City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Adelanto San Bernardino Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 237,000 square feet of existing asphalt pavement. Re-install all pavement •Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. between Jay St. and Kay St. 06/2018 07/2018 03 05 Project, Phase I markings. •Jay St. between Racoon Ave. and Muskrat Ave. •Kay St. between Janine St. and Muskrat Ave. Adelanto San Bernardino Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 184,000 square feet of existing asphalt pavement. Re-install all pavement •Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road. 06/2018 07/2018 03 05 Project, Phase I markings. •Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Aster Rd. •The east half of Mendicino Rd. between Stevens St. and Aster Rd. •Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa Rd. Adelanto San Bernardino Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 290,000 square feet of existing asphalt pavement. Re-install all pavement •Aster Rd. between Bartlett Ave. and Inyo St. 06/2019 07/2019 03 05 Project, Phase II markings. •Chevron Ct, Florence Ct, Leisure Rd, Lee Ave, Arlette Ct. and Inyo Ct. from Aster Rd. to cul-de- sac.

Adelanto San Bernardino Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 65,900 square feet of existing asphalt pavement. Re-install all pavement •Panther Ave. from Chamberlaine Wy end of pavement. 06/2019 07/2019 03 05 Project, Phase II markings. •Franklin Ct from Panther Ave. to cu-de-sac. •Colonial Ave. and Payne Ct. Adelanto San Bernardino Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 85,000 square feet of existing asphalt pavement. Re-install all pavement •Verbena Rd. from Lawson Ave. to Bartlett Ave. 06/2019 07/2019 03 05 Project, Phase II markings. •Maya St. between Verbena St. and Hermosa Rd. •Aztec Ln. between Verbena Rd. and Hermosa Rd. Adelanto San Bernardino Pavement Repair and Rehabilitation Apply crack seal & type II slurry over 817,900 square feet of existing asphalt pavement. Re-install all pavement •Bartlett Ave. between Racoon Ave. and Aster Rd. 06/2020 07/2020 03 05 Project, Phase III markings. •Aster Ave. between Bartlett Ave. and Air Expressway •Air Expressway between Aster Rd. and Racoon Ave. •Raccoon Ave. between Air Expressway and Bartlett Ave. •All streets bound by the above described limits. Adelanto San Bernardino Adelanto Rd. Widening Project Construct 1.5 miles of street to ultimate width (80 feet curb to curb) including curb, sidewalks, grind and overlay Adelanto Rd. between Yucca Rd. and Highway 395. 03/2019 06/2019 10 20 all existing asphalt pavement, construct new ADA ramps, adjust utilities as necessary, install pavement parking and signage to implement traffic calming and pedestrian safety. This portion of Adelanto Rd. is a transit route and the pavement section and traffic control devices will be implemented accordingly. Adelanto San Bernardino Rancho Rd. Widening Project. Construct 3 miles of street to ultimate width (80 feet curb to curb) including curb and sidewalks, grind and overlay Rancho Rd. between Adelanto Rd. and Koala Rd. 03/2019 06/2019 10 20 all existing asphalt pavement, construct new ADA ramps, adjust utilities as necessary, install pavement parking and signage to implement traffic calming and pedestrian safety. Portions of Rancho Road are transit routes. Therefore pavement sections and traffic control devices will be implemented accordingly. Adelanto San Bernardino Bellflower St. widening at Palmdale Rd. Construct approximately 480 feet of new curb and gutter to widen Bellflower Road. Existing pavement will be Bellflower Rd. from Palmdale Rd. to end of existing curb on west side of Bellflower. 11/2017 12/2017 10 20 ground and overlaid with new asphalt. The widened portion of Bellfower Rd. will extend new asphalt to new gutter. New pavement markings on the widened street will safety channel traffic to Palmdale Rd. (Hwy 18) and a new development at the corner of Palmdale Rd. and Bellflower Rd. Agoura Hills Los Angeles Fiscal Year 2017-18 Street Resurfacing Resurfacing twelve road segments with rubberized asphalt concrete, as well as, upgrading nine ADA ramps. Various locations within the City of Agoura Hills 10/2017 11/2017 10 25 Project Alameda Sidewalks Street tree root pruning and sidewalk repair to maintain pedestrian circulation and safety, and minimize future Throughout the City of Alameda - the backlog of repairs includes about 5,500 locations, of 07/2017 06/2018 10 70 damage to the street and sidewalk. which, several clusters will be chosen that address the oldest requests, and maximize economy by aggregating sites in close location to each other. Alameda Alameda Pavement Management Resurfacing and repair of street pavement, and restoration of flowlines of associated curb and gutter, in order to The Pavement Management program that is funded in FY 17-18 is spread throughout the City of 05/2018 11/2018 30 40 extend the life of the street and improve its ridability for cyclists and motorists. Alameda. The particular street identified for SB1 funds is Broadway, from Shoreline Drive to Otis Drive. Albany Alameda Evelyn Street Pavement Rehabilitation This project consists of the asphalt concrete overlay of Evelyn Street from Garfield Avenue to Portland Avenue, for Evelyn Street from Garfield Avenue to Portland Avenue, in the City of Albany 03/2018 06/2018 20 30 a distance of approximately 600 feet. It will also include base repair, traffic striping and upgrade of existing curb ramps at street intersections to meet ADA requirements. Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Pine Street, West City Limit to Atlantic Blvd. 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Olive Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Curtis Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Dos Robles, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Electric Avenue, Alhambra Road to North City Limit 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Marguerita Avenue, Alhambra Road to Pine Street 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Spruce Street, Curtis Avenue to Atlantic Blvd 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Almansor Street, Main Street to Huntington Drive 06/2018 12/2018 15 20 Rehabilitation Project Alhambra Los Angeles FY2017/2018 RMRA Street Grind and overlay with rubberized asphalt Marengo Avenue, Main Street to Valley Blvd 06/2018 12/2018 15 20 Rehabilitation Project Aliso Viejo Orange Glenwood Terrace Rehabilitation Local street rehabilitation (patching and overlay). FY 17-18 funds to be banked for construction in FY 18-19 Glenwood Terrace HOA Public Streets 06/2018 09/2018 10 20 Alturas Modoc East Third street maint Repair a small portion of East Third between Court and East Street East Third Street Alturas 06/2018 07/2018 05 10 Amador City Amador North Street Cape Seal Project Repainting crosswalks and curbs. Within city limits. 09/2017 12/2017 10 20 American Canyon Napa 2018 Annual Pavement Management Grind and AC Overlay Arden Court, Ascot Court, Bedford Way, Brookshire Way, Chaucer Court, Kent Way, Kingsly 05/2018 06/2018 10 20 Project Lane, Knightsbridge Court, Park Lane and Patricia Drive Anaheim Orange Billie Jo Circle Neighborhood The work consists of removing and reconstructing the pavement in the roadway, applying slurry seal, replacing Billie Jo Circle Neighborhood - bordered by Underhill Avenue to the north, Shakespeare Street 10/2017 11/2017 15 20 Rehabilitation damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and to the East, Elsiena Way to the south, and Sunkist Street to the west pavement markings. Anaheim Orange Larkspur Neighborhood Rehabilitation The work consists of removing and reconstructing the pavement in the roadway, applying slurry seal, replacing Larkspur Neighborhood - bordered by Hightree Circle to the north, Oakwood Avenue to the 11/2017 05/2018 15 20 damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and east, Orangethorpe Avenue to the south, and Bubach Street to the west pavement markings. Anaheim Orange Cinda Burntwood Neighborhood The work consists of removing and reconstructing the pavement in the roadway, applying slurry seal, replacing Cinda Burntwood Neighborhood - bordered by South Street to the north, Anaheim Coves trail 11/2017 05/2018 15 20 Rehabilitation damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and to the east, Burntwood Avenue to the south, and Rio Vista Street to the west pavement markings. Anaheim Orange Stone Creek Lane Neighborhood The work consists of removing and reconstructing the pavement in the roadway, applying slurry seal, replacing Stone Creek Lane Neighborhood - comprised of eight (8) areas located in east Anaheim. These 11/2017 05/2018 15 20 Rehabilitation damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and areas are located in close proximity to Santa Ana Canyon Road and Canyon Rim Road between pavement markings. Weir Canyon Road and Anaheim Hills Road

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Anaheim Orange Sabina Neighborhood Rehabilitation The project will address poor drainage areas throughout the community by constructing new concrete curb and Sabina Neighborhood - bordered by La Palma Avenue to the north, Anaheim Boulevard to the 11/2017 05/2018 15 20 (Project - A) gutter. The project improvements will also include cold planning and resurfacing the road with an asphalt east, Sycamore Street to the south, and Harbor Boulevard to the west concrete overlay, the replacement and construction of new ADA access ramps, and the replacement of uneven and broken sidewalks. Anaheim Orange Acacia Neighborhood Rehabilitation The work consists of removing and reconstructing the pavement in the roadway, applying slurry seal, replacing Acacia Neighborhood - bordered by Via Burton Street to the north, State College Boulevard to 05/2018 11/2018 15 20 damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and the east, Lincoln Avenue to the south, and East Street to the west pavement markings. Anaheim Orange Miraloma Avenue & Miller Street Project Partnering with APU-Electrical to cost share on the road rehabilitation of the impacted road segments due Miraloma Avenue from Blue gum Street to Miller Street 08/2015 11/2017 10 15 Rehabilitation to the APU-Electrical underground conversion project currently in construction. The road rehabilitation work Miller Street from La Palma Avenue to Miraloma Avenue [APUE UD #62] consists of cold planning, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Lincoln Avenue & Rio Vista Street Project Partnering with APU-Electrical to cost share on the road rehabilitation of the impacted road segments due Lincoln Avenue from Sunkist Street to Rio Vista Street and 08/2016 08/2018 10 15 Rehabilitation to the APU-Electrical underground conversion project currently in construction. The road rehabilitation work Rio Vista Street from Lincoln Avenue to La Palma Avenue [APUE UD #63] consists of cold planning, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Cerritos Avenue Rehabilitation Project partnering with PW-Sewer Section to cost share on the road rehabilitation of the impacted road segments Cerritos Avenue from 9th Street to Euclid Street 08/2017 11/2017 10 15 [PW Sewer] due to the PW-Sewer improvement project currently in construction. The road rehabilitation work consists of cold planning, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Orangewood Avenue Rehabilitation Project Partnering with APU-Electrical to cost share on the road rehabilitation of the impacted road segments due Orangewood Avenue from Harbor Boulevard to Lewis Street 08/2017 11/2018 10 15 from Harbor Boulevard to Lewis Street to the APU-Electrical underground conversion project currently in construction. The road rehabilitation work [APUE UD #64] consists of cold planning, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Orangethorpe Avenue & Kraemer Project partnering with the City of Placentia and OCTA to cost share on the road rehabilitation of the impacted Orangethorpe Avenue from the Kraemer Boulevard Intersection easterly on Orangethorpe 11/2017 02/2017 10 15 Boulevard Rehabilitation road segments due to the Kraemer Grade Separation Project and Orangethorpe Grade Separation Project Avenue to the end of the Orangethorpe Grade Separation project limit and southerly on [OCTA Bridges] constructed by OCTA. The road rehabilitation work consists of cold planning, resurfacing the road with an asphalt Kraemer Boulevard to East La Jolla Street concrete overlay, slurry seal, the replacement of traffic striping, traffic signal loops, pavement markings, curb and gutter, sidewalk, and an ADA access ramp. Anaheim Orange Blue Gum Street & Miraloma Avenue The road rehabilitation work consists of cold planning and resurfacing the road with an asphalt concrete overlay Blue Gum Street from La Palma Avenue to the North City Limits 11/2017 05/2018 20 25 Rehabilitation and by constructing Jointed Plain Concrete Pavement (JPCP) at the intersection approaches on Miraloma Avenue Miraloma Avenue from the SR-57 Freeway bridge to Blue Gum Street, and a and Blue Gum Street. The work also includes the removal and reconstruction of ADA access ramps, cross gutters, 527 foot segment of La Cresta Avenue starting at 264 feet east of Blue Gum Street going and the installation of new curb, gutter, sidewalk, and the replacement of traffic striping, traffic signal loops, and easterly pavement markings. Anaheim Orange Orange Avenue Rehabilitation from The road rehabilitation work consists of cold planning and resurfacing the road with an asphalt concrete overlay, Orange Avenue from Western Avenue to Dale Avenue 11/2017 05/2018 10 15 Western Avenue to Dale Avenue the removal and reconstruction of ADA access ramps, curb and gutter, concrete sidewalk, and replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange La Palma Avenue Rehabilitation from Project partnering with PW-Sewer Section to cost share on the road rehabilitation of the impacted road segments La Palma Avenue from East Street to N. Acacia Street 12/2017 11/2018 10 15 East Street to N. Acacia Street due to the PW-Sewer improvement project currently in construction. The road rehabilitation work consists of [PW Sewer] cold planning, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Arterial Slurry Seal Group 2 – Various The road rehabilitation work consists of applying a crack sealant and slurry seal coat to the existing pavement. Ball Road from Beach Boulevard to Dale Avenue 03/2018 05/2018 05 07 Locations Some minor cold planning, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic La Palma Avenue from Chrisden Street to Potomac Circle Ball Road from Beach Boulevard to striping, traffic signal loops, and pavement markings. Santa Ana Canyon Road from Fairmont Boulevard to Mohler Drive Dale Avenue La Palma Avenue from Chrisden Street to Potomac Circle Santa Ana Canyon Road from Fairmont Boulevard to Mohler Drive Anaheim Orange La Palma Avenue & Magnolia Avenue The road rehabilitation work consists of cold planning and resurfacing the road with an asphalt concrete overlay, La Palma Avenue from the West City Limit to Mayflower Street & 05/2018 08/2018 10 15 Rehabilitation the removal and reconstruction of ADA access ramps, curb and gutter, concrete sidewalk, and replacement of Magnolia Avenue from the I-5 Freeway to La Palma Avenue traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Lincoln Avenue Rehabilitation from The road rehabilitation work consists of cold planning and resurfacing the road with an asphalt concrete overlay, Lincoln Avenue from State College Boulevard to Sunkist Street 05/2018 08/2018 10 15 State College Boulevard to Sunkist the removal and reconstruction of ADA access ramps, curb and gutter, concrete sidewalk, and replacement of Street traffic striping, traffic signal loops, and pavement markings. Anaheim Orange Kings Court Neighborhood The work consists of removing and reconstructing the pavement in the roadway, applying slurry seal, replacing Kings Court Neighborhood - bordered by Ball Road to the north, Euclid Street to the east, 03/2018 11/2018 15 20 Rehabilitation damaged areas of concrete (sidewalk, curb and gutter, and access ramps), replacing pavement striping and Katella Avenue to the south, and Brookhurst Street to the west pavement markings. Anderson Shasta City Wide Grinder Dig-out Project Conduct grinder dig-outs on sections of failing pavement on City of Anderson streets. Dig-outs will vary between May include North Street, South Street, Riverside Avenue, Bruce Street, Stingy Lane, Balls Ferry 04/2018 07/2018 15 20 4' wide and 12' wide depending on width of pavement failure for length of failure. Depth will vary between 3" Road, Silver Street, Diamond Street, Briggs Street, First Street, Marmac Road, Bay Street, and 6" depending on roadway Traffic Index number. McMurray Drive, East Street, and Oak Street. Anderson Shasta North Street Cape Seal Project Cape seal North Street which is an arterial roadway. Widths vary between 56' and 64'. Length of roadway North Street from SR 2736 to the North Street Bridge 04/2018 07/2018 08 10 segment is 8,000 lf. Anderson Shasta Anderson Heights Cape Seal Project Cape Seal existing residential streets. Street widths vary between 28' and 36' wide. Length of roadway segments Pinion, Larch, Lodgepole, Aspen, Spruce, Hemlock and Jefferies Streets and Avenues 04/2018 07/2018 08 10 equals 13,000 lf. Angels Camp Calaveras 2018 Road Improvement Project Repave or Reconstruct Acorn Drive Acorn Drive 07/2018 08/2018 30 40 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Golden Bear Drive 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway El Rey Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Dolores Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Capistrano Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Bautista Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway San Joaquin Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Faria Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway D Street - W Tregallas to Putnam 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Elizabeth Lane 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Robert Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Plumleigh Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Elizabeth Court 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Putnam Street - Lone Tree to G Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Minta Lane 02/2018 08/2018 10 15 Antioch Contra Costa 2019 roadway maintenance project rubberized cape seal roadway Hillcrest Ave - E 18th to E 13th 02/2019 08/2019 10 15

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Antioch Contra Costa 2019 roadway maintenance project rubberized cape seal roadway E 13th Street - Hillcrest to Minaker 02/2019 08/2019 10 15 Antioch Contra Costa 2019 roadway maintenance project rubberized cape seal roadway Minaker Drive 02/2019 08/2019 10 15 Antioch Contra Costa 2019 roadway maintenance project rubberized cape seal roadway W 11th Street - L St to G St 02/2019 08/2019 10 15 Antioch Contra Costa 2019 roadway maintenance project rubberized cape seal roadway 14th Street - L St to G St 02/2019 08/2019 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway William Reed Drive 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Cataline Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Brisdale Place 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Stillwell Circle 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Madill Circle 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway W. Madill Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Hawthorne Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Campbell Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Creed Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Newbury Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway John Gildi Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Russell Drive 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Lawrence Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Lawton Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Texas Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Gem Lane 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway F Street - Texas to Drake 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway D Street - SPRR to Drake 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Lindburg Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Rossi Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway E Madill Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Madill Court 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Bryan Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway McGinley Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Diablo Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Beasley Avenue 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Coventry Court 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Sunset Drive 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Drake Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway Alcala Street 02/2018 08/2018 10 15 Antioch Contra Costa 2017-18 roadway maintenance project rubberized cape seal roadway View Drive 02/2018 08/2018 10 15 Apple Valley San Bernardino Mandan Road Cape Seal Cape Seal Mandan Road from Riverside Drive to SR 18 Mandan Road from Riverside Drive to SR 18 03/2018 04/2018 07 10 Apple Valley San Bernardino Shoshonee Road Cape Seal Cape Seal Shoshonee Road from Riverside Dr to Rincon Rd Shoshonee Road from Riverside Dr to Rincon Rd 03/2018 04/2018 07 10 Apple Valley San Bernardino Tao Road Cape Seal Cape Seal Tao Road from SR 18 North end Tao Road from SR 18 North end 03/2018 04/2018 07 10 Apple Valley San Bernardino Kasota Road Cape Seal Capes Seal Kasota Rd from SR 18 to Mondamon Rd Kasota Rd from SR 18 to Mondamon Rd 03/2018 04/2018 07 10 Apple Valley San Bernardino Cronese Road Cape Seal Cape Seal Cronese Rd from Seneca Rd to Yucca Loma Rd Cronese Rd from Seneca Rd to Yucca Loma Rd 03/2018 04/2018 07 10 Arcadia Los Angeles Pavement Rehabilitation Program This project will resurface approximately 1.7 miles of City street segments Citywide. Work will involve grinding • Walnut Avenue (From Holly Avenue to El Monte Avenue) 09/2017 06/2018 15 20 the top 2" of existing asphalt and re-pave the surface with rubberized asphalt. Other repair items to be included in • Walnut Avenue (From El Monte Avenue to East Cul De Sac) the scope of work are localized AC dig-out repairs and minor repairs to concrete curb and gutter, sidewalk, and • Delta Lane (From El Monte Avenue to East Cul De Sac) cross gutters. All striping and pavement markers will be reinstalled upon completion of the paving. • Hampton Road (From Michillinda Avenue to Glencoe Road) • Fifth Avenue (From Duarte Road to Camino Real Avenue) • Camino Grove Avenue (From Sixth Avenue to Eighth Avenue)

Arcadia Los Angeles Colorado Blvd Sidewalk Gap Closure This project will include construction of new sidewalk and retaining wall along the north side of the Colorado North side of Colorado Boulevard from San Antonio Road to the Colorado Boulevard Gold Line 09/2017 06/2018 20 20 Boulevard from San Antonio Road to Colorado Boulevard Gold Line Bridge. The project will consist of abandoning Bridge. an existing sewer main, removing several mature trees, regarding and landscaping the adjacent frontage of Newcastle Park, and placing a new retaining wall where needed to construct an new 5ft wide sidewalk per City Standards. Arcata Humboldt Road Safety Improvement (two radar Installing speed feedback signs at two locations in the City limit for traffic /speed control Janes Road South G Streets 11/2017 06/2018 08 10 feedback signs) Arcata Humboldt Bike and Pedestrian Improvements Bicycle and pedestrian ounters along Humboldt Bay Trail Bicycle and pedestrian counters along Humboldt Bay Trail 11/2017 06/2018 15 20 (counters for mode shift study) Arcata Humboldt Street maintenance ( fixing potholes Annual maintenance project Hauser Ct 11/2017 11/2017 15 20 and AC overlay) Arcata Humboldt Striping on City Roadways Annual striping project 2017, includes striping city streets that are fading away Various City Streets 04/2018 10/2018 03 05 Arcata Humboldt Street maintenance ( fixing potholes Annual maintenance project 18th Street H to to hauser ct 04/2018 10/2018 15 20 and AC overlay) Arcata Humboldt Street maintenance ( fixing potholes Annual maintenance project westwood ct. 04/2018 10/2018 15 20 and AC overlay) Arcata Humboldt Street maintenance ( fixing potholes Annual maintenance project 13th st Bayview to Union st 04/2018 10/2018 15 20 and AC overlay) Arroyo Grande San Luis Obispo Street Rehabilitation Rehabilitate approximately 2,000 feet of roadway Citywide 04/2017 07/2017 07 12 Artesia Los Angeles Hibbing St. Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and striping Ely Ave. to Norwalk Blvd. 06/2018 07/2018 25 30 Artesia Los Angeles Meadow Dr. Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and striping Ely Ave. to Norwalk Blvd. 06/2018 07/2018 25 30 Artesia Los Angeles 181st St. Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and striping Roseton 06/2018 07/2018 25 30 Artesia Los Angeles 188th St. Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and striping Resurfacing pavement, and/or removal and replacement of asphalt, and/or cape sealing and 06/2018 07/2018 25 30 striping Arvin Kern DiGiorgio Park traffic calming Installing radar detector signage, new stop signs, and update existing striping in high pedestrian and vehicle traffic Meyer Street and Have Drive adjacent to DiGiorgio Park 02/2018 06/2018 05 10 area and very busy intersection of Meyer and Haven Drive. Arvin Kern CA-223 cross-walk Lighted cross-walk, striping, and signage along CA-223 near intersection of Walnut Drive Intersection of CA-223 and Walnut Drive 06/2018 08/2018 05 10 Arvin Kern Royal Street Microsurfacing Microsurfacing pavement rehabilitation between Comanche Drive and Walnut Avenue. Royal Street between Comanche Drive and Walnut Avenue. 06/2018 08/2018 05 10 Arvin Kern Langford Avenue Microsurfacing Microsurfacing pavement rehabilitation between Meyer Street and A Street. Langford Avenue between Meyer Street and A Street. 06/2018 08/2018 05 10 Arvin Kern Franklin Avenue Microsurfacing Microsurfacing pavement rehabilitation between A Street and Butte Avenue. Franklin Avenue between A Street and Butte Avenue. 08/2018 11/2018 05 10 Arvin Kern S. Hill Street Microsurfacing Microsurfacing pavement rehabilitation between SR-223 and Haven Drive. S. Hill Street between SR-223 and Haven Drive. 06/2018 08/2018 05 10 Arvin Kern Sycamore Road Microsurfacing Microsurfacing pavement rehabilitation between Meyer Street and S. A Street Sycamore Road between Meyer Street and S. A Street 06/2018 08/2018 05 10 Arvin Kern S. Comanche Drive Microsurfacing Microsurfacing pavement rehabilitation between Sycamore Road and the end of the pavement. S. Comanche Drive between Sycamore Road and the end of the pavement. 06/2018 08/2018 05 10

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Arvin Kern El Camino Real Microsurfacing Microsurfacing pavement rehabilitation between Rayo de la Luna and Meyer Street El Camino Real between Rayo de la Luna and Meyer Street 06/2018 08/2018 05 10 Arvin Kern Santa Rosa Street Microsurfacing Microsurfacing pavement rehabilitation between Santa Rosa Street and Haven Drive. Santa Rosa Street between Santa Rosa Street and Haven Drive. 06/2018 08/2018 05 10 Arvin Kern S. Acala Street Microsurfacing Microsurfacing pavement rehabilitation between Tucker Street and Haven Drive. S. Acala Street between Tucker Street and Haven Drive. 06/2018 08/2018 05 10 Arvin Kern Walnut Drive Microsurfacing Microsurfacing pavement rehabilitation between Walnut Drive and SR-223. Walnut Drive between Walnut Drive and SR-223. 06/2018 08/2018 05 10 Arvin Kern N. Acala Street Overlay Overlay pavement rehabilitation between SR-223 and 4th Avenue. N. Acala Street between SR-223 and 4th Avenue. 06/2018 09/2018 05 10 Arvin Kern Arvin Avenue Overlay Overlay pavement rehabilitation between Derby Street and C Street. Arvin Avenue between Derby Street and C Street. 06/2018 08/2018 05 10 Arvin Kern Stuart Street Overlay Overlay pavement rehabilitation between Hill Street and N. A Street. Stuart Street between Hill Street and N. A Street. 06/2018 08/2018 05 10 Arvin Kern Meyer Street Overlay Overlay pavement rehabilitation between Haven Drive and Franklin Street. Meyer Street between Haven Drive and Franklin Street. 06/2018 08/2018 05 10 Arvin Kern Meyer Street Overlay Overlay pavement rehabilitation between Olson Way and Mary Street. Meyer Street between Olson Way and Mary Street. 06/2018 08/2018 05 10 Arvin Kern Sycamore Road Overlay Overlay pavement rehabilitation between S. A Street and Tejon Highway. Sycamore Road between S. A Street and Tejon Highway. 06/2018 08/2018 05 10 Arvin Kern El Camino Real Overlay Overlay pavement rehabilitation between Meyer Street and Tejon Highway. El Camino Real between Meyer Street and Tejon Highway. 06/2018 08/2018 05 10 Arvin Kern Packard Drive Overlay Overlay pavement rehabilitation between Comanche Drive and Alderete Drive. Packard Drive between Comanche Drive and Alderete Drive. 06/2018 08/2018 05 10 Arvin Kern N. Derby Street Overlay Overlay pavement rehabilitation between SR-223 and 5th Avenue. N. Derby Street between SR-223 and 5th Avenue. 06/2018 08/2018 05 10 Arvin Kern Wilson Street Overlay Overlay pavement rehabilitation between Hill Street and N. A Street. Wilson Street between Hill Street and N. A Street. 06/2018 08/2018 05 10 Arvin Kern Meyer Street FDR Full depth pavement rehabilitation between SR-223 and Haven Drive. Meyer Street between SR-223 and Haven Drive. 06/2018 09/2018 10 20 Arvin Kern Plumtree Street FDR Full depth pavement rehabilitation between SR-223 and Orchard Street. Plumtree Street between SR-223 and Orchard Street. 06/2018 08/2018 10 20 Arvin Kern Franklin Street FDR Full depth pavement rehabilitation between S. A Street and Walnut Avenue. Franklin Street between S. A Street and Walnut Avenue. 06/2018 09/2018 10 20 Arvin Kern Haven Drive FDR Full depth pavement rehabilitation between Comanche Drive and Derby Street. Haven Drive between Comanche Drive and Derby Street. 06/2018 09/2018 10 20 Arvin Kern Comanche Drive FDR Full depth pavement rehabilitation between SR-223 and Sycamore Drive. Comanche Drive between SR-223 and Sycamore Drive. 06/2018 09/2018 10 20 Arvin Kern S. Derby Street FDR Full depth pavement rehabilitation between SR-223 and Sycamore Road. S. Derby Street between SR-223 and Sycamore Road. 06/2018 09/2018 10 20 Arvin Kern A Street FDR Full depth pavement rehabilitation between SR-223 and Olson Way. A Street between SR-223 and Olson Way. 06/2018 09/2018 10 20 Arvin Kern Hood Street FDR Full depth pavement rehabilitation between Comanche Drive and Meyer Street. Hood Street between Comanche Drive and Meyer Street. 06/2018 09/2018 10 20 Arvin Kern Durham Street Full depth pavement rehabilitation between Comanche Drive and Walnut Avenue. Durham Street between Comanche Drive and Walnut Avenue. 06/2018 09/2018 10 20 Arvin Kern Reclamite Surfacing Reclamite pavement rehabilitation throughout the city, where needed. Throughout the city. 06/2018 08/2018 02 05 Arvin Kern Pothold filling throughout city Filling potholes throughout the city, where needed. Throughout the city. 01/2018 12/2018 01 03 Arvin Kern Purchase hot mix truck and plate City needs to purchase a hot mix truck and walk behind plate compactor to allow for more efficient and reliable Applicable to entire city. 01/2018 12/2018 20 20 compactor patches of potholes throughout the city. Arvin Kern Bike lane striping throughout city Add or replace bike lane striping throughout the city to improve the safety of bicyclists. Throughout the city. 06/2018 08/2018 05 10 Arvin Kern Varsity Road widening Widen Varsity Road in front of high school to fully orinally planned 60 foot width by installing an additional 10 Varsity Road between Campus Drive and Mahin Drive. 06/2018 09/2018 20 30 feet of pavement atop of the current shoulder, and install new curb, butter, and sidewalk. Arvin Kern Derby Street widening Widen Derby Street to 40 feet and install curb, gutter, and sidewalk. Derby Street between Haven Drive and Schipper Avenue. 06/2018 10/2018 20 30 Arvin Kern Langford and A Street widening Widen Langford Street and A Street to 40 feet and install curb, gutter, and sidewalk. Langford Street between A Street and Meyer Street and A Street between Langford Street and 06/2018 10/2018 20 30 Hanson Lane Arvin Kern Franklin Street widening Widen Franklin Street to 70 feet and install curb, gutter, and sidewalk. Franklin Street between Butte Avenue and Derby Street. 06/2018 10/2018 20 30 Arvin Kern S. Hill Street FDR Full depth pavement rehabilitation between Haven Drive and Langford Avenue S. Hill Street between Haven Drive and Langford Avenue. 06/2018 12/2018 10 20 Atascadero San Luis Obispo El Camino Real Rehabilitation - North Major pavement rehabilitation for approximately 0.78 miles of arterial roadway to improve deteriorated El Camino Real from San Anselmo Road (East) to San Benito Road 06/2018 12/2018 15 25 pavement conditions and better define roadway configuration for all roadway users, including motorists, bicyclists, and pedestrians. This roadway section is heavily used and the City receives numerous complaints regarding its condition and inquiries of when it will be replaced. Project will include constructing approximately 250 feet of a “missing link” section of sidewalk on the west side to provide better pedestrian connectivity along the corridor. Atherton San Mateo Overlay Adam Way Grind 2" and overlay 51,597 SF for roadway with PCI 44. Installation of pavement marking stop legend and limit Between Austin Avenue and Nora Way 05/2018 10/2018 15 20 line. Atherton San Mateo Overlay Edge Road Grind 2" and overlay 31,280 SF for roadway with PCI 45. Installation of pavement marking stop legend, limit line Between Ringwood Avenue and Oak Grove Avenue 05/2018 10/2018 15 20 and crosswalk. Atherton San Mateo Overlay Hawthorn Drive Grind 2" and overlay 40,047 SF for roadway with PCI 49. Installation of pavement marking stop legend and limit Between James Avenue and Linden Avenue 05/2018 10/2018 15 20 line. Atherton San Mateo Overlay Patricia Drive Grind 2" and overlay 34,100 SF for roadway with PCI 50. Between Serrano Drive and Austin Avenue 05/2018 10/2018 15 20 Atherton San Mateo Overlay Serrano Drive Section 1 Grind 2" and overlay 14,280 SF for roadway with PCI 55. Installation of pavement marking stop legend and limit Between Selby Lane and Robleda Drive 05/2018 10/2018 15 20 line. Atherton San Mateo Overlay Serrano Drive Section 2 Grind 2" and overlay 10,600 SF for roadway with PCI 49. Installation of pavement marking stop legend and limit Between Robleda Drive and Stockbridge Avenue 05/2018 10/2018 15 20 line. Atherton San Mateo Overlay Walnut Avenue Grind 2" and overlay 17,520 SF for roadway with PCI 53. Installation of pavement marking stop legend and limit Between El Camino Real and Station Lane 05/2018 10/2018 15 20 line. Atherton San Mateo Slurry Seal Alta Visa Drive Slurry Seal 16,940 SF for roadway with 64 PCI. Between Ridgeview Drive and Fletcher Drive 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Arthur Lane Slurry Seal 9,128 SF for roadway with 50 PCI. Between Selby Lane to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Austin Avenue Slurry Seal 28,248 SF for roadway with 56 PCI. Between Selby Lane and Stockbridge Avenue 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Barry Lane Slurry Seal 11,288 SF for roadway with 63 PCI. Between E/O 34 Barry Lane to South End 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Belbrook Way Slurry Seal 19,621 SF for roadway with 65 PCI. Between Walsh Road to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Bergessen Court Slurry Seal 10,080 SF for roadway with 57 PCI. Between Stockbridge Avenue to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Betty Lane Slurry Seal 11,345 SF for roadway with 62 PCI. Between Polhemus Avenue to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Camino Por Los Arboles Slurry Seal 30,723 SF for roadway with 53 PCI. Between Camino al Lago and Camino de Los Robles 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Catalpa Drive Slurry Seal 32,925 SF for roadway with 59 PCI. Between Irving Avenue and James Avenue 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Clay Drive Slurry Seal 18,367 SF for roadway with 65 PCI. Between Atherton Avenue to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Elizabeth Way Slurry Seal 6,680 SF for roadway with 53 PCI. Between Shearer Drive to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Greenoaks Drive Slurry Seal 9,340 SF for roadway with 62 PCI. Between Oak Grove Avenue to Rosewood Drive 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Heritage Court Slurry Seal 9,307 SF for roadway with 58 PCI. Between Middlefield Road to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Irving Avenue Slurry Seal 6,677 SF for roadway with 60 PCI. Between Heather Drive to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Jennings Lane Section 1 Slurry Seal 28,107 SF for roadway with 67 PCI. Between Middlefield Road to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Jennings Lane Section 2 Slurry Seal 7,904 SF for roadway with 56 PCI. Between Jennings Lane to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Mandarin Way Slurry Seal 20,162 SF for roadway with 66 PCI. Between Alameda de Las Pulgas to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal McCormick Lane Slurry Seal 14,300 SF for roadway with 62 PCI. Between cul-de-sac and Watkins Avenue 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Mesa Court Slurry Seal 18,596 SF for roadway with 65 PCI. Between Ridgeview Drive to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Middle Gate Slurry Seal 4,520 SF for roadway with 65 PCI. Between Almendral Avenue and Park Drive 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Mosswood Avenue Slurry Seal 12,007 SF for roadway with 62 PCI. Between Greenoaks Drive to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal North Gate Slurry Seal 4,720 SF for roadway with 66 PCI. Between Almendral Avenue and Park Drive 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Parker Avenue Slurry Seal 16,324 SF for roadway with 69 PCI. Between Stockbridge Avenue to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Prado Secoya Slurry Seal 12,107 SF for roadway with 68 PCI. Between Elena Avenue and end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Polhemus Avenue Slurry Seal 10,532 SF for roadway with 69 PCI. Between Polhemus Avenue and end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Ridgeview Drive Slurry Seal 9,080 SF for roadway with 64 PCI. Between Alta Vista Drive and end of cul-de-sac 05/2018 10/2018 03 05

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Atherton San Mateo Slurry Seal Selby Lane Slurry Seal 10,325 SF for roadway with 60 PCI. Between E/O 241 Selby Lane to North End of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Snowden Avenue Slurry Seal 13,440 SF for roadway with 54 PCI. Between Wilburn Avenue and Belleau Avenue 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal South Gate Slurry Seal 4,420 SF for roadway with 52 PCI. Between Almendral Avenue and Park Drive 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Stockbridge Avenue Slurry Seal 9,282 SF for roadway with 68 PCI. Between Stockbridge Avenue to end of cul-de-sac 05/2018 10/2018 03 05 Atherton San Mateo Slurry Seal Surrey Lane Slurry Seal 8,203 SF for roadway with 56 PCI. Between Middlefield Road to end of cul-de-sac 05/2018 10/2018 03 05 Atwater Merced Winton Way Road Improvement Winton Way will undergo a long-term pavement upgrade to address future needs of the city. Winton Way 08/2018 12/2028 20 30 Atwater Merced Fruitland Avenue Road Improvement Fruitland Avenue will undergo a long-term pavement upgrade with new traffic circles to encourage the flow of Fruitland Avenue 10/2018 12/2028 20 30 traffic while reducing emissions and increasing pedestrian safety. Atwater Merced ACEforward: Atwater Station Atwater Station, in conjunction with the Altamont Corridor Express, will provide an environmentally-friendly Atwater Blvd, between Winton Way and First Street. 12/2020 12/2022 30 50 travel alternative to the Bay Area while revitalizing Atwater Blvd with new sidewalks and improved parking. Atwater Merced Active Transportation Plan The Active Transportation Plan will slowly adapt current transportation infrastructure to encourage the use of City-wide 12/2019 12/2025 20 30 public transportation, bicycle paths and walking through the development of new mass transit options, protected bicycle lanes, and improved sidewalks. Atwater Merced City Wide Roadway Painting All city roads require extensive painting maintenance for safety. City-wide 01/2018 06/2018 10 20 Atwater Merced Curb, Gutter, and Sidewalk In conjunction with the Active Transportation Plan, the curb, gutter, and sidewalk improvement to all city City-wide 01/2018 06/2019 15 30 Replacement pedestrian infrastructure will provide improved safety and ADA compliance, making Atwater a more walkable city. The project will additionally improve drainage for roadway safety. Atwater Merced Traffic Light Installation (Atwater/First) The City of Atwater will install a traffic light at Atwater Blvd and First St to provide safe controls for drivers and Atwater Blvd and First Street 05/2018 08/2018 15 30 pedestrians Atwater Merced Traffic Retrofit (Winton/Juniper) The City of Atwater will retrofit of a traffic light from a camera control to an induction coil control for better Winton Way and Juniper Avenue 05/2018 08/2018 15 30 performance in inclement weather, ensuring safety and ease of commute for drivers and pedestrians. Auburn Placer Cleveland Avenue Repave 350 feet of street Between High Street and Lincoln Way 04/2018 06/2018 20 30 Auburn Placer Reamer Street Repave 950 feet of street Between High Street and Culdesac 04/2018 06/2018 20 30 Auburn Placer Tuttle Street Repave 600 feet of street From Elm Street to Reamer Street 04/2018 06/2018 20 30 Auburn Placer Center Street Repave 750 feet of street Between High Street and Culdesac 04/2018 06/2018 20 30 Auburn Placer Walsh Street Repave 1290 feet of Street From High Street to Pine Street 04/2018 06/2018 20 30 Auburn Placer Almond Street Repave 320 feet of Street From East Placer Street to Lincoln Way 04/2018 06/2018 20 30 Auburn Placer Agnes Street Repave 150 feet of Street From Reamer Street to Walsh Street 04/2018 06/2018 20 30 Auburn Placer Elm Avenue Repave 2900 feet of Street From High Street to Lincoln Way 04/2018 06/2018 20 30 Auburn Placer Garfield Street Repave 720 feet of Street From Highway 49 to Pine Street 04/2018 06/2018 20 30 Auburn Placer Lincoln Way Repave 300 feet of Street From Elm Street to El Dorado Street 04/2018 06/2018 20 30 Auburn Placer Harrison Avenue Repave 510 feet of Street From High Street to Lincoln Way 04/2018 06/2018 20 30 Avalon Los Angeles Global Paving Project Repair and repave streets Area known as "The Flats" 10/2017 01/2018 10 20 Avenal Kings Seventh Avenue Road Project Remove and replace 4,390 square yards of road. Remove and replace 400 linear feet of concrete curb and gutter. Seventh Ave. from San Joaquin St. south to SR 269 (Skyline Blvd.) 10/2017 03/2018 10 20 Remove and replace 1,500 square feet of concrete sidewalk. Remove and replace 200 square feet of concrete driveway. Remove and replace 8 wheel chair ramps. Avenal Kings Monterey Street Road Project Remove and replace 7,460 square yards of road. Remove and replace 600 linear feet of concrete curb and gutter. Monterey St. from First Ave. east to Fifth Ave. 02/2018 05/2018 10 20 Remove and replace 2,000 square feet of concrete sidewalk. Remove and replace 400 square feet of concrete driveway. Remove and replace 8 wheel chair ramps. Avenal Kings Mariposa Street Road Project Remove and replace 7,470 square yards of road. Remove and replace 600 linear feet of concrete curb and gutter. Mariposa St. from First Ave. east to Fifth Ave. 10/2018 04/2019 10 20 Remove and replace 2,000 square feet of concrete sidewalk. Remove and replace 400 square feet of concrete driveway. Remove and replace 8 wheel chair ramps. Avenal Kings Avenal Cutoff Road Project Grind, remove and install 45,000 square yards of 2 1/2" Asphaltic Concrete. Install 60,000 square yards of 2 1/2" Avenal Cutoff Rd. from SR 269 east to the California Aqueduct overcrossing 10/2019 04/2020 15 25 Aspaltic Concrete. Haul, place and compact 45,000 square yards of Aspaltic Concrete Grindings on the shoulder of the road. Install roadway striping. Furnish traffic controls. Azusa Los Angeles Vernon Avenue Pavement Rehabilitate pavement on Vernon Avenue from Gladstone Street to 6th Street. This segment of road is Vernon Avenue from Gladstone Street to 6th Street 04/2018 06/2018 10 15 Rehabilitation from Gladstone Street approximately 1.2 miles in length. Curb ramps that do not comply with ADA guidelines will be removed and to 6th Street replaced accordingly. Bakersfield Kern Pavement Rehabilitation on A Street Local match requirement for FHWA funding. Existing pavement along this roadway is in disrepair. Rehabilitation A Street from Brundage Lane to California Avenue 10/2018 10/2018 20 25 from Brundage Lane to California of this pavement will improve the overall rideability of the road for both passenger cars and commercial trucks. Avenue This project is 88.53% federally funded with a 11.47% local match requirement. Bakersfield Kern Pavement Rehabilitation on Hughes Local match requirement for FHWA funding. Existing pavement along this roadway is in disrepair. Rehabilitation Hughes Lane from Wilson Road to Ming Avenue 10/2018 10/2018 20 25 Lane from Wilson Road to Ming of this pavement will improve the overall rideability of the road for both passenger cars and commercial trucks. Avenue This project is 88.53% federally funded with a 11.47% local match requirement. Bakersfield Kern Pavement Rehabilitation on Auburn Local match requirement for FHWA funding. Existing pavement along this roadway is in disrepair. Rehabilitation Auburn Street from Oswell Street to Fairfax Road 10/2018 10/2018 20 25 Street from Oswell Street to Fairfax of this pavement will improve the overall rideability of the road for both passenger cars and commercial trucks. Road This project is 88.53% federally funded with a 11.47% local match requirement. Bakersfield Kern Pavement Rehabilitation on Truxtun Local match requirement for FHWA funding. Existing pavement along this roadway is in disrepair. Rehabilitation Truxtun Avenue from T Street to Beale Avenue 10/2018 10/2018 20 25 Avenue from T Street to Beale Avenue of this pavement will improve the overall rideability of the road for both passenger cars and commercial trucks. This project is 88.53% federally funded with a 11.47% local match requirement. Bakersfield Kern Pavement Resurfacing on Wilson Road Existing pavement along this roadway is in disrepair. Rehabilitation of this pavement will improve the overall Wilson Road from State Route 99 to Real Road 12/2018 12/2018 10 15 from State Route 99 to Real Road rideability of the road for both passenger cars and commercial trucks. Bakersfield Kern Allen Road from Olive Drive to Reina City Staff will perform section repairs, as needed, along with doing a complete .35 feet overlay on the entire Allen Road from Olive Drive to Reina Road 06/2018 06/2018 20 25 Road street. This will be done by utilizing various annual contracts from material suppliers, trucking, and asphalt grinding contractors, with City Streets staff doing the paving. Bakersfield Kern Bernard Street from Union Avenue to City Staff will perform section repairs, as needed, along with doing a complete .35 feet overlay on the entire Bernard Street from Union Avenue to Kern Street 06/2018 06/2018 20 25 Kern Street street. This will be done by utilizing various annual contracts from material suppliers, trucking, and asphalt grinding contractors with City Streets staff doing the paving. Bakersfield Kern Campus Park Drive from Old River City Staff will perform section repairs, as needed, along with doing a complete .35 feet overlay on the entire Campus Park Drive from Old River Road to Buena Vista Road 06/2018 06/2018 20 25 Road to Buena Vista Road street. This will be done by utilizing various annual contracts from material suppliers, trucking, and asphalt grinding contractors with City Streets staff doing the paving. Bakersfield Kern Miramonte Drive from State Route 178 City Staff will perform section repairs, as needed, along with doing a complete .35 feet overlay on the entire Miramonte Drive from State Route 178 South to City Limits 06/2018 06/2018 20 25 South to City Limits street. This will be done by utilizing various annual contracts from material suppliers, trucking, and asphalt grinding contractors with City Streets staff doing the paving. Baldwin Park Los Angeles Brooks Drive and Spring Street Project will consist of reconstruction of portions of the street structural section including removal of 22-inches of Brook Drive between Rivergrade Road and End of street. 05/2018 12/2018 20 25 Reconstruction the existing roadway and constructing new roadway section including sub-surface preparation, subgrade and Spring Street between Littlejohn and End of Street constructing aggregate base and asphalt concrete (AC) pavement sections. The project also includes upgrade/replacement of accessible ramps and major curb and gutter repairs.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Baldwin Park Los Angeles Street Rehabilitation Project Work includes 2-inch cold-mill of the roadway and placing new asphalt layer. The project also includes Frazier St between Judith St and End of Street 05/2018 12/2018 10 15 upgrade/replacement of accessible ramps, minor curb and gutter repairs, traffic signal loop replacement, and Amar Rd between Frazier St and End of Street restriping. Phelan Ave between Los Angeles St and Olive Street Nolina St between Ledford St and Dalewood St Ledford St between Frazier St and Nolina St Banning Riverside Hargrave Avenue AC Overlay Hargrave Avenue AC Overlay - Grind and construct 2" asphalt concrete and adjust water valve and sewer manhole Hargrave Avenue - from Hoffer Street to Indian School Lane in the City of Banning. 02/2018 06/2018 10 15 covers. Banning Riverside First Street AC Overlay First Street AC Overlay - Grind and construct 2" AC and adjust water valve and sewer manhole covers. First Street - from Livington Street to Williams Street in the City of Banning. 02/2018 06/2018 10 15 Banning Riverside Second Street AC Overlay Second Street AC Overlay - Grind and construct 2" AC and adjust water valve and sewer manhole covers. Second Street - from Hays Street to Williams Street in the City of Banning. 02/2018 06/2018 10 15 Barstow San Bernardino West Section 7 Rehabilitation Project Reconstruct 23,401 centerline feet of roadway. West Section 7 is defined as North of Rimrock Road, West of Barstow Road, East of Agarita 10/2017 07/2018 15 20 Avenue and South of Interstate 15 Barstow San Bernardino Pavement Preservation Project Placement of pavement preservation techniques on existing roadways. The City has developed seven zones for the pavement preservation program. The City is 02/2019 04/2019 03 05 focusing on streets within Zone 2, which is the area east of Muriel Drive, south of Interstate 40, and to the east and south city limits. Beaumont Riverside Annual Slurry Seal FY17-18 Application of crack seal and slurry seal in order to extend the pavement life of existing asphalt concrete streets. Citywide - Downtown neighborhoods to be determined based on final PMS report. 04/2018 06/2018 03 05 Bell Los Angeles Resurfacing of Local Streets Grind and overlay of local residential streets Pine Ave.(Bell Ave. to Florence Ave.) , Wiek Avenue (Heliotrope Ave. to Vinevale Ave.) 04/2018 06/2018 25 30 Bell Gardens Los Angeles Road Maintenance Rehabilitation Agra Road Maintenance Rehabilitation 1 ½ -2 R/R Agra St from Specht Ave to end 02/2018 04/2018 10 15 St Bell Gardens Los Angeles Road Maintenance Rehabilitation Gage Road Maintenance Rehabilitation 1 ½ -2 R/R Gage Ave from Darwell Ave to Garfield Ave 02/2018 04/2018 10 15 Ave Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Hannon St from Emil Ave to Perry Rd 02/2018 04/2018 10 15 Hannon St Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Toler Ave to end 02/2018 04/2018 10 15 Toler Ave Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Loveland Ave from Darwell Ave to Toler Ave 03/2018 05/2018 10 15 Loveland Ave Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Chalet Dr from Hannon St to Foster Bridge Bl. 03/2018 05/2018 10 15 Chalet Dr Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Adams Ave from Ludell St to Lubec St 03/2018 05/2018 10 15 Adams Ave Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Ludell St from Jaboner Rd to El Selinda Ave 03/2018 05/2018 10 15 Ludell St Bell Gardens Los Angeles Road Maintenance Rehabilitation Ira Road Maintenance Rehabilitation 1 ½ -2 R/R Ira Ave from Florence Ave to Fry St 04/2018 06/2018 10 15 Ave Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Ira Ave from Priory St to Clara St 04/2018 06/2018 10 15 Priory St Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Florence Ave from Scout Ave to Food Control 04/2018 06/2018 10 15 Florence Ave Bell Gardens Los Angeles Road Maintenance Rehabilitation Clara Road Maintenance Rehabilitation 1 ½ -2 R/R Clara St from Emil Ave to Scout Ave 04/2018 06/2018 10 15 St Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Gotham St from Jaboneria Rd to Gephart Ave 04/2018 06/2018 10 15 Gotham St Bell Gardens Los Angeles Road Maintenance Rehabilitation Road Maintenance Rehabilitation 1 ½ -2 R/R Garfield Ave from Shull to Eastern Ave 04/2018 06/2018 15 20 Garfield Ave Bellflower Los Angeles Cold Mill, Resurface, and Concrete Cold mill, resurface, and concrete replacement of local streets. Work includes but is not limited to full depth Ryon Ave. from Alondra Blvd. to Somerset Blvd; Cornuta Ave. from Flora Vista St. to just north 07/2017 12/2017 08 35 Replacement of Local Streets (Spec. reconstruction, grind, overlay, and replacement of curb ramps. of Nichols St.; and Hegel St. from Cornuta Ave. to the cul-de-sac. No. 14/15-02) Belmont San Mateo RMRA Street Project The project will provide for the preparation of contract documents and the construction costs for the slurry seal North Road from Hillman Avenue to Notre Dame Avenue 05/2018 09/2018 03 07 of the following streets: North Road from Hillman Avenue to Notre Dame Avenue Ralston Ranch Road from Christian Drive to Ralston Avenue Ralston Ranch Road from Christian Drive to Ralston Avenue Mountain View Avenue from Hiller Street to Old County Road Mountain View Avenue from Hiller Street to Old County Road Coronet Boulevard from Alameda de las Pulgas to Lyon Avenue Coronet Boulevard from Alameda de las Pulgas to Lyon Avenue Harbor Boulevard from El Camino Real to Sixth Avenue Harbor Boulevard from El Camino Real to Sixth Avenue Hasting Drive from Carlmont Avenue to San Carlos City Limits Hasting Drive from Carlmont Avenue to San Carlos City Limits Kedith Avenue from Ralston Avenue to O’Neill Avenue Kedith Avenue from Ralston Avenue to O’Neill Avenue

Belvedere Marin Corinthian Island Lot Repair Replace fatigued asphalt and repair base failures. Corinthian Island Lookout Parking Area (corner of Bellevue Ave. and Alcatraz Ave.). 12/2017 03/2017 15 25 Belvedere Marin Belvedere Avenue Road Repair Project Resurface roadway (2.0 inch overlay). Beginning on Pine Ave. 1500 linear feet towards Beach Rd. 06/2018 08/2018 15 30 Belvedere Marin Blanding Lane Overlay Project Mill and thin overlay of 1,200 sf of road surface. Balnding Land, 60' south of Belvedere Ave. 12/2017 03/2018 10 20 Belvedere Marin Bayview Ave. Road Repair Project Mill and replace base failures and fatigued asphalt. Bayview Ave. from Marin Ave. to Laurel Ave. 12/2017 03/2017 15 25 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Industrial Way to end of court Noyes Court 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Industrial Way to East Channel Rd Bayshore Road 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Channel Rd to Bayshore Rd East Channel Road 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Military West to 650ft pass Military West Denfield Avenue 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from West N St to Raymond Dr West 2nd Street 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from East 2nd St to end of court Harbor Vista Court 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Military to West J St West 5th Street 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Cove Way to West K St West 6th Street 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from I780 to Hillcrest East 3rd Street 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from Raymond Dr to West 5th St Shirley Drive 11/2017 11/2018 10 20 Benicia Solano 2018 Street Resurfacing Project Grind, overlay, adjust utility valves, and striping from West 6th St to West 5th St West I Street 11/2017 11/2018 10 20 Benicia Solano 2018 Microsurfacing Project Microsurface and spring from Banbury Way to Panorama Dr Chelsea Hills Dr. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from West 6th St to West 5th St Claverie Way 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from East 5th St to East East 6th St East G St. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from West 1st St to West 2nd St Military West 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Oxford Way to Windsor Dr Rose Dr. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Rose Dr to end of court Watson Court 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Military to West K St West 14th St. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Panorama Way to end of court Baker Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Rose Dr to Winsor Dr Belvedere Dr. 11/2017 11/2018 04 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Hastingd Dr to Capital Dr Cambridge Dr. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Chelsea Hills Dr to Panorama Chadwick Way 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from East L St to East K St East 6th St. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from East 5th St to East East 6th St East L St. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Panorama Way to Allen Way Gallagher Drive 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Kearney Dr to Panorama Dr McCall Drive 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Allen Way to end of court Paul Court 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Palace Ct to Oxford Dr Rose Dr. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Panorama Dr to 775ft pass Panorama Dr Tustin Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Carston Cir to Rose Dr Barton Way 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Panorama Dr to Panorama Dr Columbia Circle 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Drolette Dr to 475ft pass Drolette Corrigan Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from East 4th St to East 5th St East I St. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Hastings Dr to Solano Dr Fuchsia Dr. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Gill Way to end of court Gill Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Primrose Ln to Daffodil Dr Jasmine Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Viewmont St to end of court Pacifica Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Primrose Ln to Daffodil Dr Periwinkle Pl. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Primrose Ln to Primrose Ln Periwinkle Pl. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Fuchsia Dr to end of court Wisteria Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Poppy Cir to end of court Alder Ct. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Oxford Way to Oxford Way Bantry Way 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Oxford Way to Oxford Way Carsten Circle 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Panorama Dr to McAllister Dr Rose Drive 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from West 11th St to West 10th St West L St. 11/2017 11/2018 04 07 Benicia Solano 2018 Microsurfacing Project Microsurface and striping from Hastings Dr to end of court Zinnia Ct. 11/2017 11/2018 04 07 Berkeley Alameda FY 2018 Street Rehabilitation: Reconstruction of 0.7 miles of pavement; replacement of storm drains, retaining walls and sidewalk. From Canyon Road to the east City limit (entire street) 05/2018 10/2018 20 30 Panoramic Way Berkeley Alameda FY 2018 Street Rehabilitation: Prospect Reconstruction of 0.13 miles of pavement; replacement of sidewalk and installation of curb ramps and crosswalks. UC Berkeley Campus to Hillside Avenue 05/2018 10/2018 20 30 Street Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.9 mile of a residential street. This area has been identified in the City's Pavement Linden Drive between Whittier Drive and North Santa Monica Blvd 06/2018 06/2019 15 20 Various Locations Management Plan that requires rehabilitation. The City plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.5 mile of a major City street that goes east to west through City. The City plans to Burton Way (North side) between Rexford Drive and Oakhurst Drive 06/2018 09/2019 15 20 Various Locations incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.3 mile of a residential street that is heavily used to access major arterial streets within the Rexford Dr. between Olympic Blvd. and Pico Blvd. 06/2018 09/2019 15 20 Various Locations City. The City plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.2 mile of a residential street that is heavily used to travel to north side of City. The City Crescent Drive between Sunset Blvd. and Lexington Rd. 06/2018 09/2019 15 20 Various Locations plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.1 mile of a residential street that has a lower PCI to comparable residential streets. The City Copley Place near Sunset Blvd. 06/2018 09/2019 15 20 Various Locations plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.3 mile of a commercial street (north) and residential street (south) that is heavily used to Linden Drive between S. Santa Monica Blvd and Charleville Blvd. 06/2018 09/2019 15 20 Various Locations access major arterial streets within the City. The City plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.5 mile of residential street that is heavily used to access major arterial streets in the City. Rexford Dr. between Olympic Blvd. and Wilshire Blvd. 06/2018 09/2019 15 20 Various Locations The City plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.4 mile of residential street that is heavily used to access major arterial streets I nthe City. Almont Dr. between Charleville Blvd. and Olympic Blvd. 06/2018 09/2019 15 20 Various Locations The City plans to incorporate recycled rubber for this project. Beverly Hills Los Angeles Street and Alley Improvements - Rehabilitate approx. 0.9 mile of a major City street that goes east to west through City. The City plans to Burton Way (South side) between N. Rexford Drive and N. Robertson Blvd. 06/2018 09/2019 15 20 Various Locations incorporate recycled rubber for this project. Big Bear Lake San Bernardino Valley & Pineknot Slurry Seal Slurry seal application within The Village District Village Drive: Big Bear Boulevard to Pine Knot Avenue & Pine Knot Avenue: Village Drive to Big 07/2017 06/2018 03 05 Bear Boulevard Big Bear Lake San Bernardino Catalina Cape Seal Cape seal application of a local street Big Bear Boulevard to Elm Street 07/2017 06/2018 05 07 Big Bear Lake San Bernardino Fox Farm Cape Seal Cape seal application of a local street Big Bear Boulevard to City limits 07/2017 06/2018 05 07 Big Bear Lake San Bernardino Echo Hill Pavement Reconstruction Full depth reconstruction of a local street Castlewood Road to North End 07/2017 09/2017 20 25 Big Bear Lake San Bernardino Ironwood Pavement Reconstruction Full depth reconstruction of a local street Sky High Drive to Cameron Drive 07/2017 11/2017 20 25 Big Bear Lake San Bernardino Sky High Pavement Reconstruction Full depth reconstruction of a local street Ironwood Drive to South End 07/2017 11/2017 20 25 Big Bear Lake San Bernardino Willow Landing Pavement Overlay of a local street Hillside Trail to Catbird Lane 07/2017 11/2017 20 25 Reconstruction Big Bear Lake San Bernardino Lagunita Pavement & Drainage Full depth reconstruction of a local street with drainage improvements Lakeview Drive to North End 07/2018 11/2018 20 25 Rehabilitation Big Bear Lake San Bernardino Lower Moonridge Pavement & Full depth reconstruction of a local street including curb, gutter, and sidewalk replacement/addition Big Bear Boulevard to Elm Street 07/2018 06/2019 20 25 Sidewalk Rehabilitation Big Bear Lake San Bernardino Generap Overlay Program Annual program to overlay local streets as economies of scale opportunities present mid-year Specific corridors yet to be determined 07/2018 11/2018 20 25 Big Bear Lake San Bernardino ATP Grant Matching Funds For Construct missing link sidewalks and stripe additional bike lanes Big Bear Boulevard: Edgmoor Road to Cienega Road & Big Bear Boulevard: Stanfield Cutoff to 07/2019 06/2020 15 20 Sidewalk & Bike Lane Construction Division Drive Big Bear Lake San Bernardino Talbot Drive Pavement Reconstruction Full depth reconstruction of a local street Big Bear Boulevard to North End 07/2019 06/2020 20 25 Big Bear Lake San Bernardino Upper Moonridge Pavement & Full depth reconstruction of a local street including two (2) roundabouts, landscaped medians, curb, gutter, and Elm Street to Club View Drive 07/2019 06/2020 20 25 Sidewalk Rehabilitation sidewalk Big Bear Lake San Bernardino Generap Overlay Program Annual program to overlay local streets as economies of scale opportunities present mid-year Specific corridors yet to be determined 07/2019 11/2019 20 25 Big Bear Lake San Bernardino Summit Boulevard Pavement Full depth reconstruction of a local street including parking, pedestrian, and drainage improvements Big Bear Boulevard to Snow Summit Base Area 07/2020 06/2021 20 25 Reconstruction Big Bear Lake San Bernardino Generap Overlay Program Annual program to overlay local streets as economies of scale opportunities present mid-year Specific corridors yet to be determined 07/2020 11/2020 20 25 Big Bear Lake San Bernardino Clubview Drive Pavement Full depth reconstruction of a local street Moonridge Road to Bear Mountain Base Area 07/2021 06/2022 20 25 Reconstruction Big Bear Lake San Bernardino Cliff Drive Pavement Reconstruction Full depth reconstruction of a local street Talmadge Road to Spruce Road 07/2021 06/2022 20 25 Big Bear Lake San Bernardino Manzanita Court Pavement Full depth reconstruction of a local street Lowe Drive to Rueda Lane 07/2021 06/2022 20 25 Reconstruction Big Bear Lake San Bernardino Generap Overlay Program Annual program to overlay local streets as economies of scale opportunities present mid-year Specific corridors yet to be determined 07/2021 11/2021 20 25 Biggs Butte Aleut Street Rehab Project 2" grind and overlay with Road Fabric. Area 4695 square yards Aleut Street Between 3rd Street and 7th Street. Does not include intersections of crossing 06/2018 12/2018 05 10 streets. Biggs Butte F Street Rehab Project 2" grind and overlay with Road Fabric. Area 2108 square yards F Street Between 2nd Street and 4th Street. Does include intersections at 3rd street. 06/2018 12/2018 05 10

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Biggs Butte C Street Rehab Project 2" grind and overlay with Road Fabric. Area 2191 square yard C Street from 2nd Street to 4th Street. Includes 3 St intersection 06/2018 12/2018 05 10 Biggs Butte C Street Rehab Project 2" grind and overlay with Road Fabric. Area 2463 square yards C Street from 4nd Street to 7th Street. Includes 5th & 6th St intersection 06/2019 12/2019 05 10 Biggs Butte W. Biggs-Gridley Road Rehab Project 2" grind and overlay with Road Fabric. Area 1216 square yards West Biggs-Gridley Road from Bannock St south to City limits 06/2019 12/2019 05 10 Biggs Butte H Street Rehab Project 2" grind and overlay with Road Fabric H Street from 4th to 7th 06/2019 12/2019 05 10 Biggs Butte 6TH Street Rehab Project 2" grind and overlay with Road Fabric 6th Street from Hamiltion Slough to Chatfield 06/2020 12/2020 05 10 Biggs Butte 10th Street Rehab Project 2" grind and overlay with Road Fabric 10th Street from b to Bannock 06/2020 12/2020 05 10 Biggs Butte 3rd Street Rehab Project 2" grind and overlay with Road Fabric 3rd Street from Trent to F Street 06/2020 12/2020 05 10 Biggs Butte 7th Street Rehab Project 2" grind and overlay with Road Fabric 7th Street from H to C 06/2020 12/2020 05 10 Biggs Butte 2nd Street Rehab Project 2" grind and overlay with Road Fabric 2nd Street from B to F 06/2020 12/2020 05 10 Biggs Butte D Street Rehab Project 2" grind and overlay with Road Fabric D Street from 2nd to 7th 06/2020 12/2020 05 10 Bishop Inyo Digouts 2017 Reconstruct structural section May and Fowler near Main and Line 09/2017 10/2017 25 99 Bishop Inyo South Street Pavement Replace failed pavement and overlay South near Main 09/2017 09/2017 15 60 Bishop Inyo Spruce Fiber Seal Place fiber seal Spruce between Yaney and Wye 07/2018 06/2019 05 30 Bishop Inyo Home Street Fog Seal Place fog seal Home from Line to Sierra 07/2018 06/2019 02 20 Bishop Inyo Mac Iver Street Fog Seal Place fog seal Mac Iver 07/2018 06/2019 02 20 Bishop Inyo South Second Fog Seal Place fog seal South Second Street 07/2018 06/2019 02 20 Bishop Inyo Third and South Digouts Replace failed pavement Third and South 07/2018 06/2019 25 99 Bishop Inyo 2018-2019 Cross Gutters Construct concrete cross gutters Various 07/2018 06/2019 50 99 Bishop Inyo 2018-2019 Sidewalks Reconstruct failed sidewalk Various 07/2018 06/2019 50 99 Blue Lake Humboldt Greenwood Culvert Culvert Replacement/Drainage Ditch Greenwood Road 09/2017 09/2017 10 20 Blue Lake Humboldt Pothole Maintenance Fill Potholes Acacia Drive 05/2018 05/2018 03 05 Blue Lake Humboldt Pothole Maintenance Fill Potholes Hartman Road 05/2018 05/2018 03 05 Blue Lake Humboldt Pothole Maintenance Fill Potholes Wahl Street 05/2018 05/2018 03 05 Blue Lake Humboldt Striping/Curb & Centerline Painting Paint curbs Greenwood Road 06/2018 06/2018 02 05 Blue Lake Humboldt Striping/Curb & Centerline Painting Stop Bar Painting Acacia Drive 06/2018 06/2018 02 05 Blue Lake Humboldt Striping/Curb & Centerline Painting Paint Crosswalks and Stop Bars Railroad and South Railroad 06/2018 06/2018 02 05 Blue Lake Humboldt Speed Limit Sign Installation Install Speed Limit Signs Greenwood Road 01/2018 01/2018 05 07 Blue Lake Humboldt Traffic Delineator Installation Install Traffic Delineators Hatchery Road 05/2018 05/2018 05 07 Blue Lake Humboldt Traffic Calming Install Traffic Calming Devices Hartman Road 10/2017 10/2017 05 07 Blythe Riverside BARNARD STREET - STORMWATER Install 300 feet of underground stormwater storage system; installation of catch basins to capture stormwater Intersection of W. Barnard and N Lovekin Blvd, City of Blythe, Riverside. 06/2018 11/2018 50 99 SYSTEM IMPROVEMENT PROJECT from the street; piping to connect to the existing storm drain system; and street reconstruction. Bradbury Los Angeles Design of Citywide Slurry Seal Project The total cost of design will be $15,000 so this funds the start of the design. Citywide 12/2018 06/2019 05 07 (Partial) Brawley Imperial Streets Rehabilitation Phase 11 Resurface approximately 0.5 miles of road utilizing recycle materials. 16th, 17th and 18th Streets between K St. and Malan St. 12/2017 06/2018 15 20 Brea Orange Cliffwood Industrial Park Pavement This project will rehabilitate the pavement on Cliffwood Street, Oak Place, Thor Place and Telstar Way pursuant to The Project is located in the City of Brea at Cliffwood Industrial tract which includes Cliffwood 01/2018 06/2018 10 20 Rehabilitation Project the 2017 Pavement Management Program. Street, Oak Place, Thor Place, and Telsar Way Brentwood Contra Costa Pavement Management Program - This project will consist of pavement condition surveying of roadways every two years and then reconstructing, This is an annual Pavement Management Project, list of streets currently being developed. 05/2018 08/2018 07 15 2018 overlaying, surface sealing and crack sealing various roads each year as needed. The City's pavement management software selects those streets on which it is the most cost effective to perform preventative maintenance with field verification by staff. Constructing roadways is a significant investment for the City. Preventative maintenance is the best means for keeping this large investment in good, operable condition and avoids costly reconstruction. Brentwood Contra Costa Lone Tree Way - Union Pacific This project will construct a grade separation underpass consisting of four travel lanes crossing under the Union Lone Tree Way and Union Pacific Railroad at-grade crossing 07/2020 07/2022 25 30 Undercrossing Pacific Railroad. This project entails: constructing a bridge structure; relocation of numerous existing wet and dry utilities; high pressure gas lines; storm water pump station; retaining walls and landscaped parkway. This project will increase public safety by creating a grade separation crossing of the Union Pacific Railroad, instead of the present at-grade crossing. Brentwood Contra Costa Brentwood Boulevard Widening North - This project will continue the widening of Brentwood Boulevard with two lanes in each direction and will include: Brentwood Boulevard from Havenwood Avenue to Homecoming Way 07/2019 07/2020 25 30 Phase I two bike lanes; curbs; gutters; medians; sidewalk on east side; street lights and landscaping on each side of the roadway. This project will also include a new parallel bridge over Marsh Creek, traffic signal modification at Brentwood Boulevard and Grant Street and moving the overhead power lines, telephone lines and cable lines underground. This project will improve safety, traffic flow and facilitate adjacent development. Brentwood Contra Costa John Muir Parkway Extension - Phase II Construct approximately 1,600' of road including a 16' median; two 12' lanes; 12" water main; median John Muir Parkway from the future Foothill Drive intersection with Concord Avenue to Briones 05/2018 11/2018 25 30 landscaping; street lights; 24" storm drain and 8" non-potable water main. This section of roadway will replace Valley Road existing Concord Avenue to ensure continued traffic circulation in the area. Brentwood Contra Costa Brentwood Various Streets and Road This project will provide pavement rehabilitation and preventative maintenance on arterial roadway segments in Balfour Road from Minnesota Avenue to Fairview Avenue and from East Country Club Drive to 05/2020 09/2020 15 20 Preservation the City. Treatments will include grind and overlay, spot repairs, and slurry seals/crack seals. These pavement the Western City Limits; Lone Tree Way from Brentwood Boulevard to Medallion Drive, rehabilitation activities will require removal and replacement of ADA ramps to ensure compliance with current excluding portion located in unincorporated Contra Costa County accessibility requirements. New traffic signal detection and striping will also be required where the existing assets are removed. Brentwood Contra Costa Downtown Alley Rehabilitation This project includes the installation of new water and sewer facilities, the rehabilitation of existing facilities, Diablo Way and Midway Alleys, bounded by Brentwood Boulevard, Pine Street, Second Street, 06/2017 07/2022 25 30 including streetlights and either the removal or replacement of existing infrastructure, to correct existing and Chestnut Avenue operations and maintenance constraints due to the age of the facilities. This project will allow the City to accommodate the anticipated development of the Downtown area and, where feasible, bring the aging facilities up to current standards. Brisbane San Mateo Tunnel Avenue Rehabilitation A gutter-to-gutter grind out/removal of the existing failing asphalt-concrete and replacement with a new thicker Tunnel Avenue, beginning at the northern city limit with the City & County of San Francisco and 04/2017 10/2018 29 29 concrete section. Minor storm drain repairs/upgrades where necessary. The addition of Class II bikeway thence south for no less than 1500'. signage/striping. Buellton Santa Barbara 2017/18 Road Maintenance Project Type II Slurry Seal Road Maintenance, including localized R&R, signing and restriping to for reflectivity compliance. Riverview Drive (north of Hwy 246), Sycamore Drive (north of Highway 246), Valley Dair Road 03/2018 08/2018 15 30 (north of Highway 246), Arden Ave, Dogwood Drive, Cedar Lane, Beech Court, Alder Lane, Tamarind Lane, Blue Blossom Way, Cliff Rose Lane, Willow Lane, Via Corona Drive, Second Street (west of Calor). Buena Park Orange Descanso Avenue Rehabilitation 1/3 mile Descanso Avenue roadway rehabilitation with AC. Includes removal and replacement of curb & gutter, City of Buena Park - Descanso Avenue between Altura Boulevard and Caballero Boulevard. 12/2017 06/2018 10 15 sidewalk, accessible ramps, driveway approaches, signing & striping, utility adjustments, and other incidentals. Buena Park Orange Valley View Traffic Signal Installation of new traffic signal to safe facilitate pedestrian and bicycle crossing Valley View Avenue. This will City of Buena Park - SCE transmission main corridor at Valley View Avenue (south of Thelma 12/2017 06/2018 15 20 Improvements include a traffic signal, safety lighting, signing & striping, vehicle detection, signal timing, sidewalks, accessible Avenue). ramps, curb & gutter, and other incidentals.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Burbank Los Angeles Street Restoration Zone 2 Phase 1 Phase 1 (of 2) to resurface/reconstruct deteriorated streets, alleys, and concrete (sidewalk, driveway apron, curb, Bob Hope Dr from End to Riverside Dr; 07/2018 12/2018 20 20 gutter, and pedestrian ramps) in Zone 2. Sidewalk improvements include new pedestrian ramps for improved Edison Rd from Alameda Av to Buena Vista St; disabled access. Resurfacing/reconstructing deteriorated streets, alleys, and sidewalks reduces on-going Fairview St from Valley Heart Dr to Riverside Dr; maintenance and improves ride quality. Florence St from Oak St to Verdugo Av; Gaylord Dr from Valley Heart Dr to Riverside Dr; Lincoln St from Alameda Av to Oak St; Naomi St from Olive Av to Oak St; Naomi St from Alameda Av to Willow St; Niagara St from Valley Heart Dr to Riverside Dr; Niagara St from Riverside Dr to End; Oak St from Florence St to Naomi St; Oak St from Catalina St to Florence St; Ontario St from Alameda Av to End; Ontario St from Oak St to Verdugo Av. Burbank Los Angeles Street Restoration Zone 2 Phase 2 Phase 2 (of 2) to resurface/reconstruct deteriorated streets, alleys, and concrete (sidewalk, driveway apron, curb, Parkside Av from Bob Hope Dr to End; 02/2019 06/2019 20 20 gutter, and pedestrian ramps) in Zone 2. Sidewalk improvements include new pedestrian ramps for improved Riverside Dr from California St to Fairview St; disabled access. Resurfacing/reconstructing deteriorated streets, alleys, and sidewalks reduces on-going Riverside Dr from Fairview St to Niagara St; maintenance and improves ride quality. Riverside Dr from Niagara St to Gaylord Dr; Riverside Dr from Gaylord Dr to Bob Hope Dr; Valley Heart Dr from California St to Fairview St; Valley Heart Dr from Fairview St to Niagara St; Valley Heart Dr from Niagara St to Gaylord Dr; Verdugo Av from Lincoln St to Myers St; Verdugo Av from Myers St to Keystone St; Warner Bl from End to Bob Hope Dr. Burlingame San Mateo 2018 Street Resurfacing Project The project consists of street base failure repair and resurfacing on various streets within the city limit. Several City of Burlingame on California Drive, Trousdale Drive, Cadalliac Way and Broadway 12/2018 12/2019 10 24 different types of activities will be used including asphalt concrete “dig-out” repairs, asphalt concrete overlay, street reconstruction, surface milling, traffic markings, traffic control, concrete base repair and other related works. Calabasas Los Angeles Mulholland Hwy Shoulder Safety The project is to widen the shoulder; provide a pedestrian pathway along one side of the roadway; and, improve Mulholland Hwy between Old Topanga Cyn Rd and the City Limits with the Los Angeles County 06/2022 12/2024 25 30 Improvements sight distance at intersections. In addition, retaining walls will be constructed along certain segments within the Line project limits to prevent soil erosion during heavy rain events. Calabasas Los Angeles Las Virgenes Rd Shoulder Safety The project is to widen the shoulder and install guardrails to reduce potential runoff road incidents. Las Virgenes Rd between Lost Hills Rd and Mulholland Hwy 06/2021 06/2022 25 30 Improvements Calabasas Los Angeles Mulholland Hwy Gap Closure The improvements on Mulholland Hwy adjacent to the Calabasas High School include sidewalk connecting Mulholland Hwy between Old Topanga Cyn Rd and 770 feet east of Old Topanga Cyn Rd and 06/2019 06/2020 20 25 between the eastern high school driveway on Mulholland Highway and an access road to the high school on Old Old Topanga Cyn Rd between Mulholland Hwy and 810 feet north of Mulholland Hwy Topanga Canyon Road. It will also include extending the existing Class II bike facility to Old Topanga Canyon Road. The pedestrian and bicycle facilities will end on Mulholland Highway, in front of Calabasas High School, approximately 770 feet east of the intersection. On Old Topanga Canyon Road, the improvements will include reconstructing the existing dirt path on the east side of the roadway to a fully improved sidewalk and connects it to the existing sidewalk adjacent to the school service road. Additional improvements include providing Class II bicycle facilities on both sides of the roadway that will extend to Mulholland Hwy. The pedestrian and bicycle facilities currently end north of Old Topanga Canyon Road. Calexico Imperial Cesar Chavez Blvd. Improvements The project will consist of widening and improving Cesar Chavez Blvd. to four (4) lanes from 2nd Street to Highway Cesar Chavez Blvd. between Highway 98 and Second Street 12/2017 12/2018 10 20 98 and include surface rehab, turn lanes, traffic signal, lighting and sidewalks Calexico Imperial Second Street Bridge Widening The project will consist of widening and improving Second Street bridge Second Street Bridge 12/2017 12/2018 10 20 California City Kern Aspen Ave. & Bay Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.74 CL miles of Local Streets. Aspen Ave: 87th to Corwin; Bay Ave: S. Loop Blvd to Corwin; 87th: Aspen to Bay; 88th: CCB to 11/2017 12/2017 08 10 Aspen; Corwin St: Aspen to Bay California City Kern Catalpa Ave. & 90th St. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.60 CL miles of Local Streets. Catalpa Ave: 87th to 90th; 90th St: CCB to Catalpa; 87th: Bay to Catalpa; Corwin: Bay to Catalpa 12/2017 12/2017 08 10

