MahaRERA Application
General Information
Information Type Individual
Individual
First Name ASHWIN Middle Name BABUBHAI
Last Name PRAJAPATI Father Full Name BABUBHAI K PRAJAPATI Do you have any Past No Experience ?
Address For Official Communication
House Number SHOP NO 11 Building Name TULSI HEIGHTS
Street Name PLOT NO 25 Locality SECTOR 22
Landmark KHANDESHWAR State/UT MAHARASHTRA
Division Konkan District Raigarh
Taluka Panvel Village Kamothe
Pin Code 410209
Contact Details
Office Number 02227660092 Website URL
Past Experience Details
Project
Project Name OM ARCH VILLA Project Status New Project
Proposed Date of 31/12/2020 Completion
Litigations related to the No Project Type Others project ?
Are there any Promoter(Land Yes Owner/ Investor) (as defined by MahaRERA Order) in the project ?
Plot Bearing No / CTS no / PLOT NO 84A, SECTOR 52, Boundaries East PLOT NO 83B Survey Number/Final Plot no. DRONAGIRI Boundaries West 22 MTR WIDE ROAD Boundaries North PLOT NO 85
Boundaries South PLOT NO 84 State/UT MAHARASHTRA
Division Konkan District Raigarh
Taluka Uran Village Bokadvira
Street DRONAGIRI Locality DRONAGIRI Pin Code 400707 Area(In sqmts) 549.34
Total Building Count 1
Sanctioned Buildings Count 1 Proposed But Not 0 Sanctioned Buildings Count
Aggregate area(In sqmts) of 549.34 recreational open space
FSI Details
BuiltupArea as per 0 BuiltupArea as per 819.54 Proposed FSI (In sqmts) ( Approved FSI (In sqmts) Proposed but not sanctioned) ( As soon as approved, should be immediately updated in Approved FSI)
TotalFSI 819.54
Promoter(Land Owner/ Investor) Details
Project Promoter Promoter(Land Type of Office Other Details Name Name Owner/ Agreement/ Number Investor) Type Arrangement
OM VILLA CITY Partnership Area Share NA Address : SHIV CHAMBERS ,SHOP NO 18 ,PLOT NO 21 ARCH BUILDERS ,SECTOR 11 ,CBD BELAPUR ,Division :Konkan ,District :Thane VILLA LLP ,Taluka :Thane ,Village :Navi Mumbai (M Corp.) ,400614 ,27
Project Details
Name Proposed Booked WorkDone(In %)
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 8 0 0
Development Work
Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Supply : YES 0 Not commenced. Will be provided as per CIDCO norms
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Not commenced. Will be provided as per CIDCO norms
Storm Water Drains : YES 0 Not commenced. Will be provided as per CIDCO norms
Landscaping & Tree Planting : YES 0 Not commenced. Will be provided as per CIDCO norms
Street Lighting : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 Not commenced. Will be provided as per CIDCO norms
Energy management : NO 0 NA Fire Protection And Fire Safety Requirements : YES 0 Not commenced. Will be provided as per CIDCO norms
Electrical Meter Room, SubStation, Receiving Station : YES 0 Not commenced. Will be provided as per CIDCO norms
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Building Details
Sr.No. Project Name Proposed Number of Number Number Number of Number Number Number Name Date of Basement's of of Slab of Super of Stilts of Open of Closed Completion Plinth Podium's Structure Parking Parking
1 OM OM 31/12/2020 0 1 0 8 1 0 0 ARCH ARCH VILLA VILLA
Sr.No. Apartment Type Carpet Area (in Number of Number of Booked Sqmts) Apartment Apartment
1 SHOP 14.10 1 0
2 1BHK 15.20 1 0
3 1BHK 15.21 1 0
4 SHOP 15.39 1 0
5 1BHK 16.95 2 0
6 SHOP 19.74 1 0
7 SHOP 21.79 1 0
8 1BHK 22.33 2 0
9 1BHK 22.54 2 0
10 1BHK 24.89 8 0
11 1BHK 25.19 2 0
12 1BHK 27.26 8 0
13 1RK WITH 10.75 1 0 TERRACE
14 1RK WITH 10.76 1 0 TERRACE
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0 Windows to each of the Flat/Premises
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 0 Flat/Premises
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0 Staircases and Lifts, Overhead and Underground Water Tanks.
9 The external plumbing and external plaster, elevation, completion of terraces 0 with waterproofing of the Building/Wing
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0 CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Project Professional Information
Professional Name MahaRERA Certificate No. Professional Type
DESTINATION ARCHITECTURE INTERIOR DESIGNS NA Architect
Litigations Details
No Records Found
Uploaded Documents
Document Name Uploaded Document
Details of encumbrances View
Commencement Certificates View
Declaration in FORM B View
Copy of the legal title report View
Building Plan Approval (IOD) View
Copy of Layout Approval (in case of layout) View
Proforma of the allotment letter and agreement for sale View
Status of Conveyance Not Uploaded
Certificates of Architect (Form 4) Not Uploaded
Other Not Uploaded
Certificates of CA (Form 5) Not Uploaded
Status of Formation of Legal Entity (Society/Co Op etc.) Not Uploaded