Holger Matthiesen 04.12.2017
Arkona Offshore Wind Project Norwegian offshore wind delegation E.ON strategy
Global trends like sustainability and climate protection, digitalization and technological innovation are altering the energy landscape. At the same time our customers’ energy needs are changing. A new energy world – decentralized, green, and interconnected – is emerging. Our core businesses reflect the key energy trends:
The global growth of renewables
The transformation of yesterday’s power lines into tomorrow’s smart energy networks
The increasing demand for innovative customer solutions
Partner for the New Energy World Renewables at a glance What wedo Offshore wind Green energy We are among the largest renewable energy players in our core markets (Europe and US) Our focus is offshore and onshore wind, as well as utility-scale Onshore wind PV and energy storage Green assets We deliver and own utility scale renewable projects, engaging in development, construction and operation We partner with investors offering stakes in our existing green Utility scale PV assets or projects under development Services 1
We provide long term green energy PPAs to our customers as Technologies 2 well as offering Wind O&M/ AM/ EM services to 3rdparties Energy storage Energy solutions We have developed more than 6 GW of renewable energy projects since inception in2007 1,100 E.ON employees work in Renewables Owned capacity3 (GW) TWhproduced3
2015 4.4 Offshore 2015 11.8 Onshore +PV 2016 4.6 2016 13.0
2.0 4.0 6.0 4.0 8.0 12.0 16.0 1. Power Purchase Agreements 2. O&M: Operations & Maintenance; AM: Asset Management; EM: Energy Management, via “E.ON Energy Services” 3. Pro rata
Source: E.ON Facts & Figures 2017 We rank among the top tier in Offshore Wind experience
Project examples Operated Capacity (GW) London Array, the world’s largest offshore wind farm COD: 2013 E.ON share: 30% Capacity: 630 MW
Humber Gateway, offshore windfarm UK North Sea COD: 2015 1.0 GW E.ON share: 100% Capacity: 219 MW Operated capacity countries Amrumbank West, offshore Key facts windfarm German North Sea COD: 2015 1 1.0 GW operated capacity, global #3 for owned capacity E.ON share: 100% Portfolio across Germany, Nordic and UK Capacity: 302 MW
1. The European offshore wind industry – key trends and statistics 2016, Wind Europe E.ON ranks as global #3 in offshore wind power companies1
In operation
In construction Kårehamn (48 MW)
Amrumbank Robin Rigg West (180 MW) (302 MW) Arkona-Becken Südost 6 Humber (385 MW) alpha ventus Rødsand II Gateway 5 (60 MW)4 (207 MW) (219 MW)
Scroby Sands (60 MW)
London Array (630MW)2
Rampion (400 MW)3
1. The European offshore wind industry – key trends and statistics 2016, Wind Europe 2. E.ON share 30% (189 MW) 3. E.ON share 50% (200 MW) 4. E.ON share 26% (16 MW) 5. E.ON share 20% (41 MW) 6. E.ON share 50% (193 MW) Project Facts Arkona
• Location: Baltic Sea, exclusively in the German economic zone
• Capacity: 385 MW • Water depth: 23–37 m • Area: 39 km² • Foundations: XL Monopiles + Transition Pieces • Innerpark cabel: 65 km (10 strings) with 33 kV • Turbines: 60 x Siemens 6.0 MW-154 PB HWRT • Substation: AC Technology shared with 50Hertz • Investment: ~1,2 Billion EUR
16.10.2017 6 Arkona – Project Timeplan
Investment Survey Foundation Innerpark cabel Substation Grid Wind Turbine decision works installation installation installation connection installation
Q2 2016 Q2/Q3 2016 H2 2017 Q1 2018 Q1 2018 Q2 2018 H2 2018
Commissioning completed Windpark in operation
2019 2019 – 2044…
16.10.2017 7 Innovation: 3D Seismic Survey
• 3D multichannel seismic survey visualizes the seabed layers in a model and creates a “soil investigation hub” displaying all relevant data in one place. • Advantage of reducing costs for boreholes & geo survey campaign by several million €/farm and having a good overview of soil conditions for design concepts, cable laying, jacking procedure etc.
04.12.2017 8 Innovation: Foundation Corrosion Protection
• Thermal Sprayed Aluminum (TSA) with an epoxy paint as a sealer replaces the conventional corrosion protection with Anode Rings + CAT III Coating • Compared to conventional concepts TSA saves costs and several hundreds tons of metal emissions • TSA is applied onshore and therefore increased the safety by avoiding offshore works
• All monopiles have been fully coated with ~45m TSA • Constant quality and within approved specifications
04.12.2017 9 German Renewables Award 2017
• Thermal Sprayed Aluminum (TSA) has won the German Renewables Award as Innovation of the year 2017. • Team effort by companies E.ON, Statoil, Ramboll, Bladt, EEW and Krebs. • Independent Jury of science and industry: “The procedure developed by E.ON reduces the environmental impact and at the same time lowers the costs for the construction of offshore wind farms,”
04.12.2017 10 Supply of Monopiles
11 Status of Foundation Installation
• The 60th monopiles has been installed on the 09th of November at 4 a.m. All monopiles have been installed successfully.
12 Status of Transition Piece Installation
• The start of TP installation took place on the 7.November. • Currently 5 TPs are installed.
04.12.2017 13 Electrical Offshore Substation
• Shared electrical offshore substation with TSO 50Hertz • Grid Operator (TSO) is 50Hertz Transmission • Onshore grid connection point in Lubmin
• Unmanned offshore platform • Prepiled jacket foundation (1000t) • Top side (4000 t) • Manufacturing by STX, St. Nazaire, France
14 Innovation: Heated Boat Landing
• The fenders and ladder of the Offshore Substation’s boat landing will be electrical heated
• Connection to SCADA system for remote control
• Increases the availability of access to the substation during cold weather periods
• Improves safety and reduces risks
04.12.2017 15 Electrical Offshore Substation on Barge
04.12.2017 16 Electrical Offshore Substation – Jacket Structure
17 Innerpark Cable Supply
18 Wind Turbines - Siemens Technology
• Siemens turbines with proven technology • Net power 6 MW with upgrades up to 6,45 MW
• Hub height 102m • Blade tip speed 360km/h • Rotor diameter 154m • Rotor weight 28t • Tower weight 422t • Nacelle weight 522t
• Manufacturing mainly in Germany and Denmark • WTG installation starts in Q3 2018
19 Wind Turbine - Installation
Installation: A2Sea / Denmark Installation vessel: Sea Challenger Basis Port: Port Mukran Start installation: Q3 2018
20
Example pictures not from Arkona Operation & Maintencance
• Following the construction phase E.ON will take over the operation & maintenance of the Arkona wind park
• Sassnitz/Port Mukran will be the basis for operation & maintenance in the next 25years
• Operation & maintenance will be executed with 2-3 CTVs and an own operations team
E.ON will be the first operator who will operate offshore wind parks and the North and Baltic Sea
21 Operation & Maintenance Building