Total Project Snapshot Report 2013 Legislature TPS Report 60747v1 Agency: Department of Natural Resources Project Title: Project Type: Other Iditarod Trail Easements Project

State Funding Requested: $274,000 House District: Statewide (1-40) Future Funding May Be Requested

Brief Project Description: Secure the necessary, proper easements through negotiation and adjudication processes to create legally defensible public access and to protect the economic viability and revenue contributions to the state by the annual Iditarod and Snowmachine races.

Funding Plan: Total Project Cost: $1,374,000 Funding Already Secured: ($1,100,000) FY2014 State Funding Request: ($274,000) Project Deficit: $0 Funding Details: Total Cost of Project: $274,000

Detailed Project Description and Justification: The Iditarod Trail is a large system of trails and roads consisting of the Iditarod National Historic Trail, the Iditarod Sled Dog Race Route, inter-village travel corridors, Revised Statute 2477 trails, state roads, and numerous local trails and roads. Many of these trails and roads are still in use today. The State of is the largest landowner along this transportation system and manages 2107 miles of trail, 522 of which are on state navigable waters.

The state entered into an agreement, per AS 38.05.027, with the Iditarod Trail Committee (ITC) in 2006 and established the Iditarod Easements Group within the Alaska Department of Natural Resources in 2007. The goal was to identify, protect, and preserve historic, current, and future trail corridors and safety cabins to the extent necessary and practicable on state-managed lands for the use of all Alaskans. A set of criteria was established to prioritize segments of the Iditarod Trail that do not have easements and standards were set for which segments would be adjudicated. To date, state easements and rights-of-way exist on 1,900 miles of trail.

The Iditarod and Iron Dog races provide a financial stimulus to the local economies along the route. Bed tax, food and fuel sales, and tourism revenues along the entire race route are heavily influenced by this annual event. For example, there is a reported recurring boost of over $1 million dollars in annual revenues in both the cities of Wasilla and Nome, which host the Iditarod race beginning and end points, respectively.

The Iditarod Trail Committee funded the project with a combination of private funds and federal grant money through FY13. During the first five years of the project, the State DNR focused on adjudicating case files and preparing decisions for approximately 1,569 miles of the total route. Since 2006, DNR has utilized those funds for two staff--a Natural Resource Specialist III and a Natural Resource Specialist II--to identify and resolve the unique land ownership patterns and competing land use issues that must be addressed before easements can be issued on segments of the trail route.

For use by Co-chair Staff Only: Page 1 Contact Name: Jody Simpson Contact Number: 465-3878 $137,000 Approved 2:01 PM 5/9/2013 Total Project Snapshot Report 2013 Legislature TPS Report 60747v1

Approximately 200 miles of the total route, represented by nearly 100 disconnected segments, remain unresolved. Most of the remaining 200 miles that still require right-of-way adjudication involve regional and village corporation lands. Negotiations with individual private parties must also be undertaken before easements adjoining those private lands can be finalized. Those negotiations, following the priority list, began in FY09. Additionally, the review of approximately 300 miles of older easements that contain hand drawn alignments finalized prior to current mapping standards needs to be completed for the Iditarod Trail. This will require further adjudication work to correct any misalignments, and will assist in resolving current and potential future conflicts.

It is anticipated that DNR will need an additional two years to secure the route with continuous, dedicated easements. This capital budget request would help fund an existing NRSIII position along with some associated costs of doing this work. The NRSIII would assist in the completion of the negotiations and easements and would be available to transition into ongoing management of the established easements if future operating budget funding was secured.

The proposed budget is as follows: Proposed FY14 Budget -- Personnel Services $107,000 Travel $ 17,000 Services $ 9,000 Supplies $ 4,000

Proposed FY15 Budget -- Personnel Services $107,000 Travel $ 17,000 Services $ 9,000 Supplies $ 4,000

Total funding anticipated for completion of this project is: $274,000.

