Author SCDC Other Matters Issue

No specific date for Issue-Other Session details matters cited in Draft Hearings Programme

SCDC’s Response to Inspector’s Matters and Issues

Issue – Other Matters

78. A number of minor changes have been suggested by the Council in response to representations received to the submitted plans. Have these changes now been agreed by the relevant representors?

1.1 Emails seeking respondent’s agreement of minor changes were sent out on the 25- 26th July. The Council has received a number of respondent’s responses as set out below. As at 17th August, most minor amendments have been agreed and can be viewed in Tables 2 and 3 below.

1.2 Table 1: However, 2 stakeholders: Anglian Water (AW) and the Environment Agency (EA) had suggested alternative forms of wording with regards to 3 sites: SPP5- , SSP8- and SPP11-Orford.

1.3 As of 18th Aug, based on updated information EA has confirmed that WRC Gedgrave which serves the Orford site is operating within its Environmental Permit limits and therefore sufficient capacity has been identified to facilitate delivery of the Orford site of 10 units. The EA would still like to see a policy which requires developers to demonstrate there is capacity at the Gedgrave works before they gain planning permission be inserted. Dialogue with both stakeholders is ongoing to develop a position statement which will help developers as and when their sites come forward.

1.4 Regarding WRC , the EA have confirmed that the amount that Anglian Water is operating above the limits of its Environmental Permit has fallen to 289 houses from the previously stated figure of 1,740. Dialogue with both stakeholders is ongoing to develop a position statement which will help developers as and when their sites come forward.

Table 1: Site Allocations and Area Specific Allocations DPD: Stakeholders Anglian Water and the Environment Agency engaged in ongoing discussions to develop a position statement. POLICY / WHO HAS SUGGESTED MINOR CHANGE MINOR CHANGE AGREED? PARA SUGGESTED CHANGE NO. CHANGE AFFECTS THE SA? 1. HOUSING Para Environment Foul water from Badingham discharges to Water No Form of wording 2.49 Agency Recycling Centre (Framlingham) which is currently suggested by (4195/7833); not complying with its environmental permit. Anglian Water is Additional growth should not be permitted until the acceptable to the

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 1

ISSUE Other Matters/SCDC

water company have undertaken upgrades at this Council. The site, or demonstrated they are feasible and Environment provided a timescale for their delivery. Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16) SSP5 Environment New bullet point No Form of wording Agency  Prior to permission being granted, suggested by (4195/7833) developers will need to demonstrate that Anglian Water is there is adequate capacity at acceptable to the Framlingham Sewage Treatment Works or Council. The that capacity can be made available. Environment Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16) SSP5 Anglian New bullet point No Form of wording Water  Confirmation of adequate capacity within suggested by (follow up environmental consents at receiving Anglian Water is email Water Recycling Centre (Framlingham) acceptable to the 20.07.16) should be confirmed before development Council. The connects. Environment Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16) Para Anglian Foul water from Dennington discharges to Water No Form of wording 2.65 Water Recycling Centre (Framlingham) which is currently suggested by

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 2

ISSUE Other Matters/SCDC

(follow up not complying with its environmental permit. Anglian Water is email Anglian Water has an obligation to provide acceptable to the 20.07.16) treatment to developments with the benefit of Council. The planning consent and shall take the necessary Environment steps to ensure that this is the case. Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16) Para Environment Foul water from Dennington discharges to Water No Form of wording 2.65 Agency Recycling Centre (Framlingham) which is currently suggested by (4195/7834); not complying with its environmental permit. Anglian Water is Additional growth should not be permitted until acceptable to the the water company have undertaken upgrades at Council. The this site, or demonstrated they are feasible and Environment provided a timescale for their delivery. Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16) SSP8 Anglian New bullet point No Form of wording Water  Confirmation of adequate capacity within suggested by (follow up environmental consents at receiving Anglian Water is email Water Recycling Centre (Framlingham) acceptable to the 20.07.16) should be confirmed before development Council. The connects. Environment Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16)

