Amalgamated Inder-Kamptee Deep OC Mine NAGPUR AREA, WCL

Total Page:16

File Type:pdf, Size:1020Kb

Amalgamated Inder-Kamptee Deep OC Mine NAGPUR AREA, WCL Assessment of Environmental Impact & Management plan FOR Amalgamated Inder-Kamptee Deep OC Mine NAGPUR AREA, WCL Targeted production capacity (1.20 + 2.0) 3.20 MTPA within the ML area of 857.60 Ha APRIL - 2019 Prepared by:- CENTRAL MINE PLANNING & DESIGN INSTITUTE LIMITED CMPDI / Form – I / WCL / 2019 – 20 /April/89/ 01 Certificate of accreditation vide no. NABET/EIA/1720/ RA 0092 valid till 01.10.2020 Amalgamated Inder-Kamptee Deep OC mine (Targeted production capacity (1.20 + 2.0) 3.20 MTPA within the ML area of 857.60 Ha) 1. Preamble 1.1 Inder UG to OC expansion mining project: (J-11015/35/2010-IA-II(M) dated 06.02.2013) The PR was approved against the production capacity of 1.20 MTPA by WCL Board on dated 18.09.2009. Public Hearing conducted on 11.04.2012 for Inder UG to OC Expansion mining project for increase in production from 0.60 MTPA to 1.20 MTPA in land area of 463.80 ha. There is no forest land involved. The proposal was considered in 57th EAC meeting held on dated 17-18th September 2012, after deliberations, the proposal recommended for grant of EC under of EIA notification, 2006. The Environmental Clearance of Inder UG to OC Expansion Mining project for a production capacity of 1.20 MTPA in an area of 463.80 ha was accorded by MOEF & CC vide letter no.J-11015/35/2010-IA-II(M) dated 06.02.2013. The details of other parameters are follows: Of total ML area of 463.80 ha, 391.27 ha is agricultural land, 10.80 ha is wasteland, 61.73 has already been acquired under adjacent Gondegaon OC. Of the total ML area of 463.80 ha, 94.50 ha is quarry area, 161.05 ha is for external OB dump, 10.0 ha is for infrastructure, 14.50 ha for embankment, 12.0 ha for internal roads etc, 171.75 ha for future extension River Kanhan flows alongside the mine boundary Mining by opencast method with Shovel- Dumper combination. Stripping ratio 1:6 Maximum working depth of 150 m.bgl Coal transportation by means of trucks to Dumri railway siding at a distance of 15.60 km, and thereafter totally by railway wagons for the customers Total water requirement is 1000 KLD (Industrial- 700 KLD, Domestic- 300 KLD) R&R of Tekadi village involves 650 PAFs at a total cost of 992 lakhs. 1.2 Expansion of Kamptee Deep OC coal mine project: (J-11015/287/2010-IA-II(M) dated 11.05.2015) The PR was approved (1st stage approval) against the target production capacity of 1.50 MTPA by WCL Board on dated 18.07.2010. Public Hearing conducted on 12.09.2012 for Expansion of Kamptee deep OC coal mine project of Normative 1.50 MTPA to peak 2.0 MTPA in ML area of 661.65 ha. There is no forest land involved. The proposal was considered in 31st EAC meeting held on dated 16-17th February 2015, after deliberations, the proposal recommended for grant of EC under provisions of EIA notification, 2006. The Environmental Clearance of Expansion of Kamptee Deep OC coal mine project for capacity of 1.50 MTPA (normative), 2.0 MTPA (peak) in ML area of 661.65 ha was accorded by MOEF & CC vide letter no.J- 11015/287/2010-IA-II(M) dated 11.05.2015. The details of other parameters are follows: Of total ML area of 661.650 ha, (650.465 ha within ML area & 11.185 ha outside ML area), 651.95 ha is agricultural land, 9.70 ha is wasteland. Of the total ML area of 661.650 ha, 178.050 ha is quarry area, 254.859 ha is for external OB dump, 63.092 (51.907 +11.185) ha is for infrastructure, 165.649 ha for