More information on the adjudication project can be found at: http://dnr.alaska.gov/mlw/iditarod/ .

Project Timeline: Fy 2014 and 2015

Entity Responsible for the Ongoing Operation and Maintenance of this Project: Alaska Department of Natural Resources

Grant Recipient Contact Information: Name: Lesli Schick Title: Iditarod Trail Easements Address: 550 W. 7th Avenue, Ste. 900C Anchorage, Alaska 99501 Phone Number: (907)334-2679 Email: [email protected]

For use by Co-chair Staff Only: Page 2 Contact Name: Jody Simpson Contact Number: 465-3878 2:01 PM 5/9/2013 Total Project Snapshot Report 2013 Legislature TPS Report 60747v1 Has this project been through a public review process at the local level and is it a community priority? X Yes No

For use by Co-chair Staff Only: Page 3 Contact Name: Jody Simpson Contact Number: 465-3878 2:01 PM 5/9/2013

Trail

Alaska

Easement

Following

December,

A

ADL

bridge

to

on A

purported

that

completed.

RST-1

in A

need

24°,

RST-1467

RST-1467

section A

CIRI.

Consultation

easements

and

Consultation

private

pre-application

Quiet

thirty

Easements

issues

the

request

222930 their

Iditarod.

Trail

2012

the

18

over

is

next

of

day

Title.

2012.

Quarterly

thirty

land Knik

Consultation a

and

to

property

to

Initiative

trail.

near

Herning

summary

was

Fish

for

cross

notice

Historic

quarter

notify

is

is

back

Additional

to

The

owner

days

continuing

Knik

continuing

Department

a

An

also

Susitna

Creek

meeting

the

Plaintiffs the

meeting

is

Trail

ground

to

Grant

update

to

Division

Iditarod

on

to

sent.

near

of

Report:

not

property.

remove

Department

complete

on

the

verify

Oct

correspondence

Iditarod

subject

#10795954,

Knik

with

occurred

research

the with

The

on

accomplishments

are

between

15 th,

Trail:

Grant

the

obstructions

that

ADL

of

of

October

has State

Cook

proposed

seeking

MTNT

DNR

the

2012.

to

Proposed

status

Mining,

Natural

that

all

named

Trail

222930

pertaining

on

blockage

RST-1

Inlet

has

#1

MTNTI

of

and

for

of

he

a

The

November

0795954

of

was

meeting

Alaska

judgment

through

been

Easements

the

was

Region

the

the

was

18

Doyon

this

Resources

Land

Bridge

Iditarod

land

of

sent

removal.

to

work

Doyon

or

removing

State

quarterly

working

the

easement

sent

this

owner

will

any

Inc

for

to

&

at

14 1h

in Iditarod

December,

requested

Easement.

as

lawsuit.

to

MTNT

Water

be

Fish

Alaska

(CIRI)

easements

and

other

with

a

a

A

contacted

the

held

2012

period

(DNR)

defendant

private

field

has

Creek

DNR Trail

and

the

obstructions

on

RS-2477

Superior

in

been

for

inspection

by

January,

the

Department

of

Easements

Doyon

A

land

to

between

2012

a

DNR

October

local

DNR

Egypt

requested

in

proposed

discuss

Court

route

owner

a

this

on

trail

2013.

Complaint

and

has

will

Mountain

October

Farewell

quarter.

through

of

stating

project,

that

group

would

along

occur

these

been

Law

from

trail is

• •

:itiJ

The

ADL

near

adopted

occupying ADL

provide safety

the The

unsanitary purpose

public

outhouses to

wall

ITC

the

platform

the

ADL

“Cripple”

Iditarod

Poorman

ADL

was

management

submission

has ‘Cripple’

rrau

maintain

during

iditarod public

222930

agreement

Iditarod

received

handed

Puntilla 230023-A

tents

231711

Iditarod

231711 problems

E”:n

recreational

Easement.

