GOVERNMENT OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS LOK SABHA

UNSTARRED QUESTION NO:1929 ANSWERED ON:08.03.2006 FOREIGN ASSISTANCE FOR NATIONAL HIGHWAYS DEVELOPMENT PROJECTS Rawat Shri Ashok Kumar;Shiwankar Shri Maha Deo Rao;Yadav Shri Kailash Nath Singh

Will the Minister of SHIPPING, ROAD TRANSPORT AND HIGHWAYS be pleased to state:

(a) the National Highways Development Projects being implemented with foreign assistance in the country; 2. the details of the amount of assistance received during the last three years; 3. the total amount spent by the Government on National Highways during 2005-06; 4. the total length of National Highways constructed under the said assistance so far; 5. whether any time limit has been fixed for spending the amount of foreign assistance received for the projects; and 6. if so, the details thereof? Answer

THE MINISTER OF STATE IN THE MINISTRY OF SHIPPING, ROAD TRANSPORT AND HIGHWAYS (SHRI K. H. MUNIYAPPA)

1. List of Contracts under National Highways Development Project (NHDP) being implemented by National Highways Authority of India (NHAI) are given at Annexure-I

2. The details of external assistance received by NHAI through Government of India against various loans from World Bank (WB), Asian Development Bank (ADB) and Japan Bank for International Cooperation (JBIC) and also from ADB directly by NHAI for Surat- Manor Tollway Project alongwith expenditure against each of the project during last three years (including the current year 2005-06 upto January, 2006) are given at Annexure - II.

3. The total amount spent on National Highways Development Project during 2005-06 (Upto February, 2006) is as under :-

(i) On Projects (including share of Rs. 4807.72 crores Private sector in respect of BOT projects)

(ii) On Maintenance Rs. 197.40 crores

(d) 1527 Km of National Highways has been completed under the contracts implemented with foreign assistance.

(e) and (f) The loan closing date (the date by which the amount of loan can be utilized) of each of the loan taken from World Bank, ADB and JBIC is as per Annexure III.

ANNEXURE-I

ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 1929 DATED 8TH MARCH, 2006 ASKED BY SHRI ASHOK KUMAR RAWAT, PROF. MAHADEORAO SHIWANKAR AND SHRI KAILASH NATH SINGH YADAV REGARDING FOREIGN ASSISTANCE FOR NATIONAL HIGHWAYS DEVELOPMENT PROJECTS.

CONTRACTS UNDER IMPLEMENTATION WITH WORLD BANK AND ASIAN DEVELOPMENT FUNDING NATIONAL HIGHWAYS DEVELOPMENT PROJECT (NHDP) PHASE-I WORLD BANK (WB)

Sl.No. Stretch NH No. Length (km.)

1 -Shikohabad (GTRIP/I-A) 2 50.83 2 Allahabad Bypass 2 1.02 Contract-I ( Bridge) 3 Allahabad Bypass Contract-II 2 38.987 4 Allahabad Bypss Contract-III 2 44.708 5 Aurangabad-Barachatti (TNHP/V-A) 2 60 6 -Rajpur (GTRIP/I-C) 2 72.825 7 Fatehpur-Khaga (TNHP/II-C) 2 77 8 Gorhar-Barwa Adda (TNHP/V-C) 2 78.75 9 Handia-Varanasi (TNHP/III-C) 2 72 10 -Fatehpur (GTRIP/II-B) 2 51.5 11 Mohania-Sasaram (TNHP/IV-B) 2 45 12 Rajganj-Barakata (GTRIP/V-B) 2 80 13 Sassaram-Dehri on-Sone (GTRIP/IV-C) 2 30 14 Shikohabad-Etawah (GTRIP/I-B) 2 59.02 15 Sikandara-Bhaunti (TNHP/II-A) 2 62 16 Varanasi-Mohania (GTRIP/IV-A) 2 76

NATIONAL HIGHWAYS DEVELOPMENT PROJECT (NHDP) PHASE-I

ASIAN DEVELOPMENT BANK (ADB)

Sl.No. Stretch NH No. Length (km.)