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 3

ISSUE Other Matters/SCDC

SSP8 Environment New bullet point No Form of wording Agency  Developers will need to demonstrate that suggested by (4195/7834); there is adequate capacity at Anglian Water is Framlingham Sewage Treatment Works or acceptable to the that capacity can be made available Council. The Environment Agency has suggested an alternative form of wording. Dialogue ongoing to find definitive form of wording re WRC Framlingham. (from latest email 18.08.16) Para Environment Development of this site may require No Capacity concerns 2.86 Agency improvements to the sewerage treatment at WRC Gedgrave (4195/7835) capacity. Foul water from Orford discharges to now resolved. Gedgrave Sewage Treatment Works which is Dialogue ongoing currently not complying with its environmental to find definitive permit. The extent of any improvements will need form of wording to be assessed through discussion between the re WRC developer and Anglian Water ahead of any Gedgrave. (from planning application being submitted to the District latest email Council. 18.08.16) Para Anglian Confirmation of adequate capacity within No Capacity concerns 2.86 Water environmental consents at receiving Water at WRC Gedgrave (follow up Recycling Centre (Gedgrave) and within the foul now resolved. email network should be confirmed before Dialogue ongoing 20.07.16) development connects. to find definitive form of wording re WRC Gedgrave. (from latest email 18.08.16) SSP11 Anglian Amend bullet point 7 No Capacity concerns Water  Confirmation of adequate capacity within at WRC Gedgrave (follow up environmental consents at receiving now resolved. email Water Recycling Centre (Gedgrave) should Dialogue ongoing 20.07.16) be confirmed before development to find definitive connects: and form of wording re WRC Gedgrave. (from latest email 18.08.16)

SSP11 Environment Amend bullet point 7 Capacity concerns

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 4

ISSUE Other Matters/SCDC

Agency at WRC Gedgrave (follow up  Prior to permission being granted, now resolved. email developers will need to demonstrate that Dialogue ongoing 20.07.16) there is adequate capacity at Gedgrave to find definitive Sewage Treatment Works or that capacity form of wording can be made available. re WRC Gedgrave. (from latest email 18.08.16)

Table 2: Site Allocations and Area Specific Allocations DPD: Minor amendments agreed POLICY / WHO HAS SUGGESTED MINOR CHANGE MINOR CHANGE AGREED? PARA SUGGESTED CHANGE NO. CHANGE AFFECTS THE SA? 2. HOUSING Table 2 Amend reference to Peasenhall to read No No response at PC “Peasenhall (with part of ) 17.08.16 (3932/7945) Para Armstrong This site to the rear of…….would need to be No Replacement text 2.36 Rigg Planning widened to bring it up to standard. . Land to the suggested and (3897/7727) west of the track is in the ownership of the agreed 01.08.16 Golf Club who have confirmed their willingness to facilitate that widening. Furthermore improvements to this junction would also meet with their aspirations to provide a safer junction at this point. The access track forms the western boundary beyond which is open countryside.

2.36 This site to the rear of Rose Hill is 3ha in size. It is fairly regular in shape with adjacent low density residential development on three sides. The site is accessed via a track running north direct onto Road which would need to be widened to bring it up to standard. Land to the west of the track is in the ownership of the Aldeburgh Golf Club who have confirmed their willingness to facilitate that widening. Furthermore improvements to this junction would also meet with their aspirations to provide a safer junction at this point. The access track forms the western boundary beyond which is open countryside.

Para Anglian Anglian Water has indicated confirmed that NO Minor 2.46 Water surface water disposal should be in accordance amendment (483/7751) with the water management hierarchy. This may agreed. 27.07.16 include the use of soakaways or other forms of sustainable drainage systems.

