FORM –1

For “Proposed residential development”

At

Gat No: 116, Moshi-Alandi Road, Dudalgaon, -412105

By

M/s YASHADA DEVLOPERS.

1 Form – 1 M/s Yashada Developers APPENDIX - I (See paragraph - 6) FORM 1

(I) Basic Information

Sr. No. Item Details 1. Name of the project/s Proposed residential development 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Total plot area: 15,200.00 m2 to be handled/command area/lease FSI: 24903.43 m2 ( Including MHADA) area/number of wells to be drilled Non-FSI: 15005.50 m2 Proposed Built Up Area: 39,908.93 m2 m2

Building configuration: Bldg. Ht(m) Configuration Units A to D 35.55 P+11 451 ( G/P+11 For A Building ) G-7 shops on front side and parking E 29.65 P+9 49

MHADA 29.65 P+9 58

Club 6.00 G+1 -- House Total 558

4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. NA 6. Category of project i.e.’ A’ or ‘B’ (B2) 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? If Not Applicable yes, please specify. 9. Location Gat No : 116, Moshi-Alandi Road, Dudalgaon , Pune -412105

Latitudes: 18°40'38.13"N Longitudes: 73°52'49.11"E Plot/Survey/Khasra No. Gat No : 116, Moshi-Alandi Road, Dudalgaon , Pune -412105 Village Dudalgaon Tehsil Haveli District Pune State 10. Nearest railway station Railway Station - ~11 kms Nearest airport – ~20 km 11. Nearest Town, city, Pimpari Chinchwad ~9.3 kms District headquarters along with distance in kms. 2 Form – 1 M/s Yashada Developers Sr. No. Item Details 12. Village Panchayats, Zilla Parishad, Pimpari Chinchwad Municipal Corporation Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant Yashada Devlopers 14. Registered Address J-4," Yashada House ", Near Govid Yashada Chowk, Pimple Saudagar, Pune-411027 15. Address for correspondence J-4," Yashada House ", Near Govid Yashada Chowk, Pimple Saudagar, Pune-411027 Name Mr. Vasant Kate Designation (Owner/Partner/CEO) Partner Address J-4," Yashada House ", Near Govid Yashada Chowk, Pimple Saudagar, Pune-411027 Pin Code 411027 E-mail [email protected] Telephone No. 020-27804020 Fax No. ------16. Details of Alternative Sites examined, if Not Applicable any. Location of these sites should be shown on a topo-sheet.6+ 17. Interlinked Projects No 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves No. approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government No Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) 3 Form – 1 M/s Yashada Developers Yes Details thereof (with approximate quantities /rates, Sr. Information/Checklist / wherever possible) with source of information data No. confirmation No 1.1 Permanent or No Development will be carried in line with the topography and temporary change in without disturbing the natural drainage pattern. land use, land cover or DP attached as Annexure I topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing No -- land, vegetation and building? 1.3 Creation of new land Yes Open land will be converted in to built-up land which is in uses? line with the zoning of local body 1.4 Pre-construction Yes Hydrogeological study has been done. investigation e.g. bore houses, soil testing? 1.5 Construction works? Yes Building Configuration: Residential development with 7 shops Bldg. Ht(m) Configuration Units A to D 35.55 P+11 (including 451 shops) E 29.65 P+9 49 MHADA 29.65 P+9 58 Club 6.00 G+1 -- House Total 558

