STATE OF Kathleen Babineaux Blanco, Governor

DEPARTMENT OF NATURAL RESOURCES Scott A. Angelle, Secretary

OFFICE OF COASTAL RESTORATION AND MANAGEMENT Gerald M. Duszynski, Acting Assistant Secretary

COASTAL RESTORATION DIVISION William K. “Kirk” Rhinehart, Administrator

COASTAL ENGINEERING DIVISION Christopher P. Knotts, P.E., Director

Acknowledgments: The authors would like to thank Kenneth Bahlinger, Michael Beck, Karim Belhadjali, George Boddie, Gabrielle Bodin, Agaha Brass, Gay Browning, David Burkholder, Maury Chatellier, Jammie Favorite, Chet Frugé, Ed Haywood, John Hodnett, Helen Hoffpauir, Herbert Juneau, Luke LeBas, Keith Lovell, Brad Miller, Amanda Phillips, Cynthia Poland, Jonathan Porthouse, Rick Raynie, Chris Robertson, Rudy Simoneaux, Shane Triche, and John Truxillo for providing supporting data and information; Christina Hebert and Karen Eldridge for graphical assistance; Phyllis Darensbourg, Gerry Duszynski, Chris Knotts, Kirk Rhinehart, and Diane Smith for editorial review.

Suggested Citation: Hill, S. M. and M. M. Green. 2005. Coastal Restoration Annual Project Reviews: December 2005. Louisiana Department of Natural Resources, Baton Rouge, LA. 95 pp.

This public document was published at a total cost of $5,000.00. One thousand copies of this public document were published in the first printing at a cost of $5,000.00. The total cost of all printing of this document, including reprints, is $5,000.00. This document was published by the Louisiana Department of Natural Resources, P.O. Box 44027, Capitol Station, Baton Rouge, LA 70804-4027 in accordance with the standards for printing by state agencies established pursuant to R.S. 43:31.

The purpose of this document is to provide interested parties with easily accessible information about projects constructed to date and the current efforts to address Louisiana’s coastal land loss problem. The information contained in this report is current through November 2005. For more detailed information on these projects, or other relevant efforts visit our website at www.dnr.louisiana.gov/crm, call 1-888-459-6107, or write to the Department of Natural Resources, Coastal Restoration Division, P.O. Box 44027, Capitol Station, Baton Rouge, Louisiana 70804-4027.

TABLE OF CONTENTS

List of Figures……………………………………………………………………………………..ii

List of Tables……………………………………………………………………………………...ii

Acronyms…..…………………………………………………………………………….……….iii

An Introduction to Coastal Restoration in Louisiana…………….……….……….....….…….…...1

Region 1……………………………………………………….……….….……..…….…..…...... 13 Introduction………………………………………………………………………………13 Project Summaries………………..……………….………………………………...……14

Region 2………………………………………………………………………………………….25 Introduction………………………………………………………………………………25 Project Summaries……………………………………………………………………….26

Region 3…………………………………………………………………………………………..46 Introduction………………………………………………………………………………46 Project Summaries………………………………………………………………………..47

Region 4…………………………………………………………………………….…………….69 Introduction………………………………………………………………………………69 Project Summaries………………………………………………………………………. 70

Conclusions………………………………………………………………………….…………...95

LIST OF FIGURES

1. Coastal Louisiana land change (square miles/year) by hydrologic basin from 1990-2000 ..…………………………………………………………………...1

2. Land loss rate in Louisiana coastal plain………………………………………………….2

3. Paths of Hurricanes Katrina and Rita…………………………………………………….12

4. Location of Breaux Act projects authorized in Coast 2050 Region 1………………..….15

5. Location of State, PCWRP, Vegetation, Section 204/1135, FEMA and Other projects in Coast 2050 Region 1…………………………………………………………16

6. Location of Breaux Act projects authorized in Coast 2050 Region 2 …………………..28

7. Location of State, PCWRP, Vegetation, Section 204/1135, WRDA, and Other projects in Coast 2050 Region 2 …………………………...…………………………... 29

8. Location of Breaux Act projects authorized in Coast 2050 Region 3…………………...48

9. Location of State, PCWRP, Vegetation, Section 204/1135, FEMA, and Other projects in Coast 2050 Region 3………………………………..………….…49

10. Location of Breaux Act projects authorized in Coast 2050 Region 4…………………...71

11. Location of State, PCWRP, Vegetation, and Section 204/1135 projects in Coast 2050 Region 4…………………………………………………………72

LIST OF TABLES

1. Restoration projects completed or pending in Coast 2050 Region 1…………………….17

2. Restoration projects completed or pending in Coast 2050 Region 2…………………….30

3. Restoration projects completed or pending in Coast 2050 Region 3…………………….50

4. Restoration projects completed or pending in Coast 2050 Region 4…………………….73

5. Coastwide restoration projects and programs……………………………………………90

6. Status of all authorized Breaux Act projects……………………………………….....….91

7. Summary of all constructed/implemented coastal restoration projects …………..…..….91

8. Fifteen critical LCA projects and large-scale studies.….…………………….…….....…..92

9. Inactive state projects for which no funding exists...…………………………………….93

ii ACRONYMS

BBBS Barataria Basin Barrier Shoreline BBWW Barataria Bay Waterway CED Coastal Engineering Division CFS Cubic Feet Per Second CIAP Coastal Impact Assistance Program CRD Coastal Restoration Division CREST Coastal Restoration and Enhancement through Science and Technology CRMS Coastwide Reference Monitoring System CWPPRA Coastal Wetlands Planning, Protection and Restoration Act EPA Environmental Protection Agency FEMA Federal Emergency Management Administration GIS Geographic Information System GIWW Gulf Intracoastal Waterway LCA Louisiana Coastal Area LDAF Louisiana Department of Agriculture and Forestry LDNR Louisiana Department of Natural Resources LDWF Louisiana Department of Wildlife and Fisheries LSU Louisiana State University MRGO Gulf Outlet NEPA National Environmental Policy Act NMFS National Marine Fisheries Service NOAA National Oceanic and Atmospheric Administration NRCS Natural Resources Conservation Service NWRC National Wetlands Research Center OCRM Office of Coastal Restoration and Management OCS Outer Continental Shelf PCWRP Parish Coastal Wetlands Restoration Program PPL Priority Project List SONRIS Strategic Online Natural Resources Information System SSPM Mississippi River Small-Scale Physical Model SWCC Soil and Water Conservation Committee SWCD Soil and Water Conservation Districts TPCG Terrebonne Parish Consolidated Government USACE United States Army Corps of Engineers USFWS United States Fish and Wildlife Service USGS United States Geological Survey WRDA Water Resources Development Act

iii AN INTRODUCTION TO COASTAL RESTORATION IN LOUISIANA

Figure 1. Coastal Louisiana land change (square miles/year) by hydrologic basin from 1990-2000 (Barras et al. 20031).

OVERVIEW infrastructure valued at $90-100 billion at Since the 1930s Louisiana has lost risk. over 1,900 square miles of land. Between Responding to the crisis at hand, the 1990 and 2000 wetland loss was State of Louisiana has initiated a series of approximately 24 square miles per year programs to offset the catastrophic loss of (Figures 1 and 2). At this rate, an area the coastal wetlands. The Louisiana State and size of a football field is lost every 38 Local Coastal Resources Management Act minutes. Currently, Louisiana has 30% of was passed in 1978 to regulate the the total coastal marsh and accounts for 90% developmental activities that affect wetland of the coastal marsh loss in the lower 48 loss. The resulting Louisiana Coastal states. Resources Program became a federally The causes of wetland loss are approved coastal zone management program complex and vary across the state. They can in 1980. Additionally, the Louisiana be attributed to both natural processes (e.g., Legislature passed Act 6 of the second subsidence and storm events) and human extraordinary session of 1989 (R.S. 49:213- activities (e.g., levee and canal 214), and a subsequent constitutional construction). Wetlands not only provide amendment which created the Coastal recreation (e.g., sport fishing and hunting, Restoration Division (CRD) within the photography, and bird watching), but also Louisiana Department of Natural Resources ecological benefits such as hurricane (LDNR), as well as the Wetlands protection, water quality improvement, Conservation and Restoration Authority storm surge reduction, and resource (Wetlands Authority). Act 6 also production. If this trend of wetland loss in established the Wetlands Trust Fund, which Louisiana continues, it puts vital provides revenues derived from oil and gas

1 activities to wetland restoration efforts in Activities on the overall status and direction Louisiana. of the state’s coastal restoration program, while fostering cooperation on coastal 45 preservation and restoration issues among 40 federal, state, and local governmental 35 agencies, conservation organizations, and 30 the private sector. 25 20 Coastal Protection and Restoration 15 Authority

Land Loss (sq. miles) 10 In the wake of the devastation caused 5 by Hurricanes Katrina and Rita, it became 0 apparent that coastal restoration and coastal 1940 1950 1960 1970 1980 1990 2000 Year protection (e.g., levees) must work together. Figure 2. Land loss rate in Louisiana coastal plain (Barras In the First Extraordinary Session, 2005 of et al. 20031 and Dunbar et al. 19922) the Louisiana Legislature, which ended on November 22, 2005, Senate Bill No. 71 (Act In August 2003, the Coastal No. 8) overwhelmingly passed. The bill Restoration Division went through an provides for a new 16-member panel, called administrative reorganization and was the Coastal Protection and Restoration subsequently divided into the Coastal Authority, which is a broader version of the Restoration Division and the Coastal previous board that was named the Wetlands Engineering Division (CED). The CRD is Conservation and Restoration Authority. comprised of the Restoration Technology The new panel will include the top official, Section, the Land Section, the Planning or a designee, of the state departments of Section, and the Monitoring Section. The Transportation, Natural Resources, Wildlife CED is comprised of the Project and Fisheries, Economic Development, Management Section, the Engineering and Agriculture, and Insurance. Three other Design Section, and the Field Engineering members will represent 12 levee districts in Section. the state's coastal zone. Other members Act No. 114 of the Louisiana State include the governor's aide for coastal Legislature created the Governor’s Advisory issues, two members picked by the Police Commission on Coastal Restoration and Jury Association for parishes in the coastal Conservation during the First Extraordinary zone that have no levee districts, and the Session of 2002. The 31-member director of the State Office of Homeland commission represents statewide Security. stakeholders. The purpose of the In addition, Senate Bill No. 71 also Commission is to advise the Governor and provides for the establishment of the Coastal the Executive Assistant for Coastal Protection and Restoration Fund, previously named the Wetlands Conservation and Restoration Fund. The Fund is used for

1 coastal wetlands conservation, coastal Barras, J. A., S. Beville, D. Britsch, S. Hartley, S. Hawes, J. Johnston, P. Kemp, Q. Kinler, A. Martucci, J. Porthouse, D. Reed, restoration, hurricane protection, and K. Roy, S. Sapkota, and J. Suhayda. 2003. Historical and infrastructure impacted by coastal wetland projected coastal Louisiana land changes: 1978-2050: USGS Open File Report 03-334 losses. A constitutional amendment, which 2 Dunbar, J.B., L.D. Britsch and E.B. Kemp, III. 1992. Land loss must be voted on by the citizens of rates: report 3, Louisiana coastal plain. Technical Report GL-90-2, U.S. Army Corps of Engineers District, New Orleans, La. 28 pp.