rationalization. River Kanhan flows alongside the mine boundary Mining by opencast method with Shovel- Dumper combination. Stripping ratio 1:5.833 Maximum working depth of 200 m.bgl Coal transportation by means of trucks to Dumri railway siding at a distance of 16.0 km, and thereafter totally by railway wagons for the customers Total water requirement is 480 KLD 1.3 Amalgamated Inder-Kamptee Deep OC mine: 1.3.1 Need: Inder UG to OC expansion mining project and Expn. Kamptee deep OC mine project are adjacent on-going projects of Nagpur Area. Amalgamated Inder-Kamptee deep OC mine (targeted production capacity (1.20 + 2.0) 3.20 MTPA within the ML area of 857.60 Ha) is proposed in order to achieve following objectives: 1 | P a g e To rationalize the land requirement for proposed mine considering difficulty in acquisition of additional land and problem of OB dumping. To achieve the complete customer satisfaction in respect to quantity and quality of coal. To achieve the desired productivity in respect to HEMM and manpower deployment. Socio-economic development of the area. The amalgamated Inder-Kamptee Deep OC mine has reduced the total land requirement from 1026.06 (459.57+650.49-84.0) ha to 857.60 ha. 84.0 ha land was common between Inder UG to OC and Kamptee Deep OC. 1.3.2 Status of Present Proposal: The PR for amalgamated Inder-Kamptee deep OC mine has been approved by WCL Board on dated 09.10.2018 for production capacity of 3.20 MTPA (1.20 + 2.0) There is no forest land involved. The details of other parameters are follows: Of total area of 857.60 ha, 847.75 ha is agricultural land, 9.85 ha is waste land. Of the total area of 857.60 ha, 378.98 ha is quarry area, 260.56 ha is for external OB dump, 40 ha is for infrastructure, 28.0 ha is for embankment, 12.0 ha for road, 20 ha for colony, 118.06 ha for rationalization and blasting zone. River Kanhan flows alongside the mine boundary Mining by opencast method with Shovel- Dumper combination. Avg. stripping ratio 1:4.28 The proposed Amalgamated Inder-Kamptee Deep OC mine has been planned upto 200 m depth at the floor of bottom seam – II (B) in eastern side (Inder block including barrier) and upto 156m depth at the floor of seam-IVB in Western side (part of Kamptee colliery block). Coal transportation by A tube conveyor system is being installed by Mahagenco to transport coal of Amalgamated Inder-Kamptee Deep OC, Gondegaon Ghatrohan OC, Bhanegaon OC and Sighori OC to nearby Khapakhera and Koradi Thermal Power Station. Total water requirement is 1292.0 KLD (Industrial- 460.0 KLD, Domestic- 832.0 KLD) R&R involves 281 nos land loosers, 580 hutments, 168 private houses and Gondegaon village (721 Houses). Summary Sheet Sl Particulars Unit Inder UG to OC Expansion of Kamptee Amalgamated Remarks No. Expansion Mining Deep OC coal mine Inder- Project project Kamptee Deep OC Mine 1 Name of the - Nagpur Area/WCL No Change Area/Company 2 Nearest Name/km Kanhan/5 km No Change Railway Station for project 3 Nearest airport Name/km Nagpur Airport / 30 km No Change 4 Name of Name Northern limb of Kamptee Coalfields No Change Geological block 5 Capacity MTPA 1.20 2.0 3.2 Arithmetic Sum 6 Description of Nos. 7 3 7 of workable Details Seam Minable Grade Seam Minable Grade Seam Grade Overall grade Coal seams reserves reserves remains the V 8.57 G-10 V 3.89 G-10 V G-10 same IVT 2.07 G-9 IVT 2.39 G-9 IVT G-9 IVB 7.17 G-8 IVB 3.22 G-8 IVB G-8 IIIT 2.53 G-7 IIIT G-7 IIIB 2.18 G-6 IIIB G-6 IIT 4.72 G-7 IIT G-7 IIB 4.01 G-6 IIB G-6 7 Overall grade G-9 G-9 G-9 Overall grade remains