1.6 Demolition works? No -- 1.7 Temporary sites used Yes During construction phase, temporary housing sheds/camps for construction works within the plot boundaries will be established. or housing of construction workers? 1.8 Above ground Yes Excavation in the form of rubble and soil. Part of this soil building, structures or and rubble will be used for back filling and remaining earthworks including material will be disposed by covered trucks to approved linear structures, cut sites. and fill or excavations. 1.9 Underground works No -- including mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and No -- manufacturing processes? 1.14 Facilities for storage of Yes During construction phase temporary storing facilities will goods or materials? be created to store the construction raw material. 4 Form – 1 M/s Yashada Developers Yes Details thereof (with approximate quantities /rates, Sr. Information/Checklist / wherever possible) with source of information data No. confirmation No 1.15 Facilities for treatment Yes Facilities will be provided for collection, treatment and or disposal of solid disposal for solid and liquid waste waste or liquid STP for treatment of sewage effluents? • Segregation of solid waste into non-biodegradable and biodegradable garbage  Treatment of biodegradable waste in Integrated waste management system  Segregation of Non-biodegradable waste into recyclable & non-recyclable. Recyclable waste: To recyclers  Non-Recyclable waste: To Authorized agency  Dried sludge from STP : As manure 1.16 Facilities for long term No -- housing of operational workers? 1.17 New road, rail, or sea No -- traffic during construction or operation? 1.18 New road, rail, air No -- waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No -- existing transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted No -- transmission lines or pipelines? 1.21 Impoundment, No -- damming, culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or No -- transfers of water from ground or surface waters? 1.24 Changes in water Yes By considering the runoff prior to development and runoff bodies or the land after development there is some increment in runoff of surface affecting storm water. 5 Form – 1 M/s Yashada Developers

Yes Details thereof (with approximate quantities /rates, Sr. Information/Checklist / wherever possible) with source of information data No. confirmation No drainage or run-off? 1.25 Transport of personnel Yes There will be transport of construction materials. or materials for Precautions will be taken to reduce the impact of the construction, operation vehicular movement by trying to avoid the vehicular trips or decommissioning? during peak hours. 1.26 Long-term dismantling No -- or decommissioning or restoration works? 1.27 Ongoing activity No -- during decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes Construction phase area in either The temporary influx will be on an average. 100 nos. temporarily or Operation phase permanently? Project population : 2790 nos. residential and 53 commercial 1.29 Introduction of alien No -- species? 1.30 Loss of native species No -- or genetic diversity? 1.31 Any other actions? No --

2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sr. Information/checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The land is in developed infrastructure area. agricultural land (ha) 2.2 Water (expected source & competing Yes During construction: Potable water shall be users) unit : KLD supplied as per requirement. Construction phase: 10 m3/day Solid waste generated during construction phase will be handed over to external authorized vendor

Operation phase

Sr. Description Quantity Source of No of water water required supply KLD 1. Operation phase a. Domestic 251 Local purpose body b. Flushing 128 Treated 6 Form – 1 M/s Yashada Developers Sr. Information/checklist confirmation Yes / Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data purpose water from STP c. Gardening 13.3 Treated purpose water from STP d. Swimming 4 Tanker pool e. Club House 5 Local body Total 401 Source of water: PCMC 2.3 Minerals (MT) No -- 2.4 Construction material – stone, Yes List of raw materials used during aggregates, and / soil (expected construction phase is enclosed source – MT) herewith. Annexure- II 2.5 Forests and timber (source – MT) No - 2.6 Energy including electricity and fuels Yes During operation phase (source, competing users) Unit: fuel Source – MSEDCL (MT), energy (MW) Maximum Demand – 1248 KW Connected Load – 2259 KW

DG Sets: 1 x 180 KVA 2.7 Any other natural resources (use No - appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No -- which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or No -- affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes Direct employment to the locals during changing living conditions? construction phase.

Indirect employment to the local people has the project will create additional demand for civic amenities and other daily needs. There

7 Form – 1 M/s Yashada Developers Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data will be improvement in the socio-economic status of the people living in the vicinity. 3.4 Vulnerable groups of people who No -- could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No --

4. Production of solid wastes during construction or operation or decommissioning (MT/month):

Details thereof (with approximate quantities / Sr. Information/Checklist Yes / rates, wherever possible) with source of No. confirmation No information data 4.1 Spoil, overburden or mine No -- wastes 4.2 Municipal waste (domestic Yes Construction Phase: and or commercial wastes) Workers: 100 Biodegradable:18kg/day Non-Biodegradable: 8 kg/day The solid waste generation due to workers dwelling on the site will be segregated and will be handed over to authorized recyclers

Operation Phase: Biodegradable: 877 kg/day Non-Biodegradable: 377 kg/day Total solid waste generation is :1254 Kg /Day

