-14 Classroom at Hun Sen La- Development on Veasor Lower Secondary

School

SEIP-FST-145-A /

Renovation of School Community Pending

Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-01 2019-07-01 2019-07-01 2019-10-14

Classroom at Ang Say Lower Development on

Secondary School

SEIP-FST-146-A /

Renovation of School Community Pending

Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-01 2019-07-01 2019-07-01 2019-10-14

Classroom at Slap Leng Development on

Lower Secondary School

SEIP-FST-147-A /

Renovation of School Community Pending Building and Standard 8 IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-01 2019-07-01 2019-07-01 2019-11-28 Classroom at Samdech Euv Development on Samdech Me Borset Lower

Secondary School

SEIP-FST-149-A /

Construction of Teacher Community Pending Accommodation and IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-01 2019-07-01 2019-07-01 2019-12-28 Renovation of Standard 8 Development on Classroom at Toap Meanchey

Lower Secondary School

SEIP-FST-177-A /

Construction of Toam Community Pending Reangsey Prey Mech Lower IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Secondary School, Prey Prech Development on Village , Prey Prech

Commune,

SEIP-FST-160-A / New

Construction of school Community Pending building at Oh Thom IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-03-04 Secondary School, O Thom Development on Village, Tipor Commune,

Santuk District ,

SEIP-FST-78-A / Renovation of science subject rooms,

New Contraction of Teacher Community Pending House and New Construction IDA / 59780 Post Driven Direct 0.00 Implementati 2019-07-08 2019-07-08 2019-07-08 2020-06-02 of School Building at Ampil Development on High School, Ampil Village,

Ampil Commune, Bantay

Ampil District

GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MOEYS-SEIP-NCB001 /

Purchase 6 Vehicles (The estimated cost is Tax Single Stage - One IDA / 59780 Post Request for Bids Open - National 163,200.00 Signed 2017-07-26 2017-08-01 2017-08-31 2017-09-30 2017-10-24 2017-12-23 exclusive). All Taxes and Envelope

Duties are responsible by

Government of Cambodia

MOEYS-SEIP-NCB003 /

Purchase of Equipment for Single Stage - One Central Components IDA / 59780 Post Request for Bids Open - National 85,731.30 Signed 2017-07-26 2017-08-01 2017-08-31 2017-09-30 2018-03-23 2018-05-22 Envelope (computers, printers, photocopies, projectors, etc.)

MOEYS-SEIP-NCB004_2 /

Purchase Equipment for

POE/DOE/RTTC (Lot 1), Single Stage - One IDA / 59780 Post Request for Bids Open - National 656,006.40 Signed 2017-12-14 2017-12-19 2018-01-18 2018-02-17 2018-03-24 2018-06-22 STEM Equipment for Schools Envelope

(Lot 2) & Equipment for

RUPP (Lot 3)

MOEYS-SEIP-NS002 /

Procurement of 69 Stickers Request for Single Stage - One IDA / 59780 Post Open - National 0.00 Canceled 2018-04-27 2018-05-18 2018-11-14 and 55 Signboards for Quotations Envelope

School Construction

MOEYS-SEIP-NCB002 /

Purchase 101 Motorcycles

(The estimated cost is Tax Single Stage - One IDA / 59780 Post Request for Bids Open - National 0.00 Canceled 2017-07-26 2017-08-01 2017-08-31 2017-09-30 2017-10-24 2017-12-23 exclusive). All Taxes and Envelope

Duties are responsible by

Government of Cambodia

MOEYS-SEIP-G-SSS001 / UN Agencies Purchase of 101 Motorcycles IDA / 59780 Post Direct 165,833.42 Signed 2018-04-05 2018-04-06 2018-04-09 2018-06-08 (Direct) through UNOPS

Page 13 MOEYS-SEIP-NCB006 /

Phase 1 Furniture for 360 Single Stage - One IDA / 59780 Post Request for Bids Open - National 618,281.40 Signed 2018-04-25 2018-05-25 2018-06-24 2018-07-24 2018-08-12 2018-11-10 secondary school classrooms ( Envelope

56 sites)

MOEYS-SEIP-NCB005 /

Purchase of Furniture for Single Stage - One IDA / 59780 Post Request for Bids Open - National 0.00 Canceled 2017-07-26 2017-08-01 2017-08-31 2017-09-30 2017-10-24 2017-12-23 Schools (STEM Equipment Envelope for Schools)

MOEYS-SEIP-NCB005/1 /

Purchase of STEM Single Stage - One Equipment (Physic, IDA / 59780 Post Request for Bids Open - National 221,834.00 Signed 2018-03-21 2018-03-21 2018-04-19 2018-05-19 2018-06-09 2018-09-07 Envelope Chemistry and Biology subject) for Schools.

MOEYS-SEIP-NCB004 / Single Stage - One Purchase of Equipment for IDA / 59780 Post Request for Bids Open - National 0.00 Canceled 2017-07-26 2017-08-01 2017-08-31 2017-09-30 2017-10-24 2017-12-23 Envelope POE/DOE/RTTC

MOEYS-SEIP-NS001 /

Procurement of Equipment and Furniture for Lot 1: Request for Single Stage - One GSED Department, Lot 2: IDA / 59780 Post Open - National 25,209.32 Signed 2018-04-13 2018-05-06 2018-06-05 Quotations Envelope Central Equipment and Lot3

: Furniture for Construction

Department

MOEYS-SEIP-SSS002 / Pending UN Agencies Procurement of 01 Vehicle IDA / 59780 Post Direct 0.00 Implementati 2018-11-07 2018-12-02 2019-01-11 2019-07-10 (Direct) pickup for EQAD on

MOEYS-SEIP-NCB007 / Pending Single Stage - One Procurement of Furniture for IDA / 59780 Post Request for Bids Open - National 0.00 Implementati 2019-06-03 2019-07-03 2019-08-02 2019-09-01 2019-09-20 2019-12-19 Envelope Phase II construction on

MOEYS-SEIP-NS004 /

Purchase of STEM Pending Single Stage - One Equipment (Physic, IDA / 59780 Post Request for Bids Open - National 0.00 Implementati 2019-06-06 2019-06-11 2019-06-26 2019-07-16 2019-07-30 2019-09-28 Envelope Chemistry, Biology Subjects) on for Target Schools

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Actual Amount Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Consultant MOEYS-SEIP-CQS01 / IDA / 59780 Post Qualification Open - National 0.00 Canceled 2018-04-19 2018-05-10 2018-06-23 2018-07-23 2018-08-27 2019-02-23 Baseline survey (Firm) Selection

MOEYS-SEIP-CQS04 / A local Firm/NGO (Consultants) to Conduct Data Collection Consultant Under for an Impact Evaluation on IDA / 59780 Post Qualification Open - National 0.00 2018-07-16 2018-08-15 2018-09-05 2018-09-12 2018-09-26 2021-07-30 Implementation Improving Lower Secondary Selection

Education to Meet Minimum

Standards

INDIVIDUAL CONSULTANTS