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 5

ISSUE Other Matters/SCDC

SSP4 Anglian Amend bullet point 8 NO Minor Water Improve the capacity of the sSurface water amendment (483/7752) disposal must be network in accordance with the agreed. 27.07.16 water management hierarchy; Para Anglian Anglian Water have confirmed that surface water No Minor 2.49 Water network capacity would need to be increased as amendment (483/7753); part of any scheme. Surface water management is agreed. 27.07.16 the responsibility of the County Council as Lead Local Flood Authority. Any development scheme will therefore be expected to ensure that the management of surface water run-off is undertaken in accordance with the surface water management hierarchy. Para Anglian Anglian Water have confirmed that the surface No Minor 2.56 Water water network capacity would need to be amendment (483/7754) increased. Surface water management is…” agreed. 27.07.16 SSP6 Anglian Amend bullet point 5 No Minor Water The need to increase the sSurface water network amendment (483/7755) capacity disposal must be in accordance with the agreed. 27.07.16 water management hierarchy; and

Para Anglian Amend first sentence to read No Minor 2.65 Water Anglian Water have has indicated confirmed that amendment (483/7756); the surface water network capacity would need to agreed. 27.07.16 be increased. Surface water management is the responsibility of the County Council as Lead Local Flood Authority. Any development scheme will therefore be expected to ensure that the management of surface water run-off is undertaken in accordance with the surface water management hierarchy.

SSP8 Anglian Amend bullet point 6 No Minor Water  The need to increase the capacity of the amendment (483/7757); surface water network Surface water agreed. 27.07.16 disposal must be in accordance with the water management hierarchy.

SSP9 Anglian Amend final bullet point No Minor Water  As required, to increase the capacity of the amendment (483/7758) surface water network in accordance agreed. 27.07.16 Surface water disposal must be in accordance with the water management hierarchy Para Anglian In terms of physical constraints, the allocation site No Minor 2.78 Water is not subject to any identified constraints other amendment (483/7759) than Anglian Water identifying a need to increase agreed. 27.07.16 the surface water network as part of the scheme.

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 6

ISSUE Other Matters/SCDC

Any development scheme will therefore be expected to ensure that the management of surface water run off is undertaken in accordance with the surface water management hierarchy….” SSP10 Anglian Add bullet point No Minor Water  Surface water disposal must be in amendment (483/7760) accordance with the water management agreed. 27.07.16 hierarchy. Para Anglian Surface water disposal must be in accordance No Minor 2.86 Water with the water management hierarchy. amendment (483/7761); agreed. 27.07.16 SSP11 Anglian Amend final bullet point No Minor Water  The need to increase the capacity of the amendment (483/7762) surface water network in accordance with agreed. 27.07.16 the water management hierarchy  Surface water disposal must be in accordance with the water management hierarchy.

SSP13 SCDC Add to end of policy No Agreed with (2963/7830) 'In addition, the air quality impacts of traffic from submitted cumulative development at Melton crossroads comments and the Air Quality Management Area declared in attached to SSP24 Woodbridge will need to be investigated in the as well. 28.07.16 form of an Air Quality Assessment, together with a mitigation appraisal.' New Historic The site lies in close proximity to the Conservation No Amendments paragra Area and listed buildings. As such, development agreed. 09.08.16 ph after (4189/7786) of the site will need to preserve and enhance the 2.118 & SCDC character and setting of the Conservation Area move and listed buildings para 2.120 to follow SSP15 Anglian No Minor Water Amend final bullet point amendment (483/7763);  Developers will need to address a agreed. 27.07.16 significant off-site sewerage requirement to provide foul water connections. Risks posed by septicity of pumped connection will be addressed. A foul drainage strategy will need to be approved and implemented prior to the development connecting to the sewerage system. SSP15 Historic Amend first bullet point to read: No Amendments England  The design and layout should be of high agreed. 09.08.16 (4189/7786) quality, responding to the sites location in an Area of Outstanding Natural Beauty; the sites relationship with the Conservation Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 7

ISSUE Other Matters/SCDC

Area and being sympathetic to the setting of nearby listed buildings and preserving and enhancing the character and setting of the Conservation Area, and listed buildings;