and

management

is

state

of

state

Checkpoint

(right),

the

(example

staging

for

conditions,

located

of

Trail

Historic

out

preventing

Cripple

Lake

Trail

2

the

grant

agreement

a

lditarod

easement

Trail

public

surface

outhouses.

is

describes

land

completed

occurring

to

Committee

along

wall

Committee the

for

area

a

use

funding

along

Iditarod

Checkpoint

below),

The

use

between

safety

Sled

cooperative

the applicant

QuiiterIy

and

and

lands

tents,

of

and

the

in

resource

between

stipulations

the

facilities

managing

on

trail

application.

or

Dog

concert

a

for

Trail:

The

safety

potential

ADL

applied

for

1

consistent

State

in

North

shelter platform

RRc?rL

(ITC)

management

the

wall

work

and

Race.

Management

the

use

Ophir

ITC

Skwentna

230023-A

include

DNR

bridge.

damage,

lands;

resource

with

Route

shelters.

initial

shed,

uses

face

for

for

that

Ori.rir wishes

for

by

public

area

with

a

and

and

and

the

the

the

the

to questions

was

at

of

of

permit,

5

1

An to

throLigh

Agreement

Puntilla

application

approved

ADL

2012.

The

third

Mining,

contracts.

event concentrated

surrounding manage plans

.— LAS

G”ci answered.

Idiarod

231711

Director

Lake

28791,

and party

—7= use,

1

and Land

€.r, package

Trail the 22

I stipulations;

CornnhilIaes detailed

7

potentially

on

to of

,I’•

DNR

agreements

public

&

checkpoint

store

December

the

and

Water

area is -

Cripple”

Division

awaiting

in

equipment

information use 2of6

II

the

through and

CliackpainL signed

26 th

and

last

and and

for the

—ii

of to quarter. A land use permit map was completed for LAS 28791 and comments submitted this quarter. The permit decision was signed on December 4th 2012, and has been submitted to the ITCfor signature.

LAS 27840 BLMTripod Storage and Trail Marking The field report and pictures required for the closure of LAS 27840 were submitted by BLM this quarter. A review of the materials submitted noted that the work required to meet the permit stipulations had not been completed. Notification of this and a request for a permit amendment was sent to BLMon December 2012.

• ADL228890 Iditarod Trail A meeting with the Forest Service to review the existing ADL 228890 authorizations occurred November Z on ,7 2012. The meeting was to assist new employees at the agency in determining the status of their easement applications and authorizations, and what materials are still needed from the Forest Service in order for DNR to finalize the easements.

• ADL228890-0 Vagt Lake Trail The traditional access route used by the public to access this area was blocked by the adjacent land owner, the Alaska Railroad, in June 2012. Multiple meetings between DNR and the Forest Service occurred this quarter. The Forest Service is completing a new design of the Vagt Lake Trailhead. Once the designs have been received, DNR can move forward on establishing an easement on State land to allow for legal access to the trailhead and Lower Trail Lake.

• ADL228890-A Iditarod Trail: Nash Road to Mile 12 A meeting between the Iditarod Easements, DNR Surveys and the Chugach National Forest (CNF) surveyor occurred on November st,21 2012. The meeting discussed the draft survey submitted for the Bear Lake Trail. Comments were sent to the CNF. Work will continue in the next quarter on completion of the final survey.

Tiehack Creek now flowing down trail

Substantial flood damage occurred along ADL 228890-A this fall. The Chugach National Forest submitted documentation and details of the damage on October 3l, 2012. The information was required to determine what authorizations from DNR would be needed to begin addressing the extensive damage to this section of trail. Washout hole along ADL 228890-A

!:!Ird Trii Easnis cDLc;JtnIt.;cih Dacmber 2 P.jcr 3 of 6 • ADL226933 Divide Ski Area A field inspection was completed to assist in completing the easement map and documenting any additional survey needs that may be required for this authorization. A draft easement location drawing was completed and submitted for review. Conveyance Documents

The Iditarod Team is continuing to review conveyance documents from the BLM for lands that contain the Iditarod National Historic Trail (INHT)and/or Iditarod Race Route. Work this quarter included:

o A meeting with the Kenai Peninsula Borough representatives to discuss the Iditarod Trail and DNR land the borough may possibly select for future transfer. o A preliminary approval is currently in review for a section of the Palmer Hay Flats. o The final tentative approval was received for the Winner Creek area in Girdwood.

