00 EZ Shed™ PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION

Tool eeded Quick Framer - Gambrel Roof STMER SERIE 203591-9032-30-530

INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD BRACKETS (12 pieces), “A” ANGLE BRACKETS (24 pieces) and “B” ANGLE BRACKETS (16 pieces) . Please refer to “A” or “B” stamped into each ANGLE BRACKET. Cut and mark all to identify as stated in CUT LIST that corresponds to your structure size. Stack all lumber in separate areas. 2. In accordance with your size structure, nail BASE PLATE boards together overlapping ends to form structure base frame. (Picture #1) Use the pressure treated lumber for the bottom of the base frame to prevent rotting. Make sure base frame is by measuring from corner to corner diagonally. 3. Using screws, attach STUD BRACKETS to outside of top base frame boards (Picture #2) using measurements listed on SIDE VIEW drawing of plans in accordance with your size structure. Measurements are to center of STUD BRACKETS. 4. 3(A-D). Attach NOTE:STUD In order BRACKETS to make sure each(Picture arch is built #2) the tosame, base stand frame short 2” using x 4” scrap measurements boards into RIDGE on BOARD plans. slots Measurements of each ANGLE BRACKET are to during center assembly. of brackets (Picture #3) 4(A.). Begin Begin arch arch assembly assembly by sliding by two sliding UPPER 2 RAFTERRAFTERS boards into top top ANGLEANGLE BRACKET BRACKET “A” and secureand with secure screws with through screws. SQUARE Attachholes (for otherproper screw 2 alignment) in bracket. ANGLE(B.) AttachBRACKETS two more “A” ANGLEto BRACKETSand to ends secure of eachwith UPPER screws. board In order and secure to make with screws sure through each square arch isholes. built the same, stand 2x4 scraps(C.) Slide in LOWERRIDGE RAFTER BOARD boardsslots into ends (Picture of each “A” 3). ANGLE Stack BRACKET the arches and secure as you with assemble screws through them square using holes. the 2x4’s as alignment devices. (D.) Attach ANGLE BRACKET “B” to ends of each LOWER RAFTER boards and secure with screws through square holes. 5. After the ANGLE BRACKETS have been attached to one side of all arches, carefully turn arches over and attach 5. After ANGLE BRACKETS have been attached to one side of arch assembly, carefully turn arch over, leaving scrap boards in place in RIDGE BOARD slots. to other side while using the alignment devices mentioned in step 4. Then attach left and right 6. ANGLERepeat steps BRACKETS # 4 (A) through (D) attaching ANGLE BRACKETS to other side of arch and secure using screws through the ROUND holes (for proper screw alignment) in STUDSANGLE BRACKETS. to RAFTERS Continue and assembling secure the using required screws. number of arches according to your structure size. 7. Slide left and right STUDS into end of each ANGLE BRACKET “B” and secure using screws through ROUND holes. Carefully turn arch assembly over and secure ANGLE BRACKET “B” to STUDS using screws through SQUARE holes. Repeat this step on all arch assemblies. 8. Nail COLLAR TIE to LOWER RAFTER board of each arch assembly, making sure that the top corner of the COLLAR TIE is flush with the outside edge of LOWER RAFTER board. Be sure to attach the COLLAR TIES facing inside on the two end arches. 9. After all arch assemblies are complete, using two people carefully lift each arch onto the assembled base frame and secure to STUD BRACKETS using screws. Arches should be perpendicular to base frame (use a square). To hold the arches in a perpendicular position, use 1” x 4” temporary bracing inside of structure and leave in position until sheathing is in place, as shown in SIDE VIEW drawing. Leave nail heads slightly raised so they can be easily pulled out. The end arch assemblies should set flush with the base frame corners. Bend STUD BRACKETS around each corner of base frame and secure using screws. 10. After arch assemblies are set into place, remove scrap boards from “B” ANGLE BRACKET slots on one side of structure and place RIDGE BOARD into slots in “B” brackets. You may need to tap boards into place using a hammer. Repeat on opposite side of structure. Move up to lower ANGLE BRACKET “A” remove scrap boards and place RIDGE BOARD into slots in lower “A” brackets. Repeat on opposite side of structure. Remove scrap boards from top ANGLE BRACKET “A” and place RIDGE BOARD into slots in top “A” angle brackets. Make sure all arch assemblies are in correct positioning and adjust if needed. Secure all RIDGE BOARDS using screws through bottom holes in ANGLE BRACKETS. (For 10’ x 22’ structures, see #4 of Helpful Hints) 11. Install DOOR JAMBS as shown in FRONT VIEW drawings in accordance with your building size. Nail top of DOOR JAMBS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each DOOR JAMB. Attaching to outside of top BASE PLATE. 12. Install two VERTICAL STUDS in back wall. (Same layout as Step 11) Nail top of VERTICAL STUDS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each VERTICAL STUD. Attaching to outside of top BASE PLATE. 13. Your frame is now complete and ready to sheathe with materials of your choice. (See Helpful Hints) CUT LIST (10'X22' Building) HELPFUL HINTS (ALL SIZES) 24 - 2X4 Studs cut to 6' 4" (Cut from 24 - 8') 1. Install wall sheathing horizontally on sides of 7’X8’ building. Install wall sheathing vertically on ends of 7’X8’ building. Install all wall sheathing vertically on larger size 24 - 2X4 Upper rafters cut to 3' 6-1/8" (Cut from 12 - 8') buildings. Install roof sheathing horizontally on all building sizes. Save the pieces of sheathing that you cut off and use them elsewhere (such as the other side of the roof). 24 - 2X4 Lower rafters cut to 3' 1" (Cut from 12 - 8') Use completed arch as pattern to trace cut lines on sheathing for ends of building. 12 - 2X4 Collar ties cut to 8' 3-1/2" (Cut from 12 - 10') 2. Roofing material may be metal, corrugated fiberglass, rolled roofing or shingles. 2 - 2x4 Door jambs cut to 8' 3-1/2" (Cut from 2 - 10') 3. Doors can be cut from sheathing. Outline each half with 1X4 boards to make them rigid. Screw hinges to door jambs. On larger buildings, full sheets of plywood 2 - 2x4 Vertical studs cut to 8' 3-1/2" (Cut from 2 - 10') may be used to construct 8’doors. 2 - 2X4 Base plates 16' long (Use 2 - 16') 4. On 10’ x 22’ structures, stagger ridge board seams as follows: Start at front end of structure and place 16’ ridge board into slot in “B” brackets. (you may need to tap into 2 - 2X4 Base plates cut to 6' (Cut from 1 - 12') place using a hammer) Move to back end of structure and place 6’ ridge board into slot in remaining “B” angle brackets. Repeat on opposite side of structure. At front end of 2 - 2x4 Base Plates cut to 9' 4" (Cut from 2 - 10') structure, move up to lower angle bracket “A” and place the 6’ ridge board into slots in lower “A” angle brackets. Move to back end of structure and place 16’ ridge board into slots in remaining lower “A” angle brackets. Repeat on opposite side. At front end of structure, move up to top “A” angle bracket and place the 16’ ridge board into slots of 5 - 2X4 Ridge boards 16' long (Use 5 - 16') top “A” angle brackets. Move to back end of structure and place the 6’ ridge board into slots in remaining top “A” angle bracket. Make sure all arch assemblies are in correct 5 - 2X4 Ridge boards 6' long (Cut from 2 - 12' and 1 - 8') positioning and adjust if needed. Secure all ridge boards using screws through bottom holes in angle brackets. 10 - lX4 Temp. bracing/ door stiffener (Use 10 - 8') 5. Optional 1X4’s may be used as corner trim. 2 - 2X4 Pressure treated base plates 16' long (Use 2 - 16') 6. Sheathing may be installed above pressure treated base plates to prevent moisture damage. 2 - 2X4 Pressure treated base plates cut to 9' 11" (Cut from 2 - 16') 2 - 2X4 Pressure treated base plates cut to 5'5" (Cut from above 16's) See Helpful Hints #9 - 10 - 12 415 Reservoir Road • Whitefish,STMER MT 59937 SERIE• 1-406-253-5138 203591-9032-30-530 or 1-406-250-7054 • Fax 1-800-880-3178 U.S. Patent #5,524,397 Canadian Patent #2,227,540

