MINUTES

406th MEETING

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY-TAMIL NADU

Date: 21.10.2020 & 22.10.2020

MINUTES OF THE 406th MEETING OF THE STATE LEVEL ENvIRONMENT IMPACT ASSESSMENT AUTHORITY HELD ON 21.10.2020 & 22.10,2020

Agenda Description File Minutes No No.

Confirmation of the minutes of The minutes of the 405th meeting of the Authority a) the 405th meeting of the Authority held on 20.10.2020 was confirmed. held on 24.10.2020

The Action taken on the decisions The Member Secretary tabled the action taken b) the 4051h of meeting of the report on the decisions of the 405th meeting and Authority held on 20.10.2020 discussed the details.

I 1. to consider for the grant of 677 I After detailed discussion, lNote the Authority Clearance jEnvironmental for the unanimously accept the recommendation of the development of SEAC and decided grant lRroRosed to Environmental apartment lresidential with allied Clearance subject to the conditions as recommended lu*.niti., tenements by IWs. by SEAC and subject to normal conditions in Voora Property Developers addition to the following conditions. Private Limited at R.S.No.406l ptl 1. The Environmental Clearance issued is subject of Block No.78 old S.Nos. 37il,1 I to the outcome of clarification sought by 3762,3763 of Tond Member Secretary, SEIAA-TN rondiarpet r",*IttJn.r-;l from MoEF&CC regarding further course of action District, Tamil Nadu underl to be followed in case of violations as per the Category "B2" and Schedule Sl. I EIA Notification, 2006 as amended vide Lr. No. 8 (a) - Building and I No.SEIAA-TN/C.No.t5O87-4t2020 dated: Construction projects. l I ,/l 05.09.2020. I vr'/ MEMBER SEC ARY MEMBER CHAIRMIAN

,Page 2 of l1 I l i O*ing inspection of the proposed site by the Sub-committee constituted by the Hon'ble NGT (SZ) in original Application No' 49 o 2019 (SZ), the Sub-committee has observed that the proponent has started the construction activity without obtaining EC which is violation as Per the MoEF&CC vide Notification S.O. 804 (E), dated 14'03'201'7' Hence the State Potlution Control Board shall ensure to take necessary action against the project proponent as per of MoEF&CC Notification S.O' 804 (E), dated 14'03'2017 before issue of CTE bY TNPCB' 3. The Environmental Clearance issued is subject to the outcome of the final verdict of Hon'ble NGT (SZ) in original Application No' 49 201e (sz). 4. As per the MoEF&CC Office Memorandum F.No. 22-65l2017-IA.III dated: 30'09'2020, the proponent shall furnish the detailed EMP mentioning all the activities as proposed for Rs.40 lakhs as committed in their affidavit dated 10.06.2019 to TNPCB' Consent to Establishment (CTE) shall be issued by TNPCB only after receipt ofthe above details' 5. If any violation is noticed in due course o time, the Environmental Clearance will be cancelled without further notice'

MEMBERsEC*+1Rt

Page 3 of 11 To consider the grant of 7316 After detailed discussion the Authority unanimously Environmental Clearance for the accepted the recommendation of SEAC and decided

Proposed Industrial Park (IP) to grant EC subject to the conditions as "Vallam Vadagal Industrial Park- recommended by (SEAC except certain II by lv{/s. State Industries modification in condition No.2) and subject to Promotion Corporation at Survey normal conditions in addition to the following No: Survey No: 237pt, 238, conditions. 239pt/l-133, 241pt, 242pt, 243, 1. The SIPOT shall establish common STP to treat 247 Pt, 265, 266, 267, 268pt, 269 the sewage generated from the individual units pt, 270 of Vallam 'A' village & within the SIPCOT premises. The proponent 27 1, 272 Pt, 27 5Pt, 27 6pt, 277 pt, shall fumish the detailed proposal for the 278, 279Pt, 280, 281, 282, 283, Common STP to handle the sewage generated 284, 285, 286,287, 288, 289, from the individual units with detailed proposal 290.291.292. 293, 294, 295, for disposal of treated sewage and total Solid 2s6. 2g7, 2g8. 29e.300, 301. 302 waste Management plan to handle the solid in Vallam 'B' Village, waste generated from the individual units before obtaining Consent to Establishment (CTE) from Kancheepuram District under Sl. TNPCB No 8 (b) of the Schedule - 2. In view of the non-homogenous nature o Township and Area development proposed industries, individuals units shall Projects provide ETP with ZLD system where ever applicable and ensure that the trade effluent

shall not be discharged inside/outside the premises under any circumstances.