Project Reviews

Multiplepermit and lease applications were reviewed this quarter for possible impacts to the trail system and facilities. Some of the reviews included:

o Pt. MacKenzie Rail Extension Quarterly work on this proposed project included review of the current Iditarod Historic Dog Sledding District, Iditarod easement questions and agency reviews and comments.

o Donlin Gold An agency meeting to discuss the Iditarod Trail and issues associated with the proposed Donlin Mine project occurred on December 11thi, 2012,

o Grant Lake Hydroelectric Project A natural resources studies meeting was held on December 12111, 2012. The meeting detailed the proposed project and the studies scheduled to be completed in 2013 for the FERC review. Consultation on the Iditarod Trail will continue to be a part of this proposed project in 2013.

o Chugach Electric Association CEA was issued a permit in a previous quarter for work near the Iditarod Trail in Turnagain Pass. Unforeseen construction issues changed the project description. An additional review was completed this quarter and maps were created to assist in the Office of History and Archeology review of this project.

o Renewable Energy Grant Reviews Preliminary reviews of the 86 applications for Round VI of the Alaska Energy Authority’s Alternative Energy and Energy Efficiency grants were completed for

Quarter’y Repot Qctosr hrouh 2012

dLarod

Presentations

safety

two

The

Forest.

Iditarod

entities

produced collaborative

The

governments,

2012.

‘Partners

The

Partners

Tra

possible

Director’s

historic

Thompson,

Keileher,

Easements

Minerals

Interior, Iditarod

Blttner,

L-R:

award

award

cabins

Easmeris

and

Historic

DNR’s

Marcllynn

in

primarily

in

Conservation

safety

was

Deputy

President,

Management;

individuals.

impacts

Easements

is

BLM

Conservation

and

work

and

Office.

Supervisor;

private

contribution

Alaska

a

Trail

presented

Anchorage

authorizing

Burke,

cabins

DOI Outreach

because

Secretary;

among

to

Iditarod

Alliance,

Department

for-profit

C)jsrterJv

the

Honor

Lesil

Department

Program

Jaime

The

Award

and

District

diverse Award”

lditarod

was

of

to

Historic

Schick,

Kevin

trail

award

issuing

the

Schmidt

Fapori:

four

BLM

Award

and

adjudicating

Manager;

work

of

has

engagement

of

Keeler,

from

entities Trail

Trail

Alaska

partners:

Natural

Anchorage

the recognizes

nonprofit

OohLer

management

been

along

for

USDA-USFS

Interior,

Alliance;

System.

the

Mike

Department

BLM

outstanding

awarded

Resources,

such

thrcDb

this

Secretary

1,600+

Pool,

the

Acting

and

institutions,

Iditarod

Field

DavId outstanding

important

as

DNR

Comments

Chugach

BLM

agreements

contributions

Dternber,

Assistant

of

the

federal,

miles

Office

Regional

Hayes,

Natural

Acting

NHT

of

achievements

Iditarod

2012

National

transportation

Interior

of

other

Administrator

Secretary,

and

results

Director

2O

Resources,

Department

state,

were

Department

easements,

Manager;

for

2

of

Easement

Chugach

Forest;

nongovernmental

on

an

many

forwarded

that

local

Land

7ge

additional

October

Iditarod

that

Karen

of

Judy

have

corridor.

