(To Be Published in the Gazette of India, Part-II, and Section 3, Sub-Section (Ii) MINISTRY of ENVIRONMENT and FORESTS
Total Page:16
File Type:pdf, Size:1020Kb
FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project Sri.Ch.C.V.A.Krishna Reddy Gravel Mine. 2 S.No. in the schedule 1(a) 3 Proposed capacity/ area/ length/ Proposed Capacity: 25,000 M3/Annum. tonnage to be handled/ command Area: 0.303 Ha. area/ Lease area/ number of wells to be drilled 4 New/ expansion/ modernization New 5 Existing capacity/ Area etc. Applied area 6 Category of Project i.e. ‘A’ or ‘B’ “B” 7 Does it attract the general No condition? If yes please specify. 8 Does it attract the specific No condition? If yes please specify. 9 Location Plot/ Survey/ Khasra No. 263/2 Village Kapavaram Tehsil Biccavolu District East Godavari. State Andhra Pradesh 10 Nearest railway station/ airport Anaparthy RS – 3 km. along with distance in kms. (Madhurapudi Rajamahendravaram) Airport– 27 km.) 11 Nearest town, city, district Anaparthy – 3 Km. headquarters along with distance in kms. 12 Village panchayaths, Zilla Kapavaram Village, parishad, Municipal Corporation, Biccavolu Mandal, Local body (Complete postal East Godavari District. address with telephone no’s to be given) 13 Name of the applicant Sri.Ch.C.V.A.Krishna Reddy 14 Registered address 15 Address for Correspondence Sri.Ch.C.V.A.Krishna Reddy Kapvaram Vilage, Biccavolu Mandal, East Godavari District. Name Sri.Ch.C.V.A.Krishna Reddy Designation/Owner/Partner/CEO) Individual. Address Sri.Ch.C.V.A.Krishna Reddy Kapvaram Vilage, Biccavolu Mandal, East Godavari District. Pin code e-mail [email protected] Telephone no. 9849245999 Fax no. 1 16 Details of Alternative sites No alternative sites are examined. examined, if any location of these sites should be shown on a toposheet. 65 H/13 17 Interlinked projects None 18 Whether separate application of None interlinked project has been submitted? If yes, date of submission Not Applicable If no, reason Not Applicable 19 Whether the proposal involves approval/ clearance under: if yes, details of the same and their None status to be given. (a) The Forest (Conservation) Act, 1980 (b) The Wild Life (Protection) Act, 1972 (c) The CRZ Notification, 1991 20 Whether there is any Government None Order/ Policy relevant/ relating to the site? 21 Forest land involved (hectares) The Q.L Lease does not Comes under forest zone. 22 Whether there is any litigation pending against the project and / or land in which the project is propose to be set up? None (a) Name of the court (b) Case No. (c) Orders/ directions of the court, if any and its relevance with the proposed project. (I) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever S.No. Information/Checklist Yes/No possible) with source of confirmation information data 1.1 Permanent or temporary Yes Topographically the Quarry Lease change in land use, land cover area is plain area. or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No The Q.L.area is plain area. vegetation and buildings? 2 1.3 Creation of new land uses? No 1.4 Pre-construction investigations No Survey completed, Site service e.g. bore houses, soil testing? building will be constructed. 1.5 Construction works? Yes Site service building will be constructed. 1.6 Demolition works? No No constructions exist. 1.7 Temporary sites used for No Local villagers shall be employed construction works or housing of construction workers? 1.8 Above ground buildings, Yes A site service Building will be structures or earthworks constructed within the Quarry including linear structures, cut Lease area. No major construction and fill or excavations work is involved. 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation works? Yes Can be done after completion of Mining Activity. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing Yes Semi Machined open cast processes? Quarrying. 1.14 Facilities for storage of goods Yes Land will be provided for storage or materials? within the Mine premises. 1.15 Facilities for treatment or No The Recovery is 100%. disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing No Not required, local villagers shall be of operational workers? employed. 1.17 New road, rail or sea traffic No Existing roads are sufficient for the during construction or Quarrying activities. No rail line is operation? required. Sea traffic is not applicable. 