Rural Electrification, Distribution, and Transmission Project

Total Page:16

File Type:pdf, Size:1020Kb

Rural Electrification, Distribution, and Transmission Project RESETTLEMENT PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL Nepal Electricity Authority This report was prepared by the Borrower and is not an ADB document. May 2004 NEPAL ELECTRICITY AUTHORITY (AN UNDERTAKING OF HIS MAJESTY’S GOVERNMENT OF NEPAL) TRANSMISSION AND SYSTEM OPERATIONS TRANSMISSION LINE/SUBSTATION CONSTRUCTION DEPARTMENT THANKOT-CHAPAGAON-BHAKTAPUR 132 Kv TRANSMISSION LINE PROJECT RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT (ADB LOAN NO. 1732-NEP: (SF) & OPEC LOAN NO. 825 P) INDEPENDENT ASSESSMENT OF ACQUISITION, COMPENSATION, REHABILITATION PLAN (ACRP) FINAL REPORT Prepared by: Dr. Toran Sharma Mr. Hari P. Bhattarai (Independent Consultants) May 2004 Foreword The independent consultants as per the request of ADB to NEA prepare this Resettlement Plan (RP). This RP is based on the data already collected by NEA and its consultants at different times and the Environmental Impact Assessment (EIA) and ACRP with short Resettlement Plan Reports of the Transmission Line Project, approved by the concerned ministries of HMG and reviewed by ADB. The independent consultants have reviewed all the available reports in the context of ADB Guideline for Resettlement. In the process of independent assessment, the consultants made revisit of the T/L alignment and relocate house structures. Similarly, plant/vegetation and crop inventories have been prepared to assess the losses. Extensive discussion were held with the NEA officials for the development of the resettlement policy framework for the project, taking consideration of the HMG’s rules, regulations and practices and ADB policy on resettlement. The report presented is in the ADB report format and addresses the issues as per the ADB requirement. The consultants extend their gratitude to Mr. M.P. Khakurel (Project Manager), Mr. S.K. Mishra (Engineer) and Mr. P.D. Ulak (Assistant Administrative Officer) of Thankot–Chapagaon–Bhaktapur T/L project, NEA for providing all needed information and help to expedite independent assessment. Report is organized in XII Chapters and Six Annexes with an executive summary. The content of each chapter is briefly presented below: Chapter I describes the salient features of the project. Chapter II discusses on the efforts made to minimize the resettlement from the project activities. Chapter III presents the ADB and HMG policies for resettlement and describes the legal provisions of HMG including the practices of resettlement in the past and ongoing T/L projects implemented in Nepal. Resettlement policies for the proposed Thankot-Chapagaon-Bhaktapur 132 kV T/L project are briefly described. Chapter IV details the project-affected areas of the T/L project. Chapter V lists the project affected families/persons of the T/L project. Chapter VI presents the findings of the socio-economic study of the project affected communities and the project relocates. Chapter VII discusses on the socio-economic impacts of the project and mitigation measures to minimize the impacts. Chapter VIII describes the mechanism of stakeholders’ consultations and dialogues adopted for the RP preparation. Chapter X presents the institutional organization to accomplish the RP. Chapter XI presents the implementation schedule of RP. Chapter XII discusses monitoring and evaluation of RP. Chapter XIII presents the compensation/benefits to AFs/APs and RP cost estimates. ACRONYMS % Percentage ADB Asian Development Bank AFs Affected Families APs Affected Persons CBOs Community Base Organization CDO Chief District Officer CFC Compensation Fixation Committee DC Disturbance Compensation DDCs District Development Committees EIA Environmental Impact Assessment GI Galvanized Iron ha Hector HMG/N His Majesty’s Government of Nepal ITR Income Tax Return kg Kilogram km Kilometer kV Kilo Volt