Stud Brackets

X rsuetetdbs ltsctt '11" 6' to cut plates base treated Pressure 2X4 - 2

X rsuetetdbs ltsctt 7’5" to cut plates base treated Pressure 2X4 - 2

X ep bracing Temp. 1X4 - 4

x aepae u o6 4" 6' to cut plates Base 2x4 - 2

X aepae 'long 8' plates Base 2X4 - 2

orstiffener door /

X ig ors8 long 8' boards Ridge 2X4 - 5

x etclsusctt 6' to cut studs Vertical 2x4 - 2

X orjmsctt 6' to cut jambs Door 2X4 - 2 Ctfo -16') 1 from (Cut

X olrte u o5' to cut ties Collar 2X4 - 4 Ctfo 16') - 1 from (Cut

X pe atr u o2 4" 2' to cut rafters Upper 2X4 - 8 3-1/2" Ue4-8') - 4 (Use

3-1/2" X oe atr u o2 1" 2' to cut Rafters Lower 2X4 - 8 Ctfo 8') - 2 from (Cut

6-1/4"

X td u o4' to cut Studs 2X4 - 8 Ue2-8') - 2 (Use

Ue5-8') - 5 (Use

Ctfo 8') - 2 from (Cut

(6’ 4” long) 7-1/8" Picture #3

Ctfo 8') - 2 from (Cut

Ctfo 12') - 2 from (Cut

X rsuetetdbs ltsctt '11" 7' to cut plates base treated Pressure 2X4 - 2

U IT(’8 Building) (7’X8’ LIST CUT

Ctfo 10') - 2 from (Cut

X rsuetetdbs ltsctt 3 5" 13' to cut plates base treated Pressure 2X4 - 2

Picture #2 -10') 2 from (Cut

X ep rcn/orstiffener bracing/door Temp. 1X4 - 6

Ctfo -10') 4 from (Cut

X ig ors1'long 14' boards Ridge 2X4 - 5 Picture #1 Picture

x aepae u o7 4" 7' to cut plates Base 2x4 - 2

X aepae 4 long 14' plates Base 2X4 - 2

x etclsusctt '3-1/2" 7' to cut studs Vertical 2x4 - 2

X orjmsctt '3-1/2" 7' to cut jambs Door 2X4 - 2

Ctfo 16') - 1 from (Cut (6’ 4” long) Picture #3

X olrte u o6 5-1/4" 6' to cut ties Collar 2X4 - 8

Ctfo 16') - 2 from (Cut (6’ 4” long) Picture #3 6-24Lwrrfesctt '6" 2' to cut rafters Lower 2X4 - 16

Ue6-8') - 6 (Use

6-24Uprrfesctt '8-1/4" 2' to cut rafters Upper 2X4 - 16

Ue5-14') - 5 (Use 6-24Susctt '6" 5' to cut Studs 2X4 - 16 Picture #2

Ctfo 8') - 2 from (Cut Picture #2 Ue2-14') - 2 (Use

Ctfo 8') - 2 from (Cut

Ctfo 8') - 2 from (Cut

Ctfo 8") - 8 from (Cut

Ctfo 10') - 4 from (Cut

U IT(’1’Building) (8’X14’ LIST CUT

Ctfo 12') - 4 from (Cut Ctfo 12') - 8 from (Cut

Picture #1

CUT LIST (7’X8’ Building) CUT LIST (8’X14’ Building) 8 - 2X4 Studs cut to 4' 7-1/8" (Cut from 4 -10') 16 - 2X4 Studs cut to 5' 6" (Cut from 8 - 12')

8 - 2X4 Lower Rafters cut to 2' 1" (Cut fromPicture 2 -10') #1 16 - 2X4 Upper rafters cut to 2' 8-1/4" (Cut from 4 - 12') 6 ”long) 4” (6’ 8 - 2X4 Upper rafters cut to 2' 4" Picture(Cut from #1 2 - 10') 16 - 2X4#2 LowerPicture rafters cut to 2' 6" (Cut from 4 - 10') 4 - 2X4 Collar ties cut to 5' 6-1/4" (Cut from 2 - 12') 8 - 2X4 Collar ties cut to 6' 5-1/4" (Cut from 8 - 8") 2 - 2X4 Door jambs cut to 6' 3-1/2" (Cut from 2 - 8') 2 - 2X4 Door jambs cut to 