Amalgamated Inder-Kamptee Deep OC Mine NAGPUR AREA, WCL
Total Page:16
File Type:pdf, Size:1020Kb
Assessment of Environmental Impact & Management plan FOR Amalgamated Inder-Kamptee Deep OC Mine NAGPUR AREA, WCL Targeted production capacity (1.20 + 2.0) 3.20 MTPA within the ML area of 857.60 Ha APRIL - 2019 Prepared by:- CENTRAL MINE PLANNING & DESIGN INSTITUTE LIMITED CMPDI / Form – I / WCL / 2019 – 20 /April/89/ 01 Certificate of accreditation vide no. NABET/EIA/1720/ RA 0092 valid till 01.10.2020 Amalgamated Inder-Kamptee Deep OC mine (Targeted production capacity (1.20 + 2.0) 3.20 MTPA within the ML area of 857.60 Ha) 1. Preamble 1.1 Inder UG to OC expansion mining project: (J-11015/35/2010-IA-II(M) dated 06.02.2013) The PR was approved against the production capacity of 1.20 MTPA by WCL Board on dated 18.09.2009. Public Hearing conducted on 11.04.2012 for Inder UG to OC Expansion mining project for increase in production from 0.60 MTPA to 1.20 MTPA in land area of 463.80 ha. There is no forest land involved. The proposal was considered in 57th EAC meeting held on dated 17-18th September 2012, after deliberations, the proposal recommended for grant of EC under of EIA notification, 2006. The Environmental Clearance of Inder UG to OC Expansion Mining project for a production capacity of 1.20 MTPA in an area of 463.80 ha was accorded by MOEF & CC vide letter no.J-11015/35/2010-IA-II(M) dated 06.02.2013. The details of other parameters are follows: Of total ML area of 463.80 ha, 391.27 ha is agricultural land, 10.80 ha is wasteland, 61.73 has already been acquired under adjacent Gondegaon OC. Of the total ML area of 463.80 ha, 94.50 ha is quarry area, 161.05 ha is for external OB dump, 10.0 ha is for infrastructure, 14.50 ha for embankment, 12.0 ha for internal roads etc, 171.75 ha for future extension River Kanhan flows alongside the mine boundary Mining by opencast method with Shovel- Dumper combination. Stripping ratio 1:6 Maximum working depth of 150 m.bgl Coal transportation by means of trucks to Dumri railway siding at a distance of 15.60 km, and thereafter totally by railway wagons for the customers Total water requirement is 1000 KLD (Industrial- 700 KLD, Domestic- 300 KLD) R&R of Tekadi village involves 650 PAFs at a total cost of 992 lakhs. 1.2 Expansion of Kamptee Deep OC coal mine project: (J-11015/287/2010-IA-II(M) dated 11.05.2015) The PR was approved (1st stage approval) against the target production capacity of 1.50 MTPA by WCL Board on dated 18.07.2010. Public Hearing conducted on 12.09.2012 for Expansion of Kamptee deep OC coal mine project of Normative 1.50 MTPA to peak 2.0 MTPA in ML area of 661.65 ha. There is no forest land involved. The proposal was considered in 31st EAC meeting held on dated 16-17th February 2015, after deliberations, the proposal recommended for grant of EC under provisions of EIA notification, 2006. The Environmental Clearance of Expansion of Kamptee Deep OC coal mine project for capacity of 1.50 MTPA (normative), 2.0 MTPA (peak) in ML area of 661.65 ha was accorded by MOEF & CC vide letter no.J- 11015/287/2010-IA-II(M) dated 11.05.2015. The details of other parameters are follows: Of total ML area of 661.650 ha, (650.465 ha within ML area & 11.185 ha outside ML area), 651.95 ha is agricultural land, 9.70 ha is wasteland. Of the total ML area of 661.650 ha, 178.050 ha is quarry area, 254.859 ha is for external OB dump, 63.092 (51.907 +11.185) ha is for infrastructure, 165.649 ha for rationalization. River Kanhan flows alongside the mine boundary Mining by opencast method with Shovel- Dumper combination. Stripping ratio 1:5.833 Maximum working depth of 200 m.bgl Coal transportation by means of trucks to Dumri railway siding at a distance of 16.0 km, and thereafter totally by railway wagons for the customers Total water requirement is 480 KLD 1.3 Amalgamated Inder-Kamptee Deep OC mine: 1.3.1 Need: Inder UG to OC expansion mining project and Expn. Kamptee deep OC mine project are adjacent on-going projects of Nagpur Area. Amalgamated Inder-Kamptee deep OC mine (targeted production capacity (1.20 + 2.0) 3.20 MTPA within the ML area of 857.60 Ha) is proposed in order to achieve following objectives: 1 | P a g e To rationalize the land requirement for proposed mine considering difficulty