3. The project proponent shall fumish the detailed lay out plan for the green belt area development

covering 33% of the total area ofthe project site earmarked with dimension and GPS coordinates

Page 4 ol 11 all along the boundary of the project site before obtaining Consent to Establishment (CTE) from TNPCB. As per the MoEF&CC Office Memorandum F.No. 22-6512017-IA.III dated: 30'09'2020, the proponent shall fumish the detailed EMP mentioning all the activities as proposed for Rs.13.24 crores in their letter dated 21' 10 2020' 6efore obtaining Consent to Establishment (CTE) from TNPCB.

detailed discussion, the Authority decided to To consider the ProPosal 6681 After Member Secretary, SEIAA-TN to place development of Satellite Town in request the with with 9557 Plots along with the proposal in the ensuing Authority Meeting Notifications, Circulars amenities by lWs. Tamilnadu detailed note & all relevant for taking further course o Housing Board in UchaPatti and & O.Ms of MoEF&CC Thoppur Villages in action. District at UchaPatti and ThoPPur Village, Thirumangalam and Thirupparankudram Tehsils, Madurai District - For Terms Reference (ToR) under violation notification dated: 14.03.2017 &

14.03.2018 of MoEF & CC

discussed in detail and unanimously To consider the ProPosal for the The Authority of the SEAC & grant of Environmental Clearance accepted the recommendations to the conditions as for the proposed Rough stone & decided to grant EC subject r #t 11 -' CHAIR]*AN MEMBERSECRETARY MEIVf6ER SEIAA-TN

Page 5 of l1 Gravel quarry lease over an recommended by SEAC and subject to normal extent of 3.64.5ha at S.F.No. conditions in addition to the following conditions. 179/2(P) in Edayarpalayam Village, Sulur Taluk, Coimbatore All the condition imposed by the Assistant District, Tamil Nadu by Director, Department of Geology and Tmt.N.Chithradevi Mining vide Rc. No.6l4ll{ines/2018 dated: 12.09.2019 should be strictly followed.

The EMP Cost shall be deposited in a nationalized bank by opening separate

account and head wise expense statement

shall be furnished to TNpCB with a copy to SEIAA annually.

The proponent should strictly comply with, Tamil Nadu Govemment Order (Ms) No.84 Environment and forests (EC.2) Department dated 25.06.2018 regarding ban on one time use and throw away plastics irrespective

thickness with effect from 01.01.2019 under

Environment (Protection) Act, 1986. A detailed post-COVID health management plan for workers as per ICMR and MHA guidelines or the State Govt. guideline may be followed and report shall be fumished. If there is any change in the production or

lease area application for amendment has to be submitted to SEIAA for further approval.

To consider the proposal for the The Authority discussed in detail and unanimously

v|'h MEMBER CHAIRITAN SEIAA.TN

Page6ofll recommendations of the SEAC & grant of Environmental Clearance accepted the grant EC subject to the conditions as Proposed Rough stone Quarry decided to by SEAC and subject to normal lease over an Extent of 1.06'5Ha recommended to the following conditions' of Poramboke land in S.F'No' conditions in addition 615, AlryamPalaYam Village, 1. All the condition imposed by the Assistant Tiruvannamalai Taluk, Director, Department of Geology and Tiruvannamalai District, Tamil Mining vide Rc. No'07/Kanimanr/2019 Nadu by Thiru.P.M.Pavithran' dated: 10.07.2019 should be strictly followed. 2. The EMP Cost shall be deposited in a nationalized bank by opening separate account and head wise expense statement shall be fumished to TNPCB with a copy to SEIAA annually. 3. The proponent should strictly comply with' Tamil Nadu Government Order (Ms) No'84 Environment and forests (8C.2) Department

dated 25.06.2018 regarding ban on one time use and throw away plastics irrespective of thickness with effect from 01.01'2019 under

Environment (Protection) Act, 1 986' 4. A detailed post-COVID health management plan for workers as Per ICMR and MHA guidelines or the State Govt' guideline may

be followed and report shall be fumished' 5. If there is any change in the production or lease area application for amendment has to

be submitted to SEIAA for further approval'

CHAIRMAN MEMBERsecnhmv SEIAA-TN

Page 7 of 1l 6. To consider the proposal for the 7532 After detailed discussion, the Authority decided to grant of Environmental Clearance request the Member Secretary, SEIAA-TN to veriS Proposed gravel Quarry lease the points as mentioned in the SEAC minutes of the over an Extent of 1.87.5Ha of at l77th SEAC meeting held on 26.09.2020 and reefer S.F.No.7512&3, Karadiputtur back the proposal to SEAC for further course of Village, Gummidipoond Taluk, action Tiruvallur District, Tamil Nadu by Thiru.S.Ragupathy.

