Namakkal District
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
SA9903 F 2018 M Rajasekaran.Pdf
TAMILNADU INFORMATION COMMISSION No.2, Thiyagaraya Road, Teynampet, Chennai 600 018. Tel: 24357580 Date of Enquiry : 11.09.2020 PRESENT : Thiru S.T.TAMILKUMAR, B.A.,B.L., STATE INFORMATION COMMISSIONER. Case No. SA9903/F/2018 Thiru M. Rajasekaran .. PETITIONER /Vs/ The Public Information Officer, .. PUBLIC AUTHORITY Head Quarters Deputy Tahsildar, Paramathi Vellore – 638 182. Namakkal District. ---- ORDER Due to Covid-19 lockdown imposed by the Government of Tamil Nadu this Commission due to the constraint of conducting the enquiry in person, conducts the enquiry through telephone and online. Hence this case was taken in to enquiry on 11.09.2020 F.N. through telephone. During the enquiry the petitioner Thiru.M.Rajasekaran, Pothanur, Namakkal District was unable to attend the phone and the Public Information Officer, Head Quarters Deputy Tahsildar, Paramathi Vellore, Namakkal District was present. 2. A perusal of the petition dated 01.10.2018 filed under section 6(1) of the R.T.I. Act, 2005 reveals that the petitioner has sought information and permission to inspect all the documents and copy of the registers viz “ A” Settlement, Conditional assignment, Adangal, 2 C, 7 Account, 6 Account, 5 Account Waiver, Village Account No.4, 10 account, Additional wet assessment and Miscellaneous register maintained at the Officer of the Village Administrative Officer, Pilikalpalayam and Area under 2c patta, name of the beneficiaries and proof that they have been remitting the fee to that annually. Area under Natham and Porampoke, Panchami lands, Oozhium and lands allotted to the privileged groups, Actual area under encroachment and action caused with to evict them, their extent and survey numbers. -
Tamil Nadu Industrial Connectivity Project: Mohanur-Namakkal
Resettlement Plan Document Stage: Draft January 2021 IND: Tamil Nadu Industrial Connectivity Project Mohanur–Namakkal–Senthamangalam–Rasipuram Road (SH95) Prepared by Project Implementation Unit (PIU), Chennai Kanyakumari Industrial Corridor, Highways Department, Government of Tamil Nadu for the Asian Development Bank CURRENCY EQUIVALENTS (as of 7 January 2021) Currency unit – Indian rupee/s (₹) ₹1.00 = $0. 01367 $1.00 = ₹73.1347 ABBREVIATIONS ADB – Asian Development Bank AH – Affected Household AP – Affected Person BPL – Below Poverty Line CKICP – Chennai Kanyakumari Industrial Corridor Project DC – District Collector DE – Divisional Engineer (Highways) DH – Displaced Household DP – Displaced Person SDRO – Special District Revenue Officer (Competent Authority for Land Acquisition) GOI – Government of India GRC – Grievance Redressal Committee IAY – Indira Awaas Yojana LA – Land Acquisition LARRU – Land Acquisition, Rehabilitation and Resettlement Unit LARRIC – Land Acquisition Rehabilitation & Resettlement Implementation Consultant LARRMC – Land Acquisition Rehabilitation & Resettlement Monitoring Consultant PIU – Project implementation Unit PRoW – Proposed Right-of-Way RFCTLARR – The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 R&R – Rehabilitation and Resettlement RF – Resettlement Framework RSO – Resettlement Officer RoW – Right-of-Way RP – Resettlement Plan SC – Scheduled Caste SH – State Highway SPS – Safeguard Policy Statement SoR – Schedule of Rate ST – Scheduled Tribe NOTE (i) The fiscal year (FY) of the Government of India ends on 31 March. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2021 ends on 31 March 2021. (ii) In this report, "$" refers to US dollars. This draft resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. -
Problems Faced by Rural Youth in Coimbatore District of Tamil Nadu