7' 3-1/2" (Cut from 2 - 8') 2 - 2x4 Vertical studs cut to 6' 3-1/2" (Cut from 2 - 8') 2 - 2x4 Vertical studs cut to 7' 3-1/2" (Cut from 2 - 8') 5 - 2X4 Ridge boards 8' long (Use 5 - 8') 2 - 2X4 Base plates 14' long (Use 2 - 14') 2 - 2X4 Base plates 8' long (Use 2 - 8') 2 - 2x4 Base plates cut to 7' 4" (Cut from 2 - 8') CUT LIST (8’X14’ Building) 2 - 2x4 Base plates cut to 6' 4" (Cut from 2 - 8') CUT LIST (7’X8’ Building)5 - 2X4 Ridge boards 14' long (Use 5 - 14') 4 - 1X4 Temp. bracing / door stiffener (Use 4 - 8') CUT LIST (8’X14’ Building) 8 - 2X4 Studs cut to 4' 7-1/8" CUT LIST (7’X8’ Building)(Cut6 - from 1X4 4Temp. -10') bracing/door stiffener (Use 6 - 8')16 - 2X4 Studs cut to 5' 6" (Cut from 8 - 12') 2 - 2X4 Pressure treated base plates cut to 7’5" (Cut from 1 - 16') 7-1/8" 8 - 2X4 Studs8 - 2X4 cut to Lower 4' Rafters cut to 2' 1" (Cut from(Cut 4 -10')2 - from 2X4 2Pressure -10') treated base plates cut to 13' 5" (Cut16 - 2X4from Studs162 - -16') 2X4 cut to Upper 5' 6" rafters cut to 2' 8-1/4" (Cut from(Cut 8 - 12') from 4 - 12') 2 - 2X4 Pressure treated base plates cut to 6' 11" (Cut from 1 -16') 8 - 2X4 Lower8 - 2X4 Rafters Upper cut rafters to 2' 1" cut to 2' 4" (Cut from(Cut 2 -10')2 - from 2X4 2Pressure - 10') treated base plates cut to 7' 11" (Cut16 - 2X4from Upper161 - -16') 2X4 rafters Lower cut raftersto 2' 8-1/4" cut to 2' 6" (Cut from(Cut 4 - 12') from 4 - 10') 8 - 2X4 Upper4 - 2X4 rafters Collar cut ties to 2' cut 4" to 5' 6-1/4" (Cut from(Cut 2 - 10') from 2 - 12') 16 - 2X4 Lower8 - 2X4 rafters Collar cut ties to 2' cut 6" to 6' 5-1/4" (Cut from(Cut 4 - 10') from 8 - 8") 6-1/4" 4 - 2X4 Collar2 - 2X4 ties Door cut to jambs 5' cut to 6' 3-1/2" (Cut from(Cut 2 - 12') from 2 - 8') 8 - 2X4 Collar2 - 2X4 ties Door cut to jambs 6' 5-1/4" cut to 7' 3-1/2" (Cut from(Cut 8 - 8") from 2 - 8') 3-1/2" 2 - 2X4 Door2 - 2x4 jambs Vertical cut to studs 6' cut to 6' 3-1/2" (Cut from(Cut 2 - 8') from 2 - 8') 2 - 2X4 Door2 - 2x4 jambs Vertical cut to studs 7' 3-1/2" cut to 7' 3-1/2" (Cut from(Cut 2 - 8') from 2 - 8') 3-1/2" 2 - 2x4 Vertical5 - 2X4 studs Ridge cut boards to 6' 8' long (Cut from(Use 2 - 8') 5 - 8') 2 - 2x4 Vertical2 - 2X4 studs Base cut plates to 7' 14'3-1/2" long (Cut from(Use 2 - 8') 2 - 14') 5 - 2X4 Ridge2 - 2X4 boards Base 8' plates long 8' long (Use 5 - 8')(Use 2 - 8') 2 - 2X4 Base2 - 2x4plates Base 14' plates long cut to 7' 4" (Use 2 - 14')(Cut from 2 - 8') 2 - 2X4 Base2 - 2x4plates Base 8' long plates cut to 6' 4" (Use 2 - 8')(Cut from 2 - 8') 2 - 2x4 Base5 - plates 2X4 Ridge cut to boards 7' 4" 14' long (Cut from(Use 2 - 8') 5 - 14')