Rick

partners.

and

and

of

the

S

restoring

National

Project,

of

include

Interior

to

e

been

tribal

18 th

six the

website

decisions,

photographs,

Iditarod

General

U

Current

multiple

quarter

Large

adjudication A

Easements

Alliance

profit

SFWS.

ir[

presentation

for

Website:

Easements

that

format

Information

updates

to

maps

open

photographs

on

the

quarterly

speaks

project

November

maps

along

ITC.

for

and

The

at:

was

schools

results

http://www.dnr.alaska.gov/mlw/iditarod/

on

Large

and

reports,

the

Iditarod

past

made

Quarterly of

behalf

2 gth,

smaller

the

were

format

historic

during

pubHc

factsheets,

2012.

at

Skwentna

Easement of

Rprt.

finalized.

the

handout

maps

the

the

routes

The

notices,

annual

INHT

Iditarod

were

presentation

and

maps

Crossing

Project

in

Centennial

:in also

meeting

general

final

2012

National

of

sent

the

website

Safety

easement

and

updated

c-br

trail

for

information.

to

(2008-2012).

Historic

the

the

system

overviewed

Cabin

contains

Division

2012

the

Iditarod

documents,

Trail)

were

were

Alliance

Please

of

administrative

on

Historic

supplied

Forestry

the

sent

easement

6

(the

see

of6

Iditarod

maps,

to

non

Trail

and

our

this the

Name

Signature

in

correct,

Grantee

See

Attach

any

PROÔRItSS

Less/Ad

Supplies

Construction

Equipment Contractual

Travel

aceordanec

Personnel

FEDERAL

Grant Trail

Project

Deparent

Net

Grantee:

Budget

problems

attached

and

Total

Renibursement

anti

Certification:

additional

Committee

Number:

vance/P

Title

Name:

that

/

Services

this

Tine

Sct

;4ah,

REPOR1

ofNatural

e.rpenthtares

you

quarterly

GRANT

Report

applicable

Item

VP

Alaska

pages

10795954

QJ 1

amy

I

certif

be

Resources,

if

I’

Describe

m4fr.r

have

report FUNDS______

grant

Trails

that

experiencing,

necessary.

Authorized

bee;;

the

agreement

106,481.00

104,236.00

2,245.00

i,bove

Initiative

0.00

utade activities

Division

QUARTERLY

infbtn,ation

fat’

Budget

frI’nS any

ctcnenrs

rite

of

/2/31/12.

which

Grant

foreseen

pt,rpose

and

Mining,

co,;ditio,,s. is

Date

have

Prowatn

true

GRANT

Expenditures

of,

problems,

Land

Report

DNR/DNILW

and

and

occurred

32,300.00

32,300.00

0.00

0.00

&

-

Water

Period

FJNANCL&L

Iditarod

and/or

during

this

any

Date:

Approval:______

Payment Encumbrance

this

Total

October

special Report

RcpurtNurnber:

reporting

REPORT 65,496,00

______

Expenditures

Amount:______

65,496.00

requests

0.00

Period:

0.00

Date

to

December

No:

period.

Grant

i.e.,

Staff

include

to

direct

2012

Final: Use:

_____

Balance

vendor

a

Qyes

40,985.00

discussion

38,740.00

2,245.00

0.00 Funds

_____

payment,

of

LJNo

Grant of

travel

Trail

are The

Major numerous

transportation

522

combination

this

profit

agreements, 2007.

provided The

use

corridors

Historic

Background

• •

Two

Recipient the

Conducted restored

Permits

Management

corporation

Consultations

Recording A

adjudicated.