6245 Research Note Journal of Extension Education Vol. 31 No. 1, 2019 DOI:https://doi.org/10.26725/JEE.2019.1.31.6245-6248 Problems Faced by Rural youth in Coimbatore district of Tamil Nadu P. Radhakrishnan1 and P.P.Murugan2 ABSTRACT To achieve the evergreen revolution in agriculture sector, retaining rural youth in agriculture is one of the important tasks of the government and other stakeholders in India. But there are less number of studies with conclusive evidence on the problems rural youth face while practicing agriculture. Hence, a study on problems and suggestions for retaining rural youth in agriculture was taken up. It was found that most the respondents expressed lack of irrigation facilities, price fluctuations, involvement of intermediaries in marketing, inadequate crop insurance and insufficient inputs as the constraints. Regarding suggestions, it was found that rejuvenation of rural youth clubs, timely input supply, creation of infrastructure facilities in the village and ICT based transfer of technology would retain the rural youth in agriculture. Keywords: Agriculture; problems; rural youth; Coimbatore; Tamil Nadu The population of the state of Tamil opportunities and non remunerative income Nadu according to the 2011 Census is about from rural areas. To achieve the evergreen 7.2 crore. More than half of them live in villages, revolution in agriculture sector, retaining of although Tamil Nadu is fast becoming a urban rural youth in agriculture is one of the important state. More than half of the state population is tasks. Hence a study was undertaken to know below the age of 30. The younger generation the problems for rural youth in agriculture and will be interested in taking to agriculture as a to offer suggestions to retain rural youth in profession only if agriculture becomes both agriculture. -
World Bank Document
PROCUREMENT PLAN Project information: India; Tamil Nadu Irrigated Agriculture Modernization Project; P158522 Project Implementation agency: The lead implementing agency will be the WRD Public Disclosure Authorized under the administrative jurisdiction of Principal Secretary, PWD. Other implementing agencies will be the Departments of Agriculture, Agricultural Engineering, Agricultural Marketing and Agribusiness, Horticulture, Animal Husbandry and Fisheries; Tamil Nadu Agricultural University (TNAU), Tamil Nadu Fisheries University (TNFU), and Tamil Nadu Veterinary and Animal Sciences University (TANUVAS). A project implementation cell (PIC) will be established in each of participating line department and agency to oversee the implementation of their specific activities. The key functions of each PIC will be to prepare, implement, monitor their annual work plans and coordinate with MDPU. The PIC will consist of a nodal officer, and other staff in technical, procurement, finance, and safeguards areas as needed. Public Disclosure Authorized Date of the Procurement Plan: Dec 14, 2016 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions Public Disclosure Authorized for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. -
Annual Report 2017-2018
MCAS 24th Annual Report 2018 Annual Report 2017– 2018 Respected Chief Guest of the college day function Esteemed Chairman Thiru. K.P. Ramaswamy, Muthayammal Educational and Charitable Trust! Respectable Treasurer Tmt. Sulochana Ramaswamy! Distinguished Secretary Mr. Muthuvel Ramaswamy! Dynamic Executive Director Tmt. Manju Muthuvel! Learned Colleagues! Non-teaching staff members! Invited dignitaries! Parents! Well-wishers! Beloved students of this institution! Technicians! Press and Media Personnel! Ladies and Gentlemen! I stand before you to extend a warm welcome on the eve of 24th Annual Day celebration. It is my proud privilege to present you the 24th Annual Report of our College. Estabished in