California City Kern Lasky St. & Aspen Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.62 CL miles of Local Streets. Catalpa Ave: 90th to Lasky; Lasky St.: Catalpa to Aspen; Aspen Ave.: Lasky to 94th; 91St St.: CCB 12/2017 12/2017 08 10 to Aspen; 94th St.: CCB to Aspen California City Kern Bay Ave. & Catalpa Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.74 CL miles of Local Streets. Catapla Ave.: Lasky to 94th.; Bay Ave.: 91st to 94th; 91St St.: Bay to Catalpa; 94th St.: Aspen to 01/2018 01/2018 08 10 Catalpa California City Kern Eucalyptus Ave. & Fir Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.64 CL miles of Local Streets. Eucalyptus Ave.: S. Loop to Corwin; Fir Ave.: Holly to Corwin.; Corwin St.: Catalpa to Fir 02/2018 02/2018 08 10 California City Kern Holly & Grapewood Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.61 CL miles of Local Streets. Holly Ave.: Eucalyptus to Corwin; Grapewood Ave.: Fir to Corwin; Corwin St.: Grapewood to S 02/2018 02/2018 08 10 Loop Blvd California City Kern Dogwood Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.59 CL miles of Local Streets. Dogwood Ave.: Neuralia to Hickory 03/2018 03/2018 08 10 California City Kern Catalpa & Hickory Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.63 CL miles of Local Streets. Catalpa Ave.: 82nd to Hickory; Hickory Dr.: Catalpa to Great Circle; 84th St.: Catalpa to Dogwood 04/2018 04/2018 08 10

California City Kern Aspen Ave. & Bay Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.60 CL miles of Local Streets. Aspen Ave.: 84th to 86th; Bay Ave.: 84th to 86th; 84th St.: Aspen to Catalpa; 86th St.: Aspen to 05/2018 05/2018 08 10 Bay California City Kern Bay & 82nd & 83rd Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.63 CL miles of Local Streets. Bay Ave.: Neuralia to 82nd; 82nd St.: CCB to Dogwood; 83rd St.: CCB to Catalpa 06/2018 06/2018 08 10 California City Kern Xavier Ave. & Berry St. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.68 CL miles of Local Streets. Xavier Ave.: 72nd St. to Kenniston; Berry St.: Xavier to CCB 07/2018 07/2018 08 10 California City Kern Walpole Ave & Kenniston St Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.61 CL miles of Local Streets. Walpole Ave.: Isabella to Kenniston; Kenniston St. Walpole to CCB 07/2018 07/2018 08 10 California City Kern Dogbane & Columbine Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.77 CL miles of Local Streets. Dogbane Ave.: 76th to 78th; Columbine Ave.: 76th to 78th; Berry St.: Dogbane to Columbine; 08/2018 08/2018 08 10 76th St.: Walope to Xavier; 78th St.: Walope to Xavier California City Kern Isabella Blvd & 79th St Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.56 CL miles of Local Streets. Isabella Blvd.: Walope to CCB; 79th St.: Walope to CCB 09/2018 09/2018 08 10 California City Kern Xavier Ave. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.81 CL miles of Local Streets. Xavier Ave.: 89th to 94th; 89th St.: Xavier to CCB; 91St St.: Columbine to CCB; 94th St.: 10/2018 10/2018 08 10 Columbine to CCB California City Kern Walpole Dr. Grind existing AC Surface and Repave with 3" of Hot Mix Asphalt an Estimated 0.67 CL miles of Local Streets. Walpole Ave.: 89th to 94th; 91St St.: Fuchsia to Columbine; 94th St. Fuchsia to Columbine 11/2018 11/2018 08 10 Calimesa Riverside County Line Road Corridor Joint improvement project with the City of Yucaipa to construct improvements on County Line Road from County Line Road from Calimesa Blvd to Bryant St. 07/2018 06/2019 25 40 Improvements Project Calimesa Blvd to Bryant St including 4 intersections, sidewalk, ADA ramps, bike lanes, utility relocations and street widening. Calipatria Imperial Maintenance & Rehabilitation Width 48, Length 400, Pavement SQFT 19,200, to receive a slurry seal 1H coat Section street: Imperial Avenue, From Delta Street to California Street 01/2018 04/2018 05 08 2017/2018 ( Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 48, Length 402, Pavement SQFT 19,296, to receive a slurry seal 1H coat Section street: Imperial Avenue, From California Street to Barbara Street 01/2018 04/2018 05 08 2017/2018 ( Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 48, Length 403, Pavement SQFT 19,344, to receive a slurry seal 1H coat Section Street: Imperial Avenue, From Barbara Street to Alexandria Street 01/2018 04/2018 05 08 2017/2018 ( Imperial Avenue)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Calipatria Imperial Maintenance & Rehabilitation Width 48, Length 398, Pavement SQFT 19,104, to receive a slurry seal 1H coat Section street: Imperial Avenue, From Alexandria Street to Main Street 01/2018 04/2018 05 08 2017/2018 ( Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 32, Length 539, Pavement SQFT 17,248, to receive a slurry seal 1H coat Section Street: Commercial Ave, From Bonita Place to Church Street 01/2018 04/2018 05 08 2017/2018 ( Commercial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 713, Pavement SQFT 35,650, to receive a slurry seal 1H coat Section Street: Date Street, From Highway 111 to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 ( Date Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 612, Pavement SQFT 30,600, to receive a slurry seal 1H coat Section Street: Date Street, From Imperial Avenue to Railroad Avenue 01/2018 04/2018 05 08 2017/2018 (Date Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 700, Pavement SQFT 35,000, to receive a slurry seal 1H coat Section Street: Church Street, From Highway 111 to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 (Church Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 615, Pavement SQFT 30,750, to receive a slurry seal 1H coat Section Street: Church Street, From Imperial Avenue to Railroad 01/2018 04/2018 05 08 2017/2018 (Church Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 699, Pavement SQFT 34,950, to receive a slurry seal 1H coat Section Street: Bonita Stree, From Highway 111 to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 630, Pavement SQFT 31,500, to receive a slurry seal 1H coat Section Street: Bonita Stree, From Imperial Avenue to Railroad Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Street) Calipatria Imperial Maintenance & Rehabilitation Width 40, Length 584, Pavement SQFT 23,360, to receive a slurry seal 1H coat Section Street: Bonita Place, From Commercial Avenue to East Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Place) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 687, Pavement SQFT 34,350, to receive a slurry seal 1H coat Section Street: Alamo Street, From Sorenson Avenue to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 (Alamo Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 708, Pavement SQFT 35,400, to receive a slurry seal 1H coat Section Street: Alexandria Street, From Sorenson Avenue to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 (Alexandria Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 630, Pavement SQFT 31,500, to receive a slurry seal 1H coat Section Street: Alexandria Street, From Imperial Avenue to Railroad Avenue 01/2018 04/2018 05 08 2017/2018 (Alexandria Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 710, Pavement SQFT 35,500, to receive a slurry seal 1H coat Section Street: Barbara Street, From State HWY 111 to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 (Barbara Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 630, Pavement SQFT 31,500, to receive a slurry seal 1H coat Section Street: Barbara Street, From Imperial Avenue to Railroad Avenue 01/2018 04/2018 05 08 2017/2018 (Barbara Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 710, Pavement SQFT 35,500, to receive a slurry seal 1H coat Section Street: California Street, From State HWY 111 to Imperial Avenue 01/2018 04/2018 05 08 2017/2018(California Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 636, Pavement SQFT 31,800, to receive a slurry seal 1H coat Section Street: California Street, From Imperial Avenue to Railroad Avenue 01/2018 04/2018 05 08 2017/2018 ( California Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 709, Pavement SQFT 35,450, to receive a slurry seal 1H coat Section Street: Delta Street, From Sorenson Avenue to Imperial Avenue 01/2018 04/2018 05 08 2017/2018 (Delta Street) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 640, Pavement SQFT 32,000, to receive a slurry seal 1H coat Section Street: Imperial Avenue, From Imperial Avenue to Railroad Avenue 01/2018 04/2018 05 08 2017/2018 (Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 50, Length 2081, Pavement SQFT 104,050, Crack length 12,846, to receive a crack seal Section Street: International Avenue, From Main Street to Bowles Road 01/2018 04/2018 05 08 2017/2018 (International Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1587, Pavement SQFT 63,480, Crack Length7,347.6, to receive a crack seal Section Street: Lake Avenue, From Delta Street to Main Street 01/2018 04/2018 05 08 2017/2018 (Lake Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,642, Pavement SQFT 65,680, Crack Length 16,357.2, to receive a crack seal Section Street: Lake Avenue, From Main Street to Date Street 01/2018 04/2018 05 08 2017/2018 (Lake Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 403, Pavement SQFT 16,120, Crack Length 4,362, to receive a crack seal Section Street: Lake Avenue, From Date Street to Elder Street 01/2018 04/2018 05 08 2017/2018 (Lake Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,600, Pavement SQFT 64,000, Crack Length7,347.6, to receive a crack seal Section Street: Park Avenue, From Main Street to Date Street 01/2018 04/2018 05 08 2017/2018 (Park Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 406, Pavement SQFT 16,240, Crack Length7,800, to receive a crack seal Section Street: Park Avenue, From Date Street to Elder Street 01/2018 04/2018 05 08 2017/2018 (Park Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 439, Pavement SQFT 17,560, Crack Length 7,800, to receive a crack seal Section Street: Park Avenue, From Elder Street to Fern Street 01/2018 04/2018 05 08 2017/2018 (Park Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 47.2,Length 427, Pavement SQFT 20,154.4, Crack Length 9,800, to receive a crack seal Section Street: Railroad Avenue, From Young Street to Delta Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 33,Length 394, Pavement SQFT 13,002, Crack Length 8,800, to receive a crack seal Section Street Railroad Avenue , From Delta Street to California Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 27,Length 405, Pavement SQFT 10,935, Crack Length 8,500, to receive a crack seal Section Street Railroad Avenue , From California Street to Barbara Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 27,Length 405, Pavement SQFT 10,935, Crack Length 8,900, to receive a crack seal Section Street: Railroad Avenue, From Barbara Street to Alexandria Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 23, Length 400, Pavement SQFT 9,200, Crack Length 8,880, to receive a crack seal Section Street: Railroad Avenue, From Alexandria Street to Main Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 24,Length 400, Pavement SQFT 9,600, Crack Length 7,500, to receive a crack seal Section Street: Industrial Avenue, From Alexandria Street to Main Street 01/2018 04/2018 05 08 2017/2018 (Industrial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 24,Length 1,672, Pavement SQFT 40,128, Crack Length 15,000, to receive a crack seal Section Street: Industrial Avenue, From Main Street to Date Street 01/2018 04/2018 05 08 2017/2018 (Industrial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 25,Length 1,151, Pavement SQFT 28,775, Crack Length 16,000, to receive a crack seal Section Street: Brown Street, From Freeman Street to California Street 01/2018 04/2018 05 08 2017/2018 (Brown Street) Calipatria Imperial Maintenance & Rehabilitation Width 27 ,Length 403, Pavement SQFT 10,881, Crack Length 1,662, to receive a crack seal Section Street: Brown Avenue, From Alexandria Street to HWY 115 01/2018 04/2018 05 08 2017/2018 (Brown Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 27,Length 1,672, Pavement SQFT 45,144, Crack Length 22,000, to receive a crack seal Section Street: Brown Avenue, From Main Street to Date Street 01/2018 04/2018 05 08 2017/2018 (Brown Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 21.5,Length 959, Pavement SQFT 20,618.5, Crack Length13,426, to receive a crack seal Section Street: Brown Avenue, From Date Street to Bowles Road 01/2018 04/2018 05 08 2017/2018 (Brown Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 20,Length 390, Pavement SQFT 7,800, Crack Length 5,460, to receive a crack seal Section Street: Brown Avenue, From E. Elder Street to Delta Street 01/2018 04/2018 05 08 2017/2018 ( Commercial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 27,Length 422, Pavement SQFT 11,394, Crack Length 5,908, to receive a crack seal Section Street: Commercial Avenue, From Delta Street to California Street 01/2018 04/2018 05 08 2017/2018 (Commercial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 27.3,Length 252, Pavement SQFT 6,879.6, Crack Length 3528, to receive a crack seal Section Street: Commercial Avenue, From Main Street to Alamo Street 01/2018 04/2018 05 08 2017/2018 (Commercial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 27.3,Length 267, Pavement SQFT 7,289.1, Crack Length 3,738, to receive a crack seal Section Street: Commercial Avenue, From Alamo Street to Bonita Street 01/2018 04/2018 05 08 2017/2018 (Commercial Avenue)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Calipatria Imperial Maintenance & Rehabilitation Width 34.5,Length 240, Pavement SQFT 8,280, Crack Length 3,360, to receive to crack seal Section Street: Commercial Avenue, From Bonita Street to Bonita Place 01/2018 04/2018 05 08 2017/2018 (Commercial Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 23,Length 1,466, Pavement SQFT 33,718, Crack Length 20,524, to receive a crack seal Section Street: East Avenue, From Young Road to California Street 01/2018 04/2018 05 08 2017/2018 (East Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 23,Length 1,200, Pavement SQFT 27,600, Crack Length 3,900 to receive a crack seal Section Street: East Avenue, From California Street to Main Street 01/2018 04/2018 05 08 2017/2018 (East Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 23,Length 540, Pavement SQFT 12,420, Crack Length 3,547.2, to receive a crack seal Section Street: East Avenue, From Main Street to Bonita Place 01/2018 04/2018 05 08 2017/2018 (East Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 260, Pavement SQFT 10,400, Crack Length 3,640, to receive a crack seal Section Street: Desert Spring, From Desert Spring to Date Street 01/2018 04/2018 05 08 2017/2018 (Desert Spring) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 260, Pavement SQFT 10,400, Crack Length 1,800, to receive a crack seal Section Street: Sycamore CT, From Sycamore CT to Date Street 01/2018 04/2018 05 08 2017/2018 ( Sycamore CT.) Calipatria Imperial Maintenance & Rehabilitation Width 50,Length 1,200, Pavement SQFT 60,000, Crack Length 8,500, to receive a crack seal Section Street: Date Street, from International BLVD. to W. End of Date Street 01/2018 04/2018 05 08 2017/2018 (Date Street) Calipatria Imperial Maintenance & Rehabilitation Width 42.6,Length 424, Pavement SQFT 18062.4, Crack Length8,688, to receive crack seal Section Street: W. Elder Street, From International BLVD. to Lake Avenue 01/2018 04/2018 05 08 2017/2018 (W. Elder Street) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 866, Pavement SQFT 35,440, Crack Length 10,316.4, to receive crack seal Section Street: W. Elder Street, From Lake Avenue to HWY 111 01/2018 04/2018 05 08 2017/2018 (W. Elder Street) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,322, Pavement SQFT 52,880, Crack Length 11582.4, to receive crack seal Section Street:Date Street, From International BLVD. to HWY 111 01/2018 04/2018 05 08 2017/2018 (Date Street) Calipatria Imperial Maintenance & Rehabilitation Width 46.5,Length 951, Pavement SQFT 44212.2, Crack Length 11,646, to receive crack seal Section Street: Church Street, From International BLVD. to HWY 111 01/2018 04/2018 05 08 2017/2018 (Church Street) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,320, Pavement SQFT 52,800, Crack Length 10575.6, to receive crack seal Section Street: Bonita Street, From International BLVD. to Sorenson Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Street) Calipatria Imperial Maintenance & Rehabilitation Width 28,Length 1,300, Pavement SQFT 36,400, Crack Length 7765.2, to receive crack seal Section Street: Bonita Street, From Brown Avenue to East Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Street) Calipatria Imperial Maintenance & Rehabilitation Width 52.3,Length 625, Pavement SQFT 32687.5, Crack Length 8,500, to receive crack seal Section Street: Alamo Street, from Park Avenue to Sorenson Avenue 01/2018 04/2018 05 08 2017/2018 (Alamo Street) Calipatria Imperial Maintenance & Rehabilitation Width 25.5,Length 1,238, Pavement SQFT 31,569, Crack Length 7765.2, to receive crack seal Section Street: Alamo Street, From Brown Avenue to East Avenue 01/2018 04/2018 05 08 2017/2018 (Alamo Street) Calipatria Imperial Maintenance & Rehabilitation Width 75,Length 2,000, Pavement SQFT 150,000, Crack Length 28,000, to receive crack seal Section Street: Main Street, from School DW to International BLVD 01/2018 04/2018 05 08 2017/2018 (Main Street) Calipatria Imperial Maintenance & Rehabilitation Width 75,Length 1,500, Pavement SQFT 112,500, Crack Length 21,000, to receive crack seal Section Street: Main Street, from International BLVD. to Sorenson/ HWY 111 01/2018 04/2018 05 08 2017/2018 (Main Street) Calipatria Imperial Maintenance & Rehabilitation Width 46.25,Length 1,031, Pavement SQFT 47683.75, Crack Length 9,342, to receive crack seal Section Street: Alexandria Street, from International BLVD. to Sorenson/ HWY 111 01/2018 04/2018 05 08 2017/2018 (Alexandria Street) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,237, Pavement SQFT 49,480, Crack Length 7118.4, to receive crack seal Section Street: Barbara Street, From International BLVD. to Sorenson/HWY 111 01/2018 04/2018 05 08 2017/2018 (Barbara Street) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,282, Pavement SQFT 51,280, Crack Length 6867.6, to receive crack seal Section Street: California Street, from International BLVD. to Sorenson/HWY 111 01/2018 04/2018 05 08 2017/2018 (California Street) Calipatria Imperial Maintenance & Rehabilitation Width 48,Length 467, Pavement SQFT 22,416, Crack Length 6,538, to receive crack seal Section Street: California Street, from Brown Street to Commercial Avenue 01/2018 04/2018 05 08 2017/2018 (California Street) Calipatria Imperial Maintenance & Rehabilitation Width 36.6,Length 277, Pavement SQFT 10138.2, Crack Length 3,878, to receive crack seal Section Street: Delta Street, From Lake Avenue to Park Avenue 01/2018 04/2018 05 08 2017/2018 (Delta Street) Calipatria Imperial Maintenance & Rehabilitation Width 43,Length 467, Pavement SQFT 20,081, Crack Length 6,538, to receive crack seal Section Street: Delta Street, from Brown Avenue to Commercial Avenue 01/2018 04/2018 05 08 2017/2018 (Delta Street) Calipatria Imperial Maintenance & Rehabilitation Width 32,Length 464, Pavement SQFT 14,848, Crack Length 6,496, to receive crack seal Section Street: E. Elder Street, from Brown Avenue to Commercial Avenue 01/2018 04/2018 05 08 2017/2018 (E. Elder Street) Calipatria Imperial Maintenance & Rehabilitation Width 40,Length 1,600, Pavement SQFT 64,000, Crack Length 8757.6, tor receive crack seal and slurry seal Section Street: Park Avenue, from Delta Street to Main Street 01/2018 04/2018 05 08 2017/2018 (Park Avenue) Calipatria Imperial Maintenance & Rehabilitation Width40,Length 800, Pavement SQFT 30,600, Crack Length 9,520, to receive crack seal and slurry seal Section Street: Ironwood Avenue, from Mesa Verde RD. to Date Street 01/2018 04/2018 05 08 2017/2018 (Ironwood Avenue) Calipatria Imperial Maintenance & Rehabilitation Width 45,Length 680, Pavement SQFT 30,600, Crack Length 9,520, to receive a crack seal and slurry seal Section Street: Main Street, from Lyerly Road to School Driveway 01/2018 04/2018 05 08 2017/2018 (Main Street) Calipatria Imperial Maintenance & Rehabilitation Width 41,Length 428, Pavement SQFT 17,548, Crack Length 6565.2, to receive a crack seal and slurry seal Section Street: Alamo Street, from International BlVD. to Lake Avenue 01/2018 04/2018 05 08 2017/2018 (Alamo Street) Calipatria Imperial Maintenance & Rehabilitation Width 50,Length 635, Pavement SQFT 31,750, Crack Length 3,000, to receive a crack seal and slurry seal Section Street: Alamo Street, from Imperial Avenue to Railroad Avenuen 01/2018 04/2018 05 08 2017/2018 (Alamo Street) Calipatria Imperial Maintenance & Rehabilitation Width 20,Length 630, Pavement SQFT 12,600, Crack Length8,820, to receive a crack seal and slurry seal Section Street: Alley Between Alexandria & Main Street, from Park Avenue to Sorenson/ HWY 01/2018 04/2018 05 08 2017/2018 ( Alley Between Alexandria 111 & Main Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: International Avenue, from Delta to California Street 01/2018 04/2018 05 08 2017/2018 (International Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: International Avenue, from California to Barbara 01/2018 04/2018 05 08 2017/2018 (International Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: International Avenue, from Barbara Street to Alexandria Street 01/2018 04/2018 05 08 2017/2018 (International Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: International Avenue, from Alexandria Street to Main Street 01/2018 04/2018 05 08 2017/2018 (International Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Lake Avenue, from Elder Street to Fern Street 01/2018 04/2018 05 08 2017/2018 (Lake Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Lake Avenue, from Fern Street to Bowles Road 01/2018 04/2018 05 08 2017/2018 (Lake Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Centro Avenue, from Alexandria Street to Alamo Street 01/2018 04/2018 05 08 2017/2018 (Centro Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Imperial Avenue, from Main Street to Alamo Street 01/2018 04/2018 05 08 2017/2018 (Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Sectio Street: Imperial Avenue, from Alamo Street to Bonita Street 01/2018 04/2018 05 08 2017/2018 (Imperial Avenue)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Imperial Avenue, from Bonita Street to Church Street 01/2018 04/2018 05 08 2017/2018 (Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Imperial Avenue, from Church Street to Date Street 01/2018 04/2018 05 08 2017/2018 (Imperial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Railroad Avenue, from Main Street to Alamo Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Railroad Avenue, From Alamao Street to Bonita Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Railroad Avenue, From Bonita Street to Church Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Railroad Avenue, From Church Street to Date Street 01/2018 04/2018 05 08 2017/2018 (Railroad Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Industrial Avenue, From Young Road to Barbara Street 01/2018 04/2018 05 08 2017/2018 ( Industrial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Industrial Avenue, from Barbara Street to Alexandria Street 01/2018 04/2015 05 08 2017/2018 (Industrial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Industrial Avenue, from Date Street to Fern Street 01/2018 04/2018 05 08 2017/2018 (Industrial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Brown Avenue, from California Street to Barbara Street 01/2018 04/2018 05 08 2017/2018 (Brown Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Brown Avenue, from Barbara Stree to Alexandria Street 01/2018 04/2018 05 08 2017/2018 (Brown Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Commercial Avenue, from Freeman Street to Elder Street 01/2018 04/2018 05 08 2017/2018 (Commercial Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: East Avenue, from Bonita Place to Church Street 01/2018 04/2018 05 08 2017/2018 (East Avenue) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Lauren LN., from Fan Palm Court to Mesa Verde RD. 01/2018 04/2018 05 08 2017/2018 (Laurel LN.) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Mesa Verde RD, from Ironwood RD. to Laurel LN. 01/2018 04/2018 05 08 2017/2018 (Mesa Verde RD) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Fan Palm CT, from Ironwood to Laurel Lane 01/2018 04/2018 05 08 2017/2018 (Fan Palm CT) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Fern Street, from International Avenue to Lake Avenue 01/2018 04/2018 05 08 2017/2018 (Fern Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Fern Street, from Lake Avenue to Park Avenue 01/2018 04/2018 05 08 2017/2018 (Fern Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Fern Street, from Park Avenue to Sorenson/State HWY 111 01/2018 04/2018 05 08 2017/2018 (Fern Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Church Street, from Brown Street to Commercial Avenue 01/2018 04/2018 05 08 2017/2018 (Church Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Church Street, from Commercial Avenue to East Avenue 01/2018 04/2018 05 08 2017/2018 (Church Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Bonita Street, from Industrial Avenue to Brown Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Bonita Place, from Brown Avenue to Commercial Avenue 01/2018 04/2018 05 08 2017/2018 (Bonita Place) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Alexandria Street, from Industrial Avenue to Brown Street 01/2018 04/2018 05 08 2017/2018 (Alexandria Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Barbara Street, from Industrial Avenue to Brown Avenue 01/2018 04/2018 05 08 2017/2018 (Barbara Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: California Street, from Industrial Avenue to Brown Avenue 01/2018 04/2018 05 08 2017/2018 (California Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: California Street, from Commercial Avenue to East Avenue 01/2018 04/2018 05 08 2017/2018 (California Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Delta Street, from International BLVD. to Lake Avenue 01/2018 04/2018 05 08 2017/2018 (Delta Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Delta Street, from Park Avenue to Sorenson Avenue 01/2018 04/2018 05 08 2017/2018 (Delta Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Delta Street, from Industrial Avenue to Brown Avenue 01/2018 04/2018 05 08 2017/2018 (Delta Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Freeman Street, from Industrial Avenue to Brown Street 01/2018 04/2018 05 08 2017/2018 (Freeman Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Freeman Street, From Brown Street to Commercial Avenue 01/2018 04/2018 05 08 2017/2018 (Freeman Street) Calipatria Imperial Maintenance & Rehabilitation Streets to be rehabilitated Section Street: Freeman Street, From Commercial Avenue to East Avenue 01/2018 04/2018 05 08 2017/2018 (Freeman Street) Calistoga Napa Lake Street Pavement Rehabilitation Grind asphalt overlay and concrete street and put down hot mix asphalt leveling course, pavement reinforcing Lake Street between Grant Street and Fair Way 10/2017 11/2017 10 20 fabric over entire roadway including parking lanes, and put a final 3" lift of hot mis asphalt over entire roadway including parking lane. Calistoga Napa 2017 Microsurfacing Project Digout or remove & replace 4" HMA, skin patch, prune roots & install root barrier, install ARAM cape seal. Various streets in the City of Calistoga, approximately 548,750 sq. ft. 10/2017 11/2017 10 20 Calistoga Napa Lake Street Reconstruction Grind asphalt overlay and concrete street and put down hot mix asphalt leveling course, pavement reinforcing Lake Street between Fair Way and Washington Street 03/2018 07/2018 10 20 fabric over entire roadway including parking lanes, and put a final 3" lift of hot mis asphalt over entire roadway including parking lane. Calistoga Napa Washington Street Resurfacing Grind asphalt 2" and overlay with 3" hot mix asphalt Washington Street between Lincoln and North Oak 03/2018 07/2018 10 20

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Camarillo Ventura Annual Slurry Seal Program Asphalt Rubber Aggregate Membrane (ARAM), Slurry Seal, and appurtenant work Avenida Acaso from Adolfo Road to 299' N/O Calle Tesoro; Calle Suerte from Avenida Acaso to 07/2017 10/2017 07 10 Calle Tesoro; Calle Tecate from Via Alondra to Flynn Road; Calle Tecate from Flynn Road to 670' E Of Flynn Road; Calle Tesoro from Flynn Road to Avenida Acaso; Corte Malpaso from W End to Via Alondra; Maya Linda from Via Alondra to Flynn Road; Via Alondra from Calle Tecate to Corte Malpaso; Via Alondra from Corte Malpaso to Maya Linda; Via Alondra from Maya Linda to Vista Mercado; Via Pescador from Flynn Road to Avenida Acaso; Vista Mercado from Via Alondra to Flynn Rd Campbell Santa Clara ANNUAL STREET MAINTENANCE - Install asphalt concrete over the width of the two traveled lanes (approximately 24 feet) and apply slurry seal Audrey Avenue – from Burrows Road to the eastern terminus east of Vale Avenue at the rear 06/2018 12/2018 10 15 AUDREY AVENUE & HACK AVENUE from road edge to road edge. The project will also install ADA compliant accessibility ramps at the intersections entrance to Capri elementary School, and Hack Avenue – from W. Parr Avenue to the northern of Audrey/Burrows and at Audrey/Oburn, and new striping. terminus at Audrey Avenue

Canyon Lake Riverside Overlay and Slurry Seal of Railroad Pavement rehabilitation, preservation, re-striping. Railroad Canyon Road - Western City Boundary to Eastern City boundary - 2 Miles 01/2017 04/2017 05 07 Canyon Road Canyon Lake Riverside Catch Basin Trash Filters Install trash filters in existing storm drain catch basins Railroad Canyon Road - Western City Boundary to Eastern City boundary - 2 Miles 05/2017 06/2017 20 25 Canyon Lake Riverside Speed Feedback Signs Install speed feedback signs along Railroad Canyon Road Railroad Canyon Road - Western City Boundary to Eastern City boundary - 2 Miles 01/2017 03/2017 15 20 Capitola Santa Cruz Highway 1 Interchange Bike Lane Bike lane improvements to install green bike lanes 41st Ave, Bay Ave, and Park Ave interchanges with Highway 1 07/2017 11/2017 10 20 Improvements Carlsbad San Diego Signal Operations Modifications Modify the traffic signal equipment, signage and striping at each intersection as follows: At the intersections of El Camino Real and Hosp Way, El Camino Real and Town Garden, and El 12/2017 12/2018 25 50 · El Camino Real and Hosp Way: remove split phase and convert to 8 phase Camino Real and Cassia Road. · El Camino Real and Town Garden: remove split phase and convert to 8 phase · El Camino Real and Cassia Rd: remove north pedestrian crosswalk.

Carlsbad San Diego Traffic Signal - Camino de los Coches Installation of a three-leg, fully actuated traffic signal, including a type 170-ATC Coldfire controller, video Intersection of Camino de los Coches and La Costa Avenue 06/2018 06/2019 25 50 and La Costa Avenue detection, battery back-up system, signal interconnect system and appurtenant signing and striping. Carlsbad San Diego Traffic Signal - El Fuerte and Rancho Installation of a three-leg, fully actuated traffic signal, including a controller and intersection control program, Intersection of El Fuerte and Rancho Pancho 12/2018 12/2019 25 50 Pancho video detection, battery back-up, signal interconnect conduit, and appurtenant striping and signing. Carlsbad San Diego Traffic Signal - Faraday and Camino Installation of a three-leg, fully actuated traffic signal, including a Type 170-ATC Coldfire controller, 200SA local Intersection of Faraday Avenue and Camino Hills Drive 12/2018 12/2019 25 50 Hills intersection control program, video detection, battery back-up system, signal interconnect and appurtenant signing and striping. Carlsbad San Diego Complete Street and Traffic Calming This project funds the Carlsbad Residential Traffic Management Program (CRTMP) which considers the installation Various roadways throughout the City with the current set of projects focused on Daisy Avenue, 03/2018 03/2019 10 20 Programming of traffic calming features, such as speed cushions, traffic circles, etc. as appropriate for each neighborhood/site. Harbor Drive , Cadencia Street, Estrella De Mar and Corintia Street.

Carlsbad San Diego Concrete Repair/Replacement Program Conrete repairs to sidewalks, curb and gutter, pedestrian ramps, driveway approaches and cross gutters. Various roadways throughout the City with the 2017 project sites focused along Carslbad 06/2017 01/2018 25 50 Village Drive, El Camino Real, El Fuerte Street and various adjacent residential roadway. Carlsbad San Diego Carlsbad Blvd. and Tamarack Avenue Intersection improvements at Carlsbad Boulevard and Tamarack Avenue to adapt the streets, bikelanes, sidewalks At the Intersection of Tamarack Avenue and Carlsbad Boulevard, continuing North on Carlsbad 08/2018 08/2019 25 50 Pedestrian Improvements and bus stop to better meet the needs of all modes of travel. The project includes: Boulevard to Redwood Avenue, then South of the Agua Hedionda Bridge. East along Tamarack Avenue to the Coastal Rail Trail at the rail road tracks. Construct ADA-compliant pedestrian path through the intersection of Tamarack Avenue and Carlsbad Boulevard (west side), continue the path to the southside of the Agua Hedionda bridge by widening the sidewalk (west side) and provide pedestrian refuge island aligned with the lagoon trail to the beach access stairwell.

Project will require the removal of the existing "pork chop" islands, installation of new concrete curb, gutter, sidewalk and pedestrian ramps.

Relocation of traffic signal equipment including signal poles, controller cabinet and electric service cabinet will be necessary. Due to the age/deterioration of existing traffic conduit, the traffic signal will be completely re-wired.

Create more on-street parking where possible.

Move the bus stop out of the center island at the entrance to the parking lot to a location that’s more accessible and comfortable for people waiting for the bus.

Create better connections with the Coastal Rail Trail segments in the area.

Carlsbad San Diego El Camino Real and College Blvd. Improve the intersection by widening south bound El Camino Real to provide three through lanes and a dedicated Intersection of El Camino Real and College Boulevard. 06/2018 06/2019 25 50 Intersection Improvements right turn lane to west bound College Blvd. Carlsbad San Diego El Camino Real Medians Construct raised, landscaped medians. Work includes median curb, stamped concrete paving, irrigation and Along El Camino Real between Camino Vida Roble and Cinnabar and between Alga and Arenal. 12/2018 12/2019 25 50 landscaping. Carlsbad San Diego La Costa Avenue Road Diet and Traffic Complete a Road Diet Study and implement traffic calming features in accordance with the findings of the Study. La Costa Avenue from El Camino Real to Rancho Santa Fe Road 12/2018 12/2019 25 50 Calming Carlsbad San Diego Left Turn Lane Extensions Extend the left turn lanes at four locations along El Camino Real. The work would include new AC pavement and Left turn lanes at the interection of El Camino Real and La Costa, El Camino Real and Alga, El 08/2018 08/2019 25 50 concrete curb and gutter and the modification of existing signing and striping, concrete median and median Camino Real and Palomar Airport Road and El Camino Real and Faraday. landscaping Carlsbad San Diego Pavement Management Program The Pavement Management Program is an ongoing annual program designed to extend the service life of city Various roadways throughout the City. The 2017 Overlay project is along El Camino Real from 08/2017 02/2018 07 21 streets and to maintain a smooth and safe driving surface for vehicles. The City utilizes a pavement management Gateway to Arenal and the Slurry Seal is on various streets including Melrose Drive, Rancho database program to determine pavement management needs for the purpose of establishing which streets are Santa Fe Road, El Fuerte Street, Tamarack Avenue and Carlsbad Village Drive. to be slurry sealed, overlaid, or reconstructed. Carlsbad San Diego Roadway Slope Stabilization Program Regrading and stabilization of roadway slopes to prevent the deposition of sediment onto the public right of way Various roadways slopes throughout the City with the 2017 project focused on Faraday Avenue 06/2017 12/2017 25 50 and receiving waters. west of Camino Hills Drive. Other locations inlcude Batiquitos Drive at Poppy Lane, Olivenhain Road at El Camino Real and Jefferson Street east of I-5. Carlsbad San Diego Trails Roadway Crossings Construct pedestrian crossing facilities which would include a high visibility crosswalk with signage and pedestrian Crossing Carlsbad Village Drive at Victoria Avenue and crossing Cadencia Street at old Rancho 01/2017 12/2017 25 50 activated signal system along at CVD and Victoria and high visibility crosswalk and signage at Cadencia and old Santa Fe Road trail. Rancho Santa Fe Road Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer. 1st Avenue (Lincoln to Mission) 12/2017 06/2018 15 20 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer. 2nd Avenue (Lincoln to Mission) 12/2017 06/2018 15 20 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. 5th Avenue (Monte Verde to Dolores) 12/2017 06/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. 6th Avenue (Dolores to Lincoln) 11/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. 8th Avenue (Forest to Turn Around) 11/2017 06/2018 15 20

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. 8th Avenue (Scenic to Carmelo) 12/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer. 12th Ave. (Monte Verde to San Carlos) 12/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer. 13 Ave. (Camino Real to Monte Verde) 11/2017 06/2018 15 20 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. Dolores (Santa Lucia to Franciscan Way) 12/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. Mountain View (Santa Re to Foresst) 12/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer. Oak Knoll Way (Forest to Turn Around) 11/2017 06/2018 15 20 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. Ocean Ave. (Monte Verde to Junipero) 12/2017 05/2018 08 10 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. Rio Road (Junipero to Santa Lucia) 12/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. San Carlos (13rth to Santa Lucia) 11/2017 05/2018 10 15 Carmel-by-the-Sea Monterey Road Projects (FY 2017/18) Mill and overlay a 2-inch asphalt layer and restripe street. Scenic Road (8th Ave to A3 S End 12/2017 04/2018 10 15 Carmel-by-the-Sea Monterey Lincoln & 3rd Cul-de-Sac Safety Construct bulb-outs and overlay a 2-inch asphalt layer. Lincoln Avenue (3rd to Cul de Sac) 09/2017 04/2018 15 20 Carpinteria Santa Barbara Street Maintenance Program Road Maintenance & Rehabilitation Citywide 07/2017 06/2018 05 20 Carpinteria Santa Barbara Parking Lot No. 2 and Cactus Lane Reconstruction of Roadway Structural Section, Pedestrian Facilities, Drainage Structures, and Curb and Gutter Cactus Lane from Carpinteria Avenue to Wullbrandt Way 11/2017 03/2018 05 20 Improvements Carson Los Angeles TURMONT STREET REHABILITATION $1.6M rehabilitation project which includes removal and replacement of roadway sections, and grinding of TURMONT ST. FROM AVALON BLVD. to CENTRAL AVE. - an East -West Collector street 04/2018 09/2018 15 20 approximately 185,875 sq. ft. of asphalt pavement surface to allow for the overlay of 2"-2.5" new layer of (approximate length of 5,521 L.F.) within Maintenance Zone #3 at the Central/Northern rubberized asphalt concrete (RAC). It also includes removal and replacement of broken and damaged concrete to section of the City of Carson improve sidewalks, curb & gutter, cross gutters, driveway approaches, and wheelchair access ramps in order to comply with the requirements of ADA. The proposed overlay of RAC will provide much longer life, better skid resistance, better traction, road noise reduction, and a smooth roadway surface. Cathedral City Riverside Date Palm Drive and Dinah Shore Reconstruct pavement approaching and through the intersection using portland cement concrete and asphalt Intersection of Date Palm Drive and Dinah Shore Drive in Cathedral City 03/2018 09/2018 20 30 Intersection Reconstruction concrete. Upgrade traffic signal to include advanced dilemma detection. Cathedral City Riverside Avenida Ximino Neighborhood Street Reconstruct pavement on neighborhood streets and provide drainage improvements Avenida Ximino between 30th Avenue and Vega Road, Susan Drive, Walker Avenue and Vega 03/2019 08/2019 15 20 Reconstruction Road between Avenida Ximino and Avenida Juarez in Cathedral City Cathedral City Riverside Landau Boulevard and McCallum Way Construct new traffic signal at intersection near Mt. San Jacinto High School. Pedestrian fatality in 2015 Intersection of Landau Boulvard and McCallum Way in Cathedral City 03/2020 08/2020 15 20 Intersection Traffic Signal Construction Cathedral City Riverside Whispering Palms Neighborhood Asphalt pavement reconstruction on five residential streets Candlewood Drive, Shifting Sands Trail, Sky Blue Water Trail, Navajo Trail, and Pueblo Trail 03/2020 08/2020 15 20 Street Pavement Reconstruction between Ramon Road and Avenue 33 in Cathedral City. Cathedral City Riverside Century Park Neighborhood Street Asphalt pavement reconstruction on 38 residential streets. The Century Park Neighborhood is between Avenue 30 on the north and McCallum Way on the 03/2021 08/2021 15 20 Pavement Rehabilitation south and between Date Palm Drive on the west and Da Vall Drive on the east in Cathedral City.

Cathedral City Riverside La Posada Neighborhood Street Asphalt pavement reconstruction on ten residential streets The La Posada neighborhood is north of Vista Chino and east and west of Avenida Maravilla. 03/2022 08/2022 15 20 Pavement Rehabilitation Streets include Santiago Road, Posada Road, Madrid Road, Riviera Road, Avenida Maravilla, San Martin Street, Calle Prado, La Medera Road and Tangelo Street in Cathedral City. Cathedral City Riverside Landau Public Alleyway Reconstruction Reconstruct alleyway that provides access to residential units. The alleyway is in the Panorama Neighborhood generally bounded between Vista Chino to the 05/2022 10/2022 15 20 north and 3Qth Avenue to the south in between Landau Boulevard and Avenida La Paz. Ceres Stanislaus Mitchell Road Overlay & Reconstruct and Overlay portion of 1,000 linear feet of Mitchell Road Mitchell Road between Highway 99 and Service Road 10/2017 06/2018 15 20 Reconstruction Cerritos Los Angeles Shoemaker Avenue Resurfacing Resurfacing of Shoemaker Avenue, a major arterial street, between Artesia Boulevard and 166th Street. The Shoemaker Avenue between Artesia Boulevard and 166th Street in the City of Cerritos 07/2017 09/2017 10 15 project includes replacement of deficient sidewalks, curbs, gutters and disabled access ramps. Chico Butte Annual Road Rehab Perform Cold-In-Place-Recycle of existing pavement surface, including upgrading of sidewalk ramps, installation of On Cohasset Road, from approximately 500' north of East Avenue to just south of Eaton Road. 12/2017 08/2018 18 25 sidewalk gap closures, bike lands and restriping. Chico Butte Annual Road Rehab Type II slurry seal with restriping and addition of new bike lanes. On East Avenue, from approximately East Avenue to approximately Mariposa Avenue 12/2017 08/2018 07 10 Chino San Bernardino El Prado Reconstruction Project Reconstruction including but not limited to: grind and overlay of asphalt; selected removal of replacement of El Prado Road (Central Avenue to Kimball Avenue) 12/2017 06/2018 10 15 asphalt; concrete curb; gutter; spandrel and cross gutter; signing and striping. Chino Hills San Bernardino Pavement Repairs Project Repair subsided pavement areas within the streets of Chino Avenue, Eagle Canyon Drive, Olympic View Drive, Chino Avenue, Eagle Canyon Drive, Olymic View Drive, Beverly Glen Road, and Feldspar Drive 02/2018 06/2018 10 15 Beverly Glan Road and cracked curb and gutter on Feldspar Drive. Chowchilla Madera Fuller Street The local street maintenance project being recommended by Staff is the Fuller Neighborhood Project. Specific The project includes work on 11th Street (Monterey to Riverside) and Lake Avenue (11th Street 09/2017 10/2017 20 30 improvements related to this project include the infill and replacement of sidewalks, curb ramps, driveways, curb to 6th). and gutter and traffic striping/marking to provide accessible and safe routes to school. Improvements also include the rehabilitation of pavement on Lake Avenue, drainage work, installation of speed feedback signs, and installation of traffic striping, marking and signage. Chula Vista San Diego RMRA Major Pavement Rehabilitation Project includes street overlays and street reconstruction on various streets in the City. The major rehabilitation Proposed locations: E Palomar St (Hilltop Dr-Melrose Ave), Bay Bl (I-5 Freeway ramp-Palomar 11/2017 09/2018 20 25 FY2017/18 (STM395) treatments are based on the recommendations of the City’s Pavement Management System. St), Moss St (Fourth Ave-Third Ave), C St (N Glover Ave-Second Ave) Chula Vista San Diego RMRA Major Pavement Rehabilitation Project includes street overlays and street reconstruction on various streets in the City. The major rehabilitation Hilltop Dr (Orange Ave E-Main St), E Naples St (Crescent Dr-Medical Center Dr), Third Ave (N 11/2018 09/2019 20 25 Phase 2 FY2017/18 (STM396) treatments are based on the recommendations of the City’s Pavement Management System. Fourth Ave-D St), Naples St (Fourth Ave-Third Ave), Oxford St (Tobias Dr-Hilltop Dr), Third Ave (L St-Naples St), F St (Fourth Ave-Third Ave), Third Ave (Orange Ave-Anita St), L St ( Third Ave-First Ave), First Ave (H St-I St) Hilltop Dr (Telegraph Cyn Rd-L St E), I St (Second Ave-Hilltop Dr), Bonita Rd (City Limit @ Willow St) Citrus Heights Sacramento Citywide Pavement Management Update Citywide Pavement Management System. Re-evaluate all streets and utilize new Street Saver program to Citywide 12/2017 06/2018 15 20 System Update better track conditions of roadway segments. Citrus Heights Sacramento 2017/2018 Residential Resurfacing Resurfacing of Residential Streets (6 planned for 17/18) Auburn Frontage - End to Cobalt; Catamaran - City limits to Tupelo; Knisley Court - Sadro to 03/2018 05/2018 20 25 Project End; Tareyton - Ansbrough to Cobalt; Baranga Drive - Winlock to Cobalt; and Capricorn Drive - Pleides to Mariposa. Claremont Los Angeles Street Rehabilitation Overlay of streets not currently included on the City's 7-year street resurfacing schedule American Ave (Indian Hill - Mills), Andrews Drive, Arrow Highway, Auto Center Drive, Base Line 01/2018 06/2018 15 20 Road, Bonita Ave (College - City Limit), Cambridge Ave (Bonita - Arrow), Claremont Blvd (Monte Vista - Arrow), First Street (Indian Hill - College), Foothill Blvd, Indian Hill Blvd, Mills Ave (Foothill - CHWP Trail Head), Mills Ave (Arrow - City Limit), Monte Vista Ave (Base Line - City Limit), Mountain Ave (Harrison - City Limit), Mt Baldy Road (Mills - City LImit), Padua Ave (Mt Baldy - City Limit), SAn Jose (Mountain - Mills), Santa Fe (Bucknell - Wharton), Sixth Street (College - Claremont), Towne Ave (Base Line - Foothill), Wharton Ave (Santa Fe - Cambridge), Williams Ave (Foothill - Bloom). Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Frank Place - Yolanda Circle to Cul-de-Sac. 01/2018 07/2018 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Bettencourt Drive - Yolanda Circle East to Yolanda Circle West. 01/2018 07/2018 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Southbrook Drive - 250' west of Marquette Ct. to 100' east of Eastwood Ct. 01/2018 07/2017 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Westbrook Ct. - Southbrook Dr. to Cul-de-Sac. 01/2018 07/2017 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA El Camino Dr. - Clayton Rd. to Pine Hollow Rd. 01/2018 07/2017 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Coronado Ct. - El Camino Dr. to Cul-de-Sac. 01/2018 07/2017 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Yosemite Ct. - El Camino Dr. to Cul-de-Sac. 01/2018 07/2017 07 10 Clayton Contra Costa 2018 Neighborhood Streets Project Annual Street maintenance of various local neighborhood streets within Clayton, CA Yosemite Cir. - El Camino Dr. South to El Camino Dr. North. 01/2018 07/2017 07 10

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Clearlake Lake Dam Road/Dam Road Extension Installation of a roundabout with multi-lane entries at all intersection approaches with a 10-foot shared use Dam Road at Dam Road Extension at the intersection near Walmart. 04/2020 11/2020 20 25 Roundabout Project pathway and crosswalk. Clearlake Lake Burns Valley/Civic Center Curb, gutter, and sidewalk improvements - approximately 2600 linear feet Olympic Drive from Pine to Lakeshore Drive. Lakeshore Drive from Olympic Drive to Division 01/2020 06/2020 20 25 Enhancement Project Ave. Clearlake Lake Dam Road Extension Project Extension of Dam Road Extension South Center Drive to 18th Ave. Approximately 1000 linear feet. Dam Road Extension from Dam Road to 18th Ave. 04/2019 07/2019 20 25 Clearlake Lake Highlands Park Frontage Frontage/parking lot and pedestrian sidewalk improvements, approximately 515 linear feet. 14335 Lakeshore Drive - Highlands Park 08/2018 11/2018 20 25 Improvements Cloverdale Sonoma 4th Street Reconstruction Reconstruct 4th Street from Jefferson Street to street end. 4th Street from intersection of Jefferson Street to stret end 06/2019 07/2019 15 20 Cloverdale Sonoma Rockydale Lane Reconstruction Reconstruct Rockydale Lane to include accessibility features. Rockydale Lane from Lake Street to five feet south of the northern boundary of parcel 001-111- 08/2020 09/2020 15 20 033 Clovis Fresno Fowler Street Improvements - Barstow Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Minor concrete work. Fowler Avenue from Barstow Avenue to Shaw Avenue 05/2020 10/2020 07 20 to Shaw Stripping. Clovis Fresno Minnewawa Street Improvements- Grind and overlay existing pavement. Traffic loop replacement. Minor concrete work. Stripping. Minnewawa Avenue from Shepherd Avenue to Teague Avenue 05/2020 10/2020 07 20 Shepherd to Teague Clovis Fresno Villa Street Improvements - Barstow to Grind and overlay existing pavement, some reconstruction. Traffic loop replacement. Minor concrete work. Villa Avenue from Barstow Avenue to Shaw Avenue 05/2020 10/2020 07 20 Shaw Stripping. Coachella Riverside Peacock Palms Neighborhood The existing pavement throughout the neighborhood requires reconstruction Calle Leon, Paseo Laredo, Via Durango, Via Hermosa, Vera Cruz, Calle De Vega, Avenida Cortez, 09/2016 06/2018 20 20 Pavement Reconstruction Pavon Palma Coachella Van Buren Street Reconstruction The existing pavement requires reconstruction From Avenue 52 north to Coral Mountain School 09/2016 06/2018 20 20 Coachella Avenue 54 Street Reconstruction The existing pavement requires reconstruction From Harrison Street to Grapefrui Blvd. 09/2016 06/2018 20 20 Coachella Avenida Del Oro Neighborhood The existing pavement throughout the neighborhood requires reconstruction Avenida Del Oro, Avenida Del Parque, Corte Del Parque 09/2016 06/2018 20 20 Pavement Reconstruction Coalinga Fresno Annual Slurry/Cape Seal Various Slurry and Cape Seal projects throughout the City based on road index information. Citywide 06/2018 08/2018 08 15 Colfax Placer Rising Sun Road Pavement Resurfacing Resurface up to 1,400-feet including engineering design, base repairs, mill and fill of road ( up to 35,000-SF) and Rising Sun Road; from Ben Taylor Road to Grass Valley Street. 05/2018 09/2018 10 15 Project construction management and inspection. Colma San Mateo Mission Road Bike/Pedestrian Reconstruction of the roadway and pedestrian walkways to accommodate compliant accessible sidewalks and Mission Road, between El Camino Real and Lawndale Boulevard. 09/2018 10/2019 10 20 Improvements class II bicycle lanes in each direction, various ADA accessibility enhancements and upgrades, streetscape improvements integrated with green street infrastructure, street lighting, and high visibility flashing beacon crosswalks. Colton San Bernardino Mill Street Paving Project 1-1/2" to 2" thick grinding and rubberized asphalt overlay Mill Street between Ranchpo Ave. and Michigan Ave. 03/2017 06/2017 10 15 Colton San Bernardino Olive Street Paving Project 1-1/2" to 2" thick grinding and rubberized asphalt overlay Olive Street between La Cadena and 6th Street 03/2017 06/2017 10 15 Colton San Bernardino San Bernardino Ave. Paving Project 1-1/2" to 2" thick grinding and rubberized asphalt overlay Eucalyptus Avenue to Indigo Avenue 03/2017 12/2017 10 15 Colusa Colusa 8thStreet; Sioc - Harris Resurface of 8th Street From Sioc to Harris Street 8th Street Between Sioc and Harris 06/2018 10/2018 15 20 Colusa Colusa 8th Street; Fremont - Carson Resurface of 8th Street From Fremont - Carson Street 8th Street Between Fremont and Carson Street 06/2018 10/2018 15 20 Colusa Colusa 7th Street; Fremont - SIOC Resurface of 7th Street From Fremont to SIOC 7th Street Between Fremont and SIOC 06/2018 10/2018 15 20 Colusa Colusa 9th Street: Fremont - Harris Resurface of 9th Street From Fremont to Harris 9th Street Between Fremont and Harris 06/2018 10/2018 15 20 Colusa Colusa 10th Street; Fremont - Harris Resurface 10th Street From Fremont to Harris 10th Street Between Fremont and Harris 06/2018 10/2018 15 20 Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Garfield Avenue - From Ferguson Drive to Telegraph Road 02/2018 09/2018 20 25 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Ferguson Drive - From Atlantic Avenue to East City Limit 02/2018 09/2018 15 20 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Marianna Avenue - From Dunham Street to North City Limit 02/2018 09/2018 15 20 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Ayers Avenue - From Sheila Street to Washington Boulevard 02/2018 09/2018 20 25 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Bedessen Avenue - From Washington Boulevard to CDS 02/2018 09/2018 20 25 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Connor Avenue - From Washington Boulevard to CDS 02/2018 09/2018 15 20 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles FY 2017/18 Pavement Rehabilitation The Project will provide for the pavement rehabilitation of selected streets throughout the City. The selected Dennis Avenue - From Washington Boulevard to CDS 02/2018 09/2018 15 20 Project streets were based on the recommendations identified within the City's Pavement Management System (PMS). Commerce Los Angeles Commerce Way and Sheila Street This project includes pavement rehabilitation, reconfiguration of the intersections of Sheila/Commerce Way and Commerce Way - From Eastern Avenue to Sheila Street 02/2018 09/2018 20 25 Connectivity and Beautification Project Eastern/Commerce Way, landscaped raised medians, lighting, and beautification components.

Compton Los Angeles Central Avenue, Phase II Install cement stabilized pulverized base, asphalt concrete, asphalt rubber hot mix, install ADA compliant curb Central Avenue from Compton Boulevard to City Limits 11/2017 01/2018 10 20 ramps, curb gutter, and sidewalk improvements, striping and traffic loop replacement. Compton Los Angeles Compton Boulevard Project - East Installation of raised medians and Class II bicycle lanes. Remove and replace locations for ADA ramps, curb Compton Boulevard from Willowbrook Avenue to eastern city limits 10/2017 03/2019 10 20 gutters, sidewalk; grind/overlay asphalt; replace all traffic markings, linework, traffic loops Compton Los Angeles Compton Boulevard Project - West install bike lanes and lighting along the corridor; enhance pedestrian crossings at 15 intersections. Remove and Compton Boulevard from Willowbrook Avenue to western city limits 12/2017 04/2019 10 20 replace locations for ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, linework, traffic detector loops. Compton Los Angeles Residential Streets Resurfacing Remove and replace ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic markings, various locations citwide 12/2017 09/2019 10 15 linework. Compton Los Angeles Residential Street Rehabilitation Remove and replace locations of ADA ramps, curb, gutter, sidewalk; grind/overlay asphalt; replace all traffic Various locations citywide 08/2016 01/2018 10 15 markings, and linework. Concord Contra Costa Diamond Boulevard Pavement This project will include base repairs and resurfacing of Diamond Boulevard from Willow Pass Road to the bridge Diamond Boulevard from Willow Pass Road to the bridge over Walnut Creek 01/2019 12/2019 10 12 Rehabilitation over Walnut Creek and include the upgrade/replacement of accessible ramps on the north side of the intersection and at driveways, minor curb and gutter repairs, traffic signal loop replacement, and restriping the roadway.

Concord Contra Costa Oak Grove Road Pavement This project will extend the recently completed pavement rehabilitation work on Oak Grove Road from Whitman Oak Grove Road from Whitman Road to Treat Boulevard 01/2019 12/2019 15 20 Rehabilitation Road to Treat Boulevard, likely using cold-in-place recycling, similar to the previous phase, whereby a portion of the existing roadway asphalt is removed, treated with an asphalt recycling agent, compacted in place and then covered with a new asphalt surface layer. Work will also include the installation/upgrade of curb ramps at intersections, minor concrete repairs, replacement of traffic signal loops, adjustment of pedestrian push buttons to meet accessibility standards, and restriping the roadway. Corcoran Kings Slurry Seal at Dairy Type II Slurry/ Fiber seal, update striping and signing Dairy Avenue: Bainum Avenue to Orange Avenue 05/2018 06/2018 05 07 Corning Tehama Marin Street Overlay A 2-inch overlay, ADA compliant curb returns and curb & gutter improvements Marin Street between 3rd and 6th Streets; bid additives (1-block each) 4th and 5th Streets 10/2017 10/2017 15 18 between Marin and South Streets Corning Tehama Hoag Street Overlay A 2-inch overlay, ADA compliant curb returns and curb & gutter improvements Hoag Street between Solano and Colusa Street 05/2018 06/2018 15 18

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Corona Riverside 2017 Street Pavement Maintenance & Grind existing pavement, remove and replace striping, clear and grub, construct Asphalt Concrete leveling course (1)Lincoln Ave between Rincon Street and City's northerly limits (2) Main Street between Grand 05/2018 10/2018 15 20 Rehabilitation and final Asphalt Concrete Cap for a total 4 miles. The Project will provide a safer and quieter street network Blvd and City's northerly limits (3) River Road between Corydon and Main Streets. system. Coronado San Diego Street, Curb and Gutter Improvements Removal and replacement of 2-3" of existing asphalt surface; replacement of base material as necessary; Entire length of Adella Avenue; Jamaica Village Road; Spinnaker Way; and Flora Avenue 04/2019 05/2019 20 30 FY18/19 replacement of damaged curb and gutter; required replacement of adjacent pedestrian ramps that do not meet current ADA regulations Corte Madera Marin 2017/18 Pavement Rehabilitation Grind and Overlay of Local Streets identified to be in poor condition per the 2017 Pavement Management Report Stetson Avenue (From Buida Court to Chapman Drive), Chapman Drive (From Stetson Avenue to 10/2017 06/2018 15 20 Project and field observation Tamalpais Drive), Oakdale Avenue (From Chapman Drive to Eastman Avenue), Buena Vista Avenue (From Sausalito Street to Oakdale Avenue), Council Crest Drive, Ash Avenue

Corte Madera Marin Casa Buena Complete Streets Project Widen Casa Buena Drive to add bicycle lanes and new sidewalk to provide pedestrian access from neighboring Casa Buena Drive from Sanford Street to Meadow Valley Road 07/2017 10/2018 15 20 multifamily housing. Pavement rehabilitation will also be a component of this project Costa Mesa Orange Newport Blvd. Frontage Rd. (N/B) - This project will provide major rehabilitation to City streets which are in immediate need for improvement. The Newport Blvd. Frontage Rd. (N/B) - 15th St. to 17th St. 01/2018 06/2018 10 10 15th St. to 17th St. project is implemented in accordance with the Pavement Management System to meet the City Council Goal to reach and maintain an average Citywide Pavement Condition Index (PCI) of 85 by 2017. These RMRA funds will be used towards rehabilitation of Newport Boulevard Frontage Road (northbound) from 15th Street to 17th Street.

Costa Mesa Orange 23rd Street from Elden Ave. to This project will provide major rehabilitation to City streets which are in immediate need for improvement. The 23rd Street from Elden Ave. to Waterman Wy. 02/2018 06/2018 10 10 Waterman Wy. project is implemented in accordance with the Pavement Management System to meet the City Council Goal to reach and maintain an average Citywide Pavement Condition Index (PCI) of 85 by 2017. These RMRA funds will be used towards rehabilitation of 23rd Street, from Elden Avenue to Waterman Way. Cotati Sonoma Street Construction & Improvements Project is to repair damaged and cracked sections of La Salle Ave. from E. Cotati Ave extending approximately 315 Approx. 315 feet of La Salle Ave. extending south east from E. Cotati Ave. 04/2017 07/2017 08 10 feet toward Lincoln Ave and to cover the entire roadway section (curb to curb) with two layers of asphalt paving adding an average of half an inch of paving. Covina Los Angeles Traffic Signal Modifications - Badillo Upgrades to traffic signal poles, controller cabinet, signal heads, and signage with the consideration for the Badillo Street and Hollenbeck Avenue 01/2018 07/2018 15 20 Street and Hollenbeck Avenue addition of protected left-turn phasing to be considered. Crescent City Del Norte Crescent City Storm Drainage Install new drainage improvements, repave / resurface a minimum of 1200 LF of Roadway, install new ADA Front Street between F Street & B Street, C Street between Howe Drive & 5th Street 06/2018 06/2019 20 30 Improvement and Roadway compliant Access Ramps and pedestrian improvements Rehabilitation Project Crescent City Del Norte K Street Drainage Improvement and Install new drainage improvements, repave / resurface approximately 300LF of Roadway, install new ADA K Street Between Front Street & 2nd Street 03/2019 06/2019 20 30 Roadway Rehabilitation Project compliant Access Ramps and pedestrian improvements Cudahy Los Angeles Citywide Street Improvement Project - Project consists of the Citywide maintenance and rehabilitation of the City's Road & Sidewalk infrastructure. It Citywide Project. Includes one or more of the following potential streets: Atlantic Ave., Patata 02/2018 06/2018 10 20 Cudahy may include Asphalt Concrete (AC) restoration & slurry seal at identified areas; repair of damaged sidewalks, St., Ardine St., Clara St., Cecilia St., Otis Ave., River Road, Salt Lake Ave., Park Ave., Elizabeth St., driveways & curb & gutters; ADA improvements, traffic striping & signage. The City plans to rehabilitate approx. Hartle Ave., Walnut St., Santa Ana St., Bear Ave., Flowert St., Wilcox Ave., Live Oak St., Olive St. 10-15% of its 13 mi road/ sidewalk infrastructure this FY under SB1 Program Funds available as described above Cudahy Area: 1.2 sq. mi. and per the 2016 City's PMS & CPI Culver City Los Angeles Arterial Street Rehabilitation Project PS 3 inch grind and overlay or cold in place recycling depending on bid amount. Sepulveda Boulevard between Ballona Creek and Sawtelle Boulevard 05/2018 06/2018 25 30 005 Cupertino Santa Clara 2017 Pavement Maintenance Phase 1 2018 Pavement Maintenance Phase 1 - Residential Overlay Project Phar Lap Dr (Madera to Stevens Creek), Clifford Dr (E Estates to Blaney Ave), Scofield Dr 12/2017 09/2018 25 30 (Western to De Anza Blvd) Cypress Orange FY 2017-18 Arterial Overlay SB1 Street resurfacing of one half-mile of pavement using rubberized asphalt concrete. Other incidental items of work Cerritos Avenue from Valley View Street to Walker Street 01/2018 06/2018 15 20 include striping, manhole adjustments, traffic loops, etc. Daly City San Mateo St. Francis Heights Street Slurry Seal Application of latex-modified asphalt slurry seal on selected streets citywide per the 7-year Street Slurry Seal Alta Loma Ave., Belhaven Ave., Belhaven Ct., Buena Vista Ave., Campana Ave., Carleton Ave., 01/2018 07/2018 05 08 Master Plan. Castillejo Dr., Cerro Ct., Cerro Dr., Clarinada Ave., Del Prado Dr., Eastmoor Ave., Edgemont Dr., El Dorado Dr., Escuela Dr., Glenbrook Ave., Grandview Ave., Higate Dr., Huntington Dr., Lakeshire Dr., Larkspur Ave., Lincoln Ave., Mariposa Ave., Mayfield Ave., Midvale Dr., Monterey Dr., Northaven Dr., Olcese Ct., Pamela Ct., Portola Ave., Ridgefield Ave., Rockridge Ave., San Fernando Way, San Miguel Ave., Santa Elena Ave., Santa Paula Dr., Santa Rita Ave., Savage Way, Shelbourne Ave., Southdale Ave., St. Catherine Dr., St. Francis Blvd., St. James Ct., St. Marks Ct., St. Michaels Ct., Verano Dr., Woodland Ave., Woodside Ave., Zita Manor Dana Point Orange Arterial Roadway Resurfacing- Crown Arterial roadway rehabilitation of the pavement surface on Crown Valley Parkway Crown Valley Parkway from PCH to Camino del Avion. Geospatial coordinates: 11/2017 06/2018 20 25 Valley Parkway from PCH to Camino 33°29'20.0"N 117°43'17.9"W del Avion Danville Contra Costa Pavement Management Program C-610 Ongoing pavement maintenance of streets based on StreetSaver PCI calculations and field review. Project This project includes streets within the Town of Danville based on updated PCI values, 09/2017 09/2017 07 15 2017-18 includes slurry seals, hot asphalt overlays, reconstruction, ADA ramp upgrades, and subdrain improvements. pavement condition, and the availability of funds. The list of streets will be published in the 2017/18 Operating Budget and Capital Improvement Program Davis Yolo Third Street Improvements from A Improve Third Street between A and B Streets . Components included in the cost estimate are streetscape Third Street between D Street and A Street 10/2017 10/2018 18 20 Street to B Street and the B Street improvements and storm drain extension from D Street to A Street. This is a multi-year, multi-phase project and Alley in FY 17/18 we are completing Phase 3) Installing a storm drain main, a sewer main; and Phase 4) the surface improvements. Davis Yolo Roundabout at The existing intersection is a four-way stop for vehicles and has long been planned to be modified as vacant Intersection of Drummond Avenue/Cowell Boulevard/Chiles Road 04/2017 01/2018 18 20 Drummond/Chiles/Cowell Intersection parcels in the immediate area develop. With the completion of the New Harmony development on the southwest corner and the development of Villages at Willow Creek for the property on the southeast corner, traffic volumes are expected to increase to the point where implementing the improvements is now appropriate. Construction starting in 16/17 and wrapping up in 17/18 Davis Yolo Transportation Infrastructure Rehab This CIP provides for pavement management design and construction throughout the City. This is a multi million Various locations/streets throughout Davis - See Attached Location Maps for 8250 11/2017 12/2018 10 20 dollar a year project to focus on maintaining and repairing streets throughout the City. In 17/18, two years worth Transportation Infrastructure Rehab of concrete will be completed and one year worth of pavement to facilitate paving earlier in the season in 18/19.