the same 8 Avg. thickness m Ranging from 0.90 to Ranging from 2.0 m to Ranging from Overall range of seam 15.68 m 13.0 m 0.90 to 15.68 m of avg. thickness remains the same 9 Minable Mt 23.25 Mt (as on 24.086 Mt (As on 41.27 Mt as on Figures as per reserves May’2016) Nov’2015) 01.04.2018 approved 2 | P a g e Sl Particulars Unit Inder UG to OC Expansion of Kamptee Amalgamated Remarks No. Expansion Mining Deep OC coal mine Inder- Project project Kamptee Deep OC Mine Project Report 10 Stripping ratio 1:6 1:5.833 1:4.28 11 Method of Opencast method with Shovel Dumper combination Method of Mining mining remains the same 12 Coal Coal is transported to Coal is transported to A tube conveyor Improved Evacuation Dumri railway siding at a Dumri railway siding at a system is being coal distance of 15.60 km and distance of 16.0 km and installed by evacuation thereafter to customers thereafter to customers MahaGenco to system by means of railway by means of railway transport coal of adopted for wagons wagons. Amalgamated amalgamated Inder-Kamptee project. Deep OC, Gondegaon Ghatrohan OC, Bhanegaon OC and Sighori OC to nearby Khapakhera and Koradi Thermal Power Station. 13 Balance Mine Yrs 9 17 15 (@ rated Life output of 3.20 MTPA) starting from 01.04.2018 14 Total Nos. 115 nos (as on 561 nos (as on 549 nos Surplus Manpower 01.07.2018) 25.05.2018) proposed manpower will be gainfully utilized in other mines of WCL 15 Water M3/day 1000 m3/day 480 m3/day 1292 m3/day Rationalized requirement usage in amalgamated project 16 Land Details Ha 463.80.
Recommended publications
  • Natural Water Retention Measures
    Natural Water Retention Measures Issue 32 May 2012 Editorial Contents Page Promoting Natural Water Retention - Wetland management needs a human-centric approach 4 Wetland management should consider human health as well An Ecosystem Approach as biodiversity. By a combination of human activities, the European environment Four-step strategy for wetland restoration 5 has been progressively dehydrated through overexploitation of Scientists call for new approach to multipurpose wetland its water resources. Climate change is likely to place even greater creation or restoration. pressures on these resources, which provide essential ecosystem services to communities throughout Europe, and also lead to an Blocking drainage ditches aids peatland restoration 6 increased risk of extreme events, such as droughts and flooding. Ditch blocking could help restore valuable peatlands but care is needed, study says. This special issue explores potential management measures aimed at enhancing the water storage potential of Europe’s What factors affect run-off from agricultural land? 7 ecosystems and aquifers and safeguarding them against the A study explores ways to reduce environmental impact of effects of climate change and other such human-induced agricultural runoff. pressures. Forests: A positive force for global water availability 8 Of particular concern to policymakers is the protection against Forests should be considered as global public goods, a new flooding that natural ecosystems afford. However, the ability study concludes. of natural features to retain water also delivers other vital ecosystem services including water provision and purification, Soil properties are key factor in flood prevention 9 improvement of soil quality, provision of habitat, cultural services, Scientists investigate the critical role of forest soil conditions air quality, climate regulation and, especially in peat bogs, on rainwater runoff.