2 Louisiana, will be required to ratify the new Coast 2050 Fund. In 1997, a significant planning effort The newly authorized Coastal called “Coast 2050” was initiated to Protection and Restoration Authority shall combine all elements of Louisiana’s (1) represent the State’s position in policy previous coastal restoration efforts, as well implementation relative to coastal as recommend new initiatives. This new protection, conservation, and restoration; (2) approach included input from private develop, coordinate, make reports on and citizens, local governments, state and federal provide oversight for a comprehensive agency personnel, and the academic coastal protection master plan and annual community. This comprehensive plan coastal protection plans; (3) submit these focused all efforts of the participating plans to the Legislature; (4) approve funding agencies on the common goal of restoring appropriations from the Coastal Protection and protecting the coastal ecosystem in and Restoration Fund; and (5) enforce Louisiana. The 1998 report entitled “Coast compliance with the comprehensive master 2050: Towards a Sustainable Coastal coastal protection plan. Louisiana” subdivided the Louisiana coast into four planning regions based on RESTORATION INITIATIVES hydrologic basins. In order to reestablish a sustainable, highly productive ecosystem, Coastal Wetlands Planning, Protection and Coast 2050 identified the following three Restoration Act (CWPPRA) strategic goals as the essential natural In 1990, the United States Congress processes required: recognized the national significance of wetland loss in Louisiana and passed the Goal 1: Assure vertical accumulation to Coastal Wetlands Planning, Protection and achieve sustainability Restoration Act (Public Law 101-646, Title Goal 2: Maintain estuarine gradient to III; also known as the Breaux Act) to achieve diversity contribute federal monies and build upon Goal 3: Maintain exchange and interface to existing state restoration activities. In 2004, achieve system linkages the United States Congress voted to extend CWPPRA for an additional 15 years, under The Louisiana Coastal Wetlands the Consolidated Appropriations Act, 2005. Conservation and Restoration Task Force Since passage, CWPPRA has dedicated (Breaux Act Task Force) and the State approximately $40 million annually to Wetlands Authority adopted the Coast 2050 wetland restoration projects in Louisiana effort as their official restoration plan. It has and has authorized 151 projects, of which 74 also garnered the support of the 20 parish have been constructed. CWPPRA also councils and police juries within the created a partnership between Louisiana and Louisiana coastal zone. five federal agencies: the United States Departments of the Army, Agriculture, Louisiana Coastal Area (LCA) Ecosystem Commerce, and the Interior; and the United Restoration Program States Environmental Protection Agency. The “Louisiana Coastal Area, LA- Since 1991, the State of Louisiana and its Ecosystem Restoration: Comprehensive cooperating federal partners have been Coastwide Ecosystem Restoration Study” formally selecting restoration projects on an was the initial effort of the State of annual basis for implementation. Louisiana and the United States Army Corps

3 of Engineers (USACE) to implement the Critical Restoration Projects restoration strategies outlined in the Coast A total of 15 critical projects were 2050 report. Guidance from President identified through the study process that Bush’s 2005 budget request resulted in a could be implemented in the first 10 years of scaled-down version of the comprehensive the LCA Program (Table 8). Five of these study entitled “Louisiana Coastal Area, projects are recommended for conditional Louisiana Ecosystem Restoration Study” authorization, including three freshwater (hereafter referred to as the LCA Study). reintroduction projects, a Although not a comprehensive plan, the project, and a project to implement LCA Study lays out a series of projects and environmental restoration features for the programs that is a positive first step toward Mississippi River Gulf Outlet (MRGO). achieving the restoration goals outlined in These five projects are based on proven the Coast 2050 Plan. By focusing on critical science and technology, are in the projects, allowing for action on larger-scale engineering and design phase, and have had restoration strategies, and supporting the the National Environmental Policy Act program with science-based decision (NEPA) compliance process initiated. support systems, we will be able to Therefore, it is likely that they will be able implement projects in the near-term that to go to construction before the remaining have relatively low risk and uncertainty ten projects. The requested construction while allowing us to develop the science and authorization by Congress would be technology that will ultimately provide for conditional upon the approval of a decision sustainable restoration of Louisiana’s coastal document by the Secretary of the Army. ecosystem. The remaining ten projects would be The LCA Study contains seven authorized through the standard process for recommended program features for the implementation of USACE projects. implementation: (1) five projects for The first three freshwater conditional authorization; (2) ten additional reintroduction projects recommended in the projects for implementation in the next 10 LCA Study are currently being developed years under standard authorization through CWPPRA and include: the River processes; (3) six large-scale studies that Reintroduction into Maurepas Swamp (PO- will lay the groundwork for the systemic 29), the Mississippi River Reintroduction restoration of deltaic processes and natural into Bayou Lafourche (BA-25b), and the system hydrology; (4) a Science and Delta Building Diversion at Myrtle Grove Technology Program that will implement (BA-33). Although it is likely that these the principles and practices of adaptive projects will be constructed under LCA once management; (5) a Demonstration Project the program is authorized, they are Program that will assist in resolving critical continuing to be developed under the uncertainties; (6) a program to re-evaluate CWPPRA program in order to maintain existing water resources structures for their momentum. The barrier island project, potential to contribute to ecosystem Barataria Basin Barrier Shoreline (BBBS) restoration; and (7) a new program for Restoration, is based on work that has expanded beneficial use of dredged material. undergone extensive analysis under a The LCA Study main report can be viewed previous USACE/LDNR feasibility study. at http://www.lca.gov/main_report.aspx. The goal of this project is to re-establish the geomorphic function of the Caminada Headland and Shell Island. The MRGO

4 Environmental Restoration Features project scale projects these projects may take is divided into two phases. The MRGO greater than ten years to construct. Critical Shoreline Protection Project will However, it is critical that we begin this address areas where a breach will create a work so as not to delay their implementation new hydrologic connection between Lake in the long-term. Work has been initiated on Borgne and the MRGO, or where shoreline some level on all six of the large-scale erosion could lead to the loss of critical projects identified in the LCA Study report, estuarine habitat. The MRGO and it is anticipated that these projects will Environmental Restoration Study Phase 2 continue to be developed in the coming year. will evaluate alternatives considering various water resources needs of the area, Science & Technology Program and make a recommendation on the future of A Science and Technology Program the MRGO based on assessment of (S&T Program) is essential to ensure that we environmental and economic benefits and continue to incorporate the best available impacts. Feasibility studies were initiated science and technology into program for these two projects in 2005. It is implementation, that we continue to learn anticipated that the BBBS project feasibility from each project we implement, and that study will be completed in the summer of we are making the wisest and most efficient 2006. use of scarce restoration funding. The simple structure presented in the LCA Study Large-Scale Studies report represents only an outline of how we The above 15 projects are critical to will implement this S&T Program, but all of implement in the near-term and provide the main elements are contained therein, and significant benefits to the coastal ecosystem, sufficient flexibility has been maintained for but there remain large portions of the coastal this program to adapt its procedures based ecosystem that have not been addressed. A on evolving conditions. This program will sustainable solution to Louisiana’s coastal provide the scientific and technical ecosystem degradation will require underpinnings of the LCA Program. In additional measures to restore deltaic 2005, an ad hoc committee comprised of processes and natural system hydrology state, federal, and academic personnel was across much of the coast. For these reasons, formed in order to initiate studies on critical even as we implement critical near-term scientific uncertainties and to provide projects, we will begin studies of large-scale assistance to the Program Management concepts that may provide the long-term Team in hiring a science director and solution (Table 8). These concepts include assembling the Science Board and the initiating new delta-building in the central Science Coordination Team. This portions of the Barataria-Terrebonne committee is currently directing several Estuarine System, optimizing water and efforts including implementing an adaptive sediment distribution at the Old River management framework to improve the Control Complex, and “re-plumbing” the decision-making process and three efforts to lower to optimize improve modeling capabilities. This work the ecosystem functions while maintaining will continue into 2006. the vitally important navigation functions of the river. Although there is great promise in Demonstration Project Program all of these concepts, there is also great Related to the S&T Program is a uncertainty; based on other similar large- Demonstration Project Program which will

5 enable us to test new technology and resource that may otherwise be lost from the restoration concepts in the field to minimize system. the risk associated with implementing similar projects throughout the coastal zone. Next Steps The oversight provided by the S&T Program The LCA Study was completed in in executing the demonstration projects will December of 2004. The Chief of Engineers ensure that we make the most out of these of the USACE signed his report learning opportunities. The first (http://www.lca.gov/chief_report.aspx) in demonstration project to be developed is January of 2005, providing the opportunity titled "Long-Distance Pipeline Conveyance for Congress to authorize the LCA Program of Dredged Material." It is being designed in a future Water Resources Development to examine various engineering and Act (WRDA). Although a WRDA has not ecological uncertainties associated with been passed since the signing of the report, using pipeline conveyance of sediment the State and the USACE are continuing to slurries on a large-scale operational basis to develop the LCA Program under existing create marsh in remote areas. The study authorities. At this time, the State is experimental design is currently being in active discussions with the USACE developed by state, federal, and academic regarding the priority of the LCA Study personnel and construction could begin in features. Implementation of these features late 2006. will be determined by the available funding in the current federal fiscal year. Beneficial Use Program Lastly, there is the potential to use Energy Policy Act of 2005 existing federally-authorized water The Coastal Impact Assistance resources projects in the coastal zone for Program (CIAP) of 2005 was authorized by increased benefit to the ecosystem. Section 384 of the Energy Policy Act of Modifying existing project features and 2005. That program will provide $135 operations may provide the most cost- million annually of Outer Continental Shelf effective means of restoration in certain (OCS) mineral revenues to Louisiana for areas of the coast, and the LCA Study makes four years, beginning October 1, 2006 recommendations to allow us to evaluate (Federal Fiscal Year 2007); funds will also those opportunities. In addition, the USACE be provided to other mineral-producing estimates that up to half of the 70 million coastal states. The total (4-year) CIAP cubic yards dredged on an annual basis from funding to Louisiana is estimated at $540 federally-maintained navigation channels million, of which 35 percent ($189 million) may be used beneficially to restore wetland is dedicated to coastal parishes. and aquatic habitats. Current funding and CIAP funds can only be used for one programmatic limitations make it possible to or more of the following purposes: a) use only 14 million cubic yards of this vital conservation, restoration and protection of sediment resource for ecosystem restoration. coastal areas including wetlands; b) Currently, the Beneficial Use of Dredge mitigation of damage to fish, wildlife and Material Study Team is revising strategies to natural resources; c) planning assistance and develop a program which will provide a the administrative costs of complying with quick and cost-effective means of increasing this section; d) implementation of a federally wetlands created and maintained with this approved marine, coastal, or comprehensive conservation management plan; and e)