LAO Land Acquisition Officer m Meter M2 Meter Square MoPE Ministry of Population and Environment MT Metric Tonne NEA Nepal Electricity Authority NEPAP Nepal Environmental Policy and Action Plan NGOs Non-governmental Organizations Nos. Numbers NRs Nepali Rupees PM Project Manager PMO Project Management Office ROW Right of Way RP Resettlement Plan SLC School Leaving Certificate Sq. ft. Square Feet T/L Transmission Line TA Transportation Allowance VDCs Village Development Committee WECs Water and Energy Commission Secretariat TABLE OF CONTENTS FOREWORD ACRONYMS TABLE OF CONTENTS EXECUTIVE SUMMARY CHAPTER I: THE PROJECT 1 1.1 Rationale 1 1.2 Status of Resettlement Design 1 1.3 Project Description 2 CHAPTER II: EFFORTS TO MINIMIZE RESETTLEMENT 4 2.1 Efforts in the Phase of Alignment Survey 4 2.2 Efforts Planned During Implementation 4 CHAPTER III: POLICY AND LEGAL FRAMEWORK 5 3.1 ADB Policy on Environment 5 3.2 HMG Laws and Policy 5 3.3 Resettlement Policy Framework for Thankot-Chapagaon-Bhaktapur 132kV T/L Project 9 3.3.1 Resettlement Policies 10 3.3.2 Compensation Policy for the Project 10 CHAPTER IV: THE PROJECT AFFECTED AREAS 15 CHAPTER V: AFFECTED FAMILIES/PERSONS (AFS/APS) 18 CHAPTER VI: SOCIOECONOMIC STUDY 20 6.1 Methodology 20 6.2 Results of Socio-economic Survey 20 6.2.1 Project Affected Families 20 6.2.2 Project Affected Relocatee Families 23 CHAPTER VII: SOCIOECONOMIC IMPACTS AND MITIGATING MEASURES 26 CHAPTER VIII: COMMUNITY CONSULTATION AND DIALOGUES 27 8.1 Project Stakeholders 27 8.2 Mechanisms for Stakeholders’ Participation 27 8.2.1 Dialogues/Consultation 27 8.2.2 Information Campaign 27 8.2.3 Local Government Endorsement 27 8.3 Role of NGOs and CBOs 28 CHAPTER IX: RESOLUTION OF CONFLICTS, APPEALS AND GRIEVANCE PROCEDURES 29 9.1 Setting Up a Complaint Desk 29 9.2 Procedure 29 CHAPTER X: INSTITUTIONAL ORGANIZATION 30 10.1 Organizational Linkages and Responsibilities 30 10.1.1 Project Management Office (PMO) 30 10.1.2 Account Section, PMO 30 10.1.3 Relocatees 30 10.2 Institutional Capability Building and Strengthening 30 CHAPTER XI: IMPLEMENTATION SCHEDULE 31 11.1 Relocation Schedule 31 11.2 Relation of Relocation Activities to Project Schedule 31 11.3 Procedures for RP Implementation 31 11.4 Involvement of APs, Local Government and NGOs 32 11.4.1 APs 32 11.4.2 NGOs 32 11.4.3 Local Governments 32 CHAPTER XII: MONITORING AND EVALUATION 33 12.1 Internal Monitoring 33 12.2 External Monitoring 33 12.3 Post-Relocation Evaluation 33 CHAPTER XIII: COMPENSATION/BENEFITS TO AFS/APS AND COST ESTIMATES 34 13.1 Compensation/Benefits to AFs/APs 34 13.2 Cost Estimates 35 13.2.1 Relocatee 35 13.2.2 Payments for Land Acquisition and Land Use Restriction 36 13.2.3 Payments for Crops and Trees 36 13.2.4 External Monitoring 37 13.2.5 Summary 37 REFERENCES 38 ANNEXES ANNEX IV – 1: Vegetation Inventory Report ANNEX V – 1: Land Parcel and Land Ownership ANNEX V – 2: Photographs of Affected Structures ANNEX VI – 1: Socio-economic Data Tables (Project Affiliated Families) ANNEX VI – 2: Socio-economic Data Tables (Relocatees) ANNEX X – 1: Implementation Schedule RESETTLEMENT PLAN Thankot-Chapagaon-Bhaktapur 132 kV Transmission Line Project EXECUTIVE SUMMARY 1. This resettlement plan (RP) has been prepared for the households affected by the Thankot- Chapagaon-Bhaktapur 132 kV Transmission Line Project, the construction sites of which are located in the districts of Kathmandu, Bhaktapur and Lalitpur. 2. The project aims to increase the power transfer capacities of transmission lines of the Kathmandu Valley in order to accommodate the planned additional power and load growth in the Valley. Additionally, it also helps enhance the reliability of power supply in the Valley. 3. The main project components, which will displace people and properties, are the construction of 132 kV overhead Transmission Line (T/L) with a total length of 28.4 km and two new sub-stations in Kathmandu and Lalitpur districts. 