2 - 2x4 Base4 - plates 1X4 Temp. cut to bracing 6' 4" / door stiffener (Cut from(Use 2 - 8') 4 - 8') 5 - 2X4 Ridge6 - 1X4 boards Temp. 14' bracing/door long stiffener (Use 5 - 14')(Use 6 - 8') Picture #3 Picture / 4 - 1X4 Temp.2 - 2X4 bracing Pressuredoor treated stiffener base plates cut to 7’5" (Use 4 - 8')(Cut from 1 - 16') 6 - 1X4 Temp.2 - 2X4 bracing/door Pressure treated stiffener base plates cut to 13' 5" (Use 6 - 8')(Cut from 2 - 16') 2 - 2X4 Pressure2 - 2X4 treated Pressure base treated plates base cut toplates 7’5" cut to 6' 11" (Cut from(Cut 1 - 16') from 1 -16') 2 - 2X4 Pressure2 - 2X4 treated Pressure base treated plates base cut toplates 13' 5" cut to 7' 11" (Cut from(Cut 2 - 16') from 1 - 16') 2 - 2X4 Pressure treated base plates cut to 6' 11" (Cut from 1 -16') 2 - 2X4 Pressure treated base plates cut to 7' 11" (Cut from 1 - 16') MATERIALS LIST

Quick FramerMATERIALS - Gambrel LIST Roof Quick Framer - Gambrel Roof (7’X8’ Building) GRADE #2 OR BETTER LUMBER IS RECOMMENDED 1 — EZ Shed Instant Kit 13 — 8’ 2X4’s 8 — 10’ 2X4’s 2 — 12’ 2X4’s 2 — 16’ Pressure Treated 2X4’s 4 — 8’ 1X4’s 9 — 4X8 Sheets of sheathing material of your choice (plywood, waferwood, T-111 etc. ) 86 square feet of roofing material of your choice (metal, fiberglass, rolled roofing, shingles, etc.) 2# — 3” Nails (16d) 2# — 1-1/4” screws MATERIALS LIST (8’X14’ Building) GRADE #2 OR BETTER LUMBER IS RECOMMENDED 2 — EZ Shed Instant Framing Kits 14 — 8’ 2X4’s 4 — 10’ 2X4’s 12 — 12’ 2X4’s 7 — 14’ 2X4’s 3 — 16’ Pressure Treated 2x4’s 6 — 8’ 1X4’s 16 — 4X8 Sheets of sheathing material of your choice (plywood, waferwood, T-111 etc. ) 170 square feet of roofing material of your choice (metal, fiberglass, rolled roofing, shingles, etc.) 2# — 3” Nails (16d) 3# — 1-1/4” Deck screws MATERIALS LIST (10’X22’ Building) GRADE #2 OR BETTER LUMBER IS RECOMMENDED 3 — EZ Shed Instant Framing Kits 49 — 8’ 2X4’s 18 — 10’ 2X4’s 3 — 12’ 2X4’s 7 — 16’ 2X4’ 4 — 16’ Pressure Treated 2x4’s 10 — 8’ 1X4’s 28 — 4X8 Sheets of sheathing material of your choice (plywood, waferwood, T-111 etc. ) 330 square feet of roofing material of your choice (metal, fiberglass, rolled roofing, shingles, etc.) 4# — 3” Nails (16d) 5# — 1-1/4” Deck screws