Davis Yolo H Street Project - DLL and Tunnel Combining the scope of improvements near the Davis Little League fields and the H Street Tunnel entrance H Street between Eight Street and Covell Blvd; Bike/Ped Pathway between F Street and H Street 02/2017 08/2019 10 20 improvements, this project includes ADA compatible access along the Little League fields; resurface H Street from and between H Street and J Street Eighth and north to the end; improved street lighting, especially near the fields; improving the west end of the tunnel entrance; improving the tunnel lighting; resurfacing the bike path from the east end of the tunnel to Drexel; and resolving the right of way issue at Drexel. Davis Yolo L Street Improvements The work shall include reconstruction of L Street between 5th Street and Claremont Drive; a 1.3’ full depth L Street between Fifth Street and Claremont Drive 06/2018 06/2019 08 10 reclamation pavement section reconstruction, utility adjustments, curb and gutter, concrete flatwork, signage, striping and pavement markers on L Street from 5th Street to Claremont Drive.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Davis Yolo Mace Boulevard Corridor 1) Resurface Mace Boulevard, and 2) increase non-motorized transportation along the corridor and between the Mace Blvd between Redbud Drive and Cowell Boulevard 03/2018 12/2018 08 10 neighborhoods east and west of Mace Blvd, particularly increasing levels of bicycling to Pioneer Elementary School. The Project Scope includes resurfacing and restriping the entire corridor, reconstructing where needed, improving Mace/Cowell intersection for bicycles and pedestrians (e.g. remove free right turns/extend pedestrian refuge islands, installing bike boxes), installing two-way protected, buffered cycle track on the east side, reconfiguring lanes from four to two plus turn lanes, installing a buffered bike lane on west side, and installing signal control (RRFB or HAWK) at San Marino. Davis Yolo Fifth Street Reconstruction around The street, curb, gutter, and sidewalk near and around several maintenance holes along Fifth Street, from Pena to Fifth Street between Pena Drive and Alhambra Boulevard 02/2018 09/2018 08 10 Maintenance Holes Alhambra have sunken while the maintenance holes have not. This results in a very uneven condition for all modes of transportation, especially vehicles. This CIP would repair the sections around the maintenance holes, bringing the finish elevations up to conform with the maintenance holes. The actual repair treatment won't be known until the study is complete. In 15/16, Staff provided a temporary repair on three of the worst Maintenance Holes. Design will occur In 16/17 and permanent repairs will be made in 17/18. Davis Yolo Tim Spencer Alley Reconstruction Tim Spencer Alley, located between F and G and connecting Second and Third, has been in disrepair for several Tim Spencer Alley - the Alley between F Street and G Street from Second Street to Third Street 10/2018 03/2019 18 20 years. The sanitary sewer and the water mains are aging beyond repair and need replacing. Additionally the alley surface is damaged and does not flow properly. This project will replace the sewer and water mains and reconstruct the alley surface. The new development at 239 G Street desires a surface treatment similar to their property for a length near Third Street, along their property and will fund that portion of the project. Construction will have to be carefully implemented to minimize the businesses that use the alley for sewer, water, vehicle deliveries, etc. Planning and design are scheduled for 16/17. Project will complete in 17/18 Davis Yolo Fourteenth Street / Villanova Drive These improvements have been designated “High Priority” safety improvements for North Davis ES from the Walk Fourteenth Street from F Street to Oak Avenue; and Villanova Drive from Anderson Road to 10/2018 04/2019 08 10 Improvements Bike Audit Report and street resurfacing. Includes buffered bike lanes, intersection curb extensions, pedestrian Sycamore Lane refuge islands, restriping crosswalks, green bike lane striping alongside loading zones. Del Mar San Diego Del Mar 6 (DM06) Sidewalk Street and Drainage Improvements Camino del Mar 03/2018 12/2018 50 75 Del Rey Oaks Monterey Street Slurry phase 1 Design and construct a street slurry package. $175,000 appropriated by Council in 2017-2018 budget. Del Rey Oaks residential streets 05/2018 10/2018 15 20 Del Rey Oaks Monterey Traffic Calming Design and construct traffic calming on Portola/Quendale/Carlton Del Rey Oaks residential streets 05/2018 10/2018 15 20 Portola/Quendale/Carlton Delano Kern Pavement Resurfacing and Repave/Resurface 1.1 miles of road pavements and restripe 2,950 LF of turn lane, 1,155 LF of Left turn pockets Lexington St. between Woollomes Ave and Schuster Road 03/2018 06/2018 05 10 Rehabilitation at Lexington Street and repaint pavement markings and crosswalk. Delano Kern Pavement Resurfacing and Repave/Resurface 4,050 Feet of road pavements and restripe 3,640 LF of road center line and repaint pavement Kensington St. between Cecil Avenue and 6th Avenue 03/2018 06/2018 05 10 Rehabilitation at Kensington Street markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 1,800 Feet of road pavements and restripe 1,700 LF of road center line, and repaint pavement Dover Place between Garces Highway and 9th Avenue 03/2018 06/2018 05 10 Rehabilitation at Dover Place 1 markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 900 Feet of road pavements and restripe 830 LF of center line and repaint pavement markings Dover Place between 10th Avenue and 12th Avenue 03/2018 06/2018 05 10 Rehabilitation at Dover Place 2 and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 3,100 Feet of road pavements and restripe 2,880 LF of road center line and repaint pavement Dover Street between Garces Highway and 12th Avenue 03/2018 06/2018 05 10 Rehabilitation at Dover Street markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 900 LF of road pavements and restripe 848 LF of road centerline and repaint pavement Belmont St. between 11th Ave and 13th Ave 03/2018 06/2018 05 10 Rehabilitation at Belmont Street 1 markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 1,250 LF of road pavements and restripe 1,100 LF of road center line and repaint pavement Belmont St. between Garces Highway and 8th Avenue 03/2018 06/2018 05 10 Rehabilitation at Belmont Street 2 markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 2,450 LF of road pavements and restripe 2,300 LF of road center line, repaint pavement Belmont St. between Cecil Avenue and 20th Avenue 03/2018 06/2018 05 10 Rehabilitation at Belmont Street 3 markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 1,280 LF of road pavements. Asti Street between 1st Avenue and Garces Highway. 03/2018 06/2018 05 10 Rehabilitation at Asti Road Delano Kern Pavement Resurfacing and Repave/Resurface 1,200 LF of road pavements and restripe 1,050 LF of road center line, repaint pavement Austin St. between Garces Highway and 8th Avenue 03/2018 06/2018 05 10 Rehabilitation at Austin Street markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 2,450 LF of road pavements and restripe 2,430 LF of road center line, repaint pavement Clinton St. betweenCecil Avenue and 20th Avenue 03/2018 06/2018 05 10 Rehabilitation at Clinton Street markings and crosswalks. Delano Kern Pavement Resurfacing and Repave/Resurface 965 LF of road pavements and paint 896 LF of road center line. 22nd Avenue between Girard Street and Oxford Street 03/2018 06/2018 05 10 Rehabilitation at 22nd Avenue Desert Hot Springs Riverside Hacienda Ave - Grind and Overlay Road resurfacing project and new bikelane striping project. Hacienda Ave - Mountain View Rd to Miracle Hill Rd 03/2018 06/2018 10 20 Desert Hot Springs Riverside Mission Lakes Blvd - Grind and Overlay Road resurfacing project and new bikelane striping project. Mission Lakes Blvd - Little Morongo Rd to Indian Ave 03/2018 06/2018 10 20 Desert Hot Springs Riverside Indian Canyon Dr - Mission Lakes Blvd - Road resurfacing project and new bikelane striping project. Indian Canyon Dr - Misison Lakes to Pierson Blvd 03/2018 06/2018 10 20 Grind and Overlay Desert Hot Springs Riverside Palm Dr - Grind and Overlay Road resurfacing project and new bikelane striping project. Palm Dr - Pierson Blvd to 12th St and Hacienda Ave to Two Bunhc Palms Trail 03/2018 06/2018 10 20 Desert Hot Springs Riverside North Indian Canyon Road and Road rehabilitation and road widening project Indian Canyon Dr - I-10 to Dillon Road 06/2018 12/2018 20 30 Infrastructure Desert Hot Springs Riverside 17-18 - Crack Seal and Slurry Project Roah Rehabilitation, including crack seal, slurry seal, striping and signage. Various Road Segments- 01/2018 06/2018 05 10 Acoma Ave, Avenida Pico, Cabot Road, Estrella Ave, Granada Ave, San Juan Road, Sonora Dr, Verbena Dr, Via Loretto, Via Real, Avenida Lareda, Calle De Vecinos, Cerrita Way, Hermany Way, La Paloma Lane, Mesquite Ave, Parma Dr, San Jacinto Ln, San Luis Rd, San Rafael Rd, Santa Ysabel Dr, Upland Way Desert Hot Springs Riverside Palm Dr Bicycle Pedestrian Enhancing pedestrian and bike safety on Palm Drive between Camino Aventura and Two Bunch Palms Trail by Palm Drive between Camino Aventura and Two Bunch Palm 12/2018 06/2019 10 20 Improvement Project - ATP Cycle 3 adding sidewalks, widening bike lanes, reducing vehicle lanes, adding ADA access, adding bus warning lights and signs, adding street lights, and adding a pedestrian safety median. Desert Hot Springs Riverside Mission Lakes Walking Path - Sidewalk Installation of new ADA ramps, sidewalks, and walking path along Mission Lakes and connecting to Veterans Park. Mission alkes Blvd and Palm Dr 12/2017 06/2018 20 30 Improvements - CDBG 17-18 Desert Hot Springs Riverside Jefferson St I-10 Interchange Replacement of Bridge at Jeferson St - I-10 Interchange. This is a regional project that requires local matching Jefferson St and Interstate 10 12/2015 12/2017 30 60 funds from City of Desert Hot Springs Desert Hot Springs Riverside Safe Routes To School Cycle 3 Installation of new ADA ramps, sidewalks, curbs and gutter Cactus Dr and 4th St 06/2018 12/2018 20 30 Diamond Bar Los Angeles Grand Ave/Golden Springs Drive As a result of the widening of the Grand/Golden Springs Drive intersection being performed by the City of Intersection of Grand Ave. and Golden Springs Drive 10/2017 12/2019 10 20 Intersection Enhancement Industry, pedestrian hardscape and landscape enhancements associated with crosswalks, sidewalks and parkways are being implemented. Dinuba Tulare Pamela Avenue Reconstruction Reconstruction of roadway On Pamela Ave. from Lillie Ave. to Quail Run Dr. 05/2018 06/2018 20 30 Dinuba Tulare M' Street Pavement Rehabilitation, Grind and overlay along with Installation of curb, gutter and sidewalk On 'M' Street from Tulare St. to Fresno St. 05/2018 06/2018 20 30 Curb, Gutter and Sidewalk Dinuba Tulare Downtown Traffic Circle Rehabilitation Reconstruction of 5 traffic circles Tulare St. and L St., Tulare St. and M St., Tulare St. and K St., Fresno St. and L St., Kern St. and L 05/2018 06/2018 20 30 St.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Dinuba Tulare Second Ave. pavement Rehabilitation, Reconstruction of roadway and Installation of curb, gutter and sidewalk On Second Ave. from Tulare St. to Fresno St. 05/2019 06/2019 20 30 Curb, Gutter & Sidewalk Dinuba Tulare Olive Way Reconstruction Road reconstruction On Olive Way from Crawford Ave. to randle Ave. 05/2019 06/2019 20 30 Dinuba Tulare Kamm Ave. Grind and Overlay Road reconstruction On Kamm Ave. from Alta Ave. to College Ave. 05/2019 06/2019 20 30 Dinuba Tulare Monte Vista Avenue Grind and Overlay Road reconstruction On Monte Vista Ave. from El Monte Ave. to 800 feet south 05/2019 06/2019 20 30

Dixon Solano 2018 Pavement Rehabilitation Project Slurry seal and replace traffic striping on various streets within the City of Dixon. Street segments include: East C Street from North First Street to Doyle Lane; North Second 04/2018 06/2018 05 10 Street from East C Street to Creekside Circle; South Almond Street from West A Street to Porter Road; South Lincoln Street from West A Street to Hillview Drive; and West F Street from Pitt School Road to North First Street. Dorris Siskiyou Fourth Street Rehab. Rehabilitation & maintenance of a local roadway E. Fourth Street from Pine to Center 06/2018 10/2018 20 30 Dos Palos Merced Center Avenue North in the City of Dos Rehab Streets, Sidewalks, Replace Storm Drainage, Create Bike Path & Pedestrian Walkway, Improve Safety at 7 In the City of Dos Palos: Center Avenue between Marguerite Street and Loraine Street; Loraine 06/2018 12/2018 30 40 Palos Intersections, link to parks, multimodal transit center, senior center. Street between Center Avenue and Dos Palos Avenue. Downey Los Angeles FY 17-18 Annual Miscellaneous Construction and repair of concrete improvements within the public right-of-way to include construction of curb South East Area (Council District No. 1) 01/2018 06/2018 10 50 Concrete Construction and Repair ramps and replacement of damaged sidewalks, curb and gutter, driveway approaches and pavement. Project Downey Los Angeles FY 17-18 Annual Slurry Seal Program Approximately 40 street segments in the southwest area of the City covering a total of approximately 6.75 South West Area (Council District No. 2) 11/2017 01/2018 07 10 centerline miles of roadway have been identified for this project. The work to be performed generally consists of sealing cracks in the asphalt pavement, applying emulsified Type II slurry seal coat to the pavement surface; replacement of traffic striping, pavement markings, and raised pavement markers; and all necessary related work.

Downey Los Angeles Paramount Blvd. Median (Firestone Construction of a raised landscaped median island on Paramount Blvd. between Firestone Blvd and Imperial Hwy. Paramount Blvd. Median (Firestone Blvd. to Florence Ave.) 02/2018 12/2018 25 30 Blvd. to Imperial Hwy) Scope to include removal of existing striped median/pavement, installing raised concrete median island with drought tolerant landscaping and irrigation, left-turn lanes, signage/striping and the rehabilitation of existing pavement and repair of miscellaneous concrete surfaces. Downey Los Angeles Paramount Blvd. Median (Firestone Construction of a raised landscaped median island on Paramount Blvd. between Firestone Blvd. and Florence Ave. Paramount Blvd. (Firestone Blvd. to Florence Ave.) 02/2018 12/2018 25 30 Blvd. to Florence Ave.) The project consists of removing existing striped median/pavement, installing raised concrete median island, left- turn lanes, replacement of traffic loop detectors, signage/striping, and other related improvements. Downey Los Angeles Lakewood/Rosemead Corridor Study Multijurisdictional complete street study of the Lakewood Blvd. - Rosemead corridor within the Gateway Cities Lakewood Blvd from North City Limit to South City Limit 07/2017 06/2018 99 99 sub-region. Study will analyze multiple travel modes (I.e., transit, cycling, walking, vehicles, etc.) and enhancing connectivity among said modes. Downey Los Angeles South Downey Safe Routes to School Construction of sidewalks and curb ramps, signage, replacement of striping, pavement markings, install vehicle Blodgett Ave (Alameda St. to Donovan St.) 01/2018 06/2019 25 50 Project speed feedback signs along the project limit and school safety education program Duarte Los Angeles Huntington Drive Intersection Safety Six intersections along the Huntington Drive Corridor are recommended for safety improvements. These All Intersections are Located in Duarte, California 01/2018 06/2018 15 25 Improvements improvements include equipment upgrades, lane configuration, additional traffic markings, signage, and signal Huntington Drive and Mountain Avenue Huntington Drive and Buena Vista Street timing compliance. Currently the City of Duarte has certain equipment that is obsolete. This equipment needs to Huntington Drive and Highland Avenue Huntington Drive and Mount Olive Drive be upgraded to improve safety by reducing the probably of equipment failure or malfunction and enhancing Huntington Drive and Las Lomas Road Huntington Drive and Encanto Parkway driver, bicyclist, and pedestrian awareness. The City needs to review all pedestrian, bicycle, and vehicle clearance timing for compliance with the 2014 CA MUTCD. Dublin Alameda Annual Street Resurfacing This project provides for a variety of pavement resurfacing treatments, from slurry seal to major rehabilitation and San Ramon Road, from southern to northern city limits, and Dublin Boulevard, from San Ramon 12/2017 09/2018 20 30 reconstruction. The project also includes installation of ADA ramps along roads that are reconstructed or receive Road to Silvergate Drive. an AC overlay. Streets are selected for improvements based on the City's Pavement Management System to optimize the pavement condition based on available budget. The City owns and maintains approximately 117 centerline miles of streets.

The Metropolitan Transportation Commission (MTC) groups Pavement Condition Index (PCI) ratings into the following categories: 80-100 Very Good-Excellent; 70-79 Good, 60-69 Fair, 50-59 At Risk, 25-49 Poor, and 0-24 Failed. The City of Dublin is rated very good with a rolling three-year average PCI of 85.

This annual Resurfacing Program is primarily funded by Alameda County Transportation Commission (ACTC919) Measure B/BB funds and Gas Tax.

This program protects the substantial investment the City has in the street system.

Dublin Alameda Tassajara Road Realignment & This project will add one automobile lane and a bike lane in each direction of Tassajara Road from North Dublin Tassajara Road, from North Dublin Ranch Drive to northern City Limit. 01/2016 04/2019 20 30 Widening Ranch Drive to the City and Contra Costa County limit line. The project will also add new sidewalks and upgrade all existing and future traffic signals to accommodate the street widening. Each intersection in this segment will be designed to achieve good circulation while adhering to Complete Street Policy. The project also includes the construction of new center raised concrete median with street lighting and new curb and gutter.

This project requires preliminary engineering including a feasibility analysis to define the new roadway alignment, design cross-section, right of way, and environmental clearance before it can be moved forward for design and construction. Preliminary engineering and environmental document preparation began in Fiscal Year 2015-2016. Detail design and right-of-way acquisition will follow, pending available funding.

Total cost of the project is $43.6 million. Of this cost, $16.6 million worth of improvements are expected to be completed by development and the remaining amount ($27 million) will need to be paid for from Eastern Dublin Traffic Impact fees and/or from regional funding sources like Measure BB. A significant amount of this cost is related to improving the horizontal alignment of the street at the County line which requires several retaining walls to straighten the roadway. Dunsmuir Siskiyou 2018 Sidewalk Project Remove and replace sidewalks and construct ADA compliant curb ramps on Dunsmuir Avenue. On Dunsmuir Avennue near Cedar Street and City Hall (5915 Dunsmuir Avenue) 06/2018 09/2018 25 50 East Palo Alto San Mateo SF-05A Bay Road Improvements The Bay Road project will include street repaving; bicycle and pedestrian improvements; landscaping 0.7 miles of Bay Road from Clarke Avenue to Cooley Landing 12/2017 01/2019 20 40 improvements; and replacement of storm drain and water trunk lines. East Palo Alto San Mateo ST-07 Street Resurfacing Program This project provides for the resurfacing of City streets during the ten-year life of the CIP. Roughly $1,000,000 Various 12/2017 12/2026 20 40 needs to be expended annually on street resurfacing. East Palo Alto San Mateo ST-08 University Avenue Resurfacing & This project provides for pavement resurfacing, restriping, upgrading of traffic signals and various other University Avenue from Woodland Avenue to Notre Dame Avenue 12/2018 12/2020 20 40 Signal Upgrade improvements on University Avenue. East Palo Alto San Mateo ST-09 Bicycle & Pedestrian This project is for the installation of street improvements to enhance vehicular, pedestrian and bicycle safety Various 12/2018 12/2019 20 40 Improvements throughout the City.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum East Palo Alto San Mateo ST-12 Traffic Calming Program This project provides for the planning and construction of speed bumps, bulbouts and other traffic calming Various 12/2018 12/2019 20 40 devices to reduce speed through residential zones and to increase safety. East Palo Alto San Mateo ST-13 Major Street Reconstruction This project provides for the reconstruction of damaged City streets during the ten-year life of the CIP Various 12/2019 12/2021 20 40 East Palo Alto San Mateo ST-14 University Avenue Interchange This project will provide for the widening of the University Avenue/US 101 overpass to provide safer pedestrian University Avenue from Woodland Avenue to Donohoe Street 06/2018 12/2019 20 40 and bicycle travel and more efficient vehicle travel. The project will include the widening of the overpass bridge and construction of a new diagonal off-ramp from southbound (SB) 101 onto SB University Avenue East Palo Alto San Mateo ST-17 New Loop Road This project is to develop a new loop road around the north and east of the University Village neighborhood that Loop Road (new) 12/2018 12/2022 20 40 will connect University Avenue to the Ravenswood Business District (RBD) and include a Class I bicycle and pedestrian trail. East Palo Alto San Mateo ST-19 Runnymede/University Avenue Upgrading of traffic signals and various other improvements Runnymede/University Avenue 12/2018 12/2020 20 40 Signal Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. High Country Cir between Woodlands St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Woodlands St between Northland Rd (W End) and Northland Rd (E End) 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hunter Rd between Woodlands St and Pleasant Hill Cir 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Northlands Rd between Woodlands St (W End) and Woodlands St (E End) 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pleasant Hll Cir between Northlands Rd and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Madera Ct between Kiwi Ave and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mallory Ct between Northlands Rd and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Foxtrot Wy between Harrison Ave and Northlands Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Valley Creek ST between Northlands Rd and 65th St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. La Mesa St between Nectarine Ave and Kiwi Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kiwi Ave between Arcadia St and Cedar Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Arcadia St between Northfork Rd and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bodega Ct between Kiwi Ave and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bodega Ct between Kiwi Ave to Northfork Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Northfork Rd between Harrison Ave and Bodgea Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Golden Bit St between Harrison Ave and Arcadia St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Nectarine Ave between La Mesa St and Cedar Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mirada Ct between Arcadia St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Agoura St between Arcadia St and Nectarine Ave/CDS 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Heather Lee St between Hazel St and 945' W Hazel St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Jimson Ct between Elias St and 284' W Elias St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Elias St between Heather Lee St and Lennea St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Linnea St between Sumner Ave and Bluebell St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kaly Ct between Elias St and 207' W Elias St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hazel St between Heather Lee St and Peach Blossom St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bluebell St between Peach Blossom St and 1462' N Peach Blossom St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cloris St between Hazel St and Bluebell St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Rowen Ct between Bluebell St and 435' W Bluebell St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kamelia St between Bluebell St and Laurel St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Laurel St between Lilyrose St and Kamelia St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Lilyrose St between Kaisha St and Laurel St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Branch Ct between Lilyrose St and 632' N Lilyrose St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Peach Blossom St between 65th St and Scholar Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mulan St between Limonite Ave and Lotus St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kaisha St between Lilyrose St and Acey St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Lotus St between Snowdrop St and Acey St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Whitelily St between Snowdrop St and Scholar Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Snowdrop St between Lotus St to Hollis St and Acey St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hollis St between 65th St and 622' N 65th St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Chloe Ct between Snowdrop St and 255' NE Snowdrop St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Acey St between Snowdrop St and Kaisha St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Erica Ct between Peach Blossom St and 452' N Peach Blossom St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Fern Ct between Peach Blossom St and 315' N Peach Blossom St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Daphne St between Briar St and Peach Blossom St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Lyndsey St between Lavonda St and Peach Blossom St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cosmos St between Jardene St and Peach Blossom St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Jardene St between Bay St and Cosmos St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Tancy Ct between Jardene St and 105' NE Jardene St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Lavonda St between Mulan St and Lyndsey St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Briar St between Hazel St and Daphne St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bay St between Lavonda St and Jardene St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pattison St between Shorthorn Dr and Hereford Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Shorthorn Dr between Merry Meadows Dr and End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Nuffield Ct between Pattison Ct and End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Nobury Ct between Pattison St and End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Charolais Ct between Pattison St and End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cattleman Dr between Shorthorn Dr and Oakdale St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Merry Meadows Dr between Scholar Wy and Oakdale St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Prairie Cir between Hereford Ln and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hereford Ln between Oakdale St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kings River St between Lindsey Ct and Riverrun Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Liindsey Ct between Kayak St and 517' N Kayak St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. McKenzie Ct between Kings River St and 252' N Kings River St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kayak St between Wells Springs St and Riverrun Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Riverrun Ct between Rivertrails Dr and 1047' N Rivertrails Dr End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Tarah St between 68th St and Leanne St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Leanne St between Theresa St (N) and Theresa St (S) 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Alexis Cir between Leanne St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cecille Cir between Leanne St and CDS-End 10/2017 12/2017 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Nicole Ct between Wells Springs St - CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kourtney Ct between Wesll Springs St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Theresa St between Leanne St (S) and Leanne St (N) 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Janelle Ct between Theresa St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wells Springs St between 68th St and 65th St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Piazza Ct between Elderkin St and 227' W Elderkin St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Elderkin St between Gannet St and Ross St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gannet St between Fieldmaster St and 1053' W Fieldmaster St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Ross St between Gannet St between Finch St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Finch St between Gannet St and 1040' NE Gannet St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cabela St between Finch St and Fieldmaster St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Fieldmaster St between Archibald Ave and 137' S Gannet St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Grouse St between fieldmaster St and Pintail Loop 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Ross St between Gannet St between Finch St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bushmaster St between Wolfhound St and Fieldmaster St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wolfhound St between Goose St and 1251' NE Goose St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Goose St between Pintail Loop/W and Pintail Loop/E 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Goose St between Pintail Loop/E and Archibald Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Maisey Ct between Goose St and 359' N Goose St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gamebird St between Wolfhound St and 137' S Goose St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Benelli Ct between Pintail Loop and 117' NE Pintail Loo[ 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Brant Ct between Gamebird St and 313' E Gamebird St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cresthaven Way between Gold Spirit St and Cedar Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Great Falls St between Harrison Ave and Gold Spirit St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Turf Paradise St between Gold Spirit St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Foxpoint Ct between Turf Paradise St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Playfair Wy between Great Falls St and Turf Paradise St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Deleware Park Ct between Great Falls St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. gold Spirit between Turf Paradis St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Stampede St between Great Falls St and River Downs St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gulf Stream Ct between Stampede St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Colonial Downs St between River Downs St and Great Falls St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Amber Sky Way between Beaver Creek Dr and Hidden Valley Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Beaver Creek Dr between Diamondback Rd and Red Oak Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cedar Creek Rd between 65th St and Limonite 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Diamondback Rd between 65th St and Hidden Valley St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. elk Ridge Ct between Diamondback Rd and 151' SW Diamondback Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Foothill Dr between Sumner Ave and Red Oak Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Fox Hollow Cir between Red Oak Dr and 252' E Red Oak Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gray Hawk Ct between Cedar Creek Rd and 326' E Cedar Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hidden Valley St between Cedar Creek Rd and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Red Oak Dr between Hidden Valley St and Beaver Creek Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Aspen Grove Rd between Jasper Dr and Black Hawk Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Black Hawk Rd between Jasper Dr and Aspen Grove Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cascade Ct between Jasper Dr and 108' NE Jasper Dr End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cedar Creek Rd between Forest Wind St and 65th St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cedar Creek Rd between Forest Wind St and Schleisman Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Coralbell Dr between Jasper Dr and Sumner Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cottonwood Cir between Pinenut Path and 422' N Pinenut Path 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Diamondback Rd between Aspen Grove Rd and 65th St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Elysian Ct between Woodisde Ct and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Everyglades St between H eisler St and Forest Wind St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Forest Wind St between Everglades St and Shady Knoll Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Heisler St between Olmsted St and Everglades St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Jasper Dr between Shady Knoll Dr and Cascade Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kenai Ct between Heisler St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Lowell St between Seaside St and Everglades St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Napa Valley Ct between Black Hawk Rd and 185' N Black Hawk Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Oak Leaf Cir between Pinenut Path and 422' N Pinenut Path 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Olmsted St between Harrison Ave and Heisler St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pinenut Path between Cedar Creek Rd and Winterberry Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Prospector Ct between Cedar Creek Rd and 844' NE Cedar Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Raspberry Ct between Starflower St and 494' N Starflower St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sand Dunes St between Olmsted St and Woodside St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Seaside St between Woodside St and Lowell St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Shady Knoll Dr between Jasper Dr and Forest Wind St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Spciewood Cir between Pinenut Path and 417' N Pinenut Path 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Starflower St between Sumner Ave and Winterberry Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Starflower St between Winterberry Wy and Cedar Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sumter Trl between 65th St and Heisler St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sweet Clover Ct between Starflower St and 494' Starflower St End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Waterlily Ct between Starflower St and 494' N Starflower St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Winterberrry Way between Pinenut Path and Starflower St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Winterberry Way between Starflower St and 491' N Starflower St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Woodside St between Sand Dunes St and Everglades St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Blackbird Ln between Falcon Ridge Rd and Dove Valley Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Canyon Crest between Deer Canyon and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cedar Creek Rd between Schleisman Rd and Hollowbrook Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Deer Canyon between Hidden River and Canyon Crest 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Dove Valley Way between Pheasant Knoll Rd and Blackbird Ln 10/2017 12/2017 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Eagle Nest Ct between Blackbird Ln and 532' E Blackbird Ln End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Falcon Ridge Rd between Cedar Creek Rd and Dove Valley Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Grey Heron Ct between Woodpigeon Rd and 559' E Woodpigeon Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hidden River between Deer Canyon and Meadow Ridge 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hollowbrook Way between Cedar Creek Rd and Harrison Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Jasper Loop between Aspen Leaf Ln (E) and Aspen Leaf Ln (W) 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Little River Rd between Hidden River and Schleisman Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Lontree Ct between Hollowbrook Wy and 410' NE Hollobrook Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Maplewood Ct between Jasper Loop and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Meadow Ridge between Hidden River and Canyon Crest 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Misty Meadow Dr between Hidden River and Canyon Crest Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Orange St between Dove Valley Wy and Sumner Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pelican Peak Ct between Dove Valley Wy and 142' NE Dove Valley Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pheasant Knoll Rd between Cottage Grove Dr and 656' NW Sumner Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pheasant Way between Woodpigeon Rd and Pheasant Knoll Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Quail Run Rd between Woodpigeon Rd and Sumner Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Robin Nest Ct between Falcon Ridge Rd and 145' N Falcon Ridge Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Softwood Ct between Deer Canyon and 394' E Deer Canyon End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Tawny Owl Ct between Falcon Ridge Rd and 155' N Falcon Ridge Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. White Owl Ct between Quail Run Rd and 347' n Quail Run Rd End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Woodcrest Ct between Harrison Ave and 558' E Harrison Ave End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Woodpigeon Rd between Pheasant Way and Jasper Loop 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Babbling Brook Way between Country Fair Dr and 304' W Forest Wood St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Brass Ring Ln between Cottage Grove Dr and Midnight Rose Cir 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Butterwood Ct between Country Fair Dr and 157' W Country Fair Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Calina Ln between Milton St and Orange St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Canopy Ln between Wooden Gate Wy and Brass Ring Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cari Ct between Cottage Grove Dr and 579' NE Cottage Grove Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Chariot Rd between Canopy Ln and Midmight Rose Cir 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Clear Canyon between Cool Meadow Dr and 493' NW Cool Meadow Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cool Meadow Dr between Sumnr Ave and County Fair Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cottage Grove Dr between Wooden Gate Wy and 1775' NE Wooden Gate Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Country Fair Dr between Wooden Gate Way and Citrus St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Forest Wood St between Cool Meadow Dr and 142' S Wagon Creek Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gale Ln between Orange St and Milton St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Glen Echo Ct between Cottage Grove Dr and 145' NW Cottage Grove Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Midnight Rose Cir between Chariot Rd and 970' N Chariot Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Milton St between Gale Ln and Calina Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Orange St between Sumner Ave and Calina Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Paul St between Gale Ln and Calina Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Pheasant Knoll Rd between Sumner Ave and Cottage Grove Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Prairie Rose Ln between Orange St and Cottage Grove Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wagon Creek Way between Country Fair Dr and 1069' W Country Fair Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wooden Gate Way between Country Fair Dr and 1318' W Country Fair Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Altizer Ct between Morning Hills Dr and End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Baltimore St between Scholar Wy and Bay Bridge Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bay Bridge Rd between Morning Hills Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Beckett Field Ln between Eastern Shore Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bethany Ct between Terrapin Wy and 324' N Terrapin Wy End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Blue Crab Ct between Eastern Shore Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bodine Wy between Morning Hills Dr and Burbank Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Burbank Rd between Maggie Ln and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Canterwood Ct between Morning Hills and 229' N Morning Hills Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Carrollton Pl between Burbank Rd and Citrus St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Clemson Dr between Burbank Rd and 1485' W Burbank Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Coco Ct between Clemson Dr and 110' S Clemson Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. College Park Dr between Terrapin Wy and Schleisman Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Dairy St between Schleisman St and Excelsior Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Dolly Ct between Shady Tree St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Eastern Shore Dr between Bay Bridge Dr and Morning Hills Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Excelsior Dr between Dairy St ad Carrollton Pl 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gingerwood Ct between Morning Hills Dr and 380' N/E morning Hills Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Greenbelt Rd between Westciff Way and Shady Tree St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hollyheath Ct between Morning Hills and 223' N Morning Hills Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Jack Ln between 266' E Raymond Dr and 280' W Raymond Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Kristi Lynn Ct between Raymond Dr and 285' SE Raymond Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Maggie Ln between Mayfield St and Morning Hills Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mayfield St between Citrus St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Morning Hill Dr between Bay Bridge Dr and 135' E Hollyheath Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Morning Hills Dr 135' E Hollyheath Ct and Dairy St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mustang Way between Scholar Way and Wake Forest Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. North View ST between Greenbelt Rd and cirus St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Patti Ann Ct between Mustang Way and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Rae Ct between Wake Forest Dr and 242' W Wake Forest Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Raymond Dr between Schleisman and 1014' N Schleisman 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Shady Tree St between Greenbelt Rd and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sydney Ct between Terrapin Wy and 324' N Terrapin Wy End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Terp Ct between Eastern Shore Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Terrapin Way between 122' W Bethany Ct between 127' E College Park Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wake Forest Dr between Clemson Dr and Burbank Rd 10/2017 12/2017 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Westcliff Wy between Excelsior Dr and Greenbelt Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Feather Dr between Ohio River Dr and James River Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. James River Dr between Feather Dr and Mississippi Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mackinaw Ct between Mississippi Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Mississippi Dr between Hamner Ave and Paddlewheel Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Nile Way between Schleisman Rd and Feather Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Ohio River Dr between Mackinaw Ct and Feather Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Osage River Ct between Mississippi Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Riverboat Dr between Wells Springs St and Hamner Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Tennessee River Ct and Mississippi Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wells Spring St between Mississippi Dr and Riverboat Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Amberview Pl between Shadyside Wy and Stonegate Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Blue Sky Ct between Stonegate Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bright Water Cir between Stone Gate Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Brush Creek Ct between Cobble Creek Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Cobble Creek Dr between Citrus St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Coldwater Cd between Stonegate Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Deerpath Cir between Stonegate Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Eaglebluff ln between Soaring Bird Ct and Sumner Ave 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. East Creek Ct between Cobble Creek Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Gold Creek Dr between Cobble Creek Dr and Morning Mist Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hunters Run Ct between Stonegate Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Morning Mist Dr between Citrus St and Potter Creek Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Perry Ann Cir between Shadyside Wy and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Plummber Creek Ct between Gold Creek Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Potter Creek Dr between Cobble Creek Dr and Morning Mist Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Running Deer Cir between Soaring Bird Ct and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sagemont Ct between Shadyside Wy and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Shadyside Wy between Citrus St and Cobble Creek Dr 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Soaring Bird Ct between Citrus St and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Star Ruby Ave between Harrison Ave and Shadyside Wy 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Star Ruby Ave between Shadyside Way and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Stonegate Dr between Hunters Run Ct and Amberview Pl 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sumner Ave between Citrus St and Eaglebluff Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Twin Creek Ct between Cobble Creek Dr and CDS-End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Autumn Creek Ct between Slate Creek Rd and 447' SW Slate Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Bluff View Ln between Springwater Ln and Grapewin St 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Coldbrook Cir between Slate Creek Rd and 238' E Slate Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Comfort Cove Ln between Waterline Rd and Serenity Falls Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Creek Sand Ct between Slate Creek Rd and 319' SW Slate Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Crystal Pool Ct between Fieldstream Ct and 140' E Fieldstream Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Deep Water Bend Rd between Waterlin Rd and Serenity Falls Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Fieldstream Ct between River Bluffs Ln and 470' S River Bluffs Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Hidden Water Rd between Archibald Ave and Slate Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Prairie Creek Pl between Slate Creek Rd and Waterline Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. River Bluffs Ln between Archibald Ave and Fieldstream Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. River Bluffs Ln between Fieldstream Ct and 1160' NE Fieldstream Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Serenity Falls Rd between Wandering Rill Ct and Deepwater Bend Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Silent Stream Ct between Serenity Falls Rd and 487' W Serenity Falls Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Slate Creek Rd between Coldbrook Cir and River Blurffs Ln 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Springwater Ln between Slate Creek Rd and 997' E Slate Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Sugarcreek Cir between Slate Creek Rd and 128' SW Slate Creek Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Vernal Spring Ct between Bluff View Ln and 627' E Bluff View Ln End 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Wandering Hill Ct between Serenity Falls Rd and 335' W Serenity Falls Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Waterline Rd between Chandler St and Warm Creek Ct 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Waterline Rd between Warm Creek Ct and Deepwater Bed Rd 10/2017 12/2017 05 07 Eastvale Riverside 2017 Residential Slurry Seal Project Slurry seal operation including crack sealing, pavement preparation and traffic striping on various streets. Warn Creek Ct between Waterline Rd and 708' W Waterline Rd 10/2017 12/2017 05 07 El Cajon San Diego Overlay 2018 Repave and restripe approximately 4 centerline miles of roads Various streets in the City of El Cajon to the limits as noted: Airport Dr. - Wing Ave. to 03/2017 06/2018 13 20 Magnolia Ave., Madison Ave - Ballantyne St. to Mollison Ave., El Cajon Blvd. - Murray Dr. to I-8 EB On-ramp, Franklin Ave. - El Cajon Blvd. to Johnson Ave., Granite Hills Dr. - Melody Ln. to Madison Ave., Grossmont Ave. - Chase Ave. to Wilson Ave., Johnson Ave. - Bradley Ave. to Fletcher Pkwy., Johnson Ave. - Washington Ave. to Chase Ave., Magnolia Ave. - Airport Dr. to north City Limit, Midway Dr. - Pine Dr. to Helix View Dr., Murray Dr. - Water St. to El Cajon Blvd., Nidrah St. - Chase Ave. to end, Nugent Ct. - Grossmont College Dr. to end El Centro Imperial La Brucherie Avenue Improvements Reconstruct asphalt roadway. Increase travel lanes to two northbound and two south bound lanes. Modify signal La Brucherie Avenue between Orange Avenue and Barbara Worth Drive. 12/2017 12/2018 25 25 light. Add street lighting. Add curbs and sidewalks on both sides of street. El Cerrito Contra Costa Ohlone Greenway BART Station Area Improve and widen approx. 1/4-mi of Class I path; upgrade and expand existing crosswalks on four major streets Ohlone Greenway at/between Cutting Blvd and Hill St, and at/between Central Ave and 02/2018 12/2018 07 25 Access, Safety & Placemaking to create high visibility pedestrian zones with new striping, special pavement, improved signage, curb bulb-outs, Fairmount Ave. Improvements upgraded curb ramps and RRFBs; enhance landscaping, lighting, seating, and other amenities. El Cerrito Contra Costa Korematsu Safe Routes to School Implement enhanced crosswalk signing & striping and portions of the East Side Bicycle Boulevard per the City's Bicycle boulevard striping and speed humps on Norvell St and Schmidt Ln between Potrero Ave 02/2018 06/2018 07 10 Improvements, Phase 1 Active Transportation Plan in the vicinity of the school and Richmond St and enhanced crosswalks on Richmond St, Norvell St and Lawrence St at Gladys and Donal Aves, on Navellier St at Gladys Ave, on Potrero Ave at Navellier St, and on Norvell St at Schmidt Ln. El Cerrito Contra Costa Active Transportation Program Implement the Active Transportation Plan, adopted by the City Council in April 2016, and includes access, safety Various locations as identified in the City's Active Transportation Plan - available for review at 12/2020 12/2030 07 25 and other enhancements to pedestrian and bicycle infrastructure. www.el-cerrito.org/ATP El Cerrito Contra Costa Sidewalk & Street Sign Maintenance Sidewalk repair and sign replacement Richmond St and other prioritized locations throughout the City to address citizen requests 12/2017 06/2018 10 25 El Monte Los Angeles Merced Ave - Garvey Ave to Rio Hondo Traffic Calming and Road Diet Merced Ave from Garvey Ave to Rio Hondo Parkway 02/2018 06/2018 05 15 Parkway Road diet (Traffic Calming)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum El Monte Los Angeles Slurry Seal/Overlay Project Phase II - Roadway/street slurry seal, overlay and resurfacing project Area encompassing Mountain View Rd, Magnolia St, Parkway Dr and Fineview St 03/2018 08/2018 10 20 Mountain View Rd, Magnolia St, Parkway Dr and Fineview St El Segundo Los Angeles Local Street Rehab. 2" Grind and overlay in the more severely damaged areas and Slurry Seal in others. 2" Grind and overlay in the following streets: Mariposa Ave. (Nash to Douglas), California St. 03/2018 06/2018 05 15 (Walnut to north end), Inidana St. (Maple Ave. to dead end), Center Street (Mariposa to Imperial). Slurry Seal the area bounded by Sheldon, Mariposa, Sepulveda, and El Segundo Blvd.

Elk Grove Sacramento Bond Road Median Improvements and The project will provide a two-inch overlay for the entire roadway from East Stockton Blvd. to the bridge at Bond Road between East Stockton Blvd. & bridge at Laguna Creek. Raised Center Median: E. 04/2018 10/2018 15 25 Resurfacing Laguna Creek (~4300 feet) including new striping, markings and traffic loops. The project will also construct about Stockton Blvd. to Egret Dr. to create a physical separation between eastbound and westbound 2100 feet of raised center median on Bond Road, between E. Stockton Blvd. and Egret Dr. and provide an EB left traffic. turn pocket into the shopping center's eastern driveway. Elk Grove Sacramento Green Bike Lanes Pilot Project Project would add about 3000 feet of green bike lane markings in the conflict areas. Elk Grove Boulevard from the intersection of Auto Center Drive to E. Stockton Boulevard, & 03/2018 06/2018 05 10 Laguna Boulevard at the intersection with Neosho Drive. Emeryville Alameda San Pablo Mid-Block Cross Walk The work will include new construction of ADA pedestrian ramps, large pedestrian refuge area in the median, and San Pablo Avenue between 40th Street and Adeline Street 12/2017 06/2019 25 40 highly-visible pedestrian/vehicular traffic control devices Encinitas San Diego Street Overlay Program Rehabilitation and/or preventive maintenance of various streets throughout the City. There are 26 city wide street segments receiving overlays, and this grant funds 11.9% of the 07/2017 06/2018 10 10 entire program for FY17/18. Encinitas San Diego Street Overlay Program EOLUS AVENUE OVERLAY FROM ANDREW AV TO HYMETTUS 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program HERMES AVENUE OVERLAY FROM LEUCADIA BL TO NORTH END 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program LA COSTA AVENUE OVERLAY FROM HWY 101 TO EAST CITY LIMITS 11.9% funding from SB1 07/2017 06/2016 10 10 Encinitas San Diego Street Overlay Program LEUCADIA BL OVERLAY FROM EL CAMINO REAL TO TOWN CENTER 11.9% funding from SB1 07/2017 06/2016 10 10 Encinitas San Diego Street Overlay Program LONE JACK ROAD OVERLAY FROM RANCHO SANTA FE RD TO STRATFORD KNOLL 11.9% funding SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program OVERLAND RD OVERLAY FROM RAMBLING TO MOUNTAIN VISTA 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program SUMMERDAWN OVERLAY FROM VILLAGE VIEW TO WEST END 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program SUMMER HOLLY LN OVERLAY FROM OLIVE CREST DR TO SOUTH END 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program TRES HERMANAS WAY OVERLAY FROM WANDERING RD TO VILLAGE VIEW 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program VILLAGE RUN EAST OVERLAY FROM WOODSHADOW LN TO GARDENDALE RD 11.9% funding SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program VILLAGE RUN NORTH OVERLAY FROM VILLAGE RUN WEST TO GARDENDALE RD 11.9% funding SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program MISTY CIRCLE SLURRY SEAL FROM COUNTRYWOOD LN TO NORTH END 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program OXFORD AV OVERLAY FROM SHEFFIELD AV TO BRIGHTON AV 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program COUNTRYWOOD LN SLURRY SEAL FROM MOUNTAIN VISTA TO COUNTRYHAVEN 11.9% funding SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program VIA PALACIO SLURRY SEAL FROM VIA SARASAN TO VIA MOLENA 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program EAST JASON ST OVERLAY FROM VULCAN AV TO HERMES AV 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program NEWPORT AV OVERLAY FROM NORFOLK DR TO DUBLIN DR 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program 7TH STREET OVERLAY FROM RANCHO SANTA FE RD TO COLE RANCH RD 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program CREST DRIVE OVERLAY FROM EL CAMINO REAL TO BEECHTREE DR 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program BRISTOL RD OVERLAY FROM SHEFFIELD AV TO OXFORD AV 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program EDINBURG AV OVERLAY FROM NORFOLK DR TO SOUTH END 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program CREST DRIVE OVERLAY FROM SANTA FE DR TO BIRMINGHAM DR 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program EL CAMINO DEL NORTE OVERLAY FROM RANCHO SANTA FE RD TO WEST END 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program EL CAMINO DEL NORTE OVERLAY RANCHO SANTA FE RD TO EAST CITY LIMITS 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program FULVIA ST OVERLAY FROM HYMETTUS AV TO ORPHEUS AV 11.9% funding from SB1 07/2017 06/2018 10 10 Encinitas San Diego Street Overlay Program AMARGOSA DR OVERLAY FROM OLIVENHAIN RD TO ORCHARD WOOD 11.9% funding from SB1 07/2017 06/2018 10 10 Escalon San Joaquin Escalon Avenue Rehabilitated with new pavement overlay and thermoplastic striping, and reconstruction of broken sidewalks. Escalon Avenue from State Route 120 to the northerly City limits. 03/2018 07/2018 10 12 Escondido San Diego 2017 Street Rehab & Maintenance Removal and replacement of asphalt concrete pavement. Andreasan Drive from Auto Park Way to Enterprise Street 10/2017 02/2018 10 20 Project Escondido San Diego 2017 Street Rehab & Maintenance Removal and replacement of asphalt concrete pavement. Broadway from Valley Parkway to Washington Avenue 10/2017 02/2018 10 20 Project Escondido San Diego 2017 Street Rehab & Maintenance Removal and replacement of asphalt concrete pavement. Felicita Avenue/Road from Centre City Parkway to I-15 Southbound 10/2017 02/2018 10 20 Project Escondido San Diego 2017 Street Rehab & Maintenance Removal and replacement of asphalt concrete pavement. Lincoln Parkway/Avenue from Broadway to El Norte Parkway 10/2017 02/2018 10 20 Project Escondido San Diego 2017 Street Rehab & Maintenance Removal and replacement of asphalt concrete pavement. Sheridan Avenue from Fig Street to Vista Verde Drive 10/2017 02/2018 10 20 Project Etna Siskiyou Main Street 2018 Rehabilitation & maintenance of a local roadway Main Street 01/2018 12/2018 20 40 Eureka Humboldt Hawthorn Street Rehabilitation Rehabilitation and reconstruction of Hawthorn and Felt Streets including new asphalt pavement sections, sidewalk Hawthorn Street between Broadway and Felt Street. Felt Street between Hawthorn and Del 05/2018 09/2018 20 40 and driveway replacement and new thermoplastic markings. Norte Streets. Eureka Humboldt Maintenance Paving 2017 Remove and replace sections of asphalt pavement including new thermoplastic markings on H Street. H Street between 17th and Buhne Streets. 05/2018 09/2018 15 20 Exeter Tulare Palm Street Reconstruct and Overlay Complete reconstruction of the driving lanes (approximately 32' wide, 2,600' long). Overlay driving lanes, bike The project is located in Exeter, CA. The cross street boundaries are Kaweah Ave., which is the 06/2018 06/2019 15 20 lanes, and parking lanes. Modify curbs and ramps where needed (approximately 30). Restripe all lines and eastern extent, and G St., which is the western extent. Within the project extents, you will also symbols, including bike lanes. find the following cross streets: N. A St., N. B St., N. C St., N. D St., N E St., N. F St., N. G St., N. Filbert Rd., N. Quince Ave. The project passes through residential, commercial, and some industrial zones. It also crosses railroad tracks near G St. Palm Street is a main corridor connecting east and west Exeter. Exeter Tulare Palm Street, Phase 2 Slurry Seal approximately 305' long section of Palm Street. Restripe all lines and symbols. The project is located in Exeter, CA. The extents of this project are Orange Ave. to the West, 06/2018 06/2019 08 10 and G St. to the East. This section of Palm runs through a residential zone. Exeter Tulare Glaze Avenue - West Western Section: From Belmont Rd. to Filbert Rd., approximately 2600' long, the project shall clean drive lanes The project is located at the southern limit of Exeter, CA. The extents of the project are 06/2019 06/2020 08 10 and parking areas, crack fill all cracks 1/4" and wider, slurry seal the entire section, and restripe all lines and Belmont Rd., the western extent, and Kaweah Ave., the eastern extent. Within the project symbols. Eastern Section: From Filbert Rd. to Kaweah Ave., approximately 2650' long, the project shall clean drive extents, you will find the following cross streets: Park Place Dr., Orange Ave., S. Filbert Rd., and lanes and parking areas, chip and slurry seal, and re-stripe all lines and symbols. Industrial Dr. The north side of Glaze Ave. is residential, with a public park at the western boundary. The south side of Glaze Ave. is agricultural. Exeter Tulare Pine Street Raise approximately 10 Valve Boxes. Raise approximately 7 Manholes. Patch and repair AC where needed. Slurry The project is located within the heart of Exeter, CA. The project extends from Kaweah Ave. at 06/2020 06/2021 08 10 Seal the entire 2,200' long section of Pine Street. the eastern extent, to the railroad tracks at the western extent. The crossroads between the extents are as follows: B St., C St., D St., E St., and F St. Pine Street runs through Downtown Exeter, which is mostly commercial property. Exeter Tulare Rocky Hill Drive Reconstruct and/or repair sections as needed. Slurry seal the entire 2500' long section of Rocky Hill Drive. The project is located in Exeter, CA. The project extents are from Kaweah Ave., representing the 06/2020 06/2021 08 10 western extent, to the eastern City limits. The cross streets between the project boundaries are as follows: Portola Ave., Crespi Ave., 1st St., 2nd St., and 3rd St. Rocky Hill Dr. passes by Exeter Union High School, as well as some residential and industrial zones. It crosses railroad tracks between 1st and 2nd Streets.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Fairfax Marin Scenic Road Repavement Base failure repair and thick overlay with rubberized asphalt resurfacing. Approximately 550 linear feet of Scenic Rd between Shapiro Ln and Bay Rd. 04/2018 09/2018 15 25 roadway. Fairfax Marin Forrest Avenue Reconstruction Repair and reconstruct 100 linear feet of roadway with soldier pile and timber lagging retaining wall. Approximately #345 Forrest Ave, between Summer Ave and Forrest Terrace 04/2018 09/2018 25 35 Fairfax Marin Vanni Lane Pavement Overlay Mill roadway and resurface with asphalt overlay.Approximately 700 linear feet of roadway. Vanni Lane between Ridgeway Ave and Chester Ave. 04/2018 09/2018 15 25 Fairfield Solano PW Maintenance Crews Pothole and spot repairs Throughout the City 12/2018 12/2022 05 07 Fairfield Solano Safe Routes to School E. Tabor Ave Safe Routes to School Gap Closure West of RR tracks to east of Olive Ave 12/2018 12/2022 10 15 Fairfield Solano Chadbourne Rd Repaving approximately 226,600 square feet Highway 12 to Cordelia Rd 12/2018 12/2022 07 10 Fairfield Solano Beck Ave Repaving approximately 125,023 square feet Highway 12 to Cordelia Rd 12/2018 12/2022 07 10 Fairfield Solano Courage Dr Repaving approximately 250,944 square feet Chadbourne Rd to Beck Ave 12/2018 12/2022 07 10 Fairfield Solano Huntington Dr Repaving approximately 240,816 square feet Peabody Rd to End 12/2018 12/2022 12 16 Fairfield Solano Business Center Dr Repaving approximately 141,700 square feet Green Valley Rd to End 12/2018 12/2022 05 07 Fairfield Solano Business Center Dr Repaving approximately 293,820 square feet Green Valley Rd to Suisun Valley Rd 12/2018 12/2022 07 10 Fairfield Solano Business Center Dr Repaving approximately 190,060 square feet Dan Wilson Creek to Suisun Valley Rd 12/2018 12/2022 05 07 Fairfield Solano Business Center Dr Repaving approximately 293,820 square feet Suisun Parkway to Dan Wilson Creek 12/2018 12/2022 05 07 Fairfield Solano Capitola Way Repaving approximately 103,440 square feet Woodcreek Dr to Waterman Blvd 12/2018 12/2022 12 16 Fairfield Solano Central Way Repaving approximately 168,960 square feet Pittman Rd to City Limits 12/2018 12/2022 07 10 Fairfield Solano Central Place Repaving approximately 56,647 square feet Pittman Rd to End 12/2018 12/2022 05 07 Fairfield Solano Pittman Rd Repaving approximately 71,440 square feet Cordelia Rd to 1000' north of Redwood 12/2018 12/2022 05 07 Fairfield Solano Pittman Rd Repaving approximately 36,000 square feet 1000' north of Redwoon to Link Rd 12/2018 12/2022 12 16 Fairfield Solano Pittman Rd Repaving approximately 73,200 square feet Link Rd to Central Way 12/2018 12/2022 12 16 Fairfield Solano Pittman Rd Repaving approximately 15,000 square feet Central Way to I-80 12/2018 12/2022 05 07 Fairfield Solano Cordelia Rd Repaving approximately 60,375 square feet Ledgewood Creek to Beck Ave 12/2018 12/2022 07 10 Fairfield Solano Cordelia Rd Repaving approximately 218,904 square feet Beck Ave to Chadbourne Rd 12/2018 12/2022 12 16 Fairfield Solano Cordelia Rd Repaving approximately 72,852 square feet Monument to Link Rd 12/2018 12/2022 07 10 Fairfield Solano Cordelia Rd Repaving approximately 88,275 square feet Link Rd to City Limits 12/2018 12/2022 07 10 Fairfield Solano Air Base Parkway Repaving approximately 159,154 square feet 250' west of Heath Dr to Heath Dr 12/2018 12/2022 12 16 Fairfield Solano Air Base Parkway Repaving approximately 305,550 square feet Peabody Rd to Parker Rd 12/2018 12/2022 05 07 Fairfield Solano Suisun Valley Rd Repaving approximately 106,743 square feet Neitzel Rd to Mangels Blvd 12/2018 12/2022 05 07 Fairfield Solano Suisun Valley Rd Repaving approximately 198,927 square feet Mangels Blvd to City Limits 12/2018 12/2022 05 07 Fairfield Solano E. Tabor Ave Repaving approximately 87,500 square feet Claybank Rd to Manor Pl 12/2018 12/2022 12 16 Fairfield Solano Fulton Dr Repaving approximately 118,128 square feet Lopes Rd to Watt Dr 12/2018 12/2022 07 10 Fairfield Solano Fermi Dr Repaving approximately 141,900 square feet Watt Dr to Lopes Rd 12/2018 12/2022 07 10 Fairfield Solano Watt Dr Repaving approximately 158,112 square feet Fulton Dr to Redtop Rd 12/2018 12/2022 07 10 Fairfield Solano Cadenasso Dr Repaving approximately 47,060 square feet Beck Ave to Auto Mall Pkwy 12/2018 12/2022 12 16 Fairfield Solano North Texas Street Repaving approximately 180,614 square feet Travis to Air Base Parkway 12/2018 12/2022 12 16 Farmersville Tulare Costner Street Rehab Project Road maintained will be performed using a chip and slurry seal, also known as a Cape Seal, on approximately The project is located in Farmersville, CA. There are 3 project sections. 1) Bus pad to be 03/2018 12/2018 08 10 15,100 square feet of roadway. An overlay of 5,500 square feet will also be done as maintenance. Another section constructed on E. Costner St. approximately 200' east of N. Rose Ave. 2) Roadway realignment of the street will be realigned and re-graded in order to help with drainage due to current conditions causing and re-grading along W. Costner St. from N. Linnel Ave. to N. Shasta Ave to improve drainage flooding. The project also includes the reconstruction of two cross gutters, curb ramps (approx. 17) within the problems. 3) Slurry seal and chip seal within the boundaries of W. Ash St. and W. Costner St., cape seal area to current ADA standards, and a bus pad (18 ft by 105 ft). which are the northern and southern boundaries, respectively. The cross streets included running north to south are N. Matthew Ave., N. Ventura Ave. and N. Kern Ave. All these different projects are occuring in residential areas. Farmersville Tulare W. Walnut Ave. Street Components Street components to be added are a 5 foot wide bike lane, a 100 foot median for the pedestrian refuge area, a The project is located in Farmesville, CA on W. Walnut Ave. between N. June Ave. to the west 07/2018 06/2019 20 25 new drive approach, and 6 reconstructed ADA curb returns. and Farmersville Blvd. to the east. Cross streets from west to east are N. Matthew Ave., Carolyn St., N. Ventura Ave., Franquette Ave., and Hartley Ave. This project is located in a residential zone. Farmersville Tulare E. Walnut Ave/Southern Part of Road Construct 1,000 LF of a 10' sidewalk, curb and gutter, a 7' foot bike lane, an additional 12' lane, 5 street lights, 1 The project is located in Farmesville, CA on E. Walnut Ave. between Farmersville Blvd. and N. 12/2018 06/2020 20 25 new ADA curb return /ramp, and a storm drain inlet. Freedom Dr. The project is located next to Farmersville High School, around residential and some commercial. Ferndale Humboldt General Maintenance and Repari General street maintenance and repairs to maintain PCI on Washington, Berding, Ocean, Milton, Lincoln, Shaw, City Wide - maintenance to be determined by Public Works as needed 11/2017 06/2017 01 10 Francis, 4th Street, and Wildcat Road, and as needed on other City streets Fillmore Ventura Sidewalk, Curb and Gutter Repairs FY Repair of lifted/broken sidewalks, curb and gutter and ribbon gutter. Includes 4,000 square feet of sidewalks, 250 Bard St (Saratoga to Clay); Clay St (Bard to Second); Mountain View St (Sespe to Main); Main St 01/2018 02/2018 20 30 17-18 linear feet of curb and gutter and 220 square feet of ribbon gutter repairs. (Mountain View to Central); Los Serenos St (Ventura to Sierra Vista); River St (Sandalwood to Central); Goodenough Rd (Hinckley to Arrasmith) Fillmore Ventura Street Resurfacing FY17-18 Recycled Asphalt Pavement (RAP) Slurry Seal and crack sealing on 75,000 SF of pavement. Work is preventative B St (s/o River); River St (B to A); Surrey Way; Carriage Place 03/2018 04/2018 10 20 maintenance to cost effectively extend the life on streets in good condition. Firebaugh Fresno Q Street Rehabilitation Roadway reconstruction In the City of Firebaugh between 15th Street and P Street 08/2018 08/2019 10 20 Folsom Sacramento Cimmaron Circle Pavement 2" asphalt overlay of distressed pavement in the Cimmaron Circle neighborhood. Includes 2,100 tons of asphalt, Cimmaron Circle 03/2018 04/2018 20 25 Rehabilitation 18,500 square yards of pavement fabric and adjusting of manholes and valves. Silver Spur Court Fausset Court Saddle Court Spencer Street Folsom Sacramento Willow Creek Estates Storm Drain Cured-in-place pipe lining of corroded corrugated aluminum storm drain lines. Final limits of work pending Newington Way 03/2018 05/2018 20 25 Lining outcome of camera investigation of pipelines. Dulverton Circle Thoreau Lane Ledgemont Court Pawtucket Court Westbury Circle (Exact limits pending investigation results) Folsom Sacramento Plaza Drive Pavement Rehabilitation 2" asphalt overlay of distressed pavement on Plaza Drive. Includes 1,200 tons of asphalt, 10,300 square yards of Plaza Drive 03/2018 06/2018 20 25 pavement fabric and adjusting of manholes and valves. Fontana San Bernardino Mulberry Avenue Pavement Cold Plane existing asphalt pavement and Overlay using recycled asphalt pavement for 2 centerline miles of Mulberry Avenue - Slover Avenue to Philadelphia Avenue 12/2017 05/2018 10 15 Rehabilitation Project roadway. Restripe pavement markings, adjust utility manholes and valves to finish grade

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Fort Bragg Mendocino Crack and Small Scale Pavement When small areas of pavement are found to be in much worse condition than the majority of other pavement ALGER ST. - ALGER 10/2017 09/2018 02 10 Failures Maintenance segments or are in areas of localized deterioration damaged by utility cuts, crossing of construction traffic, or EAST FIR ST. 002 - EFIR drainage problems not representative of the remainder of the management section, they are treated with crack EAST FIR ST. 002 - EFIR sealing or small scale pavement repair. These repairs must be done in a timely fashion as damaged areas of ESPEY WAY - ESPEY pavement grow and allow water intrusion which leads to further more large scale deterioration of the pavement. HAZEL ST.003 - HAZEL Surface repair and crack sealing are the two primary intermediary actions taken to conserve the existing McKINLEY ST. - McKINL conditions of pavement. Repair of small pavement failures is the most common technique, done by removing the MYRTLE ST. - MYRTLE damaged portion of the pavement to a depth that removes all deteriorated material and then filling it with gravel NORTH HAROLD ST. 001 - NHAROL base material and asphalt as necessary, and compacted. Crack sealing involves cleaning the crack and then NORTH HAROLD ST. 002 - NHAROL applying an asphalt emulsion to fill the crack. The goal of this project is to address deferred maintenance of NORTH LINCOLN ST. - NLINCO local/residential streets with low Pavement Condition Indices (PCIs). These streets are often prioritized lower by OLSEN LANE - OLSEN the City’s Pavement Management Program (PMP) due to low traffic volumes. PARK ST. 003 - PARK SOUTH HAROLD ST. 003 - SHAROL SOUTH LINCOLN ST. - SLINCO SPRING ST. - SPRING WALNUT ST. 002 - WALNUT WEST ALDER ST. - WALDER WEST FIR ST. - WFIR WEST ST. - WEST WOODLAND DRIVE - WOODLA WEST OAK ST. 001 - WOAK CHIEF CELERI DR .001 -CHIEFCE JERE MELO ST. 001 - JEREME SOUTH HARRISON ST. 002 - SHARRI

Fort Bragg Mendocino Surface/Sub-Surface Drainage Facilities Failing surface/sub-surface drainage facilities that damage overlying or adjacent pavement creates local flood risk Intersection of Redwood and Corry 10/2017 09/2018 10 30 Maintenance for homeowners and business owners and/or safety concerns for pedestrians and bicycles as well as motor Winifred vehicles. Drainage management issues are caused by blockage in the storm drain pipe, by structural damage Hocker Ln caused by storms or failures, or missing or broken grates. Surface drainage facilities include curb and gutters, Intersection of Laurel and Redwood valley gutters, and other Low Impact Development (LID) improvements. Sub-surface facilities are the pipes, inlets, and outfalls. Failing drainage infrastructure is repaired by first removing the underlying problem or obstruction, repairing or replacing infrastructure as necessary, and replacing adjacent/overlying street improvements.

Fort Bragg Mendocino Traffic Control Devices (signage, striping, crosswalks, curb markings, signage, and other traffic control devices provide cost-effective guidance and This year all paint and sign replacement will be done in the southern portion of the City from 03/2018 09/2018 02 10 striping, & pavement markings) information for the road user. These devices help reduce accidents, and direct travelers to their destinations. The Oak South to edge of city limit. City’s Traffic Committee regularly receives requests for the installation/removal of signs, curb paint, street striping, and crosswalk painting. In addition to the regularly requested traffic control requests, the city’s existing pavement markings are re-marked every year. Each year one-half of the City will be (north or south divided at Oak St) completely re-marked. The standards for the application of markings and delineation are set forth in the California Manual on Uniform Traffic Control Devices (Cal-MUTCD) as modified by the City standards. b. Location(s): This year all paint will be done in the southern Fort Jones Siskiyou Town of Fort Jones Strategic Paving, Crack sealing, surface sealing, removal and replacement of failed roadway sections and associated work on various While the Town has a recent PCI survey for reference, determining the most effective use of 01/2018 10/2018 05 15 Preventive and Planning project; Town streets to maintain good condition; estimated life 15 years; construction to be done in 2018 (see attached limited funds for FY 17/18 requires actual observation of the streets and prioritizing to achieve Exhibit A to Resolution for detail). the best use of funds Fortuna Humboldt Annual Paving Project Asphalt Concrete and replacement and leveling course to repair failing asphalt Redwood Way between Barry Avenue and St. Joseph's Drive 01/2018 06/2018 10 20 Fortuna Humboldt Kenmar Road Reconstruction Project Asphalt Concrete and replacement and leveling course to repair failing asphalt Kenmar Road between Church Street and Remie Court 01/2018 06/2018 10 15 Foster City San Mateo Annual Pavement Rehabilitation Project consists of pavement grinding, base repair, asphalt overlay, thermoplastic traffic striping and pavement Streets throughout all of Foster City 07/2017 07/2018 15 20 Project markings, and new access. Fountain Valley Orange Euclid Street Rehabilitation and Euclid Street Rehabilitation and Resurfacing from Slater Avenue to Warner Avenue Euclid Street from Slater Avenue to Warner Avenue 12/2017 05/2017 10 15 Resurfacing from Slater Avenue to Warner Avenue Fowler Fresno Adams Avenue Reconstruction Reconstruct pavement, curb, gutters and sidewalks. Adams Ave from Golden State to Fifth Street 05/2017 04/2018 15 20 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Lake Oneida St, Lake Pyramid St. to Lake Mead Dr 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Lake Pyramid St, Lake Mead Dr to Lake Oneida St 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Ardo St, Cabrillo Dr. to east end 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Tampico Rd, Ardo St to Tamayo St 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Lexington St, Mowry Ave to Country Dr 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Wheeler Dr, Sundale Dr to Logan Dr 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Margery Dr, Davis St to Fremont Blvd 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Duarte Ave, Mission Blvd to end 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Mission Creek Dr, Palm Ave to end 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Anza St, Ellsworth St to Mission Blvd 06/2018 10/2018 10 15 Fremont Alameda 2018 Pavement Rehabilitation Project Rehabilitation of the existing pavement surface with asphalt overlays and/or base repairs Lippert Ave, Warm Springs Boulevard to 112’ East of Hoyt Street 06/2018 10/2018 10 15 Fremont Alameda Walnut Avenue Protected Bikeway Project will install a protected bikeway that is separated from traffic with a raised island, two protected Walnut Avenue from Mission Boulevard to Paseo Padre Parkway 03/2019 11/2020 20 30 intersections that will eliminate right turn slip lanes, and a new pedestrian signal at an existing uncontrolled crossing. Fresno Fresno North & Fig Reconstruction Reconstruction of North Avenue from Fig to Walnut; and Fig Avenue from North to 0.25 miles south, including North Avenue and Fig Avenue 06/2018 06/2019 15 20 pavement reconstruction and drainage facilities. Fresno Fresno North Ave Overlay, Elm to Fig* Asphalt Overlay North Ave Overlay, Elm to Fig* 05/2018 07/2018 15 25 Fresno Fresno Hughes Ave sidewalk, Hedges to Sidewalk Hughes Ave sidewalk, Hedges to Floradora* 02/2018 06/2018 15 20 Floradora* Fresno Fresno Blackstone Overlay, Shaw to Ashlan Curb ramp replacement, traffic signal loop replacement, curb and gutter repair, signing and pavement markings. Blackstone Overlay, Shaw to Ashlan 04/2018 05/2018 10 20 Fresno Fresno Clinton Overlay, Blackstone to Maroa* Rehabilitation of Clinton Avenue consisting of an asphalt concrete overlay, replacing damaged traffic detector Clinton Overlay, Blackstone to Maroa* 10/2017 05/2018 20 25 loops, restriping and upgrading non-standard curb ramps to meet ADA standards Fresno Fresno Shields Overlay, Sunnyside to Fowler* Rehabilitation of Shields Avenue consisting of an asphalt concrete overlay, replacing damaged traffic detector Shields Overlay, Sunnyside to Fowler* 10/2017 04/2019 20 25 loops, restriping and upgrading non-standard curb ramps to meet ADA standards Fresno Fresno Traffic Signal Improvements at Traffic Signal Improvements at Belmont and Fulton Belmont/Fulton Intersection 05/2018 06/2018 20 20 Belmont and Fulton Fresno Fresno BPMP Bridge Deck Rehab Phase 2 Bridge Deck Rehab BPMP Bridge Deck Rehab Phase 2 01/2018 01/2019 20 40 Fresno Fresno Hughes Ave, Weber to Shields (S) Pavement slurry seal Hughes Ave, Weber to Shields (S) 04/2018 06/2018 07 10

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Fresno Fresno Vista-Polk-San Gabriel-Santa Ana Pavement slurry seal Vista-Polk-San Gabriel-Santa Ana Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Dakota Ave east of Cornelia Pavement slurry seal construction Dakota Ave east of Cornelia 04/2018 06/2018 07 10 Fresno Fresno Polk-Barcus-Gettysburg-Rialto Pavement slurry seal Polk-Barcus-Gettysburg-Rialto Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Ashcroft-Norwich-Carnegie-Polk Pavement slurry seal Ashcroft-Norwich-Carnegie-Polk Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Island Water Park/Parkway Drive, Shaw Pavement slurry seal Island Water Park/Parkway Drive, Shaw to Veterans (S) 04/2018 06/2018 07 10 to Veterans (S) Fresno Fresno Keats-Barstow-Rosalia-Contessa Pavement slurry seal Keats-Barstow-Rosalia-Contessa Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Marks Ave Overlay, Barstow to BNSF Pavement Overlay Marks Ave Overlay, Barstow to BNSF 01/2018 06/2018 10 15 Fresno Fresno West Ave Overlay, Olive to Golden Pavement Overlay West Ave Overlay, Olive to Golden State 01/2018 06/2018 10 15 State Fresno Fresno Thorne Ave, Whitesbridge to California Pavement slurry seal Thorne Ave, Whitesbridge to California (S) 04/2018 06/2018 07 10 (S) Fresno Fresno Clinton Way, Chestnut to McKinley (S) Pavement slurry seal Clinton Way, Chestnut to McKinley (S) 04/2018 06/2018 07 10 Fresno Fresno Maple Ave, Gettysburg to Shaw (S) Pavement slurry seal Maple Ave, Gettysburg to Shaw (S) 04/2018 06/2018 07 10 Fresno Fresno Barstow Ave, Fresno to First (S) Pavement slurry seal Barstow Ave, Fresno to First (S) 04/2018 06/2018 07 10 Fresno Fresno Sunnyside, California to Jensen (S) Pavement slurry seal Sunnyside, California to Jensen (S) 04/2018 06/2018 07 10 Fresno Fresno Maple-Hayston-Church-Byrd Pavement slurry seal Maple-Hayston-Church-Byrd Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Orangewood south of Hamilton Concrete curb, gutter, sidewalk repair Orangewood south of Hamilton concrete repairs 01/2018 06/2018 15 20 concrete repairs Fresno Fresno Chestnut Ave, Copper to Sommerville Pavement slurry seal Chestnut Ave, Copper to Sommerville (S) 04/2018 06/2018 07 10 (S) Fresno Fresno Nees-El Paso-Matus-Laureen Pavement slurry seal Nees-El Paso-Matus-Laureen Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Clinton-Shields-Blackstone-41 Pavement slurry seal Clinton-Shields-Blackstone-41 Neighborhood (S) 04/2018 06/2018 07 10 Neighborhood (S) Fresno Fresno Lansing, Blackstone to Glenn concrete Concrete curb, gutter, sidewalk repair Lansing, Blackstone to Glenn concrete repairs 04/2018 06/2018 15 20 repairs Fresno Fresno Dayton & Third concrete repairs Concrete curb, gutter, sidewalk repair Dayton & Third concrete repairs 04/2018 06/2018 15 20 Fresno Fresno Dakota Ave, Blackstone to Fresno (S) Pavement slurry seal Dakota Ave, Blackstone to Fresno (S) 04/2018 06/2018 07 10 Fullerton Orange Chapman Avenue Rehabilitation The project street is functionally classified as arterial street and mostly consists of five lanes with two (2) lanes on Chapman Avenue between; Acacia Avenue to 57 Freeway/Caltrans right-of-way excluding 05/2017 08/2017 10 20 Project each direction with median lane. Total length of the street is approximately 1.2 miles with 60-70 feet wide Commonwealth Avenue to Clarke Avenue and State College Blvd to Sycamore Avenue. pavement. The work includes grind and overlay of asphalt concrete to extend the roadway service life and to reconstruct; curb, and gutter, access ramp, cross gutter, manhole and valve adjustment to grade, traffic striping, and replace traffic loop detectors all within the City right-of-way. Galt Sacramento South Galt Safe Routes to School and South Galt Safe Routes to School and Rehabilitation and SACOG Bicycle and Pedestrian Improvement Project CIP The project is located in the City of Galt. The work is on A Street from the east to west City 03/2018 07/2018 10 20 Rehabilitation and SACOG Bicycle and #518C, project description includes repairs of pavement, restriping existing bicycle lanes and bike lanes gaps, limits. Pedestrian Improvement Project adding pedestrian bulbouts and median refuge islands, adding signage and warning devices as well as adjusting utilities to grade. The project will also replace damaged sidewalk sections, upgrading to current ADA standards and adding sidewalks/walkways. The project location is bounded by SR99 to Pringle and South to Kost Road. The maximum useful life of the project is approximately 20 years. The anticipated year of construction is 2017-18.

