MahaRERA Application

General Information

Information Type Individual

Individual

First Name ASHWIN Middle Name BABUBHAI

Last Name PRAJAPATI Father Full Name BABUBHAI K PRAJAPATI Do you have any Past No Experience ?

Address For Official Communication

House Number SHOP NO 11 Building Name TULSI HEIGHTS

Street Name PLOT NO 25 Locality SECTOR 22

Landmark KHANDESHWAR State/UT MAHARASHTRA

Division Konkan District Raigarh

Taluka Panvel Village

Pin Code 410209

Contact Details

Office Number 02227660092 Website URL

Past Experience Details

Project

Project Name OM ARCH VILLA Project Status New Project

Proposed Date of 31/12/2020 Completion

Litigations related to the No Project Type Others project ?

Are there any Promoter(Land Yes Owner/ Investor) (as defined by MahaRERA Order) in the project ?

Plot Bearing No / CTS no / PLOT NO 84A, SECTOR 52, Boundaries East PLOT NO 83B Survey Number/Final Plot no. DRONAGIRI Boundaries West 22 MTR WIDE ROAD Boundaries North PLOT NO 85

Boundaries South PLOT NO 84 State/UT MAHARASHTRA

Division Konkan District Raigarh

Taluka Village Bokadvira

Street DRONAGIRI Locality DRONAGIRI Pin Code 400707 Area(In sqmts) 549.34

Total Building Count 1

Sanctioned Buildings Count 1 Proposed But Not 0 Sanctioned Buildings Count

Aggregate area(In sqmts) of 549.34 recreational open space

FSI Details

Built­up­Area as per 0 Built­up­Area as per 819.54 Proposed FSI (In sqmts) ( Approved FSI (In sqmts) Proposed but not sanctioned) ( As soon as approved, should be immediately updated in Approved FSI)

TotalFSI 819.54

Promoter(Land Owner/ Investor) Details

Project Promoter Promoter(Land Type of Office Other Details Name Name Owner/ Agreement/ Number Investor) Type Arrangement

OM VILLA CITY Partnership Area Share NA Address : SHIV CHAMBERS ,SHOP NO 18 ,PLOT NO 21 ARCH BUILDERS ,SECTOR 11 ,CBD BELAPUR ,Division :Konkan ,District :Thane VILLA LLP ,Taluka :Thane ,Village :Navi (M Corp.) ,400614 ,27

Project Details

Name Proposed Booked WorkDone(In %)

Number of Garages ( In Numbers) 0 0 0

Covered Parking ( In Numbers) 8 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details

Internal Roads & Footpaths : NO 0 NA

Water Supply : YES 0 Not commenced. Will be provided as per CIDCO norms

Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Not commenced. Will be provided as per CIDCO norms

Storm Water Drains : YES 0 Not commenced. Will be provided as per CIDCO norms

Landscaping & Tree Planting : YES 0 Not commenced. Will be provided as per CIDCO norms

Street Lighting : NO 0 NA

Water Conservation, Rain water Harvesting : YES 0 Not commenced. Will be provided as per CIDCO norms

Energy management : NO 0 NA Fire Protection And Fire Safety Requirements : YES 0 Not commenced. Will be provided as per CIDCO norms

Electrical Meter Room, Sub­Station, Receiving Station : YES 0 Not commenced. Will be provided as per CIDCO norms

Aggregate area of recreational Open Space : NO 0 NA

Open Parking : NO 0 NA

Community Buildings : NO 0 NA

Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA

Solid Waste Management And Disposal : NO 0 NA

Building Details

Sr.No. Project Name Proposed Number of Number Number Number of Number Number Number Name Date of Basement's of of Slab of Super of Stilts of Open of Closed Completion Plinth Podium's Structure Parking Parking

1 OM OM 31/12/2020 0 1 0 8 1 0 0 ARCH ARCH VILLA VILLA

Sr.No. Apartment Type Carpet Area (in Number of Number of Booked Sqmts) Apartment Apartment

1 SHOP 14.10 1 0

2 1BHK 15.20 1 0

3 1BHK 15.21 1 0

4 SHOP 15.39 1 0

5 1BHK 16.95 2 0

6 SHOP 19.74 1 0

7 SHOP 21.79 1 0

8 1BHK 22.33 2 0

9 1BHK 22.54 2 0

10 1BHK 24.89 8 0

11 1BHK 25.19 2 0

12 1BHK 27.26 8 0

13 1RK WITH 10.75 1 0 TERRACE

14 1RK WITH 10.76 1 0 TERRACE

Sr.No. Tasks / Activity Percentage of Work

1 Excavation 0

2 X number of Basement(s) and Plinth 0

3 X number of Podiums 0

4 Stilt Floor 0

5 X number of Slabs of Super Structure 0

6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0 Windows to each of the Flat/Premises

7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 0 Flat/Premises

8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0 Staircases and Lifts, Overhead and Underground Water Tanks.

9 The external plumbing and external plaster, elevation, completion of terraces 0 with waterproofing of the Building/Wing

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per 0 CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type

DESTINATION ARCHITECTURE INTERIOR DESIGNS NA Architect

Litigations Details

No Records Found

Uploaded Documents

Document Name Uploaded Document

Details of encumbrances  View

Commencement Certificates  View

Declaration in FORM B  View

Copy of the legal title report  View

Building Plan Approval (IOD)  View

Copy of Layout Approval (in case of layout)  View

Proforma of the allotment letter and agreement for sale  View

Status of Conveyance Not Uploaded

Certificates of Architect (Form 4) Not Uploaded

Other Not Uploaded

Certificates of CA (Form 5) Not Uploaded

Status of Formation of Legal Entity (Society/Co Op etc.) Not Uploaded

Back