STMER SERIE 203591-9032-30-530 415 Reservoir Road • Whitefish, MT 59937 • 1-406-253-5138 or 1-406-250-7054 • Fax 1-800-880-3178 MADE IN U.S.A. • Dealer Inquiries Invited

Stud Brackets

X rsuetetdbs ltsctt '11" 6' to cut plates base treated Pressure 2X4 - 2

X rsuetetdbs ltsctt 7’5" to cut plates base treated Pressure 2X4 - 2

X ep bracing Temp. 1X4 - 4

x aepae u o6 4" 6' to cut plates Base 2x4 - 2

X aepae 'long 8' plates Base 2X4 - 2

orstiffener door /

X ig ors8 long 8' boards Ridge 2X4 - 5

x etclsusctt 6' to cut studs Vertical 2x4 - 2

X orjmsctt 6' to cut jambs Door 2X4 - 2 Ctfo -16') 1 from (Cut

X olrte u o5' to cut ties Collar 2X4 - 4 Ctfo 16') - 1 from (Cut

X pe atr u o2 4" 2' to cut rafters Upper 2X4 - 8 3-1/2" Ue4-8') - 4 (Use

3-1/2" X oe atr u o2 1" 2' to cut Rafters Lower 2X4 - 8 Ctfo 8') - 2 from (Cut

6-1/4"

X td u o4' to cut Studs 2X4 - 8 Ue2-8') - 2 (Use

Ue5-8') - 5 (Use

Ctfo 8') - 2 from (Cut

(6’ 4” long) 7-1/8" Picture #3

Ctfo 8') - 2 from (Cut

Ctfo 12') - 2 from (Cut

X rsuetetdbs ltsctt '11" 7' to cut plates base treated Pressure 2X4 - 2

U IT(’8 Building) (7’X8’ LIST CUT

Ctfo 10') - 2 from (Cut

X rsuetetdbs ltsctt 3 5" 13' to cut plates base treated Pressure 2X4 - 2

Picture #2 -10') 2 from (Cut

X ep rcn/orstiffener bracing/door Temp. 1X4 - 6

Ctfo -10') 4 from (Cut

X ig ors1'long 14' boards Ridge 2X4 - 5 Picture #1 Picture

x aepae u o7 4" 7' to cut plates Base 2x4 - 2

X aepae 4 long 14' plates Base 2X4 - 2

x etclsusctt '3-1/2" 7' to cut studs Vertical 2x4 - 2

X orjmsctt '3-1/2" 7' to cut jambs Door 2X4 - 2

Ctfo 16') - 1 from (Cut (6’ 4” long) Picture #3

X olrte u o6 5-1/4" 6' to cut ties Collar 2X4 - 8

Ctfo 16') - 2 from (Cut (6’ 4” long) Picture #3 6-24Lwrrfesctt '6" 2' to cut rafters Lower 2X4 - 16

Ue6-8') - 6 (Use

6-24Uprrfesctt '8-1/4" 2' to cut rafters Upper 2X4 - 16

Ue5-14') - 5 (Use 6-24Susctt '6" 5' to cut Studs 2X4 - 16 Picture #2

Ctfo 8') - 2 from (Cut Picture #2 Ue2-14') - 2 (Use

Ctfo 8') - 2 from (Cut

Ctfo 8') - 2 from (Cut

Ctfo 8") - 8 from (Cut

Ctfo 10') - 4 from (Cut

U IT(’1’Building) (8’X14’ LIST CUT

Ctfo 12') - 4 from (Cut Ctfo 12') - 8 from (Cut

Picture #1

CUT LIST (7’X8’ Building) CUT LIST (8’X14’ Building) 8 - 2X4 Studs cut to 4' 7-1/8" (Cut from 4 -10')

8 - 2X4 Lower Rafters cut to 2' 1" (Cut fromPicture 2 -10') #1 16 - 2X4 Studs cut to 5' 6" (Cut from 8 - 12')