4. About 2,424 households residing within the T/L Right-of-Way (ROW) and substation areas will be affected which includes 1,651 landowners, 764 tenants, 6 landowners with residential structure and 3 tenants with residential structures. 5. Of the affected only 9 households require relocation. 6. House/structure owners will also be paid for the replacement cost of their houses/structures along with the associated land plots. 7. Relocatee-households will be granted an additional relocation package consisting of disturbance compensation and transportation allowance to help them resettle in new places. 8. Landowners without tenants will be paid for the land occupied permanently by the tower pads under T/L ROW and substation area at the market based prices. Loss of trees will also be paid at the market-based prices. 9. Landowners with tenant will be paid for land occupied permanently by the tower pads under T/L ROW and substation area at 50% of the market prices and remaining 50% will be paid to the tenants. Besides, tenants will also be paid for the damaged crops and plants at market-based price. 10. Landowners without tenants will be paid for the land restricted for use under T/L ROW at the 10% of market based prices. The loss of crops and trees will also be paid. 11. Landowners with tenant will be paid for land restricted for use under T/L ROW at 50% of the 10% market prices and remaining 50% of the 10% will be paid to the tenants. Besides, Tenants will also be paid for the crops and plants. 12. A third party monitoring team will be contracted by the project management office to undertake the external monitoring of RP implementation. 13. The project will provide the relocation budget estimated at NRs 136.39 million and will implement this RP with the assistance of His Majesty’s Government of Nepal. Chapter I THE PROJECT 1.1 Rationale The Nepal Electricity Authority has undertaken the Thankot-Chapagaon-Bhaktapur 132 kV T/L Project to complete the planned 132 kV T/L ring in Kathmandu Valley which helps enhance the reliability of power supply, decreases voltage drops and energy losses and supports rural electrification of 19 Village Development Committees (VDCs) of Lalitpur district.
Recommended publications
  • Preparation of GPS Based Digital Profile of Godawari Municipality
    Godawari Municipality Godawari, Lalitpur Final Report Preparation of GPS based Digital Profile of Godawari Municipality Submitted to Godawari Municipality Bajrabarahi, Lalitpur, Nepal Submitted by ArchieSoft Technology Lalitpur Metropolitan City 21, Lalitpur, Nepal Phone: +977 -1-5553000 Email: [email protected] Web: www.archiesoft.com.np 1 Table of Contents Chapter 1: Project Description ............................................................................................................... 4 1.1 Background ......................................................................................................................................... 4 1.2 Objective of the assignment ............................................................................................................... 4 1.3 Key Deliverables ................................................................................................................................. 5 1.4 Methodology/ process ....................................................................................................................... 5 1.5 Project Location .................................................................................................................................. 6 1.6 Time line of assignment/ study .......................................................................................................... 7 Chapter 2: Godawari Municipality an Introduction ............................................................................... 9 2.1 Background: .......................................................................................................................................