the year 1994, it offered five Undergraduate Degree courses with 83 students and a handful of Faculty members. Today, there is a drastic improvement interms of strength.The total number of teaching on the roll is 248 and the Non-Teaching staff members are 34 in number. The college shows a gradual upward movement in terms of Admission. The number has by and large augumented (Total Strength: 5566(UG-4863; PG-625; M.Phil-59; Ph.D-19). I take this historic opportunity to appreciate all our goal-oriented knowledge facilitators who have religiously dedicated themselves for the robust growth of our students. Though our college is situated in a barren terrain backward area, it attracts the length and breadth of India. It is interesting to note that students from foreign countries evinced their genuine interest in studying in our college. We now offer 18 Degree courses at the Under Graduate level (B.Sc., Statistics was introduced during this academic Year) and 15 at Post Graduate level. -
Banks Branch Code, IFSC Code, MICR Code Details in Tamil Nadu
All Banks Branch Code, IFSC Code, MICR Code Details in Tamil Nadu NAME OF THE CONTACT IFSC CODE MICR CODE BRANCH NAME ADDRESS CENTRE DISTRICT BANK www.Padasalai.Net DETAILS NO.19, PADMANABHA NAGAR FIRST STREET, ADYAR, ALLAHABAD BANK ALLA0211103 600010007 ADYAR CHENNAI - CHENNAI CHENNAI 044 24917036 600020,[email protected] AMBATTUR VIJAYALAKSHMIPURAM, 4A MURUGAPPA READY ST. BALRAJ, ALLAHABAD BANK ALLA0211909 600010012 VIJAYALAKSHMIPU EXTN., AMBATTUR VENKATAPURAM, TAMILNADU CHENNAI CHENNAI SHANKAR,044- RAM 600053 28546272 SHRI. N.CHANDRAMO ULEESWARAN, ANNANAGAR,CHE E-4, 3RD MAIN ROAD,ANNANAGAR (WEST),PIN - 600 PH NO : ALLAHABAD BANK ALLA0211042 600010004 CHENNAI CHENNAI NNAI 102 26263882, EMAIL ID : CHEANNA@CHE .ALLAHABADBA NK.CO.IN MR.ATHIRAMIL AKU K (CHIEF BANGALORE 1540/22,39 E-CROSS,22 MAIN ROAD,4TH T ALLAHABAD BANK ALLA0211819 560010005 CHENNAI CHENNAI MANAGER), MR. JAYANAGAR BLOCK,JAYANAGAR DIST-BANGLAORE,PIN- 560041 SWAINE(SENIOR MANAGER) C N RAVI, CHENNAI 144 GA ROAD,TONDIARPET CHENNAI - 600 081 MURTHY,044- ALLAHABAD BANK ALLA0211881 600010011 CHENNAI CHENNAI TONDIARPET TONDIARPET TAMILNADU 28522093 /28513081 / 28411083 S. SWAMINATHAN CHENNAI V P ,DR. K. ALLAHABAD BANK ALLA0211291 600010008 40/41,MOUNT ROAD,CHENNAI-600002 CHENNAI CHENNAI COLONY TAMINARASAN, 044- 28585641,2854 9262 98, MECRICAR ROAD, R.S.PURAM, COIMBATORE - ALLAHABAD BANK ALLA0210384 641010002 COIIMBATORE COIMBATORE COIMBOTORE 0422 2472333 641002 H1/H2 57 MAIN ROAD, RM COLONY , DINDIGUL- ALLAHABAD BANK ALLA0212319 NON MICR DINDIGUL DINDIGUL DINDIGUL -
Pradhan Mantri Awas Yojana (PMAY-U)
Pradhan Mantri Awas Yojana (PMAY-U) Proposal for 146 projects under Vertical III & IV Presented to 33rd CSMC meeting on 27.04.2018 Government of Tamil Nadu SLNA – Tamil Nadu Slum Clearance Board PROGRESS OF PMAY (U) Indicators Current Status (No.) § Cities Approved 666 § Demand Survey Completed 666 § Total Demand (as on 31.08.2017) ISSR - 47,309 (as per Demand Survey ,CSC and Online) CLSS - 4,84,105 13,91,609 AHP - 3,41,832 BLC - 5,18,363 § Whether HFAPoA Submitted HFAPoAs for 666 cities /Towns have been submitted to GoI for approval § Whether AIP Submitted Submitted along with HFAPoAs § Whether HFAPoA & AIP entered in MIS In progress ASSESSED HOUSING DEMAND Total GoI Share Vertical 1 – ISSR 2 – CLSS 3 – AHP 4 - BLC requirement (Rs. In Cr.) Demand for 666 Statutory 47,309 4,84,105 3,41,832 5,18,363 13,91,609 26301.62 Towns HOUSING ASSESSMENT ULB WISE Vertical ULB Total 1- ISSR 2- CLSS 3 - AHP 4 - BLC Greater Chennai 23516 110574 125203 92512 351805 Corporation 11 20587 94274 66469 103915 285245 Corporations 124 3206 219065 116626 157620 496517 Municipalities 528 0 58801 32934 163110 254845 Town Panchayats 2 Cantonment 0 1391 600 1206 3347 Boards Total 47309 484105 341832 518363 1391609 (666 ULBs) Demand Survey Vs Approval Demand Survey Units approved so far ISSR - 47309 ISSR - 0 Total- CLSS- Total- AHP- CLSS- 1391609 AHP- 4749 58721 484105 341832 424886 100% 0.98% 30.53 % 17.18 % BLC- BLC- 366165 518363 70.64% PROGRESS OF PMAY (U) Indicators Current Status § SLTC/CLTC staff approved vs. -