6 mitigation of the impacts of OCS activities close proximity to the shoreline and absorb through funding of onshore infrastructure wave energy, protecting existing marsh projects and public service needs. Not more vegetation. Sediment is deposited behind than 23 percent of the funds received by the these structures and promotes subsequent State or parishes for any fiscal year can be colonization and growth of new marsh used for the purposes described in items “c” vegetation. Christmas tree fences are and “d” above. relatively inexpensive, with an average cost The State must submit a Coastal of $50 per linear foot. Impact Assistance Plan (the Plan) to the The CIAP of 2001 was authorized to Secretary of the Interior by July 1, 2008. assist states in mitigating the impacts from The Secretary must approve the Plan before OCS oil and gas production. The CIAP disbursing funds to the State or any coastal recognized that offshore oil and gas parish. The LDNR has the lead for the activities impact coastal states and localities Plan’s development and implementation. A nearest to where the activities occur and major goal will be to facilitate progress in where the related facilities are located. The the ongoing State/Federal campaign to CIAP legislation appropriated money to reverse coastal land loss. The Plan should coastal states and coastal political complement ongoing restoration activities subdivisions and required that each state (CWPPRA and LCA programs) and, where submit a Coastal Impact Assistance Plan possible, hurricane protection projects. which describes how these funds will be expended. Louisiana was one of seven Other Restoration Programs coastal states selected to receive funds under Several other wetland restoration the appropriation to implement this programs have been implemented, each program. The one-time allocation in 2001 to utilizing a specific strategy to combat Louisiana totaled $26.4 million. These coastal wetland loss, including: the Parish funds are to be expended according to the Coastal Wetlands Restoration Program legislation and guidelines developed by the (PCWRP), the Coastal Impact Assistance National Oceanic and Atmospheric Program (CIAP) of 2001 governed by Administration (NOAA). Section 903 of the Commerce, State, Justice A unique, three-agency partnership FY2001 Appropriations Act, the Louisiana forms the DNR/NRCS/SWCC Vegetative Department of Natural Resources Planting Program through which native (DNR)/Natural Resources Conservation marsh vegetation is planted and monitored Service (NRCS)/Soil and Water throughout the coastal zone of Louisiana. Conservation Committee (SWCC) The LDNR enters into annual cooperative Vegetation Planting Program, and the agreements with the Louisiana Department beneficial use of dredged material program of Agriculture and Forestry (LDAF). It is governed by Sections 204 and 1135 of the through the LDAF and the SWCC's Soil and WRDA. Water Conservation Districts (SWCD) that The PCWRP, also known as the the planting tasks are selected, planned, “Christmas Tree Program,” is designed to evaluated, planted, and monitored. Each encourage public involvement and NRCS District Conservationist provides participation in coastal restoration. Wooden technical assistance to their respective enclosures are filled with recycled SWCD throughout the planting task process. Christmas trees that have been donated by Projects funded under WRDA the public. These structures are built in Sections 204 and 1135 originated from

7 operation and maintenance of existing WETLAND Campaign was honored with a USACE dredging projects for navigable Thoth Award at an awards ceremony held waterways. Through cooperation between September 29, 2005 at the National Press the state and federal governments, the Club. The Thoth Awards recognize material dredged during regularly scheduled exceptional, strategic public relations maintenance is utilized for the creation of campaigns and tactics produced by firms wetlands, improvement of wetland habitat, headquartered in the Nation's Capital and or the protection of eroding shorelines. the Washington, D.C. metropolitan area, one Through WRDA, the United States of the largest concentrations of public Congress authorized the USACE to relations agencies in the world. construct large-scale freshwater diversion Recent events including the projects along the Mississippi River. These devastation brought about by Hurricanes river diversions have the potential to benefit Katrina and Rita highlighted the importance vast areas of deteriorating marsh by of restoring the Louisiana's coast, not only introducing beneficial freshwater, sediment, for its abundant wildlife and natural and nutrients. It is anticipated that the resources, but also as hurricane protection Caernarvon and Davis Pond Freshwater for the more than two million people living Diversions near New Orleans will benefit in the state's coastal areas. over 51,200 acres of wetland habitat. Five days before struck, the America’s WETLAND campaign AMERICA’S WETLAND CAMPAIGN launched the "Save America's WETLAND, Write Now!" initiative encouraging Louisianans to alert the nation and the world as to what could happen if a killer hurricane made its path to New Orleans. As part of the launch with Louisiana's Governor Kathleen Babineaux Blanco and U.S. Senator Mary Landrieu, a prophetic award- winning film was shown that posed the now obvious conclusion, "not a matter of if, but

when." In 2002, the State of Louisiana The America's WETLAND partnered with MARMILLION + Campaign is one of the most recognized COMPANY (MCo) on America's public education efforts in Louisiana history, WETLAND: Campaign to Save Coastal garnering over twenty-one communications Louisiana, the largest, most comprehensive awards in its short history. Most recently, public education initiative in the state's the campaign was awarded two Silver Telly history. Awards for public service announcements The National Capital Chapter of the that exemplified a creative and powerful Public Relations Society of America communications in that medium. This past (PRSA) awarded its top honor for public year the America's WETLAND Campaign service to DC-based strategic was honored with the nation's most communications firm MCo, for its prestigious public relations recognition, the groundbreaking work with America's Silver Anvil Award. WETLAND: Campaign to Save Coastal Louisiana. MCo's work with the America's

8 For more information about the This website also contains a link to America's WETLAND Campaign please the SONRIS Interactive Geographic visit http://www.americaswetland.com. Information System (GIS) Map. This is a system that combines a detailed GIS CONTINUING PROGRAM database and a coastal restoration project DEVELOPMENTS relational database. GIS data that are available on the system include satellite Information Management System imagery, aerial photography, coastal Implementation of the coastal restoration project boundaries, elevation restoration program generates an abundance benchmarks, geotechnical soil borings, and of environmental monitoring data, monitoring stations. Users can perform a engineering data, geospatial data, and both wide range of custom queries, to refine and project-specific and programmatic reports. summarize information, on many of the GIS In an effort to effectively manage and make data layers available. Through the use of available the large amount of data and this GIS technology, it is possible to information generated by the coastal seamlessly link directly to the coastal restoration program, a detailed information restoration project database and download management system is maintained. It is environmental data, geospatial data, and accessible to the public through the LDNR project reports for any coastal restoration Office of Coastal Restoration and project. This innovative approach to Management (OCRM) website, located at environmental data and information http://dnr.louisiana.gov/crm. This website dissemination will elevate public awareness has recently been updated and restructured and advance the science behind coastal to improve efficiency and to reflect restoration. organizational changes within the OCRM. Coastwide Reference Monitoring System– Wetlands (CRMS-Wetlands) The CWPPRA monitoring program evaluates the effectiveness of each constructed restoration project, and scientifically evaluates how well the restoration projects create, restore, protect, and enhance coastal wetlands in Louisiana. The CRMS-Wetlands helps the state meet both of these objectives by providing a network or “pool” of reference sites that can be used to evaluate the effectiveness of individual projects. CRMS-Wetlands will also ensure that the state’s comprehensive restoration plan for coastal restoration is indeed restoring hydrologic basins and entire coastal ecosystems—not just the areas directly affected by individual projects. CRMS-Wetlands will also provide data to fill information gaps and help refine hydrodynamic and ecological models

9 developed through LCA as part of the state’s In addition to these on-the-ground overall coastal restoration program. measurements, CRMS-Wetlands has funded The implementation of CRMS- the collection of a comprehensive set of Wetlands is well underway and progress has color infrared aerial photography at 1:24,000 occurred on several fronts. The CWPPRA scale for the entire coastal zone from the Task Force has authorized a total of Sabine River to the Pearl River, including $17,066,972 in funding through FY09 the barrier islands. This photography will be ($2,560,046 is the state’s 15% share). The used to calculate the land and water areas at LDNR has secured land access agreements each CRMS-Wetlands site and it will also be for approximately 420 of the 612 CRMS- made available to other users (such as Wetlands sites. A Cost Share Agreement planners, engineers, and the Louisiana was finalized between the federal sponsor Recovery Authority) on the internet. The (USGS) and the State on June 8, 2004. CRMS-Wetlands has also funded a A Standard Operating Procedures comprehensive land:water analysis from (SOP) manual was developed by the LDNR satellite imagery that will give the state a with input from the National Wetlands qualitative assessment of how much land has Research Center (NWRC) and academia been lost since our last comprehensive which outlines, in significant detail, analysis in the year 2000. activities and procedures for CRMS- Wetlands site construction, data collection, Landowner Database and Mapping System QA/QC, data processing, and deliverables The Land Section has created an requirements. This SOP will be used by all electronic landowner database and a contractors supporting CRMS-Wetlands relational GIS database. The landowner implementation and provides the guidelines database contains contact information for and requirements to ensure standardized the landowner(s), the property description of implementation and consistency. the land, and the expiration date and The LDNR has secured a contract recordation information for executed with Coastal Estuary Services, LLC (CES; a landrights documents required for coastal partnership between Shaw and CH2M Hill) restoration projects. In addition, the for the CRMS-Wetlands site installation and program is used for all Land Section servicing. This contract became effective on document tracking, as well as tracking February 1, 2005 and to date, CES has documents that are expiring in any given worked with CRD’s Monitoring Section to time period. Reports can be generated from visit and characterize approximately 200 the landowner database, such as lists of sites and construct approximately 50 sites. documents expiring by a certain date and Progress was temporarily disrupted by lists of all landowners within a project area. hurricanes Katrina and Rita; however, This information is tied to the GIS implementation has now resumed. system. The property owner information is It is anticipated that the full suite of mapped as a separate theme and shows the stations for the first year of CRMS-Wetlands property associated with the landowner and will be constructed and operational before its relationship to the project and its features. the end of March 2006. The data to be The Land Section can add project collected in 2006 includes marsh surface boundaries and features, aerial photography, elevation, sediment accretion, surface water pipelines, utilities, oyster leases, and other level and salinity, porewater salinity, and information to maps and/or exhibits which vegetation composition and abundance.

10 also show land ownership. Both databases The SSPM represents 3,500 square are updated and maintained regularly. miles of the Mississippi River delta region These databases are tools used every and features 3 large diversions, 12 small day by the staff of the Land Section to diversions, and the Bohemia provide information about landowners and Spillway/Pointe a la Hache Relief Outlet. their relationship to a project. Exhibit maps The model is built to a horizontal scale of are created for document preparation and 1:12,000 and a vertical scale of 1:500. Plans project team information. Preliminary for future studies of the model include time- information is provided in the candidate lapse photography for a more detailed phase of the project selection process. assessment of clay and silt deposition in the Documents and their expiration dates are region, as well as modeling future diversions also provided to project team members and and navigation changes in the Mississippi our federal partners. This information has River. proven to be a great indicator of landowner The final modeling report for the participation in the early stages of project SSPM titled “Report on Feasibility of Small development. Scale Physical Model of the Lower Mississippi River Delta for Testing Water Mississippi River Small-Scale Physical and Sediment Diversion Projects” has been Model completed and is now available The Mississippi River Small-Scale electronically through the OCRM website. Physical Model (SSPM) was designed to Additionally, the model layout was analyze sediment transport patterns and improved by extending the headbox (the marsh building capabilities of various point where sediment is injected into the uncontrolled diversions in the Mississippi model) to correct sediment distribution River Delta. It is expected that the SSPM issues associated with the northernmost will aid coastal engineers and scientists in diversions. The extension was constructed evaluating the effectiveness of using by LSU staff. New model runs were combinations of large and small freshwater performed by LSU with funding from the diversions, more efficient sediment Coastal Restoration and Enhancement management practices, and the through Science and Technology (CREST) consequences to navigation in returning the program. Over the past year, LDNR and delta to a more natural state. Brown LSU have hosted a number of tours/visits to Cunningham Gannuch, Inc., the contracting the SSPM by several state and federal consultant for the LDNR, organized an agencies. interdisciplinary team of recognized experts in river modeling, sediment transport, 2005 HURRICANE SEASON coastal estuaries, and coastal geology to aid Over the years, tropical storm and in the design of the model. The model was hurricane impacts have been recognized as constructed and verified by SOGREAH of one of the major causes of wetland loss in Grenoble, France in June 2003, then shipped Louisiana. This year was no exception with to Louisiana where it was subsequently re- two major hurricanes, Katrina and Rita, assembled and reverified. The SSPM is causing catastrophic damage along the Gulf currently housed at the Vincent A. Forte Coast. River and Coastal Engineering Research Hurricane Katrina will likely be Laboratory on Louisiana State University’s remembered as the most destructive and (LSU) Baton Rouge campus. most costly natural disaster in the history of