    [Show full text]
  • Peasantry in Nepal
    92 Chapter 4 Chapter 4 Peasantry in Kathmandu Valley and Its Southern Ridges 4.1 Introduction From ancient times, different societies of caste/ethnicity have been adopting various strategies for ac- quiring a better livelihood in Nepal. Agriculture was, and is, the main strategy. The predominant form of agriculture practised throughout the hilly area of the Nepal is crop farming, livestock and forestry at the subsistence level. Kathmandu valley including Lalitpur district is no exception. The making of handicrafts used to be the secondary occupation in the urban areas of the district. People in the montane and the rural part of the district was more dependent upon the forest resources for subsidiary income. Cutting firewood, making khuwa (solidified concentrated milk cream) and selling them in the cities was also a part of the livelihood for the peasants in rural areas. However, since the past few decades peasants/rural households who depended on subsistence farming have faced greater hardships in earning their livelihoods from farming alone due to rapid population growth and degradation of the natural resource base; mainly land and forest. As a result, they have to look for other alternatives to make living. With the development of local markets and road network, people started to give more emphasis to various nonfarm works as their secondary occupation that would not only support farming but also generate subsidiary cash income. Thus, undertaking nonfarm work has become a main strategy for a better livelihood in these regions. With the introduction of dairy farming along with credit and marketing support under the dairy development policy of the government, small scale peasant dairy farming has flourished in these montane regions.
    [Show full text]
  • Tables Table 1.3.2 Typical Geological Sections
    Tables Table 1.3.2 Typical Geological Sections - T 1 - Table 2.3.3 Actual ID No. List of Municipal Wards and VDC Sr. No. ID-No. District Name Sr. No. ID-No. District Name Sr. No. ID-No. District Name 1 11011 Kathmandu Kathmandu Ward No.1 73 10191 Kathmandu Gagalphedi 145 20131 Lalitpur Harisiddhi 2 11021 Kathmandu Kathmandu Ward No.2 74 10201 Kathmandu Gokarneshwar 146 20141 Lalitpur Imadol 3 11031 Kathmandu Kathmandu Ward No.3 75 10211 Kathmandu Goldhunga 147 20151 Lalitpur Jharuwarasi 4 11041 Kathmandu Kathmandu Ward No.4 76 10221 Kathmandu Gongabu 148 20161 Lalitpur Khokana 5 11051 Kathmandu Kathmandu Ward No.5 77 10231 Kathmandu Gothatar 149 20171 Lalitpur Lamatar 6 11061 Kathmandu Kathmandu Ward No.6 78 10241 Kathmandu Ichankhu Narayan 150 20181 Lalitpur Lele 7 11071 Kathmandu Kathmandu Ward No.7 79 10251 Kathmandu Indrayani 151 20191 Lalitpur Lubhu 8 11081 Kathmandu Kathmandu Ward No.8 80 10261 Kathmandu Jhor Mahakal 152 20201 Lalitpur Nallu 9 11091 Kathmandu Kathmandu Ward No.9 81 10271 Kathmandu Jitpurphedi 153 20211 Lalitpur Sainbu 10 11101 Kathmandu Kathmandu Ward No.10 82 10281 Kathmandu Jorpati 154 20221 Lalitpur Siddhipur 11 11111 Kathmandu Kathmandu Ward No.11 83 10291 Kathmandu Kabresthali 155 20231 Lalitpur Sunakothi 12 11121 Kathmandu Kathmandu Ward No.12 84 10301 Kathmandu Kapan 156 20241 Lalitpur Thaiba 13 11131 Kathmandu Kathmandu Ward No.13 85 10311 Kathmandu Khadka Bhadrakali 157 20251 Lalitpur Thecho 14 11141 Kathmandu Kathmandu Ward No.14 86 10321 Kathmandu Lapsephedi 158 20261 Lalitpur Tikathali 15 11151 Kathmandu
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • My Journey in the Valley of Kathmandu, Nepal an Account of My 2013 Borlaug-Ruan Internship
    THE WORLD FOOD PRIZE My Journey in the Valley of Kathmandu, Nepal An account of my 2013 Borlaug-Ruan Internship By: Valerie Gamao (Live Oak, Texas) June 14 - August 14, 2013 Table of Contents Pages Acknowledgements 2 Background Information: ICIMOD 3 Part I: My Research 4-32 Introduction 4-6 Data Collection 6 Sample Size and Surveyed Areas Methodology Questionnaire Development Findings (Below are just a sample of the entire findings presented in this paper) 7-32 Overview of Households Surveyed in the Lalitpur Area 7 KUKL: Status of Pipeline Supply to Households 9 Groundwater: Status of Groundwater Extraction and Use by Households 12 Water Tankers: Market Relationship Status Between Water Tankers 16 and Households Springs: Status of Dhunge dharas and its Use by Households 18 Comparing Sources Across Quanity and Quality Problems 21 Households and their Perception of the Quantity of Water Available 21 Water Storage Tanks as a Coping Mechanism for Water Shortage 22 Households and their Perception of the Quality of the Water Available 23 The Level of Effect of Water Scarcity and Quality Issues to Households 25 Possible Determinants to Water Scarcity 27-28 Rainwater Harvesting 29-31 Part II. How My Research Tackles Food Insecurity 33 Part III. Personal Journey 34-35 Pictures 36 References 37-38 1 Acknowledgements My journey in Nepal last summer would not have been possible without the contribution and belief of key individuals and institutions to today’s youth. First off, I would like to thank the World Food Prize Foundation (WFP) for having given me opportunities that I would have never imagined starting with my participation in the Global Youth Institute to my recent Borlaug-Ruan internship.