Annexure Government of India Ministry of Science & Technology, Department of Science & Technology List of Selected Stude
Annexure 12011/32/2010 INSPIRE (Tamil Nadu) Dated: 16-Oct-2015 Government of India Ministry of Science & Technology, Department of Science & Technology List of Selected Students under the INSPIRE Award Scheme for the Year 2015-16 Name of the State :Tamil Nadu No. of Sanctioned :6293 Sr. Name of Name of Name of Sub Name of the School Name of the selected Class Sex Category Name of Father UID No Ref Code No. Revenue Education District Student or Mother District District (Block/Tehsil/Zone etc.) 1 Ariyalur Ariyalur Ariyalur ST.IGNATIUS HIGH F. BURUNO HILDON 6 M OBC FELIX 15TN1269506 SCVHOOL 2 Ariyalur ARIYALUR Ariyalur GOVERNMENT MAHENDRAN B 10 M OBC BALUSAMY 15TN1269507 HIGHER SECONDARY SCHOOL GOVINDAPURAM 3 Ariyalur Ariyalur Ariyalur PANCHAYAT UNION SELVAKUMAR 7 M OBC SENTHIL 40323838 15TN1269508 MIDDLE SCHOOL 7844 PALLAKRISHNAPUR AM 4 Ariyalur Ariyalur Ariyalur GOVT HIGH SCHOOL JOSHWA CALEPH 9 M OBC SAGGIRYAS 15TN1269509 KEELAIYUR 5 Ariyalur Ariyalur Ariyalur GOVT HR SEC NAVEENKUMAR 8 M OBC THIRUGNANASA 15TN1269510 SCHOOL MBANDHAM ELAKKURICHI 6 Ariyalur Ariyalur Ariyalur GOVT HR SEC PRASANTH 9 M OBC CHINNADURAI 15TN1269511 SCHOOL ELAKKURICHI Page 1 of 446 Sr. Name of Name of Name of Sub Name of the School Name of the selected Class Sex Category Name of Father UID No Ref Code No. Revenue Education District Student or Mother District District (Block/Tehsil/Zone etc.) 7 Ariyalur ARIYALUR Ariyalur NIRMALA GIRLS KAVIYA K 6 F Gen KANNAN P 69713599 15TN1269512 HIGHER SECONDARY 6948 SCHOOL ARIYALUR 8 Ariyalur ARIYALUR Ariyalur PANCHAYAT UNION GOPIKA M 7 F SC MANI 74541194 15TN1269513 MIDDLE SCHOOL 9444 THIRUVENGANUR 9 Ariyalur Ariyalur Ariyalur K.R.V. -
A GIS Based Study on Land Evaluation in Rasipuram Block, Namakkal District, Tamil Nadu
ISSN(Online) : 2319-8753 ISSN (Print) : 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology (An ISO 3297: 2007 Certified Organization) Vol. 5, Issue 9, September 2016 A GIS Based Study on Land Evaluation in Rasipuram Block, Namakkal District, Tamil Nadu V. Emayavaramban1 Associate Professor, Department of Geography, Madurai Kamaraj University, Madurai, Tamil Nadu, India.1 ABSTRACT: The main objective of this study is to identify an appropriate land suitable for cultivation in a scientific land evaluation manner. This kind of analysis gives a proper idea for the farmers to do the land management practices and helps to increase land productivity. A GIS based multi-criteria decision making (MCDM) is used to achieve this objective to assess the suitable area for the cultivation of crops. Overlay analysis has generally taken the form of weighted overlay depending on our perspective. The main objective of weighted overlay is to calculate a new set of values for the complete coverage based on a combination of input values. This operation processes the complete data sets, so boundaries from all inputs layers will be retained. The study area taken for this study is Rasipuram block of Namakkal District. The District lies in the interior part of Tamil Nadu. The layer used in decision making system is soil parameters such as texture, production potential and climatic parameters such as rainfall, physical parameters such as drainage density, slope and geomorphology. All these layers are ranked properly based on the expert advice and literature then suitable weights are assigned to do the overlay analysis method to delineate suitability classes. -