11 the United States. Katrina made landfall as storms caused more damage than geologists a Category 4 hurricane in Plaquemines had formerly predicted would be lost in the parish just south of Buras (Figure 3) on next 50 years. It is still too early to tell just August 29, 2005, with maximum winds of how much of the open water will revert back 140 miles per hour. Katrina made a second to marshland, but it is very likely that many landfall near the Louisiana/Mississippi new lakes will form. border with winds of 125 miles per hour. In addition to the establishment of The storm surge caused widespread flooding the Coastal Protection and Restoration in the greater New Orleans area. Authority and the Coastal Protection and On September 24, 2005, Hurricane Restoration Fund, it is anticipated that there Rita made landfall as a Category 3 hurricane will be additional legislative enactments and between Sabine Pass, Texas and Johnson’s policy revisions based upon the continuing Bayou, Louisiana (Figure 3). Maximum assessment of the hurricanes’ impact on sustained winds from Hurricane Rita were coastal Louisiana. 120 miles per hour and caused extensive damage across southwestern Louisiana and SYNOPSIS east Texas. The LDNR, its federal partners, and the State Wetlands Authority have implemented projects throughout coastal Louisiana that have been successful at restoring, protecting, and enhancing coastal wetlands. These projects are reducing coastal erosion, improving habitat conditions for coastal fisheries and wildlife species, and building new wetlands. This report provides information about all coastal restoration projects that either have been completed or are in the planning stages in the four Coast 2050 regions to date. It includes a compilation of information from all federal and state Figure 3. Paths of Hurricanes Katrina and Rita. agencies involved in coastal restoration in Louisiana. Scientists with the USGS estimate that Katrina caused as much as 30 square miles of marsh in Breton Sound to be transformed into open water. An additional 47 square miles of marsh was lost throughout the Pontchartrain, Pearl River, Barataria, and Terrebonne basins. The active Mississippi River Delta incurred approximately 14 square miles of loss. The Chandeleur Islands, one of coastal Louisiana’s barrier island chains that serve as the first line of defense against tropical storms, have been reduced by as much as 50 percent as a result of the hurricanes. The

12 REGION 1

INTRODUCTION Lake Pontchartrain, connected to Lake Region 1 encompasses the Lake Maurepas by Pass Manchac and North Pass, Pontchartrain Basin, extending from the also receives freshwater inflows from the MRGO on the south to the Prairie Terrace Tangipahoa and Liberty Bayou-Tchefuncte on the north, and from the Chandeleur watersheds (a combined area of 1,471 Islands on the east to the Lake Maurepas square miles), as well as the Bonnet Carre´ swamps and marshes on the west. This Spillway. Major navigation channels within region covers all or part of the following the region are the MRGO and the Gulf parishes: Livingston, Tangipahoa, St. Intracoastal Waterway (GIWW). Tammany, St. Bernard, Orleans, Jefferson, Considerable wetland loss began in St. Charles, St. John the Baptist, St. James, Region 1 in the early 1960s after the and Ascension. construction of the MRGO, with marsh loss Region 1 contains 576,570 acres of occurring directly through channel dredging, coastal wetlands consisting of approximately and indirectly through saltwater intrusion 110,000 acres of bottomland hardwood and vessel wakes. Effects of increased forest; 213,570 acres of swamp; 34,700 salinities were seen as far away as the acres of freshwater marshes; 27,700 acres of Pontchartrain/Maurepas Land Bridge. intermediate marshes; 110,900 acres of Marshes east of New Orleans and adjacent brackish marshes; and 79,700 acres of saline to the MRGO were severely impacted by marshes. levee-induced ponding of water. Other Estimates of wetland loss from major causes of land loss within this region Region 1 indicate that between 1990 and include shoreline erosion, subsidence, and 2000, a total of 23,296 acres of wetlands altered hydrology. were lost (an average of 2,304 acres per The most critical concerns of parish year). Lakes Pontchartrain, Maurepas, and governments and the public are preserving Borgne are the dominant hydrologic features the present habitats and current levels of within this region. Predominantly all of the productivity. Near the Manchac and North Amite, Lake Maurepas, and Tickfaw Shore areas and around the Pearl River watersheds (a combined area of 3,255 mouth, conversion of some intermediate and square miles) drain into Lake Maurepas. brackish marshes to fresh marshes is needed.

13 Open water in the interior of the forested Parish Coastal Wetlands Restoration wetlands near Lake Maurepas is also Program recommended for conversion back to The following seven Christmas tree forested wetland. Forested wetlands located projects have been constructed within immediately southwest of the MRGO in the Region 1: Blind Lagoon, Crab Pond, Goose Central Wetlands are slated for expansion. Point, LaBranche, The Prairie, Bayou Some of the saline Biloxi Marshes are Bienvenue, and Jones Island. In 2005, the recommended for conversion to brackish Blind Lagoon Christmas tree project was marshes. refurbished, and vegetation was planted Coast 2050 identified specific adjacent to the fences of The Prairie project. ecosystem strategies for protecting and Since 1990, approximately 6,044 linear feet sustaining the region’s coastal resources. of fences have been constructed in Region 1. These strategies can be grouped into one of the following five general categories: DNR/NRCS/SWCC Vegetation Planting restoring swamps, restoring and sustaining Program marshes, protecting the integrity of the Since 1988, a total of 43 vegetation shorelines, restoring and maintaining the planting projects have been implemented Chandeleur Islands, and restoring and within Region 1. Several phases, spanning maintaining critical landforms. multiple years, exist for many of the planting projects. The 2005 vegetation PROJECT SUMMARIES planting projects for Region 1 included A total of 82 restoration projects Point Platte, Blind River, and Bayou Black. have been authorized in Region 1 (Figures 4 and 5, Table 1). Project specific information Section 204/1135 is presented below, organized by project Within Region 1, three Section funding source. 204/1135 projects were constructed in 1999 along the MRGO between Mile -3 and Mile CWPPRA 14. These projects utilized dredged material A total of 18 projects have been from routine maintenance of the MRGO to authorized under the direction of CWPPRA create approximately 76 acres of wetlands. in Region 1. These projects are anticipated Two projects were constructed along the to benefit 12,230 acres of wetlands at a cost MRGO, Mile 14 to 12 in 2002 and 2003 in of $27,661,644. Region 1. These projects utilized dredged The CWPPRA Task Force officially material from the MRGO to create deauthorized the following four projects in approximately 163 acres of wetlands behind Region 1: Violet Freshwater Distribution the MRGO jetty. (PO-09a), Red Mud Demonstration (PO-20), Eden Isles East Marsh Restoration (PO-21), and Bayou Bienvenue Pump Station Diversion and Terracing (PO-25).

State Six projects have been implemented in Region 1 and funded by the Wetlands Trust Fund. These projects are currently estimated to benefit 2,443 acres of land at a cost of $3,673,435.

14 15

Figure 4. Location of Breaux Act projects authorized in Coast 2050 Region 1. 16

Figure 5. Location of State, PCWRP, Vegetation, Section 204/1135, FEMA, and Other projects in Coast 2050 Region 1. Table 1. Restoration projects completed or pending in Coast 2050 Region 1.

l) e drights & edera , F on Dat e r ( & Lan nc e e n, a ig s t timate timat inten Es Numb De a Es t nsor ive , M st t c me pe o at g s Sp t Co Co Na Ty / en uction Completierin uction Cost ion, e ct ct cy s tr e tr at e e n ator ish s s r n r Project Summary

Program State Proje Proj Proj PPL Age Se Repre Pa Acres BenefitedCon Engin Cost Con Ope Monitoring Cos Baselin Current The purpose of the project is to address wetland loss in the area and to improve habitat for wildlife and fisheries by increasing the flow of freshwater into the marsh PO-06 Fritchie Marsh and managing the outfall. Project features include diverting part of the W-14 canal

Breaux Act Breaux (PO-06) Restoration HR 2 NRCS Boasso Crowe StT. 1,040 2001 $309,687 $751,128 $1,140,858 $3,048,389 $2,201,674 and installing larger culverts under Highway 90. The objective of the outfall management plan was to optimize the use of freshwater and sediment supplied by the existing siphons by managing water flow through the area. This would be accomplished by reducing channelized flow and routing the Violet Freshwater diverted flow across marshes or through shallow water areas instead of through PO-09a Distribution Odinet, larger channels. This project was officially deauthorized by the Breaux Act Task

Breaux Act Breaux (PO-09a) (Deauthorized) HR 3 NRCS Boasso Hutter StB. N/A Deauth. $85,717 N/A $42,910 $1,821,438 $128,627 Force in October of 2001. Bayou Sauvage National Wildlife The Lake Pontchartrain hurricane protection levee isolated Units 3 and 4 of the PO-16 Refuge Hydrologic Bayou Sauvage Wildlife Refuge from the surrounding marsh complex and (XPO- Restoration, established a large freshwater impoundment. The project utilizes pumps to remove

Breaux Act Breaux 52A) Phase 1 HR 1 USFWS Duplessis Odinet Orl. 1,550 1996 $87,653 $887,847 $654,692 $1,657,708 $1,630,193 the excess water during the spring and summer.

The project goal was to create vegetated wetlands in an area bounded by I-10, Lake PO-17 Bayou LaBranche Pontchartrain, and Bayou LaBranche. This objective was accomplished by dredging

Breaux Act Breaux (PPO-10) Wetland Creation MC 1 USACE Chaisson Smith StC. 203 1994 $758,435 $2,784,909 $274,584 $4,461,301 $3,668,885 sediment from Lake Pontchartrain.

Bayou Sauvage The hurricane protection levee system has impounded the marsh in the project area. PO-18 National Wildlife The project increases the drainage capacity of the system to reduce water levels in

17 (XPO- Refuge Hydrologic the project area. Project features consist of two 36-inch pumps which operate to

Breaux Act Breaux 52B) Restoration, Phase 2 HR 2 USFWS Duplessis Odinet Orl. 1,280 1997 $101,483 $892,402 $648,666 $1,452,035 $1,642,553 maintain water levels at 0.5 feet above or below marsh elevation. Mississippi River The objective of the project is to protect and preserve vegetated wetlands by Gulf Outlet repairing the lateral and rear dikes of the Mississippi River Gulf Outlet (MRGO) (MRGO) Disposal disposal areas. Repairs to a 28,000 linear-foot dike, in conjunction with the PO-19 Area Marsh installation of metal box weirs with a single 40-inch pipe is used to control and

Breaux Act Breaux (XPO-71) Protection HR 3 USACE Boasso Odinet StB. 755 1999 $246,834 $40,000 $26,311 $512,198 $313,145 divert water flow to prevent the perched marshes from draining.

This project was authorized to determine whether red mud, produced as a by-product of removing alumina from bauxite, could be utilized as marsh-creation material in combination with compost and marsh sediment. Construction of the experimental Red Mud units was initiated in 1997; however, due to unexpected problems with fill material, PO-20 Demonstration liners, and contaminants in the water source, the project was officially deauthorized

Breaux Act Breaux (XTE-43) (Deauthorized) MC 3 EPA Amedee Faucheux StJo. N/A Deauth. $26,836 $321,499 $122,165 $350,000 $470,500 by the Breaux Act Task Force in August 2001. The project was intended to restore 2,536 acres of drained fastlands by actively managing water levels to maximize marsh creation. There was a change in Eden Isles East landowners of the project area during the planning phase of this project. PO-21 Marsh Restoration Consequently, the project was officially deauthorized by the Breaux Act Task Force

Breaux Act Breaux (PPO-4) (Deauthorized) HR 4 NMFS Boasso Crowe StT. N/A Deauth. $36,078 N/A $2,947 $5,018,968 $39,025 in January 1998. The project is designed to protect currently exposed wetlands areas from erosive wave energy from Lake Pontchartrain, and to enhance the establishment of submerged aquatic vegetation in the ponds behind the rock dikes. This is accomplished by constructing a 2,870 linear-foot rock dike across the mouth of the PO-22 Bayou Chevee north cove and a 2,820 linear-foot rock dike, tying into an existing USFWS rock

Breaux Act Breaux (XPO-69) Shoreline Protection SP 5 USACE Duplessis Odinet Orl. 75 2001 $405,813 $1,802,719 $380,871 $2,555,029 $2,591,454 dike, across the south cove.