1 Chitradurga-Sira 4 66.7 2 Chitradurga Bypass 4 18 3 Harihar-Chitradurga 4 77 4 Haveri-Harihar 4 56

NHDP PHASE-II

WORLD BANK

Sl.No. Stretch NH No. Length (km.)

1 Ayodhya- (LMNHP-1) 28 36 2 Ayodhya-Lucknow (LMNHP-2) 28 47 3 Ayodhya-Lucknow (LMNHP-3) 28 41.925 4 Deewapur to 28 41.085 (UP)/Bihar Brder (LMNHP-9) 5 Gorakhpur-Ayodhya (LMNHP-4) 28 29 6 Gorakhpur-Ayodhya (LMNHP-5) 28 44 7 Gorakhpur-Ayodhya (LMNHP-6) 28 43.7 8 Kasia to Gorakhpur (LMNHP-7) 28 40 9 Kotwa to Dewapur (LMNHP-10) 28 38 10 Mehsi to Kotwa (LMNHP-11) 28 40 11 Muzzaffarpur to Mehsi (LMNHP-12) 28 40 12 UP/Bihar Border to Kasia (LMNHP-8) 28 41.115

ASIAN DEVELOPMENT BANK

Sl.No. Stretch NH No. Length (km.)

1 Deesa to Radhanpur (Package-VI) 14 85.4 2 Radhanpur to Gagodhar (Package-V) 15 106.2 3 Gagodhar to Garamore (Package-IV) 15, 8A 90.3 4 Jhansi Bypass (UP-3) 25 15 5 Jhansi-shivpuri (EW-II-MP-2) 25 35 6 Jhansi-Shivpuri (UP/MP-1) 25 41 (UP-11 km & MP- 30km) 7 Orai to Jhansi (UP-4) 25 66 8 Orai to Jhansi (UP-5) 25 50 9 Shivpuri Bypass & upto Madhya 25,76 53 Pradesh(MP)/Rajashtan Border (EW-II-MP-I) 10 Lalitpur-Sagar (ADB-II/C-4) 26 55 11 Lalitpur-Sagar (ADB-II/C-3) 26 38 12 Rajmarg Choraha to Lakhnadon 26 54 (ADB-II/C-8) 13 Rajmarg Choraha to Lakhnadon 26 54.7 (ADB-II/C-9) 14 Sagar Bypass (ADB-II/C-5) 26 26 15 Sagar-Rajmar Choraha (ADB-II/C-6) 26 44 16 Sagar Rajmarg Choraha (ADB-II/C-7) 26 42 17 Kota to Chittorgarh (RJ-7) 76 63 18 Kota to Chittorgarh (RJ-8) 76 65 19 RJ/MP Border to Kota (RJ-10) 76 59.85 20 RJ/MP Border to Kota (RJ-11) 76 70 21 RJ/MP Border to Kota (RJ-9) 76 43.15 22 Chittorgarh Bypass (RJ-6) 76,79 40 23 Garamore to Bamanbore (Package-III) 8A 71.4 24 Bhiladi to Porbandar (Package-I) 8B 50.5 25 Jotpur to Bhiladi (Package-II) 8B 64.5

ANNUEXURE-II

ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 1929 DATED 8TH MARCH, 2006 ASKED BY SHRI ASHOK KUMAR RAWAT, PROF. MAHADEORAO SHIWANKAR AND SHRI KAILASH NATH SINGH YADAV REGARDING FOREIGN ASSISTANCE FOR NATIONAL HIGHWAYS DEVELOPMENT PROJECTS.