    [Show full text]
  • District Census Handbook, Nagpur, Part-B, Part a & B, Series-28
    CENSUS OF INDIA 2001 SERIES-28 MAHARASHTRA DISTRICT CENSUS HANDBOOK Part - A & B NAGPUR DISTRICT PART-B VILLAGE & TOWN DIRECTORY ~ VILLAGE AND TOWNWISE PRIMARY CENSUS ABSTRACT ~.,~ & ~ PEOPLE ORIENTED Samir Kumar Biswas of the Indian Administrative Service Director of Census Operations, Maharashtra Product Code Number Contents Pages Foreword IX Preface XI Acknowledgements Xlll District Map XV District Highlights - 200 I Census XVII Important statistics in the District xviii Ranking ofTahsils in the District xx Statements 1 - 9 Statement 1 - Name of the headquarters of distrk<t/tahsil, their rural urban status and distance from district headquarters, 20'0 i xxi i Statement 2 - Name of the headquarters of district/C.D. Block, their rural urban status and distance from district headquarters, 2001 xxii Statement 3 - Population of the District at each Census from 1901 to 2001 XXI1l Statement 4 - Area, Number of villages/towns and population in district and tahsil, 2001 XXIV Statement 5 - C.D. Block wise number ofvillages and rural population, 2001 xxx Statement 6 - Population of Urban Agglomerations/Towns, 2001 XXXI Statement 7 - Villages with population of 5,000 and above at C.D. Block level as per 2001 Census and amenities available XXXII Statement 8 - Statutory towns with population less than 5,000 as per 2001 Census and amenities available xxxiv Statement 9 - Houseless and Institutional population ofTahsils, Rural and Urban, 2001 XXXVI Analytical Note (i) History and scope of the District Census Handbook 3 (ii) Brief History of the District
    [Show full text]
  • Stormwater and Water Quality
    Contact information: www.engr.uconn.edu/cee 1 We will begin with an overall examination of what is “pollution,” discuss some primary water quality issues. Then, we will move on to some typical impacts that IWC will deal with and address the effectiveness and cost of mitigation measures. 2 Straw poll used to generate discussion on what WAS the state of the environment … then jump to how this has changed. 3 London – early 1850s cholera epidemic surrounding Broad Street Pump Dr. John Snow – broke handle to pump “breaking” the case Pre-1908: filtration used to purify drinking water Boonton Reservoir (NJ) – 1st system in US chlorinated 1908 Safe Drinking Water Act Killer smog – Donora, PA atmospheric inversion layer trapped pollutants near surface in a valley near Pittsburgh, PA – killing several people led to increased atmospheric awareness of air pollution Cuyahoga River (Cleveland) caught fire!!! Yes, water CAN burn! Resulted from garbage and oil on surface Not the only incident involving harbors burning Love Canal, NY – near Buffalo Toxic dumping site in old canal “bathtub” eventually filled with water and seeped into french drains and neighborhood – exposing residents to VERY high levels of pollutants Increased cancer and disease Led to CERCLA (a.k.a. “Superfund”) in 1980 4 Fish kill due to low oxygen in water – likely but not necessarily CSS outfall in West Hartford – YES! -note garbage and toilet paper in reeds in foreground Stormwater filled with sediment – YES! Acid mine drainage (low pH – acid – and high metals) – YES! -orange color
    [Show full text]
  • Peak Water Demand Study: Development of Metrics And
    The Future of Estimating Peak Water Demand in the Uniform Plumbing Code DAN COLE ACEEE HOT WATER FORUM MARCH, 2018 Estimating Peak Demand for Residential Dwellings Water Demand Calculator Code Provisions Code Provisions PEAK WATER DEMAND CALCULATOR M 101.0 General. M 101.1 Applicability. This appendix provides a method for estimating the demand load for the building water supply and principal branches for single- and multi-family dwellings with water-conserving plumbing fixtures, fixture fittings, and appliances. Code Provisions M 102.0 Demand Load. M 102.1 Water-Conserving Fixtures. Plumbing fixtures, fixture fittings, and appliances shall not exceed the design flow rate in Table M 102.1. Code Provisions M 102.2 Water Demand Calculator. The estimated design flow rate for the building supply and principal branches and risers shall be determined by the IAPMO Water Demand Calculator available for download at www.iapmo.org/WEStand/Pages/WaterDemandCalculator.aspx Code Provisions M 102.3 Meter and Building Supply. To determine the design flow rate for the water meter and building supply, enter the total number of indoor plumbing fixtures and appliances for the building in Column [B] of the Water Demand Calculator and run Calculator. See Table M 102.3 for an example. Code Provisions M 102.4 Fixture Branches and Fixture Supplies. To determine the design flow rate for fixture branches and risers, enter the total number of plumbing fixtures and appliances for the fixture branch or riser in Column [B] of the Water Demand Calculator and run Calculator. The flow rate for one fixture branch and one fixture supply shall be the design flow rate of the fixture according to Table M 102.1.