(Region 1) 18

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program PO-33 PO-32 PO-30 Project) (Complex PO-29 (PPO-07a) PO-28 95) 27(XPO- PO- 55a) (XPO- PO-26 74a) (XPO- PO-25 (PPO-38) PO-24

State Proje

Creation Platte Marsh Goose Point/Point Protection MRGO Shoreline Lake Borgneand Shoreline Protection Lake Borgne EPA 11 FD Maurepas Swamp Reintroduction into River Shoreline Protection Planting, and Wetlands Terracing, LaBranche Marsh Restoration Chandeleur Islands Spillway of theBonnetCarre Opportunistic Use (Deauthorized) Terracing Diversion and Pump Station Bayou Bienvenue Restoration Hydrologic Hopedale ct Numb Proj e er ( ct F Na edera me l) ´ C1 USFWS 13 MC USACE 12 SP $306,836 $821,752 EPA $1,570 10 SP $305,266N/A Pending 489 StC. Smith Chaisson NMFS 9 VP SP SNT NMFS 9 VP USACE 9 FD MC HR NMFS 8 HR

Proj NMFS 8 ect PPL Ty pe

Age n cy /Sp cele un t.46Pnig$,3,9 / / 19056 $1,730,596 $1,930,596 N/A $1,348,345 $1,348,345 $1,730,596 N/A $30,932 Pending 436 StT. $1,317,413 N/A Pending Burns 266 Schedller StB. Odinet Boasso Boasso Chaisson Amedee, StB. Odinet Boasso StC. Smith Chaisson Duplessis Boasso, StB. Odinet Boasso o nsor Se n ator dntStB. $6,780,307 $5,434,288 $48,863 Odinet Hutter, $6,731,444 N/A Pending 5,438 StJo. Smiley Smith, Faucheux, Richmond Odinet,

Repre

sen ta tive StB. Orl.

Pa rish 167 N/A 220 177 134

Acres Benefited edn 16592NA$198 13430 $1,667,950 $1,334,360 $21,988 $1,645,962N/A Pending $3,295,574 $212,142 $832 $211,310N/A Deauth. 01$6,0 5278 1423 $1,435,066 $174,263 $937,977 $261,006 $502,708 $188,383 2001 $150,706 $82,279 $106,104N/A Pending $1,115,052$2,179,491$1,803,052 $438,000 $250,000 2004

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat to flowfromtheriverintoLakePontchartrain. in theMississippiRivertoallownomorethan4,000cubicfeetpersecondofwater been mergedwiththisproject. adjoining project,LakeBorgneShorelineProtection atBayouDupre(PO-31),has construction ofacontinuousnearshorerockbreakwater. Aseparatelyauthorized exposure tolakewaveenergyandstormsurges. Thiswillbeaccomplishedthrough protects thecommunitiesofShellBeach,Yscloskey, andHopedalefromdirect separates LakeBorgnefromtheMississippiRiver GulfOutlet(MRGO).Thisland The goalofthisprojectistomaintaintheintegrity ofthenarrowstripmarshthat planted withsmoothcordgrass( construction ofadiversionchannel,watercontrolstructures,andearthenterraces This projectwasintendedtocombinetheuseofexistingpumpstationswith degraded swamp. accomplished throughthediversionofMississippi Riverwaterintoanareaof inputs incypress-tupeloswamptractssouthof LakeMaurepas.Thiswillbe This projectisintendedtorestoreanaturalhydrologic regimeandincreasenutrient April 2002. marsh loss.TheprojectwasofficiallydeauthorizedbytheBreauxActTaskForcein freshwater andnutrientsthroughadeterioratedmarshareatoabatesite-specific ( Chandeleur Soundsideoftheislandchainandwereplantedwithsmoothcordgrass overwash areas,whichencompass364acres,arelocatedat22sitesalongthe overwashed byHurricaneGeorgesin1998throughvegetationplantings.The This projectisintendedtoacceleratetherecoveryperiodofbarrierislandareas removal ofpinsfromtheBonnetCarre surrounding LakePontchartrain.Thisobjectivewillbeaccomplishedthroughthe This projectisintendedtoabatehighsalinitystressonvegetatedwetlands reduce wetlandlossrates,andprotectapproximately3,086acresofmarsh. structure wouldallowmorerapiddrainageofthearea,improvefisheriesaccess, surges andreducewetlanddeteriorationwithintheprojectsite.Replacementofthis furbishment andconstructionofawatercontrolstructuredesignedtopreventtidal culverts installedinthe1950snearYscloskey,Louisiana.Theprojectinvolvesre- This projectisdesignedtoabatesite-specificwetlandlossbyreplacingcollapsed shoreline protection,andvegetationplanting. along theshorelinebyrestoringandcreating489acresthroughmarshterracing, Located alongLakePontchartrain,theprojectintendstoreduceemergentmarshloss Lake Pontchartrain. as welltomaintainthe lakerimfunctionalongthissectionofthenorth shoreof dredged materialinopen waterareasinthevicinityofGoosePointand PointPlatte The objectiveofthisproject istocreatemarshhabitatthroughthedeposition of MRGO. will beconstructedalong theLakeBorgneshorelineandalongnorth bankofthe Mississippi RiverGulfOutlet(MRGO)bypreventing shorelineerosion.Arockdike The objectiveofthisprojectistopreservethe marshbetweenLakeBorgneandthe Spartina alterniflora e ). Spartina alterniflora ProjectSummary ´ Spillwaystructureduringhighflowperiods ). Thiswillforcetheflowof 19

PCWRP PCWRP PCWRP PCWRP State State State State State State Program O0cByuCee PNANADpessOie r.7 94 / / NANA$200 This projectinstalled2,000feetofbrushfencesatt $62,000 N/A N/A N/A PO-10 N/A 1994 75 Orl. PO-08 Odinet Duplessis PO-03b N/A N/A PO-03 SP BayouChevee PO-02c PO-01

State Proje h rii PNANACaso mt to 719 NANA / / $183,387 N/A N/A $108,935 N/A N/A N/A 1991 $91,646 37 N/A StJo. Smith N/A N/A Chaisson N/A N/A N/A N/A SP 1991 N/A 3 The Prairie StT. N/A Burns 1991 Schedler 1 N/A Orl. N/A SP Odinet Duplessis Goose Point N/A N/A SP Crab Pond arnh PNANACaso mt t.519 NANA / / $184,800 N/A N/A N/A N/A 1991 5 StC. Smith Chaisson N/A N/A SP LaBranche rtcinS / / hisnSihSJ.1419 NANA / / $366,000 N/A N/A N/A $1,290,851 $1,324,000 N/A N/A 1994 184 N/A StJo. N/A Smith N/A Chaisson N/A N/A N/A N/A SP N/A 1996 N/A Boasso Protection 50 1987 Turtle CoveShore StC. 1,750 N/A StC. N/A Smith FD Smith Chaisson Chaisson Pump Outfall N/A Central Wetlands N/A N/A SP N/A Shoreline Protection SP LaBranche Canal Closure Stabilization and Shoreline Boasso LaBranche N/A N/A Diversion FD Violet Siphon ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator utrSB 0 92 / / NANA$250,000 N/A N/A N/A $380,584 N/A 1992 N/A 300 StB. N/A Hutter Odinet, N/A N/A 1992 84 StB. Hutter Odinet,

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat planted in2005. ( were plantedadjacenttothefences.Atotalof 1,200Californiabulrush bulrush ( 1996, 1997,1998,1999,2000,2001,2003and 2004.Atotalof1,500California originally constructedandfilledin1991maintenance wasperformedin1995, growth ofmarshvegetation,andtopreventthe erosionofthelakerim.Fenceswere maintain theseparationbetweenThePrairieand LakePontchartrain,topromotethe between LakesMaurepasandPontchartrain.The projectwasconstructedto Prairie”, an800-acreexpanseofshallow,open waterborderedbyfreshwatermarsh Wave actionfromLakePontchartrainwaseroding thestripoflandadjacentto“The 2000, 2001,2003and2004. constructed andfilledin1991maintenance wasperformedin1992,1993,1998, the colonizationandgrowthofnewmarshvegetation. Fenceswereoriginally the innermarsh,toprotectexistingmarshvegetation fromerosion,andtoencourage The projectwasconstructedtorestricttheopeningbetweenLakePontchartrainand The GoosePointprojectislocatedalongthenorthernshoreofLakePontchartrain. performed in1994,1997,1998,2000,and2001. Fences wereoriginallyconstructedandfilledin1991maintenancewas constructed topreventChefMenteurPassfromerodingfurtherintoCrabPond. the BayouSauvageNationalWildlifeRefuge.Christmastreefenceswere The CrabPond,anopen-waterareaadjacenttoChefMenteurPass,islocatedwithin 1997, 1998,1999,2000, and2003. and filledin1991maintenance wasperformedin1992,1993,1994, 1995,1996, emergent marshinthe LaBranche wetlandarea.Fenceswereoriginally constructed erosion bywind-generated waves.Thebrushfencesweredesignedto create ponds locatedwithinthe LaBranchewetlands.Thesepondedgesare susceptibleto The LaBrancheChristmas treefenceswereconstructedinaseriesof open-water with stormwaterrunofftoanareaofmarshneartheVioletSiphon,PO-01. This projectisdesignedtoprovidefreshwater,nutrients,andsedimentassociated to offsetmarshsubsidenceandsaltwaterintrusion. enlarge thesizeofdiversionsothatmoresedimentandfreshwaterareavailable The purposeofthisprojectistoreturnintooperationtheexistingsiphon,and additional $195,600wasusedformaintenancein2001. energies, andtoencouragesedimentdepositionbehindthegabionstructure.An shallow, openwatermarshborderedbyorganicfreshwatermarsh)fromhighwave the LakePontchartrainshorelinethatshelters“ThePrairie”(an800-acreexpanseof A 1,640footrock-filledgabionbreakwaterwasconstructedtomaintainandprotect wetlands frombeingbreached. Bayou LaBranche,toprotectthehydrologicboundarybetweenlakeand A rockbreakwaterwasconstructedalongtheLakePontchartrainshoreline,eastof Lake PontchartrainfromthewesternedgeofLaBranchewetlands. The purposeofthisprojectistorestoretheintegrityshorelinewhichseparates Schoenoplectus californicus e Schoenoplectus californicus ) and200roseaucane( ProjectSummary ) and100roseaucane( he mouthofBayouChevee. Phragmites australis Phragmites australis ) were ) 20

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation PCWRP PCWRP PCWRP Program

State Proje os on PNANAShde BrsST 91 / / / / $40,000 N/A $5,203 Burns Schedler N/A N/A N/A Burns N/A $3,254 Schedler N/A VP N/A N/A Goose Point1 N/A Smith N/A N/A N/A VP $90,000 Chaisson 1991 Smith Goose Point1 N/A N/A Chaisson N/A 9 N/A N/A StT. 1988 N/A VP N/A Burns N/A 10 Sediment Fence VP N/A $18,000 StT. LaBranche Schedler N/A N/A Burns Wetlands $76,250 N/A N/A N/A 1987 Hainkel LaBranche VP N/A 6 StJo. N/A N/A N/A Goose Point N/A VP 2000 Smith 35 Chaisson N/A N/A Tan. Lighthouse Madisonville N/A Winston N/A N/A N/A Hainkel VP 2001 N/A N/A Turtle Cove N/A 1 SP StB. 2000 Odinet 7 Jones Island Orl. Dean Odinet N/A Duplessis N/A N/A SP Bayou Bienvenue N/A SP Blind Lagoon 4GoePitV / / celrBurns Schedler N/A N/A VP 94 GoosePoint ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive ef 719 NANANANA$24,000 N/A 7 StT. N/A 7 StT. N/A 5 N/A StC. 1991 27 Jeff. StC. t.4 StT.