Status as on 31.01.2006 Amount in Rs. crore

RECEIPT OF EXTERNALLY AIDED PROJECTS (EAP) FUND UTILISATION OF EAP FUND

Year Funds Received from GOI ADB Loan (Direct) Total EAP Total Expenditure Grants Loan Total Prin- Interest Receipts (including Against against Against cipal & Commi- (4+5+6) Counterpart Fund EAP EAP Loan tment WB JBIC ADB- Total ADB- Grand Amount Charges Proj- Proj- III,V,(8+9+ IV Total ects ects VI&VII 10) Proj- (11+ Proj- ects 12) ect

1 2 3 4 5 6 7 8 9 10 11 12 13

2002- 1202.00 301.00 1503.00 138.56 8.63 1650.19 674.35 225.03 186.94 1086.31 250.58 1336.89 2003

2003- 1159.12 289.78 1448.90 190.54 11.70 1651.14 898.34 124.45 297.68 1320.47 351.68 1672.15 2004

2004- 1239.08 360.50 1599.58 117.36 14.91 1731.85 1290.18 32.86 361.43 1684.46 98.15 1782.61 2005

2005- 2200.00 600.00 2800.00 1.21 10.21 2811.42 1217.76 1.76 635.93 1855.45 118.79 1974.24 2006 (Upto Jan.06)

Total 5800.20 1551.28 7351.48 447.67 45.45 7844.60 4080.62 384.09 1481.98 5946.70 819.20 6765.89

ANNEXURE - III

ANNEXURE REFERRED TO IN REPLY TO PARTS (e) AND (f) OF LOK SABHA UNSTARRED QUESTION NO.1929 FOR ANSWER ON 08.03.2006 ASKED BY SHRI ASHOK KUMAR RAWAT, PROF. MAHADEORAO SHIWANKAR AND SHRI KAILASH NATH SINGH YADAV REGARDING FOREIGN ASSISTANCE FOR NATIONAL HIGHWAYS DEVELOPMENT PROJECTS.

Status of Loans for Externally Aided Projects of NHAI (upto Feb., 2006)

Agency Loan No. Details of Date of Effective Date of Amount Project Agree- date closing of Loan ment of Loan

ADB 1747-IND Surat-Manor 05/10/ 08/11/ 30/09/ USD 165,000,000 Tollway Project 2000 2000 2005

1274-IND ADB III, Total 12/09/ 29/06/ USD 245,000,000 5 road works 1996 2002

1839-IND Western Transport 14/12/ 04/02/ 31/12/ USD 191,478,791 Corridor Project 2001 2002 2006

1944-IND East-West 25/08/ 19/11/ 31/12/ USD 320,000,000 Corridor Project 2003 2003 2006

2029-IND National Highways 27/10/ 24/01/ 31/12/ USD 400,000,000 Corridor Sector- 2004 2005 2007 1 Project

2154-IND National Highways 15/12/ 20/02/ 31/12/ USD 400,000,000 Corridor Sector- 2005 2006 2008 II Project

Total USD 1,721,478,791

WB 4764-IN Lucknow-Muzaffarpur18/11/ 28/12/ 30/06/ USD 620,000,000 National Highway 2005 2005 2010 Project (LMNHP)

4719-IN Allahabad Bypass 16/12/ 15/03/ 30/06/ USD 240,000,000 Project (ABP) 2003 2004 2009

4622-IN Grant Trunk Road 27/07/ 21/11/ 31/12/ USD 589,000,000 Improvement 2001 2001 2006 Project (GTRIP)

4559-IN Third National 11/08/ 02/10/ 30/06/ USD 516,000,000 Highways 2000 2000 2006 Project (TNHP)

Total USD 1,965,000,000

JBIC IDP-91 Construction of 24/01/ 24/01/ 11/03/ 10037 Million Yen Bridge over 1994 1994 2005 at Allahabad/ Naini with approach road in Uttar Pradesh

IDP-92 Chilakaluripet- 24/01/ 24/01/ 11/06/ 11360 Million Yen Vijayawada Section 1994 1994 2003 - Widening to four lane including strengthening of existing two lane of km 355 to km 434 on NH-5 in Andhra Pradesh

IDP-100 Jagatpur-Chandikole 28/05/ 28/05/ 12/01/ 5836 Million Yen -Section Widening 1995 1995 2005 to four lane including strengthening on NH-5 in Andhra Pradesh

IDP-101 Ghaziabad-Hapur 28/02/ 28/02/ 12/02/ 4827 Million Yen Section including 1995 1995 2004 construction of Hapur Bypass in Uttar Pradesh - Widening and strengthening of NH-24

Total 32060.00 Million Yen