in acquisition of additional land and problem of OB dumping. To achieve the complete customer satisfaction in respect to quantity and quality of coal. To achieve the desired productivity in respect to HEMM and manpower deployment. Socio-economic development of the area. The amalgamated Inder-Kamptee Deep OC mine has reduced the total land requirement from 1026.06 (459.57+650.49-84.0) ha to 857.60 ha. 84.0 ha land was common between Inder UG to OC and Kamptee Deep OC. 1.3.2 Status of Present Proposal: The PR for amalgamated Inder-Kamptee deep OC mine has been approved by WCL Board on dated 09.10.2018 for production capacity of 3.20 MTPA (1.20 + 2.0) There is no forest land involved. The details of other parameters are follows: Of total area of 857.60 ha, 847.75 ha is agricultural land, 9.85 ha is waste land. Of the total area of 857.60 ha, 378.98 ha is quarry area, 260.56 ha is for external OB dump, 40 ha is for infrastructure, 28.0 ha is for embankment, 12.0 ha for road, 20 ha for colony, 118.06 ha for rationalization and blasting zone. River Kanhan flows alongside the mine boundary Mining by opencast method with Shovel- Dumper combination. Avg. stripping ratio 1:4.28 The proposed Amalgamated Inder-Kamptee Deep OC mine has been planned upto 200 m depth at the floor of bottom seam – II (B) in eastern side (Inder block including barrier) and upto 156m depth at the floor of seam-IVB in Western side (part of Kamptee colliery block). Coal transportation by A tube conveyor system is being installed by Mahagenco to transport coal of Amalgamated Inder-Kamptee Deep OC, Gondegaon Ghatrohan OC, Bhanegaon OC and Sighori OC to nearby Khapakhera and Koradi Thermal Power Station. Total water requirement is 1292.0 KLD (Industrial- 460.0 KLD, Domestic- 832.0 KLD) R&R involves 281 nos land loosers, 580 hutments, 168 private houses and Gondegaon village (721 Houses). Summary Sheet Sl Particulars Unit Inder UG to OC Expansion of Kamptee Amalgamated Remarks No. Expansion Mining Deep OC coal mine Inder- Project project Kamptee Deep OC Mine 1 Name of the - Nagpur Area/WCL No Change Area/Company 2 Nearest Name/km Kanhan/5 km No Change Railway Station for project 3 Nearest airport Name/km Nagpur Airport / 30 km No Change 4 Name of Name Northern limb of Kamptee Coalfields No Change Geological block 5 Capacity MTPA 1.20 2.0 3.2 Arithmetic Sum 6 Description of Nos. 7 3 7 of workable Details Seam Minable Grade Seam Minable Grade Seam Grade Overall grade Coal seams reserves reserves remains the V 8.57 G-10 V 3.89 G-10 V G-10 same IVT 2.07 G-9 IVT 2.39 G-9 IVT G-9 IVB 7.17 G-8 IVB 3.22 G-8 IVB G-8 IIIT 2.53 G-7 IIIT G-7 IIIB 2.18 G-6 IIIB G-6 IIT 4.72 G-7 IIT G-7 IIB 4.01 G-6 IIB G-6 7 Overall grade G-9 G-9 G-9 Overall grade remains the same 8 Avg. thickness m Ranging from 0.90 to Ranging from 2.0 m to Ranging from Overall range of seam 15.68 m 13.0 m 0.90 to 15.68 m of avg. thickness remains the same 9 Minable Mt 23.25 Mt (as on 24.086 Mt (As on 41.27 Mt as on Figures as per reserves May’2016) Nov’2015) 01.04.2018 approved 2 | P a g e Sl Particulars Unit Inder UG to OC Expansion of Kamptee Amalgamated Remarks No. Expansion Mining Deep OC coal mine Inder- Project project Kamptee Deep OC Mine Project Report 10 Stripping ratio 1:6 1:5.833 1:4.28 11 Method of Opencast method with Shovel Dumper combination Method of Mining mining remains the same 12 Coal Coal is transported to Coal is transported to A tube conveyor Improved Evacuation Dumri railway siding at a Dumri railway siding at a system is being coal distance of 15.60 km and distance of 16.0 km and installed by evacuation thereafter to customers thereafter to customers MahaGenco to system by means of railway by means of railway transport coal of adopted for wagons wagons. Amalgamated amalgamated Inder-Kamptee project. Deep OC, Gondegaon Ghatrohan OC, Bhanegaon OC and Sighori OC to nearby Khapakhera and Koradi Thermal Power Station. 13 Balance Mine Yrs 9 17 15 (@ rated Life output of 3.20 MTPA) starting from 01.04.2018 14 Total Nos. 115 nos (as on 561 nos (as on 549 nos Surplus Manpower 01.07.2018) 25.05.2018) proposed manpower will be gainfully utilized in other mines of WCL 15 Water M3/day 1000 m3/day 480 m3/day 1292 m3/day Rationalized requirement usage in amalgamated project 16 Land Details Ha 463.80.