6 ”long) 4” (6’ 8 - 2X4 Upper rafters cut to 2' 4" Picture(Cut from #1 2 - 10') 16 - 2X4#2 UpperPicture rafters cut to 2' 8-1/4" (Cut from 4 - 12') 4 - 2X4 Collar ties cut to 5' 6-1/4" (Cut from 2 - 12') 16 - 2X4 Lower rafters cut to 2' 6" (Cut from 4 - 10') 2 - 2X4 Door jambs cut to 6' 3-1/2" (Cut from 2 - 8') 8 - 2X4 Collar ties cut to 6' 5-1/4" (Cut from 8 - 8") 2 - 2x4 Vertical studs cut to 6' 3-1/2" (Cut from 2 - 8') 2 - 2X4 Door jambs cut to 7' 3-1/2" (Cut from 2 - 8') 5 - 2X4 Ridge boards 8' long (Use 5 - 8') 2 - 2x4 Vertical studs cut to 7' 3-1/2" (Cut from 2 - 8') 2 - 2X4 Base plates 8' long (Use 2 - 8') 2 - 2X4 Base plates 14' long (Use 2 - 14') CUT LIST (8’X14’ Building) 2 - 2x4 Base plates cut to 6' 4" (Cut from 2 - 8') CUT LIST (7’X8’ Building) 2 - 2x4 Base plates cut to 7' 4" (Cut from 2 - 8') 4 - 1X4 Temp. bracing / door stiffener (Use 4 - 8') 5 - 2X4 Ridge boards 14' long (Use 5 - 14') CUT LIST (8’X14’ Building) 8 - 2X4 Studs cut to 4' 7-1/8" CUT LIST (7’X8’ Building)(Cut from 4 -10') 16 - 2X4 Studs cut to 5' 6" (Cut from 8 - 12') 2 - 2X4 Pressure treated base plates cut to 7’5" (Cut from 1 - 16') 7-1/8" 6 - 1X4 Temp. bracing/door stiffener (Use 6 - 8') 8 - 2X4 Studs8 - 2X4 cut to Lower 4' Rafters cut to 2' 1" (Cut from(Cut 4 -10') from 2 -10') 16 - 2X4 Studs16 - 2X4 cut to Upper 5' 6" rafters cut to 2' 8-1/4" (Cut from(Cut 8 - 12') from 4 - 12') 2 - 2X4 Pressure treated base plates cut to 6' 11" (Cut from 1 -16') 2 - 2X4 Pressure treated base plates cut to 13' 5" (Cut from 2 - 16') 8 - 2X4 Lower8 - 2X4 Rafters Upper cut rafters to 2' 1" cut to 2' 4" (Cut from(Cut 2 -10') from 2 - 10') 16 - 2X4 Upper16 - 2X4 rafters Lower cut raftersto 2' 8-1/4" cut to 2' 6" (Cut from(Cut 4 - 12') from 4 - 10') 2 - 2X4 Pressure treated base plates cut to 7' 11" (Cut from 1 - 16') 8 - 2X4 Upper4 - 2X4 rafters Collar cut ties to 2' cut 4" to 5' 6-1/4" (Cut from(Cut 2 - 10') from 2 - 12') 16 - 2X4 Lower8 - 2X4 rafters Collar cut ties to 2' cut 6" to 6' 5-1/4" (Cut from(Cut 4 - 10') from 8 - 8") 6-1/4" 4 - 2X4 Collar2 - 2X4 ties Door cut to jambs 5' cut to 6' 3-1/2" (Cut from(Cut 2 - 12') from 2 - 8') 8 - 2X4 Collar2 - 2X4 ties Door cut to jambs 6' 5-1/4" cut to 7' 3-1/2" (Cut from(Cut 8 - 8") from 2 - 8') 3-1/2" 2 - 2X4 Door2 - 2x4 jambs Vertical cut to studs 6' cut to 6' 3-1/2" (Cut from(Cut 2 - 8') from 2 - 8') 2 - 2X4 Door2 - 2x4 jambs Vertical cut to studs 7' 3-1/2" cut to 7' 3-1/2" (Cut from(Cut 2 - 8') from 2 - 8') 3-1/2" 2 - 2x4 Vertical5 - 2X4 studs Ridge cut boards to 6' 8' long (Cut from(Use 2 - 8') 5 - 8') 2 - 2x4 Vertical2 - 2X4 studs Base cut plates to 7' 14'3-1/2" long (Cut from(Use 2 - 8') 2 - 14') 5 - 2X4 Ridge2 - 2X4 boards Base 8' plates long 8' long (Use 5 - 8')(Use 2 - 8') 2 - 2X4 Base2 - 2x4plates Base 14' plates long cut to 7' 4" (Use 2 - 14')(Cut from 2 - 8') 2 - 2X4 Base2 - 2x4plates Base 8' long plates cut to 6' 4" (Use 2 - 8')(Cut from 2 - 8') 2 - 2x4 Base5 - plates 2X4 Ridge cut to boards 7' 4" 14' long (Cut from(Use 2 - 8') 5 - 14')