1,

Iditarod

still

program

of

State

Iditarod

of

consists

889

set

that

Accomplishments

which

location

corridors,

in

all

The

Trail

actively

$808,000

and

of

use

Miles

local of

Alaskans.

and manages

(Don’s

Race

criteria

of

goal

Easements

has Alliance,

of

Alaska

and

of

are

safety

today.

of

system

multiple

and

historic,

data

concurrences

the

of

State

trails

used

older

agreements

been

on

have

of

the

State

Route

Revised

Cabin

multiple

in

2012

was

and

cabins

this

State

is

the

roads, grant

and

and

the

State

easements Funding

Iditarod

trespass

discontinued.

resulted

the

commemorative

Easements,

Group

maps

established

group

Partners

and

that

Iditarod

non-profit

manages

roads.

navigable

largest

private to

money.

owned

navigable

Statute

have

have

the

the

were

Trail

do

for

was

in

investigations

is

td

Aviflage Id

4

Skwentna

or

extent

easements

in

not

Private

Native

Trail

Elim

Regional been to

Cities State

Federal

Many this

property

been

land

and

established

not

Committee,

2,107 that

The

Rights-of-Way

certifications

Conservation

to water. identify,

-

2477

water, have

._

project,

complete.

prioritize

and

completed

Allotment owner

Sled

Corp

managed

speaks

issued

necessary

grant

of

miles

owners.

Crossing

these

race

The

easements,

routes

inter-village

and

being

Dog

protect

source

along

for

within

to

of

on

the

segments

routes),

Iditarod

that

access

Award

safety

routes

trail

date,

multiple

for

and

Race,

behalf

and

granted

non-

and

Safety

complete

misaligned

newly

private

The the

land Appreciation

land

remaining

Key

this

and

were the

an

for

(a

Navigable

practicable

has

Iditarod

additional

cabins

by

and

defense

Alaska

Components

of

next owners

.-_-____-___-_

without preserve

projects

either

of

Cabin).

for

the

the

acquired

lands,

come

Ownership:

the

to

the

State

State

phase

Secretary

historic

built

Historic

Department

older

set

Waters

not

of

Iditarod

for

and

easements), six

along

Iditarod

on

from

determine

historic,

existing

by

recorded

standards

easements

safety

State

review

segments State

-

of

easements

Centennial

trail,

Seward

Remaining

the

Trail Iditarod

two

the now

—----

of

National

this

Trail,

of

Alaska

easements.

current

provided

trail

cabins.

the

of

primary

Alliance.

exist

land,

if

of

Alaska

at

Natural

to

project

to

Trail,

easements

continue

Interior,

system.

including

the

that

(all Nome

projects

for

which

Historic

Partnership

created

Road

and

begin

time

$339,000

sources,

of

the

managed

cross

Resources

is

which

and

future

2,

of

Commission

one

segments

negotiations

to

‘Elim

Trail

i

•BLM

•uSFwS

along

tOT

the

are

authorization

Military

Cities Village

USFS

Private Regional

prior unencumbered

Native

State

a

complete

from

Certificate

in

abut

Iditarod

miles

award

The

lands

needed

(INHT)

review

assistance

in

Allotments

Corp

this

to

a

Corp

January

Iditarod

private

will

village

of

for

GPS,

were

from

with

trail

Trail

trail.

and

the

on

the

be

of

of or

Ongoing

project Alaska.

development

restart

keep The

(10-1874

easements.

Request

inter-village

system,

continuation

this

it

(including

continue

stewardship

at

Funding

and

program

a

travel

phase

later

10-1881).

of

to

is

corridor,

date.

the

running.

this

needed

establish

and

responsibilities

evaluation

The

project

are

The

continue

for

State

familiar

equipment

management

existing

two

is

essential

criteria

funding

(2)

are

trespass

with

grant

existing

essential

has

the

and

is

agreements

to

been

funding

a

investigations

programs,

secure

less

schedules,

DNR

to

purchased

reconciling

expensive

has

positions

this

for

forms,

diminished

vital

existing

background

and

and

within

alternative

inter-viflage

past

templates

access

staff

safety

and

to

the

members

a

assertion

future

research

Division

level

cabins

and

to

travel

ending

uses

processes

where

have

and

corridor

and

of

and

of

the

Mining,

infrastructure

defense

this

only

already

mapping

project

being

that

corridor.