Garden Grove Orange Westminster Rehabilitation (Harbor- Road rehabilitation with miscellaneous concrete improvements. On Westminster Avenue, from Harbor Blvd. to Roxey Drive, in the City of Garden Grove. 03/2018 10/2018 10 20 Roxey) Garden Grove Orange Chapman Rehabilitation (Brookhurst - The City will use the full-depth reclamation process to reconstruct Chapman in the most economically and On Chapman Avenue, from Brookhurst Street to Nelson Street, in the City of Garden Grove. 05/2018 11/2018 10 20 Nelson) environmentally conscious method. Gardena Los Angeles Local Road Maintenance 2018 Coldmill and overlay approx. 230,000 S.F. of local street pavement. Various 06/2018 08/2018 05 20 Gilroy Santa Clara FY 18 Pavement Maintenance Project Pavement maintenance project, including digouts, crack seal, and rubberized cape seal surface treatment In the City of Gilroy, on the following street segments: Farrel Ave (from Wren to Monterey), 08/2018 10/2018 06 08 Eight St (from Princevalle to Church), Martin St (from Monterey to Chestnut), and Murray Ave (from I.O.O.F. to Leavesley) Glendale Los Angeles Doran Street Rehabilitation Project Rehabilitation of Doran Street which includes grinding and resurfacing of the pavement using rubberized asphalt, Project is Located in the County of Los Angeles, City of Glendale, on Doran Street between 04/2018 08/2018 15 20 reconstruction of damaged sidewalks, curbs, gutters and reconstruction/upgrade of ADA Accessible Curb Ramps Brand Boulevard and Adams Street. where required. From: 34°09'16.9"N 118°15'17.5"W To: 34°09'12.1"N 118°14'30.8"W Glendora Los Angeles ALLEY REHABILITATION repave some of the badly deteriorated alleys Alleys south of E Ada, north of Walnut Ave, ease of Glendora Avenue and west of S Wabash 03/2018 05/2018 15 20 Ave. Glendora Los Angeles ROUTE 66 FROM GRAND EAST 500 FT Rehabilitate southern half of Route 66 pavement from Grand Ave to approx. 500 ft east. Southern half of Route 66 pavement from Grand Ave to Vermont Ave. 08/2017 09/2017 15 20 Glendora Los Angeles PASADENA SRTEET IMPROVEMENTS repave street segment due to deterioration from water leak patch repair , age, and after new water line Pasadena Street from Ada Ave to Railroad Tracks. 03/2018 05/2018 15 20 FROM ADA TO RR installation. Glendora Los Angeles GLENDORA FROM GLADSTONE TO This project will rehabilitate the pavement . Glendora Ave from Gladstone St to Juanita Ave. 08/2017 01/2018 15 20 JUANITA Glendora Los Angeles FOOTHILL / BARRANCA LEFT TURN This project will install protected left turn phasing for all legs of the Barranca/Foothill intersection Barranca/Foothill intersection 02/2018 06/2018 10 15 PHASING Glendora Los Angeles CLARADAY IMPROVEMENTS This project will repair pavement and sidewalks from Bonnie Cove to the easterly cul-de-sac and Greer Ave from Claraday from Bonnie Cove to the easterly cul-de-sac and Greer Ave from Claraday to Arrow 02/2018 05/2018 15 20 Claraday to Arrow Hwy. Hwy Glendora Los Angeles PARKING LOT REHABILITATION This project will rehabilitate the pavement and add lighting to the large downtown City-owned parking lot. Downtown Parking Lot between Vista Bonita Ave and Glendora Avenue, south of Meda Ave. 03/2018 05/2018 15 20 Glendora Los Angeles TRAFFIC SIGNAL ENHANCEMENTS upgrade traffic signal controllers and equipment at a few intersections throughout the City Along Route 66. 03/2018 05/2018 10 15 Glendora Los Angeles LONE HILL IMPOVEMENTS PHASE 2 This project is for the design only for asphalt concrete resurfacing from Route 66 to Auto Center Lone Hill Street from Route 66 to Auto Center Drive. 12/2017 06/2018 15 20 Glendora Los Angeles CROSSWALK AT VALLEY CENTER AND Upgrade of existing lighted crosswalk due to failing in-pavement flashing lights and poor visibility of beacon S Valley Center Avenue south of Foothill Blvd and north of Steffen St 11/2017 01/2018 10 15 GHS Glendora Los Angeles LORAINE AVE STREET IMPROVEMENTS rehabilitate Loraine from Sierra Madre Ave to Mountain View Ave and concrete curb & gutter and sidewalk repair Loraine Ave from Sierra Madre Ave to Mountain View Ave. 03/2018 08/2018 15 20

Glendora Los Angeles AUTO CENTER DR STREET resurface from southbound 57 FWY onramp to Amelia Ave Auto Center Drive from southbound 57 FWY onramp to Amelia Ave 12/2017 04/2018 15 20 IMPROVEMENTS Glendora Los Angeles AMELIA AVE STREET IMPROVEMENTS Route 66 to Auto Center Dr; repair pavement, curb, gutter, and sidewalk Amelia Avenue from Route 66 to Auto Center Drive. 12/2017 04/2018 15 20 Glendora Los Angeles LONE HILL STREET IMPROVEMENTS rehabilitate roadway from Gladstone to San Dimas Wash Lone Hill Street from Gladstone to San Dimas Wash 03/2018 08/2018 15 20

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Glendora Los Angeles FOOTHILL / OAK TREE CROSSWALK install flashing beacon units at existing painted crosswalk on Foothill at Oak Tree Dr for safer pedestrian crossing On Foothill Blvd at Oak Tree Drive 12/2017 01/2018 10 15 Goleta Santa Barbara FY 2017/18 Pavement Rehabilitation Deep lift Cement treated pulverized material regrade Cathedral Oaks Road: East side of bridge to N. Los Carneros Road 10/2017 04/2018 15 20 Project Gonzales Monterey Alta Street Pavement Rehab Alta Street Pavement Rehabilitation Project will use the Full Depth Reclamation (FDR) approach to reconstruct the The Alta Street Pavement Rehabilitation Project will provide full reconstruction of the roadway 12/2017 04/2018 12 20 10,000 feet of roadway. FDR grinds the existing base rock and pavement and reuses it for new base material. It from Tenth Street (northern city limits) to the Gonzales Cemetery (south end of the roadway), a includes adding cement to the subbase and is capped with new hot mix asphalt. distance of approximately 10,000 feet. Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section Arliss Lane 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section McClarren Street 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section Orangewood Court 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section Mavis Street 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section Vivienda Avenue 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section Dos Rios Avenue 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Grind and Overlay 2.5" Asphalt Grind and overlay 2.5" asphalt concrete of street section Franklin Street 03/2018 05/2018 15 20 Concrete Grand Terrace San Bernardino Slurry Seal of approximately 20 streets Remaining streets not included in Year 1 for slurry seal treatment Approximately 20 streets or 3.5 lane miles 03/2018 05/2018 07 15 Grass Valley Nevada 2017 Annual Street Rehab Project Deferred maintenance on local street system / basic street maintenance and rehabilitation Cambridge Ct / Centennial Dr / Crown Point Circle / Crown Point Ct / East Main St / Freeman Ln 03/2018 06/2018 15 20 / Terrace / Mill St / Spring Hill Dr Grass Valley Nevada 2018 Annual Street Rehab Project Deferred maintenance on local street system / basic street maintenance and rehabilitation Bennett St / Brighton St / East Main St / Freeman Ln / McCourtney Rd / Mill St / South Auburn 06/2018 06/2019 15 20 St Greenfield Monterey Street Maint. Staff Staff costs for street maintenance and repair Citywide, various locations as-needed 06/2018 06/2018 05 10 Greenfield Monterey Alley Repaving Repaving existing alley (City streets), approx. 0.5 mile 9th from Apple Ave. to Elm Ave. 10/2017 12/2017 10 15 Gridley Butte Spruce Street Rehab Repair structural failures and Grind and Overlay, 5284 L.F. Full Width W. Biggs/Gridley Road to HWY 99. 06/2018 12/2018 05 10 Gridley Butte Magnolia Street Rehab Repair structural failures and Grind and Overlay, 2575 L.F. Full Width Oregon Street to Virginia Street 06/2018 12/2018 05 10 Gridley Butte Nevada Street Rehab Repair structural failures and Grind and Overlay, 400 L.F. Full Width Cedar Street to Laurel Street 06/2019 12/2019 05 10 Gridley Butte Indiana Street Rehab Repair structural failures and Grind and Overlay, 450 L.F. Full Width Peach Street to Pecan Street 06/2019 12/2019 05 10 Gridley Butte Peach Street Rehab Repair structural failures and Grind and Overlay, 330 L.F. Full Width Indiana Street to Vermont Street 06/2019 12/2019 05 10 Gridley Butte Bridgeford Street Rehab Repair structural failures and Grind and Overlay, 427 L.F. Full Width Ohio Street to Virginia Street 06/2019 12/2019 05 10 Gridley Butte Ohio Street Rehab Repair structural failures and Grind and Overlay, 800 L.F. Full Width Spruce Street to Sycamore Street 06/2019 12/2019 05 10 Gridley Butte Kentucky Street Rehab Repair structural failures and Grind and Overlay, 800 L.F. Full Width Spruce Street to Sycamore Street 06/2019 12/2019 05 10 Gridley Butte Lincoln Street Rehab Repair structural failures and Grind and Overlay, 550 L.F. Full Width Magnolia Street to Sycamore Street 06/2020 12/2020 05 10 Gridley Butte Jackson Street Rehab Repair structural failures and Grind and Overlay, 410 L.F. Full Width Magnolia Street to Sycamore Street 06/2020 12/2020 05 10 Gridley Butte Washington Street Rehab Repair structural failures and Grind and Overlay, 410 L.F. Full Width Magnolia Street to Sycamore Street 06/2020 12/2020 05 10 Gridley Butte Oregon Street Rehab Repair structural failures and Grind and Overlay, 410 L.F. Full Width Cedar Street to Laurel Street 06/2020 12/2020 05 10 Gridley Butte California Street Rehab Repair structural failures and Grind and Overlay, 800 L.F. Full Width Cedar Street to Magnolia Street 06/2021 12/2021 05 10 Gridley Butte W. Biggs Gridley Road Rehab Repair structural failures and Grind and Overlay, 700 L.F. Full Width Sycamore Street to Spruce Street 06/2021 12/2021 05 10 Gridley Butte Park Street Rehab Repair structural failures and Grind and Overlay, 400 L.F. Full Width Magnolia Street to Laurel Street 06/2021 12/2021 05 10 Gridley Butte Mar Ter Street Rehab Repair structural failures and Grind and Overlay, 560 L.F. Full Width Haskell Street to End of Cul-de-Sac 06/2021 12/2021 05 10 Gridley Butte Sycamore Street Rehab Repair structural failures and Grind and Overlay, 6800 L.F. Full Width Highway 99 to Butte View Drive 06/2022 12/2022 05 10 Gridley Butte Hazel Street Rehab Repair structural failures and Grind and Overlay, 1900 L.F. Full Width Highway 99 to Washington Street 06/2022 12/2022 05 10 Grover Beach San Luis Obispo CIP 2283 Major Street Maintenance Rehabilitation of local streets El Camino Real, Oak Park, 4th Street, Farroll, Grand Avenue 06/2018 06/2019 15 20 Program Guadalupe Santa Barbara 2018 Pavement Rehabilitation Project Crack Fill & Slurry Seal (Type B) and localized 4" removal and replacement of HMA on City roads as outlined in Plans available upon request. Section 1: Ibis Circle, Pacific Dunes Way from W. Main to Surfbird 05/2018 11/2018 03 05 City's Pavement Management System document (2013). Ln, Sandpiper Lane from Pacific Dune Way to cul-de-sac, Point Sal Dunes Ln from W. Main to Surfbird Ln, Surfbird Ln from Pacific Dunes to Surfbird Ct., Egret Lane. Section 2: Garrett Street, Mary Knoll Drive. Section 3: 2nd St from Tognazzini Ave to Hwy 1, Campodonico Ave from 2nd St to 7th St, Alley between Campodonico Ave and Hwy 1 from 2nd to 7th St, 3rd Street, 7th St, Rubio St, Peralta St. from 10th St to 11th St, Escalante St. Guadalupe Santa Barbara 2018 Pavement Maintenance Project Pavement Rehabilitation of City roads as outlined in City's Pavement Management System document (2013). Obispo St. from West Main to 10th Street, Pelican Lane from Sandpiper Lane to Surfbird Lane, 05/2018 11/2018 07 13 Sandpiper Lane from Pacific Dunes Way to Pelican Lane. Gustine Merced Hillview Project Ramp, sidewalk and gutter rehabilitation to improve safety and walkability of the area. The project will replace Block on the southwest corner of 5th Street and North avenues and Northwest corner of 5th 06/2017 06/2018 10 20 uneven concrete that contains tripping hazards, as well as replace ramps for handicap access for all pedestrians, Street and First Avenue adjacent to the public high school and funeral home. including citizens attempting to access both the public High School and the sole funeral home in the City. Gustine Merced Greenacres Project Eliminate high curbs and install ADA-compliant ramps. Sidewalks and public street near the entrance of mobile-home located in the 1400 block of 06/2017 12/2018 10 20 Meredith Avenue. Gustine Merced Main Street/GPS Project Ramp, sidewalk and gutter rehabilitation to improve safety and walkability of the area. The project will replace Block on the northwest corner of 5th Street and 3rd Avenue, in the heart of the City business 06/2017 12/2019 10 20 uneven concrete that contains tripping hazards, as well as replace ramps for handicap access for all pedestrians, district and utilized extensively by the public. including all traffic in the downtown corridor. Half Moon Bay San Mateo Crosswalks and ADA Retrofit Program This program involves annual evaluation, prioritization and construction of improvements, including sidewalks and City-wide 10/2017 06/2018 30 50 curb ramps, to comply with the American Disabilities Act (ADA). This program also includes the placement of new and improved crosswalks to improve pedestrian safety, often in conjunction with ADA related work. The focus of FY 2017-18 includes the design and installation of crosswalks at Poplar/Main, Arnold/Main, Stonepine/Main, Lewis Foster Drive/Main, Kelly/Pilarcitos, and Main Street Midblock (700 Block). Hanford Kings Grangeville / BNSF-Grade Sep. Preliminary engineering study report to determine feasibility of providing a grade separation structure between Grangeville Blvd / BNSF Railroad. 06/2018 12/2018 50 99 Feasibility Study the BNSF Railroad and Grangeville Blvd. Hanford Kings 12th Ave Pavement Resurfacing. Resurface 0.4 miles of street. 12th Ave- Hfd-Arm. Rd. to Springcrest St. 06/2018 10/2018 15 20 Hawaiian Gardens Los Angeles Street Improvement Proj FY 17/18 (10 Remove and replace damaged pavement, curb, gutter, sidewalk; upgrade curb ramps to ADA compliance; replace Arline Ave (Civic Ctr Dr to 221st St), Clarkdale Ave (Civic Ctr Dr to 221st St), Elaine Ave (Civic Ctr 03/2018 05/2018 20 25 street segments) broken alley intersection & add ADA access; install high visibility striping, pavement markings, crosswalks. Dr to 221st St), 223rd St (Norwalk Blvd E to Belshire Ave), Alley E of Norwalk (223rd St to 224th St), Alley E of Norwalk (224th St to Brittain St), 215th St (Elaine Ave to Pioneer Blvd), 226th St (Norwalk Blvd to Norwalk Channel), 226th St (Cortner Ave to Wardham Ave). Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 117th Street from Prairie Avenue to East end 11/2019 12/2022 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 118th Street from Prairie Avenue to 3834 W. 118th Street 11/2019 12/2022 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Doty Avenue from Imperial Highway to 118th Street 11/2019 12/2022 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Kornblum Avenue from 115th Street to 117th Street 11/2019 12/2022 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Kornblum Avenue from 119th Street to 120th Street 11/2019 12/2022 10 20

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 144th Place from Doty Avenue to West end 02/2020 12/2022 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 147th Place from Prairie Avenue to Doty Avenue 02/2020 12/2022 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Cerise Avenue from Rosecrans Avenue to City Limits 02/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Cordary Avenue from 144th Street to Prairie Avenue 02/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Lemoli Avenue from Rosecrans Avenue to 147th Street 10/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Washington Avenue from City Limit to El Segundo Boulevard 10/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 118th Place from Tahoe Avenue to Felton Avenue 10/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 138th Place from Glasgow Place to Aviation 10/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Atkinson Avenue to 116th Street to 119th Street 10/2020 12/2024 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 131st Street from Chadron Avenue to Crenshaw Boulevard 10/2020 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. 132nd Place from Kornblum Avenue to Yukon Avenue 10/2020 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Crenshaw Boulevard W/S from 135th Street to Rosecrans Avenue 10/2020 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Doty Avenue from Rosecrans Avenue to 135th Street 01/2021 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. El Segundo Boulevard from Hawthorne Blvd to Crenshaw Boulevard 01/2018 12/2020 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Fonthill Avenue from Rosecrans Avenue to North end 01/2021 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Lisso Avenue from Kornblum Avenue to West end 01/2021 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Simms Avenue from 131st Street to El Segundo Boulevard 01/2021 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Slayton Avenue from Cerise Avenue to West end 01/2021 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Freeman Avenue from 120th Street to El Segundo Boulevard 01/2021 12/2026 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Freeman Avenue from Imperial Highway to 120th Street 01/2021 12/2028 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Menlo Avenue from 120th Street to El Segundo Boulevard 01/2021 12/2028 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Oxford Avenue from El Segundo Boulevard to 120th Street 01/2021 12/2028 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Broadway Avenue from Hawthorne Boulevard to Inglewood Avenue 01/2021 12/2028 10 20 Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Dalerose Avenue (Gale) from Imperial Highway to North end 01/2021 12/2028 10 20 Hawthorne Los Angeles Ongoing Maintenance (Per Attachment Street, pothole and sidewalk repair and maintenance and traffic marking/signage Citywide, ongoing 10/2017 12/2026 05 20 B) Hawthorne Los Angeles Local Streets Improvement Project Repave & replace asphalt pavement on streets currently in poor condition. Certain streets in the Ramona, Bodger Park & Holly Glen sections of Hawthorne. 03/2017 01/2018 10 20 Hawthorne Los Angeles Hawthorne Blvd. Improvement Project Improve pedestrian and vehicular safety along Hawthorne Blvd., through upgrade of traffic and pedestrian signals Hawthorne Blvd. between 111th Street and 126th Street. 10/2018 09/2021 10 20 Phase 3 and intersection safety lighting. Hawthorne Los Angeles El Segundo Blvd. Improvement Project Repave & replace asphalt pavement; replace & upgrade traffic signals and curb ramps. El Segundo Blvd. between I-405 Freeway & Ramona Avenue. 09/2019 07/2022 10 20 Hawthorne Los Angeles Prairie Avenue Mobility Project Upgrade traffic signal system at 10 intersections along Prairie Ave. Street widening at El Segundo Blvd. & Prairie Avenue between 118th Street and Marine Avenue. 11/2019 09/2022 10 20 Rosecrans Avenue. Hawthorne Los Angeles 120th Street Traffic Signal Upgrade Replace and upgrade traffic signals 120th Street between Prairie Ave. and Felton Ave. 10/2019 03/2022 10 15 Hayward Alameda Pavement Rehabilitation FY 18 - RMRA Structural repair, which includes spot repairs, placement of reinforcing fabric, and construction of an asphalt Fairway Street - Carroll Avenue to Brae Burn Avenue, Fairway Street - Brae Burn Avenue to 12/2017 03/2018 15 20 concrete overlay. Mission Bourlevard, and Calaroga Avenue - Catalpa Way to Tennyson Road Healdsburg Sonoma Josephine Lane Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are north of Bianca Lane to south of Powell Avenue 05/2018 08/2018 05 07 Healdsburg Sonoma Albert Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are east of Lupine Road to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Alexandria Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are east of Monte Vista to east of Lupine Road 05/2018 08/2018 05 07 Healdsburg Sonoma Alexandria Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are east of Lupine Road to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Ferrero Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are Healdsburg Avenue to Linda View Drive 05/2018 08/2018 05 07 Healdsburg Sonoma Foss Creek Circle Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are the full circle from north to south Grove Street intersections 05/2018 08/2018 05 07 Healdsburg Sonoma Foss Street Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are North Street to end of street 05/2018 08/2018 05 07 Healdsburg Sonoma Jachetta Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from west of Ridgeview Drive to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Jasmine Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from Ferrero Drive to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Langhart Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from Ferrero Drive to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Langhart Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from Alexandria Drive to Ferrero Drive 05/2018 08/2018 05 07 Healdsburg Sonoma Linda View Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from Ferrero Drive to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Lupine Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from Ferrero Drive to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Lupine Road Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from south of Monte Vista to Ferrero Drive 05/2018 08/2018 05 07 Healdsburg Sonoma Lupine Road Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from north of Monte Vista to south of March Avenue 05/2018 08/2018 05 07 Healdsburg Sonoma Moore Lane Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from north of West North Street to end of street 05/2018 08/2018 05 07 Healdsburg Sonoma North Street Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from east of Grove Street to west of Healdsburg Avenue 05/2018 08/2018 05 07 Healdsburg Sonoma Ridgeview Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from north of Powell Avenue to south of Jachetta Court 05/2018 08/2018 05 07 Healdsburg Sonoma Ridgeview Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from north of Jachetta Court to end of street 05/2018 08/2018 05 07 Healdsburg Sonoma Robinson Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from west of Langhart to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma School Street Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from north of Monte Vista to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Smith Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from west of Langhart to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Theresa Court Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from east of Lupine Road to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma Vista Via Drive Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from north of Powell Avenue to end of cul-de-sac 05/2018 08/2018 05 07 Healdsburg Sonoma West North Street Pavement preservation/rehabilitation through Cape Seal (chip seal w/top seal coat.) Limits are from west of Grove Street to end of cul-de-sac 05/2018 08/2018 05 07 Hemet Riverside Florida Avenue EVP Hardware Project A hardware purchase only project to solicit bids for emergency vehicle preemption equipment compatible with Florida Avenue; 23 traffic signals 11/2017 05/2018 10 15 the City's system. Hemet Riverside Pavement Management Program Slurry seal. Various locations. Please see attached list. 11/2017 05/2018 05 07 Phase 1 Slurry Seal Project Hemet Riverside Pavement Management Program Slurry seal. Various locations. Please see attached list. 06/2018 05/2019 05 07 Phase 2 Slurry Seal Project Hercules Contra Costa Annual Street Maintenance Project Deep lift repair, crack sealing, slurry sealing, striping Lupine Road - 2105 Lupine to Violet; Dogwood Court; Cottonwood Court; Turquoise - 605 to 08/2017 10/2017 07 10 777 Turquoise; Mandalay Avenue - Grenadine to Refugio; Redwood Road - Pepperwood to 1955 Redwood; Violet Road - Lupine to Iris; Manzanita Place - Sequoia to Lupine; Nutmeg Court; Grenadine Way - Mandalay to Bonaire; Alfred Nobel Drive - Linus Pauling to traffic circle; James Watson Drive - Linus Pauling to traffic circle. Hermosa Beach Los Angeles 24th Street Improvements This project consists of resurfacing approximately 1,100 linear feet of 24th Street and will include the construction The project will take place on 24th Street from Valley Drive to Park Avenue. 02/2018 06/2018 10 20 of curb and gutter as needed to correct drainage deficiencies, and the lowering of public utilities (by utility companies) to standard depth to permit the paving of the street. This work will be performed following the sewer and storm drain repairs needed as specified in the new Sewer and Drainage Master Plans, and it will be constructed according to the schedule in the new Pavement Management Plan. Hermosa Beach Los Angeles Bike Friendly Street Improvements This project proposes to implement Bicycle Friendly Street improvements as identified and prioritized in the South This project will take place on 27th Street, Ardmore Avenue, Valley Drive, and Pier Avenue. 10/2017 06/2018 02 04 Bay Bicycle Master Plan. Emphasis will be placed on 27th Street, Ardmore Avenue, Valley Drive, and Pier Avenue to consider sharrow markings, signage, and other improvements to enhance bicycle visibility and safety.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Hermosa Beach Los Angeles Street Improvements – Various This project proposes pavement rehabilitation of streets at various locations. The project will also address limited The location of projects will be determined based on the recommendations of the Pavement 04/2018 08/2018 10 20 Locations quantities of deteriorated concrete sidewalk, curb and gutter, curb ramps and drainage deficiencies. Management Plan. Hesperia San Bernardino FY 2017-18 Annual Street Removal and Replacement of existing asphalt to remediate deteriorating pavement. Main Street from Hickory Road to Third Avenue 10/2017 06/2018 10 15 Improvement Project Hesperia San Bernardino Ranchero Road Improvements Various improvements including widening which is vital to traffic circulation and safety. Ranchero Road from Seventh Avenue to Mariposa Road 10/2017 09/2022 15 25 Hesperia San Bernardino Main Street Traffic Signal Installation of real-time adaptive signal controller technology at seven intersections which will adjust signal timing Main Street from Escondido Avenue to Cataba Road 01/2018 12/2018 10 15 Synchronization Project based on existing traffic at an approaching intersection. Hidden Hills Los Angeles Long Valley Road/Valley Circle/US-101 The improvement and construction of a right turn pocket on Valley Circle Boulevard; an additional traffic lane on Long Valley Road in between Valley Circle Boulevard, US-101 on-ramp and City of Hidden Hills 07/2019 10/2019 40 50 On-Ramp Improvements the Long Valley Corridor ramp from Valley Circle Boulevard to Long Valley Road Intersection; ADA compliant gatehouse sidewalk from Long Valley Road security gate in the City of Hidden Hills to the Valley Circle Boulevard/Ventura Boulevard intersection; the purchase and improvement of a parking/staging area on Long Valley Road in the City of Hidden Hills to alleviate traffic congestion; and the reconfiguration of the security gatehouse. Highland San Bernardino City-wide Minor Street Maintenance Repair potholes and perform minor pavement rehabilitation as necessary Various locations, city-wide 11/2017 06/2018 02 05 Highland San Bernardino City-wide Pavement Striping and Maintain pavement striping and marking as necessary Various locations, city-wide 11/2017 06/2018 03 07 Marking Highland San Bernardino City-wide Traffic Signal Maintenance Maintain traffic signal systems as necessary Various locations, city-wide 11/2017 06/2018 10 30 Highland San Bernardino Sterling Avenue Pavement Rehabilitate pavement with localized reconstruction and overlay Sterling Avenue from 6th Street to Base Line 03/2018 06/2018 10 15 Rehabilitation Hillsborough San Mateo 2019 Street Resurfacing Summary: Selected streets are located in various areas within the Town’s limit. Detailed locations of each 05/2019 09/2019 04 30 The 2019 Street Resurfacing Project consists of street resurfacing and rehabilitation work for approximately 53 street are summarized in Appendix A. miles of rubberized asphalt overlay, asphalt overlay, cape seal, microsurfacing, and crack sealing. The primary factor for choosing the roadway segments included for rehabilitation is the Pavement Condition Index (PCI) of each roadway. PCI is a measure of a street’s condition derived through field inspections that utilize scoring criteria developed by the Metropolitan Transportation Commission’s (MTC) pavement management program. Field inspections were conducted in fall of 2016, and the roads with the lowest PCI rating were included in this project and will increase the Town’s overall PCI. The improvement of the PCI will help to eliminate the need for vehicles to slow, swerve, or stop suddenly to avoid hazardous road conditions. Properly maintained streets also help to improve traffic flow and assist in preventing congestion, slow traffic, and generally unsafe driving conditions. The Town plans to continue to utilize ,where appropriate, recycled Rubberized Asphalt Concrete (RAC) to help reduce the accumulation of disposed tires occupying landfills in the State of California. The RAC also provides a smoother and quieter roadway surface than conventional asphalt and offers a better platform for outdoor activities such as cycling and running, which in turn promotes the overall health of the community.

Hollister San Benito Road Rehabilitation Program San Felipe Road, south of Bypass (SR 25) to 3rd Street. San Felipe Road is a former State Highway that was San Felipe--Beginning South of Bypass (SR 25) to 3rd Street for 3,971 linear feet. 09/2017 06/2018 30 30 2017/2018 relinquished several years ago. The project area is a 3,971 linear ft. portion of the arterial road with a current PCI of 31 to 72. The proposed maintenance is expected to bring the PCI to 100 and add 30 years of useful life. Hollister San Benito Road Rehabilitation Program A four lane divided arterial road, San Felipe Road was a former State Highway relinquished several years ago. The San Felipe Road-- Beginning North of Bypass (SR 25) to City limits, 12,400 linear feet in length. 09/2017 06/2018 10 10 2017/2018 current CPI ranges from 61 to 76. The maintenance proposed is a "dig out and patching" of failed areas, which is expected to brin the PCI to about 85 and extyend the useful life for an addit8ional 10 years before needing an overlay. Hollister San Benito Road Rehabilitation Program South Street, from San Benito Street to West Street, is a two lane residential street 990 feet in length. The PCI is South Street--Beginning at San Benito Street and proceeding west to West Street for 990 linear 09/2017 06/2018 30 30 2017/2018 22. This street serves the downtown area from the west side of Hollister. The maintenance proposed is overlay, feet. which is estimated to increase useful life by 30 years. Hollister San Benito Road Rehabilitation Program Monterey Street, from South Street to Nash Road, is a two lane collector road 2,897 feet in length. The PCI ranges Monterey Street--Beginning at South Street and proceeding south to Nash Road for 2,897 09/2017 06/2019 30 30 2017/2018 from 30 to 54 with the majority at about 32. This street serves the downtown area near San Benito High School. linear feet. The proposed overlay is expected to bring the PCI to 100 and extend the useful life by 30 years. Hollister San Benito Road Rehabilitation Program Westside Blvd., from South Street to Nash Road is a wide two lane collector road 3,065 feet in length. The PCI Westside Blvd.--Beginning at South Street and proceeding south to Nash Road for 3,065 linear 09/2017 06/2019 30 30 2017/2018 ranges from 56 to 82 with the majority at about 66. This street serves the west side of Hollister providing a traffic feet. corridor from Fourth Street to Nash Road. The proposed overlay is expected to bring the PCI to 100 and extend the useful life by 30 years. Hollister San Benito Road Rehabilitation Program San Benito Street , proceeding south past Nash Road, is a two lane arterial road 1,330 feet in length. The PCI San Benito Street--Beginning at Nash Road and proceeding south of San Benito High School for 09/2017 06/2019 30 30 2017/2018 ranges from 60 to 67 with the majority at 60. This street is adjacent to San Benito High School, is a southerly 1,330 linear feet. gateway to Hollister, and is frequently travelled to tourist attractions in southerly San Benito County. The proposed maintenance is overlay which is expected to bring the PCI to 100 and increase the useful life by 30 years. Hollister San Benito Road Rehabilitation Program West Street, from Fourth Street to South Street is two lane collector road 1,300 feet in length. The PCI ranges West Street--Beginning at Fourth Street and proceeding south to South Street for 1,300 linear 09/2017 06/2019 30 30 2017/2018 from 20 to 24 with the majority at 20. This street serves residential and part of the central business district of feet. Hollister. The proposed overlay is expected to bring the PCI to 100 and extend the useful life by 30 years. Hollister San Benito Road Rehabilitation Program Hawkins Street, from San Benito Street to Monterey Street is a two lane residential road 540 feet in length. The Hawkins Street--Beginning at San Benito Street and proceeding west to Monterey Street for 540 09/2017 06/2019 30 30 2017/2018 PCI is 13. The maintenance proposed is overlay, which is expected to bring the PCI to 100 and provide a useful life linear feet. of 30 years. Hollister San Benito Road Rehabilitation Program Flynn Road--San Felipe Road to SR25 is a two lane collector road 4,235 feet in length. This section is within the Flynn Road--San Felipe Road to SR25 09/2017 06/2019 30 30 2017/2018 City of Hollister and San Benito County jurisdictions. The PCI n the City limits ranges from 50 to 64 with the majority at about 64. The proposed overlay is expected to bring the PCI to 100 and provide a useful life of 30 years. The proposal is to combine efforts and resources with the County of San Benito to repair this road. Holtville Imperial (029) Ninth Street Pavement Project undergrounds an open earthen ditch that borders the road, widens the narrow roadway and adds curb, Ninth Street Between Palm & Olive Avenues 11/2017 12/2017 20 30 Improvements Project gutter & sidewalk Hughson Stanislaus Whitmore Avenue Pedestrian Construct new pedestrian and bicycle improvements on Whitmore Avenue, including sidewalk and bicycle lane, Whitmore Avenue from east of Tully Road to Charles Street 12/2018 12/2019 10 30 Improvement Project and Overlay across BSNF Rail Lines Huntington Beach Orange Arterial Rehabilitation RMRA allocation will partially fund the rehabilitation of select arterial highways. The total project cost is Heil Aveneue (Springdale to Bolsa Chica); Indianapolis Avenue (Newland to Beach); Slater 10/2017 09/2018 15 25 approximately $4.7 million, with full allocation of just over $1.1 million from RMRA. Avenue (Goldenwest to Gothard)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Huntington Park Los Angeles Middleton Safe Routes to School In May 2011, the Los Angeles County Department of Public Health PLACE (Policies for Livable, Active Communities The four proposed project locations are at the intersections of Gage Ave. at Santa Fe, Gage Ave 02/2017 11/2017 15 20 and Environments) Program announced that the City of Huntington Park was one of five cities that would be the at Middleton St., Gage Ave at Malabar St., and Zoe at Santa Fe Ave. recipient of the Healthy Policies initiatives (HPI) Grant. The goal of the Healthy Policies Initiative is to collaborate with cities, such as Huntington Park, with high rates of childhood obesity to improve their physical activity and food environments through policy and environmental change. SR2S plan would encourage students to walk and bike to school safely, which may decrease traffic around schools as well as increase physical activity.

Based upon the need for better routes, as well as support from school administration, Middleton Elementary School and Middleton Primary Center were selected as the focus schools for the plan.

Project Description: The Project will consist of new ADA ramps, advanced yield and stop markings, countdowns signals, updated pedestrian signs, rapid-flashing beacons, repainting exiting pavement markings, removal of nonfunctional in road lights, and ladder style crosswalks. Funding for ongoing educations programs such as classroom training for bicycle and pedestrian safety, safety rodeos by local Police, walking day education and activities, and crossing guard training is also included.

Huntington Park Los Angeles Street Improvements The Street Improvement project includes the repair of residential streets. Target Areas 1 and 2 are Code Albany St (Zoe Ave to Florence Ave) 09/2017 06/2017 15 20 Enforcement areas of focus and thus will be the focus of the street improvements project. Below are the selected Mortimer Ave (CDS to Santa Fe Ave) streets (see highlights) within the Targeted Areas and a projected aggregate cost. Cost were determined based on Marbrisa Ave (Mortimer Ave to Florence Ave) the condition of each respective street. The work will either consist of a slurry seal, cold milling, or overlaying in Saturn Ave (Alameda St to Santa Fe Ave) addition to striping of each street. Everett Ave (Slauson Ave to E 60th St) Loma Vista Ave (Slauson Ave to E 61st St) E 59th Pl (Maywood Ave to Loma Vista Ave) E 60th St (Maywood Ave to Loma Vista Ave) E 60th Pl (Maywood Ave to Loma Vista Ave) E 61st St (Maywood Ave to Carmelita Ave) Huntington Park Los Angeles ATP Cycle II On February 8, 2016 the City was awarded a $1,757,000 grant for the “Uncontrolled Crosswalk Pedestrian Safety 1. Pacific Blvd/53rd St (North and South Leg) 10/2017 10/2018 10 20 Enhancement Project”. The Project consist of new ADA ramps, advanced yield and stop markings, countdown 2. Pacific Blvd/56th St (North Leg) pedestrian signals, updated pedestrian signs, rapid-flashing beacons, repainting existing pavement markings, 3. Pacific Blvd/57th St (North and South Leg) removal of nonfunctional in road lights, and ladder style crosswalks for 22 locations within the City of Huntington 4. Pacific Blvd/58th St (North and South Leg) Park at unprotected crosswalks near schools, either mid-block or across major arterials (Proposed 22 5. Pacific Blvd/South of Slauson Ave (Midblock) improvements). 6. Pacific Blvd/ South of Belgrave Ave (Midblock) 7. Pacific Blvd/ South of Randolph St (Midblock) 8. Miles Ave/57th St (North Leg) 9. Miles Ave/Clarendon Ave (South Leg) 10. Gage Ave/Regent St (East and West Leg) 11. Gage Ave/Albany St (East and West Leg) 12. Gage Ave/Middleton St (East Leg) 13. Gage Ave/Stafford Ave (West Leg) 14. Gage Ave/Marconi St (West Leg) 15. Gage Ave/Cedar St (East Leg) 16. Gage Ave/Hollenbeck St (West Leg) 17. Gage Ave/Bissell St (West Leg) 18. Zoe Ave/Passaic St (East Leg) 19. State St/Zoe Ave (North Leg) 20. Saturn Ave/Hood Ave (Proposed Crosswalk – No Existing Stop or Crosswalk) 21. Florence Ave/Bissell St (West Leg) 22. Live Oak St/State St (South Leg) Huntington Park Los Angeles Huntington Park Signal Synchronization This project improves the operation and efficiency by synchronizing 10 signalized, Reconfiguration of traffic lanes 1. Santa Fe Avenue/Randolph Street 01/2018 01/2019 15 30 to allow dual turning lanes at specific intersections, and the installation of three changeable message signs along 2. Pacific Boulevard/Belgrave Avenue Pacific Boulevard. The signal improvements will include controller upgrades, new masts at specific intersections 3. Pacific Boulevard/Randolph Street (up to five locations), video activated traffic controllers, and synchronization of the signalized mid-block 4. Pacific Boulevard/Clarendon Avenue pedestrian crossings on Pacific Boulevard. Synchronizing the signals along both Pacific and the other north-south 5. Pacific Boulevard/Zoe Avenue arterials will help improve the bus lines’ operations and efficiency by providing transit priority at the signalized 6. Pacific Boulevard/Saturn Avenue intersections and synchronize the mid-block pedestrian signals in order to reduce traffic queuing 7. Miles Avenue/Belgrave Avenue 8. Miles Avenue/Randolph Street 9. Miles Avenue/ Zoe Avenue 10. Miles Avenue/Saturn Avenue Huron Fresno Palmer Ave Class II Bike Lane From Install 0.9 mi of Class II bike lane Palmer Ave from Lassen Ave to Siskiyou Ave 09/2018 10/2019 10 20 Lassen Ave To Siskiyou Ave Huron Fresno M St Class II Bike Lanes From 4th St To Install two (2) 900 ft Class II bike lanes M St from 4th St to 7th St 10/2018 12/2019 10 20 7th St Huron Fresno M St Class IV Bike Lanes From 7th St To Install two (2) 0.63 mi Class II bike lanes M St from 7th St to Palmer Ave 03/2019 09/2020 10 20 Palmer Ave Huron Fresno Lassen Ave Sidewalks From Placita To Improve sidewalks and install landscaping to improve pedestrian experience Lassen Ave from Placita (9th St) to 12th St 12/2018 12/2020 25 35 12th St Huron Fresno Lassen Ave Sidewalks & Greening From Improve sidewalks and install landscaping to improve pedestrian experience Lassen Ave from 12th St to US Post Office 06/2019 06/2021 25 35 12th St To Post Office Imperial Imperial Storm Drain System Preparation of Improvement Plans and Installation of storm drain system 11th Street from F St to Old SR 86 01/2018 06/2018 30 50

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Imperial Beach San Diego Sidewalk Infill Citrus Ave The project includes two blocks of Citrus Ave in between Alabama St. and Rainbow Dr. totaling approximately The project includes two blocks of single family residential on Citrus Avenue totaling 03/2018 07/2018 20 25 1,800 feet. This stretch has a 50 foot wide right-of-way and an existing asphalt street. However, there is no approximately 1,800 feet in between Alabama Street and Rainbow Drive in the Mar Vista sidewalk on either side. neighborhood.

An asphalt grind and 3” overlay will be done over this stretch of Citrus Ave. To address areas that have been identified as showing significant failing asphalt, dig-out operations will be performed to place new base and asphalt.

In order to increase walkability, the project proposes to install 4 foot wide ADA compliant sidewalk and standard driveways on both sides of Citrus Ave. Standard 6-inch curb and gutter will replace existing rolled curb. As part of the green streets feature, there will be a foot and a half section of permeable pavers in between the proposed curb and sidewalk.

To accommodate the limited parkway width and unique conditions of the site, the project will include some modified bulb-out driveways in between Corvina St. and Rainbow Dr. which will also serve as a traffic calming measure and should increase pedestrian safety. Indian Wells Riverside Cook Street Rehabilitation Reconstruction of Cook Street (south) to include rubberized asphalt, road diet (through re-striping), and bike lanes Cook Street from Fairway Drive to Highway 111 07/2019 06/2020 15 20

Indian Wells Riverside Miles Street Overlay Overlay of Miles Avenue to include rubberized asphalt, road diet (through re-striping), and bike lanes Miles Avenue from Highway 111 to Washington Street 07/2019 06/2019 10 15 Indio Riverside Hwy. 111 Improvements (Madison St Highway 111 improvements will include widening Highway 111 from four lanes to six lanes including pavement Highway 111 from approximately 700ft west of Madison Street to Rubidoux Street. 05/2017 06/2019 10 20 to Rubidoux St) reconstruction, intersection improvements, and upgraded traffic signals at all intersections between Madison Street and Rubidoux Street. The improvements will upgrade all existing sidewalks and driveways to current ADA standards and add sidewalk to the bus stops near the intersection of Madison Street and Highway 111. Industry Los Angeles Arenth Avenue Reconstruction Cold Mill Overlay, driveway approaches, improved hydrology pattern, ADA improvements, striping Arenth Avenue from Puente Road to Nogales Street 12/2017 07/2018 15 25 Inglewood Los Angeles Centinela Avenue Improvements 1.5 miles of design of street resurfacing, curb, gutter and sidewalk repairs, ADA ramp upgrades and related Centinela from La Cienega to Florence 02/2018 03/2019 10 20 activates Inglewood Los Angeles N. La Brea Avenue Improvements 1.15 Miles of Construction of Street reconstruction, curb, gutter and sidewalk repairs, ADA ramp upgrades and N. La Brea from Florence Blvd to 64 St 11/2017 01/2019 10 20 related activates Inglewood Los Angeles South Prairie Improvement Project 1 Mile of Design and Construction of street resurfacing and associated improvements including curb, gutter and S. Prairie Ave from Century Blvd to I-105 fwy 10/2018 02/2020 10 20 sidewalk repairs and curb ramp construction Inglewood Los Angeles Imperial Highway Improvement Project 1.5 Miles of street resurfacing and associated improvements including curb, gutter and sidewalk repairs and curb Imperial Hwy from Van Ness to Prairie Ave 11/2017 03/2019 10 20 ramp construction as well as traffic and pedestrian safety improvements Ione Amador Micro-surfacing Sutter Lane from SR Micro-surfacing Sutter Lane from SR 104 to Shakeley. This project will include digging out some damaged area, This project is located between SR 104 and Shakeley 02/2018 06/2018 07 10 104 to Shakeley. crack sealing and installing a micro-surfacing. Micro-surfacing is similar to slurry sealing, but uses slightly larger aggregate in the mix. Irvine Orange Slurry Seal and Local Streets Rehabilitation of roadway pavements and infrastructure improvements. Planned neighborhood areas for FY 17-18 include University Park; Rancho San Joaquin; portions 10/2017 06/2018 17 62 Rehabilitation of Woodbridge, south of Barranca; and Barranca Parkway from Culver to Peters Canyon Wash.

Irwindale Los Angeles 2017/2018 Resurfacing Program 2" grind and overlay of AC pavement, Re-striping Irwindale Ave, between Arrow Hwy and Cypress St 02/2018 04/2018 10 15 Isleton Sacramento Storm Water Drainage Stormwater Drainage Improvement Citywide 01/2018 06/2018 15 20 Isleton Sacramento Jackson Blvd., From 2nd St to 4th St Grind and Overlay - 454' x 33' Two large manholes 4 small services points gutters need rehab (cost does not Jackson Blvd., From 2nd St to 4th St 01/2018 06/2018 15 20 include gutter rehab) Isleton Sacramento Jackson Blvd. Ext. from 4th St to 6th St. Grind and Overlay - 454' x 33' Two large manholes 4 small services points gutters need rehab (cost does not Jackson Blvd. Ext. from 4th St to 6th St. 01/2018 06/2018 15 20 include gutter rehab) Isleton Sacramento 3rd St from Jackson to C Street Grind and Overlay - 680' x 25' Grind and Overlay and 10 Handicap upgrades 3rd St from Jackson to C Street 01/2019 06/2019 15 20 Isleton Sacramento 4th St. from A St. to B Street Grind and Overlay - 272' x 30' needs handicap ramps at B St. & gutter rehab (Cost estimate does not include 4th St. from A St. to B Street 01/2019 06/2019 15 20 gutter rehab) Isleton Sacramento B St. from 2nd to 5th Street Grind and Overlay - 588' x 18' Roughly half has 3' sidewalks ADA should be 4'. 1-30"x30" stormgrate 2- B St. from 2nd to 5th Street 01/2019 06/2019 15 20 30"manholes, 1-monitoring well, 1 water service Isleton Sacramento C St. from 3rd St. to 5th Street Grind and Overlay - 288' x 21' Sidewalks are not handicap capable (width & ramps) (This estimate is only for C St. from 3rd St. to 5th Street 01/2020 06/2020 15 20 asphalt overlay of 1.5" x 2" Isleton Sacramento D St. from 5th St to 6th St Grind and Overlay - 465' x 29' Three large manholes no sidewalks (This estimate is for a 1.5"-2"asphalt overlay D St. from 5th St to 6th St 01/2021 06/2021 15 20 Isleton Sacramento G St. from 6th St. to East 3rd Street Grind and Overlay - 388' x 26' 75% of road only needs overlay / 25% needs repave and regarded 2-30" manholes G St. from 6th St. to East 3rd Street 01/2021 06/2021 15 20 Isleton Sacramento H St. from Union to 6th Street Grind and Overlay - 9,816 sq. ft. total of 5 service boxes in street (1-30" MH, 1-12", 3.8") This estimate is only for H St. from Union to 6th Street 01/2022 06/2022 15 20 an asphalt overlay of 1.5"-2" Isleton Sacramento Union St. from C St. to D Street Grind and Overlay - 1584' x 20' Sidewalks are only 3' not handicap accessible 4-30" manholes, 10-water services Union St. from C St. to D Street 01/2022 06/2022 15 20 Isleton Sacramento B St. from 160 to 1st Street Grind and Overlay - 135' x 30' Grind and overlay with 2 handicap ramps B St. from 160 to 1st Street 01/2023 06/2023 15 20 Isleton Sacramento Everything West of Delta Avenue Slurry Seal - This is a actual quote for a slurry seal coat Everything West of Delta Avenue 01/2023 06/2023 15 20 Isleton Sacramento Union St. from F St. to H St. Grind and Overlay - 534' x 30' - 3' x 534' 1-30" manhole Union St. from F St. to H St. 01/2024 06/2024 15 20 Isleton Sacramento 1st Street to Hwy 160 Grind and Overlay - 161' x 15' Grind and Overlay 1st Street to Hwy 160 01/2024 06/2024 15 20 Isleton Sacramento Main Street - C to H Streets Grind and Overlay - Striping parking stalls and crosswalks - ADA ramps - Main Street - C to H Streets 01/2018 06/2018 15 20 Isleton Sacramento 6th Street - Jackson Extension to H Grind and Overlay 6th Street - Jackson Extension to H Street 01/2020 06/2020 15 20 Street Isleton Sacramento Park & Ride Lot Grind and Overlay - Estimated 15,112 square feet pave for park & ride lot - stripe parking stalls - bicycle parking 2nd & D Street - Parcel 15700260020000 01/2018 06/2018 15 20 area. Jackson Amador Pavement Striping Project Pavement Striping Citywide - See Attached Table 05/2018 07/2018 02 03 Jurupa Valley Riverside Riverside Drive Pavement Rehabilitation, reconstruction and widening of the existing roadway. Wineville Ave to Etiwanda Ave 08/2017 04/2018 10 20 Rehabilitation Jurupa Valley Riverside Jurupa Valley High School Safe Routes Provides curb, gutter, sidewalk and dirt trails along with LED crosswalk flashers at the Martin/Bellegrave Martin St - 50th to Bellegrave 05/2018 08/2018 10 20 to School intersection and curb bump outs at the Martin St intersections. 48th St - Martin to Troth Troth St - 48th to Bellegrave Jurupa Valley Riverside Annual Pavement Maintenance Slurry/Crack seal Various neighborhoods in City 03/2018 06/2018 05 10 Jurupa Valley Riverside Pavement Management Program Complete a pavement management program for the first time since incorporation Citywide 12/2017 03/2018 03 05 Jurupa Valley Riverside Wallace St Pavement Rehabilitation Rehabilitation of failed AC pavement Wallace St - 34th to 1900' north 10/2017 01/2018 10 20 Kerman Fresno Del Norte Ave Reconstruct Complete Reconstruction including removal and replacement of full depth pavement section. On Del Norte 200' South of C Street to Kearney Blvd in Kerman, CA 06/2018 09/2018 20 35 King City Monterey Crack Seal and Slurry Seal Program - Crack seal and slurry seal of multiple streets in the Rio Vista neighborhood. Rio Vista Circle (Canal Street to Rio Vista Drive); Rio Vista Drive (River Road to Rio Vista Circle); 04/2018 07/2018 10 15 Rio Vista Neighborhoods Rio Vista Court (River Road to end of street); River Road (Broadway Circle to Canal Street); Forden Street (Canal Street to Rio Vista Drive); Beverly Street (Forden Street to end of street); Canal Street (River Road to Rio Vista Drive)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum King City Monterey Design, Grind and Overlay - Design, grind and overlay of Bishop Street; Vanderhurst Avenue; and Queen Street Bishop Street (King Street to end of street); Vanderhurst Avenue (King Street to end of street); 07/2018 10/2018 25 30 Bishop,Vanderhurst, Queen and Queen Street (Vanderhurst Avenue to end of street) Kingsburg Fresno 2017 Street Maintenance Project Reclamite Application on thirteen (13 local streets. Sierra Ranch Development (southeast of Sierra Street / Bethel Avenue intersection. 06/2017 10/2017 05 08 La Canada Flintridge Los Angeles 2018 Street Resurfacing Program 17/18 SCOPE OF WORK. The work to be done consists of furnishing all labor, materials, equipment, tools, and Location 1 Ocean View Blvd Cross Street to Castle Road 10/2017 01/2018 15 20 1 incidentals as required by the Plans (Drawing Number 1122, Sheets 1 through 17), Specifications, and Contract Location 2 San Gorgonio Road Ocean View Blvd to Castle Road Documents. The general items of work include variable depth cold milling of existing pavement; paving with Location 3 Earl Dr. Fairmount to Jarvis Ave. asphalt rubber hot mix (ARHM) and conventional asphalt concrete; miscellaneous curb and gutter removal and Location 4 Foothill Blvd. Verdugo Blvd. to Hill Street replacement; adjustment to grade of manhole and valve cover; installation of traffic striping, marking, raised Location 5 Lanterman Lane Encinas Dr. to Cul-De-Sac pavement marker, and curb address (house number) painting; and miscellaneous appurtenant work. Clean up and Location 6 Oakwood Ave Foothill Blvd to Georgian Road leave in an operable and acceptable condition all of the work and other items not mentioned that are required by Location 7 Paulette Place Gould Ave to Knight Way the Plans and Specifications. Location 8 Paradise Canyon Lane Paulette to Place to Cul-De-Sac Striping Plan Ocean view Blvd cross street to Castle Road La Habra Orange Idaho Street Rehabilitation (La Habra Cold plane and overlay 1/2 mile full width of Idaho Street from La Habra Blvd. to Whittier Blvd. Idaho Street between La Habra Blvd. and Whittier Blvd. 05/2018 06/2018 15 20 Blvd. to Whittier Blvd.) La Habra Heights Los Angeles REPOSADO DR Repave/Resurface Road REPOSADO DR (AHUACATE RD to END) 04/2018 07/2018 10 15 La Habra Heights Los Angeles PAPAYA DR Repave/Resurface Road PAPAYA DR (944' N/O EAST RD to PINTO DR) 04/2018 07/2018 10 15 La Habra Heights Los Angeles REPOSADO DR Repave/Resurface Road REPOSADO DR (GREENVIEW DR to CITRON RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles AHUACATE RD Repave/Resurface Road AHUACATE RD (1185' N/O CHURCHHILL DR to REPOSADO DR) 04/2018 07/2018 10 15 La Habra Heights Los Angeles REPOSADO DR Repave/Resurface Road REPOSADO DR (CITRON RD to HILLSIDE CT) 04/2018 07/2018 10 15 La Habra Heights Los Angeles PAPAYA DR Repave/Resurface Road PAPAYA DR (EAST RD to 944' N/O EAST RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles REPOSADO DR Repave/Resurface Road REPOSADO DR (HACIENDA RD to CHANDOS LN) 04/2018 07/2018 10 15 La Habra Heights Los Angeles VALLE DR Repave/Resurface Road VALLE DR (1065' N/O EAST RD to AIROSO DR) 04/2018 07/2018 10 15 La Habra Heights Los Angeles AIROSO DR Repave/Resurface Road AIROSO DR (SKYLINE DR to VALLE RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles REPOSADO DR Repave/Resurface Road REPOSADO DR (CHANDOS LN to GREENVIEW RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles AHUACATE RD Repave/Resurface Road AHUACATE RD (CHURCHILL RD to 1185' N/O CHURCHILL RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles REPOSADO DR Repave/Resurface Road REPOSADO DR (HILLSIDE CT to AHUACATE RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles CHURCHILL RD Repave/Resurface Road CHURCHILL RD (AHUACATE RD to EAST RD) 04/2018 07/2018 10 15 La Habra Heights Los Angeles VALLE DR Repave/Resurface Road VALLE DR (EAST RD to 1065' N/O EAST RD) 04/2018 07/2018 10 15 La Mesa San Diego 70th St. Rehabilitation Project Asphalt mill and overlay. 70th Street from University Avenue to the city limits 02/2018 06/2018 15 25 La Mesa San Diego La Mesa Blvd. Rehabilitation Project Asphalt mill and overlay. La Mesa Blvd from Lee Ave to University Ave and from Allison Ave to Randlett Dr 02/2018 06/2018 15 25 La Mesa San Diego Palm Ave. Rehabilitation Project Asphalt mill and overlay. Palm Ave from 4400 Palm Ave to Echo Dr 02/2018 06/2018 15 25 La Mirada Los Angeles Alondra Bl/Phoebe Ave New Traffic Installation of a new traffic signal Intersection of Alondra Boulevard and Phoebe Avenue 12/2017 06/2017 30 50 Signal La Palma Orange Orangethorpe Avenue Rehabilitation Full width 2 inch grind and overlay with localized digouts to repair deteriorated pavement sections; thermal Walker Street to Valley View Street 01/2018 06/2018 10 20 striping, curb & gutter work; ADA ramps; traffic loops; and median island rehabilitation. La Puente Los Angeles Resurfacing of Local Streets Grind and overlay of local residential streets Radway St. (Prichard to Temple), Broadmoor Ave. (Prichard to Temple) 04/2018 06/2018 25 30 La Quinta Riverside La Quinta Village Complete Streets - A The proposed improvements will convert the La Quinta Village into a bicycle and pedestrian friendly, complete The three major streets affected include: Calle Tampico, from Eisenhower Dr. to Washington 05/2019 08/2020 20 30 Road Diet Project streets atmosphere St.; Eisenhower Dr., from Calle Tampico to Calle Sinaloa; and Calle Sinaloa/Ave 52, from Eisenhower Dr. to Washington St. La Verne Los Angeles Wheeler Avenue Rehabilitation Project will rehabilitate approximately 440,000 square feet of pavement surface using an Asphalt-Rubber Wheeler Avenue between Arrow Highway and Foothill Boulevard 01/2018 03/2018 12 15 Aggregate Membrane (ARAM) maintenance process. ARAM is a 3/8-inch rubberized membrane comprised of both California scrap tire rubber and tires with a high natural rubber content that provides maintenance-free street surface. The project will also improve the profile of an intersecting street (Palomares) to improve safety and an existing multi use trail crossing. Lafayette Contra Costa 2018 Road & Drain Rehab Reconstruct failed pavement by rebuilding the roadway structural section. Replace failed storm drain crossings Crescent Dr, Del Arroyo Ct, Hillview Ln, Moon Ct, Via Baja, Via Media 04/2018 10/2018 25 30 coincident with road reconstruction. Laguna Beach Orange Fiscal Year 2017/218 Street Slurry Seal This project provides funding to repair damaged pavement and slurry seal the streets that were last rehabilitated Laguna Canyon Frontage Road, Arroyo Drive, Woodland Drive, Canyon Acres Drive, and the area 05/2018 11/2018 08 12 and Rehabilitation in 2008. between Thalia Street and Cress Street Laguna Hills Orange Citywide Pavement Rehabilitation Pavement rehabilitation to include remove/replace deteriorated pavement, edge grind, asphalt concrete overlay, Various streets in Zone A, Zone D and Zone E throughout the City of Laguna Hills - see attached 09/2017 05/2018 07 15 Project raise utilities to grade, REAS slurry seal, striping, ADA ramps, miscellaneous related work. street listing and Resolution Laguna Niguel Orange Alicia Parkway Pavement Roadway maintenance and repair including the repair of isolated areas of pavement, pavement grinding and Alicia Parkway from Highlands Avenue to Pacific Park Drive 01/2017 03/2017 12 15 Rehabilitation Project removal, asphalt pavement overlay, associated concrete improvements including bus pads and access ramps, adjustment of surface facilities to final pavement grade, and roadway marking and striping. Laguna Woods Orange Pavement Management Plan Project This project involves the rehabilitation of pavement along the specified street section, including replacement of Westbound El Toro Road between Avenida Sevilla and Paseo de Valencia, including the 10/2017 12/2017 05 05 (Westbound El Toro Road between deteriorated pavement and a surface seal of crack sealant and rubberized slurry. Pedestrian accessibility intersection of El Toro Road and Avenida Sevilla Avenida Sevilla and Paseo de Valencia) improvements will also be made along the street section and/or within the City. Laguna Woods Orange Pavement Management Plan Project This project involves the rehabilitation of pavement along the specified street section, including replacement of Eastbound El Toro Road between Avenida Sevilla and Church Intersection 10/2018 12/2018 05 05 (Eastbound El Toro Road between deteriorated pavement and a surface seal of crack sealant and rubberized slurry. Pedestrian accessibility Avenida Sevilla and Church improvements will also be made along the street section and/or within the City. Intersection) Lake Elsinore Riverside Graham Ave Pavement Rehabilitation 2” Grind and overlay W. Graham Ave. between Lakeshore and Langstaff 01/2018 04/2018 07 10 between Lakeshore and Langstaff Lake Elsinore Riverside Graham Ave Pavement Rehabilitation 2” Grind and overlay W. Graham Ave. between Langstaff and Main 01/2018 04/2018 07 10 between Langstaff and Main Street Lake Elsinore Riverside Graham Ave Pavement Rehabilitation Type II Slurry Seal E. Graham Ave. between Main and Heald 01/2018 04/2018 07 10 Between Main Street and Heald Ave. Lake Forest Orange Annual Slurry Seal, Zone E Slurry Seal of Non-Arterial Streets within Zone E The non-arterial public streets generally between Trabuco Road and SR-241, south of Lake 09/2017 01/2018 07 10 Forest Drive within the City Limits Lake Forest Orange FY 17/18 STREET Asphalt Resurfacing of Portola Parkway within the SR- 241 Caltrans Right-of-Way and Dimension Drive from Bake Portola Parkway within the SR-241 Caltrans Right-of-Way and Dimension Drive from Bake 12/2017 06/2018 15 20 RESURFACING- Portola Parkway to Lake Forest Drive Parkway to Lake Forest Drive Parkway@241 and Dimension Parkway Resurfacing Lakeport Lake Third Street Thin Lift Overlay Mill and Fill of failed areas with a thin lift overlay, project will also include new striping as a safety enhancement. Third Street between Main and Forbes Streets 12/2017 05/2018 07 10

Lakewood Los Angeles Hardscape Repair Project Repair sidewalk, curb, and gutter within the public Rights of Way in the City of Lakewood. Approximately 2,400 documented locations within 22 grid sections in the city, depicted on the 11/2017 06/2018 25 50 attached map. Lakewood Los Angeles Downey Avenue Overlay Project Overlay of street pavement. Downey Avenue from Del Amo Blvd. to Countryclub Drive 11/2017 06/2018 15 25

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Lancaster Los Angeles 2015 Pavement Management Program The 2015 PMP-Revive 25 is one of a series of projects to "revive" every lane mile within City limits by the year 1. 20th St East (Ave K-8 to Ave L) 2. 20th St East (Ave J to Ave K) 3. East 06/2017 10/2017 15 30 (PMP) - Revive 25 2025. Revive 25 will maximize the life of all Lancaster roads by preventing road issue before they occur. This Ave J-8 (Rodin Ave to Challenger Way) 4. project includes street resurfacing, traffic calming measures, and right sizing roadways. Project will improve East Ave K (Division St to Challenger Way) 5. East approximately 23.43 lane miles of roads in Lancaster. Ave J-8 (Challenger Way to 20th St East) Larkspur Marin FY 2017/18 Local Streets Rehabilitation repave 2-1/2 miles of streets in the Palm Hill and Larkspur Marina neighborhoods, including ADA curb ramps as Corte Del Bayo (all), Corte Del Coronado (all), Riviera Circle (all), Via La Brisa (all), Alexander 05/2018 10/2018 15 20 Project required and restriping/ marking in-kind. Avenue (Acacia to Bayview), Bayview Avenue (Pepper to Alexander), Elm Avenue (Acacia to hairpin turn), Pepper Avenue (Elm to City limit), William Avenue (Garden to Diane), Madrone Avenue (Orange to Olive), Murray Avenue (Magnolia to Arbour). Lathrop San Joaquin 2018 Pavement Rehabilitation Project Resurface approximately 2,000' of roadway Bizzibe St (Louise Ave - Orlando Ln) 06/2018 12/2018 06 08 Lawndale Los Angeles Alley Hawthorne Repave/resurface 0.05 miles of road. Replace 600 square feet of cross gutter. 163rd St to 164th St 05/2018 07/2018 20 22 Lawndale Los Angeles Alley Hawthorne Repave/resurface 0.05 miles of road. Replace 600 square feet of cross gutter. 164th St to 165th St 05/2018 07/2018 25 28 Lawndale Los Angeles Alley Hawthorne Repave/resurface 0.05 miles of road. Replace 600 square feet of cross gutter. 165th St to 166th St 05/2018 07/2018 20 22 Lawndale Los Angeles Alley Hawthorne Repave/resurface 0.06 miles of road. Replace 600 square feet of cross gutter and 305 lf gutter. 167th St to 168th St 05/2018 07/2018 25 28 Lemon Grove San Diego FY 2017-18 Street Rehabilitation Rehabilitate city streets with various treatment based on the current conditions. There are numbers locations. The staff report previously submitted, outlines the street names 11/2017 06/2018 05 10 Project and limits of the treatment. Lemoore Kings Cinnamon Dr: 19 1/2 Ave to Holly Ave Type II Slurry seal, update striping and signing Cinnamon Drive from 19 1/2 Avenue to Holly Avenue 04/2018 10/2018 08 10 Lemoore Kings 19 1/2 Ave: Castle to Cinnamon Type II Slurry seal, update striping and signing 19 1/2 Avenue from Castle Way to Cinnamon Drive 04/2018 10/2018 08 10 Lemoore Kings Hanford-Armona Rd: Hwy 41 to Fox Type II Slurry seal, update striping and signing Hanford-Armona Road from Hwy 41 to Fox Street 04/2019 10/2019 08 10 Lemoore Kings Hanford-Armona Rd: Belinda to Canal Type II Slurry seal, update striping and signing Hanford-Armona Road from Belinda Drive to the Canal 04/2019 10/2019 08 10 Lemoore Kings Silverado Dr: 19 1/2 to 19th Type II Slurry seal, update striping and signing Silverado Drive from 19 1/2 Avenue to 19th Avenue 04/2019 10/2019 08 10 Lemoore Kings 19 1/2 Ave: Silverado to Bush Type II Slurry seal, update striping and signing 19 1/2 Avenue from Silverado Drive to Bush Avenue 04/2019 10/2019 08 10 Lemoore Kings Cedar Lane: 19th to Vine Type II Slurry seal, update striping and signing Cedar Lane from 19th Avenue to Vine Street 04/2020 10/2020 08 10 Lemoore Kings Cinnamon Dr: Balboa to Hanford- Type II Slurry seal, update striping and signing Cinnamon Drive from Balboa to Hanford-Armona Road 04/2020 10/2020 08 10 Armona Lincoln Placer Street Resurfacing Project Combination of resurfacing processes, including AC overlay, digout repairs, cape seal, and full roadway H, I and J Streets between 6th and 9th Street, and 7th and 8th Streets between H and J Street. 04/2018 10/2018 15 25 reconstruction, as well as the installation of ADA ramps and striping. Lindsay Tulare Tulare Road Surface seal of 2 miles of Tulare Road (arterial street). Restripe effected areas (bike lanes and travel lanes). Oak Avenue to Footill Avenue 05/2018 06/2018 05 10 Lindsay Tulare Westmore Court Surface seal of .13 miles of Westmore Court (residential street). Mariposa Street south to alley 05/2018 06/2018 05 08 Lindsay Tulare Samoa Street Surface seal of .12 miles of Samoa Street (commercial/residential street). Mirage Avenue to Homasell Avenue 05/2018 06/2018 05 08 Lindsay Tulare Hermosa Street Surface seal of 2 miles of Hermosa Street (arterial street). Restripe effected areas (bike lanes and travel lanes). Hwy. 65 to Mirage Avenue 05/2018 06/2018 15 18 Lindsay Tulare Mirage Avenue Asphalt recycling of .1 miles of Mirage Avenue (arterial street). Restripe effected areas, renovate concrete curbs, Samoa Street to Hermosa Street 04/2018 05/2018 15 18 gutters and sidewalks. Lindsay Tulare Linda Vista Loop Asphalt recycling of .25 miles of Linda Vista Avenue (residential street). Renovate concrete curbs, gutters and Valencia Street to Valencia Street 04/2018 05/2018 15 18 sidewalks, minor storm drain upgrades. Live Oak Sutter Pennington Road Complete Streets Rehabilitate existing roadway and complete streets elements Pennington Road from Connecticut Avenue to Broadway, west of SR 99 05/2018 11/2018 20 40 Rehabilitation Livermore Alameda Street Resurfacing 2018 Base Repair and resurfacing pavement, repair curb and gutter, signing and striping, ramp installation of various Various City streets, tentative list includes Airway Blvd, Elm St, Scenic Av, Seventh St, Silver Oaks 07/2018 11/2018 20 30 residential, collector, arterial roadways, bike paths, and other City owned paved facilities. Priorities for Wy, S S St, Springtown Blvd, S Vasco Rd, Crystal Ct, Kino Wy, Tourmaline Ct, East Av, First St, resurfacing are established by the Pavement management system (PMS) and a Risk Level Analysis and traffic Fourth St, Garaventa Ranch Rd, Las Positas Rd, N Canyons Pkwy, N Greenfield Rd, N Livermore volumes. Av, Portola Av, E Stanley Blvd, Wall St. Final selection of streets based on utility relocation, verification with utility companies and budget Livermore Alameda Slurry Seal 2018 Microsurfacing treatment, slurry seal treatment, installation of ADA ramps, and base repairs of various residential, Various City streets, tentative list includes E Airway Blvd, Arroyo Rd, Bluebell Dr, Broadmoor St, 05/2018 08/2018 07 10 collector and arterial roadways and other facilities. Priorities for slurry seal treatment are established by the Charlotte Wy, Church St, College Av, Concannon Blvd, Daphne Dr, East Av, E Jack London Blvd, El Pavement Management System (PMS) and a Risk Level Analysis and traffic volumes. Caminito, Fenton St, First St, Fourth St, Galloway St, Hagemann Dr, Hillcrest Av, Holmes St, Junction Av, Las Positas Rd, Madeira Wy, Maple St, Murdell Ln, Murrieta Blvd, N Murrieta Blvd, N Mines Rd, N P St, N Vasco Rd, Olivina Av, Patterson Pass Rd, Portola Av, Railroad Av, Rincon Av, Scenic Av, Seventh St, S P St, Springtown Blvd, S Vasco Rd, Terminal Cr. Final selection of streets based on utility relocation, verification with utilities and budget Livingston Merced CMAQ - Construct Roundabout at Main Construct a Roundabout at Main Street & B Street. In the City of Livingston at the intersection of Main Street and B Street. 08/2018 08/2019 10 20 St & B St Livingston Merced Stefani Avenue Rehabilitation Reconstruction of the roadway structural section. In the City of Livingston between Davis Street and Campbell Boulevard. 08/2018 09/2019 10 20 Lodi San Joaquin 2017 Pavement Resurfacing Project Rehabilitate existing streets with rubberized capeseal including pavement repair and striping Church Street (Lodi to Kettleman); Hutchins Street (Kettleman to Harney); Vine Street 03/2018 06/2018 10 15 (Beckman to Cluff); Cluff Avenue (Vine to Industrial); Industrial Way (Beckman to Cluff) Loma Linda San Bernardino California Street Widening Widen California from 2 to 5 lanes Redlands Blvd to 400' south 02/2018 03/2018 14 20 Loma Linda San Bernardino Business Center Drive Pavement rehabilitation Mountain View Ave to Bryn Mawr Ave 04/2018 05/2018 07 15 Loma Linda San Bernardino Commerce Street Pavement rehabilitation Business Center Dr to Redlands Blvd 04/2018 05/2018 07 15 Loma Linda San Bernardino Corporate Drive Pavement rehabilitation Business Center Dr to Redlands Blvd 04/2018 05/2018 07 15 Loma Linda San Bernardino Enterprise Drive Pavement rehabilitation Business Center Dr to Redlands Blvd 04/2018 05/2018 07 15 Loma Linda San Bernardino Industrial Circle Pavement rehabilitation Business Center Dr to Redlands Blvd 04/2018 05/2018 07 15 Loma Linda San Bernardino Anderson Street Pavement rehabilitation Barton Rd to Lawton St 04/2018 05/2018 07 15 Lomita Los Angeles 250th Street Roadway Rehabilitation Roadway rehabilitation including street repair and resurfacing, PCC items including curb ramps and curb and 250th Street between Pennsylvania Avenue and Eshelman Avenue 06/2018 12/2018 10 20 gutter/sidewalk repair, and other roadway improvements Lompoc Santa Barbara Lane Line Striping Painting of lane line striping by City Maintenance workers. Citywide 07/2017 06/2018 02 05 Lompoc Santa Barbara Stencil Painting Painting of roadway stencil markings (arrows, stop bars, speed limits, etc.) by City Maintenance workers. Citywide 07/2017 06/2018 02 05 Lompoc Santa Barbara Sign Maintenance Maintenance of City owned street signs. Citywide 07/2017 06/2018 02 07 Lompoc Santa Barbara Pavement Repair Various pavement repairs of the City roadway network by City Maintenance workers. Citywide 07/2017 06/2018 01 20 Long Beach Los Angeles FY18 Residential Street Repair, CD 3 Repave/resurface 0.1 mile of road Vermont St between Termino Ave to Roswell Ave 05/2018 06/2018 10 15 Long Beach Los Angeles FY18 Residential Street Repair, CD 5 Repave/resurface 0.5 mile of road Hazelbrook Ave between Harvey Way to Arbor Rd 10/2017 11/2017 10 15 Long Beach Los Angeles FY18 Residential Street Repair, CD 5 Repave/resurface 0.5 mile of road Roxanne Ave between Los Santos Dr to El Paseo St & Volk St between Los Santos Dr to N End 02/2018 03/2018 10 15 Long Beach Los Angeles FY18 Residential Street Repair, CD 9 Repave/resurface 0.4 mile of road Harbor Ave between Artesia Blvd to W 70th St 01/2018 02/2018 10 15 Loomis Placer Brace Road Asphalt Overlay Asphalt Overlay Brace Road between Sierra College Blvd and Horseshoe Bar Road 07/2018 08/2018 10 15 Los Alamitos Orange Part of Greenbrook Neighborhood Approximately 100 feet of street grind and overlay with rubberized asphalt concrete and 200 feet of slurry seal. Lassen Street from San Joaquin Ave to north end of cul de sac, San Joaquin Ave from Lassen St 03/2018 06/2018 20 30 Street Rehabilitation Project to eastern end of cul de sac and Sierrra Circle from Cerritos Ave to northern end of cul de sac. Los Altos Orange Covington Road Resurfacing Resurface Covington Road between Miramonte Avenue and Grant Road Covington Road from Miramonte Ave to Grant Rd 06/2018 07/2018 10 15

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Los Altos Hills Santa Clara 2017 Pavement Rehabilitation and Resurfacing and repave approximately 6 miles of streets. Various streets throughout Los Altos Hills: Albertsworth Lane, Alexander Place, Almaden Court, 09/2017 10/2017 05 20 Drainage Improvement Project Amherst Court, Atherton Court, Bryne Park Lane, Cardo Court, Colina Drive, Dawson Drive, Dawnridge Drive, Estacada Way, Fernhill Drive, Fremont Road, Harvard Court, Liddicoat Circle and Drive, Melody Lane, Middle Fork Lane, Miranda Court and Road, Newbridge Drive, Old Page Mill Lane, Olive Tree Lane, Oneonta Drve, Palo Hills Drive, Paseo del Roble Drive, Purissima Road, Ravensbury Avenue, Rhoda Drive, Stonebrook Court, Templeton Place, Tripoli Court, Via Feliz, Vista Del Valle Court, Weston Drive, Westwind Way, Willow Pond Lane Los Altos Hills Santa Clara Page Mill Road / Moon Lane Design and construct for a pedestrian bridge to alleviate the congestion and safety between motorists and Northbound of Page Mill Road, crossing the Matadero Creek between Paseo Del Roble and 04/2018 05/2018 20 50 Pedestrian Bridge Project pedestrians. Moon Lane. Los Altos Hills Santa Clara Hale Creek Pathway Project (Bob Stutz Design and construct native pathway for pedestrians and equestrians. Magdalena Road at El Monte Road 05/2018 06/2018 05 10 Path) Los Altos Hills Santa Clara Matadero Creek Restoration Project Removal of a portion of the outfall apron below Page Mill Road box culvert, removal of 13 willow and walnut Page Mill Road at Berry Hill Court 06/2018 09/2018 30 50 trees, grading of new channel, creation of a rock rip-rap chute and reinforced drop-pool habitat features, downstream enforcement of the creek banks, and replanting. Project will provide pavement stability of a portion of Page Mill Road improving pedestrian and vehicular access and safety. Los Angeles Los Angeles Avalon from San Pedro to 120th Complete Street Project involving 3.9 lane miles of street reconstruction, 5.3 lane miles of resurfacing, and safety Avalon from San Pedro to 120th 03/2018 06/2019 20 30 improvements. The project will include a street reconfiguration to one lane each way with a center lane for (Council Districts 8, 9, 15) turning, fully protected bike lanes from 56th to Manchester, speed feedback signs, leading pedestrian intervals, rectangular rapid flash beacons (RRFB), protected left turns, curb extensions, signal timing upgrades, intersection tightening, new crosswalks with RRFB, new traffic signals, and bus stop relocation. Los Angeles Los Angeles Main (south) from MLK to Imperial Complete Street Project involving 3.1 lane miles of asphalt street reconstruction, 2.3 lane miles of concrete street Main (south) from MLK to Imperial (Council Districts 8, 9) 03/2018 06/2019 20 30 reconstruction, 4.9 lane miles of asphalt resurfacing, and safety improvements. The project will include speed feedback signs, leading pedestrian intervals, adding RRFBs to crosswalks, protected left turns, signal timing upgrades, new crosswalks with RRFB, new traffic signals, and bus stop relocation. Los Angeles Los Angeles Reseda from Parthenia to Victory Complete Street Project Involving 6.2 lane miles of street reconstruction, 6.2 lane miles of resurfacing and safety Reseda from Parthenia to Victory 03/2018 06/2019 20 30 improvements. The project will include crosswalk installation or upgrades, striping modifications, curb extensions, (Council District 3,12) signal phasing and timing changes, and proposals for closing a gap in the existing bike lanes, between Valerio and Vanowen. Los Angeles Los Angeles Roscoe from the 405 Freeway to Complete Street Project involving 3.4 lane miles of street reconstruction, and safety Improvements. The project Roscoe from the 405 Freeway to Woodman 03/2018 06/2019 20 30 Woodman will include speed feedback signs, leading pedestrian intervals, protected left turns, traffic signals and crosswalk (Council Districts 6) upgrades. Los Angeles Los Angeles Temple from Beverly to Beaudry Complete Street Project involving 2.9 lane miles of street reconstruction, 1.3 lane miles of resurfacing, and safety Temple from Beverly to Beaudry 03/2018 06/2019 20 30 improvements. The project will include speed feedback signs, leading pedestrian intervals, protected left turns, (Council Districts 1, 13) signal timing upgrades, new crosswalks with RRFB, new traffic signals, and bus stop relocation. Los Angeles Los Angeles Venice {east) from Arlington to Complete Street Project involving 6.8 lane miles of street reconstruction, 1.6 lane miles of resurfacing, and safety Venice (east) from Arlington to Figueroa (Council Districts 1, 9, 10) 03/2018 06/2019 20 30 Figueroa Improvements. The project will include leading pedestrian intervals, adding RRFB to crosswalks, protected left turns, and new traffic signals. Los Angeles Los Angeles 6th Street from Rampart to Beaudry Complete Street Project Involving 0.9 lane miles of resurfacing, and safety improvements. Input from the public 6th Street from Rampart to Beaudry 01/2019 06/2020 20 30 and affected Council Office(s) will be used to determine specific safety improvements. (Council District 1) Los Angeles Los Angeles Adams from Fairfax to Crenshaw Complete Street Project involving 0.9 lane miles of resurfacing, and safety Improvements. Input from the public Adams from Fairfax to Crenshaw 01/2019 06/2020 20 30 and affected Council Office(s) will be used to determine specific safety improvements. (Council District 10) Los Angeles Los Angeles Alvarado from 6th to 7th Complete Street Project involving safety improvements. Input from the public and affected Council Office(s) will Alvarado from 6th to 7th 01/2019 06/2020 20 30 be used to determine specific safety improvements. Input from the public and affected Council Office(s) will be (Council District 1) used to determine specific safety Improvements. Los Angeles Los Angeles Broadway from Century to MLK Complete Street Project involving 3.7 lane miles of street reconstruction, 3.4 lane miles of resurfacing, and safety Broadway from Century to MLK 01/2019 06/2020 20 30 improvements. Input from the public and affected Council Office(s) will be used to determine specific safety (Council Districts 8, 9) improvements.