2.134; Environment A drain crosses…….The Environment Agency have No Amendments (same Agency confirmed that if development is to take place on agreed. 17.08.16 factual (4195/7837) 1ha or more, then a flood risk assessment will be correcti required. Anglian Water…” on Note this is standard text across numerous 2.131) policies . The same modification should be applied to each. SSP13 SCDC Add to end of policy No Agreed. (2963/7830 'In addition, the air quality impacts of traffic ) from cumulative development at Melton crossroads and the Air Quality Management Area declared in Woodbridge will need to be investigated in the form of an Air Quality Assessment, together with a mitigation appraisal.' 3. ECONOMY Para Evolution Suffolk Coastal contains a legacy of former airfields No Amendment 3.15 Town – Parham, and (Bentwaters agreed. 03.08.16 Planning Park). They are large, part brownfield sites in the (3055/8031 countryside. which are generally poorly related to & the main road network in the district. They are 3055/8036); located on or close to the zone distributor lorry SCDC route network as set out in the Suffolk Lorry Route Network.. Over time, a number of the buildings have been re-used or re-developed…” SSP21 Anglian Add new bullet point No Minor Water  A drainage strategy is approved and amendment (483/7764) implemented before development agreed. 27.07.16 proceeds. SSP22 Anglian Add new bullet point No Minor Water  A drainage strategy is approved and amendment (483/7765) implemented before development agreed. 27.07.16 proceeds. Para Evolution Anglian Water have advised that development of No Amendment 3.25 Town this site may require a new sewage treatment agreed. 03.08.16 Planning facility. This should be discussed between the (3055/8037) developer and Anglian Water ahead of any relevant planning application being submitted to the Council. Para Evolution Any relevant development proposals should No Awaiting 3.26 Town include a desk-based assessment to identify response from Planning potential impacts on heritage assets.and historic Evolution

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 8

ISSUE Other Matters/SCDC

(3055/8038); asset assessment of the buildings to be affected, 19.08.16 SCDC particularly if buildings survive relating to military useArchaeological investigation may be required at an appropriate stage in the development process, depending on the nature of the proposals. SSP23 Anglian Add new bullet point No Minor Water  A drainage strategy is approved and amendment (483/7766) implemented before development agreed. 27.07.16 proceeds where necessary.

SSP23 Evolution  Amend 3rd bullet point No Amendment Town Where necessary investigation of potential agreed. 03.08.16 Planning contamination at the site has been undertaken (3055/8039) prior to submission of any relevant planning application. SSP23 Evolution Also amend 4th bullet point to read “Where No Amendment Town necessary adequate sewage treatment…” (this agreed. 03.08.16 Planning ties the policy to the wording in para 3.25 which (follow up was amended to include the word ‘relevant’ in email respect of potential sewage matters.) 03.08.16)

SSP23 Evolution Also delete bullet point 5 about heritage assets No Awaiting Town unless you can explain which assets you are response re bullet Planning concerned about? point 5 from (follow up Evolution email 19.08.16 03.08.16) Para Evolution Anglian water have advised…..the developer and No Amendment 3.32 Town Anglian Water ahead of any relevant planning agreed. 03.08.16 Planning application…” (3055/8032) Para Evolution The Council has recently granted planning …..A No Amendment 3.34 Town new footpath/bridleway access from Rendlesham agreed. 03.08.16 Planning into the adjoining countryside, opening up access (3055/8033) for residents of Rendlesham is to be provided as part of alongside these proposals" Para Evolution The following policy is designed to support the No Amendment 3.35 Town recently agreed planning application recent agreed. 03.08.16 Planning planning permission and to support the longer (3055/8034) term use of the site through the plan period SSP24 Evolution Missing from this table - 3x amendments to SSP24 No These Town submitted at soundness stage: amendments to Planning  Insert words ‘and infrastructure’ after be addressed in (follow up ‘building sizes and types’. hearing

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 9

ISSUE Other Matters/SCDC

email  Delete words ‘but that it does so within statements. 03.08.16) the identified constraints as set out in the agreed comprehensive plan for the site (planning application ref C/10/3239). Accordingly the Council will support’.  Insert instead ‘Planning permission will be granted’ before ‘new employment uses’ and afterwards insert ‘including those in Use Classes B1, B2 and B8’.