    [Show full text]
  • Nepal Earthquake: One Year On
    ne year has passed since a devastating magnitude-7.8 earthquake struck Nepal on 25 April 2015, with the epicenter about 80 kilometers northwest of the capital, Kathmandu. This was the worst disaster to hit Nepal in decades. Only 17 days later a second earthquake of magnitude 7.4 hit near Mount Everest, taking more lives and destroying more homes. According to government estimates, the earthquakes EXECUTIVE Oleft over 750,000 houses and buildings destroyed or damaged and caused over 8,790 deaths. It is estimated that the earthquakes affected the lives of approximately eight million people, constituting almost one-third of the population of Nepal. With the situation dire, the Nepal government declared a state of emergency, and appealed for international aid. Along with other agencies, Habitat SUMMARY for Humanity answered the call to assist the people of Nepal. During the emergency phase, Habitat distributed 5,142 temporary shelter kits to families whose homes were destroyed or left uninhabitable. Habitat volunteers removed 650 tons of earthquake rubble, and distributed 20,000 water backpacks to families in earthquake-affected areas. As the emergency phase ended, Habitat’s programs shifted into reconstruction. Engineers completed safety assessments on 16,244 earthquake- damaged homes. Initial construction began on permanent homes in the community in Kavre district. As months passed, winter brought the threat of cold weather exposure, and Habitat distributed 2,424 winterization kits to families at risk to the elements. In addition, 32 trainers and 632 people in affected communities received instruction on the Participatory Approach for Safe Shelter Awareness. Overall in the first year since the earthquakes, Habitat for Humanity provided assistance to more than 43,700 families through various disaster response programs.
    [Show full text]
  • Standing List 2072 /73 45 H.S.W
    37 Deepak Nirman Sewa, Rajbiraj 38 Dharma Nirman Sewa,Kritipur 39 Dronacharya Nirman Sewa Pvt.Ltd,Lazimpat 40 Eklabya Construction, Manamaiju 41 G.R.P. Nirman Sewa,Nuwakot 42 Ganga Mata Nirman Sewa,Baneshwor 43 Glory Tamang Nirman Sewa,Nuwakot 44 Gokarna Nirman Sewa Pvt.Ltd, Jorpati Standing List 2072 /73 45 H.S.W. Builders ,Dapcha 46 Hamro Unnati Costruction,Chabahil,Kathmandu 1) Name of Works :- ejg lgdf{0f tyf 47 Him Jyoti Construction Services,New dd{t ;DaGwL sfo{ Baneshwor 48 Hosana Nirman Sewa ,Koteshwor S.N Name and address 49 I.K. Construction Pvt.Ltd, Kalanki 1 Aarati Lawati Construction ,Baneshwor Kathmandu 2 Aasan Multipurpose Pvt.Ltd, Chakrapath 50 Ishan Nirman Sewa, Thankot 3 Abh ay Nirman Sewa , Jagritinagar 51 Jagadamba Nirman Sewa ,Babarmahal 4 Abhinab Nirman Sewa,Suntaal 52 Jagadamba Nirman Sewa, 5 Acme Facility Management Services , Babarmahal,Kathmandu