7. To consider the proposal for the 7401 The Authority discussed in detail and unanimously grant of Environmental Clearance accepted the recommendations of the SEAC &

for the proposed Rough stone & decided to grant EC subject to the conditions as Gravel quarry lease over an recommended by SEAC and subject to normal extent of 3.95.50 ha at S.F.No. conditions in addition to the following conditions. r05/1(P), 105tz(P), 105/4(P), 105/5(P), 105/6A(P), 105/7(P), 1. All the condition imposed by the Assistant 105/8(P), 105/9(P), 105/10(P) & Director, Department of Geology and l06l2B(P), in Sudanur Village, Mining vide Rc. No.38/2019(Mines), dated: , 15.11.2019 should be strictly followed. 2. The District, Tamil Nadu by M/s. Sri EMP Cost shall be deposited in a Venkatachalapathy Blue Metals nationalized bank by opening separate account and head wise expense statement

shall be furnished to TNPCB with a copy to SEIAA annually. 3. The proponent should strictly comply with, Tamil Nadu Government Order (Ms) No.84 Environment and forests (EC.2) Department dated 25.06.2018 regarding ban on one time

\ ../ %'i--- MEMBER spckranv ru[fisnn CHAIRMAN SEIAA.TN

Page 8 of 11 us" and throw away plastics irrespective of thickness with effect from 01'01'2019 under Environment (Protection) Act, 1986' A detailed post-COVID health management plan for workers as Per ICMR and MHA guidelines or the State Govt. guideline may

be followed and report shall be fumished' If there is any change in the production or lease area application for amendment has to

be submitted to SEIAA for further approval'

unanimously decided to request Proposed lx 10 MW Coal Based 7412 The Authority process this proposal and fumish Co-Gen Thermal Power Plant in SEAC to in accordance with provisions of S F No.491 at Oragadam Village' recommendation and Circulars etc Sriperumbudur Taluk, EIA Notification, 2006' O.Ms, Kancheepuram Distdct, Tamil issued by MoEF&CC. Nadu by lWs. APollo TYres Ltd- For Terms of Reference

discussion, the Authority decided to Proposed auto cast foundry bY 7464 After detailed Member Secretary, SEIAA-TN to obtain m/s. J.S.Auto Cast Foundry India request the from MoEF&CC as Private Limited at S.F.no. l27Pt, necessary clarifications whether the MoEF&CC 128pt, 131 & 132 in Ingur recommended by SEAC, dated 24.12.2013 is valid as on date or not for village, 213Pt, 214 Pt &.2l6Pt o O.M Industries (Fenous & Non- Perundurai Village, Ingur & 3(a) Metallurgical Notification, 2006 as amended and Perundurai Taluk, Erode District ferrous) of EIA under 82 category or - for Environmental Clearance - proposal can be considered is legal related issue and the Honorable category b & schedule item no. not since it AY MEMBER MEMBER SECI** -,^d,-sErAA-rN

Page 9 of 11 3(a) - metallurgical industries NGT, Principle Bench, New Delhi has already ,. (ferrous & non - ferrous) of EIA issued ff one of the following order/direction in IL Notification, 2006 respect the original application M.A. No.l23 of 2014 and M.A. No. 419 of 2014 vide Hon,ble NGT order dated l3th January 2015,

"We also hold and declare that the ffice memorandums dated 24th June, 2013 and 24th December, 2013 to extend afore- indicated are invalid and inoperative being beyond the power ofdelegated legislation."

Further the Authority requested the Member Secretary SEIAA to place the proposal in ensuing Authority meeting on receipt of reply from MoEF &CC. The Authority also noted that the proponent has also applied for ToR for this proposal.

10. Note to consider for the grant of 5233 After detailed discussion the Authority decided to Environmental Clearance for the request the Member Secretary to give necessary proposed expansion of clarification as requested by SEAC in its l49th multistoried of residential and SEAC meeting and refer back the proposal to SEAC commercial building complex by for further course of action. M/s. PBEL Property development (India) Pvt. Limited at S.F.No.l380ll, 1382, 1383, 1401/97, etc of Thaiyur B Village, Tiruporur Taluk, Kancheepuram District, Tamil Nadu under Category "B2" and

MEMBERsocpranv MEMBER^>-- SEIAA-TN

Page l0 of 11 Schedule S1. No. 8 (a) - Building

and Construction Projects

MS-SEIAA to 1 Authority decided to request To consider the ProPosal for the 107 The of all the details grant of Terms of Reference fumish the comparative statement filed before violation and under violation for the existing in the application ToR in the ensuing meeting' project for the mining of Black application filed under Granite over an extent of 35.99.0 ha (Govt. Poramboke land) at S.F.No. 412(P art), Sunjalnatham Village, , bY IWs Tamil Nadu Minerals Limited h'^',-- MEMBER snclranv rvrnrfif,nn SEIAA.TN

A\

vrnrv/nn cua.mlunN MEMBER SJCNTTANV sr/n -rN (

Page 11 of11