SSP26 SCC – Park as identified …. capacity can be No SCDC Agreed Archaeology made available. An archaeological investigation amendments (2442/7907) may be required depending on the nature of the 17.08.16 groundworks. SSP27 SCC – Add new bullet point No SCDC Agreed Archaeology  An archaeological investigation may be amendments (2442/7908) required depending on the nature of the 17.08.16 groundworks.” Para Barton “The Garden Suburb is a significant urban No Amendments 6.08 Wilmore extension to Ipswich which will provide up to 2,700 agreed. 28.07.16 (3746/8027) 3,500 new homes, supported by new…..” Policy SCC Two parcels of land…..Mill Farm and its setting No SCDC Agreed SSP35 (2442/7909) which is a listed building. An archaeological amendments investigation may be required dependent on the 17.08.16 nature of the groundworks involved." Para Rushmere St This policy updates replaces Local Plan ‘saved’ No No response as of 6.13 Andrew PC Policy AP228…..” 17.08.16 (502/7850) SSP24 SCDC Bentwaters Park is identified…….Accordingly No Agreed. Environmen the Council will support new employment uses tal where they will not breach site and highway Protection constraints (including air quality) identified (2963/7831 and conditioned….” ); and SCDC 4. ENVIRONMENT Para SCC Suffolk Coastal has a rich, diverse and dense No SCDC Agreed 7.08 (2242/7970) archaeological landscape with the river valleys, in amendments particular, topographically favourable for early 17.08.16 occupation of all periods. There are over 7,300 sites of archaeological interest currently recorded in the Suffolk Historic Environment Record for the district. The distinctive character of the historic environment in the District includes upstanding outstanding coastal archaeology of all dates. SSP37 Historic Within the plan area…..interest compiled by No Amendments England English Heritage Historic England and have the agreed. 09.08.16 (4189/7794) status as Designated Heritage Assets:…” 5. DELIVERY AND

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 10

ISSUE Other Matters/SCDC

MONITORING SSP7 Amend to read No Amendments Parish Parish Council Darsham Village Hall Trust agreed. 26.07.16 Council (4179/7737)

Table 3: Felixstowe Peninsula AAP DPD: Minor amendments agreed POLICY / WHO HAS SUGGESTED MINOR CHANGE MINOR CHANGE PARA SUGGESTED CHANGE AGREED? NO. CHANGE AFFECTS THE SUSTAINABILI TY APPRAISAL? 1. HOUSING FPP3 Anglian “Improving the capacity of the foul No Minor Water sewerage network Confirmation of amendment (483/7767) adequate capacity in the foul sewerage agreed. network or action to upgrade to create 27.07.16 the required capacity." New para Amec Foster National Grid have identified that the site No Amendment to be Wheeler on is in close proximity to IP/HP s agreed added behalf of (intermediate pressure pipelines and high 26.07. 16 after 3.73 National Grid pressure pipelines) gas distribution (4184/8011) apparatus which any future development will need to take into account. National Grid wishes to be involved in the preparation, alteration and review of plans and strategies which affect their assets to ensure the continued safe operation of existing sites and equipment. 3.74 Suffolk Suffolk County Council require an No SCDC agreed County archaeological assessment excavation to amendments Council be undertaken prior to any future 17.08.16 (2442/7914) development of this area. A brief for the work and the options for preservation of any findings is to be agreed with Suffolk County Council. FPP4 – Amec Foster "Consideration of the IP / HP apparatus No Amendment new Wheeler on crossing the site." s agreed bullet behalf of 26.07. 16 point. National Grid (4184/8011) 3.81 Anglian “The capacity of the foul sewerage No Minor Water network is a constraint that needs to be amendment (483/7773) overcome to the satisfaction of Anglian agreed. Water. Issues in respect of surface water 27.07.16 management will have to be overcome to Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 11