Bakhundole 53 Janaadarsa Nirman Sewa, kavre 6 Acme Technotrade Concern Bakhundole 54 Jhapali Nirman Sewa,Putalisadak 7 Agrim Nirman Sewa ,Kavre 55 Jiri - Shikri Nirman Sewa Pvt.Ltd , 8 Ajay Nirman Sewa,Teku Gothatar 9 Amar jyoti Nirman Sewa Pvt.Ltd., 56 Juju Nirman Sewa,Kritipur Sitapaila 57 Jyang Chup Chhyothul Construction,Kavre 10 Amikshya Construction ,Gothatar 58 K & S Builders , Dallu 11 Aneva Engineering Consultancy 59 K.M Construction, Sewa, Nuwakot Pvt.Ltd,Anamnagar 60 Kageshowri Nirman 12 Angat Construction & Suppliers Sewa,Gothatar,Kathmandu Pvt.Ltd,Harisiddhi Lalitpur 61 Kalinchowk Nirman Sewa,Gokarneshwor 13 Aradhana Construction Pvt.Ltd, Khumaltar ,Kathmandu 14 Arun Nirman Sewa Ghattekulo 62 Kausil Basnet Nirman Sewa 15 Aryan Construction And Consultant Pvt.Ltd,Bijeshori Pvt.Ltd,Buddhanagar 63 Kausitar Nirman Sewa,Nagarkot 16 Asmita Construction Pvt.Ltd ,Baneshwor 64 Kiran Construction,Anamnagar 17 B.A.S Nirman Sewa Manamaiju 65 Laxmi Puja Nirman Sewa , Dolpa 18 B.B.
    [Show full text]
  • Site Specific Conservation Action Plan for Bats in the Kathmandu Valley, Nepal
    Site specific Conservation Action plan for bats in the Kathmandu valley, Nepal 2018-2023 1 A draft submitted to Rufford Small Grants, UK Submitted by: Small Mammals Conservation and Research Foundation, Kathmandu, Nepal Technical Team: Debbie Bartlett, PhD (Advisor) Mr. Sanjan Thapa, Mr. Ganesh Shrestha, Mr. Tejab Pun, Ms. Babita Gurung, Ms. Varsha Rai, Mr. Hari Basnet, Mr. Sagar Dahal, Ms. Aditi Subba, Ms. Sabita Gurung Photographs: Front Cover: A colony of Intermediate Horseshoe Bat (Rhinolophus affinis) at an old abandoned house in Sankhu, the house was demolished in the 2015 Earthquake All photographs by: Sanjan Thapa, Hari Basnet, Sabita Gurung, Bishnu Achhami, Sagar Dahal, Gabor Csorba, C.M. Francis Acknowledgements We would like to express esteem acknowledgements to The Rufford Small Grants Foundation, UK for the financial support; Department of Forests and Department of National Parks and Wildlife Conservation, Babar Mahal, Kathmandu; Department of Plant Resources, Thapathali, Kathmandu; Shivapuri Nagarjun National Park, Panimuhan, Kathmandu and Godawari Botanical Garden, Godawari, Lalitpur for their support to conduct the monitoring surveys which was helpful to prepare this action plan for the conservation of bats in the Kathmandu valley . I would like to express sincere gratitude to Dr. Maheshwar Dhakal, Joint Secretary, Ministry of Forest and Soil Conservation; Dr. Stephen Rossiter, Queen Mary University of London, UK and Dr. B.A. Daniel, Scientist, Zoo Outreach Organization, Coimbatore, India for their kind and continuous support. I am indebted to Dr. Debbie Bartlett, University of Greenwich, UK for guiding through the process of preparation of the action plan and Dr. Richard Crompton for technical support.