    [Show full text]
  • Peak Water: Risks Embedded in Japanese Supply Chains
    Peak water: Risks embedded in Japanese supply chains Analysis of how companies in the Nikkei 225 Index are exposed to water risk through suppliers in Asia kpmg.or.jp trucost.com c | Section or Brochure name Contents 1.0 Executive summary 1 2.0 Trade in water risk: Corporate financial exposure in Japan 3 2.1 Study to assess supply chain water risk in the Nikkei 225 Index 3.0 Water use in the Nikkei 225 7 3.1 Supply chain water use varies across sectors 3.2 Variations in the water intensity of companies 3.3 Water scarcity pricing to identify risk 4.0 Mapping water use in supply chains 13 4.1 Water hot spots across the Personal & Household Goods sector 5.0 Corporate water risk in Asia 17 5.1 Creating supplier water risk profiles 5.2 Exposure to water risk in raw materials sourcing 6.0 Conclusions and next steps 21 7.0 Appendix: Trucost methodology 23 Authors: KPMG Director Kazuhiko Saito and Trucost Research Editor Liesel van Ast Acknowledgements: Thanks to Tom Barnett, Jessica Hedley, Steve Bullock, Stefano Dell’Aringa and Aaron Re’em of Trucost for contributing to this study. © 2012 KPMG AZSA Sustainability Co., Ltd., a company established under the Japan Company Law and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG International”), a Swiss entity. All rights reserved. © 2012 Trucost Plc 1 | Peak water: Risks embedded in Japanese supply chains 1.0 Executive summary KPMG AZSA Sustainability Co. has partnered with environmental data and insight experts Trucost to look at supply chain water risk in the Nikkei 225 Index.
    [Show full text]
  • Esmeralda County Water Resource Plan 2012
    ESMERALDA COUNTY WATER RESOURCE PLAN 2012 Prepared by Farr West Engineering 5442 Longley Lane Suite B Reno, NV 89511 Esmeralda County Water Resource Plan TABLE OF CONTENTS Introduction ..................................................................................................................... 1 Guiding Principles ........................................................................................................... 5 Policies............................................................................................................................ 6 Regulatory Framework .................................................................................................... 9 Nevada Statutory Requirements .................................................................................. 9 Federal Acts and Plans .............................................................................................. 12 Water Resource Assessment ........................................................................................ 16 Topography ................................................................................................................ 16 Climate ...................................................................................................................... 16 Surface Water ............................................................................................................ 18 Springs ...................................................................................................................... 18 Groundwater
    [Show full text]
  • High-Resolution Water Footprints of Production of the United States
    University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Daugherty Water for Food Global Institute: Faculty Publications Daugherty Water for Food Global Institute 3-26-2018 High-Resolution Water Footprints of Production of the United States Follow this and additional works at: https://digitalcommons.unl.edu/wffdocs Part of the Environmental Health and Protection Commons, Environmental Monitoring Commons, Hydraulic Engineering Commons, Hydrology Commons, Natural Resource Economics Commons, Natural Resources and Conservation Commons, Natural Resources Management and Policy Commons, Sustainability Commons, and the Water Resource Management Commons This Article is brought to you for free and open access by the Daugherty Water for Food Global Institute at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Daugherty Water for Food Global Institute: Faculty Publications by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. PUBLICATIONS Water Resources Research RESEARCH ARTICLE High-Resolution Water Footprints of Production 10.1002/2017WR021923 of the United States Key Points: Landon Marston1,2 , Yufei Ao1,2 , Megan Konar1 , Mesfin M. Mekonnen3 , and We present the most detailed and Arjen Y. Hoekstra4,5 comprehensive water footprints of production of any country to date 1Department of Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, Urbana, IL, USA, Significant variability is evident in 2 3 water footprints of production Department
    [Show full text]
  • Water Management and Irrigation Scheduling Bill Peacock, Larry Williams, and Pete Christensen