ISSUE Other Matters/SCDC

the satisfaction of in partnership with Suffolk County Council who have a statutory responsibility for surface water management.” 3.82 Suffolk Suffolk County Council have therefore No SCDC agreed County highlighted that the need for an amendments Council archaeological assessment is to be 17.08.16 (2442/7915) undertaken prior to the development on this site at an appropriate design stage prior to the granting of outline, technical details or full planning permission. FPP5 Anglian “Improving the capacity of the foul No Minor Water sewerage network Confirmation of amendment (483/7768) adequate capacity in the foul sewerage agreed. network or action to upgrade to create 27.07.16 the required capacity." 3.94 Suffolk An archaeological assessment will be No SCDC agreed County required prior to any future development amendments Council on this site at an appropriate design stage 17.08.16 (2442/7916) prior to the granting of outline, technical details or full planning permission. FPP6 Anglian “Improving the capacity of the foul No Minor Water sewerage network Confirmation of amendment (483/7769) adequate capacity in the foul sewerage agreed. network or action to upgrade to create 27.07.16 the required capacity." FPP6 Historic “Development will need to be high quality No Amendment England and sympathetic to the setting of the area s agreed. (4189/7808) and existing Listed Buildings” 09.08.16 3.101 Suffolk Suffolk County Council require an No SCDC agreed County archaeological assessment to be amendments Council undertaken at an appropriate stage prior 17.08.16 (2442/7917) to the granting of outline, technical details or full planning permission. prior to any future development of this area. 3.109 Suffolk An archaeological assessment will need to No SCDC agreed County be undertaken at an appropriate design amendments Council stage prior to the granting of outline, 17.08.16 (2442/7918) technical details or full planning permission which will allow archaeological..… FPP8 Historic Development will need to be high quality No Amendment England and sympathetic to the setting of Mill s agreed. (4189/7810) Farmhouse. 09.08.16 2. EMPLOYMENT FPP10 Anglian “Improving the capacity of the foul No Water sewerage network Confirmation of Minor (483/7770) adequate capacity in the foul sewerage amendment network or action to upgrade to create agreed. 27.07.16

Suffolk Coastal Local Plan Site Allocations and Area Specific Policies Development Plan Document Felixstowe Peninsula Area Action Plan Joint Examination 2016 12

ISSUE Other Matters/SCDC

the required capacity." FPP11 Anglian “Improving the capacity of the foul No Minor Water sewerage network Confirmation of amendment (483/7771) adequate capacity in the foul sewerage agreed. network or action to upgrade to create 27.07.16 the required capacity." New para Amec Foster National Grid have identified that the site No Amendments to be Wheeler on is in close proximity to IP/HP agreed. 26.07. 16 added behalf of (intermediate pressure pipelines and high after 4.29 National Grid pressure pipelines) gas distribution (4184/8012) apparatus which any future development will need to take into account. National Grid wishes to be involved in the preparation, alteration and review of plans and strategies which affect their assets to ensure the continued safe operation of existing sites and equipment. FPP12 – Amec Foster "Consideration of the IP / HP apparatus No Amendment new Wheeler on crossing the site." s agreed. bullet behalf of 26.07. 16 point National Grid (4184/8012) FPP12 Anglian “Improving the capacity of the foul No Minor Water sewerage network Confirmation of amendment (483/7772) adequate capacity in the foul sewerage agreed. network or action to upgrade to create 27.07.16 the required capacity." 3. RETAIL

4. TOURISM AND SEA FRONT 6.03 Suggested by Felixstowe’s heritage has a positive No Amendment Historic contribution on to tourism in the area s agreed. England which the AAP will seek to protect and 09.08.16 (4189/7815) retain. FPP24 SCDC "Proposals will normally be expected in sea No Agreed. Economic front locations but may also be welcomed Services in other locations across the Felixstowe (4218/8005) Peninsula such as the town centre...."