ERODE Sl.No Division Sub-Division Name & Address of the Office With
ERODE Details of Locations with Land Line & Bandwidth - 256 Kbps No. of PCs Name & Address of the office with Land Line connected with Existing Proposed Sl.No Division Sub-Division Contact Number where VPNoBB Number the VPNoBB Bandwidth Bandwidth Connectivity is available connectivity AE/O&M/S/Chithode,Indra Nagar, Urban / 1 Chithode Naduppalayam, 0424-2534848 4 256 256 Erode Chithode - 638 455 South / C&I/South/ AE/O&M/Solar, 2 0424-2401007 4 256 256 Erode Erode Iraniyan St,Solar Asst.Engineer,O&M/Gugai, AEE/O&M/Gugai, D.No.17/26 , 3 Gugai 0427-2464499 4 256 256 Ramalingamadalaya Street,Gugai,Salem Town/ Salem Asst.Engineer,O&M/ Linemedu/ Salem/TNEB 4 Gugai 0427-2218747 4 256 256 D.No.60,Ramalingamsamy Koil St, Linemedu Gugai Salem 6. Asst.Engineer,O&M/ Kalarampatty/Salem/TNEB, 5 0427-2468791 4 256 256 D.No.13, Nethaji St., Town/ Salem Kitchi palayam Kalarampatty,Salem 636015 Junior.Engineer,O&M/ 6 Dadagapatty/TNEB,Shanmuga 0427-2273586 4 256 256 nagar, dadagapatty Salem 636006 Asst.Engineer,O&M/ 7 Swarnapuri Mallamooppampatti/TNEB, Sundar 0427-2386400 4 256 256 nagar,Salem 636302 West/ Salem Asst.Engineer,O&M/ Narasothipatti/TNEB, 5/71-b2,PG 8 Swarnapuri 0427-2342288 4 256 256 Nagar, Jagirammapalayam.Salem 636302 Asst.Engineer,O&M/ 9 Town/ Salem Gugai Seelanaickenpatty/ Salem,SF.No.93, 0427-2281236 4 256 256 Seelanaickenpatty bypass, Salem Asst.Engineer,O&M/ 10 Suramangalam Rural/Nethimedu/TNEB, Circle 0427-2274466 4 256 256 Thottam /Nethimedu, Salem West/ Salem 636002 West/ Salem Asst.Engineer,O&M/ 11 Shevapet Kondalampatti/TNEB, 7/65 -
Thematic Area
1 PROFORMA FOR PREPARATION OF ANNUAL REPORT (April 2018-March 2019) APR SUMMARY (Note: While preparing summary, please don’t add or delete any row or columns) 1. Training Programmes Clientele No. of Courses Male Female Total participants Farmers & farm women 161 3282 1139 4421 Rural youths 10 170 127 297 Extension functionaries 19 598 312 910 Sponsored Training 15 287 152 439 Vocational Training - - - - Total 205 4337 1730 6067 2. Frontline demonstrations Enterprise No. of Farmers Area (ha) Units/Animals Oilseeds 131 50 - Pulses 200 80 - Cereals 15 6 - Vegetables 43 1.4 - Other crops 72 24.4 - Total 461 161.8 Livestock & Fisheries 56 0.4 30 dairy Animals 50 Small Ruminants Duck-70nos Cage -2nos ( 8X8X2m) Other enterprises - - - Total 56 0.4 150 Grand Total 517 162.2 150 3. Technology Assessment & Refinement Category No. of Technology No. of Trials No. of Farmers Assessed & Refined Technology Assessed Crops 6 40 40 Livestock 2 20 20 Various enterprises 1 10 10 Total 9 70 70 Technology Refined - - - Crops Livestock Various enterprises Total Grand Total 9 70 70 4. Extension Programmes Category No. of Programmes Total Participants Extension activities 571 25883 Other extension activities 565 22715 2 Total 1136 48598 5. Mobile Advisory Services Type of Messages Other Total Name of Livesto Marke Awar Message Type Crop Weather enterpris KVK ck -ting e-ness e Text only 37 3 55 1 5 0 101 Voice only - - - - - - - Voice & Text both - - - - - - - Total Messages 37 3 55 1 5 0 101 Total farmers 410 462 831 45 417 - 2165 Benefitted 6. Seed & Planting Material Production Quintal/Number Value Rs. -
ANNEXURE 5.8 (CHAPTER V, PARA 25) FORM 9 List of Applica Ons For
ANNEXURE 5.8 (CHAPTER V, PARA 25) FORM 9 List of Applicaons for inclusion received in Form 6 Designated locaon identy (where Constuency (Assembly/£Parliamentary): Paramathi-Velur Revision identy applicaons have been received) From date To date @ 2. Period of applicaons (covered in this list) 1. List number 03/12/2020 03/12/2020 3.