    University of California Cooperative Extension Tulare County Pub. IG9-98 Water Management and Irrigation Scheduling Bill Peacock, Larry Williams, and Pete Christensen Water Management Seasonal evapotranspiration (ET) or water use of of irrigation on vine growth and fruit development is a mature raisin vineyard can vary from 19 to 26 best discussed by dividing the season into four stages. inches (483-1143 mm) in the San Joaquin Valley The irrigation stages depicted in this chapter should depending on canopy size. ET is a combination of not be confused with the three stages of berry growth the water evaporating from the soil surface (E) and discussed elsewhere. transpiring from the leaves (T). Evaporative demand varies very little from season to season The first irrigation stage (Stage One) covers the within the geographical boundary of the raisin period from shortly after budbreak to bloom (April 1 industry. to May 10). The water requirement during this period is low with only 2.5 inches (64 mm) used during the The total amount of irrigation water applied, 40-day period. Moisture stored in the soil from winter however, is often more than vineyard ET. An rains is usually adequate to meet vineyard water additional 6 to 8 inches (152 - 203 mm) of water requirements during this time frame. Even with no may be needed some years for leaching salts and spring irrigation, grapevines rarely exhibit symptoms of providing frost protection, and the efficiency of the water stress during this period. The exceptions are irrigation system must be taken into account. vineyards on very sandy or shallow soils with limited Winter rainfall can offset irrigation requirements by soil water storage, or vineyards with cover crops.
    [Show full text]
  • Chapter 4 Water Requirements
    Chapter 4 Water Requirements Contents NJ652.04 a) Crop Evapotranspiration b) Net Irrigation Water Requirements c) Management Allowed Soil-Water Depletion d) Auxiliary Water Requirements e) Water Requirements for Soil-Water Budget/Balance Analysis f) Water Sources Tables Table NJ 4.1a Net Irrigation Water Requirement, North Jersey Table NJ 4.1b Net Irrigation Water Requirement, Central Jersey Table NJ 4.1c Net Irrigation Water Requirement, South Jersey Table NJ 4.2a Crop Consumptive Use and Peak ET, North Jersey Table NJ 4.2b Crop Consumptive Use and Peak ET, Central Jersey Table NJ 4.2c Crop Consumptive Use and Peak ET, South Jersey Table NJ 4.3 Crop Planting and Harvest Dates Table NJ 4.4 Suggested Before and After System Efficiencies Table NJ 4.5 Recommended Application Rates for Strawberries Table NJ 4.6 Gallons Per Minute Needed For Various Application Rates for Each Acre to be Frost Protected Table NJ 4,7 Example Soil-Water Budget Figures Figure NJ 4.1 Irrigation Zones of New Jersey Chapter 4 Water Requirements Part 652 Irrigation Guide NJ652.04 Water Requirements Peak-Period Consumptive Use The average daily water-use rate during the 6 to 10 days of the highest consumptive use of (a) Crop Evapotranspiration, ETc the season is called the peak-period use rate and is the design rate to be used in planning an Plants must have a continuous supply of irrigation system. The peak-use period readily available moisture in order to maintain generally occurs when the crop is starting to rapid, vigorous growth. The moisture used by produce its harvest, vegetation is most plants plus the moisture evaporated directly abundant, and temperatures are high.
    [Show full text]
  • New Jersey Water Supply Plan 2017-2022 V 1.01
    State of New Jersey Department of Environmental Protection NEW JERSEY WATER SUPPLY PLAN 2017-2022 V 1.01 STATE OF NEW JERSEY Chris Christie, Governor Kim Guadagno, Lieutenant Governor Department of Environmental Protection Bob Martin, Commissioner Water Resources Management Dan Kennedy, Assistant Commissioner NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION NJDEP’s core mission is and will continue to be the protection of the air, waters, land and natural and historic re- sources of the State to ensure continued public benefit. The Department’s mission is advanced through effective and balanced implementation and enforcement of environmental laws to protect these resources and the health and safety of our residents. At the same time, it is crucial to understand how actions of this agency can impact the State’s economic growth, to recognize the interconnection of the health of New Jersey’s environment and its economy, and to appreciate that environmental stewardship and positive economic growth are not mutually exclusive goals: we will continue to protect the environmental while playing a key role in positively impacting the economic growth of the state. Suggested citation: New Jersey Department of Environmental Protection, 2017, New Jersey Water Supply Plan 2017-2022: 484p, http://www.nj.gov/dep/watersupply/wsp.html Cover Photo: “Delaware River from the Calhoun Street Bridge, Trenton, NJ”. Photo by Chelsea DuBrul. ii | P a g e TABLE OF CONTENTS AUTHORITY .................................................................................................................................................................