Pa rish

Acres Benefited 93NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A 1993 N/A N/A 1992 N/A 1992 94NANANAN/A N/A N/A N/A 1994

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $16,000 $16,000 $3,432 $3,693 timate

Current

Co st Es timat trade gallonsofCaliforniabulrush( extensive nutriadamage. shorelines, acrossinteriormarshes,and mudflatsthathaveahistoryof 2,000 seashorepaspalum( ( planted torenourishmarshareasimpactedby nutria herbivory. A totalof2,000tradegallonssmoothcordgrass ( along thenorthshoreofLakePontchartrainandBayouLaCombe. A totalof10,000singlestemssmoothcordgrass( sides ofthepeninsulawheretherewerenorockprotection. Pontchartrain. Plantswereinstalledaroundasmallnearbyisland,andalongthe Lighthouse, whichislocatedonapeninsulaextendingabout600feetintoLake decrease erosionfromwaveactioninLakePontchartrainneartheMadisonville A totalof4,400smoothcordgrass( structure. on LakePontchartrain.Theseplantswereinstalledbehindarockbreakwater linear feetofshorelineinordertoestablishvegetationareacheroded A totalof480giantcutgrass( cypress trees,112roseaucane( and maintenancewasperformedin2001,2002,20032004.In2004,840 establish bottomlandforest.Fenceswereoriginallyconstructedandfilledin2000 Created Christmastreeislandsandplantedvegetation(cypressseedlings)tore- vegetation alongBayouBienvenue. Gauche toslowtidal-influencedwaterexchange,trapsediment,andprotect Approximately 400feetofbrushfencewereconstructedtothesouthwestBayou Christmas treefenceswereplacedinawind-rowmannertotrapsedimentand by nutriaexclusionfence. energy fromLakePontchartrain. Seventy-threepercentoftheplants wereprotected perennials inamarshexperiencing erosionanddegradationfromwave andtidal peat potsofseashorepaspalum ( p 2004 and2005. originally constructedandfilledin2000maintenancewasperformed2001, tree fencehadeffectively trapped. establish aplantcommunityonnewlydeposited siltsandsandsthattheChristmas A totalof4,000smoothcordgrass( tree fencehadeffectivelytrapped. establish aplantcommunityonnewlydeposited siltsandsandsthattheChristmas A totalof4,000smoothcordgrass( alterniflora Approximately 210tradegalloncontainersof smoothcordgrass( A totalof3,000single stem smoothcordgrass( Schoenoplectus californicus rovide wildlifehabitatintheBayouSauvageNationalWildlifeRefuge.Fenceswere e ) and209tradegallonsofgiantcutgrass( Paspalum vaginatum ) wereplanted.In2005,600cypresstrees,and450 Zizaniopsis miliacea Phragmites australis Paspalum vaginatum ProjectSummary Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Spartina alterniflora ) plantswereplantedalong ) plantswereusedover2,400 Spartina alterniflora Spartina alterniflora ) ,and200Californiabulrush Zizaniopsis miliacea ) wereusedtoestablish ) plantswereusedto ) plantswereusedto ) plantswereusedto Spartina ) wereplanted. ) plantsand500 ) plantsand ) wereused ) were 21

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje avdrPm-nV / / loWoo t.1 99 / / / / $6,780 $10,848 N/A N/A N/A N/A N/A $16,000 N/A N/A StC. N/A $13,600 1999 N/A Smith 11 1999 Chaisson StC. N/A N/A $16,000 18 Wooton N/A StT. N/A VP $3,840 N/A Crowe N/A Ullo N/A Boasso LaBranche '99 N/A N/A StC. N/A N/A N/A N/A N/A VP 1998 N/A $7,580 Smith Salvador Pump-in VP 23 Chaisson N/A N/A StT. N/A 1997 N/A N/A Hog Island Burns N/A 20 N/A VP N/A Schedler StT. 1996 N/A $3,866 LaBranche'98 N/A Burns N/A 15 N/A Schedler VP StT. 1996 N/A N/A N/A 98 GoosePoint Burns 6 N/A StJo. Schedler VP N/A N/A Smith 97 GoosePoint N/A 1996 Chaisson N/A $10,299 13 VP N/A StB. N/A 96 GoosePoint N/A Hutter VP N/A N/A Smith Boasso 1995 Turtle Cove Chaisson N/A N/A 4 N/A N/A StT. VP N/A Bayou Bienvenue VP N/A Burns 1995 Schedler 17 N/A StB. N/A Creation LaBranche Marsh N/A Hutter VP Boasso 95 GoosePoint N/A N/A MRGO VP arnh 9 IV / / hisnSihStC. Smith Chaisson N/A N/A VP LaBranche '99II ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive t.18 StC.

Pa rish 11 14 11

Acres Benefited 96NANANAN/A N/A N/A N/A 1996 99NANANAN/A N/A N/A N/A N/A 1999 N/A N/A N/A 1998 99NANANAN/A N/A N/A N/A 1999

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $8,000 $9,600 $12,800 $8,000 timate

Current

Co st Es timat shoreline erosion. Bienvenue alongtheleveeandaninteriorborrowcanalinordertodecrease to provideavegetativebufferagainstwaveaction fromLakePontchartrain. trade gallonsofCaliforniabulrush( degradation. Allplantswereenclosedinanutriaexclusionfence. to vegetateanexposedmudflatinorderhelppreventmarsherosionand Pontchartrain. experiencing degradationanderosionfromwavetidalenergyLake used toestablishperennialvegetationonabaremudflatareawithinmarsh to provideshorelineprotectionalongBayouDupree. used alongtheMississippiRiverGulfOutlet(MRGO)inordertocreatemarshand smooth cordgrass( energy, andpreventcontinuederosion. linear feetofshorelineinordertoprotectanarea oferodedshoreline,absorbwave A totalof1,000giantcutgrass( vegetation bufferalonganerodingshorelinesegment. bulrush ( A totalof800giantcutgrass( A totalof2,000tradegallonssmoothcordgrass ( erosion. provide abufferagainstwaveactionandtocombatinteriormarshdegradation A totalof1,200tradegallonssmoothcordgrass( A totalof4,000singlestemssmoothcordgrass( by agabionbreakwaterstructure. used toestablishgiantcutgrassalonganareaoferodedshorelinewhichisprotected A totalof480tradegallonsgiantcutgrass( A totalof430tradegallonsblackmangrove( A totalof3,000singlestemsmoothcordgrass( A totalof1,500galloncontainerssmoothcordgrass( LaBranche marsharea. californicus A totalof1,000tradegallon containersofCaliforniabulrush( surrounding levee. establishment oftheplantswillprovidestability incaseofdamagetothe californicus A totalof1,200tradegalloncontainersCalifornia bulrush( californicus A totalof1,600tradegalloncontainersCaliforniabulrush( LaBranche marsharea. californicus A totalof1,000tradegallon containersofCaliforniabulrush( e Schoenoplectus californicus ) wereplantedtoenhance theproductivityandwildlifehabitatof ) wereplantedonaspoilsitelocatedintheinterior marsharea.The ) wereplantedintheinteriorspoildisposalareatoenhanceproductivity. ) wereplantedtoenhance theproductivityandwildlifehabitatof Spartina alterniflora Zizaniopsis miliacea Zizaniopsis miliacea ProjectSummary Schoenoplectus californicus ) tradegallonswereusedtoprovidea ) tradegallonswereusedonBayou Zizaniopsis miliacea Spartina alterniflora Avicennia germinans Spartina alterniflora ) tradegallonsand800California Spartina alterniflora Spartina alterniflora ) plantswereusedalong5,000 Spartina alterniflora Schoenoplectus Schoenoplectus Schoenoplectus Schoenoplectus ) wereusedto ) plantswere ) plantswere ) treesand688 ) wereused ) wereused ) and500 ) were 22

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje eosrto PNANAAee mlyLv 02 / / / / $6,200 $4,816 N/A N/A N/A $6,400 N/A N/A N/A $8,000 N/A 2002 N/A N/A 7 N/A $7,524 N/A Liv. 2002 Smiley N/A N/A N/A 7 Amedee StT. $7,558 N/A N/A N/A Burns N/A N/A 2001 Demonstration VP Schedler N/A Lake Maurepas $4,000 9 N/A N/A Asc. N/A 2001 N/A N/A Smiley VP N/A 11 Amedee N/A Shoreline Demo StT. Big Branch 2001 N/A N/A N/A Burns $5,424 N/A 9 Schedler VP Liv. N/A N/A N/A Saveiro Canal $8,136 N/A Smiley 2001 N/A VP Amedee 11 N/A StC. N/A N/A Demonstration N/A 2000 Goose Point N/A Smith VP 6 Chaisson N/A Asc. N/A Lake Maurepas N/A Smiley N/A N/A N/A Amedee VP StC. Bayou LaBranche 2000 N/A N/A Smith N/A 9 VP Chaisson StT. 2000 Saveiro Canal N/A 14 Crowe Asc. N/A Boasso VP Smiley LaBranche 2000 N/A Amedee N/A VP N/A West PearlRiver N/A VP Blind River e ie aa PNANAAee abr s.920 NANANANA$6,400 N/A N/A N/A N/A 2002 9 Asc. Lambert Amedee N/A N/A VP New RiverCanal ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 23