    [Show full text]
  • Number of Organizations Per Cluster Gorkha Rasuwa Health 26
    NEPAL: Lalitpur - Operational Presence Map (as of 30 Jun 2015) As of 30 June 2015, 72 organizations are reported to be working in Lalitpur district Number of organizations per cluster Health WASH NUMBER OF ORGANI Shelter Protection Protection Education Nutrition 10 6 10 1 5 ZATIONS PER VDC 26 Gorkha No. of Org Health No data Dhading Rasuwa 1 Nuwakot Makawanpur Shelter 2 3 - 4 Sindhupalchok 5 - 6 INDIA CHINA Kabhrepalanchok No. of Org Dolakha Sindhuli Ramechhap Education No data No. of Org 1 - 2 Okhaldunga WASH 3 4 - 5 No data 6 - 26 1 Creation date: Glide number: Sources: 2 - 3 The boundaries and names shown and the desi 4 - 7 8 - 10 No. of Org 10 July 2015 EQ-2015-000048-NPL Cluster reporting No data No. of Org 1 Nutrition 2 gnations used on this map do not imply offici No data 3 4 1 2 -4 5 - 7 8 - 9 al endorsement or acceptance by the Uni No. of Org Feedback: No data [email protected] www.humanitarianresponse.info 1 ted Nations. 2 3 4 Lalitpur District List of organizations by VDC and cluster Health Protection Shelter and NFI WASH Nutrition EDUCATION VDC name JSI,TLM,UNICEF,WHO The Himalayan Innovative Society Cesvi,LWF FCA Asrang Badikhel UNICEF,WHO AA GNI,HDRVG GNI,OXFAM,UNICEF,Wateraid SDPC GNI Bhardeu JSI,UNICEF,WHO UNFPA HDRVG,LWF,MCC UNICEF SDPC Bhattedanda JSI,TLM,UNICEF,WHO HDRVG,LWF,SDC SDC,UNICEF SDPC RBF Bisangkhunarayan UNICEF IMC,OXFAM,UNICEF SDPC GNI, Restless Bukhel JSI,UNICEF,WHO UNFPA,Women's Rehabilitation Center AKF,HDRVG UNICEF SDPC Restless JSI,UNICEF,UNFPA,WHO CGNN,CWISH,Kopila Nepal ,START Cesvi,HAI,Peace
    [Show full text]
  • Nepal Earthquake Reconstruction Research: Scoping Study
    DELIVERED THROUGH TH E EXPERT ADVISORY CA LL- DOWN SERVICE (EAC D S) L O T B : STRENGTHENING RESILIENCE AND RESPONSE TO CRISES RECONSTRUCTION RESEARCH IN NEPAL IMC WORLDWIDE LENA MICHAELS, JEEVAN BANIYA & NADEEM March 2019 AHMED IMPLEMENTING PARTNER SERVICE IMPLEMENTATI O N B Y IMC WORLDWIDE A DAI CONSORTIUM EXPERT ADVISORY CALL DOWN SERVICE – L O T B STRENGTHENING RESILIENCE AND RESPONSE TO CRISES THE SERVICE Through the Lot B: Resilience service, DAI offers rapid response, high quality support to UK Government and other donors, across a wide range of development and humanitarian challenges. We offer support for risk informed design for development interventions across all sectors; risk and contingency financing; understanding changing systems; and strategic integration of humanitarian action and development. We offer a clear process for users that draws upon a well-established network of relevant expertise provided through over 60 consortium partners. We are able to build strong practical partnerships for rapid and responsive delivery through: A dedicated, easy-to-access Secretariat to manage new enquiries and assure delivery Consistent end-to-end quality assurance A user friendly, customer-oriented outlook A pro-active approach to knowledge sharing and communication A focus on due diligence, efficiency and cost effectiveness ACKNOWLEDGEMENTS AND DISCLAIMER This document has been produced by IMC Worldwide with the assistance of the UK Department for International Development (DFID) contracted through the EACDS Lot B service ‘Strengthening resilience and response to crises’, managed by DAI Europe Ltd. under contract to the UK Department for International Development (DFID). The views expressed in this document are entirely those of the authors and do not necessarily represent DFID’s own views or policies, or those of DAI.