    [Show full text]
  • Second Prize Moil Limited Kandri Mine Nagpur (Maharashtra) Sector
    Second Prize Moil Limited Kandri Mine Sector: Mining Nagpur (Maharashtra) Unit Profile: Kandri Mine was established in the beginning of the twentieth century around 1903 AD by Central Provinces of Manganese Ore (CPMO) incorporated in Great Britain. Later on, it was taken over by MOIL in the year 1962. Kandri Mine is an underground mine of the Manganese Ore (India) Limited, situated in Nagpur district of Maharashtra State. The annual production of Manganese Ore in Mine was 63181 T in 2013-14 and 63105 T during 2014 – 15. Total mining lease hold area of the Mine is 83.06 hectare. The total mineral reserve of the mine is 2.05 million tones. So far 30.0 hectare area of the mine is covered with a forestation. MOIL Limited is the largest Manganese ore producing company of India. At present total ten nos. mines including underground and opencast mines, are in operation in Madhya Pradesh and Maharashtra. Company share about 55% of Manganese ore production of India. MOIL has established a 10000 TPA capacity Ferro-Manganese plant at Balaghat (M.P.) and a 1200 TPA capacity Electrolytic Manganese Di- Oxide plant at Dongri Buzurg in Maharashtra State. For Energy conservation and clean & green environment, MOIL has installed 4.8 MW and 15.2 MW capacity Wind Energy Generator Plants at Dewas (M.P.), which are contributing in energy conservation. Brief Description of the major Energy Conversation Actions: 1. Operation of 50 H.P. pump in place of 100 H.P. pump. 2. Operation of 200 H.P new Air compressors in place of 250 H.
    [Show full text]
  • District Census Handbook, Nagpur
    ·CENSUS OF INDIA 1961 DISTRICT CENSUS HANDBOOK NAGPUR Compiled by THE MAHARASHTRA CENSUS OFFICE BOMBAY Printed in India by the Manager, Government Press and Book Depot, Nagpur, and Published by the Director, Government Printing and Stationery, Maharashtra State, Bombay-,. 1965 rPrice - Rs. Ei~ht] CENSUS OF INDIA 196 t Central Government Publications Census Report, Volume X-Maharashtra, is published in the folk>wing Parts I-A and B General Report I-C Subsidiary Tables II-A General Popuiation Tables JI-B (i) General Economic Tables-Industrial Classification II-]} (ii) General Economic Tables-Occupational Classification II-C (i) Social and Cultural Tables II-C (ii) Migration Tables III Household Economic Tables IV Report on Housing and Establishments V-A Scheduled Castes and Scheduled Tribes in Maharashtra-Tables V·B ... Scheduled Castes and Scheduled Tribes i.n Maharashtra-Ethnographic Notes VI (1-35) Village Surveys (35 monographs on 35 selected villages) VII·A Handicrafts in Maharashtra VII-B Fairs and Festivals in Maharashtra VIII-A Administration Report-Enumeration (For official use only) VIII·B Administration Report-Tabulation (For official use only) IX Census Atlas of Maharashtra X (1-12) Cities of Maharashtra (15 Volumes-Four volumes on Greater Bombay and One each on other eleven Cities) State Government Publications 25 Volumes of District Census Handbooks in English 25 Volumes of District Census Handbooks in Marathi Alphabetical List of Villages in Maharashtra J-1977-i.3-(Nagpur.} ' . .. : « Drs ~ A r I? I l (r.. 0 D l c .. O c t- % I ~ " 0 III , It! 0 0 l- I- " ' ~ \ c:r . '" .(, ... ~'" ,..~ • A,lIAr q.
    [Show full text]