Acres Benefited 00NANANAN/A N/A N/A N/A 2000

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$16,000 timate

Current

Co st Es timat the existingcanalbankfromerosion. barren channelbanktostabilizetheerodingbank. and 1364-inchcontainersofbitterpanicum( existing vegetation. fertilization ofplantsinnaturalenvironmentsnewlyplantedvegetationaswell to establishavegetativebufferalongtheshorelineandobserveeffectsof along SaveiroCanal,eastofSorrento,tocreateabufferagainstshorelineerosion. shallow sandbanks.Atotalof2,908linearfeet ofplantingswerecreated. planting, andtodemonstratetheeffectiveness ofestablishingbitterpanicumon demonstrate theeffectsoffertilizerapplication tosmoothcordgrassonashoreline bank andlakeshoreline wereprotected. Maurepas inanareathatwasusedbytheoilindustry. Atotalof3,200feetriver vegetative bufferalongBlindRiverandtostabilize barrenshorelineofLake planted with100plugsofgiantcutgrass( ( A riverbankplantingusing600tradegalloncontainers ofgiantcutgrass Five hundredtradegalloncontainersofsmooth cordgrass( gallons ofCaliforniabulrush( A totalof400tradegallonsgiantcutgrass( A totalof1,000tradegallonssmoothcordgrass( Lake Maurepasjunction. close offanabandonedoilfieldcanallocatedthreemilesnorthoftheBlindRiver- A totalof800giantcutgrass( exchange betweenthecanalandadjacentmarsh. particular stretchofthecanalbankiscurrentlyatriskbreaching,allowingwater along BayouLaBranchetoprovideabufferagainstshorelineerosion.This A totalof1,000Californiabulrush( A totalof500tradegallonsgiantcutgrass( gallons ofCaliforniabulrush( A totalof400tradegallonsgiantcutgrass( 1,000 tradegallonsofgiantcutgrass( A totalof200tradegallonsCaliforniabulrush( banks ofBlindRiver. selected areastoprovideavegetationbufferandreclaimerodedalongthe of 4,000feetcanalbank wasvegetated. ( This canalbankplanting used800tradegalloncontainersofgiantcutgrass wildlife habitat. californicus Approximately 2,000tradegalloncontainersofCaliforniabulrush( Zizaniopsis miliacea Zizaniopsis miliacea e ) wereplantedintheinteriormarshtoenhanceproductivityandimprove ) andashorelineplantingusing200feetofcoconut fiberlogs ) tovegetateanewlylifted leveebankalongthecanal.Atotal Zizaniopsis miliacea Schoenoplectus californicus Schoenoplectus californicus ProjectSummary Schoenoplectus californicus Zizaniopsis miliacea Zizaniopsis miliacea Panicum amarum Zizaniopsis miliacea Zizaniopsis miliacea Zizaniopsis miliacea Schoenoplectus californicus ) plantswereusedinanattemptto Spartina alterniflora ) plantswereusedin ) wereplantedtoprotect ) plantswereusedalonga Spartina alterniflora ) weredonetocreatea ) wereplantedto ) plantswereplaced ) and400trade ) and400trade ) wereplanted Schoenoplectus ) wereused ) and ) 23

Section 204/1135 Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje ao lc PNANAAee abr Asc. Lambert Amedee Liv. N/A Smiley N/A Amedee StT. VP N/A Burns Bayou Black N/A Schedler VP StJo. Faucheux N/A Blind River N/A Amedee StB. VP N/A Hutter N/A Point Platte VP Boasso Asc. N/A Maurepas N/A Lambert Liv. VP West Lake Amedee Smiley StT. N/A Amedee Foundation Burns Wetlands N/A VP N/A St. Bernard Schedler N/A New River'04 VP N/A N/A VP Demo II Lake Maurepas N/A '04 Big BranchDemo N/A VP Bayou Conway N/A N/A VP N/A Diversion Canal Amite River N/A VP Demonstration Point Platte o- MNANABas otnPa.NA19 NANANANA$150,000 N/A N/A N/A N/A 1999 N/A Plaq. Wooton Boasso N/A N/A DM 2 to-3 MRGO, Berm,Mile ct Numb Proj e er ( ct F Na edera me l) -

Proj

ect PPL Ty pe

Age n cy /Sp mdeSmiley Amedee Smiley Amedee Burns Schedler o nsor Se n ator

Repre

sen ta tive Asc. Liv. StT.

Pa rish 11 9 1 9 7 1 9 1 9 1 5

Acres Benefited 03NANANANA$8,000 N/A N/A N/A N/A N/A N/A N/A N/A N/A 2003 N/A N/A 2003 N/A 2003 05NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2005 N/A N/A N/A N/A 2005 N/A N/A N/A N/A 2005 N/A N/A N/A N/A 2004 N/A N/A N/A N/A 2004 N/A N/A N/A 2004 N/A N/A 2004 N/A 2004

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $6,400 $1,550 $6,400 $4,800 $1,170 $6,400 $750 $6,400 $1,650 $2,725 timate

Current

Co st Es timat were plantedonBayouConwaytocreatevegetationnewspoil. Approximately 1,000tradegalloncontainersofgiantcutgrass( feeds BretonIsland.This projectwascompletedinAugust1999. along theMississippiRiver GulfOutlet(MRGO)tonourishthelittoral systemthat This Section204project utilizedmaterialfrommaintenancedredging activities along theintersectionoftwochannels. californicus A totalof800tradegalloncontainersCaliforniabulrush( establish vegetationonanoilcanalspoilbank. ( Approximately 100tradegalloncontainersand150-feetofsmoothcordgrass planted toestablishvegetationonanewlydredged canal. A totalof800tradegalloncontainersgiant cutgrass( Blind River. californicus A totalof600tradegalloncontainersCalifornia bulrush( accelerate siltingofaninteriormarsh. ( Approximately 90feetofcoconutfibermatswith impregnatedsmoothcordgrass area atthemouthofBlindRiver. California bulrush( A totalof4,000feetshorelineplantingusing 800tradegallonscontainersof fiber materialsinasalinemarsh. ( A totalof150feetcoconutfibermatsimpregnatedwithsmoothcordgrass were plantedtoestablishvegetationonanewlydredgedcanal. Approximately 800tradegalloncontainersofgiantcutgrass( giant cutgrass( Approximately 150feetofcoconutfibermatsand100logswith with smoothcordgrass( A totalof200tradegalloncontainersand225feetcoconutfibermatsimpregnated stabilize thebarrenshorelineofLakeMaurepas. not coconutmatspreventherbivoredamage. Spartina alterniflora Spartina alterniflora) Spartina alterniflora e ) wereplantedtoestablishavegetativebufferdampenwaveaction ) wereplantedtovegetateanaturalsiltdeposit ontheeasternbankof Zizaniopsis miliacea Schoenoplectus californicus ) plugs,impregnatedintococonutfiber,wereplantedto ) wereplantedtodemonstratetheeffectivenessofcoconut and80feetofunvegetatedcoconutfiberlogs wereplantedto Spartina alterniflora ProjectSummary ) wereusedtocreateavegetativebuffer ) wereplantedtodeterminewhetheror ) wereplantedonnewlyaccreted Zizaniopsis miliacea Schoenoplectus Schoenoplectus Zizaniopsis miliacea Zizaniopsis miliacea ) were ) ) 24 Program projects. Resources DevelopmentAct;FEMA=Federal EmergencyManagmentAdministrationprojects;CIAP=CoastalImpactAssistance 204/1135= WaterResourceDevelopmentAct Sections204and1135beneficialuseofdredgedmaterialprojects;WRDA=Water Restoration Program(ChristmasTreeProgram); Vegetation=DNR/NRCS/SWCCVegetationPlantingProgram;Section funded primarilybytheStateofLouisianathrough theCoastalRestorationDivision;PCWRP=ParishWetlands Corps ofEngineers. Conservation Service;NWRC=National WetlandsResearchCenter; USFWS=U.S. FishandWildlifeService;USACE=U.S. Army Program: Agency/Sponsor: Project Type: PPL: OM=Outfall Management; BI=BarrierIsland;SD=SedimentDiversion. Creation; SP=ShorelineProtection;FD=Freshwater Diversion;VP=VegetationPlanting;SNT=SedimentandNutrientTrapping; Other Other FEMA Section 204/1135 Section 204/1135 Section 204/1135 Section 204/1135 Program 4355NP4 PO- HPL-MIT 81768 DSR- PriorityProjectList(as authorizedeachyearbytheBreauxActTask Force).

State Proje BreauxAct=CoastalWetlandsPlanning,Protection andRestorationAct(CWPPRA);State=Restorationprojects HR=HydrologicRestoration;DM=Beneficial UseofDredgedMaterial;MM=MarshManagement;MC=Marsh 2(03 MNANABas dntSB 1 03 / NA / NA$580,000 N/A $290,000 N/A N/A N/A $350,000 N/A N/A N/A 2003 N/A 113 StB. N/A $1,050,000 N/A Odinet 2002 N/A Boasso 50 N/A N/A StB. N/A N/A DM Odinet 1999 N/A Boasso 50 12 (2003) StB. N/A MRGO, Mile14to N/A Odinet N/A DM Boasso N/A N/A 1999 12 (2002) MRGO, Mile14to N/A DM 26 Plaq. Wooton 14 to11 Boasso MRGO (1999),Mile N/A N/A DM Mile 2.3to4.0 Island Restoration, MRGO, Breton iiainPoetS / / hisnFuhu to 0 96 / / / / $2,222,892 $42,800 N/A N/A N/A N/A N/A N/A N/A 1996 600 N/A StJo. 2000 Faucheux N/A Chaisson StC. N/A Park Mitigation Smith Fontainebleau State N/A Chaisson SP Mitigation Project N/A Lake Pontchartrain N/A SP Wetlands (FEMA) LaBranche c

EPA=Environmental Protection Agency;NMFS=NationalMarineFisheries Service;NRCS=NaturalResources t Numb Proj e er ( ct F Na edera me l) MNANAShde iso t.619 NANANANA$225,000 N/A N/A N/A N/A 1999 6 StT. Winston Schedler N/A N/A DM SP

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig (Region 1) n, Con & Lan s tr d uction Cost rights N/A=Not Applicable. Parish: size andquantity. Beginning withBreauxActPPL10,projectcosts areforPhaseIonly.Vegetationprogramprojectcostsestimatedbasedon programs arefromDNR'sContractandBudget Section.BaselineCostandCurrentEstimatebothincludecontingencyfunds. Baseline CostEstimatesandCurrent forBreauxActprojectsarefromtheUSACE.Costsotherrestoration Anticipated AcresBenefited: Tan.=Tangipahoa, Ter.=Terrebonne,Ver.=Vermilion. Orl.=Orleans, Plaq.=Plaquemines,StB.=St.Bernard, StC.=St.Charles,StJo.=St.JohntheBaptist,StM.=St.Mary,StT.=St.Tamman

Ope

Asc.=Ascension,Asu.=Assumption,Cal.=Calcasieu, Cam.=Cameron,Ibe.=Iberia,Jef.=Jefferson,Laf.=Lafourche, ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co

N/AforBreauxActdemonstrationanddeauthorized projects. st Es timate

Current

Co st Es timat to marshvegetationestablishment. River GulfOutlet(MRGO)navigationchannelandplacedatanelevationconducive acres ofmarsh.Thematerialwasdredgedfrommiles14.0to12.0theMississippi This projectinvolvedpumping4.3millioncubicyardsofsedimentstocreate113 impact ofHurricaneLiliandTropicalStormIsidore. 50 acresofmarshbehindtheMRGOjetty.Thisprojectwasfasttrackeddueto The projectinvolvedpumpingapproximately1.6millioncubicyardstocreatesome vegetation establishment. Outlet (MRGO)navigationchannelandplacedtoanelevationconducivemarsh The materialwasdredgedfrommiles14.0to11.0oftheMississippiRiverGulf yards ofmaterialintoshallowwateradjacenttothesouthjettyataboutmile15.3. This Section204projectprovidedfortheunconfinedplacementof3,468,901cubic project wascompletedinNovember1999. along theMississippiRiverGulfOutlet(MRGO)torepairBretonIsland.This This Section204projectutilizedmaterialfrommaintenancedredgingactivities State Park. 9,000 cubicyardsofsandforafeederbermon theeasternmostendofFontainebleau This projectrepairedasectionofbreachedshoreline bydepositingapproximately the LakePontchartrainHurricaneProtectionProject. Area. Theprojectspecificallymitigatedfordamages resultingfromconstructionof Pontchartrain paralleltoafive-milereachofthe ManchacWildlifeManagement This projectconsistedofanear-shore,segmentedbreakwatersysteminLake damaged byHurricaneGeorges,Earl,andTropicalStormFrancisin1998. A 700-footsectionofaChristmastreebrushfencewasrepaired.Thisproject e ProjectSummary plant y, REGION 2