Los Angeles Los Angeles Figueroa from MLK to Imperial Complete Street Project involving 9.5 lane miles of Figueroa from MLK to Imperial 01/2019 06/2020 20 30 street reconstruction, 3.6 lane miles of resurfacing, (Council Districts 8, 9) and safety improvements. Input from the public and affected Council Office(s) will be used to determine specific safety Improvements. Los Angeles Los Angeles Hoover from Vernon to Manchester Complete Street Project involving 1.3 lane miles of Hoover from Vernon to Manchester 01/2019 06/2020 20 30 street reconstruction, 3.7 lane miles of resurfacing, (Council Districts 8, 9) and safety improvements. Input from the public and affected Council Office(s) will be used to determine specific safety improvements. Los Angeles Los Angeles N Broadway from Ave 18 to Mission Complete Street Project involving 1.6 lane miles of street reconstruction, 3.3 lane miles of resurfacing and safety N. Broadway from Ave 18 to Mission 01/2019 06/2020 20 30 improvements. Input from the public and affected Council Office(s) will be used to determine specific safety (Council District 1) improvements. Los Angeles Los Angeles Pico (east) from Western to Union Complete Street Project involving 0.9 lane miles of street reconstruction, 0.6 lane miles of resurfacing, and safety Pico (east) from Western to Union 01/2019 06/2020 20 30 improvements. Input from the public and affected Council Office(s) will be used to determine specific safety (Council Districts 1, 10) improvements. Los Angeles Los Angeles Sepulveda from Nordhoff to Rinaldi Complete Street Project involving 12.4 lane miles of street reconstruction, 4.9 lane miles of resurfacing, and safety Sepulveda from Nordhoff to Rinaldi 01/2019 06/2020 20 30 improvements. Input from the public and affected Council Office(s) will be used to determine specific safety (Council District 7) improvements. Los Angeles Los Angeles 7th from Figueroa to Alameda Complete Street Project involving 1.0 lane mile of street reconstruction, 0.4 lane miles of resurfacing, and safety 7th from Figueroa to Alameda 01/2019 06/2020 20 30 improvements. Input from the public and affected Council Office(s) will be used to determine specific safety (Council District 14) improvements. Los Angeles Los Angeles Western from Century to Washington Complete Street Project involving 3.5 lane miles of street reconstruction, 4.6 lane miles of resurfacing, and safety Western from Century to Washington 01/2019 06/2020 20 30 improvements. Input from the public and affected Council Office(s) will be used to determine specific safety (Council Districts 8, 10) improvements. Los Angeles Los Angeles Davies Way (2044) Bulkhead The project will construct a bulkhead type retaining wall with new steel piles and precast concrete lagging to 2044 Davies Way 02/2018 08/2018 20 30 restore lateral support to the roadway and provide for pedestrian safety. Los Angeles Los Angeles Verde Oak Drive (2252 N) Bulkhead The project will construct a bulkhead type retaining wall with new steel piles and precast concrete lagging to 2252 N. Verde Oak Drive 10/2018 04/2019 20 30 restore lateral support to the roadway. The roadway has settled one to two feet over an 80 linear foot area. Los Angeles Los Angeles Glendale Blvd/Silverlake Blvd Rockfall The project will install a wire mesh net to keep material from a failed slope from continuing to impact the public Glendale Bl. And Silverlake Bl. 08/2018 01/2019 20 30 Mitigation right of way. Sandstone debris up to four feet in diameter previously dosed the sidewalk and two lanes of traffic on the street. Los Angeles Los Angeles Tujunga/Strathern/Falr Street/Sidewalk This project will repair the roadway bed and sidewalks along Tujunga, Strathern and Fair Streets. Tujunga Ave. , Strathern St. and Fair St. 01/2020 06/2021 20 30 Project

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Los Angeles Los Angeles Re-lmagine Ventura Blvd Streetscape This project will begin with a study is to assess the feasibility of implementing new parking elements such as Ventura Bl, between Royer and Sale Ave. 01/2020 01/2021 20 30 Improvements diagonal parking along Ventura Boulevard between Royer and Sale Avenue. This was accomplished by evaluating potential impacts to parking, roadway capacity, walkability, bicycle infrastructure, driveway accessibility (turn restrictions), aesthetics, and cost. Practicality and public opinion are also considered in this assessment. Additional design work and construction of the streetscape improvements are expected to occur in future years.

Los Angeles Los Angeles Tunnel and Underpass lighting This project will convert existing high intensity discharge lamps to LED's at approximately 100 tunnels and Existing tunnels and underpasses throughout the City. 10/2017 06/2018 15 15 Improvement underpasses within the City. The new lighting will improve visibility and safety for motorists and pedestrians while Program (TULIP) reducing energy use. Los Banos Merced Fog Seal West I Street From Pacheco Blvd to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Cardoza Road From Badger Flat Rd to West I St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Bellflower Way From Woodbrush Ave to Wildrye Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Bluegrass Court From Woodbrush Ave to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Woodbrush Ave From Bellflower Way to Badger Flat Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Dewberry Court From Woodbrush Ave to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Oatgrass Way From Woodbrush Ave to Ortigalita Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Cattail Court From Oatgrass Way to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Reed Court From Bellflower Way to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Watercress Court From Bellflower Way to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Landing Way From Bellflower Way to Cardoza Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Wildrye Avenue From Bellflower Way to Oatgrass Way 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Ortigalita Road From Pacheco Blvd to Cardoza Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Birch Avenue From Ortigalita Rd to Magnolia Way 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Birch Avenue From West I St to Eucalyptus Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Alberta Street From Birch Ave to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Alberta Court From Alberta St to east end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Alberta Court From Alberta St to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Greenwood Way From Birch Ave to Alberta St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Hawthorne Drive From Birch Ave to West I St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Paradise Lane From Pacheco Blvd to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal West Adams Avenue From Paradise Ln to Center Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Alpine Lane From West Adams Ave to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Sierra Lane From north end to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Shasta Lane From West Adams Ave to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal South Nevada Avenue From Pacheco Blvd to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal South California Street From north end to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Crescent Drive From Center Ave to Bluff Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Crescent Court From Crescent Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Bluff Court From Crescent Dr to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Bluff Drive From Crescent Dr to Alps Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Bluff Court From Alps Dr to east end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Ravine Court From Bluff Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Canyon Court From Bluff Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Pike Street From Bluff Dr to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Aspen Court From Bluff Dr to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Rainier Drive From Bluff Dr to McKinley St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Alps Drive From Bluff Dr to Whitney St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Alps Court From Alps Dr to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Whitney Court From Alps Dr to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Whitney Street From Alps Dr to Smokey Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Everest Street From Smokey Dr to Rainier Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Half Dome Avenue From Everest to Coastal Ct 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Coastal Court From east end to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Smokey Drive From Whitney St to Smokey Ct 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Smokey Court From McKinley St to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Foothill Street From Rainier Dr to Arroyo Street 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Foothill Court From Arroyo St to east end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Arroyo Street From McKinley St to Foothill St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal McKinley Street From Rainier Dr to Smokey Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Black Hills Avenue From McKinley St to Pioneer Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Arroyo Court From McKinley St to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal McKinley Court From McKinley St to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Blue Ridge Avenue From McKinley St to Pioneer Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Seventh Street From H St to Pacheco Blvd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Iowa Avenue From Pacheco Blvd to Madrone St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Juniper Circle From Iowa Ave to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Madrone Street From west end to Illinois Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Texas Avenue From H St to West I St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Pinion Avenue From Texas Ave to Delaware Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Pine Street From Iowa Ave to Illinois Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Arizona Avenue From H St to West I St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Nevada Avenue From H St to West I St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Nantes Avenue From Capri Rd to Overland Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Vineyard Drive From Nantes Ave to Cabernet St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Cabernet Street From Santa Barbara St to Overland Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Second Street From Overland Ave to Citrus Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Second Street From Orange Ave to Willmott Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Third Street From Overland Ave to Orange Ave 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Mandarin Avenue From Tangerine St to Third St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Chenin Blanc Street From Chenin Blanc Ct to Santa Ana St 07/2017 09/2017 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Los Banos Merced Fog Seal Santa Ana Street From Fume Blanc St to Saratoga St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Fume Blanc Street From Meritage Ct to Fume Blanc Ct 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Fume Blanc Court From Fume Blanc St to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Meritage Court From Fume Blanc St to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Pinot Noir Street From Monterey St to Claret St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Monterey Street From Marsala St to Pinot Noir St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Monterey Court From Pinot Noir St to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Pinot Noir Court From Pinot Noir St to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Heritage Court From Pinot Noir St to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Pinot Blanc Court From Pinot Noir St to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Claret Court From Pinot Noir St to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Claret Street From Pinot Noir St to Saratoga St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Saratoga Street From Claret St to Santa Ana St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Santa Barbara Street From Ranchwood Dr to N. Santa Ana St 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Santa Barbara Street From N. Santa Venetia to Mercey Springs 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Regency Drive From Mercey Springs Rd to Bedford Ct 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Saint James Avenue From East B St to Foxmeadow Way 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Greenbriar Way From Saint James Ave to east end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Foxmeadow Way From Greenbriar Way to Racquet Club Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Banbury Court From Foxmeadow Way to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Foxmeadow Way From Foxmeadow Way to east end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Racquet Club Dr From San Luis St to east end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal San Luis Street From Miller Ln to Place Rd 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Snowgoose Drive From Ward Rd to N. Fallbrook Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal North Creekside Drive From Ward Rd to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal North Mountainside Drive From Heather Creek Dr to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal North Rock Creek Drive From Heather Creek Dr to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal North Fallbrook Drive From Ward Rd to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Heather Creek Drive From N. Creekside Dr to S. Creekside Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal South Creekside Drive From Heather Creek Dr to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal South Creekside Court From S. Creekside Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Cool Springs Court From S. Creekside Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal South Fallbrook Drive From S. Creekside Dr to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal South Rock Creek Drive From S. Creekside Dr to Snowgoose Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Riverbrook Court From S. Creekside Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Sun Stream Court From Snowgoose Dr to west end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Canvasback Way From San Luis St to Canvasback Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Canvasback Drive From Brant Dr to Harlequin Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Brant Drive From Canvasback Dr to Goldeneye Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Goldeneye Dr From Brant Dr to Harlequin Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Harlequin Court From Goldeneye Dr to south end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Cinnamon Teal Drive From Brant Dr to Merganser Dr 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Cinnamon Teal Court From Cinnamon Teal Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Fog Seal Gadwall Court From Cinnamon Teal Dr to north end 07/2017 09/2017 05 07 Los Banos Merced Crack Seal West I Street From Pacheco Blvd to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Cardoza Road From Badger Flat Rd to West I St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Bellflower Way From Woodbrush Ave to Wildrye Ave 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Bluegrass Court From Woodbrush Ave to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Woodbrush Ave From Bellflower Way to Badger Flat Rd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Dewberry Court From Woodbrush Ave to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Oatgrass Way From Woodbrush Ave to Ortigalita Rd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Cattail Court From Oatgrass Way to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Reed Court From Bellflower Way to north end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Watercress Court From Bellflower Way to north end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Landing Way From Bellflower Way to Cardoza Rd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Wildrye Avenue From Bellflower Way to Oatgrass Way 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Ortigalita Road From Pacheco Blvd to Cardoza Rd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Birch Avenue From Ortigalita Rd to Magnolia Way 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Birch Avenue From West I St to Eucalyptus Dr 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Alberta Street From Birch Ave to north end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Alberta Court From Alberta St to east end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Alberta Court From Alberta St to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Greenwood Way From Birch Ave to Alberta St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Hawthorne Drive From Birch Ave to West I St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Paradise Lane From Pacheco Blvd to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal West Adams Avenue From Paradise Ln to Center Ave 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Alpine Lane From West Adams Ave to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Sierra Lane From north end to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Shasta Lane From West Adams Ave to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal South Nevada Avenue From Pacheco Blvd to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal South California Street From north end to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Crescent Drive From Center Ave to Bluff Dr 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Crescent Court From Crescent Dr to north end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Bluff Court From Crescent Dr to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Bluff Drive From Crescent Dr to Alps Dr 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Bluff Court From Alps Dr to east end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Ravine Court From Bluff Dr to north end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Canyon Court From Bluff Dr to north end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Pike Street From Bluff Dr to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Aspen Court From Bluff Dr to south end 10/2017 12/2017 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Los Banos Merced Crack Seal Rainier Drive From Bluff Dr to McKinley St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Alps Drive From Bluff Dr Whitney St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Alps Court From Alps Dr to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Whitney Court From Alps Dr to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Whitney Street From Alps Dr to Smokey Dr 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Everest Street From Smokey Dr to Rainier Dr 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Half Dome Avenue From Everest to Coastal Ct 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Coastal Court From east end to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Smokey Drive From Whitney St to Smokey Ct 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Smokey Court From McKinley St to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Foothill Street From Rainier Dr to Arroyo Street 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Foothill Court From Arroyo St to east end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Arroyo Street From McKinley St to Foothill St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal McKinley Street From Rainier Dr to Smokey Dr 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Black Hills Avenue From McKinley St to Pioneer Rd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Arroyo Court From McKinley St to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal McKinley Court From McKinley St to south end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Blue Ridge Avenue From McKinley St to Pioneer Rd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Seventh Street From H St to Pacheco Blvd 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Iowa Avenue From Pacheco Blvd to Madrone St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Juniper Circle From Iowa Ave to west end 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Madrone Street From west end to Illinois Ave 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Texas Avenue From H St to West I St 10/2017 12/2017 05 07 Los Banos Merced Crack Seal Pinion Avenue From Texas Ave to Delaware Ave 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Pine Street From Iowa Ave to Illinois Ave 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Illinois Avenue From H St to West I St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Arizona Avenue From H St to West I St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Nevada Avenue From H St to West I St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Nantes Avenue From Capri Rd to Overland Ave 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Vineyard Drive From Nantes Ave to Cabernet St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Cabernet Street From Santa Barbara St to Overland Ave 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Second Street From Overland Ave to Citrus Ave 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Second Street From Orange Ave to Willmott Rd 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Third Street From Overland Ave to Orange Ave 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Mandarin Avenue From Tangerine St to Third St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Chenin Blanc Street From Chenin Blanc Ct to Santa Ana St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Santa Ana Street From Fume Blanc St to Saratoga St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Fume Blanc Street From Meritage Ct to Fume Blanc Ct 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Fume Blanc Court From Fume Blanc St to south end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Meritage Court From Fume Blanc St to south end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Pinot Noir Street From Monterey St to Claret St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Monterey Street From Marsala St to Pinot Noir St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Monterey Court From Pinot Noir St to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Pinot Noir Court From Pinot Noir St to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Heritage Court From Pinot Noir St to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Pinot Blanc Court From Pinot Noir St to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Claret Court From Pinot Noir St to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Claret Street From Pinot Noir St to Saratoga St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Saratoga Street From Claret St to Santa Ana St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Symphony Street From Santa Ana St to Claret St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Santa Barbara Street From Ranchwood Dr to N. Santa Ana St 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Santa Barbara Street From N. Santa Venetia to Mercey Springs 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Regency Drive From Mercey Springs Rd to Bedford Ct 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Saint James Avenue From East B St to Foxmeadow Way 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Greenbriar Way From Saint James Ave to east end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Foxmeadow Way From Greenbriar Way to Racquet Club Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Banbury Court From Foxmeadow Way to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Foxmeadow Court From Foxmeadow Way to east end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Racquet Club Dr From San Luis St to east end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal San Luis Street From Miller Ln to Place Rd 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Snowgoose Drive From Ward Rd to N. Fallbrook Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal North Creekside Drive From Ward Rd to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal North Mountainside Drive From Heather Creek Dr to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal North Rock Creek Drive From Heather Creek Dr to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal North Fallbrook Drive From Ward Rd to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Heather Creek Drive From N. Creekside Dr to S. Creekside Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal South Creekside Drive From Heather Creek Dr to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal South Creekside Court From S. Creekside Dr to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Cool Springs Court From S. Creekside Dr to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal South Fallbrook Drive From S. Creekside Dr to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal South Rock Creek Drive From S. Creekside Dr to Snowgoose Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Riverbrook Court From S. Creekside Dr to north end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Sun Stream Court From Snowgoose Dr to west end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Canvasback Way From San Luis St to Canvasback Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Canvasback Drive From Brant Dr to Harlequin Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Brant Drive From Canvasback Dr to Goldeneye Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Goldeneye Dr From Brant Dr to Harlequin Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Harlequin Court From Goldeneye Dr to south end 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Cinnamon Teal Drive From Brant Dr to Merganser Dr 01/2018 03/2018 05 07 Los Banos Merced Crack Seal Cinnamon Teal Court From Cinnamon Teal Dr to north end 01/2018 03/2018 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Los Banos Merced Crack Seal Gadwall Court From Cinnamon Teach Dr to north end 01/2018 03/2018 05 07 Los Banos Merced Cold Mix Overlay Overland Avenue From Nantes Ave to Johnson Rd 06/2018 06/2018 10 20 Los Banos Merced Cold Mix Overlay Pioneer Road From Ortigalita Rd to West City Limits 06/2018 06/2018 10 20 Los Gatos Santa Clara Street Repair & Resurfacing Placement of rubber cape seal to maintain pavement surface. Blossom Hill Road from Blossom Dale Road to Belgatos Road 06/2018 10/2018 07 10 Los Gatos Santa Clara Street Repair & Resurfacing Placement of rubber cape seal to maintain pavement surface. Los Gatos-Almaden Road from Los Gatos Boulevard to Camino Del Cerro 06/2019 10/2019 07 10 Los Gatos Santa Clara Street Repair & Resurfacing Placement of rubber cape seal to maintain pavement surface. Union Avenue from Blossom Hill Road to Los Gatos-Almaden Road 06/2020 10/2020 07 10 Loyalton Sierra Rail Road and Lewis Fixing Curbs and Road Repair for wash out City of Loyalton 05/2018 06/2018 03 05 Lynwood Los Angeles Duncan Ave. Rehabilitation of street pavement, damaged curbs and gutters, driveway approaches, sidewalks, wheelchair Duncan Ave. from Imperial Hwy. to Beechwood Avenue 10/2017 10/2019 20 30 ramps, pavement striping and signage. Madera Madera Spring 2018 ChipSeal Project Application of a chip seal (AKA Bituminous Surface Treatment) to local streets located throughout Madera. 6th. St. From K St. To J St.6th. St. From K St. To J St. 6th. St. From J St, To I St. 05/2018 06/2018 05 08 6th. St. From I St. To Freeway 99 6th. St. From H St. To G St. 6th. St. From G St. To Gateway 7th St. From L St To K St. 7th St. From K St To J St. 7th St. From J St. To I St. 7th St. From I St. To Freeway 8th St. From L St To K St. 8th St. From K St To J St. 8th St. From J St. To I St. 8th St. From I St. To Freeway 9th St. From K St. To J St. 9th St. From J St. To I St. 9th St. From I St. To end 9th St. From Lake To Vineyard Airport Drive From Aviation To Yeager Airport Drive From Airport Bldg. To Aviation Alderwood Court From Schnoor To Alderwood Ct. Ashlan Way From D To Noreen Ashlan Way From Noreen To Popoli Ashlan Way From Popoli To Lucia Ashlan Way From Lucia To Sonora Aspen Lane From Cleveland To Meadowrest Aspen Lane From Meadowrest To Beechwood Aspen Lane From Beechwood To Grapewood Aspen Lane From Grapewood To Plumwood Aspen Lane From Plumwood To Foxglove Asti Court From Asti Ct To Lucia Madera Madera Spring 2018 Asphalt Rejuvenation Application of a asphalt rejuvenation treatment material (AKA Reclamite) to local streets located throughout Adams Ave. From Kennedy To TylerAlmond Ave. From Knox To Papaya St 05/2018 06/2018 03 05 Treatment Project Madera. Almond Ave. From Papaya St To Pear St. Almond Ave. From Pear St. To Blueberry Ln Almond Ave. From Blueberry Ln To Mandarin St Almond Ave. From Mandarin To Tozer Amy Avenue From Lacreta To Kathryn Ave. Anna Ave. From Kathryn Ave. To Carmen Ave. Apple Ct. From Hacienda To To End Apple St. From Hacienda To Pear St. Apple Tree Ct From Peach Tree Dr To end Apple Tree Dr From Berry Dr To Toschi Dr Apple Tree Dr From Toschi Dr To S Granada Dr Arbella From Los Cerritos To Knox Arbella From Knox To Mariposa Arbella From Mariposa To Monarch Arbella From Monarch To Bridge Way Aries Ct. From End To Glenville Ave. Ashbury Ave. From End To Glenville Ave. Ashbury Ave. From Glenville Ave. To Glade Ave. Ashlan Way From Rogers To Fresno Ashlan Way From Fresno To Lake Ashlan Way From Lake To Austin Austin From Lincoln To South Aviation Drive From Condor To Falcon Bay View Dr. From Mainberry Dr. To Sand Dollar Ct. Bay View Dr. From Sand Dollar Ct. To Harbor Dr. Berry Dr. From Pear Tree Dr To Peanut Dr Berry Dr. From Peanut Dr To Apple Tree Dr Berry Dr From Apple Tree Dr To Orange Tree Dr Malibu Los Angeles Annual Street Maintenance This project consists of the reconstruction and maintenance of approximately 686,106 square feet of City streets. Major maintenance to be performed on the following streets: Paseo Portola Street, Rambla 03/2018 06/2018 10 20 Orienta Street, Paseo Hidalgo Street, Calle Del Barco, and Seaboard Road. Minor maintenance to be performed in the Carbon Canyon, Las Flores and Big Rock neighborhoods.

Mammoth Lakes Mono Meridian Blvd Curb and Gutter The project will replace failed curb and gutter that is undermining the roadway, not conveying drainage, and Meridian Blvd from Minaret Road to Eagle Lodge in Mammoth Lakes 06/2017 08/2018 15 25 Replacement Project impacting bicycle lanes. Manhattan Beach Los Angeles Manhattan Avenue/Highland Avenue Pavement resurfacing and curb ramp improvements along Highland Avenue between 1st Street and 10th Street Highland Avenue between 1st Street and 10th Street and Manhattan Avenue between 1st 02/2018 05/2018 12 15 Street Improvement Project and Manhattan Avenue between 1st Street and 8th Street. The resurfacing work will fully utilize rubberized Street and 8th Street - Manhattan Beach, CA asphalt (2.5-inch thick) cap that is made from recycled used tires. All applicable curb ramps will be upgraded to be ADA compliant. Any other deteriorated curb, gutter, spandrels and access approaches will also be fizzed at the same time as a part of the street improvements to minimize further disruption of traffic flow and the community in general.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Manteca San Joaquin Airport - Yosemite to Daniels Widening and resurfacing of 39,000 square yards of street surface on Airport Way. This projects also The planned improvements are located on Airport Way, between Yosemite Avenue and Daniels 06/2020 06/2022 15 25 includes the installing 8,000 linear feet of sidewalks and bicycle lanes. Street. Manteca San Joaquin Yosemite Avenue: Main Street to This project will rehabilitate, replace, or restore approximately 35,000 square yards of pavement that is aging, or The Project is located on Yosemite Avenue, between Main Street and Cottage Drive. 12/2017 12/2018 15 25 Cottage Avenue Improvement Project beginning to fail. This project also includes the installing 10,000 linear feet of bicycle lanes. Manteca San Joaquin Main Street: Yosemite Avenue to This project will rehabilitate, replace, or restore approximately 42,000 square yards of pavement that is aging, or The Project is located on Main Street, between Yosemite Avenue to Atherton Drive. 12/2017 12/2018 15 25 Atherton Drive Improvement Project beginning to fail. This project also includes the installing 12,000 linear feet of bicycle lanes. Manteca San Joaquin 2017 Annual Pavement Maintenance Pavement maintenance of approximately 300,000 square yards of road surface. This could include asphalt This Project’s two construction areas are: 02/2018 12/2018 10 25 Project overlays, slurry seals, dig outs, base repair, and other pavement repairs in accordance with the recommendations (1) The area that is north of Crom Street, East of Airport Way, West of Union Road, and South of the City’s Pavement Management of Louise Avenue. Program. (2) The Sherwood Forest Subdivision

Manteca San Joaquin Main Street: Center Street to Yosemite This project will rehabilitate, replace, or restore approximately 3,500 square yards of pavement that is aging, or The Project is located on Main Street, between Center Street to Yosemite Avenue. 12/2017 12/2018 15 25 Avenue Improvement Project beginning to fail. This project also includes the installation of1,250 linear feet of new bicycle lanes. Manteca San Joaquin Springtime Estates Improvement Pavement maintenance of 65,000 square yards of road surface. This could include asphalt overlays, slurry seals, This project area is East of Main Street, North of Louise Avenue, and Southwest of 02/2018 12/2018 15 25 Project dig outs, base repair, and other pavement repairs in accordance with the recommendations of the City Pavement State Highway 99. Management Program. Manteca San Joaquin 2018 Annual Pavement Maintenance Pavement maintenance of approximately 600,000 square yards of road surface. This would include asphalt This project area is located: North of Yosemite Avenue, East of Union Road, South of Louise 06/2018 12/2018 10 25 Project overlays, slurry seals, dig outs, base repair, and other pavement repairs in accordance with the recommendations Avenue, and West of Main Street. of the City’s Pavement Management Program. Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL ALEXIS COURT, REINDOLLAR AVE. TO END 03/2018 06/2018 31 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL BAYONET CIR, BAYONET CT. TO END 03/2018 06/2018 30 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL BEGONIA CIR, MICHAEL DR. TO END 03/2018 06/2018 32 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL BENNET COURT, ZENETTA DR. TO END 03/2018 06/2018 33 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL BOSTICK AVE., LARSON CT. TO CARMEL AVE. 03/2018 06/2018 29 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL CARMELO CIR., CARMEL AVE. TO END 03/2018 06/2018 28 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL CYPRESS AVE., DEL MONTE BLVD. TO SUNSET AVE. 03/2018 06/2018 31 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL FEHRING PL., MESSINGER DR. TO END 03/2018 06/2018 29 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL FREDRICK CIR., HILLCREST AVE. TO END 03/2018 06/2018 30 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL HARBEN CIR., MICHAEL DR. TO END 03/2018 06/2018 31 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL KELLI CT., SUNRISE AVE. TO END 03/2018 06/2018 30 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL LIEVRY WAY, PARSON CIR. TO END 03/2018 06/2018 30 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL MARSAN CT., SALINAS AVE. TO END 03/2018 06/2018 31 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL MIMI CT., ROBIN DR. TO END 03/2018 06/2018 29 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL NINOLE DR., SOUTH END TO HILO AVE. 03/2018 06/2018 32 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL ORA CT., CARDOZA AVE. TO END 03/2018 06/2018 30 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL PHILLIP CIR., REINDOLLAR AVE. TO END 03/2018 06/2018 28 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL SEASIDE CIR., RESERVATION RD. TO END 03/2018 06/2018 30 38 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL SELLS CT., MICHAEL DR. TO END 03/2018 06/2018 32 39 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL SHULLER CIR., CRESCENT AVE. TO END 03/2018 06/2018 32 39 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL SILVERWOOD PL., CARDOZA AVE. TO END 03/2018 06/2018 29 39 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL STEVEN CT., BELLE DR. TO END 03/2018 06/2018 31 39 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL VILLA CIR., BEACH RD. TO END 03/2018 06/2018 31 39 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL WEBER CIR., ZANETTA DR. TO END 03/2018 06/2018 29 39 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL HARRIS CT., OWEN AVE. TO END 03/2018 06/2018 32 39 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL CALIFORNIA AVE., CARMEL AVE. TO RESERVATION RD. 03/2018 06/2018 26 31 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL CRESCENT AVE., HILLCREST AVE TO CARMEL AVE. 03/2018 06/2018 15 17 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL CRESCENT AVE., SIRENA DEL MAR TO NORTH END 03/2018 06/2018 11 13 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL REINDOLLAR AVE., DEL MONTE BLVD. TO SUNSET AVE. 03/2018 06/2018 10 14 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL CARMEL AVE., VAUGHAN AVE. TO CALIFORNIA AVE. 03/2018 06/2018 11 15 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL HILLCREST AVE., ZANETTA DR. TO VAUGHAN AVE. 03/2018 06/2018 14 17 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL BROOKSIDE PL., CARDOZA AVE. TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL CORAL WAY, DOLPHIN CIR. TO END 03/2018 06/2018 21 27 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL DOLPHIN CIR., CARDOZA AVE. TO LOOP END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL ESTRELLA DEL MAR WAY, QUEBRADA DEL MAR RD. TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL HAYES CIR., THIRD AVE. TO BOOKER ST. 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL KING CIR., REINDOLLAR AVE. TO SOUTH END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL LAVELL CT., SALINAS AVE. TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL NEESON RD., IMJIN RD. TO WEST END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL PACIFIC CT., ABDY WAY TO END 03/2018 06/2018 23 38 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL REDWOOD HEIGHTS CT., REDWOOD DR. TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL SAN PABLO CT., MARINA DR. TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL SEAL CT., COVE WAY TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL SEAN CT., MICHAEL DR. TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL TRACY CT., AARON WAY TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SLURRY SEAL VERA LN., REINDOLLAR AVE TO END 03/2018 06/2018 23 28 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS CLARKE PL., MESSINGER DR. TO END 03/2018 06/2018 19 21 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS CONCORD CT., EDDY ST. TO END 03/2018 06/2018 15 17 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS COVE WAY, DOLPHIN CIR. TO END 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS ECHO ST., NEESON RD. TO DELTA ST. 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS ELLIS CT., SALINAS AVE. TO END 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS FIFTH AVE., THIRD ST. TO EIGHTH ST. 03/2018 06/2018 13 15 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS FITZGERALD CIR., BEACH RD. TO END 03/2018 06/2018 15 17 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS FOREST CIR., BAYER ST. TO END 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS KAREN CT., CALIFORNIA AVE. TO END 03/2018 06/2018 16 18 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS LAKE CT., SR1 TO END 03/2018 06/2018 14 16 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS LAKEWOOD DR., DREW ST. TO ABDY WAY 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS MAX CIR., REINDOLLAR AVE. TO END 03/2018 06/2018 16 18 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS MICHAEL DR., MICHELLE CT. TO NORTH END 03/2018 06/2018 15 17 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS QUEBRADA DEL MAR RD., COST DEL MAR RD. TO SIRENA DEL MAR RD. 03/2018 06/2018 15 17 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS SANDPIPER WAY, DOLPHIN CIR. TO END 03/2018 06/2018 18 20

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS SUSAN AVE., VISTA DEL CAMIN TO MELANIE RD. 03/2018 06/2018 17 19 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS TAMARA CT., CALIFORNIA AVE. TO END 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS VISTA DEL CAMINO CIR., GEORGE WAY TO SOUTH END 03/2018 06/2018 15 17 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS VISTA DEL SUR, SUSAN AVE. TO END 03/2018 06/2018 17 19 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS RESERVATION RD., BLANCO RD. TO IMJIN PARKWAY 03/2018 06/2018 18 20 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS RESERVATION RD., CRESCENT AVE. TO SALINAS AVE. (EASTBOUND) 03/2018 06/2018 12 14 Marina Monterey ANNUAL STREET RESURFACING SEAL CRACKS RESERVATION RD., SALINAS AVE TO CRESCENT AVE. (WESTBOUND) 03/2018 06/2018 12 14 Marina Monterey ANNUAL STREET RESURFACING CRACK SEALING, DIG-OUTS, RUBBER CAPE SEAL MILDRED CT., REINDOLLAR AVE. TO END 03/2018 06/2018 31 36 Martinez Contra Costa 2019 Downtown Arterial Paving Project Base failure repair and AC overlay Alhambra Ave from Jones St to Marina Vista; Pine/Court Street from Susana St to Marina Vista 06/2019 06/2020 12 25

Marysville Yuba East 22nd Street Rehabilitation Reconstruct / AC Overlay, ADA ramp improvements, striping improvements. Hall Street to SR20 04/2018 09/2018 20 30 Marysville Yuba 1st Street Rehabilitation Reconstruct / AC Overlay, ADA ramp improvements, striping improvements. E Street to B Street 04/2018 10/2018 20 30 Marysville Yuba B Street Rehabilitation Reconstruct / AC Overlay, ADA ramp improvements, striping improvements. 1st Street to 3rd Street 04/2019 10/2019 20 30 Marysville Yuba East 19th Street Rehabilitation Reconstruct / AC Overlay, ADA ramp improvements, striping improvements. Ramirez Street to Covillaud Street 04/2019 10/2019 20 30 Marysville Yuba Sampson Street Rehabilitation Reconstruct / AC Overlay, ADA ramp improvements, striping improvements. Rideout Way to Triplett Way 04/2019 10/2019 20 30 Maywood Los Angeles 53rd Street Grind & Overlay Carmelita Ave to Corona Ave 12/2017 06/2018 05 10 Maywood Los Angeles 57th Street Grind & Overlay Pine Ave to Atlantic Blvd 12/2017 06/2018 05 10 Maywood Los Angeles 60th Street Grind & Overlay King Ave to Atlantic Blvd 12/2017 06/2018 05 10 Mcfarland Kern City of McFarland_ ATP Kern Ave Complete Street Components: new sidewalks, curb, gutter, class 3 bikes lanes, and high visibility crosswalks. Various locations- three city blocks bounded by 5th Street from W. Kern to W. Sherwood; 4th 12/2017 04/2018 10 20 Elementary SR2S Connectivity Project Street from W. Harlow Ave to California Ave; 3rd and 4th Place from W. Sherwood to California Ave Mendota Fresno 8th Street Reconstruction In general, the project consists of reconstruction of 8th Street from Oller Street (State Route 180) to Rio Frio 8th Street from Oller Street (State Route 180) to Rio Frio Street. 08/2017 11/2017 15 30 Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway and alley approaches, and traffic striping and markings to add two way left turn lanes and parking/bike lanes. Mendota Fresno Self Help Housing Resurfacing Crack and Type II slurry seal of asphalt pavement of Peach Avenue, Locust Avenue, Elm Avenue, Ash Avenue, and Peach Avenue, Locust Avenue, Elm Avenue, Ash Avenue, and Sorensen Avenue from Ash to 03/2017 07/2017 05 15 Sorensen Avenue from Ash to bend in roadway north of Locust. (104,000 sf) Some minor digouts and repairs will bend in roadway north of Locust. occur on Peach near intersection with Belmont Avenue. Residential streets will be restriped as necessary. Mendota Fresno Belmont Avenue Resurfacing Crack and Type II slurry seal of asphalt pavement of Belmont Avenue from Derrick Avenue (SR 33) to Oller Avenue Belmont Avenue from Derrick Avenue (SR 33) to Oller Avenue (SR 180.) 03/2017 07/2017 05 15 (SR 180.) (229,500 sf) Some minor digouts and repairs will occur to repair failed areas. This collector street that fronts a library and two schools will be restriped with school zone crossings, two-way left turn lanes and bike lanes. Mendota Fresno Las Palmas Phase 1 & 2 Resurfacing Crack and Type II slurry seal of asphalt pavement of Espinoza Street, Valenzuela Street, Maldonado Street, Santa Espinoza Street, Valenzuela Street, Maldonado Street, Santa Cruz Street, San Pedro Street, 03/2017 07/2017 05 15 Cruz Street, San Pedro Street, Oxnard Street, and Black Avenue from Espinoza to Rowe Ave. (217,000 sf) Some Oxnard Street, and Black Avenue from Espinoza to Rowe Ave. minor digouts and repairs will occur to repair any failed areas. Residential streets will be restriped as necessary. Mendota Fresno 7th Street & Derrick In general, the project consists of realigning 7th Street to provide a perpendicular intersection with Derrick 7th Street from Derrick Avenue (SR 33) to Tule Street. 05/2017 12/2017 25 50 Avenue (State Route 33). The project includes street reconstruction, landscape & landscape irrigation, new and replacement street lighting, decorative concrete, a new monument sign and seat walls in a plaza space, pedestrian crossing improvements, and ADA-compliant curb returns. Existing utility and storm drainage infrastructure will be relocated and/or modified to accommodate the proposed improvements. A portion of two existing parking lots will be reconfigured to accommodate the street realignment and will include the relocation of the existing Mendota Food Center sign. A raised median will be constructed in 7th Street. Menifee Riverside Rustler's Ranch Phase 1 repave/resurface 2.2 miles of neighborhood streets in severe condition Rustler's Ranch Neighborhood. North of Newport Rd and East of Bradley Rd 03/2018 05/2018 05 08 Menifee Riverside Rustler's Ranch Phase 2 repave/resurface 2.4 miles of neighborhood streets in severe condition Rustler's Ranch Neighborhood. North of Newport Rd and East of Bradley Rd 03/2019 05/2019 05 08 Menifee Riverside Murrieta Road Resurfacing repave/resurface 3.0 miles of local arterial road. Restripe bike/Neighborhood Electric Vehicle (NEV) lanes. Install Murrieta Road from Newport Road to Rouse Road 05/2019 07/2019 10 15 additional signs. Menifee Riverside Briggs Road Resurfacing repave 1.0 miles of local major road. Briggs Road from Hwy 74 to Mapes Rd 07/2019 09/2019 10 15 Menifee Riverside Watson Road Resurfacing reconstruct 0.4 miles of industrial collector road Watson Road from Hwy 74 to westerly city limits 08/2020 10/2020 20 25 Menifee Riverside Sherman Road Resurfacing reconstruct 0.35 miles of major road Sherman Road from Ethanac Road to Jackson Avenue 03/2020 05/2020 20 25 Menifee Riverside Goetz Road Resurfacing resurface 2.7 miles of major road Goetz Road from Vista Way to Northerly City limits 07/2020 08/2020 10 15 Menifee Riverside Menifee Lakes Community Resurfacing resurface 1.0 miles of major road Menifee Lakes neighborhood. North of La Piedra Road and East of Antelope Road 08/2020 10/2020 05 08 Menifee Riverside Garbani Road Resurfacing resurface 1.0 miles of major road Garbani Road from Antelope Road to Menifee Road 09/2020 11/2020 10 15 Menifee Riverside Palomar Road Resurfacing resurface 1.0 miles of major road Palomar Road from Garbani Road to Holland Road 09/2020 11/2020 10 15 Menifee Riverside Mapes Road Resurfacing repave/resurface 2.2 miles of local rural road Mapes Road from Sherman Road to Malaga Road 08/2021 10/2021 10 15 Menifee Riverside Ethanac Road resurfacing reconstruct 0.8 miles of local major road Ethananc Road from Trumbell Road to Mathews Road 03/2022 05/2022 20 25 Menifee Riverside Cherry Hills Blvd. Resurfacing repave 1.02 miles of local major road Cherry Hills Blvd. from Murrieta road to Bradley Road 03/2021 05/2021 10 15 Menifee Riverside Rouse Road Resurfacing repave 0.70 miles of local major road Rouse Road from Bradley Road to Hull Road 04/2021 06/2021 10 15 Menifee Riverside Menifee Road Resurfacing repave 0.30 miles of local arterial road Menifee Road from Byscaine Road to Hwy 74 07/2022 08/2022 10 15 Menifee Riverside Menifee Road Resurfacing repave 0.60 miles of local arterial road Menifee Road from Holland Road to Bayport Road 08/2022 09/2022 10 15 Menifee Riverside Menifee Road Resurfacing repave 0.62 miles of local arterial road Menifee Road from Rockport Road to 650' north of Camino Cristal 09/2022 11/2022 10 15 Menifee Riverside Anelope Road / Sunstream Road safety install concrete raised medians and signs intersection of Antelope Road and Sunstream Road 03/2019 04/2019 40 50 medians Menifee Riverside Newport Road safety medians install concrete raised medians and signs Newport Road from Bradley Road to Murrieta Road 03/2019 05/2019 40 50 Menifee Riverside Goetz Road Guardrail Install 164 feet of guardrail, widened shoulder, install drainage improvements Goetz Road south of Coyote Drive 07/2019 09/2019 25 30 Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Alice Lane, from University to End 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Almanor Ave, from Ivy Drive to Newbridge Ave 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Bay Laurel Drive, from San Mateo Drive to Hermosa Way 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Burgess Drive, from Alma Street to Laurel Street 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Campbell lane, from Branner Drive to Campbell Lane (end) 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Campo Bello Court, from Campo Bello Lane to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Chilco Street, from Ivy Drive to Newbridge Ave 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters College Avenue, from University to El Camino Real 06/2017 11/2017 12 15 and construction of new ADA ramps.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Cotton Street, from Cotton Place to Middle Ave 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Del Norte Alley, from Del Norte Ave to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Fanita Way, from Oakdell Drive to Fanita Way (end) 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Garden Lane, from San Mateo Dr MW to San Mateo Dr SE 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Haight Street, from Menalto Ave to North End 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Hamilton Avenue, from Almanor Ave to Chilco Street 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Harmon Drive, from Bay Road to Lorelei Lane 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Kent Place, from Waverly Street to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Lassen Drive, from Whitney Drive to 196' S of Whitney Drive 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Linfield Place, from Linfield drive to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Menlo Avenue, from University to End 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Oak Knoll Lane, from Oak Dell Drive to School driveway 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Pineview Lane, from Elder Ave to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Santa Cruz Access Road, from Orange Ave to Olive Street 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Scott Drive, from Marsh Road to Bohannan 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Sevier Avenue, from Pierce Road to Newbridge St 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Sharon Park Drive, from Sand Hill Road to Sharon Road 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Sunrise Court, from Campo Bello to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Timothy Lane, from Bay Road to Peggy Lane 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Warner Range Ave, from Sharon Park to Monte Rosa 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Waverly Street, from Linfield Drive to Laurel Street 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Independence Drive, from Constitution to Chrysler 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Santa Cruz Avenue, from Olive Street to University 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Monte Rosa Drive, from Sand Hill Road to Siskiyou 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Wallea Drive, from San Mateo SE to San Mateo NE 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo 2017 Resurfacing Project Rehabilitation of existing infrastructure by grinding and paving, replace damaged sidewalks and curb & gutters Cathy Place, from Wallea to end 06/2017 11/2017 12 15 and construction of new ADA ramps. Menlo Park San Mateo Chrysler Stormwater Pump Station This project involves design and construction of upgrades to the aging equipment at the Chrysler Pump Station. 1221 Chrysler Drive near the Bayfront Expressway 01/2017 12/2019 20 60 Improvements The existing Chrysler Pump Station is approximately 60 years old and its electrical equipment and pumps need to be upgraded and/or replaced. Menlo Park San Mateo Sidewalk Repair Program This annual project removes hazardous sidewalk offsets and replaces sidewalk sections that have been damaged Various City areas 07/2017 06/2018 15 20 by City tree roots to eliminate trip hazards. Menlo Park San Mateo Transportation Projects (Minor) This annual project supports small transportation projects such as minor crosswalk enhancements, bicycle lane Various City areas 07/2017 06/2018 05 10 gap closures, traffic signal modifications and sign/ striping installations and restores outine maintenance levels for more timely response to resident complaints. Merced Merced Roadway Scrub Seal (1) Scrub Seal Roadway Rehabilitation Project Canal Street (Childs Ave to 16th St) 05/2018 07/2018 07 10 Merced Merced Roadway Scrub Seal (2) Scrub Seal Roadway Rehabilitation Project East El Portal Ave (“G” St to Joerg Ave) 05/2018 07/2018 07 10 Merced Merced Roadway Scrub Seal (3) Scrub Seal Roadway Rehabilitation Project West 26th St ("G" St to "M" St) 05/2018 07/2018 07 10 Merced Merced Roadway Scrub Seal (4) Scrub Seal Roadway Rehabilitation Project Merced Ave (Parsons Ave to Motel Dr) 05/2018 07/2018 07 10 Merced Merced Sidewalk Replacement Project Sidewalk Replacement Project Various Locations Throughout the City of Merced - See attached Map 03/2018 06/2018 10 20 Merced Merced Curb and Gutter Replacement Project Curb and Gutter Replacement Project Various Locations Throughout the City of Merced - See attached Map 03/2018 06/2018 10 20 Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Janes Street from Molino Avenue to Montford Avenue 11/2017 05/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Cascade Drive from Throckmorton Avenue to Cornwall Street 11/2017 12/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Summit Avenue from Tamalpais Avenue to Fern Canyon Road 11/2017 12/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Buena Vista Avenue from Oakdale Avenue to Country Club Road 11/2017 12/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Montford Avenue from Janes Street to Miller Avenue 11/2017 12/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Country Club Drive from Buena Vista Drive to end 11/2017 12/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing W Blithedale Avenue from Hillside Avenue to Throckmorton Avenue 11/2017 12/2018 28 30 Project

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Coach Drive from Underhill Road to Benson Circle 11/2017 12/2018 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Roadway Rehabilitation with asphalt resurfacing Seaver Drive from Kipling Drive to Mailton Drive 06/2017 12/2017 28 30 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Wildomar Street from Molino Avenue to Ethel Avenue 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Tamalpais Avenue from Summit Avenue to North End 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Mazanita Place from Ralston Avenue to east End 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Helens Lane from Birch Street to Florence Avenue 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Marsh Drive from Marguerite Avenue to West End 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Keats Drive from Kipling Drive to Wilkins Drive 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Mesa Avenue from Alta Vista Avenue to E Blithedale 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Sycamore Avenue from Amicita Avenue to E. Blithedale Avenue 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Grove Street from E Blithedale Avenue to Presidio Street 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Oakdale Avenue from Buena Vista Drive to W. Blithedale Avenue 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Lovell Avenue from 920 Lovell Avenue to Cascade Drive 11/2017 12/2018 05 07 Project Mill Valley Marin 2017 Streets and Sewer Rehabilitation Slurry Seal Vista Linda Drive from Buena Vista Avenue from Sheridan Court 11/2017 12/2018 05 07 Project Millbrae San Mateo Old Bayshore Highway Repaving 2018 Overlay of Old Bayshore Highway from Burlingame City Limit to Millbrae Avenue. Work includes signage, striping, Old Bayshore Highway between Burlingmae City Limit & Millbrae Avenue 12/2017 06/2018 20 29 pavement legend and sidewalk replacement and wheel chair curb ramps upgrade. Milpitas Santa Clara Street Resurfacing 2018 Maintenance seal treatment, overlay, and/or reconstruction of city streets, construction of ADA curb ramps, and Project streets will be bounded by Milpitas Boulevard, I680, Jacklin Road, and Yosemite Drive. 06/2018 12/2018 05 15 implementation of bike facility per city's bikeway masterplan Specific streets and maintenance treatement to be incorporated into the project will be determined by pavement survey report to be completed by Dec. 2017. Mission Viejo Orange Residential Resurfacing Resurface (overlay and slurry seal treatment) 61.75 lane miles of public residential streets in Area 5 (please refer Area 5 of the City of Mission Viejo Residential Resurfacing Program is generally bounded by the 07/2017 10/2017 07 20 to the Project Location column for a description of the geographic boundaries of Area 5), as part of the City of City of Mission Viejo northern jurisdictional boundary, Trabuco Road to the west, Alicia Parkway Mission Viejo Residential Resurfacing Program: CIP 838. and Marguerite Parkway to the south, and Santa Margarita Parkway to the east; and, an additional area bounded by El Toro Road to the north, SR-241 to the west, the Upper Oso Reservoir to the south, and the City of Mission Viejo jurisdictional boundary to the east. Modesto Stanislaus Fairmont Area Type II Slurry Seal 8.2 lane miles of residential streets Street segments in the Fairmont Neighborhood 05/2018 06/2018 05 07 Modesto Stanislaus Merle Area Type II Slurry Seal 11.0 lane miles of residential streets Street segments in the Merle Neighborhood 07/2017 08/2017 05 07 Modesto Stanislaus Mt Vernon Area Type II Slurry Seal 10.5 lane miles of residential streets Streets segments in the Mt Vernon Neighborhood 07/2017 08/2017 05 07 Modesto Stanislaus Encina Area Type II Slurry Seal 6.5 lane miles of residential streets Streets segments in the Encina Neighborhood 08/2017 09/2017 05 07 Modesto Stanislaus Downtown Area Type II Slurry Seal 6.5 lane miles of residential streets Streets segments in the Downtown Business Area 08/2017 09/2017 05 07 Modesto Stanislaus Brighton Area Type II Slurry Seal 12.0 lane miles of residential streets Streets segments in the Brighton Neighborhood 08/2017 09/2017 05 07 Modesto Stanislaus Montclair Area Type II Slurry Seal 11.5 lane miles of residential streets Streets segments in the Montclair Neighborhood 09/2017 10/2017 05 07 Modesto Stanislaus Veneman Area Type II Slurry Seal 6.0 lane miles of residential streets Streets segments in the Veneman Neighborhood 09/2017 10/2017 05 07 Modesto Stanislaus Carpenter Area Type II Slurry Seal 12.2 lane miles of residential streets Streets segments in the Carpenter Neighborhood 05/2018 06/2018 05 07 Modesto Stanislaus Floyd Area Type II Slurry Seal 9.0 lane miles of residential streets Streets segments in the Floyd Neighborhood 09/2017 10/2017 05 07 Modesto Stanislaus Crack Seal Crack seal residential streets throughout Modesto to prevent water entrusion and preparation for next slurry Street segments throughout Modesto 10/2017 05/2018 05 07 season. Modesto Stanislaus Dig-Outs Asphalt section repairs of residential streets throughout Modesto for preparation of next slurry season. Street segments throughout Modesto 10/2017 05/2018 05 07 Monrovia Los Angeles Old Town Striping Improvements Restriping of traffic lanes, crosswalks, markers, and legends in Old Town Monrovia. Process includes removal of Myrtle Ave between Huntington Drive and Foothill Blvd. Includes the side streets of Primrose 07/2017 06/2018 05 05 existing, layout of new, and application of two coats of roadway striping paint. Ave to the West, Ivy Ave to the East, and all cross streets between Walnut Ave to the South and Palm Ave to the North. Monrovia Los Angeles Bicycle Master Plan Implementation Installation of roadway striping and signage to delineate the City of Monrovia's Class II and Class III bicycle routes. Along all Class I and Class II bicycle routes as outlined in the City of Monrovia's Bicycle Master 07/2017 06/2018 05 15 Plan Monrovia Los Angeles School Zone Striping Improvements Replacement of all traffic markings in designated school zones, including painting and signage. In and around all school zones related to twelve school sites within Monrovia Unified School 07/2017 06/2018 05 15 District Monrovia Los Angeles Station Square/Gold Line Area Striping Restriping of all traffic lanes, crosswalks, markers, and legends in and around the Station Square/METRO Gold Line In and around the Station Square Area, which is bound by Evergreen Ave to the north, Duarte 07/2017 06/2018 05 05 Improvements area. Rd to the south, Magnolia Ave to the west, and California Ave to the East Monrovia Los Angeles Foothill Blvd Traffic Sign Replacement Upgrade/replacement of all traffic signs along Foothill Blvd. Along Foothill Blvd, from the west City limit (5th Ave) to mountain Ave 07/2017 06/2018 15 15 Montague Siskiyou Crack Seal Rehabilitation & maintenance of a local roadway West Webb, South 13th, North Ninth, Buell, Prather, North Fifth, North Sixth 08/2017 06/2018 02 04 Montclair San Bernardino San Bernardino Street Rehabilitation The project will repair curb, gutter and sidewalk, upgrade traffic signal equipment, resurface the pavement, and The project limits include both eastbound and westbound lanes from Mills Avenue (west city 12/2017 06/2018 10 20 stripe the street to include a designated bike lane. limit) to Benson Avenue (east city limit). Montclair San Bernardino Monte Vista Avenue Street Design services only. The project will repair curb, gutter and sidewalk, upgrade traffic signal equipment, resurface The project limits include both northbound and southbound lanes from Pacific Electric Bicycle 01/2018 12/2018 10 20 Rehabilitation (Design Only) the pavement, and stripe the street. Trail (north city limit) to Phillips Street (south city limit). Monte Sereno Santa Clara Oak Noll resurfacing project Rehabilitation of Oak Knoll Drive Oak Knoll Drive 03/2018 05/2018 15 20 Montebello Los Angeles Montebello Blvd ATP Project Perform various pavement improvements (incl. dedicated bike lanes, new pedestrian sidewalks/lighting, The project is located in northerly Montebello. Montebello Blvd is a major arterial street. 04/2018 04/2020 15 20 rehabilitate existing AC pavement, update ADA facilities, replace existing damaged public concrete improvements, upgrade traffic signals and replace pavement markings, plant trees and landscape medians). Monterey Monterey Reconstruction of Via Gayuba Construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach) and curb ramps, storm Via Gayuba (between Via Del Pinar and Mar Vista) 01/2018 06/2018 20 25 drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Chandler Av from Harding Av to Garvey Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat College View Dr from Ridgecrest St to Valley Vista Dr 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Copa Way from Casuda Canyon Dr to End 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Crest Vista Dr from Brightwood St to Wandering Dr 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat De Lafuente St from Sevilla St to Cadiz St 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Fulton Av from Kempton Av (S) to Kempton Av (N) 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Kingsford St from Cadiz St to Harding Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Keller St from Garfield Av to Kempton Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Moore Av from Newmark Av to Garvey Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Mcpherrin Av from Avondale Av to Emerson Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Woods Av from Cesar Chavez Av to Floral Dr 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Woods Av from Dorner Dr to South City Limit 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Vancouver Av from Cesar Chavez Av to Floral Dr 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Schoolside Av from 1st St to Cesar Chavez Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Crest Vista Dr from Wandering St to Crest Way 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat De Lafuente St from Cadiz St to Harding Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Wilcox Av (1) from Pomona Dr to Aldergate Sr 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Wilcox Av (2) from Keller St to El Repetto Dr 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Keller St from Kempton Av to Fulton Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Mabel Av from Marguerita Av to Atlantic Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Marguerita Av from Newmark Av to Garvey Av (W) 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Mooney Dr from Orange Av to City Limit East 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Moore Av from Harding Av to Garvey Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Monterey Park Los Angeles Various Street Rehabilitation A combination of localized pavement repairs, rubberized asphalt overlay construction, and slurry seal coat Mcpherrin Av from Emerson Av to Hellman Av 12/2017 01/2018 15 20 application as identified in the City’s Pavement Management Study. Moorpark Ventura General Street Maintenance General maintenance including but not limited to pavement marking, pavement maintenance, traffic signals, Vicinity of Moorpark College 11/2017 05/2018 05 10 street lighting and landscaping work Moraga Contra Costa 2018 Joint Moraga-Orinda Full Depth Combining Moraga's $1.1M (since the project will occur during the 2018 construction season and span both The preliminary list of potential street segment candidates for the $1.1M is as follows: 04/2018 10/2018 20 20 Reclamation Project FY17/18 and FY18/19, inclusive of FY17/18 $93,300 and FY18/19 $279,884 of SB1 projected funding) with Orinda's $10.3M of construction funding to address street segments needing reconstruction utilizing Full Depth • THARP DR (N END TO RIMER DR) Reclamation (FDR) with a final lift of rubberized asphalt concrete overlay (incorporating used tires which are • THARP DR (RIMER DR TO DEERFIELD DR) diverted from landfills) to increase quantities and yield lower bid prices. • THARP DR (DEERFIELD DR TO LAKEFIELD PL) • THARP DR (LAKEFIELD PL TO REDFIELD PL) • THARP DR (REDFIELD PL TO SPRINGFIELD PL) • THARP DR (SPRINGFIELD PL TO DEERFIELD DR) • THARP DR (DEERFIELD DR TO BUTTERFIELD PL) • THARP DR (BUTTERFIELD PL TO CAMINO PABLO)

The project is currently in the design phase and depending on final engineer's estimate, certain streets may be removed to be within the construction budget. Of the street segments, the following street segments will likely be funded by SB1:

• THARP DR (REDFIELD PL TO SPRINGFIELD PL) using FY18/19 RMRA funds • THARP DR (SPRINGFIELD PL TO DEERFIELD DR) using FY18/19 RMRA funds • THARP DR (DEERFIELD DR TO BUTTERFIELD PL) using FY17/18 RMRA funds Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Abedul St 06/2018 09/2018 05 10 Buena Fortuna Ln - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Ancladero Ct 06/2018 09/2018 05 10 Buena Fortuna Ln - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Aslan Ct 06/2018 09/2018 05 10 Seafarer Wy - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Avenida de Loring 06/2018 09/2018 05 10 Buena Fortuna Ln - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Bayless St 06/2018 09/2018 05 10 Blooming Meadow Rd - Ironwood Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Betts Pl 06/2018 09/2018 05 10 Rockcrest Dr - Sylmar Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Blooming Meadow Rd 06/2018 09/2018 05 10 Bayless St - Wild Flax Ln Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Bluntleaf Ct 06/2018 09/2018 05 10 Sweetleaf St - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Bodega Ct 06/2018 09/2018 05 10 Napa Valley Ct - North End

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Briar Knoll Pl 06/2018 09/2018 05 10 Rhea Dr - Blooming Meadow Rd Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Broadleaf Ln 06/2018 09/2018 05 10 Bluntleaf Ct - Sunnymead Bl Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Brookstone Dr 06/2018 09/2018 05 10 Stonebridge Ct - Poppystone Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Buena Fortuna Ln 06/2018 09/2018 05 10 Abedul St - Avenida de Loring Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Buena Village Ct 06/2018 09/2018 05 10 West End - Avenida de Loring Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Burd Ct 06/2018 09/2018 05 10 Plato Dr - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Calabria Dr 06/2018 09/2018 05 10 Avenida de Loring - Abedul St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Callita St 06/2018 09/2018 05 10 Abedul St - Avenida de Loring Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Camino Juanito 06/2018 09/2018 05 10 Buena Fortuna Ln - Kramera Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Candle Shoe Ct 06/2018 09/2018 05 10 End - Meadow Wood Wy Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Canyonstone Dr 06/2018 09/2018 05 10 Gentian Av - Poppystone Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cascada Cr 06/2018 09/2018 05 10 Avenida de Loring - West End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Caspian Wy 06/2018 09/2018 05 10 Dome St - Yee St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Challis Ct 06/2018 09/2018 05 10 Pattilynn Dr - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Chiante Ct 06/2018 09/2018 05 10 Pattilynn Dr - Yee St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cinnamon Creek Ct 06/2018 09/2018 05 10 West End - Meadow Wood Wy Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cobra Dr 06/2018 09/2018 05 10 Wedow Dr - Santiago Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cockatiel Dr 06/2018 09/2018 05 10 Swan St - McCylly Ct Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cope Ct 06/2018 09/2018 05 10 Plato Dr - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Copper Cove Ln 06/2018 09/2018 05 10 Cypress Sands Ln - Lasselle St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Crane Ct 06/2018 09/2018 05 10 Rhea Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Creekstone Dr 06/2018 09/2018 05 10 Fugate Ct - Heacock St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cushenbury Dr 06/2018 09/2018 05 10 Running Deer Rd - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Cypress Sands Ln 06/2018 09/2018 05 10 Copper Cove Ln - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Dome St 06/2018 09/2018 05 10 Yee St - Caspian Wy Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Dunhill Dr 06/2018 09/2018 05 10 Nagai Dr - Cottonwood Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Elyce Ct 06/2018 09/2018 05 10 Running Deer Rd - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Flamingo Bay Ln 06/2018 09/2018 05 10 Copper Cove Ln - Brodiaea Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Frente Caliente 06/2018 09/2018 05 10 Abedul St - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Fugate Ct 06/2018 09/2018 05 10 Puddingstone Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Gemstone Ct 06/2018 09/2018 05 10 Puddingstone Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Graham St 06/2018 09/2018 05 10 Ironwood Av - Woodlander Wy Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Gregory Ln 06/2018 09/2018 05 10 McCylly Ct - Heacock St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Hackberry Ln 06/2018 09/2018 05 10 Ninebark St - Ninebark St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Havenwood St 06/2018 09/2018 05 10 Graham St - Wild Flax Ln Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Heartleaf St 06/2018 09/2018 05 10 Fir Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Hollybrook St 06/2018 09/2018 05 10 Heartleaf St - Willow Tree Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Hummingbird Pl 06/2018 09/2018 05 10 Rhea Dr - Swan St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Hutton Ct 06/2018 09/2018 05 10 Running Deer Rd - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Ivory Av 06/2018 09/2018 05 10 Kitching St - Abedul St

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Jamaica Sands Ln 06/2018 09/2018 05 10 End - Copper Cove Ln Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Juneberry Ct 06/2018 09/2018 05 10 Sweetleaf St - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Kristina Ct 06/2018 09/2018 05 10 Bay Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Lyrebird Ct 06/2018 09/2018 05 10 Rhea Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Martinique Dr 06/2018 09/2018 05 10 Copper Cove Ln - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Mc Bride Pl 06/2018 09/2018 05 10 Rundell Dr - Sylmar Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal McCylly Ct 06/2018 09/2018 05 10 Cockatiel Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Meadow Wood Wy 06/2018 09/2018 05 10 Whispering Winds Wy - Candle Shoe Ct Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Montego Bay Dr 06/2018 09/2018 05 10 Copper Cove Ln - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Nagai Dr 06/2018 09/2018 05 10 Bay Av - Cottonwood Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Nan Av 06/2018 09/2018 05 10 Wedow Dr - Santiago Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Nanwood Dr 06/2018 09/2018 05 10 Rockcrest Dr - West End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Napa Valley Ct 06/2018 09/2018 05 10 Dracaea Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Ninebark St 06/2018 09/2018 05 10 Fir Av - Lasselle St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Ninya Av 06/2018 09/2018 05 10 Wedow Dr - Santiago Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Parkside Ln 06/2018 09/2018 05 10 Abedul St - Kitching St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Pattilynn Dr 06/2018 09/2018 05 10 Bay Av - Cottonwood Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Peachleaf St 06/2018 09/2018 05 10 Sunnymead Bl - Heartleaf St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Petaluma Av 06/2018 09/2018 05 10 Morrison St - Napa Valley Ct Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Plato Dr 06/2018 09/2018 05 10 Bay Av - West End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Poppystone Dr 06/2018 09/2018 05 10 Canyonstone Dr - Heacock St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Port Royal Pl 06/2018 09/2018 05 10 Copper Cove Ln - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Puddingstone Dr 06/2018 09/2018 05 10 Canyonstone Dr - Fugate Ct Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Rena Ct 06/2018 09/2018 05 10 Bay Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Rhea Dr 06/2018 09/2018 05 10 Hummingbird Pl - Cockatiel Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Rockcrest Dr 06/2018 09/2018 05 10 Bay Av - Cottonwood Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Rolanda Dr 06/2018 09/2018 05 10 Pattilynn Dr - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Rowe Dr 06/2018 09/2018 05 10 Cockatiel Dr - Sandpiper Ct Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Rundell Dr 06/2018 09/2018 05 10 Cottonwood Av - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Running Deer Rd 06/2018 09/2018 05 10 Dracaea Av - Eucalyptus Av Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal San Cristobal Bay Dr 06/2018 09/2018 05 10 Copper Cove Ln - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Sandpiper Ct 06/2018 09/2018 05 10 Rowe Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Schayleen Ct 06/2018 09/2018 05 10 Bay Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Seafarer Wy 06/2018 09/2018 05 10 Sugar Creek Ct - Graham St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Shadowbrook St 06/2018 09/2018 05 10 Willow Tree Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Shady Glen Ct 06/2018 09/2018 05 10 Graham St - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Skybrook St 06/2018 09/2018 05 10 Shadowbrook St - Kitching St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal St Tropez Ct 06/2018 09/2018 05 10 Copper Cove Ln - South End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Stonebridge Ct 06/2018 09/2018 05 10 Canyonstone Dr - West End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Sugar Creek Ct 06/2018 09/2018 05 10 North End - Seafarer Wy

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Sunnymead Bl 06/2018 09/2018 05 10 Kitching St - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Swan St 06/2018 09/2018 05 10 Honey Hollow - Cockatiel Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Sweeney Dr 06/2018 09/2018 05 10 Dunhill Dr - Nagai Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Sweetleaf St 06/2018 09/2018 05 10 East End - Heartleaf St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Sylmar Dr 06/2018 09/2018 05 10 Bay Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Tiffin Ct 06/2018 09/2018 05 10 Puddingstone Dr - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Tioga Pass Ct 06/2018 09/2018 05 10 Petaluma Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Warbler Wy 06/2018 09/2018 05 10 Rhea Dr - Swan St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Wedow Dr 06/2018 09/2018 05 10 Iris Av - North End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Whispering Winds Wy 06/2018 09/2018 05 10 Bayless St - Wild Flax Ln Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Wild Flax Ln 06/2018 09/2018 05 10 Whispering Winds Wy - Blooming Meadow Rd Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Willow Tree Av 06/2018 09/2018 05 10 Fir Av - Sunnymead Bl Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Wolcott Dr 06/2018 09/2018 05 10 Running Deer Rd - Cushenbury Dr Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Woodlander Wy 06/2018 09/2018 05 10 Honey Hollow - East End Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Yee St 06/2018 09/2018 05 10 Bay Av - Graham St Moreno Valley Riverside Citywide Slurry Seal Project Slurry Seal Ziteo Ct 06/2018 09/2018 05 10 Nagai Dr - West End Morgan Hill Santa Clara Rehabilitation of Sutter Boulevard The removal and replacement of failed pavement sections, a 2” asphalt concrete overlay and the restriping of Sutter Boulevard between the intersections of Cochrane Road to Serene Drive 04/2018 07/2018 05 10 existing bike lanes, legends, crosswalks and lane lines. Morro Bay San Luis Obispo Alder Ave Cape Seal 21,420 square feet North Morro Bay: Bay Sequoia St to San Jaciento St 09/2017 11/2017 04 06 Morro Bay San Luis Obispo Bayview Ave Triple Layer Cape Seal 21390 square feet North Morro Bay: Hill St to Hillview St 09/2017 11/2017 06 08 Morro Bay San Luis Obispo Beachcomber Double Layer Chip Seal 4480 square feet North Morro Bay: Yerba Buena Ave to North Terminis 09/2017 11/2017 05 07 Morro Bay San Luis Obispo Birch Ave Triple Layer Cape Seal 22320 square feet North Morro Bay: San Jaciento St to San Joaquin St 09/2017 11/2017 06 08 Mount Shasta Siskiyou Alma Street Traffic Signal Project Remove existing traffic signals and install new traffic signals at the intersection of Alma Street and North Mt. The intersection of Alma Street and North Mt. Shasta Blvd. 03/2018 08/2018 25 25 Shasta Blvd. Construct new ADA compliant curb ramps at the four corners of the intersection. Mountain View Santa Clara Street Resurfacing and Slurry Seal Install asphalt concrete and fog seal overlays, raise utilities and monuments, or apply slurry seal to selected street Various locations, see list attached 06/2018 09/2018 08 10 Program surfaces Murrieta Riverside Murrieta Pavement Resurfacing Rehabilitation of existing asphalt concrete roadways and asphalt concrete overlay Nutmeg Street from Jefferson Avenue to Jasckson Avenue 11/2017 05/2018 10 20 Asphalt Overlay Project Murrieta Riverside Murrieta Pavement Resurfacing Rehabilitation of existing asphalt concrete roadways and asphalt concrete overlay Hancock Avenue from Los Alamos Road to Murrieta Hot Springs 11/2017 05/2018 10 20 Asphalt Overlay Project Napa Napa SB 1 - Street Rejuvenation Project Apply a asphalt rejuvenation sealant on more than 100 roadway segments (approximately 16 centerline miles). Various locations within the City of Napa. Neighborhoods are identified as: Young Ave. Area, 01/2018 05/2018 02 05 FY2017/18 This process reverses the effects of aging due to environmental damage from sunlight and water. It is cost- Mac Tract, West Twin Oaks Area, Robinson Lane Area, River Park, Napa Valley Corporate Park, effective and extends the life of the roadway 2-5 years. and ABC Streets. Area maps are attached. National City San Diego FY 2018 Safe Routes to School (SRTS) Construct traffic calming measures such as corner bulb-outs and high intensity signing and striping, and new Intersection of Harbison Avenue and E. 2nd Street 03/2018 06/2018 20 30 Pedestrian and Bicycle Enhancements pedestrian curb ramps for Americans with Disabilities Act (ADA) compliance at the intersection of Harbison – Harbison Avenue and E. 2nd Street Avenue and E. 2nd Street Traffic Calming National City San Diego FY 2018 SRTS Pedestrian and Bicycle Construct a raised crosswalk with pedestrian actuated flashing crosswalk signs, high intensity striping, and new Lanoitan Avenue in front of Lincoln Acres Elementary School 10/2017 11/2017 20 30 Enhancements – Lincoln Acres pedestrian curb ramps for ADA compliance on Lanoitan Avenue in front of Lincoln Acres Elementary School Elementary School Raised Crosswalk National City San Diego FY 2018 SRTS Pedestrian and Bicycle Provide street resurfacing and restriping to include a "road diet" for traffic calming converting four travel lanes to Division Street between Euclid Avenue and Harbison Avenue 03/2018 06/2018 10 15 Enhancements – Division Street Traffic three travel lanes (two westbound and one eastbound) with a two-way left-turn center lane, Class II bike lanes, Calming, Euclid Avenue to Harbison and new pedestrian curb ramps for ADA compliance on Division Street between Euclid Avenue and Harbison Avenue Avenue Needles San Bernardino Five Mile Road rehabilitation project Crack seal and slurry City's portion of Five Mile Road rehabilition project by County of San Bernardino 02/2018 06/2018 05 10 Needles San Bernardino Shore Street to Jack Smith Park Crack seal and slurry Shore Street to Jack Smith Park entrance 01/2018 05/2018 05 10 entrance rehabilitation project Nevada City Nevada Commercial Street This project consists of roadway rehabilitation. Sidewalk will be widened and enhanced at intersections to Commercial Street from Union Street to Broad Street 05/2018 06/2019 10 20 provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement improvements include replacement of deteriorated pavement and improvements to cross-slope for drainage. This project will help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. Nevada City Nevada Broad Street Y This project consists of roadway rehabilitation. Sidewalk will be widened and enhanced at intersections to Broad Street from Commerical Street to (and including) the intersection of West Broad Street 05/2019 11/2019 10 20 provide safe, convenient and efficient pedestrian access within the Downtown Historic District. Pavement and East Broad Street. improvements include replacement of deteriorated pavement and improvements to cross-slope for drainage. This project will help reduce traffic congestion and improve pedestrian safety which reduces vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals. Newark Alameda Citywide Accessible Pedestrian Ramps Installation, repair or replacement of accessible pedestrian ramps at various locations throughout the City Various locations throughout the City. Specific curb ramp locations will be finalized during 02/2018 04/2018 20 30 development of construction plans based on identified needs. Newark Alameda Citywide Street Signs Installation or replacement of street signs at various locations throughout the City Various locations throughout the City. Specific street sign locations will be finalized during 08/2018 12/2018 15 25 development of construction plans based on identified needs. Newark Alameda Thermoplastic Street Striping Installation or replacement of traffic striping and pavement markings at various locations throughout the City Various locations throughout the City. Specific street striping locations will be finalized during 08/2018 09/2018 05 10 development of construction plans based on identified needs.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Newark Alameda 2018 Street Patch Paving Program Removal and replacement of failed roadway pavement sections on various streets located throughout the City Aralia Dr., Blackburn Dr. between Chapman Dr. and Portmouth Ave., Chestnut St., Cinnabar Ct., 04/2018 06/2018 15 20 Dorking Ct., Hebrides Ct., Ipswich Ct., Lakewood Dr., Lundy Dr., Mayhews Landing Rd. between Spruce St. and Haley St., Norwich Pl., Orkney Ct., Redwood Ct., and Wells Ave. between Enterprise Dr. and Filbert St. Newark Alameda 2018 Asphalt Concrete Overlay Roadway pavement rehabilitation on various streets located throughout the City. Pavement rehabilitation Balentine Drive between Stevenson Bouelvard and NewPark Mall; Smith Avenue between 04/2018 06/2018 15 20 Program typically involves removal of 2" of existing pavement and replacement with an asphalt concrete pavement overlay. Cherry Street and Cedar Bouelvard

Newark Alameda 2018 Street Slurry Seal Program Roadway pavement preventative maintenance on various streets located throughout the City. Preventative Aralia Dr., Blackburn Dr. between Chapman Dr. and Portmouth Ave., Chestnut St., Cinnabar Ct., 05/2018 07/2018 05 07 maintenance typically involves application of a slurry seal to the existing roadway pavement Dorking Ct., Hebrides Ct., Ipswich Ct., Lakewood Dr., Lundy Dr., Mayhews Landing Rd. between Spruce St. and Haley St., Norwich Pl., Orkney Ct., Redwood Ct., and Wells Ave. between Enterprise Dr. and Filbert St. Newark Alameda 2018 Sidewalk, Curb and Gutter Repair of damaged concrete curb, gutter and sidewalk at various locations throughout the City. Various locations throughout the City. Specific sidewalk, curb and gutter locations will be 02/2018 04/2018 15 30 Replacement finalized during development of construction plans based on identified needs. Newark Alameda Traffic Calming Measures Installation of traffic calming measures such as speed bumps on various streets located throughout the City. Specific locations of traffic calming measure installation will be determined based on the results 04/2018 06/2018 15 20 of prerequisite traffic studies Newman Stanislaus Upper Road Pulverize, Grade and add 2.5 inches of AC Upper Road between Inyo and Patchett 12/2017 05/2018 10 15 Newport Beach Orange MacArthur Blvd and University Dr This project grinds and overlays sections of MacArthur Boulevard and University Drive with rubberized asphalt MacArthur Boulevard from Bonita Canyon Road to SR 73 and University Drive from Jamboree 07/2018 11/2018 15 25 Pavement Rehab concrete. Reconstruction of deteriorated concrete improvements is also included. Road to State Route 73. Norco Riverside River Rd Street Improvement Project Street grind and overlay project on River Road between Main Street and Corydon Avenue. Norco has half street Norco's responsibility for River Road street improvements is between Second St and Corydon 12/2017 06/2018 15 25 maintenance requirements for a portion of River Road and this project will be conducted jointly with the City of Ave Corona as the Lead Agency Norco Riverside Second St Widening and Dual Right Street widening and improvement project on Second Street The street improvements will be located on Second St between Hamner Ave and the I-15 12/2017 06/2018 15 25 Turn Lanes onto I-15 FWY (between Hamner Avenue and I-15 Freeway) to add dual right turn lanes onto the I-15 southbound Freeway Freeway Norco Riverside Sixth St Widening and Dual Right Turn Street widening and improvement project on Sixth Street The street improvements will be located on Sixth St between Hamner Ave and the I-15 Freeway 12/2017 06/2018 15 25 Lanes onto I-15 FWY (between Hamner Avenue and I-15 Freeway) to add dual right turn lanes onto the I-15 southbound Freeway Norwalk Los Angeles Local Streets Rehabilitation Proposed construction work will involve approximately 3.6 linear miles of repaving among 21 of our City's local Street Locations: Longworth Ave. (From Adoree St. to Carne St.); Gridley Rd. (From Ratliffe St. 01/2018 05/2018 10 15 streets, including curb and gutter repairs, sidewalk repairs, slotted cross gutters replacement and installation of to Carne St.); Graystone Ave. (From Adoree St. Carne St.); Carne St. (From Fairford Ave. to Orr accessibility ramps at intersection corners. & Day Rd.); Orr & Day Rd. (From Ratliffe St. to Imperial Hwy.); Harvest Ave. (From Ratliffe St. to Carne St.); Adoree St. (From Fairford Ave. to Longworth); Adoree St. (From Harvest St. to Cul-de- Sac); Borson St. (From Harvest St. to Cul-de-Sac); Cheddar St. (From Harvest St. to Cul-de-Sac); Dalwood Ave. (From Foster Frontage Rd. to Cul-de-Sac); Crossdale Ave. (From Foster Frontage Rd. to Cul-de-Sac); Ratiffe St. (From Dalwood Ave. to Fairford Ave.); Lyndora St. (From Newmire Ave. to Cul-de-Sac); Cheddar St. (From Newmire Ave. Cul-de-Sac); Borson St. (From Newmire Ave. to Cul-de-Sac); Lefloss Ave. (From Excelsior Dr. to Liggett St.); Elmhurst Dr. (From Gridley Rd. to Maidstone Ave.); Sylvanwood Ave. (From Harvard St. to Elmhurst Dr.); McRae Ave. (From Harvard St. to Elmhurst Dr.); Gard Ave. (From Harvard St. to Elmhurst Dr.)