1.18 New road, rail, air waterborne No Existing roads are sufficient for the or other transport Quarrying activities. No rail line is infrastructure including new or required. altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not required transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not required lines or pipelines? 3 1.21 Impoundment, damming, No Nil culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No None 1.23 Abstraction or transfers of No Water shall be drawn from the local water form ground or surface villages for the purpose of drinking waters? purpose. 1.24 Changes in water bodies or the No The project no way affects the land surface affecting drainage existing drainage pattern/run off. or run-off? Precautions should be taken for dump yard. 1.25 Transport of personnel or No Local people are working for this materials for construction, Quarry. There is no need of operation or decommissioning? transportation for personal. 1.26 Long-term dismantling or No No decommissioning or restoration works? 1.27 Ongoing activity during Yes Increase in dust levels for short decommissioning which could duration have an impact on the environment? 1.28 Influx of people to an area in Yes Local people will be employed in either temporarily or mines. permanently? 1.29 Introduction of alien species? No No alien species will be introduced. 1.30 Loss of native species or No No native species or generic genetic diversity? diversity is lost. The proposed M.L area is slightly elevated and covered with shrubs, bushes and small trees. 1.31 Any other actions? No None 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with S.No. Information/Checklist approximate quantities /rates, confirmation Yes/No wherever possible) with source of information data 2.1 Land especially undeveloped Yes Topographically the Land is plain or Agriculture land (ha) Area. 2.2 Water (expected source & Yes Water requirement will be meet competing users) unit: KLD through tankers from the nearby villages. Requirement of water in the Mine 4 is about 6 M3/day. 2.3 Minerals (MT) Yes 25,000 M3 /Annum. 2.4 Construction material – Yes No major construction work is stone, aggregates, sand / soil involved. A site service building (expected source – MT) will be constructed. 2.5 Forests and timber (source – No No timber is used. MT) 2.6 Energy including electricity No Quarrying Day time only and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources No No other natural resources will be (use appropriate standard used. units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with Information/Checklist approximate quantities /rates, S.No. confirmation Yes/No wherever possible) with source of information data 3.1 Use of substances or No There are no Hazardous materials, which are substances or material is to hazardous (as per MSIHC human health or the environment. rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No The proposed project does not disease or affect disease cause any change to the prevailing vectors (e.g. insect or water factors. borne diseases) 3.3 Affect the welfare of people Yes The Mining Operations will bring e.g. by changing living improvement in the socio-economic conditions? levels in the study area. 3.4 Vulnerable groups of people No Mine workers are likely to get who could be affected by the exposed to dust. Dust masks will project e.g. hospital patients, be provided to all the employees. children, the elderly etc., 3.5 Any other causes No None 5 4. Production of solid wastes during construction or operation or decommissioning (MT/month). Details thereof (with approximate quantities /rates, S.No. Information/Checklist Yes/No wherever possible) with source of confirmation information data 4.1 Spoil, overburden or mine No N/A wastes 4.2 Municipal waste (domestic No No Municipal Waste will be and or commercial generated. wastes) 4.3 Hazardous wastes (as per No No Hazardous waste is anticipated. Hazardous Waste Management Rules) 4.4 Other industrial process No No process wastes are anticipated. wastes 4.5 Surplus product No No Surplus products are envisaged. 4.6 Sewage sludge or other sludge No No Effluent treatment is involved in from effluent treatment the proposed project. 4.7 Construction or demolition No No constructions exist in the wastes proposed mine Lease area. 4.8 Redundant machinery or No Machinery is good working equipment condition will be employed. 4.9 Contaminated soils or other No Soil is almost un existing in the materials area and whatever soil that will be recovered will be stored separately for use in Afforestation.