2 - 2x4 Base4 - plates 1X4 Temp. cut to bracing 6' 4" / door stiffener (Cut from(Use 2 - 8') 4 - 8') 5 - 2X4 Ridge6 - 1X4 boards Temp. 14' bracing/door long stiffener (Use 5 - 14')(Use 6 - 8') Picture #3 Picture / 4 - 1X4 Temp.2 - 2X4 bracing Pressuredoor treated stiffener base plates cut to 7’5" (Use 4 - 8')(Cut from 1 - 16') 6 - 1X4 Temp.2 - 2X4 bracing/door Pressure treated stiffener base plates cut to 13' 5" (Use 6 - 8')(Cut from 2 - 16') 2 - 2X4 Pressure2 - 2X4 treated Pressure base treated plates base cut toplates 7’5" cut to 6' 11" (Cut from(Cut 1 - 16') from 1 -16') 2 - 2X4 Pressure2 - 2X4 treated Pressure base treated plates base cut toplates 13' 5" cut to 7' 11" (Cut from(Cut 2 - 16') from 1 - 16') 2 - 2X4 Pressure treated base plates cut to 6' 11" (Cut from 1 -16') 2 - 2X4 Pressure treated base plates cut to 7' 11" (Cut from 1 - 16') Quick Framer - Gambrel Roof PLEASE READ ALL INSTRUCTIONS AND HELPFUL HINTS CAREFULLY BEFORE CONSTRUCTION Quick FramerMADE -IN U.S.A.Gambrel Roof Tools needed: Hammer, , , Level, Square, Ladder