State

Land

completed

is

of

and

used

a

funding

the

standards).

and

symbol

along

trying

existing

for

Water

this

this

the

will

to of

Jules

Jonathan

Leo

Judith

l1ltarod

By:

protecting

Dated

funding,

THEREFORE

oversight

project.

discontinued,

Iditarod rights

and

emphasis

accomplishments,

agreements

National

p’

the

National

advance

Department

Resolution

Rasmussen,

Iditarod

assertion,

Mead,

trails,

“Jona

this

and

Bittner,

WHEREAS,

WHEREAS,

WHEREAS,

Historic

WHEREAS,

WHEREAS,

for

WHEREAS,

Project

WHEREAS,

WHEREAS,

WHEREAS,

Seweil,

the

without

Historic

Historic

to

and

20 th

statehood

Treasurer

the

State

passed

from

a

Trail

knowledge,

of

with

BE

stewardship

President

an trespass

preserving

day

two

Natural

Secretary

staff,

Trail

Vice

Conduct

Recipient

Management

Restoration Iditarod

1,

Sewpll,

IT

interruption

Roads,

the

Trail,

system;

Trail

as

much

of

by

889

established

RESOLVED it

this

the

the

entitlements);

the

DNR

the

the

Alliance

the

evidenced

December,

President

and

Alliance

.4 1 J/

is

the

investigations,

Seward

Miles

Resources

the

Alliance

critical

investment

service

Vice

Iditarod

State appreciation,

and State

important

Iditarod

the

grant

trespass

Race

Iditarod

has

and

role

of

Iditarod

numerous

Iditarod

of

the

President

of

and

IDITAROI)

or

Board is

established

is

agreements

(which

Route

to

positions

funding

by

an

for

is

State

the

a

2012.

that

recognizes

loss

2012

Trail

Historic

Nome

currently

an

signatory

investigations

these

Historic

(DNR)

additional

the

and

work

in

primary

Sled

of

the Alaska

of

and

Trail

Easements,

review

includes,

preservation

is

a

Partners

State

Directors:

Lee

Dale

RichardBurnhatn

Greg

efficiency,

local

will

DNR

facts:

Route

a RESOLUTION

yet

Alliance

(PCN

Dog

Iditarod

Iditarod

the

Trail

large

completed

for

Trail HISTORIC

Poleske

provided

that

to

expire

Trails

of

to

Myers

owner

Bill

trails

of

two

Iditarod

Iditarod

Race

the

future

Alaska

be

(BLM

101874

Alliance

competing

in

but

system

the

Alliance

and

requests

State

Rights-of-Way

completed;

which

Conservation

Comprehensive

and

National Initiative Easements

within

Route,

and

of

is

project

by

access

generations

1986);

for

not

this

to

and

Easement Easements

roads,

owned

of

enjoyment

TRAIL

the

is

provide

will

six

(Alliance)

2012-UI

limited

the

trails

a

inter-village

trail

the

land

PCN

is

existing

Historic statewide

defense

and

grant

safety

year

assist

and with

transitioning

Project.

legislature

safety

system

use

and

Award

ioi88i)

ALLIANCE

funding

and

Project

to,

of

Project,

from

and

Management

the

cabins.

of

requests,

land

requesting

roads

trail

of

Easement

Trail.

general

cabins.

Navigable

the

nonprofit

State

and

existing

the

travel

by

the

Tom

Mike

Dan

managers

has

users,

to

provide to

historic

the

consisting

which

grant

manages

from

continue

Iditarod

continue

managing

management,

resulted

Seavey

resolving

Jensen

corridors,

Tierney

Secretary

Management

the

easements.

Waters

Plan organization

source

an

is

base

Iditarod

funding

and

funded

Easement

Trail

over

this

of

this

for

in

General

over

issues

trail

the

has

exist

Revised

of

proven

the

project

2000

established

Committee;

Trail;

the

by

access

of

Iditarod

been

2,100

groups

Unit

Iditarod

for

the

with

chartered

assistance

Interior.

acquisition

Fund

miles

the Statute

and

miles;

defense

state’s

in

of

and

to and