Norwalk Los Angeles Local Streets Rehabilitation Proposed work will involve the design of the repaving of a 1/2 mile segment of 162nd Street. 162nd Street (From Clarkdale Ave. to Norwalk Blvd.) 01/2018 09/2018 10 15 Norwalk Los Angeles Local Streets Rehabilitation Proposed work will involve the design of the repaving of a 1/4 mile segment of Sproul Street Sproul St. (From Esmond Ave. to Belmart Ave.) 01/2018 09/2018 10 15 Norwalk Los Angeles Local Streets Rehabilitation Proposed work will involve the design of the repaving of a 1/4 mile segment of Orr & Day Road. Orr&Day Rd. (From Vista Verde to Imperial Hwy.) 01/2018 09/2018 10 15 Novato Marin MTC Pavement Management Phase IV Citywide pavement condition assessment, rehabilitation project determination, and reporting All city owned/maintained streets 07/2017 06/2021 04 04 Novato Marin Sherman Ave. & Cain Lane Pavement maintenance and rehabilitation Sherman Ave. & Cain Ln. between Sherman & Reichert 08/2020 12/2021 15 30 Improvements Novato Marin Vineyard Road Pavement Rehab Pavement maintenance and rehabilitation. Possibly add bike lanes where existing width allows. Vineyard Rd. between Wilson Ave. and Sutro Ave. 04/2018 04/2019 15 30 Novato Marin Measure A Group 10 Pavement preservation, maintenance and rehabilitation. Nave Dr. and Bel Marin Keys Blvd. 04/2018 04/2019 15 30 Novato Marin Measure A Group 11 Pavement preservation, maintenance and rehabilitation. Exact locations TBD pending pavement condition assessment 04/2019 04/2020 10 20 Novato Marin S. Novato Blvd to US101 Preventative Pavement preservation, maintenance and rehabilitation. S. Novato between Diablo Ave. and US101 12/2021 12/2023 10 30 Mtce Novato Marin Olive Phase III (Redwood to Railroad) Enhance safety of the RR crossing, pavement rehabilitation, replace failing drainage facilities Olive Ave. between Redwood Blvd. and Railroad Ave. 09/2018 12/2021 15 30 Novato Marin Redwood & San Marin Improvements Enhance safety, reduce traffic congestion, modify the interchange (including widening) San Marin Dr. at Redwood Blvd. and southbound US101 I/C 12/2020 12/2023 20 30 (AGP-5 & NP-1) Novato Marin Novato Blvd Improvements 7th/Tam- Enhance safety, reduce traffic congestion, widen roadway, and add bike/pedestrian facilities Novato Blvd. between Diablo Ave. and Tamalpais Ave. 12/2020 12/2023 20 30 Diablo Novato Marin SMART Access Improvements Address deficiencies in the public right-of-way (pedestrian/bike focus) near SMART stations In the vicinity of the SMART San Marin and Hamilton stations 10/2017 12/2018 10 20 Novato Marin Traffic, Bicycle, & Ped Improvements Enhance safety, provide equal access, and reduce congestion as issues are identified All city streets & sidewalks 10/2017 12/2018 10 20 FY 14/15-18/19 Novato Marin North Redwood Blvd Corridor Study Develop comprehensive streetscape plan with public input, determine constraints. Redwood Blvd. between Diablo Ave. and Wood Hollow Dr. 12/2019 12/2020 10 30 Novato Marin Lamont Ave Bike Lanes Add Class 2 bike lanes to Lamont Ave., sliver widening, pavement rehab., and new striping. Lamont Ave. between Reichert Ave. and Franklin Ave. 12/2017 12/2018 10 20 Novato Marin Novato Blvd. Multiuse Path Evaluate improvements to bike/ped access to Stafford Lake Park. May rehab existing pathway. Novato Blvd. between Sutro Ave. and Stafford Lake 12/2018 12/2022 10 30 Novato Marin Pedestrian Access to Transit & Enhance five crosswalks identified as being potential barriers to transit use. Novato/McClay, Redwood/Rush Cr., 12/2017 12/2018 10 20 Crosswalk Improvements Novato Marin Redwood Blvd. Improvements North of Enhance safety, reduce traffic congestion, widen roadway, rehabilitate existing pavement Redwood Blvd. between San Marin Dr. and Wood Hollow Dr. 12/2022 12/2024 20 30 San Marin (NP-2) Novato Marin Grant Ave. Bridge Rehab Bridge widening/rehab, bike/ped facilities, and pavement maintenance/rehabilitation. Grant Ave. between 8th St. and Virginia Ave. 03/2019 12/2020 20 30 Novato Marin Downtown SMART Station Phase III Plan and construct improvements to unimproved downtown depot site Grant Ave. between Scott Ct. and Railroad Ave. 12/2019 10/2021 10 30 Novato Marin Retaining Wall Assessment Group 1 Assess condition of city retaining walls, establish inventory, implement repairs as necessary. 70 city owned/maintained retaining walls at various locations 11/2017 11/2018 10 20 Repairs Novato Marin Citywide Bridge Assess condition of city bridges, establish inventory, implement repairs as necessary. All city-owned/maintained bridges at various locations 08/2018 12/2020 10 30 Assessment/Improvement (Group 1) Novato Marin San Marin/Simmons Signalization or Enhance safety, reduce traffic congestion, rehabilitate existing pavement Intersection of San Marin Dr. and Simmons Ln. 12/2020 12/2022 20 30 Roundabout Novato Marin Traffic Signal Upgrade Program Traffic signal equipment replacement and timing/phasing modifications to improve efficiency. All City-owned traffic signals (31 total) at various locations 10/2017 06/2019 05 20 Novato Marin ADA RoW Transition Plan Inventory accessibility of city right-of-way, identify & document access barriers per ADA Title II All public paths of travel within the city right-of-way. 05/2018 12/2020 10 30 Oakdale Stanislaus H Street (Oak to Wood) Micro surface application, sign and stripe H Street between the blocks of Oak Avenue and Wood Avenue 07/2018 08/2018 07 15 Oakdale Stanislaus H Street (Ash to Oak) Remove and reconstruct pavement surface, stripe and sign. H Street between the blocks of Ash Avenue and Oak Avenue 07/2018 08/2018 20 30 Oakdale Stanislaus Magnolia Street (Oak to Maxwell) Remove and reconstruct pavement surface, stripe and sign. Install updated crosswalk lighting technology Magnolia between the streets of North Oak Avenue and Maxwell Avenue 06/2018 06/2018 20 30 Oakdale Stanislaus Armstrong Way (Yosemite to Post) Micro surface application, sign and stripe Armstrong Way between Yosemite Avenue and Post Road 02/2018 03/2018 05 10 Oakdale Stanislaus South 5th Avenue (Design Only) Remove and reconstruct pavement surface, replace water and sewer mains, stripe and sign including class 3 bike South 5th Avenue between G and J Streets 07/2018 08/2018 20 30 lanes

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Oakdale Stanislaus 3rd Avenue Street and Pedestrian 3rd Avenue Street and Pedestrian Improvements 3rd Avenue between F and E Streets 02/2019 02/2019 20 30 Improvements (Design Only) Oakland Alameda Wesley Avenue Resurfacing Repave .5 miles of roadway Lakeshore Ave to MacArthur Blvd 10/2017 11/2017 10 20 Oakland Alameda Brooklyn Avenue Resurfacing Repave .14 miles of roadway Van Dyke Ave to Park Blvd 11/2017 11/2017 10 20 Oakland Alameda Capital Street Resurfacing Repave .09 miles of roadway Wesley Ave to Merritt Ave 11/2017 11/2017 10 20 Oakland Alameda Cleveland Street Resurfacing Repave .07 miles of roadway Haddon Rd to Athol Ave 11/2017 12/2017 10 20 Oakland Alameda Capell Street Resurfacing Repave .23 miles of roadway Cleveland Ave to MacArthur Blvd 12/2017 12/2017 10 20 Oakland Alameda Dwight Way Resurfacing Repave .28 miles of roadway City Limit to Dwight Place 12/2017 01/2018 10 20 Oakland Alameda Panoramic Place Resurfacing Repave .16 miles of roadway Panoramic Way to West End 01/2018 01/2018 10 20 Oakland Alameda Panoramic Way Resurfacing Repave .66 miles of roadway Dwight Way to City Limit 01/2018 01/2018 10 20 Oakland Alameda Vernon St Resurfacing Repave .47 miles of roadway Vernon Terrace to MacArthur Blvd 08/2017 08/2017 10 20 Oakland Alameda Chatham Road Resurfacing Repave .33 miles of roadway Beaumont Ave to Park Blvd 01/2018 02/2018 10 20 Oakland Alameda Bridge Ave Resurfacing Repave .20 miles of roadway Foothill Boulevard to E. 16th Street 02/2018 02/2018 10 20 Oakland Alameda Chatham road Resurfacing Repave .32 miles of roadway South End to 29th Ave 02/2018 02/2018 10 20 Oakland Alameda E. 16th Street Resurfacing Repave .14 miles of roadway 35th Ave to 37th Ave 02/2018 03/2018 10 20 Oakland Alameda E. 18th Street Resurfacing Repave .15 miles of roadway 34th Ave to 36th Ave 03/2018 03/2018 10 20 Oakland Alameda Farnam Street Resurfacing Repave .12 miles of roadway Fruitvale Ave to 34th Ave 08/2017 08/2017 10 20 Oakland Alameda Mason Street Resurfacing Repave .08 miles or roadway Foothill Boulevard to Walnut Street 03/2018 03/2018 10 20 Oakland Alameda Shone Ave Resurfacing Repave .23 miles of roadway Sterling Drive to Fontaine Street 03/2018 04/2018 10 20 Oakland Alameda Old Redwood Road Resurfacing Repave .28 miles or roadway Redwoood Road to North End 04/2018 04/2018 10 20 Oakland Alameda Lowell Street Resurfacing Repave .67 miles of roadway Adeline Street to Market Street 04/2018 04/2018 10 20 Oakland Alameda Citywide Street Maintenance Street Maintenance activities including pothole patching, concrete repair, sidewalk repair citywide - locations identified through inventory system and prioritized by safety concerns 01/2018 07/2018 05 10 Oakley Contra Costa Laurel Road Widening Project, City CIP This project will widen and improve Laurel Road by constructing curb, gutter, sidewalks, bike lanes, medians, and Laurel Raod between Rose Avenue to Mellowood Drive 09/2017 03/2018 15 25 # 196 new roadway resurfacing Oceanside San Diego Street Slurry Seal Program Slurry sealing 50 lane-miles of streets in Oceanside Streets in Oceanside; list is attached. 03/2018 08/2018 05 10 Ojai Ventura 2017 Pavement Rehabilitation Project Cold planning, milling, placing rubberized concrete asphalt, ADA corner curb ramps, curb & gutter, sidewalk, Various City Streets - Carrillo Rd., Valle Rio Ave., La Paz Dr., Blanche St., Olive St., Park St., 07/2017 11/2017 10 15 pavement striping & appurtenant work France Cir., Aliso St., Waite St., Drown Ave., Sunset Pl., San Ramon Way, Los Alamos Dr., Boardman Rd., Summer St., Oak St. Ontario San Bernardino Milliken Avenue Grind & Asphalt Overlay, Repair failing areas Jurupa Street to Airport Drive 06/2018 07/2018 15 20 Ontario San Bernardino Philadelphia Street Grind & Asphalt Overlay, Repair failing areas Archibald Avenue to Turner Avenue 06/2018 07/2018 15 20 Ontario San Bernardino Archibald Avenue Grind & Asphalt Overlay, Repair failing areas SR 60 to Riverside Drive 06/2018 07/2018 15 20 Orange Orange Pavement Rehabilitation FY 17/18 The Pavement Rehabilitation Project will maintain and rehabilitate approximately 18 Streets for a total of 13,505 See attached project limits of the 18 streets that will be improved. 05/2018 12/2018 10 15 linear feet and 457,640 square feet of pavement. The construction activities will consist of slurry seal, cold planning, and overlay operations. In addition to the pavement rehabilitation the City will improve access ramps within the project limits along with other construction activities related to pavement rehab such as, adjusting valve boxes, manhole rings, crack sealant, and striping. Orange Cove Fresno Park Blvd. Sidewalks Repair of sidewalks to remove trip and fall hazards and improve accessibility for disabled persons The North side of Park Blvd. between Center Street and Sixth Street. 03/2018 06/2018 20 50 Orinda Contra Costa 2017 Annual and Measure J & L Road pavement rehabilitation. Along El Nido Ranch Road from St. Stephen Drive to the City Limit 03/2017 09/2017 10 15 Pavement Rehabilitation Orland Glenn Seventh Street Patch, chip seal & slurry coat approx. 866' of 7th St. 7th St between W. Walker&Tehama Sts 04/2018 06/2018 15 20 Oroville Butte ORO DAM BL repave - resurface Highlands to Valley View Dr 12/2018 06/2019 05 15 Oroville Butte ORANGE AV repave - resurface Long Bar 01/2018 06/2018 05 15 Oroville Butte ORANGE AV repave - resurface Laurel Ave to Long Bar 01/2018 06/2018 05 15 Oroville Butte ORANGE AV repave - resurface Felice Ct to Acacia Ave 01/2018 06/2018 05 15 Oroville Butte ORANGE AV repave - resurface Long Bar 01/2018 06/2018 05 15 Oroville Butte ORANGE AV repave - resurface Bridge St. to Linden Ave. 01/2018 06/2018 05 15 Oroville Butte ORO QUINCY HY repave - resurface Myrtle Dr to Casa Loma Way 01/2018 06/2018 05 15 Oroville Butte MONTGOMERY ST repave - resurface Washington Ave to Norton Ave 01/2018 06/2018 05 15 Oroville Butte HIGHLANDS BL repave - resurface Rockridge Rd to Canyon Highlands Dr 01/2018 06/2018 05 15 Oroville Butte FEATHER RIVER BL repave - resurface Pomona Ave to High St. 01/2018 06/2018 05 15 Oroville Butte SPENCER AV repave - resurface Mitchell to Wilcox 01/2018 06/2018 05 15 Oroville Butte BAGGETT MARYSVILLE RD repave - resurface Georgia Pacific Wy to City limits 01/2018 06/2018 05 15 Oroville Butte VEATCH ST repave - resurface Oro Dam 01/2018 06/2018 05 15 Oroville Butte 5TH AV repave - resurface Georgia Pacific Wy to Simpco Lane 01/2018 06/2018 05 15 Oroville Butte FEATHER RIVER BL repave - resurface Oro Dam Bl to Mitchell Ave 01/2018 06/2018 05 15 Oroville Butte 5TH AV repave - resurface High St. to Spruce St. 01/2018 06/2018 05 15 Oroville Butte CHEROKEE RD repave - resurface la Colina Dr to city limits 01/2018 06/2018 05 15 Oroville Butte CASEY CT repave - resurface Nelson Bl 01/2018 06/2018 05 15 Oroville Butte LARKIN RD repave - resurface Mineral Way to Oro Dam Bl 01/2018 06/2018 05 15 Oroville Butte GLEN DR repave - resurface Oro Dam Bl 01/2018 06/2018 05 15 Oroville Butte WORTHY AV repave - resurface Grand Ave to end 01/2018 06/2018 05 15 Oroville Butte MOONSHINE CT repave - resurface Butte Woods Dr 01/2018 06/2018 05 15 Oroville Butte WOODCREST DR repave - resurface Oro Quincy Hwy 01/2018 06/2018 05 15 Oroville Butte GLEN DR repave - resurface Glen Circle Dr to Glen view way 01/2018 06/2018 05 15 Oroville Butte SPENCER AV repave - resurface Wyandotte Ave to Corto St 01/2018 06/2018 05 15 Oroville Butte BAGGETT PALMERO RD repave - resurface Railroad Ave to Ophir Rd 01/2018 06/2018 05 15 Oroville Butte FAY WY repave - resurface Olive Hwy to Fay Way 01/2018 06/2018 05 15 Oroville Butte OAK PARK AV repave - resurface Acacia Ave to Valley View Dr. 01/2018 06/2018 05 15 Oroville Butte STAUSS AV repave - resurface Stanford Ave to Canyon Highlands Dr 01/2018 06/2018 05 15 Oroville Butte WHITCOMB AV repave - resurface Morningstar Ave to Worthy Ave 01/2018 06/2018 05 15 Oroville Butte 5TH AV repave - resurface Simpco Ln to Rainys Way 01/2018 06/2018 05 15 Oroville Butte COVENTRY DR repave - resurface Rockridge Rd to Linda Dr 01/2018 06/2018 05 15 Oroville Butte OAK AV repave - resurface Oro Quincy Hwy to Pine Oaks Rd 01/2018 06/2018 05 15 Oroville Butte SAFFORD ST repave - resurface Feather River Bl to 5th St 01/2018 06/2018 05 15 Oroville Butte VALLEY VIEW DR repave - resurface Oro Dam Bl to Service St. 01/2018 06/2018 05 15 Oroville Butte COARSE GOLD RD repave - resurface Sutter Mill Rd to Nelson Ave 01/2018 06/2018 05 15 Oroville Butte MOURNING DOVE LN repave - resurface Coarse Gold Rd to Golden Eagle Rd 01/2018 06/2018 05 15 Oroville Butte BUTTE WOODS DR repave - resurface End to Pleasant Oak Ln 01/2018 06/2018 05 15 Oroville Butte GOLDEN EAGLE RD repave - resurface Sutter Mill Rd 01/2018 06/2018 05 15

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Oxnard Ventura Auto Center Neighborhood St Resurf The resurfacing project consists of a two-inch cold mill and 3/8-inch ARAM and finished with 2-inch ARHM. The Auto Center Commercial Neighborhood project is the area North of the 101 Fwy between 03/2018 06/2018 15 20 Rose and Rice. Pacific Grove Monterey Crack Seal and Slurry Seal Crack seal & slurry Seal VARIOUS LOCATIONS: 03/2017 06/2018 05 07 -MORSE DRIVE (FOREST AVE. TO BEAUMONT AVE.) -ALLEY (BEAUMONT AVE. TO MORSE DR.) -OLMSTEAD AVENUE (BEAUMONT AVE. TO MORSE DR.) -ALLEY (BEAUMONT AVE. TO MORSE DR.) -MCFARLAND AVENUE (BEAUMONT AVE. TO MORSE DR.) -PLATT COURT (MORSE DR. TO MCFARLAND) -ALLEY (MORSE DR. TO MCFARLAND) -BEAUMONT AVENUE (FOREST AVE. TO END) -ALLEY (FOREST AVE. TO END) -14TH STREET (HILLCREST AVE. TO BEAUMONT AVE.) -ALLEY (ALLEY TO ALLEY) -FOUNTAIN AVENUE (HILLCREST AVE. TO BEAUMONT AVE) -ALLEY (HILLCREST AVE. TO ALLEY) -ALLEY (FOUNTAIN AVE. TO 14TH ST.) -HILLCREST AVENUE (FOREST AVE. TO CARMEL AVE.)

Pacifica San Mateo Manor Drive and Paloma Avenue The Manor Drive and Paloma Avenue Bridge Deck Repair Project will repair the spalling concrete, provide Manor Drive from Oceana Blvd. to Palmetto Ave. and Paloma Avenue from Oceana Blvd. to 06/2018 07/2018 10 15 Bridge Deck Repair Project protective treatment of the exposed reinforcing steel and provide an epoxy overlay to prevent further concrete Francisco Blvd. degradation. Pacifica San Mateo Citywide Curb Ramp Project The Citywide Curb Ramp Project will replace 100 curb ramps throughout the City of Pacifica. Citywide 07/2018 08/2018 20 30 Pacifica San Mateo Palmetto Sidewalk Project The project consists of the construction of 1,400 feet of sidewalk, curb and gutter along the west side of Palmetto Palmetto Avenue from Westline Drive to 100 Palmetto Avenue 08/2018 09/2018 20 30 Avenue. Pacifica San Mateo FY 2017-18 Pavement Rehabilitation The FY 2017-18 Pavement Rehabilitation Project will rehabilitate the pavement along Oceana Boulevard from Oceana Boulevard from Milagra Drive to Monterey Road and Linda Mar Boulevard from Adobe 08/2018 09/2018 15 20 Project Milagra Drive to Monterey Road and Linda Mar Boulevard from Adobe Drive to Alicante Drive by placing 2 inches Drive to Alicante Drive of asphalt overlay. This project will also include pavement grinding for base repair as well as installation of thermoplastic traffic striping, markings, and pavement markers. Palm Desert Riverside Monterey Avenue Repaving - Repave 3/4 mile of road using the full depth reclamation street resurfacing. Northbound Monterey Avenue from Whitewater Storm Channel to Hovley Lane West 03/2018 06/2018 20 25 Whitewater Channel to Hovley Lane West Palm Springs Riverside 2017 Annual Slurry Seal Annual Slurry Seal Sunrise, Racquet Club, and Farrell 03/2018 06/2018 05 07 Palmdale Los Angeles 2017-18 Arterial Overlay/Arterial Approximately 800,000 square feet of arterial roads within the City of Palmdale that need either an overlay and/or Arterial streets throughout the City 05/2018 10/2018 10 20 Reconstruction Projects reconstruction Palmdale Los Angeles 2017-18 Cape Seal/Slurry Seal Projects Approximately 1,200,000 square feet of local streets within the City of Palmdale that need either a capeseal Local streets throughout the City 07/2018 10/2018 05 08 and/or slurry seal Palmdale Los Angeles 2017-18 Overlay Projects Approximately 2,000,000 square feet of local streets within the City of Palmdale that need an overlay Local streets throughout the City 06/2018 10/2018 10 12 Palo Alto Santa Clara FY 2018 Asphalt Paving Project The FY 2018 Asphalt Paving Project includes the replacement of broken sidewalks, driveways, damaged PCC slabs, Alma Street (Palo Alto Ave to Melville Ave); Ash Street (Sherman Ave to Page Mill Rd); Barron 03/2018 12/2018 25 30 and uplifted curb and gutter; installation of valley gutters and curb ramps; resurfacing of asphalt pavement and Avenue (Laugna Ave. to Josina Ave); Birch Street (Leland Ave Stanford Ave); Downing Lane installation of new signage and striping. (Forest Ave to Homer Ave); El Cerrito Road (Cerrito Way to End); Emerson Street (N. California Ave to Oregon Expressway); Guinda Street (Melville Ave to Addison Ave); Hale Street (Palo Alto Ave to University Ave); Julie Court (Matadero to End); La Calle Court (Barron Ave to End, North/South); Lane 33 (Ruthven Ave to Cowper St); Lincoln Avenue (Unversity to End); San Jude Avenue (La Donna St to End); W. Crescent Drive (University Ave to Southwood); Whitman Court (Bryant St to Waverley St) Palos Verdes Estates Los Angeles 2017-2018 Street Resurfacing Grind and overlay roadway pavement with rubberized asphalt. CalRecycle Grant applied for due to use of recycled North and Southside of Palos Verdes Drive West From Via Coronel/Cloydon Road to South City 08/2018 09/2018 10 20 tires in asphalt mix to be used and to cover costs in excess of RMRA funds. CIP funds will be utilized to cover any Limit; Via Carillo From Palos Verdes Drive West to Paseo Lunado; Tyburn Road From Via remaining balance in construction costs and for engineering and contract administration. Anacapa to Via Pacheco. Paradise Butte Paradise Gap Closure Complex Project will leverage $3.8M in ATP funds and address roadway needs by utilizing Cold Central Plan Recycling and Birch Street (Skyway to Black Olive), Fir Street (Skyway to Black Olive), Foster Road (Pearson to 06/2018 09/2020 10 30 essentially reconstructing a new roadway section concurrently with an underground utility district and Birch), Black Olive Drive (Pearson to Fir) and Elliott Road (Skyway to Almond) construction of new sidewalks, bike lanes and bike paths. Paradise Butte Traffic Signal Upgrades Project will replace aging traffic signal equipment and lights including cabinets and service meters Various traffic signals throughout Paradise 12/2017 06/2018 10 20 Paradise Butte Town Roadway Striping Project will replace aging traffic striping with new coat of paint Major roadways including Skyway, Elliott, Bille, Wagstaff, Pentz, Oliver 06/2017 06/2018 02 03 Paradise Butte Maintenance Program Ongoing transportation infrastructure maintenance needs including weed abatement and hazard removal, Various locations throughout the Town of Paradise's 100 centerline miles 06/2017 06/2018 01 10 drainage culvert replacements and clearing, roadway digouts and potholes, tree removal and clearing Paramount Los Angeles Resurfacing of Arterial Street Grind and overlay of Arterial Street Alondra Blvd frpm Gundry Avenue to Hunsaker Avenue 10/2017 03/2018 20 30 Paramount Los Angeles Resurfacing of Neighborhood Streets Grind and overlay of Neighborhood Streets San Juan Street from Orange Avenue to San Jose Avenue and San Miguel Street from Orange 02/2018 06/2018 25 30 Ave to Dills Park Parlier Fresno 5th Street Construction Construction of 160 feet of new street, curb and gutter and sidewalk 5th Street between Academy Avenue and Sierra Avenue 10/2018 04/2019 15 30 Pasadena Los Angeles Orange Grove Boulevard Resurfacing This project will resurface 1.3 miles of Orange Grove Boulevard from Lincoln Ave. to Lake Ave. utilizing the cold-in- Orange Grove Blvd. from Lincoln Ave. to Lake Ave. 05/2018 11/2018 15 20 place recycling paving method. Improvements will also include appurtenant concrete curb, gutter, curb ramp, striping and utility adjustments. Paso Robles San Luis Obispo Sherwood, Creston to Linne Upgrade old sewer mains, install street lights, traffic signal, landscaping, upgrade curb ramps to meet ADA Sherwood, Creston to Linne 05/2018 08/2018 10 20 requirements, and resurface road, including bike lane striping. Patterson Stanislaus ORKNEY DR Slurry Seal and Crack Seal Tarland Ln to Ward Ave 03/2018 07/2018 05 07 Patterson Stanislaus TIREE PL Slurry Seal and Crack Seal Orkney Dr to North End 03/2018 07/2018 05 07 Patterson Stanislaus KIRKWALL WY Slurry Seal and Crack Seal Moray Wy to Tarland Ln 03/2018 07/2018 05 07 Patterson Stanislaus MACKILHAFFY DR Slurry Seal and Crack Seal Moray Wy to Ward Ave 03/2018 07/2018 05 07 Patterson Stanislaus MC MURPHY CT Slurry Seal and Crack Seal Mackilhaffy Dr to North End 03/2018 07/2018 05 07 Patterson Stanislaus PITSCOTTIE LN Slurry Seal and Crack Seal Orkney Dr to Mackilhaffy Dr 03/2018 07/2018 05 07 Patterson Stanislaus W LAS PALMAS AVE Slurry Seal and Crack Seal Plaza Cir to 9th St 03/2018 07/2018 05 07 Patterson Stanislaus S DEL PUERTO AVE Slurry Seal and Crack Seal Plaza Cir to E St 03/2018 07/2018 05 07 Patterson Stanislaus S DEL PUERTO AVE Slurry Seal and Crack Seal E St to Sperry Ave 03/2018 07/2018 05 07 Patterson Stanislaus HOLLY HOCK CIR Slurry Seal and Crack Seal Lorelei Ln to Morning Glory Dr 03/2018 07/2018 05 07 Patterson Stanislaus LORELEI LN Slurry Seal and Crack Seal Morning Glory Dr to N Hartley St 03/2018 07/2018 05 07 Patterson Stanislaus EMILY CT Slurry Seal and Crack Seal Lorelei Ln to NW End 03/2018 07/2018 05 07 Patterson Stanislaus LILY CT Slurry Seal and Crack Seal Lorelei Ln to NW End 03/2018 07/2018 05 07 Patterson Stanislaus M ST Slurry Seal and Crack Seal N 2nd St to Ward Ave 03/2018 07/2018 05 07 Patterson Stanislaus L ST Slurry Seal and Crack Seal N 2nd St to N 7th St 03/2018 07/2018 05 07

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Patterson Stanislaus K ST Slurry Seal and Crack Seal N 2nd St to N Salado Ave 03/2018 07/2018 05 07 Patterson Stanislaus J ST Slurry Seal and Crack Seal N 2nd St to N 3rd St 03/2018 07/2018 05 07 Patterson Stanislaus I ST Slurry Seal and Crack Seal N 2nd St to N 7th St 03/2018 07/2018 05 07 Patterson Stanislaus H ST Slurry Seal and Crack Seal N 4th St to N 7th St 03/2018 07/2018 05 07 Patterson Stanislaus N SALADO AVE Slurry Seal and Crack Seal Plaza Cir to Ward Ave 03/2018 07/2018 05 07 Patterson Stanislaus N 4TH ST Slurry Seal and Crack Seal L St to M St 03/2018 07/2018 05 07 Patterson Stanislaus N 5TH ST Slurry Seal and Crack Seal L St to M St 03/2018 07/2018 05 07 Patterson Stanislaus N 5TH ST Slurry Seal and Crack Seal K St to L St 03/2018 07/2018 05 07 Patterson Stanislaus N 5TH ST Slurry Seal and Crack Seal W Las Palmas Ave to K St 03/2018 07/2018 05 07 Patterson Stanislaus N 7TH ST Slurry Seal and Crack Seal W Las Palmas Ave to N Salado Ave 03/2018 07/2018 05 07 Patterson Stanislaus N DEL PUERTO AVE FDR 2" HMA/9" AB Plaza Cir to N 2nd St 03/2018 07/2018 15 20 Patterson Stanislaus MORNING GLORY DR FDR 2" HMA/9" AB Lorelei Ln to Periwinkle Dr 03/2018 07/2018 15 20 Patterson Stanislaus PERIWINKLE DR FDR 2" HMA/9" AB Hannah Dr to Morning Glory Dr 03/2018 07/2018 15 20 Patterson Stanislaus J ST FDR 2" HMA/9" AB N 3rd St to N 7th St 03/2018 07/2018 15 20 Patterson Stanislaus N 3RD ST FDR 2" HMA/9" AB K St to M St 03/2018 07/2018 15 20 Patterson Stanislaus N 4TH ST FDR 2" HMA/9" AB N Salado Ave to I St 03/2018 07/2018 15 20 Patterson Stanislaus TARLAND LN 2.5" AC Overlay Kirkwall Wy to Orkney Dr 03/2018 07/2018 10 15 Patterson Stanislaus MORAY WY 2.5" AC Overlay Kirkwall Wy to Mackilhaffy Dr 03/2018 07/2018 10 15 Patterson Stanislaus MORAY CT 2.5" AC Overlay Moray Wy to West End 03/2018 07/2018 10 15 Patterson Stanislaus SPERRY AVE 2.5" AC Overlay S American Eagle Ave to Walker Ranch Pkwy 03/2018 07/2018 10 15 Patterson Stanislaus SPERRY AVE 2.5" AC Overlay Walker Ranch Pkwy to Baldwin Rd 03/2018 07/2018 10 15 Patterson Stanislaus WARD AVE 2.5" AC Overlay W Las Palmas Ave to James Burke Ave 03/2018 07/2018 10 15 Patterson Stanislaus WARD AVE 2.5" AC Overlay James Burke Ave to N Salado Ave 03/2018 07/2018 10 15 Patterson Stanislaus WARD AVE 2.5" AC Overlay N Salado Ave to American Eagle Ave 03/2018 07/2018 10 15 Patterson Stanislaus E LAS PALMAS AVE 2.5" AC Overlay 699 E/O N Hartley St to N Hartley St 03/2018 07/2018 10 15 Patterson Stanislaus E LAS PALMAS AVE 2.5" AC Overlay La Lynn Dr to N Hartley St 03/2018 07/2018 10 15 Patterson Stanislaus E LAS PALMAS AVE 2.5" AC Overlay N 1st St to Weber Ave 03/2018 07/2018 10 15 Patterson Stanislaus HANNAH DR 2.5" AC Overlay Periwinkle Dr to Lorelei Ln 03/2018 07/2018 10 15 Patterson Stanislaus ROSEMARY DR 2.5" AC Overlay Hannah Dr to Morning Glory Dr 03/2018 07/2018 10 15 Patterson Stanislaus SAFFRON WY 2.5" AC Overlay Walnut Ave to Perwinkle Dr 03/2018 07/2018 10 15 Patterson Stanislaus N 3RD ST 2.5" AC Overlay Plaza Cir to K St 03/2018 07/2018 10 15 Patterson Stanislaus N 4TH ST 2.5" AC Overlay I St to L St 03/2018 07/2018 10 15 Patterson Stanislaus N 6TH ST 2.5" AC Overlay H St to L St 03/2018 07/2018 10 15 Patterson Stanislaus N 6TH ST 2.5" AC Overlay W Las Palmas Ave to H St 03/2018 07/2018 10 15 Patterson Stanislaus N 7TH ST 2.5" AC Overlay N Salado Ave to L St 03/2018 07/2018 10 15 Perris Riverside A Street Pavement Rehab Repave existing 1.25 miles of roadway A Street (between 4th Street and Nuevo Road) 07/2018 12/2018 07 10 Perris Riverside Perris Boulevard Pavement Rehab Repave existing 2.00 miles of roadway Perris Boulevard (between Ramona Expressway and Orange Avenue) 07/2019 12/2019 07 10 Perris Riverside Ramona Expressway Pavement Rehab Repave existing 4.25 miles of roadway Ramona Expressway (between Webster Avenue and Rider Street) 07/2018 12/2018 07 10 Perris Riverside Wilkerson Avenue Pavement Rehab Repave existing 0.33 miles of roadway Wilkerson Avenue (between 4th Street and San Jacinto Avenue) 07/2018 12/2018 07 10 Perris Riverside Mountain Avenue Pavement Rehab Repave existing 0.75 miles of roadway Moutatin Avenue (between A Street and Sunnysands Drive) 07/2018 12/2018 07 10 Perris Riverside G Street Pavement Rehab Repave existing 0.50 miles of roadway G Street (between 4th Street and Case Road) 07/2019 12/2019 07 10 Perris Riverside Goetz Road Pavement Rehab Repave existing 1.25 miles of roadway Goetz Road (between Ethanac Road and southern City Limits) 07/2019 12/2019 07 10 Perris Riverside Citywide Pavement Rehab Repave various streets throughout the City Various streets in throughout City 07/2018 12/2018 07 10 Petaluma Sonoma Pavement Restoration Apply 19,400 square yards of slurry seal and install new striping and pavement markings B Street between Petaluma Blvd South and El Rose Drive 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 24,300 square yards of slurry seal and install new striping and pavement markings I Street between Petaluma Blvd South and the City Limits 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 6,300 square yards of slurry seal and install new striping and pavement markings Grant Street between I Street and Mountain View Avenue 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 14,400 square yards of slurry seal and install new striping and pavement markings Madison Street between Arlington Drive and Lakeville Street 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 3,700 square yards of slurry seal and install new striping and pavement markings McKenzie Avenue between McDowell Blvd S. and Stuart Drive 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 4,800 square yards of slurry seal and install new striping and pavement markings Kresky Way between Stuart Drive and Lindberg Lane 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 7,500 square yards of slurry seal and install new striping and pavement markings Lindberg Lane between Saint Francis Drve and McDowell Boulevard South 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 5,100 square yards of slurry seal and install new striping and pavement markings Saint Francis Drive between Lindberg Lane and Lombardi Avenue 11/2017 05/2018 05 07 Petaluma Sonoma Pavement Restoration Apply 3,700 square yards of slurry seal and install new striping and pavement markings S. McDowell Blvd Extension between Lakeville Highway and the bridge 11/2017 05/2018 05 07 Pico Rivera Los Angeles Telegraph Road Resurfacing Project Street Overlay Improvement From Passons Blvd to East City Limits 07/2017 12/2018 10 20 Pico Rivera Los Angeles Telegraph Road Resurfacing Project Street Overlay Improvement From Manzanar Avenue to West City Limits 07/2017 12/2018 10 20 Piedmont Alameda 2017 Pavement Project The project includes replacement of 10 pedestrian ramps to meet accessibility standards; installation of 651 Arbor Drive, Lower Wildwood, Abbott Way, Echo Lane, Nellie Avenue, Crocker Avenue, Highland 10/2017 06/2018 10 20 square feed of sidewalk and 475 feet of curb and gutter; placement of 3,652 square yards of new pavement; and Way and Caperton Avenue placement of 14,476 square yards of micro-paving slurry seal. Pinole Contra Costa Annual Residential Slurry Seal Project crack seal, repair isolated base failures, slurry seal, and reinstall existing striping Crestview Dr (all), Major Vista Ct (all), Nob Hill Ave (Meadow Ave to Sunnyview Dr), Fifth Ave 06/2018 12/2020 03 05 (San Pablo Avenue to Nob Hill Ave), O’Conner Dr. (City Limits to Bantry Rd). Pismo Beach San Luis Obispo Shell Beach Streetscape Streetscape project resurfacing an existing road, providing separate bike/pedestrian lane, bulbouts, landscaping, Shell Beach Road, Pismo Beach, CA 93449 12/2017 05/2019 20 50 street furniture, etc. Pittsburg Contra Costa 2017/18 Traffic Calming Project Installation of speed humps and RADAR speed feedback signs to help slow traffic Brookside Drive - four locations, other locations to be determined. 01/2018 06/2018 10 20 Pittsburg Contra Costa Bart Station Parking Strategy and Install informational and directional signage for new BART station and signage for designated parking areas. Various areas around the newly constructed BART station at Railroad Avenue and Highway 4. 01/2018 06/2018 20 20 Signage Pittsburg Contra Costa 2017/18 Citywide Pavement Patch paving on Loveridge Road from Pittsburg-Antioch Highway to E. Leland Road. Also includes patch paving on Patch paving on Loveridge Road from Pittsburg-Antioch Highway to E. Leland Road. Also 01/2018 06/2018 10 10 Management Project W. Leland Road from Burton Avenue to Bailey Road. includes patch paving on W. Leland Road from Burton Avenue to Bailey Road. Pittsburg Contra Costa Traffic Signal Modification Modifications to traffic signal timing and modernization of traffic control equipment. Citywide, with emphasis on the Leland Road corridor. 01/2018 06/2018 01 10 Placentia Orange Residential Slurry Seal Project Preventative maintenance project to provide a rubberized slurry seal coat to approximately 1 million square feet The residential streets to be included in this project are identified in the attached map. 09/2017 11/2017 07 10 of residential streets. Additional project areas will be included as additive alternate bid items that depending on competitive bids will allow the City to slurry seal up to 2.2 million square feet of residential streets. Placentia Orange Metrolink Station Parking Structure In partnership with the Orange County Transportation Authority, the City is constructing a 246 space parking 321 S. Main Street, Placentia, CA 92870 11/2017 04/2018 50 75 structure and the newest Metrolink Train Station to be built in Orange County in 15 years. The parking structure will support the Metrolink station along with two existing public parking lots. Placerville El Dorado Country Club Dr. Remove and Replace Remove large cracks in pavement and replace with new AC as described in the project location Country Club Drive From Top of Country Club Drive near Airport at city county line to Cedar 12/2017 02/2018 05 10 Asphalt Cracks Ravine Road. Placerville El Dorado Country Club Dr. Crack Sealing Crack seal the road section as described in the project location using a Hot crack sealing machine Country Club Drive From Top of Country Club Drive near Airport at city county line to Cedar 12/2017 03/2018 05 10 Ravine Road. Placerville El Dorado Placerville Dr. Crack Sealing Crack seal the road section as described in the project location using a Hot crack sealing machine On Placerville Drive between Ray Lawyer Dr. and US Hwy 50 Bridge at Main street. 12/2017 04/2017 05 10

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Pleasant Hill Contra Costa Pleasant Hill Road Improvement .5 mile of complete street and safety improvements Taylor Boulevard to Gregory Lane 06/2018 04/2020 15 25 Project (Taylor Boulevard to Gregory Lane) Pleasanton Alameda Annual Resurfacing & Reconstruction This annual project involves the resurfacing and reconstruction of various city streets to assure conformance with Various Streets throughout the City, including but not limited to: Main Street/Santa Rita (from 10/2017 05/2018 10 15 of Various Streets city maintenance standards and the Complete Streets Policy. Streets to be resurfaced and reconstructed will be Bernal Avenue to Amador High School); Foothill Road (from I-580 to Muirwood); Muirwood determined based upon conclusions reached as part of Pavement Condition Survey studies. When resurfacing Drive North (from Foothill to W. Las Positas) and various courts off Muirwood; Johnson Drive thoroughfares, the asphalt mix will be sound attenuating pavement to attenuate tire noise, slightly increasing the (from Owens Drive to Commerce Drive); Stoneridge Drive around Gibraltar; Various streets in cost of resurfacing. The project will include performing base repairs and crack sealing for the Annual Slurry Seal County Fair Estates, off of Paseo Santa Cruz (north); Various streets in Val Vista, off of Single project. In addition, the replacement of existing traffic loop detectors, installation of traffic signal cameras, and Tree, Payne, Alvord, and Inglewood. the reconstruction of pavement surface approaches to signalized intersections will be completed. Traffic striping will be updated to accommodate new bike lanes where possible in accordance with the Bicycle Master Plan.

Plymouth Amador SR49/Main St Roundabout Project Replace two way stop intersection on SR49 with a SOTA Roundabout to eliminate a very dangerous intersection at Intersection of State Route 49 and Main St. in Plymouth, CA Lat:38°'28'54.6"N Long: 120° 06/2017 12/2017 20 40 SR49& Main St. in Plymouth, CA. Adding pedestrian/bike crossings. 50'41.28"W Point Arena Mendocino Port Road Rehab & Overlay 2” AC overlay for .6 mile long by 25’ (Approximate). 200 sq. ft. of dig outs and replacement prior to overlay. On Port Road, extending easterly from the western terminus at the Point Arena Pier ramp for 02/2018 06/2018 15 20 0.6 miles, ending approximately at the eastern terminus near the Iversen Road junction. Pomona Los Angeles Street Preservation-Local Citywide Street Preservation of local streets Citywide, according to pavement management program, focused primary on Please See Attachment "A" Streets List 10/2018 10/2019 02 12 (FY17-18) Project No. 428-68558 slurry seals, cape seals, and thin overlays. Pomona Los Angeles Public Works - Work Order System Purchase and implementation of a centralized work order tracking system for maintenance and repair requests, Citywide 01/2017 06/2018 10 15 and completion of said work for road, lighting, traffic signals and signage, and storm drain system; provide for an overall centralized database for efficient tracking of work orders, staff time, materials,etc. Pomona Los Angeles Conversion of an existing City truck to Funding will provide for the replacement of a crane on an existing Tree Trunk Removal Truck with an Asphalt Citywide 11/2017 06/2018 10 15 include an asphalt material bed Material Bed. This will allow Public Works Street Crews to carry asphalt for the fixing of potholes and patchwork more efficiently. Pomona Los Angeles Safety Training and Equipment for To provide safety equipment for field crews who are inspecting and providing maintenance for City streets. Citywide 11/2017 06/2018 02 02 Field Crews Pomona Los Angeles GPS Tracking System GPS tracking system for field crews within the Traffic Signal and Lighting Division to be able to identify and track Citywide 11/2017 06/2018 05 06 service locations in real time. Pomona Los Angeles Contract Landscape Maintenance Provide for landscape maintenance to medians and tree wells, to include pest control, debris and trash removal, Garey Avenue from Aliso Street to Foothill Boulevard 11/2018 06/2018 01 01 tree maintenance, lifting of trees as necessary, sucker removal, trimming of shrubs and ground cover, watering and irrigation, backflow certification, replacement of all irrigation parts including valves, heads, backflow device and controllers as necessary. Maintenance is continuous. Pomona Los Angeles Contracted Asphalt and Concrete Contracted Asphalt and Concrete Repair Services to supplement existing field crews and provide asphalt repairs to Citywide 11/2017 06/2018 01 10 Repair Services include potholes, patchwork repairs where broken asphalt and other areas require service and repair on an as- needed basis. Typical locations for repair services consist of residential and arterial roadways. This will also supplement services for repairs to sidewalks, curbs and gutters. Pomona Los Angeles Contract Landscape Maintenance Provide for landscape maintenance of sloped areas at on- and off-ramps. Work will include weed control, pest SR-71/Mission Blvd. 04/2018 06/2018 01 01 control, debris and trash removal, tree maintenance, as necessary, trimming of shrubs and ground cover, watering and irrigation. Maintenance is continuous. Port Hueneme Ventura Ventura Road Crack fill and slurry Various locations along Ventura Road from Port Hueneme Road to Channel Islands Blvd 05/2018 06/2018 15 20 Port Hueneme Ventura Crosswalk Upgrades Upgrade signs and striping with new highly reflective material Bard Road, Scott Street, Pearl Street, Bryce Canyon, Sunkist Street and Wheelhouse Avenue 04/2018 05/2018 15 20 Port Hueneme Ventura Pedestrian Safety Replacement of cracked, uplifted sidewalks and additional curb ramps Bard Road, Scott Street, Pearl Street, Bryce Canyon, Sunkist Street and Wheelhouse Avenue 05/2018 06/2018 15 20 Porterville Tulare Orange Avenue Rehabilitation of four-lane arterial road half mile in length and 64 feet wide. The rehabilitation includes the Between Main Street and Plano Street, this is also a school route to Santa Fe Elementary 07/2017 07/2018 10 15 removal and replacement of the asphalt pavement section and curb ramps, updating traffic signal components, School. and other related items to improve the deficiencies of the roadway. Portola Plumas West Street Patching Patch selected potholes - remove and replace base and asphalt pavement as required Along entire length of West Street 09/2018 09/2018 02 05 Portola Plumas Joy Way Street Patching Patch selected potholes - remove and replace base and asphalt pavement as required Along entire length of Joy Way 09/2018 09/2018 02 05 Portola Plumas Main Street Patching Patch selected potholes - remove and replace base and asphalt pavement as required Along entire length of Main Street 09/2018 09/2018 02 05 Portola Plumas Pacific Street Patching Patch selected potholes - remove and replace base and asphalt pavement as required Along entire length of Pacific Street 09/2018 09/2018 02 05 Portola Plumas 2nd Ave Patching Patch selected potholes - remove and replace base and asphalt pavement as required Along entire length of 2nd Ave 09/2018 09/2018 02 05 Portola Plumas Taylor Ave Patching Patch selected potholes - remove and replace base and asphalt pavement as required Along entire length of Taylor Ave 09/2018 09/2018 02 05 Portola Valley San Mateo 2017/2018 Street Resurfacing project Project will consist of: Base repairs, crack seal, slurry seal or asphalt overlay, traffic striping Cheyenne Point: Entire Length 05/2019 06/2019 04 06 Portola Valley San Mateo 2017/2018 Street Resurfacing project Project will consist of: Base repairs, crack seal, slurry seal or asphalt overlay, traffic striping Nathorst Avenue (East) , Entire Length 05/2019 06/2019 04 06 Portola Valley San Mateo 2017/2018 Street Resurfacing project Project will consist of: Base repairs, crack seal, slurry seal or asphalt overlay, traffic striping Nathorst Avenue (West): Entire Length 05/2019 06/2019 04 06 Portola Valley San Mateo 2017/2018 Street Resurfacing project Project will consist of: Base repairs, crack seal, slurry seal or asphalt overlay, traffic striping Paloma Road: Entire Length 05/2019 06/2019 04 06 Portola Valley San Mateo 2017/2018 Street Resurfacing project Project will consist of: Base repairs, crack seal, slurry seal or asphalt overlay, traffic striping Sioux Way: Entire Length 05/2019 06/2019 04 06 Poway San Diego 17/18 Street Maintenance Project This project will provide deep patching, crack sealing, and slurry seal coating for all streets in Street Maintenance Ciy of Poway street maintenance zone 8, consisting of all public streets generally west of 06/2017 10/2017 15 20 Zone 8, extending the life of the existing asphalt. Zone 1 contains approximately 21 miles of residential, collector Pomerado Road between Twin Peaks Road and the south City limit, and south of Poway Road and arterial roadways. between Community Road and the west City limit. Rancho Cordova Sacramento 2017 Street Rehabilitation Project This project will rehabilitate the roadways within the Cordova Meadows neighborhood. This project will also Cordova Meadows Neighborhood 07/2017 11/2017 20 20 include sidewalk upgrades/repairs and storm drain upgrades as necessary. (SB1 funds to be spent in FY 17/18) Rancho Cordova Sacramento Sunrise Boulevard Rehabilitation - This project will rehabilitate Sunrise Boulevard from Folsom Boulevard to Citrus Road. The project will also Sunrise Boulevard from Folsom Boulevard to Citrus Road 10/2017 11/2018 15 20 Phase I include sidewalk upgrades/repairs and storm drain upgrades as necessary. (SB1 funds to be spent in FY 18/19) Rancho Cucamonga San Bernardino 6th Street from Milliken Avenue to The project involves storm drain, localized asphalt repair, cold planning, crack sealing, asphalt rubber hot mix 6th Street from Milliken Avenue to Charles Smith Avenue. 03/2018 04/2018 20 30 Charles Smith Avenue Pavement overlay, video detection signal upgrades, ADA ramp upgrades, utility adjustments and pavement striping for Rehabilitation approximately 0.85 miles of roadway. Rancho Cucamonga San Bernardino Jersey Boulevard from Haven Avenue The project involves cold planning, localized asphalt repair, crack sealing, asphalt rubber hot mix overlay, video Jersey Boulevard from Haven Avenue to Rochester Avenue 03/2018 04/2018 20 30 to Rochester Avenue Pavement detection signal upgrades, ADA ramp upgrades, utility adjustments and pavement striping for approximately 1.70 Rehabilitation miles of roadway. Rancho Mirage San Bernardino Dinah Shore Drive Pavement This project will include a full rehabilitation of existing pavement on the westbound #1 lane of a 3/4-mile segment Dinah Shore Drive, north side, from Los Alamos Road to 1,320’ west of Bob Hope Drive (Total 06/2018 06/2018 15 20 Rehabilitation of Dinah Shore Drive that was recently annexed into the City of Rancho Mirage. The existing pavement has distance: 0.75 miles) deteriorated over numerous years without the necessary maintenance, which has resulted in severe alligator cracking over the entire length and a Pavement Condition Index of 41 – the lowest in the City of Rancho Mirage. The City plans to utilize the cold in-place recycling method for existing asphalt pavement in order to reduce costs.

Rancho Palos Verdes Los Angeles Arterial Rehabilitation Project - Crest Repave/Resurface 1 mile of roadway with asphalt rubber pavement, pedestrian enhancements and pavement Crest Road East from Palos Verdes Drive East to 500 feet north of Ganado Drive 11/2017 03/2018 18 22 Road East striping. Rancho Santa Margarita Orange Avenida Empresa Pavement The project consists of grinding 0.2 miles of existing asphalt, placement of a new layer of asphalt concrete and full City of Rancho Santa Margarita in the County of Orange, located on Avenida Empresa within the 03/2018 06/2018 10 15 Rehabilitation Project depth reconstruction in localized areas. bounds of Antonio Parkway and Avenida De Las Banderas

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Red Bluff Tehama Walnut Ave. Overlay Microsurfacing of halfwidth of Walnut Street between Paskenta and David. Complete the resurfacing that has Walnut Street between Paskenta and David 03/2018 05/2018 05 07 occurred as part of Courthouse project. Red Bluff Tehama S. Jackson Street Rehabilitation Pavement rehabilitation and microsurfacing of S. Jackson Street between Vista Way and Luther Road. Infill of S. Jackson Street between Vista Way and Luther Road 12/2017 03/2018 05 07 approximately 1,200 lf of sidewalk adjacent to Vista School. Redding Shasta 2017 Cape/Slurry Seal Project Residential cape and slurry seal project in various neighborhoods in Redding Various neighborhoods in Redding 04/2018 07/2018 05 12 Redding Shasta Quartz Hill Road ATP Widening Project includes installation of bike lanes and sidewalks along Quartz Hill Road. Also the addition of enhanced Quartz Hill Road from Market Street to just south of Terra Nova 11/2017 08/2017 10 20 pedestrian crossings with rapid flashing beacons Redding Shasta Bechlli Lane ATP Improvements Project includes a road diet, sidewalk gap closure, ADA curb ramps, buffered bike lanes and enhanced pedestrian Bechelli Lane from Cypress Ave on the north to Riverview Country Club 02/2019 09/2019 10 15 crossings Redding Shasta 2017 ADA Curb Ramp and Siewalk Installation of new ADA curb ramps and repair of lifted sidewalk sections Various locations throughout the City 10/2017 12/2017 10 20 Repair Project Redlands San Bernardino PIPP Implementation Install bike boulevards, high-visibility crosswalks, pedestrian bulbouts, and ADA accessibility features around the Various locations along Grant Avenue, Cajon Street, and Vine Avenue 06/2018 12/2018 30 30 Redlands Library and Redlands Bowl Redondo Beach Los Angeles North Redondo Beach Commercial The project will resurface the commercial streets in north Redondo Beach including Santa Fe, Space Park Drive, The project will resurface the commercial streets in north Redondo Beach including Santa Fe, 06/2018 12/2018 20 30 Streets and Doolittle. Curbs and gutters will be repaired and replaced as necessary. (Adopted CIP, pg. 22) Space Park Drive, and Doolittle. Curbs and gutters will be repaired and replaced as necessary. (Adopted CIP, pg. 22) Redwood City San Mateo 2017-2018 Overlay Project (Twin Preventative rehabilitation and pavement maintenance, including raising utilities covers to grade, ADA Twin Dolphin Drive, Marine to Redwood Shores Parkway, in the City of Redwood City 04/2018 04/2019 08 15 Dolphin Drive) improvements and installation of associated markers and striping. Redwood City San Mateo Hopkins Avenue Overlay Project Preventative rehabilitation and pavement maintenance, including raising utilities covers to grade, ADA Hopkins Avenue, El Camino Real to Upland Road 12/2018 12/2019 08 15 improvements and installation of associated markers and striping. Reedley Fresno Manning Ave - Frankwood to Columbia The City of Reedley will be utilizing the full 2017-18 allocation of SB 1 for partial funding of a multi-year project for Manning Avenue, between North Frankwood Avenue and Columbia Avenue. 03/2018 06/2018 10 15 heavy road maintenance on Manning Ave., between North Frankwood Ave. and Columbia Ave. Manning Ave. is classified as a major arterial street for the City of Reedley. A Pavement Management Plan, which included the inspection of all streets within the City limits, was completed in March of 2017. This plan indicated that the aforementioned section of roadway has an average Pavement Condition Index of 38, thus the condition is classified as poor, and the roadway is in dire need of maintenance or rehabilitation. The City lacks sufficient funds for complete roadway reconstruction so the City is planning to perform heavy maintenance activities on the roadway, including crack sealing, dig outs where needed, and a complete Cape Seal. Cape Seal will include a chip seal followed by a slurry seal and then complete re-striping of the roadway. The total cost of the project is anticipated to be $225,000, which will utilize the entire anticipated 2017-18 SB 1 allocation of $180,000, and a portion of the 2018-19 year allocation to complete the project budget. Rialto San Bernardino 2017/18 Annual Street Overlay Project 1. Pavement rehabilitation of the indicated existing street segments (approximately 3.59 miles of road) using one Linden Ave. from Foothill Blvd. to Rialto Ave.; Merrill Ave. from Maple Ave. to Riverside Ave.; 03/2018 09/2018 07 20 or more of the following methods: (1) Cold Milling and Asphalt Concrete (AC) Surface Course; (2) Full Depth AC Rialto Ave. from Riverside Ave. to Sycamore Ave.; Valley Blvd. from Spruce Ave. to 640 ft east of removal and re-construction; (3) Full Depth Reclamation including in-place pulverization and mixing of the existing Lilac Ave.; and Valley Blvd. from Riverside Ave. to East City Limit. pavement to create a stabilized base, followed by construction of AC Base and Surface Course; (4) Cold In-Place Recycling of existing pavement, followed by construction of an AC Surface Course. 2. Addition of new and/or repair/upgrade of curbs and gutters, cross gutters, catch basins, and culverts. 3. Addition of new and/or repair/upgrade of ADA curb ramps; and addition of new sidewalks and/or repair/replacement of damaged sidewalks. 4. Replacing/Upgrading traffic striping and pavement markings. Richmond Contra Costa 2018 Pavement Rehabilitation Project Pavement Rehabilitation 7th Street from Pennsylvania Avenue to Hensley Street; Castro Ranch Road from Olinda Road to 06/2018 12/2019 20 20 the City Limit east of Country View Drive; Central Avenue from east of highway 580 to east of highway 80; Cutting Boulevard from South 49th Street to the City Limit east of Peerless Avenue; Giant Highway from Griffin Drive to Atlas Road; Marina Way from Ohio Avenue to Barrett Avenue; and South 55th Street from Carlson Boulevard to the City Limit north of Creely Avenue.

Ridgecrest Kern Nancy Avenue, Chip Seal Chip Seal 588 lin. ft. by 36 ft. wide local residential street, Nancy Ave. Beginning at the intersection of College Hts. Blvd. and going West to the end of the 2 lane 04/2018 05/2018 04 07 segment. Ridgecrest Kern Portion of W. Dolpin Ave., Slurry Seal Class 2 slurry seal 648 lin. ft. by 33 ft. wide a portion of 2 lane local collector residential street, W. Dolphin. Beginning at the intersection of College Hts. Blvd. and going West to the end of the pavement 04/2018 05/2018 03 05 segment. Ridgecrest Kern Portion of S. Norma Street, Micro Pave Micro Pave 1,320 lin. ft. by 51 ft. wide local collector residential street, S. Norma Street. Beginning at the intersection of S. China Lake Blvd. and going North to the intersection of W. 04/2018 05/2018 06 09 Bataan Ave. Ridgecrest Kern Cielo Ave. Slurry Seal Slurry Seal 2,868 lin. ft. by 36 ft. wide 2 lane local residential street, Cielo Ave. Beginning at the intersection of S. Norma Street and going East to the intersection of College 04/2018 05/2018 03 05 Hts. Blvd. Ridgecrest Kern Portion of E. Wilson Ave. Slurry Seal Slurry Seal 610 lin. ft. by 36 ft. wide 2 lane local residential street, E. Wilson Ave. Beginning at the intersection of Desert Candles Street and going East to the intersection of 04/2018 05/2018 03 05 Sunland Street. Ridgecrest Kern Portion of W. Las Flores Ave. Slurry Slurry Seal 315 lin. ft. by 20 ft. wide segment of local collector residential street. Beginning at the intersection of Garth Ave. at City Limits and going East to the intersection of 04/2018 05/2018 03 05 Seal Mahan Street. Ridgecrest Kern Portion of Chelsea St. Slurry Seal Slurry seal 1,380 lin. ft. by 36 ft. wide 2 lane local commercial street. Beginning at the intersection of Rowe Ave. and going North to the intersection of Ward Ave. 04/2018 05/2018 03 05 Ridgecrest Kern Vulcan Ave. Slurry Seal Slurry seal 2,545 lin. ft. by 36 ft. wide 2 lane local residential street, Vulcan Ave. Beginning at the intersection of Mahan St. and going East to the intersection of Downs St. 04/2018 05/2018 03 05 Ridgecrest Kern Portion of W. French Ave. Slurry Seal Slurry seal 343 lin. ft. by 72 ft. wide 4 lane commercial collector street, W. French Ave. Beginning at the intersection of Balsam St. and going East to the intersection of N. China Lake 04/2018 05/2018 03 05 Blvd. Ridgecrest Kern Portion of S. Mahan St. Micro Pave Micro Pave 2,641 lin. ft. by 36 ft. wide 2 lane residential area, arterial street, S. Mahan St. Beginning at the intersection of E. Upjohn Ave. and going North to the intersection of E. 04/2018 05/2018 06 09 Ridgecrest Blvd. Ridgecrest Kern Portion of Sierra View St. Micro Pave Micro Pave 600 lin. ft. by 36 ft. wide 2 lane residential collector street, Sierra View St. Beginning at the intersection of W. Las Flores Ave. and going North +/- 155 ft. North of the 04/2018 05/2018 06 09 intersection of Mary Ann Ave. Ridgecrest Kern Portion of S. Norma Street Micro Pave Micro pave 330 lin. ft by 60 ft. wide 2 lane residential local collector street, S. Norma St. Beginning at the intersection of Robertson Ave. and going North to the intersection of Church 04/2018 05/2018 06 09 Ave. Ridgecrest Kern Portion of East Bowman Road Rejuvenation seal treatment for 2,150 lin. ft. by 26 ft. wide 2 lane rural arterial street, E. Bowman Rd. Beginning at the intersection of Lumill St. and going East to the intersection of San Bernardino 04/2018 05/2018 02 04 Rejuvenation seal treatment County Line Rd. Ridgecrest Kern Portion of S. Richmond Road Rejuvenation seal treatment for 715 lin. ft. by 24 ft. wide 2 lane commercial, arterial street, S. Richmond Rd. Beginning at the intersection of East Upjohn Ave. and going South +/- 715 ft. to the City Limits. 04/2018 05/2018 02 04 Rejuvenation seal treatment Ridgecrest Kern Portion of East Upjohn Ave. Rejuvenation seal treatment for 1,330 lin. ft. by 66 ft. wide 2 lane residential arterial street, E. Upjohn Ave. Beginning at the intersection of S. Gateway Blvd. and going West to the intersection of Forest 04/2018 05/2018 02 04 Rejuvenation seal treatment Knoll St. Ridgecrest Kern Portion of East Upjohn Ave. Rejuvenation seal treatment for 1,000 lin. ft. by 33 ft. wide 2 lane residential arterial street, E. Upjohn Ave. Beginning at the intersection of Fountain St. and going West to the intersection of S. Richmond 04/2018 05/2018 02 04 Rejuvenation seal treatment Rd. Ridgecrest Kern Portion of West Upjohn Ave. Micro Micro Pave 1,320 lin. ft. by 36 ft. wide 2 lane rural arterial street, W. Upjohn Ave. Beginning at the intersection of S Brady St. and going East to the intersection of S. Guam St. 04/2018 05/2018 06 09 pave Ridgecrest Kern Portion of East California Ave. Rejuvenation seal treatment for 1,320 lin. ft. by 58 ft. wide 2 lane residential local street, E. California Ave. Beginning at the intersection of S. Gateway Blvd. and going East to the intersection of S. 04/2018 05/2018 02 04 Rejuvenation seal treatment Richmond Rd.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Ridgecrest Kern Portion of East Wilson Ave. Rejuvenation seal treatment for 413 lin. ft. by 36 ft. wide 2 lane residential local collector street, E. Wilson Ave. Beginning at the intersection of S. China Lake Blvd. and going East to the intersection of Lumil 04/2018 05/2018 02 04 Rejuvenation seal treatment St. Ridgecrest Kern Portion of American St. Slurry Seal Slurry seal 912 lin. ft. by 36 ft. wide 2 lane residential local street, American St. Beginning at the intersection of E. Church Ave. and going North to the intersection of 04/2018 05/2018 03 05 Commercial Ave. Ridgecrest Kern Portion of American St. Slurry Seal Slurry seal 316 lin. ft. by 36 ft. wide 2 lane residential local street, American St. Beginning at the intersection of Commercial Ave. and going North to the intersection of E. 04/2018 05/2018 03 03 Ridgecrest Blvd. Rio Dell Humboldt General Maintenance and Repairs General Streets Maintenance and Repairs, including but not limited to potholes, sweeping, storm drain City-Wide - Maintenance needs are to be determined by future road conditions. 07/2017 06/2018 01 05 maintenance etc. Rio Vista Solano Sierra Avenue Paving Project ADA curb ramps, grind in place, overlay with new asphalt and replace old water pipeline. Sierra Avenue from Main Street to Drouin Drive 07/2017 10/2017 20 30 Rio Vista Solano Drouin Drive Paving Project ADA curb ramps, grind in place, overlay with new asphalt and replace old water pipeline. Drouin Drive from Sierra Drive to Hwy./ State Route SR12. 07/2017 10/2017 20 30 Rio Vista Solano Access Road to Hwy. 12 from Front ADA curb ramps, grind in place, overlay with new asphalt, add new bicycle and pedestrian crossing with and Front Street to Hwy./State Route SR 12 both off and on ramps. 07/2018 10/2018 20 30 Street flashing repeatable warning sign. Rio Vista Solano 5th Street from Hwy.12 to Logan Street ADA curb ramps, grind place, overlay with new asphalt, and replace old water pipeline. 5th Street from Hwy./State Route 12 to Logan Street. 07/2018 10/2028 20 30 Project Rio Vista Solano Airport Road Repair and Class II Bike Add ADA Class II bike and pedestrian pathway from Church road to St. Francis Way. Airport Road from Church Road to St. Francis Way. 07/2019 12/2019 30 40 Lane Project Ripon Road Overlay Asphalt Grind and Overlay River Road between Jack Tone Road and North Ripon Road 01/2018 06/2018 10 25 Riverbank Stanislaus Prestwick Drive Crack Seal Repairs River Cove Drive to Atchison Street 02/2018 04/2018 05 07 Riverbank Stanislaus St. Lakes Court Crack Seal Repairs River Cove Drive to South End 02/2018 04/2018 05 07 Riverbank Stanislaus Spanish Bay Court Crack Seal Repairs River Cove Drive to South End 02/2018 04/2018 05 07 Riverbank Stanislaus Burneyville Road Crack Seal Repairs Riverside Drive to North End 02/2018 04/2018 05 07 Riverbank Stanislaus River Cove Drive Crack Seal Repairs Burneyville Road to Briar Cliff Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Dunbar Lane Crack Seal Repairs River Cove Drive to Briar Cliff Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Briar Cliff Drive Crack Seal Repairs River Cove Drive to Dunbar Lane 02/2018 04/2018 05 07 Riverbank Stanislaus Turnberry Lane Crack Seal Repairs Briar Cliff Drive to River Cove Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Royal Links Drive Crack Seal Repairs Briar Cliff Drive to River Cove Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Burning Tree Court Crack Seal Repairs Briar Cliff Drive to North End 02/2018 04/2018 05 07 Riverbank Stanislaus Olive Grove Court Crack Seal Repairs Estelle Avenue to East End 02/2018 04/2018 05 07 Riverbank Stanislaus River Mesa Drive Crack Seal Repairs Stanislaus Street to Santa Fe Street 02/2018 04/2018 05 07 Riverbank Stanislaus Almondwood Drive Crack Seal Repairs Rio Verde Drive to Rivergate Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Silver Rock Road Crack Seal Repairs Oakdale Road to Patterson Road 02/2018 04/2018 05 07 Riverbank Stanislaus Goldstone Way Crack Seal Repairs Silverrock Road to High Mesa Way 02/2018 04/2018 05 07 Riverbank Stanislaus South Gate Drive Crack Seal Repairs Lonestar Lane to Oakdale Road 02/2018 04/2018 05 07 Riverbank Stanislaus High Mesa Way Crack Seal Repairs Silverroack Road to Goldstone Way 02/2018 04/2018 05 07 Riverbank Stanislaus Rock Creek Road Crack Seal Repairs Red Rock Lane to Patterson Road 02/2018 04/2018 05 07 Riverbank Stanislaus Kentucky Avenue Crack Seal Repairs Claus Road to Terminal Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Sandy Ridge Drive Crack Seal Repairs Rocky Point Way to Hot Springs Lane 02/2018 04/2018 05 07 Riverbank Stanislaus Hot Springs Lane Crack Seal Repairs Patterson Road to Sandy Ridge Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Rocky Point Way Crack Seal Repairs Sandy Ridge Drive to Clearwater Way 02/2018 04/2018 05 07 Riverbank Stanislaus Clearwater Way Crack Seal Repairs Red Rock Lane to South End 02/2018 04/2018 05 07 Riverbank Stanislaus Red Rock Lane Crack Seal Repairs Sandy Ridge Drive to Clearwater Way 02/2018 04/2018 05 07 Riverbank Stanislaus Colony Manor Drive Crack Seal Repairs Oakdale Road to Estelle Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Crossroads Drive Crack Seal Repairs Mc Cafrey Lane to Colony Manor Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Heritage Manor Drive Crack Seal Repairs Colony Park Drive to Estelle Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Virginia Avenue Crack Seal Repairs Tennessee Avenue to Castleberg Drive 02/2018 04/2018 05 07 Riverbank Stanislaus McAllister Drive Crack Seal Repairs Kasper Drive to McDevitt Road 02/2018 04/2018 05 07 Riverbank Stanislaus DeLeon Way Crack Seal Repairs Mc Caffrey Lane to Mc Allister Lane 02/2018 04/2018 05 07 Riverbank Stanislaus Kasper Drive Crack Seal Repairs Mc Caffrey Lane to Mc Allister Lane 02/2018 04/2018 05 07 Riverbank Stanislaus McCaffrey Lane Crack Seal Repairs Kasper Drive to Crossroads Drive 02/2018 04/2018 05 07 Riverbank Stanislaus McDevitt Drive Crack Seal Repairs Wodard Way to Mc Allister Lane 02/2018 04/2018 05 07 Riverbank Stanislaus Woodard Way Crack Seal Repairs McDevitt Drive to Falcon Ridge Lane 02/2018 04/2018 05 07 Riverbank Stanislaus Deer Ridge Place Crack Seal Repairs Country Manor Drive to North End 02/2018 04/2018 05 07 Riverbank Stanislaus Jaguar Court Crack Seal Repairs Country Manor Drive to North End 02/2018 04/2018 05 07 Riverbank Stanislaus Howard Avenue Crack Seal Repairs Morrill Road to Patterson Road 02/2018 04/2018 05 07 Riverbank Stanislaus Newbrook Drive Crack Seal Repairs Lindbrook Drive to Morrill Road 02/2018 04/2018 05 07 Riverbank Stanislaus Linbrook Drive Crack Seal Repairs Newbrook Drive to Carnwood Drive 02/2018 04/2018 05 07 Riverbank Stanislaus North Rose Brook Drive Crack Seal Repairs Rose Brook Drive to Roselle Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Rose Brook Drive Crack Seal Repairs South Rose Brook Drive to North Rose Brook Drive 02/2018 04/2018 05 07 Riverbank Stanislaus Story Brook Lane Crack Seal Repairs Rose Brook Drive to Roselle Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Soares Place Crack Seal Repairs Roselle Avenue to West End 02/2018 04/2018 05 07 Riverbank Stanislaus Fern Court Crack Seal Repairs Roselle Avenue to SW End 02/2018 04/2018 05 07 Riverbank Stanislaus Ward Avenue Crack Seal Repairs Howard Avenue to Don Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Sierra Street Crack Seal Repairs Eight Street to First Street and Jackson to Callendar Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Second Street Crack Seal Repairs Atchison Street to Sierra Street 02/2018 04/2018 05 07 Riverbank Stanislaus Stanislaus Street Crack Seal Repairs Third Street to Eighth Street 02/2018 04/2018 05 07 Riverbank Stanislaus Texas Avenue Crack Seal Repairs Terminal Avenue to Chief Tucker Avenue 02/2018 04/2018 05 07 Riverbank Stanislaus Nevada Avenue Crack Seal Repairs Terminal Avenue to Eighth Street 02/2018 04/2018 05 07 Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles CRANFORD AV (SEVENTH ST (140' N'LY) to EVERTON PL) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles PRESLEY AV (LINDEN ST to SEVENTH ST) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles SEVENTH ST (EOS to CHICAGO AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles SEVENTH ST (EOS to CRANFORD AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles SEVENTH ST (PRESLEY AV to CRANFORD AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles BOX SPRINGS BL (SYCAMORE CANYON BL to RIVER CREST DR) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles QUAIL VALLEY CT (EOS to BOX SPRINGS BL) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles DOUGLASS AV (UNIVERSITY AV to LINDEN ST) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles ROSSBO AV (WOLFE AV to YOUNG ST) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles BINGHAM AV (HOLE AV to MOBLEY AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles WOLFE AV (ROSSBL AV to MOBLEY AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles YOUNG ST (ROSSBO AV to BINGHAM AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles MERCED DR (MAGNOLIA AV to STERLING AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles PIERCE ST (MAGNOLIA AV to INDIANA ST) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles STERLING AV (PIERCE ST to EOS) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles TENBY CT (WEATHERBY DR to EOS) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles HEATHROW DR (WICKHAM DR to WEATHERBY DR) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles KEYS CT (WEATHERBY DR to EOS) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles NEWMARKET DR (WICKHAM DR to WEATHERBY DR) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles WEATHERBY DR (HEATHROW DR to NEWMARKET DR) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles HEDRICK AV (WELLS AV to HOLE AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Road Maintenance and Rehabilitation project will consist of resurfacing 0.39 miles of arterial and 3.68 miles MIMOSA HILL CT (EOS to HEDRICK AV) 04/2018 08/2018 12 17 Traffic Improvements of residential streets to provide a safer and quieter street network system. Existing concrete sidewalk, curb/gutter, and driveways will be rehabilitated to eliminate tripping hazards and pedestrian ramps will be improved to the current ADA standards. Riverside Riverside 2017-2018 SB-1 Maintenance and The Traffic Signal Installation project (Mission Inn Avenue at Pine Street) would signalize the intersection of MISSION INN AV AND PINE ST 04/2018 08/2018 15 20 Traffic Improvements Mission Inn Avenue at Pine Street. As part of the project, the intersection would include crosswalks and dedicated left-turn lane on Mission Inn Avenue to improve safety and reduce delay to Pine Street.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Riverside Riverside 2017-2018 SB-1 Maintenance and The Pedestrian HAWK Signal Installation project (Arlington Avenue at Arlington Regional Learning Center, east of ARLINGTON AV AND MURRAY ST 04/2018 08/2018 15 20 Traffic Improvements Murray St) would construct a pedestrian HAWK signal directly in front of the Arlington Regional Learning Center so students can access the RTA bus stop on the southerly side of Arlington Avenue. The project would install a crosswalk, pedestrian ramps, and pedestrian indications to safeguard pedestrian crossings. Riverside Riverside 2017-2018 SB-1 Maintenance and The Alley Improvements project would grade and pave the 20-ft alley as indicated. The project would include one- ALLEY BETWEEN FRANKLIN AV AND KANSAS AV / FIFTH ST AND MISSION INN AV 04/2018 08/2018 15 20 Traffic Improvements way, Do Not Enter, and Wrong Way signs to convert the alley to one-way in the eastbound direction. The project would also provide pavement delineation to encourage separation between pedestrians and motorists. Riverside Riverside 2017-2018 SB-1 Maintenance and The Concrete Pad project (on westerly side of Franklin Avenue just south of Sixth Street for Longfellow Elementary FRANKLIN AV AND SIXTH ST 04/2018 08/2018 25 30 Traffic Improvements School) would grade and install a concrete pad measuring approximately 60’x10’ on the westerly side of Franklin Avenue just south of Sixth Street to facilitate drop offs and pick-ups at Longfellow Elementary. Rocklin Placer Citywide Dig Outs The removing and replacing of degraded asphalt needs to be done as part of general repairs and is necessary to Granite Drive (Rocklin Road to Dominguez Road); Lonetree Blvd. (City Limit with Roseville to 02/2018 06/2018 20 20 preserve the roadways and prevent major rehabilitation in the coming years. Sunset Blvd.); Blue Oaks Blvd. (City Limit with Roseville to Sunset Blvd.); Wildcat Blvd. (West Stanford Ranch Road to City Limit with Lincoln); Park Drive (City Limit with Roseville to Stanford Ranch Road); Park Drive (Stanford Ranch Road to Crest Drive); Sunset Blvd. (Stanford Ranch Road to Fairway Drive); Sunset Blvd. (Stanford Ranch Road to HWY 65); Sierra College Blvd. (Rocklin Road to Southside Ranch Road); Sierra College Blvd. (City Limit with Loomis to City Limit with Placer County); West Oaks Blvd. (Sunset Blvd. to Stanford Ranch Road).