•Segregation of non-biodegradable and biodegradable garbage on site. •Bio degradable garbage: Treatment in OWC •Non- biodegradable garbage: Segregation into recyclable and non-recyclable waste Recyclable waste: To recyclers Non-recyclable waste: To PCMC •STP Sludge (Dry sludge): Use as manure 4.3 Hazardous wastes (as per Yes Being a construction project, no Hazardous Waste is Hazardous waste Management expected Rules) 4.4 Other industrial process wastes No -- 4.5 Surplus product No -- 4.6 Sewage sludge or other sludge Yes Dried sludge from STP will be used as manure. from effluent treatment. 4.7 Construction or demolition Yes Solid waste generation during construction phase is wastes. mainly due to excavation in the form of rubble and soil. Part of this soil and rubble will be used for back filling and remaining material will be 8 Form – 1 M/s Yashada Developers Details thereof (with approximate quantities / Sr. Information/Checklist Yes / rates, wherever possible) with source of No. confirmation No information data disposed by covered trucks to the authorized sites. 4.8 Redundant machinery or No -- equipment. 4.9 Contaminated soils or other No -- materials. 4.10 Agriculture wastes. No -- 4.11 Other solid wastes. No --

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) :

Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes D.G. Sets as per CPCB norms will be used during fossil fuels from stationary or power failure. mobile sources 5.2 Emissions from production No -- processes 5.3 Emissions from materials Yes Fugitive dust emission due to handling and loading handling including storage or unloading activities is envisaged during transport construction. Frequent water sprinkling will be done to minimise the fugitive emissions. 5.4 Emissions from construction Yes The project may cause rise in dust levels during activities including plant and construction phase. Precautions would be taken to equipment reduce dust generation during construction phase: • Use of RMC will eliminate on site concrete production reducing handling of cement and sand. Thus dust emission will be reduced. • Water sprinkling will be done at regular intervals to reduce control of dust generation. 5.5 Dust or odours from handling Yes Dust generation will be controlled as described of materials including above. construction materials, sewage Proper ventilation will be provided in and around and waste STP. No odour from sewage as it will be carried out through closed pipelines. No odour from solid waste as it will be segregated into wet and dry waste. 5.6 Emissions from incineration of No -- waste 5.7 Emissions from burning of No -- waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No -- sources

9 Form – 1 M/s Yashada Developers

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. Information/Checklist Yes / No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 6.1 From operation of Yes During construction phase vibration & noise equipment e.g. engines, pollution may occur, necessary precaution shall be ventilation plant, crushers. taken at source, along path & at receptor. DG sets will be provided with acoustic enclosures. 6.2 From industrial or similar No -- processes. 6.3 From construction or Yes During construction phase vibration & noise demolition. pollution may occur, necessary precaution shall be taken at source, along path & at receptors. 6.4 From blasting or piling. No No Piling work is required. 6.5 From construction or Yes During Construction phase: operational traffic. • Proper traffic management for the construction vehicles • Regular maintenance of vehicles with suitable enclosures and intake silencers • Planning and ensuring effective implementation of the waste movement plan for loading and offsite movement in non-traffic hours. • Vehicles entering the construction site shall be restricted to a speed limit of 10 Km/hr • Ear plugs and necessary personal protective equipment shall be provided to the construction workers. • DG sets used will be provided with acoustic enclosures. • Barricading will be provided all around the site to avoid the pollution to neighboring sites.

During Operation Phase : • Install traffic control measures to regulate the flow of traffic • Assign traffic wardens to regulate flow of project traffic during peak hours 6.6 From lighting or cooling No -- systems. 6.7 From any other sources. No --

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Sr. Information/Checklist Yes / No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, No - use or spillage of hazardous materials. 7.2 From discharge of sewage No Construction phase: Mobile toilets will be 10 Form – 1 M/s Yashada Developers

Sr. Information/Checklist Yes / No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data or other effluents to water provided for the workers or the land (expected mode and place of Operation phase: discharge). Sewage generated will be treated in a proposed STP of 346 KLD and will be reused for flushing and gardening within the premises. Excess treated sewage will be disposed to sewer line. 7.3 By deposition of pollutants No -- emitted to air into the land or into water. 7.4 From any other sources. No -- 7.5 Is there a risk of long term No -- build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment :

Sr. Information/Checklist Yes / No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, No -- spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes. No -- 8.3 Could the project be Yes On site Emergency Plan shall be prepared in affected by natural consultation with relevant Stakeholders. disasters causing environmental damage (e.g. floods, earthquakes, landslides, and cloudburst)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality:

Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting facilities, ancillary Yes Project will help for Infrastructure augmentation. development or development stimulated by the project which could have impact on the environment. 11 Form – 1 M/s Yashada Developers

Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, No which could have an impact on the environment 9.3 Set a precedent for later Yes Will create job opportunity for support staff like developments Security, Maintenance, household workers etc 9.4 Have cumulative effects due to Yes Impacts on water availability, storm water proximity to other existing or drainage, availability of electricity, traffic planned projects with similar congestion etc. effects

(III) Environmental Sensitivity

Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary 1 Areas protected under international NA --- conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive Indrayani River 0.25 for ecological reasons - Wetlands, Pawana River 10.50 watercourses or other water bodies, 10.50 coastal zone, biospheres, mountains, Mula – Mutha 14.80 forests River 16.70 Ram River 20.00 Bhima River 9.00 Shahu Maharaj 8.75 Talav Bird Valley Lake 8.30 Sumanth Sarovar 7.70 Upper Lake 8.30 Shri Ganesh 12.50 Talav, Dehuroad Lake 13.80 Lohgaon Lake 10.40 Visharant Wadi 10.80 Lake 14.60 Wagholi Lake

12 Form – 1 M/s Yashada Developers

Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary 3 Areas used by protected, important or Indrayani River 0.25 sensitive species of flora or fauna for Pawana River 10.50 breeding, nesting, foraging, resting, Mula River 10.50 over wintering, migration Mula – Mutha 14.80 River Mutha River 16.70 Ram River 20.00 Bhima River 9.00 Shahu Maharaj 8.75 Talav Bird Valley Lake 8.30 Sumanth Sarovar 7.70 Upper Lake 8.30 Shri Ganesh 12.50 Talav,Nigdi Dehuroad Lake 13.80 Lohgaon Lake 10.40 Visharant Wadi 10.80 Lake 14.60 Wagholi Lake 4 Inland, coastal, marine or underground Indrayani River 0.25 waters Pawana River 10.50 Mula River 10.50 Mula – Mutha 14.80 River Mutha River 16.70 Ram River 20.00 Bhima River 9.00 Shahu Maharaj 8.75 Talav Bird Valley Lake 8.30 Sumanth Sarovar 7.70 Upper Lake 8.30 Shri Ganesh 12.50 Talav,Nigdi Dehuroad Lake 13.80 Lohgaon Lake 10.40 Visharant Wadi 10.80 Lake 14.60 Wagholi Lake 5 State, National boundaries No Not Applicable 6 Routes or facilities used by the public No Not Applicable for access to recreation or other tourist, pilgrim areas 7 ~11 km Defence installations cantonment CME ~12 km 8 Densely populated or built-up area Pimpari ~6 Chinchwad 13 Form – 1 M/s Yashada Developers

Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) from Proposed project location boundary 9 Areas occupied by sensitive man-made Mahatma Phule ~2 land uses (hospitals, schools, places Primary School of worship, community facilities) Pimpari ~2 Chinchwad Marathi School Shree Hospital ~1.5 Sanjivan Hospital ~2.3 RJSPM ‘s Institute ~1.8 of Computer Science Modern college of Pharmacy 10 Areas containing important, high No Not Applicable quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No Not Applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard No It lies in Zone-III of seismic which could cause the project to region and designing and present environmental problems construction will be done (Earthquakes, subsidence, landslides, accordingly. erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies: Not Applicable

14 Form – 1 M/s Yashada Developers

Raw Material List

Sr. No. Name Units

1 Cement bags

2 White Cement bags

3 Steel Metal tonnes

4 Metal cuft

5 Sand cuft

6 Bricks/siporex nos.

7 Binding wire kg.

8 Tiles Granite/Marble sq.ft

9 Paint lts

10 Plaster sq.mts

11 Wood kg.

12 Aluminium kg.