    [Show full text]
  • Thankot-Chapagaon-Bhaktapur 132 Kv Transmission Line Project for the Rural Electrification, Distribution and Transmission Projec
    RESETTLEMENT PLAN THANKOT-CHAPAGAON-BHAKTAPUR 132 kV TRANSMISSION LINE PROJECT for the RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT in NEPAL Nepal Electricity Authority This report was prepared by the Borrower and is not an ADB document. May 2004 NEPAL ELECTRICITY AUTHORITY (AN UNDERTAKING OF HIS MAJESTY’S GOVERNMENT OF NEPAL) TRANSMISSION AND SYSTEM OPERATIONS TRANSMISSION LINE/SUBSTATION CONSTRUCTION DEPARTMENT THANKOT-CHAPAGAON-BHAKTAPUR 132 Kv TRANSMISSION LINE PROJECT RURAL ELECTRIFICATION, DISTRIBUTION AND TRANSMISSION PROJECT (ADB LOAN NO. 1732-NEP: (SF) & OPEC LOAN NO. 825 P) INDEPENDENT ASSESSMENT OF ACQUISITION, COMPENSATION, REHABILITATION PLAN (ACRP) FINAL REPORT Prepared by: Dr. Toran Sharma Mr. Hari P. Bhattarai (Independent Consultants) May 2004 Foreword The independent consultants as per the request of ADB to NEA prepare this Resettlement Plan (RP). This RP is based on the data already collected by NEA and its consultants at different times and the Environmental Impact Assessment (EIA) and ACRP with short Resettlement Plan Reports of the Transmission Line Project, approved by the concerned ministries of HMG and reviewed by ADB. The independent consultants have reviewed all the available reports in the context of ADB Guideline for Resettlement. In the process of independent assessment, the consultants made revisit of the T/L alignment and relocate house structures. Similarly, plant/vegetation and crop inventories have been prepared to assess the losses. Extensive discussion were held with the NEA officials for the development of the resettlement policy framework for the project, taking consideration of the HMG’s rules, regulations and practices and ADB policy on resettlement. The report presented is in the ADB report format and addresses the issues as per the ADB requirement.
    [Show full text]
  • (SAFER/GEO-591 V1.1) User Manual
    The SAFER Borehole Database (SAFER/GEO-591 v1.1) User Manual by C.E.L. Gilder, R.M. Pokhrel & P.J. Vardanega Department of Civil Engineering, University of Bristol December 2019 (version 1.1) Suggested citation: Gilder, C. E. L., Pokhrel, R. M., Vardanega, P. J. (2019). The SAFER Borehole Database (SAFER/GEO-591_v1.1): User Manual, December 2019, v1.1. University of Bristol, Bristol, UK. https://doi.org/10.5523/bris.3gjcvx51lnpuv269xsa1yrb0rw Disclaimer: The opinions, findings, and conclusions or recommendations expressed in this report are those of the authors and do not necessarily reflect the views of the study sponsor(s), project partner(s), data contributor(s) or the University of Bristol. This report and accompanying database do not constitute a design standard or code of practice. This report is for information purposes only and should not be relied upon for any specific purpose. Released under the CC-BY 4.0 Licence (https://creativecommons.org/licenses/by/4.0/) The SAFER Borehole Database (SAFER/GEO-591) User Manual by C.E.L. Gilder, R.M. Pokhrel & P.J. Vardanega Department of Civil Engineering, University of Bristol December 2019 (version 1.1) Document revisions: This document supersedes manual 1.0. Gilder, C. E. L., Pokhrel, R. M., Vardanega, P. J. (2019). The SAFER Borehole Database (SAFER/GEO-591): User Manual, September 2019, v1.0. University of Bristol, Bristol, UK. https://doi.org/10.5523/bris.2d5fji307ihtm28492er663bwf The SAFER Borehole Database – User Manual SAFER/GEO-591 v1.1 Acknowledgements: The authors would like to thank and acknowledge the support received throughout the project.
    [Show full text]