Rohnert Park Sonoma Snyder Lane Rehabilitation Pavement rehabilitation (full depth reclamation), replacement of existing Class 2 bike lanes Snyder Lane between Keiser Avenue and Moura Lane 01/2017 11/2017 20 30 Rohnert Park Sonoma Martin Avenue and Commerce Pavement rehabilitation (full depth reclamation or similar treatment) Martin Avenue between Redwood Drive and Dowdell Avenue, and a segment of Commerce 05/2017 09/2018 20 30 Boulevard Rehabilitation Boulevard between Professional Center Drive and Hinebaugh Creek Rohnert Park Sonoma Circle Drive Rehabilitation Pavement rehabilitation (asphalt overlay with pavement fabric reinforcement) Circle Drive, including cul-de-sacs 05/2017 06/2018 10 15 Rohnert Park Sonoma East Cotati Avenue Paving Pavement rehabilitation (asphalt overlay with pavement fabric reinforcement), replacement of existing Class 2 East Cotati Avenue (Easternmost City Limit to City Limit east of SMART railroad tracks) 07/2017 07/2018 10 15 bike lanes Rohnert Park Sonoma State Farm Drive Ph. 1 Rehabilitation Pavement rehabilitation (full depth reclamation), pedestrian crossing enhancements, sidewalk gap closure, bus State Farm Drive between Rohnert Park Expressway and 200' north of Professional Center Drive 11/2017 10/2019 20 30 stop improvement Rohnert Park Sonoma Traffic Signals System Needs Implementation of a central traffic management system, including interconnect media, local intersection Golf Course Drive, Redwood Drive, Rohnert Park Expressway, Commerce Boulevard, Snyder 04/2016 06/2019 10 15 Implementation Project hardware, and central system software and hardware Lane, East Cotati Avenue Rohnert Park Sonoma Southwest and Commerce Boulevard Improvement of traffic flow through this intersection which may include lane reconfiguration and installation of Intersection of Southwest Boulevard at Commerce Boulevard 01/2018 11/2020 25 30 Intersection Improvements various traffic devices (signal, signage and pavement markings. Rolling Hills Estates Los Angeles 2017-18 Street Resurfacing Project Resurface 4.63 lane miles of road Hawthrone Blvd (n/s City limit to s/PVDN); Silver Spur (s/s City limit to 150' N/Kingspine); 03/2018 06/2018 25 30 Deerhill Drive, Harbor Sight Drive, Spinning Wheel Lane and Sweetgrass Drive Rosemead Los Angeles Walnut Grove Resurfacing Project The Project consists in ARHM pavement overlay, sidewalk replacement, striping, curb ramp installation, tree From Northerly City Limit to Valley Boulevard. 05/2018 06/2018 10 15 planting and appurtenances. Roseville Placer 2017 Residential Resurfacing Project The project will remove and replace failed asphalt concrete roadway sections and apply a preventative Hillcrest residential neighborhood 01/2018 11/2018 07 10 maintenance surface treatment. The maintenance surface treatment will provide a water proof membrane to protect the existing asphalt surfaces and extend the life of the underlying pavement. Ross Marin FY17/18 Pavement Rehab Program grind and 2" AC overlay of existing street Wellington, Fallen Leaf: Entire length 03/2018 06/2018 15 25 (PRP) Ross Marin FY18/19 Pavement Rehab Program grind and 2" AC overlay of existing street Bolinas, Walnut, Olive: Entire length 03/2019 06/2019 15 25 (PRP) Ross Marin FY19/20 Pavement Rehab Program Lagunitas:micro surface otherwise grind and 2" AC overlay of existing street Lagunitas:Allen to Woodside, Chestnut:Bridge to Town Limit, Thomas Ct.: Entire length 03/2020 06/2020 15 25 (PRP) Ross Marin FY20/21 Pavement Rehab Program Lagunitas:micro surface otherwise grind and 2" AC overlay of existing street Lagunitas:Woodside to Glenwood, Laurel Grove:Walters to Canyon 03/2021 06/2021 15 25 (PRP) Sacramento Sacramento Natomas Boulevard Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and Natomas Boulevard from North Park Drive to Elkhorn Boulevard 06/2018 11/2018 30 30 avoid major street reconstruction in the future. Sacramento Sacramento Grand Avenue Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and Grand Avenue from Marysville Boulevard to Rio Linda Boulevard 06/2018 11/2018 30 30 avoid major street reconstruction in the future. Sacramento Sacramento J Street Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and J Street from 16th Street to 30th Street 06/2018 11/2018 30 30 avoid major street reconstruction in the future. Sacramento Sacramento Folsom Boulevard (former Jackson Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and Folsom Boulevard from Power Inn Road to Florin Perkins Road 06/2018 11/2018 30 30 Hwy) avoid major street reconstruction in the future. Project is former state highway recently relinquished to the City of Sacramento. Sacramento Sacramento Mack Road Placement of Hot Mix Asphalt (HMA) over the existing pavement structure to extend the life of the street and Mack Road from Stockton Boulevard to Morrison Creek bridge deck 06/2018 11/2018 30 30 avoid major street reconstruction in the future. Sacramento Sacramento C Street Application of a microsurfacing treatment to existing asphalt roadway. The pavement seal prevents water C Street from 39th Street to Elvas Boulevard 03/2017 08/2017 15 15 penetration which reduces damage to the underlying road bed and provides a new wearing surface. Sacramento Sacramento Elvas Boulevard Application of a microsurfacing treatment to existing asphalt roadway. The pavement seal prevents water Elvas Boulevard from C Street to H Street 03/2017 08/2017 15 15 penetration which reduces damage to the underlying road bed and provides a new wearing surface. Sacramento Sacramento Westlake neighborhood Application of a slurry seal treatment to existing asphalt roadway. The pavement seal prevents water penetration Westlake neighborhood bounded by Bayou Way to the North, Del Paso Road to the South, El 03/2017 08/2017 15 15 which reduces damage to the underlying road bed and provides a new wearing surface. Centro Road to the East, City limit to the West. Sacramento Sacramento Sundance Lake neighborhood Application of a slurry seal treatment to existing asphalt roadway. The pavement seal prevents water penetration Sundance Lake neighborhood bounded by Del Paso Road to the North, Arena Boulevard to the 03/2017 08/2017 15 15 which reduces damage to the underlying road bed and provides a new wearing surface. South, El Centro Road to the West, Duckhorn Road to the East. Sacramento Sacramento East Sacramento neighborhood Application of a cape seal surfacing treatment to existing asphalt roadway. The pavement seal prevents water East Sacramento neighborhood bounded by B Street to the North, Folsom Boulevard to the 03/2017 08/2017 15 15 penetration which reduces damage to the underlying road bed and provides a new wearing surface. South, Alhambra Boulevard to the West, 40th Street to the East Sacramento Sacramento Curtis Park neighborhood Application of a cape seal surfacing treatment to existing asphalt roadway. The pavement seal prevents water Curtis Park neighborhood bounded by Donner Way to the South, Broadway to the North, 03/2017 08/2017 15 15 penetration which reduces damage to the underlying road bed and provides a new wearing surface. Freeport Boulevard to the West, Franklin Boulevard to the East. Salinas Monterey Williams Rd./John St./E. Alisal St. Design of new roundabout to minimize congestion and idling emissions at the intersection of Williams, John and Intersection of Williams Road, John Street and E. Alisal Street 10/2017 06/2018 25 50 Roundabout Design Alisal. Salinas Monterey E. Alvin Drive Sidewalks Sidewalk repairs on a major arterial street. E. Alvin Dr., between N. Main St. and Natividad Road 01/2018 04/2018 25 50 Salinas Monterey Priority Traffic Signals 1-2 New Traffic Signals on City Priority List (1 & 2) E. Alvin Dr. at Linwood Dr.; Boronda Rd. at Sanborn Rd. 01/2018 12/2018 25 50 Salinas Monterey Priority Traffic Signals 3-4 New Traffic Signals on City Priority List (3 & 4) Williams Rd. at Garner Ave; E. Alisal St. at Murphy St. 01/2018 06/2019 25 50 Salinas Monterey Striping and Signing Upgrade Faded Crosswalks (various locations) and Bikelanes (various locations) Bike Lanes include Alisal Street (Work St. to Bardin Rd.); Abbott St. 01/2018 07/2018 05 07 Salinas Monterey Circle Drive Improvements Pavement repairs and AC overlay on collector street Circle Dr. Circle Dr., between Sanborn Rd. and St Edwards Dr. 03/2018 06/2018 25 50 Salinas Monterey Constitution Blvd Improvements Pavement maintenance (slurry seal) on major arterial street Constitution Blvd. Constitution Blvd., between E. Laurel Dr. and Boronda Rd. 03/2018 06/2018 05 07 Salinas Monterey Natividad Road Improvements Pavement maintenance (slurry seal) on major arterial street Natividad Rd. Natividad Road between Lesley Dr and E. Boronda Road 03/2018 06/2018 05 07 Salinas Monterey John Street Improvements Pavement maintenance (slurry seal) on major arterial John St. John Street, between Wood Street and Alisal road 03/2018 06/2018 05 07 Salinas Monterey E. Laurel Drive Improvements Pavement maintenance (slurry seal) on major arterial street E. Laurel Drive E. Laurel Drive, between Natividad Road and N. Sanborn Road 03/2018 06/2018 05 07 Salinas Monterey Bardin Road Improvements Roadway reconstruction Bardin Rd., between Williams Rd. and Alisal Rd. 07/2018 06/2019 25 50

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Salinas Monterey E. Laurel Drive Improvements Pavement maintenance (slurry seal) on a major collector street E. Laurel Drive, between N. Sanborn Road and Williams Rd. 03/2019 06/2019 05 07 Salinas Monterey N. Sanborn Road Improvements Pavement maintenance (slurry seal) on a major arterial street N. Sanborn Road, between John Street and E. Laurel Drive 03/2019 06/2019 05 07 Salinas Monterey Harden Ranch Residential Streets Area Pavement maintenance (slurry seal) on residential streets Harden Ranch residential area, bounded by N. Main St; Natividad Rd; Harden Pkwy.; & Boronda 03/2019 06/2019 05 07 Rd. Salinas Monterey Creekside Residential Streets Area Pavement maintenance (slurry seal) on residential streets Creekside residential area, bound by Independence Blvd; Constitution Blvd; Laurel Dr; & 03/2019 06/2019 05 07 Boronda Rd. Salinas Monterey East Salinas (AKA Williams Ranch) Pavement maintenance (slurry seal) on residential streets East Salinas res area bounded by Const Blvd; Williams Rd; Freedom Blvd; and Boronda Rd 03/2019 06/2019 05 07 Improvements Salinas Monterey Residential Street Improvements Pavement maintenance (slurry seal) on residential streets District 3 residential streets bounded by S. Davis Rd.; W. Market St.; Blanco Rd; Abbot St. 03/2019 06/2019 05 07 Salinas Monterey Residential Street Improvements Pavement maintenance (slurry seal) on residential streets Dist. 5 residential streets bound by City western boundary; Casentini St.; N. Main St.; & Russell 03/2020 10/2020 05 07 Rd. Salinas Monterey Williams Road Imp.- Phase 1 Roadway reconstruction Williams Road Imp., between John St./Alisal St. and Bellhaven St. 04/2021 12/2022 25 50 San Anselmo Marin Merced Avenue Rehabilitation Removal of the existing pavement section and replace with asphalt concrete. Project includes replacing existing Merced Avenue from Fern Lane to San Anselmo Avenue 05/2018 10/2018 20 30 striping and signage, as required, as well as other Complete Streets elements. San Anselmo Marin Plumas Avenue Rehabilitation Removal of the existing pavement section and replace with asphalt concrete. Project includes replacing existing Plumas Avenue from Scenic Avenue to Morton Lane 05/2018 10/2018 20 30 striping and signage, as required, as well as other Complete Streets elements. San Anselmo Marin Morton Avenue Rehabilitation Removal of the existing pavement section and replace with asphalt concrete. Project includes replacing existing Morton Lane from Plumas Avenue to Elm Avenue 05/2018 10/2018 20 30 striping and signage, as required, as well as other Complete Streets elements. San Anselmo Marin San Francisco Boulevard Rehabilitation Removal of the existing pavement section and replace with asphalt concrete. Project includes replacing existing San Francisco Boulevard from Sir Francis Drake Boulevard to end 05/2018 10/2018 20 30 striping and signage, as required, as well as other Complete Streets elements. San Bernardino San Bernardino Bridge and Railing Repairs at Various Bridge and Railing Repairs at Various Locations in the City of San Bernardino by coating with Methacrylate, Citywide within City of San Bernardino 04/2018 06/2018 05 10 Locations patching spalling concrete, repairing bridge seals, repairing damaged or vandalized bridge railing, and related work. San Bernardino San Bernardino Pavement Rejuvenation at Various Crack filling and Slurry Sealing at various citywide locations. The project consists of cleaning and sealing cracks, Citywide within City of San Bernardino 04/2018 06/2018 02 05 Locations (Annual)Slurry grinding raised areas, and applying a slurry seal that protects the street against moisture intrusion into the subgrade.

San Bernardino San Bernardino Inland Center Drive Pavement Pavement Rehabilitation of Inland Center Drive between “E” Street and Adell Street in front of Inland Center Mall Inland Center Drive between “E” Street and Adell Street. 08/2018 11/2018 05 10 Rehabilitation between "E" Street and to repair roadway, broken curb and gutter and sidewalk. Also retrofitting or installing ADA access ramps as Adell street required by State / Federal guidelines. This project will grind 1 ½ “ to 2” of existing asphalt at Inland Center Drive between “E” Street and Adell Street for total of approximately 0.5 miles, repair damaged portions and overlay with new asphalt and restripe. Scope also includes replacement of damaged curb and gutter and sidewalk along 0.5 miles About 13 curb ramps will be retrofit or installed at total of 3 street intersections. San Bernardino San Bernardino Little Mountain Drive Pavement Pavement Rehabilitation of Little Mountain Drive between Kendall Drive and 30th Street. Scope of work also Little Mountain Drive between Kendal Drive and 30th Street. 08/2018 11/2018 05 10 Rehabilitation between Kendall Drive includes repairing or replacing broken curb and gutter and sidewalk. Retrofitting or installing ADA ramps as and 30th Street required by State / Federal guidelines. This project will grind 1 ½ “ to 2” of existing asphalt at Little Mountain Drive between Kendall Drive and 30th Street for total of approximately 3 miles, repair damaged portions and overlay with new asphalt and restripe. Scope also includes replacement of damaged curb and gutter and sidewalk along 3 miles over 13 locations. About 64 curb ramps will be retrofit or installed at total of 16 street intersections. This segment of Little mountain Drive is included in five year Measure I plan adopted by City Council.

San Bruno San Mateo Masson Avenue Rehabilitation Project Street rehabilitation of approximately 1400 feet of failed pavement along Masson Avenue by removal of the On Masson Avenue between Angus Anvenue and San Bruno Avenue 12/2017 08/2018 34 34 existing pavement section and replacement with new asphalt and aggregate base. San Carlos San Mateo 2018 Pavement Rehabilitation-Phase 1 Pavement rehabilitation, maintenance, striping and ADA ramps Arundel Road, Phelps Rd.,Palm Ave., Hillcrest Road, Upland Ave., Vista Ave., Carmelita Drive, 09/2018 10/2018 08 28 Prospect Rd., Brittan Ave., Knoll Dr., Coronado, Hilltop Dr. & Belmont Ave. San Carlos San Mateo 2018 Pavement Rehabilitation-Phase 2 Pavement rehabilitation, maintenance, striping and ADA ramps Cedar Street and Brittan Ave. 02/2019 03/2019 13 13 San Clemente Orange Alley Pavement Rehabilitation Reconstruct about 0.45 miles of 20-foot wide public alleys. Alley west of and parallel to North El Camino Real from Avenida Cabrillo to West El Portal. 02/2018 07/2018 25 30 San Diego San Diego Slurry Seal Group 1803 This project involves the application of a slurry seal on approximately 60 miles of roads throughout the city. Slurry Carmel Mountain Ranch, Centre City, City Heights, Clairemont Mesa, College Area, Kearny Mesa, 01/2018 06/2018 03 07 seal is generally used on streets which are in good condition to protect them from deterioration. The application Kensington-Talmadge, La Jolla, Miramar Ranch North, Navajo, Ocean Beach, Otay Mesa, Otay of a slurry seal, which consists of sand, emulsion and water applied in a thin layer up to 3/8 of an inch thick on a Mesa-Nestor, Peninsula, Rancho Penasquitos, Sabre Springs, Scripps Miramar Ranch, Serra street surface, can protect and preserve the street pavement for approximately 3-7 years. Mesa, Skyline-Paradise Hills, Sorrento Valley, Southeastern San Diego, Tierrasanta, Uptown

San Diego San Diego Slurry Seal Group 1804 This project involves the application of a slurry seal on approximately 60 miles of roads throughout the city. Slurry Carmel Valley, City Heights, Clairemont Mesa, College Area, Eastern Area, Encanto, Greater 02/2018 08/2018 03 07 seal is generally used on streets which are in good condition to protect them from deterioration. The application Golden Hill, Greater North Park, Kensington-Talmadge, La Jolla, Mira Mesa, Miramar Ranch of a slurry seal, which consists of sand, emulsion and water applied in a thin layer up to 3/8 of an inch thick on a North, Mission Valley, Navajo, Normal Heights, Otay Mesa, Pacific Beach, Scripps Miramar street surface, can protect and preserve the street pavement for approximately 3-7 years. Ranch, Southeastern San Diego, Torrey Pines, Uptown San Dimas Los Angeles Rennell Ave Et Al Rehabilitation, resurfacing and restoration of speed bumps. The repair work will also include Rennell Ave from Arrow Hwy to Juanita Ave including adjacent short cul-de-sac 04/2018 06/2018 15 20 upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping. San Dimas Los Angeles Covina Blvd Rehab Project will use Full Depth Reclamation technology up to 15" deep and overlaid with asphalt concrete. Repair and Covina Blvd 04/2019 06/2019 20 25 reconstruction work will include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk Arrow Hwy to 57 Fwy panels and striping. Project will require State and Railroad permits. San Dimas Los Angeles Avenida Entrada Rehab Rehabilitate existing street by use of Full Depth Reclamation technology up to 15" deep and overlay asphalt Avenuda Entrada 04/2020 06/2020 20 25 concrete base and cap. Will also include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, Via Verde to Avenida Ladera sidewalk panels and striping. Project will include grind and overlay of short adjacent cul-de-sac. San Dimas Los Angeles Eaton Road Et Al Project Rehabilitation, resurfacing and restoration of existing street. The repair work will also include Southwest corner of Arrow Hwy and Lone Hill 04/2021 06/2021 15 20 upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping. San Dimas Los Angeles Arrow Highway Rehab Rehabilitation, resurfacing and restoration of existing street. The repair work will also include Arrow Highway 04/2023 06/2023 15 20 upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping. City Limit to City Limit

San Dimas Los Angeles Bonita Ave Corridor Rehabilitate existing street by use of Full Depth Reclamation technology up to 15" deep and overlay asphalt Bonita Ave from San Dimas Ave to eastern City Limits 04/2025 06/2025 20 25 concrete base and cap. Will also include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk panels and striping. Project will include grind and overlay of short adjacent cul-de-sac. San Fernando Los Angeles Residential Street Resurfacing Project Resurfacing of approximately 6,400 linear feet of roadway including: sidewalk, curb/gutter, driveway approach, City of San Fernando: 1) N. Workman St. - Fourth st. to Library St.; 2) N. Huntington St. - Fourth 12/2017 03/2018 15 25 striping and miscellaneous concrete work St. to Library St.; 3) Harps St. - First St. to Fourth St.; 4) Fermoore St. - Fourth St. to Fifth St.; 5) Newton St. - Fourth St. to Fifth St.; 6) Library St. - Harding Ave to Orange Grove Ave.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum San Gabriel Los Angeles Road Maintenance and Rehabilitation The scope of work includes of resurfacing local street pavement, including removing and replacing existing curb San Marino Ave. (Longden to Las Tunas Dr.), Warner Lane (San Marino to west terminus), Oak 03/2018 04/2018 10 15 ramps in order to comply with ADA standards. Lane (San Marino to west terminus), Broadway (Mission Dr. to Junipero Serra), Alanmay (Broadway to Live Oak), Cresta Avenue (Las Tunas to Hermosa), Earle Street (Las Tunas to Elm), and Mission Dr. (Las Tunas to Sycamore) San Jacinto Riverside DeAnza Road Improvements Grind and overlay/Replacement DeAnza (from State Street to Young Street) 03/2018 06/2018 07 10 San Jacinto Riverside Old Mountain Road Reconstruction Full replacement; reconstruction Old Mountain (from 7th Street to Esplanade) 04/2018 07/2018 12 15 San Jacinto Riverside Hewitt Street Improvements Grind and overlay/Replacement Hewitt Street (from Shaver Street to Park Avenue) 03/2018 06/2018 07 10 San Jacinto Riverside Cottonwood Avenue Improvements #1 Grind and overlay/Replacement Cottonwood Avenue (from Lyon Avenue to Palm Avenue) 03/2018 06/2018 07 10 San Jacinto Riverside Cottonwood Avenue Improvements #2 Grind and overlay/Replacement Cottonwood Avenue (from Palm Avenue to Bissell Place) 03/2018 06/2018 07 10 San Jacinto Riverside State Street Improvements Grind and overlay/Replacement State Street (from Esplanade Avenue to Ramonda Expressway) 03/2018 06/2018 07 10 San Jacinto Riverside Sanderson Avenue Improvements Grind and overlay/Replacement Sanderson Avenue (from Cottonwood Avenue to Ramona Expressway) 03/2018 06/2018 07 10 San Jacinto Riverside Ramona Boulevard Improvements #1 Grind and overlay/Replacement Ramona Boulevard (from Young Street to State Street) 03/2018 06/2018 07 10 San Jacinto Riverside Ramona Boulevard Improvements #2 Grind and overlay/Replacement Ramona Boulevard (from Sanderson Avenue to Young Street) 03/2018 06/2018 07 10 San Jacinto Riverside Ramona Boulevard Improvements #3 Grind and overlay/Replacement Ramona Boulevard (from Main Street/San Jacinto Avenue to State Street) 03/2018 06/2018 07 10 San Joaquin Fresno Idaho Avenue Reconstruction Roadway reconstruction In the City of San Joaquin between 9th Street and Main Street. 08/2020 08/2021 10 20 San Joaquin Fresno Nevada Avenue Overlay Roadway overlay In the City of San Joaquin between 5th Street and Main Street. 08/2019 08/2020 10 20 San Joaquin Fresno Roadway Sealing Project Roadway crack sealing and slurry sealing. At various locations in the City of San Joaquin; First St from Colorado to Annabella 08/2020 08/2021 05 10 Annabella from Helm to 4th St Helm from Colorado to California 2nd St from Annabella to Helm 3rd St from Annabella to Helm 1st St Court 2nd St Court 4th St from Annabella to West Nevada West Nevada from 3rd St to 5th St White St from 3rd St to 5th St San Joaquin Fresno 6th Street Repairs Project Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. 08/2019 08/2020 10 20 San Joaquin Fresno 11th Street Reconstruction Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. 08/2022 08/2023 10 20 San Joaquin Fresno 9th Street Reconstruction Roadway reconstruction In the City of San Joaquin Between Colorado Avenue and Nevada Avenue. 08/2023 08/2024 10 20 San Joaquin Fresno Oregon Avenue Reconstruction Roadway reconstruction In the City of San Joaquin Between 9th Street and Pine Street. 08/2024 08/2025 10 20 San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The Blaney Av. (Between Prospect Rd. and Bollinger Rd.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET SEALING PROJECT This project will install microsurfacing sealant over streets that may have received spot "remove and replace" Blossom Hill Rd. (Between Blossom Av. And HWY 101 Bridge) 05/2018 10/2018 05 08 repairs San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The Delmas Av. (Between Santa Clara St and Auzerais Av.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET SEALING PROJECT This project will install microsurfacing sealant over streets that may have received spot "remove and replace" Dry Creek Rd. (Between Bascom Av. And Hicks Av.) 05/2018 10/2018 05 08 repairs San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The McKee Rd. (Between Eastside Dr. and the city limits on Ridge Vista Av.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The McKee Rd. (Between the city limits on Gridley St. and the city limits on Valley View Av.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET SEALING PROJECT This project will install microsurfacing sealant over streets that may have received spot "remove and replace" Monroe St. (Between Newhall St. and Tisch Wy.) 05/2018 10/2018 05 08 repairs San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The Norwood Av. (Between White Rd. and Murillo Av.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The Plumeria Dr. (Between 1st St. and Monague Ex.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET RESURFACING This project aims to resurface and rehabilitate the following section of road within the City of San Jose. The Ringwood Av. (Between Trade Zone Bl. And Murphy Av.) 05/2018 10/2018 15 20 PROJECT project will include work such as Cold In-Place Recycling (CIR), placing pavement fabric, applying a rubberized hot mix asphalt overlay, replacing traffic striping and markings, adding new/enhanced bike lanes, and installing bicycle detector loops. San Jose Santa Clara 2018 MAJOR STREET SEALING PROJECT This project will install microsurfacing sealant over streets that may have received spot "remove and replace" St John St. (Between Montgomery St. and 13th St.) 05/2018 10/2018 05 08 repairs San Jose Santa Clara 2018 MAJOR STREET SEALING PROJECT This project will install microsurfacing sealant over streets that may have received spot "remove and replace" Trade Zone Bl. (Between N. Capitol Av. And Montague Ex.) 05/2018 10/2018 05 08 repairs San Juan Bautista San Benito Muckelemi Street reconstruction Reconstruct existing street w 12" AB and 4"AC; striping for bike lanes The limits of the project are from 4th Street to San Antonio Street 05/2017 08/2017 15 20 San Juan Capistrano Orange Capistrano Villas I, II, and III Pavement The project involves rehabilitation of approximately 2.2 miles of residential streets, construction of 5 ADA ramps, The project area is in the northerly portion of the city, on the west side of the I-5 Freeway, and 01/2018 06/2018 15 30 Rehabilitation replacement of 10 speed humps, and construction of a raised channelization island and an additional street light encompases approximately 80 acres of medium density, low income housing with 799 at one major intersection. The rehabilitation will involve completed pavement reconstruction in some areas and condomenium units. The neighborhood is known as the "Capistrano Villas." The streets in the pavement overlay in other areas. project are Avenida De La Vista, La Zanja Street, Los Rios Street, Calle Santa Barbara, Calle San Luis, Calle San Antonio and Calle San Diego. San Leandro Alameda Adason Drive Placement of thin overlay of travel land and crack-seal surface. Existing PCI=7. Work anticipated to increase PCI by Between Halcyon Drive to Hesperian Blvd. Designated Residential. 03/2018 07/2018 04 05 30-45 points. San Leandro Alameda 150th Avenue Remove and replace distressed pavement sections and crack-seal surface. Existing PCI=49. Work anticipated to Between Hesperian Blvd. to southern City Limits. Designated Arterial. 04/2018 08/2018 05 06 increase PCI by 25-30 points. San Leandro Alameda Durant Avenue Remove and replace distressed pavement sections and crack-seal surface. Existing PCI=23. Work anticipated to South side of road (possibly north side if can be coordinate with Oakland - ROW is in two 05/2018 09/2018 05 06 increase PCI by 35-40 points. different cities), between E. 14th Street to Bancroft Ave. Designated Collector.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum San Leandro Alameda Lafayette Avenue Remove and replace distressed pavement and crack-seal surface. Existing PCI=25. Work anticipated to increase Between Lorraine Blvd. and California Ave. Designated Residential 11/2017 12/2017 05 06 PCI by 35-40 points. San Leandro Alameda Miller Street Remove and replace distressed pavement and crack-seal surface. Existing PCI=45. Work anticipated to increase Between Fairway Dr. and Factor Ave. Designated Local 06/2018 10/2018 05 06 PCI by 35-40 points. San Leandro Alameda Factor Avenue Remove and replace distressed pavement and crack-seal surface. Existing PCI=68. Work anticipated to increase End to end. Designated Local 06/2018 10/2018 05 06 PCI by 35-40 points. San Luis Obispo San Luis Obispo Safe Routes to School Implementation: This project will construct bicycle and pedestrian improvements as part of a Safe Routes to School Plan for the Intersection of Foothill Boulevard and Ferrini Road 10/2017 06/2018 18 20 Foothill Crossing Pacheco and Bishop Peak Elementary Schools. The project will address roadway crossing needs at Foothill Boulevard as well as surrounding the two schools. This project will complement the Broad Street Bicycle Boulevard and the Ramona Neighborhood Traffic Management Program. The project will construct improvements at the intersection of Foothill/Ferinni that includes additional traffic control, sidewalk, curb & gutter changes, and increased traffic warning devices. San Luis Obispo San Luis Obispo Broad Street Bicycle Boulevard Design and construct Phase 1 of the bicycle boulevard on Broad Street from US 101 to Foothill. The project Broad Street, from U.S. Highway 101 to Foothill Boulevard 10/2017 06/2019 18 20 description in currently under study and may include bikeway enhancements along Broad, Chorro and other area streets. San Marcos San Diego Annual Surface Seal Use of a Pavement Preservation Strategy in the placement of a Surface Seal of Roadways Mission Road, Twin Oaks Valley Road 02/2018 08/2018 05 08 San Marino Los Angeles St Rehab Pgm Cycle 1 Yr 2 Resurface local streets pursuant to 2016 PMP Year 2 30-street segments citywide 03/2018 11/2018 20 20 San Marino Los Angeles Del Mar Av Pvmt Rehab Resurface major arterial street Del Mar Av from city limits to Huntington Dr 03/2018 11/2018 20 20 San Marino Los Angeles Huntington Dr Pvmt Rehab Resurface major arterial street Huntington Dr WB Virginia Rd to city limits 03/2018 11/2018 20 20 San Mateo San Mateo E. Hillsdale Boulevard Rehabilitation The project will rehabilitate the pavement on E. Hillsdale Boulevard from Saratoga Drive to Norfolk Street The project is located on E. Hillsdale Boulevard from Saratoga Drive to Norfolk Street in the City 02/2018 09/2018 15 15 (approximately 0.44 miles). The proposed treatment includes milling the existing pavement surface then applying of San Mateo. an asphalt concrete overlay. Related work will include the upgrade of curb access ramps to current standards, installation of pavement striping, and other incidental work such as raising of manhole frames and covers and utility box lids. San Pablo Contra Costa Randy Lane Drainage Improvement The Randy Lane Drainage Project (RLN-DRN) consists of resurfacing pavement following the construction of a new Randy Lane and Giant Road (from Randy Lane to Bridge on Giant Road), San 09/2016 03/2018 15 25 Project storm drain line from Randy Lane to an outfall into San Pablo Creek on Giant Road. Approximately 542 LF of 16- to Pablo, CA 24-inch Storm Drain pipeline; three (3) 48-inch diameter Storm Drain Manholes; one (1) Drainage Inlet; creating storm drain discharge through existing concrete canal wall penetration in San Pablo Creek. CEQA has been completed and all permits, including Section 408, have been approved. San Rafael Marin Lincoln Ave Curb Ramps San Rafael Sanitation District has performed a large sewer replacement on Lincoln Avenue. Once the work Lincoln Avenue: Pacheco Avenue to Hammondale Court 03/2018 06/2018 15 20 underneath the roadway is complete, SRSD will resurface the roadway. In conjunction with the resurfacing work, Public Works will install new ADA compliant curb ramps along Lincoln Avenue where non compliant ramps exist. As is standard practice, all curb ramps are replaced and updated with street resurfacing work is performed. San Rafael Marin Smith Ranch Road Resurfacing Resurfacing, grind, and overlay of new asphalt on Smith Ranch Road in the area underneath the freeway and short Smith Ranch Road: Underneath Highway 101 and adjacent east-west roadway area 03/2018 06/2018 05 10 stretch of Smith Ranch Road east and west. While the roadway directly under Highway 101 is Caltrans jurisdiction, per the agreement in place, the City is responsible for the maintenance of Smith Ranch road. San Rafael Marin Merrydale Pathway – North Connector This project includes the construction of a multi-use path, parking, and other road improvements along one side Las Gallinas Avenue to Civic Center SMART station 05/2018 06/2019 10 15 (Northgate Promenade) of the roadway from Las Gallinas Avenue to the Civic Center SMART station.

The FY 2017-18 amount listed ($100,000) is to contract with an outside firm for the preliminary engineering and design of the pathway. San Ramon Contra Costa Pavement Management 2018 Project This project provides for street rehabilitation work in accordance with the City Pavement Management Program. More than 7 miles of street (54 street segments) within the City of San Ramon. SEE DETAILED 03/2018 10/2018 03 25 Based on a long-range projection, each street is programmed for necessary rehabilitation. Street rehabilitation LIST ON SUPPORT DOCUMENTATION (City Council Staff Report) work will include slurry seal/micro seal, asphalt overlays, street reconstruction, etc. Sand City Monterey Contra Costa Street and Sidewalk Curb, gutter, and sidewalk improvements; and adjacent street rehabilitation with new crosswalk. (funds to be Contra Costa Street/Sidwalk between Elder Avenue and Shasta Avenue 01/2022 03/2022 20 30 Improvement Project banked and combined with other funding sources). Sanger Fresno 7th and P Street Frontage Construction of curb, gutter, sidewalk and landscaping Northeast corner of 7th and P Streets 07/2017 09/2017 50 70 Improvements Sanger Fresno Sanger Streetlight Improvements Installation of new LED streetlights and associated electrical infrastructure. In an area bounded by 7th Street, West Avenue, 9th Street and Greenwood Avenue 11/2017 06/2018 30 50 Project (Phase V) Sanger Fresno Church Avenue Overlay - Bethel to Asphalt overlay with curb ramp upgrades and addition of bicycle lanes. Church Avenue between Bethel and Greenwood Avenues 07/2018 11/2018 15 20 Greenwood Santa Ana Orange Euclid Street Rehabilitation: Hazard City's Pavement Management System has identified Euclid Street from Hazard Avenue to Westminster Avenue as Euclid Street from Hazard Avenue to Westminster Avenue. 08/2018 06/2019 20 20 Avenue to Westminster Avenue a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age, and heavy usage. This project will rehabilitate 2700 feet of Euclid Street; replace damaged curbs, gutters, sidewalks, and driveway approaches; reconstruct 20 curb ramps to conform to the latest ADA standards; and restripe bike lanes. The project will increase the rideability and safety of motorists, pedestrians and bicycle users. Santa Ana Orange Flower Street Preventative Preventative street maintenance is one of the planned strategies prolonging the useful life of streets and reducing Flower Street from Sunflower Avenue to MacArthur Boulevard. 06/2018 12/2018 10 10 Maintenance: Sunflower Avenue to the costly alternative of reconstructing streets. The proposed improvements include the benefits of improving MacArthur Boulevard the texture of the asphalt wearing surface and reducing water infiltration under the pavement to delay the pavement deterioration process. Additionally, this 3700-feet segment of MacArthur Boulevard from Raitt Street to Bristol Street has been identified as high priority in need of preventative maintenance before it deteriorates beyond good condition, which would require a more expensive treatment. Santa Ana Orange MacArthur Boulevard Preventative Preventative street maintenance is one of the planned strategies prolonging the useful life of streets and reducing MacArthur Boulevard from Raitt Street to Bristol Street. 06/2018 12/2018 10 10 Maintenance: Raitt Street to Bristol the costly alternative of reconstructing streets. The proposed improvements include the benefits of improving Street the texture of the asphalt wearing surface and reducing water infiltration under the pavement to delay the pavement deterioration process. Additionally, this 2200-feet segment of Flower Street from Sunflower Avenue to MacArthur Boulevard has been identified as high priority in need of preventative maintenance before it deteriorates beyond good condition, which would require a more expensive treatment. Santa Ana Orange Westminster Avenue Rehabilitation: City's Pavement Management System has identified Westminster Avenue from Harbor Boulevard to Fairview Westminster Avenue from Harbor Boulevard to Fairview Street. 06/2018 12/2018 20 20 Harbor Boulevard to Fairview Street Street as a priority for rehabilitation to prevent further deterioration of the pavement section due to weather, age, and heavy usage. This project will rehabilitate 5300 feet of Westminster Avenue; replace damaged curbs, gutters, sidewalks, and driveway approaches; and reconstruct 20 curb ramps to conform to the latest ADA standards. The project will increase the rideability and safety of motorists and pedestrians. Santa Barbara Santa Barbara Bath Street Overlay Grind and overlay five blocks of Bath Street from Carrillo Street to Micheltorena Street Bath Street from Carrillo Street to Micheltorena Street in Downtown Santa Barbara 03/2019 07/2019 15 20 Santa Clara Santa Clara Annual Street Maintenance and Resurface 1.2 miles of existing streets with asphalt concrete or slurry seal. Remove and replace failed concrete De La Cruz Blvd (Reed St to Central Expy); Monroe St (Cabrillo Ave to Scott Blvd) 04/2018 12/2018 03 20 Rehabilitation Program Project and asphalt concrete pavement, curbs, gutters, sidewalks, curb ramps and median islands. Replace traffic striping, markings, roadway legends and traffic detection loops.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Santa Clarita Los Angeles 2017-2018 Overlay & Slurry Seal The Annual Overlay & Slurry Seal Program reflects the City's commitment to roadway infrastructure by resurfacing This is a Citywide project. Specific roadway segments typically include arterial and residential 06/2017 06/2018 03 15 Program streets in need of attention. streets in the four communities of Santa Clarita: Canyon Country, Newhall, Saugus, and Valencia. Streets identified in the City's Five-Year Pavement Preservation Program will be selected during the design process. Santa Cruz Santa Cruz Catch Basin Replacement Program Upgrade non-standard catch basins with Type B catch basins throughout the city to reduce maintenance Citywide 09/2017 12/2017 30 50 requirements and reduce flooding. Priorities based on operational needs. Santa Cruz Santa Cruz CMP (Corrugated Metal Pipe) Replace corroded and collapsed corrugated metal drainage pipe (CMP) at various locations in the city streets Citywide 09/2017 12/2017 30 50 Replacement storm drain system. Santa Cruz Santa Cruz Streetlights, 555 Pacific Ave. to Beach Install 7 decorative streetlights to complete this missing segment of street lighting consistent with Pacific Avenue South of Laurel Area on Pacific Avenue 03/2018 06/2018 30 50 St. (Downtown) lighting requirements. Santa Cruz Santa Cruz Storm Damage Local match funding for FEMA and OES eligible funded storm damage restoration projects on the city street and Upper Park Road north of DelaVeaga Rd, West Cliff Drive at San Jose, East Cliff Drive at 3rd Ave, 09/2017 10/2018 30 50 multi-use path system Ocean at Plymouth, Parkway north of Allerton Santa Cruz Santa Cruz Arterial and Collector Street Replace sidewalks and access ramps to meet current standards concurrent with reconstructing Arterial and Cedar Street from Laurel to Lincoln 09/2017 10/2018 15 20 Reconstruction Collector Streets Santa Fe Springs Los Angeles Greenleaf Avenue Street Rehabilitation Industrial street project will consist of the removal of existing asphalt concrete/macadam pavement surface, Between Telegraph Road & Los Nietos Road 12/2017 01/2018 15 20 reworking the underlying aggregate base and in situ soil material to provide a firm and stable platform for placing new asphalt concrete pavement. The removal and replacement. The removal and replacement of curb and gutter along with removal of sidewalk and driveways. Santa Maria Santa Barbara North Miller Street and East Alvin Road This project will reconstruct two arterial roadways. New structural base and asphalt concrete will be provided on North Miller Street from Eat Chapel Street to Alvin Avenue; East Alvin Avenue from College 11/2017 03/2018 15 25 Rehabilitation both roadway sections and a 2" asphalt concrete overlay will be placed on areas not reconstructed. The project Drive to the Hwy 101 Bridge. includes installation of new striping and pavement markings. One hundred eighty-one thousand (181,000) square feet of roadway, equivalent to 2.9 lane miles, will be completely renewed. Santa Maria Santa Barbara Thin Maintenance Overlay This project will place a rubberized asphalt overlay approximately 1.25" thick over three (3) existing roadways. East Cypress Street from South Suey Road to South Palisade Drive; 11/2017 05/2018 07 15 The work involves grinding down the edges of the roadways to allow for an even transition from the overlaid North Palisades Drive from East Alvin Avenue to North Valerie Street; roadway and the roadway edge. Once the overlay is complete, the roadway striping will be replaced. This project North Valerie Street from East Alvin Avenue to East Main Street will resurface three (3) severely distressed roadways accounting for 150,000 square feet or the equivalent of 2.4 lane miles. Santa Monica Los Angeles Citywide Annual Paving Project Improvements made through the Annual Paving and Sidewalk Repair Project to maintain the City's streets Citywide 04/2018 04/2019 07 25 Santa Paula Ventura Harvard Boulevard Improvements The project consists of 1.2-miles pavement resurfacing; 14-each curb ramp upgrades; traffic signal modifications; Harvard Blvd. from Peck Rd to 250 feet west of Elizabeth Ct. and adjoining streets [Acacia Rd. 12/2017 03/2019 15 25 Project- Peck Road to Elizabeth Court and 60-linear feet curb and gutter repairs. As a part of the street improvements, this project also consists of (300 to 400 Blocks) from Santa Cruz St. to Harvard Blvd; Dartmouth Rd. (300 Block) from Santa concurrently upgrading wastewater (sewer) and potable water pipes in conformance with the Wastewater System Cruz St. to Harvard Blvd; Lucada St. (300 Block) from Santa Cruz St. to Harvard Blvd.; Laurie Ln. Master Plan and Potable Water System Master Plan, respectively, in order to defer future construction impacts (300 Block) from Santa Cruz St. to Harvard Blvd.; and Santa Cruz St. (500 to 700 Blocks) from onto the neighborhood. Estimated transportation improvements (pavement, curb ramps, curbs, gutters, and Dartmouth Rd. to Princeton St.] traffic signals) construction cost $2,775,000. Santa Paula Ventura Foothill/Hardison/Cameron Storm The project consists of installing a storm water quality treatment control BMP infiltration basin with 0.25-mile Foothill Rd. from Ridge Crest Dr. to Steckel Dr. 11/2017 12/2018 10 20 Drain Project sediment capture chambers incorporating infiltration wells. Estimated construction cost $334,650. Santa Paula Ventura Citywide Crosswalk Safety The project consists of removing 8-each existing in-road warning lights at crosswalks due to obsolete part Existing in-road warning lights crosswalks: Cameron St. and Main St., Harvard Blvd. and Fifth St., 12/2018 12/2019 15 25 Improvement Project materials and replacing with Rectangular Rapid Flash Beacon (RRFB) for enhanced pedestrian safety. Curb ramp Lucada St. and Main St., Main St. and Dean Dr., Main St. and Fourth St., Palm Ave. and Ventura upgrades are proposed adjacent to all RRFB locations. Estimated construction cost $381,157. St., Santa Paula St. and Fifth St., and Ventura St. and Oak St. Santa Paula Ventura Citywide Sidewalk Repair Project The project consists of repairing 54,563-square feet sidewalk trip hazards. Estimated construction cost $398,000. Ventura St. (Seventh St. to Harvard Blvd.), High St. (Ojai Rd. to Guilberson St.), Orchard St. (Ojai 06/2017 12/2018 20 30 Rd. to end), Virginia Terr. (Sixth St. to Ojai Rd.), Santa Barbara St. (Palm Ave. to Sixth St.), Peck Rd. (Harvard Blvd. to Santa Paula St.), Monte Vista Dr. (Sixth St. to Tenth St.), Oak St. (Ventura St. to Santa Barbara St.), Santa Paula St. (Palm Ave. to Sixth St.), Eleventh St. (Santa Paula St. to Saticoy St.), Twelfth St. (Saticoy St. to Santa Paula St.), Saticoy St. (Eleventh St. to Twelfth St.), Sixth St. (Santa Paula St. to Virginia Terr.), Santa Paula St. (Twelfth St. to Eleventh St.), Peralta Dr. (Santa Cruz St. to Santa Ana St.) Santa Paula Ventura Citywide Street Improvements Project- The project consists of 1.7-miles pavement resurfacing; curb ramp upgrades; and curb and gutter repairs. As a part Virginia Terr. (Tenth St. to Park St.), Virginia Terr. (Park St. to Ojai Rd.), Orchard St. (Ojai Rd. to 12/2018 03/2020 15 25 Fiscal Year 2018/2019 of the street improvements, this project also consists of concurrently upgrading wastewater (sewer) and potable Park St.), Park St. (Ojai Rd. to Orchard St.), Ojai St. (Main St. to Santa Barbara St.), Eleventh St. water pipes in conformance with the Wastewater System Master Plan and Potable Water System Master Plan, (Main St. to Santa Barbara St.), Weston Ct. (Santa Paula St. to End), Brett Way (Harvard Blvd. to respectively, in order to defer future construction impacts onto the neighborhood. Estimated transportation End), Sycamore St. (Santa Paula St. to Richmond Rd.), Saticoy (Sycamore St. to Thirteenth St.), improvements (pavement, curb ramps, curbs, and gutters) construction cost $81,000. Saticoy St. (Fourteenth St. to Guiberson St.), Forest Dr. (Mariposa Dr. to Cliff Dr.), Glen Way (Ninth St. to Mill St.), and Princeton (Casabella Ct. to Santa Ana St.) Santa Rosa Sonoma Fulton Road Reconstruction - ADD QUANTIFIABLE MEASUREMENT This project will reconstruct Fulton Road between Occidental Road and W. Fulton Road between Occidental Road and W. 3rd Street 04/2018 04/2019 20 20 Occidental Road to W 3rd Street 3rd Street using roller compacted concrete technology, updating pedestrian ramps to current ADA standards and maintaining existing Class II bicycle lanes. Santee San Diego Illuminated Street Signs Lighting To replace burnt out and/or obsolete bulbs for the internally illuminated street name signs by energy efficient LED all signalized intersections in the city (60) 02/2018 08/2018 15 20 Replacement bulbs which provides much longer service life with energy savings. Santee San Diego Pavement Repair and Rehabilitation Repair and rehabilitate streets as recommended by the City's Pavement Management Analysis Report. The project Includes streets identified in the City's Pavement Management Analysis Report within Zones BF, 04/2018 06/2018 20 25 Citywide will focus on overlays and full reconstruction. BB, BF, AA, CG, EE. BD, EB, CB, CD, FC, CI, CE, ED, AND EF. Santee San Diego Pavement Roadway Maintenance Conduct pavement maintenance on streets as recommended by the City's Pavement Management Analysis Includes streets identified in the City's Pavement Management Analysis Report within Zones BF, 04/2018 06/2018 10 15 Citywide Report. The project will focus on crackfilling and slurry sealing. BB, BF, AA, CG, EE. BD, EB, CB, CD, FC, CI, CE, ED, AND EF. Santee San Diego Bridge Restorations Citywide Provide maintenance and repairs to City owned bridges. Including bridge joint seals, deck sealing, and minor Magnolia Avenue Bridge, Cayamaca Street Bridge, Carlton Hills Boulevard Bridge, Mast 06/2018 06/2019 25 30 patching Boulevard Bridge, and Prospect Avenye Bridge. Saratoga Santa Clara Annual Roadway Improvements Pavement maintenance project to rehabilitate city roadways to improve PCI and safety. AC overlay, Repair Failed City wide various streets. 06/2018 07/2018 10 15 Street Sections, microsurfacing , traffic loops, curb and gutter, ADA ramps and re-striping traffic lanes. Sausalito Marin Turney St Remove and replace existing AC pavement to eliminate exposed road base material from entering the bay during On Turney St., between Bridgeway and the Turney St. boatramp. 04/2018 06/2018 10 30 wet weather. Road base material is exposed here because of the deteriorated pavement. Sausalito Marin Locust St. Remove and replace existing AC pavement to eliminate exposed road base material from entering the bay during On Loucst St., between Bridgeway and the bay 04/2018 06/2018 10 30 wet weather. Road base material is exposed here because of the deteriorated pavement. Sausalito Marin Butte St. Remove and replace existing AC pavement Butte St. from Lower Anchorage to Sacramento Ave. 04/2018 06/2018 20 30 Sausalito Marin Excelsior Ln. Remove existing concrete pavement and replace with AC pavement Excelsior Ln. between Bulkley Ave. and steps to Bridgeway 04/2018 06/2018 20 30 Sausalito Marin Easteby St. AC overlay with attendant grinding and base repair Easterby St. between the Bridgeway/Filbert intersection and Pearl St. 04/2018 06/2018 20 30 Sausalito Marin Girard Ave. Remove existing concrete pavement and replace with AC pavement Girard Ave. between Johnson St. and Truney St. 04/2018 06/2018 20 30 Scotts Valley Santa Cruz Pavement Rehabilitation on Green Hills This project will rehabilitate Green Hills Road from Glen Canyon Road to its terminus. The project will include bike The project location is in Scotts Valley, CA, and includes Glen Canyon Road from Flora Lane to 01/2018 07/2018 15 20 Road lanes, road widening, new curb and gutter, restriping on Glen Canyon Road from Vern Hart Fish Park to Green Hills Green Hills Road, Green Hills Road from Glen Canyon Road to the northern end at S. Navarra Road. The project will also include signage and sharrows on South Navarra Drive from Green Hills Road to Grant Drive, and S. Navarra Drive from the southern end to Granite Creek Road. Creek Road. Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. PURDUE CR BTW COLLEGE PARK DR & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. 5TH ST BTW MARINA DR & PCH 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. COLLEGE PARK DR BTW (S) HARVARD LN & CITY LIMIT 04/2018 06/2018 07 10

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. DARTMOUTH CR BTW HARVARD LN & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. GALLEON WY BTW ELECTRIC AV& DORY WY 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. HARVARD LN BTW COLLEGE PARK DR & OCCIDENTAL LN 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. HARVARD LN BTW OCCIDENTAL LN (N) & COLLEGE PARK DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. LOYOLA PLAZA BTW COLLEGE PARK DR & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. OCCIDENTAL DR BTW STANFORD LN & HARVARD LN 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. PRINCETON CR BTW HARVARD LN & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. SCHOONER WY BTW GALLEON WY & DORY WY 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. STANFORD LN BTW COLLEGE PARK DR & COLLEGE PARK DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. YALE CR BTW END & YALE LN 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. YALE LN (N) BTW COLLEGE PARK DR & (S) COLLEGE PARK DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. ADOLFO LOPEZ DR BTW END & 425 E/SEAL BEACH BL 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. ADOLFO LOPEZ DR BTW SEAL BEACH BL & 425 W/SEAL BEACH BL 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. BALBOA DR BTW PCH& BOLSA AV 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. BAYSIDE DR BTW BOLSA AV & CRESTVIEW AV 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CARMEL AV BTW SURF PL & COASTLINE DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CATALINA AV BTW BALBOA DR & COASTLINE DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CATALINA AV BTW SEA BREEZE DR & BALBOA DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. COASTLINE DR BTW CARMEL AV & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. COASTLINE DR BTW MARVISTA DR & CARMEL DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CORAL PL BTW CDS & BAYSIDE DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CREST DR BTW CATALINA AV & CRESTVIEW AV 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CRESTVIEW AV BTW CATALINA AV & BAYSIDE DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. CRESTVIEW AV BTW BAYSIDE DR & CREST DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. DRIFTWOOD AV BTW BALBOA DR & COASTLINE DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. EBBTIDE PL BTW COASTLINE PL & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. EMERALD COVE WY BTW BERYL COVE WY & JADE COVE WY 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. EMERALD PL BTW EMERALD COVE WY & CDS 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. MARLIN AV BTW SEAL BEACH BL & BALBOA DR 04/2018 06/2018 07 10 Seal Beach Orange Annual Slurry Seal Project The work will consist of surface treatment and traffic pavement markings. RIVIERA DR BTW MARLIN AV & BOLSA AV 04/2018 06/2018 07 10 Seaside Monterey Residential Streets Remove & Replace Failed Road Sections on Harcourt between Fremont & Prospect and on Trinity between Harcourt between Fremont & Prospect and on Trinity between Fremont & Noche Buena 03/2018 08/2018 05 30 Fremont & Noche Buena Seaside Monterey Bike Safe Grates Construct bike safe grates Arterial and Collector Streets throughout the City 03/2018 07/2019 10 30 Seaside Monterey Residential Streets Remove & Replace Failed Road Sections on Hamilton between Fremont & Noche Buena and on Sonoma between Hamilton between Fremont & Noche Buena and on Sonoma between Fremont & Noche Buena 04/2018 09/2018 05 30 Fremont & Noche Buena Seaside Monterey Residential Streets Remove & Replace Failed Road Sections on Amador between Fremont & Noche Buena and on Elm between Amador between Fremont & Noche Buena and on Elm between Fremont & Noche Buena 05/2018 10/2018 05 30 Fremont & Noche Buena Seaside Monterey General Jim Moore Blvd & Eucalyptus Remove & Replace Failed storm drains and road sections General Jim Moore Blvd & Eucalyptus Road 06/2018 11/2021 05 30 Road Seaside Monterey Playa Ave Construct pedestrian, bike, street and storm drain upgrades From City limit to Noche Buena 10/2018 10/2020 05 30 Seaside Monterey Hilby Ave Construct pedestrian, bike, street, and storm drain upgrades From Mescal Street to State Route 218 08/2018 10/2020 05 30 Seaside Monterey West Broadway Modify traffic control devices From Del Monte to Fremont Blvds 03/2018 03/2019 05 30 Seaside Monterey West Broadway Construct pedestrian, bike, street, and storm drain upgrades from Del Monte to west of Hillsdale 10/2019 03/2021 05 30 Seaside Monterey Fremont at Trinity Construct pedestrian and storm drain upgrades Fremont at Trinity 06/2018 10/2018 05 30 Seaside Monterey Del Monte Blvd Slurry Seal Crack seal and slurry seal Del Monte Blvd Approximately 1000 ft south of Tioga intersection to Fremont Blvd 03/2018 05/2018 01 05 Sebastopol Sonoma Bodega/Nelson HAWK Signal Add pedestrian activated HAWK crosswalk signal Bodega Avenue - Nelson Way - Gold ridge Farm intersection, Sebastopol, CA 01/2018 06/2018 30 40 Sebastopol Sonoma Bodega/Ragle interim intersection Add pedestrian activated RRFB crosswalk signal and median refuge for pedestrians, restripe crosswalks Bodega Avenue - Ragle Road intersection, Sebastopol, CA 02/2018 06/2018 30 40 improvements Sebastopol Sonoma Repave/repair Willow Street Remove & replace pavement, stabilize sub-grade, include new bicycle lane markings when restriping Willow Street between High Street and Jewell Avenue, Sebastopol, CA 04/2017 07/2017 20 30 Sebastopol Sonoma Bodega at High Street paving repairs Remove & replace pavement, stabilize sub-grade, redo crosswalk stamping & marking, and change crosswalk Bodega Avenue - High Street intersection, Sebastopol, CA 05/2017 11/2017 20 30 flashers to RRFB Sebastopol Sonoma Bicycle Lanes signs & Striping on Local Add appropriate bicycle lane markings: striping, signs, sharrows, to locally owned streets. Locally-ownwed by the City streets, Sebastopol, CA, 9.2 total miles. 08/2017 04/2018 08 10 Streets Sebastopol Sonoma Covert Lane median strip & bike lanes Remove median strip, pave disturbed area, add bicycle lane markings along Covert Lane West end of Covert Lane near Ragle Road, Sebastopol, CA 11/2017 04/2018 08 10 Sebastopol Sonoma Bodega/Florence crosswalk & safety Relocate crosswalk and create a raised pedestrian refuge island at the median Bodega Avenue - Florence Avenue intersection, Sebastopol, CA 03/2018 08/2018 30 40 improvements Sebastopol Sonoma Bodega/Washington crosswalk & Install a raised pedestrian refuge island within the existing center lane area Bodega Avenue - Washington Avenue intersection, Sebastopol, CA 03/2018 08/2018 30 40 safety improvements Sebastopol Sonoma ADA Curb Ramps Bring curb ramps at crosswalks and intersections to current ADA standards; Gravenstein Hwy, North and South; 30 crosswalk locations along SR 116: Gravenstein Highway, Main Street, Healdsburg Avenue, 01/2018 06/2018 08 20 Healdsburg Ave, North and South Main St, and Petaluma Ave. This is a necessary first step to repaving and adding Petaluma Avenue, all in Sebastopol, CA bicycle lanes on the same streets, which are separate but integral parts of a larger project. Sebastopol Sonoma Bodega/Robinson crosswalk & safety Restripe crosswalks and add a Rectangular Rapid Flashing Beacon Bodega Avenue - Robinson Road intersection, Sebastopol, CA 03/2018 08/2018 30 40 improvements Sebastopol Sonoma Repave Bodega Avenue, High to Jewell Pavement preservation project, portion of Bodega Avenue Bodega Avenue between High Street and Jewell Avenue, Sebastopol, CA 07/2018 06/2019 20 30 Sebastopol Sonoma Roadway shoulder reconstruction, Reconstruct roadway shoulder along the cemetery boundary South shoulder Bodega Avenue between Pleasant Hill Road and Virginia Avenue 07/2018 05/2019 20 30 Bodega Avenue Sebastopol Sonoma Bodega Avenue widening north side Widen Bodega Avenue north side between Golden Ridge and Virginia Avenues Bodega Avenue at Golden ridge and Virginia Avenues, Sebastopol, CA 07/2019 05/2020 20 30 Sebastopol Sonoma Sidewalk Gap Closure Bodega Avenue Add sidewalk to Bodega Avenue at Huntley Square Bodega Avenue at Huntley Square, Sebastopol, CA 08/2020 06/2021 20 30 at Huntley Square Sebastopol Sonoma Sidewalk Gap Closure Bodega Avenue Add sidewalk to Bodega Avenue between Pleasant Hill Road and Golden Ridge Avenue Bodega Avenue at Pleasant Hill Road and Golden Ridge Avenue, Sebastopol, CA 09/2020 06/2021 20 30 between Pleasant Hill Road and Golden Ridge Avenue Sebastopol Sonoma Repave Bodega Avenue Jewell Avenue Pavement preservation project, portion of Bodega Avenue Bodega Avenue between Pleasant Hill Road and Jewell Avenue, Sebastopol, CA 07/2020 06/2021 20 30 to Pleasant Hill Road Sebastopol Sonoma Pavement Preservation, several City Recurring pavement preservation project, overlay and slurry seal as appropriate to location Virginia Ave, Golden Ridge Ave, Nelson Way overlay: 12 City street blocks for slurry seal, 07/2021 06/2022 08 20 streets Sebastopol, CA Sebastopol Sonoma Sidewalk gap closure Bodega Avenue Add sidewalk to Bodega Avenue between Nelson way and Robinson Road Between Nelson Way and Robinson Road on Bodega Avenue, Sebastopol, CA 07/2020 06/2021 20 30 Nelson to Robinson Sebastopol Sonoma Bicycle Lanes Striping and signs on After Bodega Avenue has had shoulders and sidewalks fixed, and the road is repaved, bicycle lane markings and Bodega Avenue between Ragle Road and High Street, Sebastopol, CA 07/2021 11/2021 08 10 Bodega Avenue signs will be added.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Selma Fresno 1. Nebraska Avenue Improvement Located in Selma on Nebraska Avenue from Highway 43 to Mitchell Avenue, reconstruct the existing 2-lane rural Nebraska Avenue from Hwy 43 to Mitchell Avenue 01/2018 03/2018 20 25 Project roadway including widening the westbound roadway to the ultimate width, providing enhanced access in and out of downtown Selma and congestion relief at the Thompson/Highland intersection. Selma Fresno Arterial Street Rehabilitation Patch longitudinal cracking with Hot Mix Asphalt (HMA) in 4’ strips along Arterials and Major Collectors using a 4’ McCall from Floral to Dinuba, Orange from Floral to Nelson, Nelson from Highland to 01/2018 03/2018 20 25 wide paving machine (see attached photos). Crack seal all joints and cracks, place Caltrans type II slurry seal over Thompson, Rose from McCall to Country Rose, Second from E Front to High entire road width and restripe Shafter Kern Los Angeles Shoulder Stabilization This project consists of adding 4ft of shoulder, rumble strips, and fog lines, to both sides of East Los Angeles Ave. East Los Angeles Ave. between State Highway 43 and Thompson St. 03/2018 06/2018 15 20 Project for roughly 3,500ft between State Highway 43 and Thompson St. Shasta Lake Shasta Cascade Boulevard Improvements Grind and repave approximately 0.5 mile of local collector street. Cascade Boulevard between SR151 and Grand Coulee Boulevard. 05/2018 06/2018 20 30 2018 Shasta Lake Shasta Churn Creek Bridge Methacrylate Deck Seal bridge deck with methacrylate resin. Pine Grove Avenue @ Churn Creek 05/2018 06/2018 20 30 Seal Shasta Lake Shasta Moody Creek Bridge Replacement Replace bridge. Cascade Boulevard @ Moody Creek 05/2019 12/2020 50 75 Sierra Madre Los Angeles FY 2017-18 Street Rehabilitation Reconstruction, grind and cap, crack seal and slurry seal, curb and gutter, sidewalks, handicap ramps, stripping Michillinda Ave. - SM Blvd. to Fairview; Auburn Ave. - Grandview to Alegria; W. Grandview Ave. - 04/2018 07/2018 07 20 Project Auburn to Alegria; W. Highland Ave. - Hermosa to Lima ; Fairview Ave. - Cresvale to Sierra Keys; N. Mt Trail Ave. - Grandview to Alegria; E. Montecito Ave. - Baldwin to Mt Trail; Manzanita Ave. Hermosa to Lima; W. Laurel Ave. - Hermosa to Sunnyside; S. Hermosa Ave. - SM Blvd. to Orange Grove Signal Hill Los Angeles Pavement Management Slurry Seal Myrtle Avenue (1/2 Street) 07/2017 06/2018 05 07 33RD TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal LEWIS AVENUE 07/2017 06/2018 05 07 32ND TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal LEMON AVENUE 07/2017 06/2018 05 07 S. CITY LIMITS TO NEVADA ST.

Signal Hill Los Angeles Pavement Management Slurry Seal CERRITOS 07/2017 06/2018 05 07 S. CITY LIMITS TO BURNETT ST.

Signal Hill Los Angeles Pavement Management Slurry Seal LEMON AVENUE 07/2017 06/2018 05 07 32ND TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal BRAYTON AVENUE (1/2 STREET) 07/2017 06/2018 05 07 33RD TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal GUNDRY AVENUE 07/2017 06/2018 05 07 33RD TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal FALCON AVENUE 07/2017 06/2018 05 07 33RD TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal WALNUT AVENUE 07/2017 06/2018 05 07 32ND (CITY LIMIT) TO N. CITY LIMITS

Signal Hill Los Angeles Pavement Management Slurry Seal 33RD ST. 07/2017 06/2018 05 07 CALIFRONIA AVENUE TO WALNUT AVENUE

Signal Hill Los Angeles Pavement Management Slurry Seal 32ND ST. 07/2017 06/2018 05 07 CALIFORNIA AVENUE TO ORANGE AVENUE

Signal Hill Los Angeles Pavement Management Slurry Seal 29TH ST. 07/2017 06/2018 05 07 W. CITY LIMITS TO OLIVE AVENUE

Signal Hill Los Angeles Pavement Management Slurry Seal COLUMBIA ST. 07/2017 06/2018 05 07 W. CITY LIMITS TO E. LIMIT

Signal Hill Los Angeles Pavement Management Slurry Seal PATERSON 07/2017 06/2018 05 07 W. CITY LIMITS TO E. LIMIT

Signal Hill Los Angeles Pavement Management Slurry Seal WALTON ST. 07/2017 06/2018 05 07 LIME AVE TO MYRTLE ST.

Signal Hill Los Angeles Pavement Management Slurry Seal VERNON ST. 07/2017 06/2018 05 07 W. CITY LIMITS TO CALIFORNIA AVENUE

Signal Hill Los Angeles Pavement Management Slurry Seal 25TH ST. 07/2017 06/2018 05 07 W. CITY LIMITS TO CALIFORNIA AVENUE

Signal Hill Los Angeles Pavement Management Slurry Seal LEWIS AVENUE 07/2017 06/2018 05 07 S. CITY LIMITS TO BURNETT ST.

Signal Hill Los Angeles Pavement Management Slurry Seal 23RD ST. 07/2017 06/2018 05 07 LEMON AVENUE TO CERRITOS

Signal Hill Los Angeles Pavement Management Slurry Seal DAWSON AVENUE 07/2017 06/2018 05 07 WILLOW TO 28TH ST.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Signal Hill Los Angeles Pavement Management Slurry Seal 21ST ST. 07/2017 06/2018 05 07 CHERRY TO TEMPLE

Signal Hill Los Angeles Pavement Management Cape Seal ALLIANCE ST. 07/2017 06/2018 06 08 ALLEY TO ORANGE

Signal Hill Los Angeles Pavement Management Cape Seal BURNETT ST. 07/2017 06/2018 06 08 ORANGE TO WALNUT

Signal Hill Los Angeles Pavement Management Cape Seal BURNETT ST. 07/2017 06/2018 06 08 ROSE AVENUE TO CHERRY

Signal Hill Los Angeles Pavement Management Cape Seal CRESTON AVENUE 07/2017 06/2018 06 08 WALNUT TO TERMINES

Signal Hill Los Angeles Pavement Management Cape Seal JESSE NELSON CIRCLE 07/2017 06/2018 06 08 HILL ST. TO TERMINES

Signal Hill Los Angeles Pavement Management Cape Seal GAVIOTA AVENUE 07/2017 06/2018 06 08 ALAMITOS AVENUE TO HILL ST.

Signal Hill Los Angeles Pavement Management Cape Seal CRESCENT ST. 07/2017 06/2018 06 08 ROSE TO GARDENA

Signal Hill Los Angeles Pavement Management Cape Seal 20TH ST. 07/2017 06/2018 06 08 FREEMAN TO OBISPO

Signal Hill Los Angeles Spring Street Overlay Restore paved road surfaces to add structural capacity, riding comfort and skid resistance which add to the road's SPRING STREET 07/2017 06/2020 25 30 safety. ATLANTIC TO JUNIPERO Simi Valley Ventura Ashley Drive Pavement Rehabilitation Repave/Resurface approximately 17,000 SF of street pavement, and all appurtenant work Ashley Drive (Fourth Street to East End) 03/2018 09/2018 15 20 Simi Valley Ventura Borden Avenue Pavement Repave/Resurface approximately 50,000 SF of street pavement, and all appurtenant work Borden Avenue (Fitzgerald Rd. to Arcane Ave.) 03/2018 09/2018 15 20 Rehabilitation Simi Valley Ventura Brandon Avenue Pavement Repave/Resurface approximately 17,000 SF of street pavement, and all appurtenant work Brandon Avenue (Fitzgereald Rd. to South End) 03/2018 09/2018 15 20 Rehabilitation Simi Valley Ventura Hagen Court Pavement Rehabilitation Repave/Resurface approximately 11,000 SF of street pavement, and all appurtenant work Hagen Cout ( Parkhurst Street to end ) 03/2018 09/2018 15 20 Simi Valley Ventura Heywood Street Pavement Repave/Resurface approximately 50,000 SF of street pavement, and all appurtenant work Heywood Stret ( Sycamore Dr. to Bridget Ave.) 03/2018 09/2018 15 20 Rehabilitation Simi Valley Ventura Hudspeth Avenue Pavement Repave/Resurface approximately 120,000 SF of street pavement, and all appurtenant work Hudspeth Ave. (Fitzgerald Rd. to Sutter Avenue) 03/2018 09/2018 15 20 Rehabilitation Simi Valley Ventura Knollhaven Street Pavement Repave/Resurface approximately 36,000 SF of street pavement, and all appurtenant work Knollhaven Street ( Elmdale Ave. to Justin Ave.) 03/2018 09/2018 15 20 Rehabilitation Simi Valley Ventura Smith Road Pavement Rehabilitation Repave/Resurface approximately 66,000 SF of street pavement, and all appurtenant work Smith Road (Kuehner Dr. to East End) 03/2018 09/2018 15 20 Simi Valley Ventura Burnside Street Pavement Repave/Resurface approximately 36,000 SF of street pavement, and all appurtenant work Burnside Street Street ( Elmdale Ave. to Justin Ave.) 03/2018 09/2018 15 20 Rehabilitation Simi Valley Ventura Hampton Avenue Pavement Repave/Resurface approximately 28,000 SF of street pavement, and all appurtenant work Hampton Avenue (Oak Haven Avenue to Brichcroft Steet 03/2018 09/2018 15 20 Rehabilitation Solana Beach San Diego Annual Pavement Management As a small city, the first year of the city's RMRA funding is less than $80,000. Due to the small amount, these The city's annual pavement management program typically occurs in all four quadrants of the 09/2018 01/2019 15 25 Program (2018) funds will be added to the annual pavement repair project so more streets could be repaired. In a typical year, city. Since Solana Beach is only four square miles in size, each year, work would cover all the city's pavement repair project places a 2 inch overlay on 250,000 square feet of roadway or places a slurry seal quadrants and in most neighborhoods. Actual street segments to be repaired have not been on xx sy of roadway. identified at this time. Soledad Monterey 2017 Street Maintenance Project Crack Sealant and Repair of Failed Road Section (Digout and Replacement of Asphalt Concrete) Front Street between San Vicente and Dixie, West St Between Gabilan and Front Street, Metz 10/2017 12/2017 10 20 Rd Between Third and East St. Solvang Santa Barbara FY 2017-18 Pavement Maintenance Accumulate funds for FY 2018-19 Pavement Slurry Seal Project. See FY 2018-19 Pavement Slurry Seal Project locations. 09/2018 05/2019 06 09 Solvang Santa Barbara FY 2018-19 Pavement Slurry Seal Apply Type 2 slurry seal to asphalt surface to extend useful life of roadway pavement, and apply new striping and Preliminary: Portions of Alisal Rd, Atterdag Rd, Birch Dr, Elverhoy Wy, Fifth St, First Crt, First St, 09/2018 05/2019 06 09 Project pavement markings. Willow Dr, Mountain View Dr, Third St, Fjord Dr, Ironwood Wy, Juniper Dr, Pepperwood Wy, Sandalwood Wy, Aarhus Dr, Midten Hof, Oster Sted, Vester Sted, Aebeltoft Wy, Eucalyptus Dr, Fredensborg Canyon Rd, Laurel Av, Roskild Dr, Creekside Dr, Holly Ln, Rebild Dr, Nysted Dr, Ringsted Dr, Skagen Dr, Viborg Dr, Alamo Pintado Rd, Maple Av, and Windmill Crt. Sonoma Sonoma 2017 Street Rehabilitation and Water The project will consist of street rehabilitation (i.e. asphalt grinding, extensive replacement of base rock material, Avenue Del Oro (from Fifth Street East to Cordilleras Drive and #693 Avenue Del Oro to 07/2017 11/2017 10 20 Services Replacement Project placement of new asphalt surfaces, curb ramp replacement, and traffic striping) and removal/replacement of 1- Appleton Way), Aureo Court, and El Nido Court in the City of Sonoma, Sonoma County, CA. inch water service and water main blow-off valve infrastructure. Only project elements related to the street rehabilitation will utilize SB 1 funding. Sonora Sonoma Centerline Striping and Street Markings Centerline Striping and Street Markings in thermoplastic material. Current street markings are paint and have Snell Street - Washington Street to City Limits Stewart 03/2018 06/2018 03 05 worn away over several years. The City has not had funding to complete the project. Street - Lytton Street to Church Street Lyons Street - Steward Street to Greenley Rd Mono Way - Greenley Rd to Sanguinetti Rd Sanguinetti Rd - Greenley Rd to Sanguinetti Loop Rd Saratoga Rd - Shaws Flat ot City Limits Guzzi Lane - Greenley Rd to Pauline Court South El Monte Los Angeles Alesia St This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install new striping Alesia St. from e/s Adelia Ave. to w/s Potrero Ave. 07/2018 10/2018 10 15 South El Monte Los Angeles Chico Ave. This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install new striping Chico Ave. - from n/s Rush St. to s/s Fern Ave.; 07/2018 10/2018 10 15 South El Monte Los Angeles Elliot Ave This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install new striping Elliott Ave. – s/s from Santa Anita Ave. e/s to 460’ east. 07/2018 10/2018 10 15 South El Monte Los Angeles Floradale Ave. This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install new striping Floradale Ave. – 1800 blk. n/o Thienes Ave. 07/2018 10/2018 10 15 South El Monte Los Angeles Granada Ave. This project includes street seal coating over existing AC Pavement, crack sealing, and new striping Granada Ave. – from n/s Weaver Ave. to s/s Klingerman Ave. 07/2018 10/2018 05 07 South El Monte Los Angeles Lashbrook Ave. This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install new striping Lashbrook Ave. – from 600ft. s/o Garvey Ave. to s/s Garvey 07/2018 10/2018 10 15 South El Monte Los Angeles Klingerman Ave. This project includes grinding of 2” existing asphalt, install 2” A.C. overlay and install new striping Klingerman Ave. – from 650’ w/o Potrero Ave. to w/s Potrero 07/2018 10/2018 10 15 South El Monte Los Angeles Various Streets Pothole repairs and sidewalk repairs Various streets 07/2018 10/2018 10 15 South Gate Los Angeles City Sidewalk Improvement Project The Sidewalk Improvement will maintain pedestrian safety a priority. Under this project, over 650 locations of Citywide/Multiple Locations 01/2018 04/2018 30 50 Phase V damaged sidewalk, curb, gutters and access ramp around the City will be repaired to remove any potential tripping hazards.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum South Lake Tahoe El Dorado Tulare Avenue SB-1 Full depth pulverization and recycling of existing materials, re-grade and compact and pave with PG 64-28 Polymer Tulare Avenue from the limits of US Hwy 50 to Freel Peak Avenue 05/2018 10/2018 10 25 Modified HMA South Pasadena Los Angeles Grevelia Street Street and highway pavement maintenance; rehabilitation, installation, construction, and reconstruction of Grevelia Street from Fair Oaks to Stratford Avenue. 12/2017 06/2018 15 20 necessary associated facilities such as drainage and traffic control devices; and safety projects to reduce fatalities.