INSTRUCTIONS 1. Separate and stack all parts included in kit. STUD BRACKETS (12 pieces), “A” ANGLE BRACKETS (24 pieces) and “B” ANGLE BRACKETS (16 pieces) . Please refer to “A” or “B” stamped into each ANGLE BRACKET. Cut and mark all lumber to identify as stated in CUT LIST that corresponds to your structure size. Stack all lumber in separate areas. 2. In accordance with your size structure, nail BASE PLATE boards together overlapping ends to form structure base frame. (Picture #1) Use the pressure treated lumber for the bottom of the base frame to prevent rotting. Make sure base frame is square by measuring from corner to corner diagonally. 3. Using screws, attach STUD BRACKETS to outside of top base frame boards (Picture #2) using measurements listed on SIDE VIEW drawing of plans in accordance with your size structure. Measurements are to center of STUD BRACKETS. 4. 3(A-D). Attach NOTE:STUD In order BRACKETS to make sure each(Picture arch is built #2) the tosame, base stand frame short 2” using x 4” scrap measurements boards into RIDGE on BOARD plans. slots Measurements of each ANGLE BRACKET are to during center assembly. of brackets (Picture #3) 4(A.). Begin Begin arch arch assembly assembly by sliding by two sliding UPPER 2 RAFTERRAFTERS boards into top top ANGLEANGLE BRACKET BRACKET “A” and secureand with secure screws with through screws. SQUARE Attachholes (for otherproper screw 2 alignment) in bracket. ANGLE(B.) AttachBRACKETS two more “A” ANGLEto RAFTERS BRACKETSand to ends secure of eachwith UPPER screws. RAFTER board In order and secure to make with screws sure through each square arch isholes. built the same, stand 2x4 scraps(C.) Slide in LOWERRIDGE RAFTER BOARD boardsslots into ends (Picture of each “A” 3). ANGLE Stack BRACKET the arches and secure as you with assemble screws through them square using holes. the 2x4’s as alignment devices. (D.) Attach ANGLE BRACKET “B” to ends of each LOWER RAFTER boards and secure with screws through square holes. 5. After the ANGLE BRACKETS have been attached to one side of all arches, carefully turn arches over and attach 5. After ANGLE BRACKETS have been attached to one side of arch assembly, carefully turn arch over, leaving scrap boards in place in RIDGE BOARD slots. to other side while using the alignment devices mentioned in step 4. Then attach left and right 6. ANGLERepeat steps BRACKETS # 4 (A) through (D) attaching ANGLE BRACKETS to other side of arch and secure using screws through the ROUND holes (for proper screw alignment) in STUDSANGLE BRACKETS. to RAFTERS Continue and assembling secure the using required screws. number of arches according to your structure size. 7. Slide left and right STUDS into end of each ANGLE BRACKET “B” and secure using screws through ROUND holes. Carefully turn arch assembly over and secure ANGLE BRACKET “B” to STUDS using screws through SQUARE holes. Repeat this step on all arch assemblies. 8. Nail COLLAR TIE to LOWER RAFTER board of each arch assembly, making sure that the top corner of the COLLAR TIE is flush with the outside edge of LOWER RAFTER board. Be sure to attach the COLLAR TIES facing inside on the two end arches. 9. After all arch assemblies are complete, using two people carefully lift each arch onto the assembled base frame and secure to STUD BRACKETS using screws. Arches should be perpendicular to base frame (use a square). To hold the arches in a perpendicular position, use 1” x 4” temporary bracing inside of structure and leave in position until sheathing is in place, as shown in SIDE VIEW drawing. Leave nail heads slightly raised so they can be easily pulled out. The end arch assemblies should set flush with the base frame corners. Bend STUD BRACKETS around each corner of base frame and secure using screws. 10. After arch assemblies are set into place, remove scrap boards from “B” ANGLE BRACKET slots on one side of structure and place RIDGE BOARD into slots in “B” brackets. You may need to tap boards into place using a hammer. Repeat on opposite side of structure. Move up to lower ANGLE BRACKET “A” remove scrap boards and place RIDGE BOARD into slots in lower “A” brackets. Repeat on opposite side of structure. Remove scrap boards from top ANGLE BRACKET “A” and place RIDGE BOARD into slots in top “A” angle brackets. Make sure all arch assemblies are in correct positioning and adjust if needed. Secure all RIDGE BOARDS using screws through bottom holes in ANGLE BRACKETS. (For 10’ x 22’ structures, see #4 of Helpful Hints) 11. Install DOOR JAMBS as shown in FRONT VIEW drawings in accordance with your building size. Nail top of DOOR JAMBS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each DOOR JAMB. Attaching to outside of top BASE PLATE. 12. Install two VERTICAL STUDS in back wall. (Same layout as Step 11) Nail top of VERTICAL STUDS to COLLAR TIE of end arch assembly. Screw STUD BRACKETS to bottom of each VERTICAL STUD. Attaching to outside of top BASE PLATE. CUT LIST (10'X22' Building) 13. Your frame is now complete and ready to sheathe with materials of your choice. (See Helpful Hints) 24 - 2X4 Studs cut to 6' 4" (Cut from 24 - 8') HELPFUL HINTS (ALL SIZES) 24 - 2X4 Upper rafters cut to 3' 6-1/8" (Cut from 12 - 8') 1. Install wall sheathing horizontally on sides of 7’X8’ building. Install wall sheathing vertically on ends of 7’X8’ building. Install all wall sheathing vertically on larger size 24 - 2X4 Lower rafters cut to 3' 1" (Cut from 12 - 8') buildings. Install roof sheathing horizontally on all building sizes. Save the pieces of sheathing that you cut off and use them elsewhere (such as the other side of the roof). 12 - 2X4 Collar ties cut to 8' 3-1/2" (Cut from 12 - 10') Use completed arch as pattern to trace cut lines on sheathing for ends of building. 2 - 2x4 Door jambs cut to 8' 3-1/2" (Cut from 2 - 10') 2. Roofing material may be metal, corrugated fiberglass, rolled roofing or shingles. 2 - 2x4 Vertical studs cut to 8' 3-1/2" (Cut from 2 - 10') 3. Doors can be cut from plywood sheathing. Outline each half with 1X4 boards to make them rigid. Screw hinges to door jambs. On larger buildings, full sheets of plywood 2 - 2X4 Base plates 16' long (Use 2 - 16') may be used to construct 8’doors. 2 - 2X4 Base plates cut to 6' (Cut from 1 - 12') 4. On 10’ x 22’ structures, stagger ridge board seams as follows: Start at front end of structure and place 16’ ridge board into slot in “B” brackets. (you may need to tap into 2 - 2x4 Base Plates cut to 9' 4" place using a hammer) Move to back end of structure and place 6’ ridge board into slot in remaining “B” angle brackets. Repeat on opposite side of structure. At front end of (Cut from 2 - 10') structure, move up to lower angle bracket “A” and place the 6’ ridge board into slots in lower “A” angle brackets. Move to back end of structure and place 16’ ridge board into 5 - 2X4 Ridge boards 16' long (Use 5 - 16') slots in remaining lower “A” angle brackets. Repeat on opposite side. At front end of structure, move up to top “A” angle bracket and place the 16’ ridge board into slots of 5 - 2X4 Ridge boards 6' long (Cut from 2 - 12' and 1 - 8') top “A” angle brackets. Move to back end of structure and place the 6’ ridge board into slots in remaining top “A” angle bracket. Make sure all arch assemblies are in correct 10 - lX4 Temp. bracing/ door stiffener (Use 10 - 8') positioning and adjust if needed. Secure all ridge boards using screws through bottom holes in angle brackets. 2 - 2X4 Pressure treated base plates 16' long (Use 2 - 16') 5. Optional 1X4’s may be used as corner trim. 2 - 2X4 Pressure treated base plates cut to 9' 11" (Cut from 2 - 16') 6. Sheathing may be installed above pressure treated base plates to prevent moisture damage. 2 - 2X4 Pressure treated base plates cut to 5'5" (Cut from above 16's) 415 Reservoir Road • Whitefish, MT 59937 • 1-406-253-5138 or 1-406-250-7054 • Fax 1-800-880-3178 STMER SERIE 203591-9032-30-530 G&T SALES, Inc. 415 Reservoir Road • Whitefish, MT 59937U.S. •Patent 1-406-253-5138 #5,524,397 Canadian or 1-406-250-7054 Patent #2,227,540 • Fax 1-800-880-3178 • email: [email protected] U.S. Patent #5,524,397 Canadian Patent #2,227,540