South Pasadena Los Angeles Monterey Road Street and highway pavement maintenance; rehabilitation, installation, construction, and reconstruction of Monterey Road from Via Del Rey to Pasadena Avenue 12/2017 06/2018 15 20 necessary associated facilities such as drainage and traffic control devices; and safety projects to reduce fatalities.

South San Francisco San Mateo North Access Road Bike and Pedestrian Widen approximately 1,000 feet of bike and pedestrian pathways. North Access Road beginning at South Airport Boulevard 03/2018 06/2018 15 20 Improvements South San Francisco San Mateo Grand Boulevard Project Phase 3 Improve El Camino Real between Arroyo Drive and Kaiser Way by installing enhanced pedestrian crossings, bike El Camino Real between Arroyo Drive and Kaiser Way 12/2018 12/2019 20 30 (Arroyo Drive to Kaiser Way) lanes, corner bulbout and median refuges, expanded bus stop/waiting areas, a new landscaped median, and green infrastructure. St. Helena Napa Pavement Restoration Project Overlay 0.41 miles, upgrade curb ramps and striping Kennedy Court, El Bonita, and La Quinta Way 05/2018 06/2018 07 15 St. Helena Napa Oak Street Storm Drain Repair Replace storm drain, backfill trenches, and repair the street. Oak Street between Mitchell Drive and Spring Street 10/2017 11/2017 07 50 Stanton Orange Knott Avenue Rehab Two-inch overlay of existing arterial highway Knott Avenue north of Cerritos Avenue to City limits and Knott Avenue south of Katella Avenue 03/2018 07/2018 30 30 to City limits Stockton San Joaquin Microsurfacing of City Streets This project will provide approximately 9 centerline miles of microsurfacing pavement maintenance on local Various City Streets 07/2018 11/2018 05 07 roadways at various locations. Stockton San Joaquin Lighted Crosswalk Upgrades This project will install Rectangular Rapid Flashing Beacons, upgrade existing crosswalks/signs, and install frontage Center Street 07/2018 03/2019 15 20 improvements at two uncontrolled crossings to increase pedestrian and bicycle safety. The two crosswalks are on Center Street (at Channel and north of Parkers Alley). Center Street is a major one-way arterialwith a least three travel lanes. Stockton San Joaquin Stolen Wire Theft Repair - Street This project will re-wire approximately Various City Streets 02/2018 05/2018 40 50 Lighting 100 non-functional street lights at various locations and includes securing pull boxes to prevent vandalism. Stockton San Joaquin Neighborhood Traffic Management This project will install traffic calming measures such as speed humps, speed cushions, traffic circles, etc. in 8 Various City Streets 05/2018 11/2018 15 20 Program neighborhoods. The Project will develop and construct traffic calming plans that offer viable solutions to each neighborhood's specific traffic safety concerns. Suisun City Solano Marston Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Driftwood Drive 015 Application of a Cape Seal 300 lineal feet west of Main Street 03/2018 05/2018 05 08 Suisun City Solano Hillborn Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Spence Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Brookside Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Flagstone Circle Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Hibiscus Lane Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Keyes Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano NcNabe Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Birchwood Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Bottlebrush Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Camellia Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Dawn Rose Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Dawn Rose Way Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Driftwood Court Application of a Cape Seal Entire Street, east of Marina Blvd 03/2018 05/2018 05 08 Suisun City Solano Kinsmill Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Limewood Drive Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano McCoy Creek Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Peytonia Court Application of a Cape Seal Entire street 03/2018 05/2018 05 08 Suisun City Solano Blossom Road 2" Overlay 110 feet south of Canvasback to 280 feet north of Canvasback 03/2018 05/2018 10 15 Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Caribbean Ave- Mathilda to Borregas 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Caribbean Ave- Crossman to Twin Creeks 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Caribbean Ave- Twin Creeks to Moffett Park 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Caribbean Ave- Moffett Park to change of pavement overpass over highway 237 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Mathilda- Caribbean to Moffett Park 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Mathilda - Washington to Olive Ave 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-03 / Slurryseal of arterial streets Type 3 slurry seal Bernardo- El Camino Real to Fremont 01/2018 06/2018 07 10 2018B Sunnyvale Santa Clara ST-18-08 / Slurryseal of arterial streets Type 3 slurry seal Old San Francisco Road- Cezanne to Fair Oaks 07/2018 06/2019 07 10 2019B Sunnyvale Santa Clara ST-18-08 / Slurryseal of arterial streets Type 3 slurry seal Hollenbeck- Fremont to The Dalles 07/2018 06/2019 07 10 2019B Sunnyvale Santa Clara ST-18-08 / Slurryseal of arterial streets Type 3 slurry seal Sunnyvale Saratoga- Fremont to Homestead 07/2018 06/2019 07 10 2019B Sunnyvale Santa Clara ST-18-08 / Slurryseal of arterial streets Type 3 slurry seal Java- Mathilda to Crossman 07/2018 06/2019 07 10 2019B Susanville Lassen Overlay Street Resurfacing Work Bunyan; n/o Cameron to s/o Gamble Ct: Gamble; CDS e/o Bunyan: Rob's Way; Main to 06/2021 06/2022 15 20 Riverside: S. Alley; Mesa to Sacramento: S. Spring; Main to River St: Cornell; Alexander to Ash: S Ash; Cornell to River: Alexander Ct; n/o Cornell: S. Sacramento; Main to River St: Randolph; Paiute to Barbara: Ruth; Paiute to Barbara: Valley Vista; Paiute to Heather Susanville Lassen Overlay Street Resurfacing Work S. Fairfield; Main to River: Skyline; Paiute to Ash (SR139): Russell; Main to 200' s/o Bunyan: Fair 06/2022 06/2023 15 20 Dr; Main to Russell: S. Lassen; Main to Susan River: Chestnut; Roop to Weatherlow & Weatherlow to Grand: Cherry Terrace; Roop to Glenn: N. Fairfield; Main to Derek: Riverside; Richmond to C.L. (old Mill entry) & Rob's Way to Susan River (C.L.)

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Susanville Lassen Overlay Street Resurfacing Work Plumas; Orchard to South end: Shasta; Orchard to Modoc: Sierra; Orchard to Modoc: Juniper; 06/2023 06/2024 15 20 Cypress to South end: Elm; Cypress to south end: Plum; Cypress to south end: Pearl Circle; Richmond to west end: Gem Dr; Pearl to Pearl: Opal Ct; Pearl to CDS end: Sapphire Ct; Pearl to CDS end: Emerald Ct; Pearl to CDS end: N. Gay; Nevada to North: Maple; North to Willow Susanville Lassen Overlay Street Resurfacing Work Alexander; Riverside to Sierra: S. Lassen; Cypress to Susan River: Modoc; Richmond to 06/2024 06/2025 15 20 Alexander: Cypress; Lassen to Richmond: Cottage; Weatherlow to SR 36 (Pine St): S. Roop; Court to Main: N Roop; Main to Cherry Terrace: Court; Roop to Miller: Glenn; N Roop to 500' west: Paiute; Skyline to Glenn Susanville Lassen Overlay Street Resurfacing Work Harrison; Chestnut to Mark: Lowry; Chestnut to south end: Spring Circle; n/o Bunyan: N Spring; 06/2025 06/2026 15 20 2nd to 4th: N. Gilman; 2nd to 4th: S. Gilman; River to Main: S. McDow; River to Main: River St; Fairfield to Ash: Minkler; Riverside to Railroad: Prospect; Riverside to Railroad: Knoch; Prospect to Riverside: Hood; Prospect to Alexander: Pardee; Riverside to Hood: S. McDow; Main to Riverside Susanville Lassen Overlay Street Resurfacing Work Grand; North to Chestnut: Chestnut; Ash to Weatherlow: Hall; SR 139 (Ash) to North: Fourth; 06/2026 06/2027 15 20 Ash to Mesa: Fourth; Ash to Grand: Second; Hall to Mesa: S. Mesa; Main to Riverside: Cherry Terrace; Meadow view to Lakewood: Meadow View; Cherry Terrace to Paiute: Johnstonville; Riverside to City Limits: North St; Roop to Weatherlow & Weatherlow to Grand & Grand to Ash (SR 139) Susanville Lassen Overlay Street Resurfacing Work S. Railroad; Pardee to Alexander: N Railroad; Richmond to Alexander: Orchard; Richmond to 06/2027 06/2028 15 20 Railroad: Harrison; Chestnut to Mark: Harris; SR 36 to Pine: Prattville; Pine to west end: Parkdale; Willow to Chestnut: Third; Ash to Hall & Park to Spruce: Fifth; Ash to Hall: Pine; Main to Harris: Park; North to Fifth Susanville Lassen Overlay Street Resurfacing Work Shadow Mtn; Bunyan to North end: Gentry; Shadow Mtn to Skyline: Dawn Ct; n/o Shadow Mtn: 06/2028 06/2029 15 20 Jahna Ct; w/o Shadow Mtn: Keegan; w/o Shadow Mtn: Sunkist; n/o Cameron: Morning Glory; n/o Cameron: Overlook; Numa to Cameron: Cameron; Numa to Skyline (n/o): Wildwood; Paiute to Woodside: Woodside; Paiute to Cherry Terrace: Lakewood; Paiute to Cherry Terrace: South St; Richmond to C.L. (county line) Susanville Lassen Fog Seal Apply SS-1 fog seal to recently overplayed streets < 5 years and PCI greater than 90 Numa; Skyline to Cameron: Riverside; Rob's Way to Main St. & Main St. to City limits: Bunyan; 06/2018 06/2019 03 05 Ash to Derek: Derek; Fairfield to Bunyan: Johnstonville; Fairgrounds to Riverside: Laurel; Main to Riverside: Russell Ct; n/o Bunyan Susanville Lassen Fog Seal Apply SS-1 fog seal to recently overplayed streets < 5 years and PCI greater than 90 Fifth St; Grand to Ash (SR 139): N Union; Main to North: Carroll St; Mill to Lassen: Cook St; Pine 06/2018 06/2019 03 05 to southwest end at CDS: Hill St; N Roop to west end: Inspiration Pt; Harris Dr to east end: Long Alley; Lovell to west end: Lovell Alley; Pine to north end Susanville Lassen Fog Seal Apply SS-1 fog seal to recently overplayed streets < 5 years and PCI greater than 90 Quarry; w/o Main: S. Pine; Cottage to Court: S. Roop; s/o Court: S. Union; Main to Cottage: 06/2018 06/2019 03 05 View; Pine to north: Shasta; Modoc to Tehama: Sierra; Modoc to s/o Tehama: Tehama; Sierra to Shasta: Wall; Richmond to Prospect: Shawn; Paiute to Barbara Susanville Lassen Fog Seal Apply SS-1 fog seal to recently overplayed streets < 5 years and PCI greater than 90 S. Gay St; Cottage to Mill: Adaline; North to north alley of Arnold: Adela; North to north alley of 06/2018 06/2019 03 05 Arnold: Martha; North to north alley of Arnold: Arnold; Grand to w/o Weatherlow at CDS end: Foss; Main to south end (Susan River): Alley; Martha to Grand: Maple; Nevada to North: Brookwood; Cherry Terrace to south end CDS: Oakridge; Brookwood to west end CDS: Meadowwood; Brookwood to north end CDS Susanville Lassen Fog Seal Apply SS-1 fog seal to recently overplayed streets < 5 years and PCI greater than 90 N. Sacramento; Main to Fourth St: N Spring St; Main to Second; Fourth to Bunyan: Oak St; Grand 06/2018 06/2019 03 05 to Fifth: Park St; Main to North St: Small St; Main to south end (creek): N McDow; Main to Second; Fourth to Bunyan: S. Gay St; Main to Cottage (Pancera Plaza) Susanville Lassen Slurry Seal Apply type II slurry seal to roads in good condition where overplayed less than 10 years ago with PCI more than 80 Grand; Main to North: S. Roop; Main to Court: Burma; Pine to N. Roop: Court; Lassen to Roop: 06/2019 06/2020 05 07 Maidu; north & south of Glenn: River; S. Fairfield to S McDow: Washo; north to south of Glenn: Prattville; w/o Pine to SR 36: Cherry Terrace; Glenn to Lakewood: S. Gay; Mill to Brashear: Court; Lassen to Gay: Nevada; Pine to Weatherlow: Chestnut; Ash to Grand Susanville Lassen Chip Seal Apply 3/8" minus aggregate cip seal to streets with a more rural road cross section or excessive volume truck Johnstonville; 600' e/o Riverside to City Limits 06/2019 06/2020 07 15 percentages Sutter Creek Amador Main Street Bridge Reconstruction and Rehab Main Street 10/2017 10/2018 10 20 Tehachapi Kern Surface Seal of Various Roads 2017 Slurry seal or seal coat up to 5 miles of various roads in the City of Tehachapi. Curry from Highline to Tehachapi Blvd; Mountain View from Tehachapi Blvd to Valley; Dennison 07/2017 06/2018 03 07 from Pinon to Valley; Tehachapi Blvd from Hayes to Steuber; Tucker from Cherry Lane to Highline; Dennison from Valley to Tehachapi Blvd; and Mill Street from Enterprise Way to Challenger Dr. Tehama Tehama E Gyle shoulder protection Addition of rock and cement to south shoulder of East Gyle. East Gyle in City of Tehama 07/2018 01/2019 20 40 Temecula Riverside Pavement Rehabilitation Program - Rehabilitate the pavement Rancho California Road, From Old Town Front/Jefferson to Western City Limits 04/2018 07/2018 10 20 Rancho California Road Temecula Riverside Pavement Rehabilitation Program - Rehabilitate the pavement Winchester Road, from Nicolas Road to Eastern City Limits 04/2018 07/2018 10 20 Winchester Road Temecula Riverside Pavement Rehabilitation Program - Rehabilitate the pavement Ynez Road, from Winchester Road to Date Street 04/2018 07/2018 10 20 Ynez Road Temecula Riverside Pavement Rehabilitation Program - Rehabilitate the pavement Equity from Ynez to County Center and County Center from Ynez to Equity 04/2018 07/2018 10 20 Equity Drive and County Center Drive Loop Temple City Los Angeles Rosemead Boulevard Resurfacing resurfacing of about 2 miles of major arterial street with slurry seal Rosemead Boulevard from northern city boundary (just north of Calita Street) to southern city 03/2018 06/2018 05 10 boundary (railroad grade separation south of Pentland Street) Thousand Oaks Ventura 2018 Pavement Overlay Program Overlay 28.7 miles of arterial and residential streets and the installation and modification of 295 curb ramps to Lynn Rd, Avenida de los Arboles, Avenida de las Flores, Thousand Oaks Blvd, Erbes Rd, 12/2017 12/2018 15 20 comply with ADA requirements within the City of Thousand Oaks. Townsgate Rd, Ventu Park Dr, Grande Vista, Lang Ranch, Valley Spring, N. Lakeview Canyon, Area 192, Area 261, Area 41, Area 197, Area 183, Area 310 and Area 310 shown on Location Map in Budget Support Documentation Part 1 Tiburon Marin 2018 Vasious Streets Overlay Las Pavement overlay of Las Lomas Lane from Mar West to end. Las Lomas Lane, Town of Tiburon 01/2018 05/2018 15 30 Lomas Lane Torrance Los Angeles Sidewalk Repair for Handicap Repair damaged sidewalk and related curb/gutter Citywide 04/2018 12/2019 25 50 Accessibility Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 264,576 square foot overlay will be applied. 11th Street From Lammers to City Limits 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 157,248 square foot overlay will be applied. 11th Street From Tracy Blvd to Central 11/2017 12/2019 10 15 19

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, an 8,640 square foot overlay will be applied. 12th Street From Holly Dr to Adams St. 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 91,280 square foot overlay will be applied. Arbor Rd. From MacArthur to Holly Dr. 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 76,890 square foot overlay will be applied. Bessie Ave. From Grant Line Rd. to W. Lowell Ave. 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 20,720 square foot overlay will be applied. Beverly From Lincoln Blvd to Schleiger Dr. 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 135,700 square foot overlay will be applied. Brochetto Rd. From Banta Rd to City Limits 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 151,008 square foot overlay will be applied. Corral Hollow From 1.4 Miles South of Linne to 2.5 Miles South of Linne 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 91,920 square foot overlay will be applied. Corral Hollow From 11 St to Cypress Dr 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 141,780 square foot overlay will be applied. Corral Hollow From Cypress Dr to Schulte 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to minor damage to the existing pavement, an area of 48,260 square feet of micro-surfacing will be applied. Eaton From Holly Dr to East St. 11/2017 12/2019 07 12 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to minor damage to the existing pavement, an area of 59,200 square feet of micro-surfacing will be applied. Eaton From Richard Dr to Tracy Blvd 11/2017 12/2019 07 12 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to minor damage to the existing pavement, an area of 94,924 square feet of micro-surfacing will be applied. Eaton From Tracy Blvd to Holly Dr. 11/2017 12/2019 07 12 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 23,632 square foot overlay will be applied. El Portal From 11th St. to 100' N of Highland 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 319,682 square foot overlay will be applied. Grant Line Rd. From Byron Rd to Naglee Rd 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 185,820 square foot overlay will be applied. Grantline Rd. From Lincoln to N. Tracy Blvd 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 94,010 square foot overlay will be applied. Grantline Rd. From Lammers to 170' W/O Walmart Entrance 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 138,972 square foot overlay will be applied. Grantline Rd. From 170' W/O Walmart Entrance to Naglee Rd 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to minor damage to the existing pavement, an area of 219,414 square feet of micro-surfacing will be applied. Grantline Rd. From Corral Hollow to Lincoln 11/2017 12/2019 07 12 19 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 78,084 square foot overlay will be applied. Highland Ave. From Bessie Ave. to El Portal 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 7,884 square foot overlay will be applied. Highland Ave. From Holly Dr to El Portal 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 48,063 square foot overlay will be applied. Hollywood From Holly Dr to East St. 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to minor damage to the existing pavement, an area of 61,308 square feet of micro-surfacing will be applied. Lammers Rd From Feteira Way to 1572' So. of Feteira Way 11/2017 01/2019 07 12 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to minor damage to the existing pavement, an area of 163,800 square feet of micro-surfacing will be applied. Lammers Rd From 11th St. to Jaguar Run 11/2017 01/2019 07 12 18 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 108,376 square foot overlay will be applied. Lincoln Blvd From Lowell Ave. to 195' S of Beverly 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 93,248 square foot overlay will be applied. Lincoln Blvd From 195' S of Beverly to 11th Street 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 15,272 square foot overlay will be applied. Lowell Ave. From Corral Hollow to Regency 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to minor damage to the existing pavement, an area of 79,305 square feet of micro-surfacing will be applied. MacArthur Dr From Yosemite to Pvmnt Chng N/O Eastlake 11/2017 01/2019 07 12 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 64,070 square foot overlay will be applied. MacArthur Dr From Schulte to Yosemite 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 18- Due to modest damage to the existing pavement structure, a 62,792 square foot overlay will be applied. Naglee From Grant Line Rd. to Lowell 11/2017 12/2019 10 15 19 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 47,058 square foot overlay will be applied. Paradise Bridge From City Limits to Pesacadero 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 16,206 square foot overlay will be applied. Rehn Rd From McDermott Dr to Pavement Change 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 62,730 square foot overlay will be applied. Schulte Rd From Tracy Blvd to 530 Ft W/O Central Ave 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 38,160 square foot overlay will be applied. Schulte Rd From 530 Ft W/O Central Ave to Central 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 35,150 square foot overlay will be applied. Toste Rd From Grant Line Rd. to End of Road 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 119,424 square foot overlay will be applied. Tracy Blvd From Linne Rd. to FWTP 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to minor damage to the existing pavement, an area of 75,000 square feet of micro-surfacing will be applied. Valpico From Tracy Blvd to 1250 Ft. E/O Tracy Blvd 11/2017 01/2019 07 12 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, an 18,720 square foot overlay will be applied. Valpico From 1250 Ft. E/O Tracy Blvd to 1610 Ft. E/O Tracy Blvd 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 37,080 square foot overlay will be applied. Valpico From 2515 Ft. E/O Tracy Blvd to 270 Ft. W/O Glenbriar 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 27,360 square foot overlay will be applied. W. Beverly From Bessie Ave. to Parker Ave. 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 20,630 square foot overlay will be applied. W. Beverly From W. Lowell Ave. to Wall St. 11/2017 01/2019 10 15 18 Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to modest damage to the existing pavement structure, a 17,376 square foot overlay will be applied. Walnut From 11th St. to Highland Ave. 11/2017 01/2019 10 15 18

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Tracy San Joaquin Street Patch & Overlay Program FY 17- Due to minor damage to the existing pavement, an area of 46,080 square feet of micro-surfacing will be applied. Whittier Ave From Holly Dr to East St. 11/2017 01/2019 07 12 18 Trinidad Humboldt Edwards Street Pavement Resurface and restripe approximately 0.35 miles of roadway. From Trinity Street to the pier parking lot. 01/2018 07/2018 05 10 Rehabilitation Trinidad Humboldt Westhaven Drive Pavement Resurface and restripe approximately 0.25 miles of roadway. From Main Street to City Limts 01/2018 07/2018 05 10 Rehabilitation Trinidad Humboldt Town Hall Pedestrian and Accessible Construct curb ramp, accessible driveway and accessible on-street parking stall, including striping and signage. Trinity Street in front of Town Hall 01/2018 07/2018 20 40 Parking Improvements Truckee Nevada 2018 Slurry Seal Project The 2018 Slurry Seal Project would apply slurry seal to approximately 33 miles of local road, representing 78 Roads anticipated to be slurry sealed include portions of the Tahoe Donner and Glenshire 05/2018 10/2018 05 15 roadway segments, consistent with the Town's Pavement Maintenance Program. A slurry seal is a cold-mix Subdivisions, as well as the Prosser Lakeview Estates neighborhood. A map and list of roadways combination of asphalt emulsion, fine well-graded aggregate, and water. This is a versatile treatment which is provided in the attached project description. results in a smooth surface with adequate friction with moderate costs. Slurry seals have been used by the Town for several years and have proven to be a cost-effective preventive treatment that is well accepted by the community.

Tulare Tulare "E" Street Bardsley-Pleasant Pavement Management System Project that includes ADA concrete work; and water, sewer, and surface water On "E" St. between Bardsley and Pleasant Avenues. 12/2017 10/2018 20 30 facilities. Tulare Tulare "I" Street-Owens Improvements Pavement Management System/Utility project that includes ADA concrete work, water, sewer, and surface water On "I" St. between San Joaquin & Pleasant Aves; on Owens Ave. between"E" & "I" Sts. 11/2017 07/2018 20 30 facilities. Tulare Tulare Prosperity Avenue-Blackstone Pavement Management System/Traffic Safety project that includes ADA concrete work, signal upgrades, median On Prosperity Ave. @ Blackstone St. to approx. 395' east of the intersection. 12/2017 06/2018 20 30 Improvements improvements to expand the queueing area for westbound Prosperity Ave. left turn lane to southbound Blackstone St., resurfacing/overlay of Prosperity Ave. bridge deck, and enhanced traffic safety. Tulare Tulare Cross Avenue Improvements Pavement Management System project that includes ADA concrete work. On Cross Avenue @ West St. to approx. 1,000' west of the intersection. 01/2018 06/2018 20 30 Tulare Tulare Cherry-Bash Alley Improvements Pavement Management System/Utility project that also includes ADA concrete work, water, sewer and surface On Cherry St. between Tulare Ave. and Merritt Ave.; Bash Alley between Gem St. and Cherry 03/2018 12/2018 20 30 water facilities. St.; Gem/Auburn Alley between Cross Ave. and Terrace Ave.; Auburn/Cherry Alley between Cross Ave. and Bash Alley; Lyndale Dr. between Cherry St. and Blackstone St. Tulelake Siskiyou FY 17/18 Road maintenance and Crack seal Main Street between "F" and "G" Streets, and if funds allow crack seal 2nd Street between Modoc Various streets within City limits 06/2018 08/2018 15 20 Rehabilitation Street and "B" Street, and crack seal 2nd Street between "E" and "F" Streets Turlock Stanislaus Christoffersen Median Fencing (SB 1) Install 1200' of 48" tall median fence along Christoffersen Parkway adjacent to the Turlock Junior High School. Christoffersen Parkway median from Walnut Road 1200' west. 06/2018 09/2018 20 30 Turlock Stanislaus 2018 Slurry Seal (SB 1) Install Type II slurry seal to 33 residential and commercial streets throughout the City of Turlock 33 streets throughout the City per the adopted list and budget amendment approved by the 05/2018 07/2018 07 10 City Council on October 10, 2017. Tustin Orange Newport Avenue Rehabilitation Repave/resurface 0.80 miles of road, including localized removal and repair of asphalt concrete pavement failure Intersate 5 Freeway to Holt Ave. 06/2018 03/2019 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping Tustin Orange Newport Avenue Rehabilitation Repave/resurface 0.63 miles of road, including localized removal and repair of asphalt concrete pavement failure Sycamore Ave. to Interstate 5 Freeway 06/2018 03/2019 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping Tustin Orange Browning Avenue Rehabilitation Repave/resurface 0.95 miles of road, including localized removal and repair of asphalt concrete pavement failure El Camino Real to Irvine Blvd. 09/2019 06/2020 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping Tustin Orange Red Hill Avenue Rehabilitation Repave/resurface 0.24 miles of road, including localized removal and repair of asphalt concrete pavement failure San Juan St. to Bryan Ave. 06/2020 03/2021 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, traffic striping, and median reconstruction to lengthen the northbound left turn pocket at Bryan Ave. Tustin Orange Red Hill Avenue Rehabilitation Repave/resurface 0.47 miles of road, including localized removal and repair of asphalt concrete pavement failure Walnut Ave. to Interstate 5 Freeway 06/2020 03/2021 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping Tustin Orange Edinger Avenue Rehabilitation Repave/resurface 0.23 miles of road, including localized removal and repair of asphalt concrete pavement failure Jamboree Rd. to Harvard Ave. 09/2020 06/2021 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping Tustin Orange Jamboree Road Rehabilitation Repave/resurface 1.6 miles of road, including localized removal and repair of asphalt concrete pavement failure Barranca Pkwy. to SCRRA Railroad 09/2021 06/2022 20 30 areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping Tustin Orange Parkcenter Lane and Bryan Avenue Installation of new traffic signals and equipment Parkcenter Lane / Bryan Ave. Intersection 03/2018 10/2018 15 25 Traffic Signal Installation Tustin Orange Lansdowne Road and Valencia Avenue Installation of new traffic signals and equipment Lansdowne Rd. / Valencia Ave. Intersection 03/2018 10/2018 15 25 Traffic Signal Installation Twentynine Palms San Bernardino Capital Equipment for Roads Skid Tractor and Skip Loader Twentynine Palms 10/2017 10/2017 15 25 Ukiah Mendocino AC Overlay of S. Orchard Ave. (Gobbi AC Overlay of S. Orchard Ave. between Gobbi St. & Marlene St. S. Orchard Ave. from Gobbi St. to Marlene St. 05/2018 06/2018 15 20 St. to Marlene St.) Union City Alameda Overlay Program (routine) Overlay of various of streets within the City where the condition of the roadway requires more than a slurry seal. Various streets within the City 03/2018 06/2018 10 15 Union City Alameda Slurry Seal Program (routine) Slurry seal of various of streets within the City . The project will include crack sealing the street prior to applying Various streets within the City 02/2018 06/2018 07 10 the slurry seal.. Upland San Bernardino 3rd Avenue Rehabilitation 0.58 miles of water main replacement, asphalt concrete pavement resurfacing, rock curb and gutter repairs, A Street to 11th Street. 04/2018 10/2018 10 20 sidewalk repairs, handicap ramp upgrades, and roadway striping. Upland San Bernardino 9th Street Rehabilitation 0.38 miles of asphalt concrete pavement resurfacing. 3rd Ave. to e/o Campus Ave. 04/2018 10/2018 10 20 Upland San Bernardino Arrow Highway Rehabilitation 1.13 miles of asphalt concrete pavement resurfacing. Benson Ave. to San Antonio Ave. 09/2018 06/2019 10 20 Upland San Bernardino Mulberry Avenue Reconst. 0.17 miles of asphalt concrete pavement reconstruction Foothill Blvd. to Pine Street. 09/2018 06/2019 20 30 Upland San Bernardino 14th Street Rehabilitation 0.69 miles of asphalt concrete pavement resurfacing. Campus Ave. to Grove Ave. 09/2019 06/2020 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Fruitvale Road to the Ulatis Creek Bridge Gibson Canyon Road 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from East Monte Vista Avenue to Merchant Street Dobbins Street 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Cernon Street to Davis Street Mason Street 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping on the entire street Hickory Lane 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Ulatis Drive to Woodstock Circle (South)/Arcadia Court Arcadia Drive 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Orange Drive to the Lemon Tree Mobile Homes Park property line Lawrence Drive 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Marshall Road to Brookdale Drive Tulare Drive 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Tulare Drive to Marshall Road Beelard Drive 10/2018 10/2019 10 20 Vacaville Solano 2018 AC Overlay RHMA overlay and striping from Marshall Road to Alamo Lane California Drive 10/2018 10/2019 10 20

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Vallejo Solano Citywide Slurry Seal Project Slurry seal a number of streets throughout the City. The following streets are targeted for slurry sealing for as far as the funding allows: 04/2018 09/2018 06 15

• Betty Court from Jack London Drive to End

• Donner Pass Road from W/O Ebbetts Pass Rd to 50' E/O Tobin Dr

• Olympic Drive from Quartz Ln to Whitney Ave

• Basalt Drive from 80' West Of Zircon to Olympic Drive

• Copper Way from Basalt Drive to Quartz Lane

• Persimmon Drive from Phoenix Circle to Phoenix Circle

• Platt Court from Tuolumne Street to End

• Riverview Drive from Tuolumne Street to Mitchell Court

• Amber Avenue from Holly Street to Power Drive

• Edgehill Court from Woodside Road to End

• Hospital Drive from Tuolumne Street to 236' E/O Tuolumne St

• Valle Vista Avenue from North Of Whitecliff Dr to Fairgrounds Drive

• Serra Court from El Camino Real to Culdesac West

• Mira Vista Way from Borges Lane to Borges Lane Vallejo Solano Citywide Curb Ramp and ADA Installation of curb ramps throughout the City where they are absent. Removal of ADA-noncompliant sidewalk The following intersections are targeted for as far as the allocated funding allows: 01/2018 05/2018 25 40 Improvement Project tripping hazards throughout the City in partnership with the residents. • Jennings Ave at Steffan St

• Steffan St at Steffan St

• Steffan St at Buss Ave

• Brookwood Ave at Cottonwood Dr

• Thelma Ave at Concord St

• Rinaldo Dr at Roleen Dr

• David Ct at Roleen Dr

• Alice Dr at Roleen Dr

• York St at Alameda St

• York St at El Dorado St

• York St at Sutter St

• York St at Napa St

• Aden St at Parrott St

• Werden St at Parrott St Ventura Ventura Johnson Drive (Bristol to US 101) This project consists of resurfacing Johnson Drive from Bristol Road to HWY 101. The project includes cold milling, Johnson Drive, from Bristol Road to HWY 101 05/2018 06/2018 15 20 pavement repairs, manhole and valve adjustments to grade, upgrading street signs, re-striping, replacement of traffic inductive loops and asphalt overlay. Vernon Los Angeles Signs Replacement Program Traffic signs replacement program to comply with the CAMUTCD's Maintaining Minimum Retroreflectivity Section 3 of the Sign Replacement Program. Northern boundary line between Santa Fe Avenue 07/2017 10/2017 10 15 standards and Soto Street to Vernon Avenue. Soto Street to east side of Santa Fe Avenue including all streets within Section 3 - 26th Street, 27th Street, 28th Street, 30th Street, 37th Street, Seville Avenue, Jewel Avenue, Minerva Street, and Harriett Street (see attached Map). Victorville San Bernardino Village Dr (Mojave Dr to Air Village Dr. is a 4-lane arterial road, 4.3 miles long. This project will reconstruct existing pavement, add shoulders, Village Drive between Mojave Dr. and Air Expressway, a length of 4.3 miles. 02/2018 06/2018 20 25 Expressway) Pavement Rehabilitation install Class II bike lanes, upgrade access ramps and driveway approaches to meet ADA standards. Villa Park Orange Leigh Circle Remove and replace deteriorated pavement section; Grind street pavement and re-overlay with a minimum of 2 from Ridgeview Circle to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Ridgeview Circle Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Cul-de-sac to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Daron Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Taft to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Loma Street Remove and replace deteriorated pavement section; Grind street pavement and re-overlay with a minimum of 2 from Cerro Villa Drive to Valley Drive 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Valley Drive Remove and replace deteriorated pavement section; Grind street pavement and re-overlay with a minimum of 2 from Cerro Villa Drive to Loma Street 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Aubrey Circle Remove and replace deteriorated pavement section; Slurry Seal the full width of the street from Valley Drive to Cul-de-sac 02/2018 06/2018 05 07 Villa Park Orange Montana Circle Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Vida Circle to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Villa Park Orange Francisco Drive Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Vida Circle to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Fernando Circle Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Roberto to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Vida Circle Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Francisco Drive to Fernando Circle 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Roberto Street Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Collins Avenue to Fernando Circle 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Mesa Drive Remove and replace deteriorated pavement section; Grind street pavement and re-overlay with a minimum of 2 from Mesa Drive to Villa Isle Drive 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Mesa Drive Remove and replace deteriorated pavement section; Grind street pavement and re-overlay with a minimum of 2 from Villa Isle Drive to Cerro Viila Drive 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Park Villa Lane / Place Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Villa Park Road to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Hidden Valley Drive Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Canyon Drive to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Durfee Circle Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Lemon Street to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange James Circle Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from James Road to Cul-de-sac 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange James Road Remove and replace deteriorated pavement section; Grind pavement edge and re-overlay with a minimum of 2 from Center Road to James Circle 02/2018 06/2018 15 20 inches of AC over the full width of the street. Villa Park Orange Christine Circle Remove and replace deteriorated pavement section; Slurry Seal the full width of the street from James Road to Cul-de-sac 02/2018 06/2018 05 07 Visalia Tulare Cape Seal Cape Seal Road Maintenance Segments of Arlen Ave, Border Links Dr, Cambridge Ave, Chestnut Ct, Church St, Cindy St, 03/2018 08/2018 06 10 Crescent Ct, Damsen Ave, Fairview Ave, Garden St, Gilmer Ct, Green View Ct, Highland St, Hillsdale Ave, Howard Ave, Hyde Ave, Judy Ave, Julieann St, Keogh Ave, Madsen St, Martin St, Meadow Ave, Menlo Ave, Middlefield Ct, Nicholas Ave, Oak Park St, Oak View Ave, Princeton Ave, Tilden Ct, Vassar Ave, Vine Ave, Willis St, Judy Ave, Kent St, Noyes St, Paradise Ave, Vassar Ave (27,234 feet length, 111,012 sq yards) Vista San Diego Street Rehabilitation, Construction, Reconstruction of deteriorated streets, including asphalt overlay of greater than one-inch in thickness. Cedar Rd from West Dr to W. Vista Way, and Durian St from Hill Dr to northerly end 06/2017 07/2017 10 20 and Overlay-Biennial Construction includes curb ramps; repair of distressed curbs, gutters, and sidewalks; and re-striping. Vista San Diego Citywide Storm-drain Relining/ Repair or replace storm-drain culverts throughout the city that have reached the end of their useful life, have Cedar Rd from westerly City limits to W. Vista Way, Hill Dr from Grapevine Rd to W. Vista Way, 03/2018 06/2018 40 50 Replacement failed as identified in the storm-drain inventory, or where needed prior to overlay or other pavement Melrose Dr from W. Vista Way to the northerly City limits, W. Vista Way from Santa Clara Dr to rehabilitation work. the westerly City limits, and Olive Ave from Emerald Dr to Maryland Dr Vista San Diego Street Maintenance and Slurry Seal - Repair deteriorated pavement areas and resurface streets where identified as priorities in street inventory. Cedar Rd from westerly City limits to West Dr, Hill Dr from Grapevine Rd to W. Vista Way, 05/2018 12/2018 04 06 Biennial Includes fog seal, slurry seal, cape seal, chip seal, asphalt concrete overlay, and other maintenance that is less Melrose Dr from W. Vista Way to the northerly City limits, W. Vista Way from Santa Clara Dr to than one inch in thickness, as well as re-striping, the westerly City limits, and Olive Avenue from Emerald Dr to Maryland Dr Walnut Los Angeles Amar Road Resurfacing Provides for the rehabilitation of the pavement using full depth reclamation- cement stabilized treated base. Amar Road from Country Hollow to Creekside Drive 05/2017 11/2017 20 35 Walnut Creek Contra Costa 2018 Oak Grove Road Rehabilitation The 2018 Oak Grove Rehabilitation project will repave Oak Grove Road from Ygancio Valley Road to Cedro Lane, The 2018 Oak Grove Rehabilitation project will repave Oak Grove Road from Ygancio Valley 01/2018 08/2018 10 20 and Oak Grove Road from Mitchell Drive to the City Limits. These sections were last repaved between 1982 and Road to Cedro Lane, and Oak Grove Road from Mitchell Drive to the City Limits. 1990 and has a PCI average rating of 59. The project will perform required ADA upgrades and traffic signal upgrades as needed.

The roadway area to be repaved is estimated to be 275,000 S.F. This project will be funded by Measure J/ Gas Tax Funding. Walnut Creek Contra Costa 2019 OBAG NORTH MAIN STREET The 2019 OBAG North Main Street project will repave North Main Street from Interstate 680 to California The 2019 OBAG North Main Street project will repave North Main Street from Interstate 680 to 01/2019 08/2019 10 20 REHABILITATION PROJECT Boulevard. This section of North Main Street was last repaved in 1982 and has a PCI rating of 69. The project will California Boulevard. perform required ADA upgrades and traffic signal upgrades as needed.

The roadway area to be repaved is estimated to be 127,000 S.F. This project will be funded by Federal One Bay Area Grant, Measure J/ Gas Tax Funding. Walnut Creek Contra Costa 2019 OBAG2 YGNACIO VALLEY ROAD & The 2019 OBAG2 Ygnacio Valley Road & Oak Grove Road Rehabilitation Project will repave Ygnacio Valley Road The 2019 OBAG2 Ygnacio Valley Road & Oak Grove Road Rehabilitation Project will repave 01/2019 08/2019 10 20 OAK GROVE ROAD REHABILITATION from Civic Drive to San Carlos Drive and Oak Grove Road from Ygnacio Valley Road to Mitchell Drive. This section Ygnacio Valley Road from Civic Drive to San Carlos Drive and Oak Grove Road from Ygnacio PROJECT of Ygnacio Valley Road was last repaved in 1989 and has a PCI rating of 70. The project will perform required ADA Valley Road to Mitchell Drive. upgrades and traffic signal upgrades as needed.

The roadway area to be repaved on Ygnacio Valley Road is estimated to be 630,000 S.F. and the roadway area to be repaved on Oak Grove Road is estimated to be 140,000 S.F. This project will be funded in part by Federal One Bay Area Grant, Measure J/ Gas Tax Funding. Walnut Creek Contra Costa 2020 ROADWAY REHABILITATION The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio Valley Road and The 2020 Roadway Rehabilitation project will repave Broadway from Parkside Drive to Ygnacio 01/2020 08/2020 10 20 Parkside Drive from Civic Drive to San Juan Avenue. Broadway and Parkside Drive were last repaved between Valley Road and Parkside Drive from Civic Drive to San Juan Avenue. 1986 and 1993 perspectival and has a PCI average rating of 71. The project will perform required ADA upgrades and traffic signal upgrades as needed.

The roadway area to be repaved is estimated to be 191,000 S.F. This project will be funded by Measure J/ Gas Tax Funding. Wasco Kern Local Streets Fiber Seal Fiber seal existing pavement 9th Place from Beckes St. to Griffith St. 10/2017 12/2017 08 12 Wasco Kern Local Streets Fiber Seal Fiber seal existing pavement Peters St. from 9th Place to Jubilee Drive 10/2017 12/2017 08 12 Waterford Stanislaus Summers Street Improvements Reconstruct 800' of roadway, replace 8 curb ramps, repair 120' sidewalk, curb & gutter From F St. to D St. 03/2018 10/2018 15 25 Waterford Stanislaus E Street Improvements 450' of sidewalk, 300' of curb & gutter, 2 curb ramps, reconstruct 325' of roadway From La Gallina to Oden 03/2019 10/2019 15 25 Waterford Stanislaus Welch Street Improvements Reconstruct 1,720' of roadway, replace 8 curb ramps Welch, Loy, Barnes, Tohara loop 03/2020 10/2020 15 25 Waterford Stanislaus H Street Improvements Reconstruct 970' of roadway, replace 6 curb ramps From Bentley to Dorsey 03/2021 11/2021 15 25 Waterford Stanislaus D Street Improvements Reconstruct 480' of roadway, replace 4 curb ramps, repair 400' of sidewalk, curb & gutter From Bentley to Main 03/2022 11/2022 15 25 Waterford Stanislaus G Street Improvements Install 430' sidewalk, repair 250' sidewalk, curb & gutter, overlay 700' of roadway From Yosemite to Bentley 03/2023 06/2023 08 12 Waterford Stanislaus I Street Improvements Repair 400' sidewalk, curb & gutter, overlay 460' of roadway, 5 curb ramps Bentley to Main 04/2023 11/2023 08 12 Waterford Stanislaus Main Street Improvements Install 310' sidewalk, curb & gutter, reconstruct 780' of roadway, replace 8 curb ramps, repair 360' sidewalk, curb G Street to Church Street 03/2024 11/2024 15 25 & gutter Waterford Stanislaus B Street Improvements Repair 800' sidewalk, curb & gutter, overlay 950' of roadway, replace 6 curb ramps Bentley to Dorsey 03/2025 11/2025 08 12 Waterford Stanislaus Harriett Drive Improvements Reconstruct 550' of roadway, replace 2 curb ramps, repair 380' of sidewalk, curb & gutter Bentley to Enid 03/2026 11/2026 15 25 Waterford Stanislaus Kadota Avenue Improvements Reconstruct 970' of roadway, replace 6 curb ramps, repair 680' sidewalk, curb & gutter Pasadena to Western 03/2027 11/2027 15 25

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Waterford Stanislaus Hickman Street Improvements Reconstruct 360' of roadway, repair 330' curb & gutter Baker St. to N. Appling 03/2028 11/2028 15 25 Watsonville Santa Cruz Bicycle Safety Bicycle improvements including signage, traffic markings and educational programs Bridge St (Beck St/East Lake Ave), Green Valley Road (Harkins Slough Rd/city limits); Harkins 07/2017 06/2018 10 10 Slough Rd/Walker St (Green Valley Rd/Riverside Dr); Pennsylvania Dr (Green Valley Rd/Main St); Rodriguez St (Riverside Dr/Main St); West Beach (Lee Rd/Rodriguez St) Watsonville Santa Cruz Curb Ramp Replacement Replace non-standard curb ramps Green Valley Rd, Westridge Dr 07/2017 06/2018 20 20 Watsonville Santa Cruz Downtown Revitalization Provide complete streets improvements on Main Street and Rodriguez Street including but not limited to Main Street from West Beach St to Freedom Boulevard 07/2018 06/2019 20 20 pedestrian facilities, bus stops, parking, bicycle facilities and traffic management. Includes design, environmental documentation and construction. Watsonville Santa Cruz Elm St (Marchant St to Lincoln St) Repair and resurface damaged roadway and bike lanes, replace damaged sidewalks, add pedestrian facilities Elm St from Marchant St to Lincoln St 07/2018 06/2020 20 20 where none exist. Watsonville Santa Cruz Freedom Blvd (Airport Blvd to Buena Design and Environmental phases to repair and resurface damaged roadway and bike lanes, replace damaged Freedom Blvd from Airport Blvd to Buena Vista Dr 07/2019 07/2021 20 20 Vista Dr) sidewalks, add pedestrian facilities where none exist. Watsonville Santa Cruz Freedom Blvd (Green Valley Rd to Repair and resurface damaged roadway and bike lanes, replace damaged sidewalks, add pedestrian facilities Freedom Blvd from Green Valley Rd to Airport Blvd 07/2020 06/2022 20 20 Airport Blvd) where none exist. Includes design. Watsonville Santa Cruz Freedom Boulevard (Alta Vista to Repair and resurface damaged roadway and bike lanes, replace damaged sidewalks and address accessibility Freedom Boulevard from Alta Vista to Green Valley Road 07/2020 06/2022 20 20 Green Valley Road) items, as necessary. Includes design. Watsonville Santa Cruz Green Valley Rd (Freedom Blvd to City Repair and resurface damaged roadway and bike lanes, replace damaged sidewalks, add pedestrian facilities Green Valley Rd from Freedom Blvd to City Limits 07/2020 06/2022 20 20 Limits) where none exist. Includes design, environmental documentation and construction. Watsonville Santa Cruz Green Valley Rd Adaptive Traffic Provide adaptive traffic control system Green Valley Rd from Hwy 1 to Carnation Dr 07/2017 07/2018 15 15 Control System Watsonville Santa Cruz Green Valley Rd (Struve Slough to Reconstruct roadway and bike lanes, replace asphalt ped path with curb, gutter sidewalk and ADA compliant curb Green Valley Rd from Struve Slough to Freedom Blvd 07/2017 07/2018 20 20 Freedom Blvd) ramps; upgrade signage and loop detectors. Watsonville Santa Cruz Ohlone Parkway (West Lake Ave to Repair and resurface damaged roadway and bike lanes, replace damaged sidewalks, add pedestrian facilities Ohlone Parkway from West Lake Ave to railroad tracks 07/2020 06/2022 20 20 railroad tracks) where none exist. Watsonville Santa Cruz Pajaro Valley High School Connector Construct 8' wide pedestrian and bike trail. Includes design, environmental documentation and construction. From Airport Blvd to Harkins Slough Rd 07/2019 07/2021 10 10 Trail (Airport Blvd to Harkins Slough Rd) Watsonville Santa Cruz Pedestrian & Traffic Safety Educational/safety programs and installation of striping, markers, signage, flashing beacons, curb extensions, Roache Rd, Beach St near Harvest, Harkins Slough Rd 07/2017 07/2018 15 15 speed humps, etc. Watsonville Santa Cruz Rail Trail Pedestrian and Bicycle Trail Construct pathway parallel to the railroad tracks: eight-foot width asphalt (hma) and two-foot base rock shoulders Along existing railroad right of way from Lee Rd to Walker St at West Beach St 07/2017 06/2019 10 10 (Lee Rd to Walker St at West Beach St) on each side. Provide bicycle and pedestrian safety training. Watsonville Santa Cruz Roadway Maintenance Provide three coating seal system to preserve existing roadways Green Valley Rd (Harkins Slough Rd/Home Depot Entrance); Ohlone Parkway (railroad 07/2018 06/2019 08 08 tracks/Main St; Longview Dr (Progress Ave/Pennsylvania Dr); Elm St (Marchant St/Lincoln St; Bridge St (Blackburn St/Beck St) Watsonville Santa Cruz Trail Maintenance Maintain existing trails All or portions of Bay Breeze, Fed Ex, Stone Creek, Struve Slough, Upper Struve Slough and 07/2017 06/2018 10 10 Watsonville Slough trails Weed Siskiyou Vsista Drive Rehabilitation Rehabilitation & maintenance of a local roadway Vista Drive 06/2018 09/2018 10 20 West Covina Los Angeles Residential Streets Rehab Rehabilitation of pavement, replacement of damaged curb, gutter and sidewalks, retrofitting of access ramps, Maintenance Zones 11 and 12 04/2018 06/2018 10 20 signing and striping. West Hollywood Los Angeles Annual Paving project FY 2017-2018 Grind and Overlay 2-inches of Asphalt Concrete, repair curb gutter and sidewalk, place new striping, adjust Formosa Ave, Greenacre Ave, Vista St, Spaulding Ave, Genesee Ave, Stanley Ave, Gardner Ave, 02/2018 06/2018 15 20 manhole covers, and other misc. improvements. Flores St, and Kings Rd. West Hollywood Los Angeles Annual Concrete Sidewalks Repair Reconstruct broken and damaged concrete sidewalks, curbs, gutters, driveway aprons, and access ramps to meet Holloway Dr, Palm Ave, Harrat St, Willoughby Ave, Sweetzer Ave, Dicks St, Dorrington Ave, and 11/2017 11/2018 05 10 Project ADA requirements. These repairs improve pedestrian safety. others citywide. West Sacramento Yolo Pavement Management System Preparation of a multiyear Pavement Rehabilitation Program that includes updating PMS Citywide 01/2018 12/2018 05 07 Update West Sacramento Yolo States Streets Neighborhood Pavement Rehabilitate the local street network including storm drainage repairs, ADA accessibility upgrades and pavement States Streets Neighborhood 01/2018 12/2019 05 10 Rehabilitation rehabilitation in Old West Sacramento Neighborhood West Sacramento Yolo West End of West Capitol Avenue Design phase of West Capitol Ave from I-80 to Enterprise Blvd (approximately 1 mile) West Capitol Avenue: I-80 to Enterprise Blvd 01/2018 12/2020 05 30 Rehabilitation Westlake Village Los Angeles Joint City Pavement Rehabilitation The Project will improve residential and arterial streets and extend their useful life through a variety of pavement The SB-1/RMRA will fund most of the Denver Springs Drive, Kirsten Lee Drive, and GrandOaks 11/2017 06/2018 15 25 Project improvements. The SB-1/RMRA portion of the work will be ARHM Overlay Drive work within the larger Joint City Pavement Rehabilitation Program. Westminster Orange Westminster Boulevard Street Remove existing pavement and place new asphalt concrete overlay; remove and replace damaged curb, gutter, Westminster Boulevard from Newland Street to Magnolia Street 02/2018 06/2018 15 20 Improvements cross gutter, spandrel, sidewalk, wheel chair ramps, driveway approach, bus pad, alley apron; adjust manholes and water valves to grade; install signing and striping Westmorland Imperial CMAQ Project to install new street and Pave existing roadway without adding capacity. Excavate to place Cl. 2 A.B. with A.C.; install curb, gutter, cross North H Street (from 7th to 8th St) and 8th Street (from H St. to I St.) [950'] 09/2018 10/2018 30 50 curb and sidewalk gutter, ADA ramps, sidewalk, and driveway entrances; raise manhole covers and water valve covers; striping and signage. Westmorland Imperial Streets Rehabilitation Program Phase 2 City of Westmorland is proceeding with a project for the design and installation of conventional asphalt with an C Street from Main Street to 7th Street, D Street from 5th St to 6th St and J Street from 7th St 01/2018 02/2018 12 15 asphaltic rubberized aggregate membrane. The selected streets have been in conjunction with the Pavement to 8th St. Management Study. Wheatland Yuba F Street Resurfacing The project will level, repair and resurface F Street, from Wheatland Road to 3rd Street. F Street - Wheatland Road to 3rd Street 03/2018 08/2018 07 10 Wheatland Yuba 3rd Street Resurfacing The project will level, repair and resurface 3rd Street, from E Street to F Street . 3rd Street - E Street to F Street 03/2018 08/2018 07 10 Whittier Los Angeles Newcomb Avenue Asphalt Pavement Cold mill & asphalt overlay of existing local residential roadway, sidewalk repair and installation of ADA access Newcomb Avenue from north of Citrustree Road to Leffingwell Road 08/2018 09/2018 15 25 Rehabilitation ramps. Whittier Los Angeles Lashburn Street Asphalt Pavement Cold mill & asphalt overlay of existing local residential roadway. Lashburn Street from First Avenue to east of Maybrook Avenue 08/2018 09/2018 15 25 Rehabilitation Whittier Los Angeles Pounds Avenue Asphalt Pavement Cold mill & asphalt overlay of existing local residential roadway. Pounds Avenue from north of Lashburn Street to south of Lashburn Street 08/2018 09/2018 15 25 Rehabilitation Wildomar Riverside Clinton Keith Road Rehabilitation and Remove rectangular areas of failed pavement sections and replace with new asphalt. Palomar to Renaissance Plaza 02/2018 06/2018 15 21 Repair Wildomar Riverside Bundy Canyon Road Rehabilitation and Remove rectangular areas of failed pavement sections and replace with new asphalt. Oak Creek to The Farm 02/2018 06/2018 07 10 Repair Wildomar Riverside Grand Avenue Rehabilitation and Remove rectangular areas of failed pavement sections and replace with new asphalt. Leslie to 2000' se'ly of McVicar 07/2018 12/2018 15 24 Repair Wildomar Riverside Lemon Street AC Overlay Place a thin asphalt section over existing pavement. 771' SW of Gafford to Gafford 07/2018 12/2018 15 20 Wildomar Riverside Inland Valley AC Overlay Place a thin asphalt section over existing pavement. Clinton Keith Road to Prielipp 07/2018 12/2018 07 10 Wildomar Riverside PCI Update Pavement Management Report. Inventory streets citywide, determine pavement condition index, prepare 5 year Citywide 07/2018 12/2018 03 05 pavement maintenance strategy. Williams Colusa Husted Rd South Pavement Rehab Husted Road (South) Pavement Repair & Overlay Husted Road (South) from I-5 to Abel Road 06/2018 12/2018 07 10 Project

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Williams Colusa 7Th Street Rehab Project 7th Street / Frontage Road Pavement Repair & Overlay 7th Steet / Frontage Road from Theater Road to Husted Road 06/2019 12/2019 07 10 Williams Colusa Husted Rd North Pavement Rehab Husted Road (North) Pavement Repair & Overlay Husted Road (North), from E Street to State Route 20 06/2019 12/2019 07 10 Project Williams Colusa E Street Rehab Project E Street Pavement Repair & Overlay E Street from Husted Road to 6th Street 06/2019 12/2019 07 10 Willits Mendocino Creekside Road Stabilization Project This project will repair drainage structures, regrade the roadway, replace approximately 80' of curb, gutter, and Creekside Street, between Boscabell and South Lenore Streets 04/2018 06/2018 10 25 asphalt. Willits Mendocino 2017 Annual Traffic Striping Replacement of approximately 5 miles of deteriorated traffic markings, including: pedestrian crosswalks, center Various locations thoughout the City 09/2017 06/2018 02 04 lines, bike lanes, etc. This is part of a program to replace a quarter of the City's traffic markings per year. Willows Glenn Sycamore Street Reconstruction Supplement STIP funds for Scyamore Street repair/replace sidewalk, curb and gutters where needed. Replace Sycamore St. from Lassen St. to Tehama St. 08/2017 02/2018 20 50 ramps to meet State ADA requirements. Willows Glenn Sidewalk renovation Remove and replace broken and uneven sidewalks that are trip and fall hazards or force pedestrian traffic to leave South side of Birch St. from Butte St. to Tehama St. West side of Tehama St. from Birch ST. to 03/2018 05/2018 20 50 the sidewalk and travel in the street. Repair or replace curb and gutter where needed. Connect sections to Cedar St. encourage pedestrian travel and bring sidewalk system into ADA compliance. Willows Glenn Sidewalk renovation Remove and replace broken and uneven sidewalks that are trip and fall hazards or force pedestrian traffic to leave South side of Walnut ST. from Shasta St. to Butte St. West side of Butte St. from Walnut St. to 05/2018 07/2018 20 50 the sidewalk and travel in the street. Repair or replace curb and gutter where needed. Connect sections to Sycamore St. encourage pedestrian travel and bring sidewalk system into ADA compliance. Windsor Sonoma Town-Wide Street Resurfacing Slurry seal to invest in the on-going maintenance of Town streets to reduce the deterioration of pavement and All streets east of Hembree Lane bounded on the north by Arata Lane down south to the US 06/2017 07/2018 03 07 extend the useful life of the streets. This is part of the annual pavement maintenance plan and is considered a 101 inclduing streets in the Crosscreek, Wilson Estates, Jane's Meadow, and Pool Creek best management practice. neighborhood (e.g. Billington Lane, Wilson Lane, etc.) Winters Yolo Winters RMRA Project 1.1 Along a 123,108 Sq Ft corridor there will be spot repairs, crack and slurry seals. Edwards St, from Main St to Railroad. 11/2017 03/2018 05 07 Winters Yolo Winters RMRA Project 1.2 Along a 17,950 Sq Ft corridor there will be spot repairs, crack and slurry seals. East Main St, between Railroad and Elliot. 11/2017 03/2018 05 07 Winters Yolo Winters RMRA Project 1.3 Along a 34,956 Sq Ft corridor there will be spot repairs, crack and slurry seals. Almond Dr, between Walnut Ln and Orchard. 11/2017 03/2018 05 07 Winters Yolo Winters RMRA Project 1.4 Along a 17,640 Sq Ft corridor there will be spot repairs, crack and slurry seals. Orchard Ln, from Almond Dr to the street terminus. 11/2017 03/2018 05 07 Winters Yolo Winters RMRA Project 1.5 Along a 3,960 Sq Ft corridor there will be crack and slurry sealed. Almond Dr, from Orchard Ln to the street terminus. 11/2017 03/2018 05 07 Winters Yolo Winters RMRA Project 1.6 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The SW corner of Abbey at Fourth St. 11/2017 11/2017 05 07 Winters Yolo Winters RMRA Project 1.7 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NE corner of Haven at Main St. 11/2017 12/2017 05 07 Winters Yolo Winters RMRA Project 1.8 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NW corner of Fourth at Main St. 11/2017 01/2018 05 07 Winters Yolo Winters RMRA Project 1.9 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NW corner of Abbey at Haven St. 11/2017 02/2018 05 07 Winters Yolo Winters RMRA Project 1.10 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The SE corner of Abbey at Haven St. 11/2017 03/2018 05 07 Winters Yolo Winters RMRA Project 1.11 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The SW corner of Abbey at Haven St. 11/2017 04/2018 05 07 Winters Yolo Winters RMRA Project 1.12 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NE corner of Abbey at Haven St. 11/2017 05/2018 05 07 Winters Yolo Winters RMRA Project 1.13 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The SW corner of Baker at First St. 11/2017 06/2018 05 07 Winters Yolo Winters RMRA Project 1.14 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The SW corner of Morgan at E. Baker St. 11/2017 07/2018 05 07 Winters Yolo Winters RMRA Project 1.15 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NE corner of Baker at Railroad Ave. 11/2017 08/2018 05 07 Winters Yolo Winter RMRA Project 2.1 Along a 111,456 Sq Ft corridor sections will have spot repairs, crack and slurry seals, and be grind and paved. Anderson St, from Railroad to Hemenway. 11/2018 03/2019 13 20 Winters Yolo Winters RMRA Project 2.2 Along a 39,420 Sq Ft corridor there will be spot repairs, crack and slurry seals. Carrior Cr and Pricilla Ct, from Railroad to Anderson. 11/2018 03/2019 05 07 Winters Yolo Wintesr RMRA Project 2.3 Along a 80,532 Sq Ft corridor there will be crack and slurry seals. Third St, from Grant to the terminus. 11/2018 03/2019 05 07 Winters Yolo Winters RMRA Project 2.4 Along a 153,328 Sq Ft corridor there will be spot repairs, slurry seals, and grind/paves. Main St, between Grant and Second. 11/2018 03/2019 13 20 Winters Yolo Winters RMRA Project 2.5 Along 9,540 Sq Ft corridor there will be spot repairs, crack and slurry seals. Entirety of Betty Ct 11/2018 03/2019 05 07 Winters Yolo Winters RMRA Project 2.6 Along 113,596 Sq Ft corridor there will be spot repairs, crack and slurry seals. East Baker St, between Railroad and Main. 11/2018 03/2019 05 07 Winters Yolo Winters RMRA Project 2.7 65,052 Sq Ft corridor will have spot repairs, crack and slurry seals. Baker St, from Waggoner to Railroad 11/2018 03/2019 05 07 Winters Yolo Winters RMRA Project 2.8 Along 29,472 Sq Ft corridor there will be spot repairs, crack and slurry seals. East St, from East Baker to East Main 11/2018 03/2019 05 07 Winters Yolo Winters RMRA Project 2.9 Along 11,808 Sq Ft there will be grind and pave. East St, from E Baker to Grant 11/2018 03/2019 13 20 Winters Yolo Winters RMRA Project 2.10 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NW and NE corners of Anderson and Mermod need ramps. 11/2018 06/2019 05 07 Winters Yolo Winters RMRA Project 2.11 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NE and SE corners of Lenis at Hemenway need ramps. 11/2018 07/2019 05 07 Winters Yolo Winters RMRA Project 2.12 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NE and SW corners of Lenis at Mermod need ramps 11/2018 08/2019 05 07 Winters Yolo Winters RMRA Project 2.13 Repair corner so that crosswalks are ADA compliant and accessible by all residents. All 4 ramps at the corners of Baker at Second need ramp repairs/alterations. 11/2018 10/2019 05 07 Winters Yolo Winters RMRA Project 2.14 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The corner of SW Emery and Main needs a ramp. 11/2018 11/2019 05 07 Winters Yolo Winters RMRA Project 3.1 Along 27,420 Sq Ft there will be spot repairs, crack and slurry seals. E Main St, from Grant to E Baker 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.2 Along 15,768 Sq Ft there will be spot repairs, crack and slurry seals. Westwood Ct, from Russel to the terminus 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.3 Along 49,140 Sq Ft there will be spot repairs, crack and slurry seals, and grind and pave where necessary Railroad Ave, from Grant to Russell. 11/2019 03/2020 13 20 Winters Yolo Winters RMRA Project 3.4 Along 49,788 Sq Ft there will be spot repairs, crack and slurry seals. Adams Ln, from Taylor to Valley Oak. 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.5 Along 13,068 Sq Ft there will be spot repairs, crack and slurry seals. Hampshire Ct, from Valley Oak to its terminus. 11/2019 03/2020 05 07 Winters Yolo Wintesr RMRA Project 3.6 Along 34,146 Sq Ft there will be spot repairs, crack and slurry seals. First St, from Grant to Abbey. 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.7 Along 34,146 Sq Ft there will be spot repairs, crack and slurry seals. Second St, from Grant to Abbey. 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.8 Along 22,365 Sq Ft there will be spot repairs, crack and slurry seals. Haven St, from Main to Edwards. 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.9 Along 145,796 Sq Ft there will be spot repairs, crack and slurry seals. Abbey St, between Railroad and Dry Creek. 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.10 Along 33,680 Sq Ft there will be spot repairs, crack and slurry seals. E Abbey St, between Railroad to East St. 11/2019 03/2020 05 07 Winters Yolo Winters RMRA Project 3.11 Along 19,400 Sq Ft there will be grind/pave. Riverview Ct, from Russell St to end. 11/2019 03/2020 13 20 Winters Yolo Winters RMRA Project 3.12 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The corners of NE and NW Lincoln at Washington need ramps. 11/2019 04/2020 05 07 Winters Yolo Winters RMRA Project 3.13 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The corners of NE and NW Jefferson at Lincoln need ramps. 11/2019 05/2020 05 07 Winters Yolo Winters RMRA Project 3.14 Repair corner so that crosswalks are ADA compliant and accessible by all residents. The NE corner of Wolfskill and First needs a ramp. 11/2019 06/2020 05 07 Winters Yolo Winters RMRA Project 3.15 Repair sidewalks so that they are accessible to all residents. Second St between Baker and Edwards on West Side. Wolfskill property. 11/2019 07/2020 05 07 Winters Yolo Winters RMRA Project 3.16 Repair sidewalks so that they are accessible to all residents. Abbey St, from bus stop to end of bleachers on the Little League side. 11/2019 08/2020 05 07 Winters Yolo Winters RMRA Project 3.17 Repair sidewalks so that they are accessible to all residents. Haven St, from Main to bleachers on Little League side. 11/2019 09/2020 05 07 Winters Yolo Winters RMRA Project 3.18 Repair sidewalks so that they are accessible to all residents. Rotary Park from West parking lot to gazebo. 11/2019 10/2020 05 07 Winters Yolo Winters RMRA Project 3.19 Repair sidewalks so that they are accessible to all residents. Rotary Park from South parking lot to gazebo. 11/2019 11/2020 05 07 Woodlake Tulare South Valencia Blvd Improvements Construct about 3,300 linear feet of curb, gutter, and 6 foot wide sidewalk on both sides of S. Valencia Blvd (SR The project is located in Woodlake, CA along its main road S. Valencia Blvd (SR 245). The cross 03/2018 12/2018 15 20 Project 245). The improvements also include the installation of ADA ramps, drive approaches, storm drainage, paving, street boundries that are containing the project site are Bravo Ave which is the northern cross and landscape repair street and Wutchumna ditch with is at the southern end on the project site. Within the project site you will also find the cross street Deltha Ave, Laguna Ave, and Ropes Ave going from south to north. The project is located in a high residential area and is towards the most southern part of town. The city yard is on the south of this project and just to the east is Bravo Lake.

Woodlake Tulare Magnolia St Improvements Project Construct about 550 linear feet of curb, gutter, and decorative sidewalk along the east side of Magnolia St The project is located in Woodlake, CA in a commercial zone of the city. The location is 06/2018 12/2018 10 15 between Antelope Ave and Lakeside Ave. The sidewalk will be 10 feet wide and includes brick tree wells, two Magnolia St between Antelope Ave and Lakeview Ave. The project is on the east side of drive approaches, ADA ramps, decorative street lights, storm drainage, paveout, and striping. Magnolia St in front of a commercial center. To the north of the project location across Lakeview Ave is residential area. To the west of the project is a transit center along with a commercial zone and the City's main road, N. Valencia Blvd (SR 245). To the south of the project, just past Antelope Ave, is a City park.

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected] City - Submitted Local Streets and Roads Projects FY 17-18 as of 1-31-18

Project Project Pre- Useful Life Useful Life Agency Name County Project Title Construction Description Location Construction Minimum Maximum Woodlake Tulare North Valencia Blvd Extension Construct about 620 linear feet of curb, gutter, and 6 foot wide sidewalk along N. Valencia Blvd (SR 245). The The project is located in Woodlake, CA in a high residential area along N Valencia Blvd (SR 245) 03/2019 12/2019 15 20 Improvement Project improvements also include drive approaches, 5 foot wide bike lanes, 30 foot radius curb return with ADA ramps, towards the northern part of town. The cross streets are Sequoia Ave which is the northern street lights, paveout, and striping. The project will also construct about 150 feet of 4 foot wide sidewalk along W cross street and Sierra Ave which is the southern cross street. One block to the west along Palm Sequoia Ave to connect to existing sidewalk. St is Woodlake Valley Middle School and all around the project site is residential. To the east is a proposed development site for more residential homes. Woodland Yolo 2020 Road Rehabilitation Project Roadway rehabilitation including asphalt roadway rehabilitation, repair damaged curb, gutter and sidewalk Matmor Road from E. Main Street to Gibson E. Road and Gum Avenue from East Street to 12/2019 12/2022 15 20 sections, improve ADA access at intersections, improve delineation of, and widen bike lanes. Project will improve Matmor Road. access to shopping, school and neighborhoods within and through the project area. Woodside San Mateo Road Rehabilitation Program Strategic maintenance of the Town's roads provides greater safety for the various users of the roads and Crest Road from Cinnabar to Cragmont 01/2018 10/2018 05 07 lengthens the life of the roadway system. Project will resurface the pavement, improve storm drainage, and Harcross Road from School to End complete other safety improvements on local streets throughout the Town of Woodside. Normandy Lane from Woodside Dr to End Hardwick Rd from Woodside Dr to End Canada Rd from Woodside Rd to Palm Circle Patrol Rd from Summit Springs to End Ward Way from Alameda DLP to End Eleanor Dr from 270 Eleanor to Eugenia Glenwood Rd from Hillsdale to End Hillside Dr from Glenwood to Alta Mesa Stadler Dr from End S to End N Alta Mesa Rd from Highland Terr to Hillside West California from Jefferson to N Jeff West Glen Wy from W California to Glencrag Maple Wy from East View to Glencrag Portola Rd from Highland to Family Farm Portola Rd from Sandhill to La Honda

Yorba Linda Orange On Going Street Maintenance The project includes crack sealing, slurry sealing, asphalt overlays, and miscellaneous asphalt repair along with Zone 1 is located on the west side of the City generally west of Valley View Avenue and north of 06/2018 09/2018 05 07 Program/Annual Pavement restriping of pavement markings. The City is divided into 7 zones and the program provides for treatment of one Yorba Linda Boulevard. The zone consists of 68 lane miles of pavement which include a Preservation Program (APPP) Zone 1 zone per year. combination of arterials, collectors, and local streets. Yountville Napa Annual Street Maint Program Project Development and planning for FY18/19 Mulberry Street,Webber Avenue,Yount Street 04/2018 04/2019 05 15 Yountville Napa Street Light Replacement Replace 21 wood pole streetlights that have reached the end of service life in Oak Circle Neighborhood Oak Circle X141-X162. 21 Streetlights 09/2017 09/2018 12 25 Yreka Siskiyou City of Yreka Strategic Paving, Strategically chipsealing approximately ____ feet of streets and roads in the City of Yreka as the most cost While the City has a recent PCI survey for reference, determining the most effective use of 06/2017 12/2017 05 15 Preventive and Planning Project effective means of using allocated funds. limited funds for FY 17/18 requires actual observation of the streets and prioritizing to achieve the most area covered Yuba City Sutter Bridge Street Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Gray Avenue to Cooper Avenue 04/2018 09/2018 20 30 Yuba City Sutter Garden Highway Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Lincoln Road to Shanghai Bend Road 04/2019 10/2019 20 30 Yuba City Sutter S Walton Avenue Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Lincoln Road to Camino De Flores 04/2020 10/2020 20 30 Yuba City Sutter Tharp Road Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. SR 20 WB to Poole Boulevard 04/2021 10/2021 20 30 Yuba City Sutter Franklin Avenue Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. SR 99 to Wilbur Avenue 04/2021 10/2021 20 30 Yuba City Sutter Civic Center Boulevard Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. SR 20 WB to Butte House Road 04/2023 10/2023 20 30 Yuba City Sutter Queens Avenue Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Blevin Road to Stabler Lane 04/2024 10/2024 20 30 Yuba City Sutter Blevin Road Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Butte House Road to Queens Avenue 04/2024 10/2024 20 30 Yuba City Sutter El Margarita Road Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Imperial Way to 1100' S/O Spirit Drive 04/2024 10/2024 20 30 Yuba City Sutter Sanborn Road Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Bogue Road to Pebble Beach Drive 04/2024 10/2024 20 30 Yuba City Sutter Little John Road Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Hunn Road to Franklin Road 04/2024 10/2024 20 30 Yuba City Sutter Washington Avenue Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Gray Avenue to Live Oak Boulevard 04/2026 10/2026 20 30 Yuba City Sutter Railroad Avenue Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Lask Drive to Teesdale Road 04/2025 10/2025 20 30 Yuba City Sutter Stabler Lane Rehabilitation .3' Mill and AC Overlay, ADA ramp improvements, striping improvements. Jamie Drive to Butte Vista Lane 04/2025 10/2025 20 30 Yucaipa San Bernardino Yucaipa Boulevard Improvements, 15th Rehabilitation of asphalt and curb/gutter. Construction of sidewalk, drainage improvements and associated street Yucaipa Blvd from 15th Street to I-10 Freeway 10/2017 11/2017 25 25 Street to I-10 Freeway improvements. Yucaipa San Bernardino County Line Road Improvements, Rehabilitation of asphalt and curb/gutter. Construction of sidewalk, drainage improvements and associated street County Line Road from Bryant Street o I-10 Freeway 10/2017 11/2017 25 25 Bryant Street to I-10 Freeway improvements. Yucaipa San Bernardino Avenue E Intersection Improvements, Rehabilitation of asphalt and curb/gutter at intersections as part of the construction of roundabouts. Avenue E from Bryant Street to 5th Street 10/2017 11/2017 25 25 Bryant Street to 5th Street Yucca Valley San Bernardino Buena Vista Drive Pavement Pavement Rehabilitation Buena Vista Drive: SR-247 and Yucca Messa Road in the Town of Yucca Valley 12/2017 06/2018 10 15 Rehabilitation

This information is provided solely for informational purposes and pursuant to SHC 2034 is subject to change by cities and counties. For additional information please contact Commission staff at (916)654-4245 or [email protected]