INTRODUCTION saltwater intrusion, nutria herbivory, wind Region 2 encompasses the Breton induced shoreline erosion, and high Sound and Barataria Basins and the subsidence rates. Mississippi River Delta. It extends from the Habitat objectives for the year 2050 MRGO on the east to Bayou Lafourche on are the result of a cooperative effort between the west, and from the Mississippi River on the public, parish governments, and Coast the north to the on the south. 2050 Regional Team members. Several This region covers all or part of the large diversions into the Barataria Basin are following parishes: St. Bernard, proposed to extend the fresh marshes south Plaquemines, Jefferson, Lafourche, St. of Little Lake and across the basin through Charles, St. James, St. John the Baptist, and the Myrtle Grove area. Another objective is Assumption. to create a new strip of fresh marsh parallel Region 2 contains 894,700 acres of to the Mississippi River from West Pointe a coastal wetlands. These wetlands are la Hache to Venice and near the river in classified as 90,000 acres of bottomland American Bay. A band of intermediate hardwood forests; 146,000 acres of cypress- marsh is desired gulfward of the fresh tupelo swamps; 220,100 acres of fresh marshes, and brackish marshes are desired marshes; 73,000 acres of intermediate to its south in the vicinity of Barataria Bay. marshes; 214,500 acres of brackish marshes; Additional objectives include the restoration and 151,100 acres of saline marshes. and maintenance of barrier islands and the This region lost approximately barrier shoreline. 52,160 acres of wetlands between 1990 and Coast 2050 identified specific 2000 (an average of 5,184 acres per year). regional ecosystem strategies for protecting This region is currently experiencing some and sustaining the region’s coastal of the highest rates of land loss across resources. These specific ecosystem Louisiana’s coast; therefore, there is a high strategies can be grouped into one of the concentration of restoration projects in the following five general categories: restoring area. Factors that are contributing to this swamps; restoring and sustaining marshes; degradation include: altered hydrology, oil protecting bay and lake shorelines; restoring and gas access canals and associated and maintaining barrier headlands, islands,

25 and shorelines; and maintaining critical Parish Coastal Wetlands Restoration landforms on the Central Basin Land Program Bridge. A total of eight Christmas tree projects have been constructed in Region 2. PROJECT SUMMARIES The projects include Goose Bayou, Whiskey A total of 169 restoration projects Canal, Fourchon, Eighty Arpent Canal, have been authorized for Region 2 (Figures Bayou Bienvenue, Bayou Segnette, Bayou 6 and 7, Table 2). Project specific Gauche, and Catfish Lake. In 2005, the information is presented below, organized Goose Bayou, Fourchon, and Catfish Lake by project funding source. Christmas tree projects were refurbished.

CWPPRA DNR/NRCS/SWCC Vegetation Planting A total of 46 projects have been Program authorized under the direction of CWPPRA Since 1988, a total of 95 vegetation in Region 2. They are anticipated to benefit planting projects have been implemented in 42,596 acres of wetlands at a cost of Region 2. Several phases, spanning multiple $288,510,665. This includes the Riverine years, exist for many of the planting Sand Mining/Scofield Island Restoration projects. The vegetation planting projects (BA-40) project, the South Shore of The Pen that were constructed in 2005 in Region 2 Shoreline Protection and Marsh Creation are Lake Verret, Ollie Canal, Bayou Petit (BA-41) project, and the White Ditch Liard, Little Lake/Round Lake, King/Rawle, Resurrection and Outfall Management (BS- Bayou Lafourche, West Bayou Dupont, Fifi 12) project which were authorized in 2005 Island, East Little Lake, and the Christmas on the 14th Project Priority List. Tree Fence Demonstration. The CWPPRA Task Force officially deauthorized nine projects in Region 2, Section 204/1135 these projects include: Fourchon Hydrologic Within Region 2, the three Section Restoration (BA-18), Bayou Perot and 204/1135 projects which created marsh Bayou Rigolettes Marsh Restoration (BA- using dredged material are Grand Terre 21), White’s Ditch Outfall Management Island Wetland Creation, Barataria Bay (BS-04a), Grand Bay Crevasse (BS-07), Waterway (mile 31 to 24.5), and Barataria Pass-a-Loutre Crevasse (MR-07), Beneficial Bay Waterway (Grand Terre, Phase II). Use of Hopper Dredged Material Approximately 115 acres of marsh were Demonstration (MR-08), Upper Oak River created on Grand Terre Island. The two Freshwater Siphon, Phase I (BS-09), Bayou Barataria Bay Waterway projects created L’Ours Ridge Hydrologic Restoration (BA- approximately 205 acres of marsh along 6.5 22), and LA Highway 1 Marsh Creation miles of waterway. (BA-29). Water Resources Development Act State Two freshwater diversion projects, Thirteen projects have been authorized under the WRDA, will benefit implemented in Region 2 and funded by the the largest acreage of wetlands, thus far. Wetlands Trust Fund and/or local parish The Davis Pond Freshwater Diversion funds. These projects benefited an project, completed in 2001, will preserve estimated 11,292 acres of land at a cost of 33,000 acres of deteriorating wetlands in the $20,821,508. Barataria Basin. The Caernarvon Freshwater Diversion project, completed in 1991, will preserve 16,000 acres of wetlands 26 in the Breton Sound hydrologic basin. Operation of the Caernarvon diversion is anticipated to help rehabilitate marshes lost and damaged by Hurricane Katrina in the upper Breton Sound basin within Region 2.

Other In Region 2, the Fifi Island Restoration Project, which received funding from the CIAP of 2001, was constructed in 2003. An additional project, Fisheries Habitat Restoration on West Grand Terre Island, was also constructed in 2003 and received funding through a NOAA Fisheries grant.

27 28

Figure 6. Location of Breaux Act projects authorized in Coast 2050 Region 2. 29

Figure 7. Location of State, PCWRP, Vegetation, Section 204/1135, WRDA, and Other projects in Coast 2050 Region 2. Table 2. Restoration projects completed or pending in Coast 2050 Region 2.

l) e drights & edera , F on Dat e r ( & Lan nc e e n, a ig s t timate timat inten Es Numb De a Es t nsor ive , M st t c me pe o at g s Sp t Co Co Na Ty / en uction Completierin uction Cost ion, e ct ct cy s tr e tr at e e n ator ish s s r n r Project Summary

Program State Proje Proj Proj PPL Age Se Repre Pa Acres BenefitedCon Engin Cost Con Ope Monitoring Cos Baselin Current

GIWW (Gulf Intracoastal This project will protect approximately 14,948 acres of intermediate wetlands by Waterway) to restoring natural hydrologic conditions. The project utilizes canal plugs, weirs, and BA-02 Clovelly Hydrologic the rebuilding of low overflow banks to better retain freshwater and prevent rapid

Breaux Act Act Breaux (BA-02) Restoration HR 1 NRCS Dupre Pitre Laf. 175 2000 $981,549 $5,462,880 $2,471,703 $8,141,512 $8,916,131 salinity increases resulting from saltwater intrusion. The goal of this project is to reduce saltwater intrusion and enhance wetland productivity by managing the outfall of eight existing siphons. The two fixed crest BA-03c Naomi Outfall Boasso, weirs assist in the management of existing siphon outfall water from the Mississippi

Breaux Act Act Breaux (BA-03c) Management OM 5 NRCS Ullo Wooton Plaq. 633 2002 $303,108 $800,169 $1,078,150 $1,686,865 $2,181,427 River into adjacent west bank wetlands.

This project provides for management of the West Pointe a la Hache siphon outfall area to maximize the retention of freshwater, nutrients, and sediment within interior West Pointe a la brackish marshes to counteract saltwater intrusion and wetland loss. This project BA-04c Hache Outfall utilizes water control structures to divert water from the main distributary channels

Breaux Act Act Breaux (BA-04c) Management OM 3 NRCS Boasso Wooton Plaq. 1,087 Pending $637,409 $1,764,443 $1,666,193 $881,148 $4,068,045 to secondary channels and allow more efficient flow over the marsh. The project is intended to maintain the shoreline along a section of Lake Salvador and help re-establish the natural hydrology of interior marsh. Phase I of the project was constructed to demonstrate the effectiveness of four separate types of segmented Lake Salvador breakwaters in a poor soil environment. Phase II of the project included the

30 BA-15 Shore Protection installation of 8,000 feet of continuous rock structure along the western section of

Breaux Act Act Breaux (BA-15) Demonstration SP 3 NMFS Chaisson Wooton StC. N/A 1998 $363,162 $2,058,356 $388,834 $1,444,628 $2,810,353 the lake. Fourchon Hydrologic The goal of this project was to restore tidal exchange to 2,400 acres of impounded BA-18 Restoration wetlands. The project was officially deauthorized by the Breaux Act Task Force in

Breaux Act Act Breaux (BA-18) (Deauthorized) HR 1 NMFS Dupre Pitre Laf. N/A Deauth. $7,340 N/A $363 $252,036 $7,703 July of 1994 at the request of the landowner. This project was authorized to create marsh in shallow water areas adjacent to the Barataria Bay Waterway. However, oyster leases prohibited the use of the dredged material at all of the marsh creation sites. As an alternative, approximately 9 acres of Barataria Bay vegetated wetlands were created adjacent to the state-funded Queen Bess project by BA-19 Waterway Wetland constructing a rock dike and filling the containment area with dredged material from

Breaux Act Act Breaux (BA-19) Restoration MC 1 USACE Ullo Wooton Jef. 445 1996 $157,135 $945,791 $64,906 $1,759,257 $1,167,832 the Barataria Bay Waterway.

The goal of this project is to restore the natural hydrologic conditions of the area and BA-20 Jonathan Davis reduce shoreline erosion. This is accomplished through a constructed series of water

Breaux Act Act Breaux (PBA-35) Wetland ProtectionHR 2 NRCS Ullo Wooton Jef. 510 2001 $1,383,509 $19,375,618 $8,127,489 $3,398,867 $28,886,616 control structures and a rock dike. This project was authorized to protect deteriorated intermediate-to-brackish marsh Bayou Perot/Bayou located between Lake Salvador and Little Lake by using dredged material to re- BA-21 Rigolettes Marsh establish the shoreline. Due to an unstable and rapidly eroding site, the project was (XBA- Restoration Jef. deemed unfeasible and was officially deauthorized by the Breaux Act Task Force in

Breaux Act Act Breaux 65a) (Deauthorized) MC 3 NMFS Ullo Wooton Laf. N/A Deauth. $14,880 N/A $6,083 $1,835,047 $20,963 January of 1998. Bayou L’Ours This project was proposed to restore natural hydrologic flow to the marsh by Ridge Hydrologic reinforcing breached areas of the Bayou L’Ours Ridge through a series of canal BA-22 Restoration closures and two water control structures. The project was officially deauthorized by

Breaux Act Act Breaux (PBA-34i) (Deauthorized) HR 4 NRCS Dupre Pitre Laf. N/A Deauth. $265,334 N/A $105,899 $2,418,676 $371,232 the Breaux Act Task Force in April 2003.

(Region 2) 31

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program i) (XBA-1a- BA-28 BA-27d 63iii) (XBA- BA-27c 63/63ii) (XBA- BA-27 12b) (PBA- BA-26 BA-25b (PBA-20) BA-25 48a) (XBA- BA-24 12a) (PBA- BA-23

State Proje

sadV MSUl otnJf 2 01$117,657 $209,575 $928,895$493,753 $166,521 2001 127 $18,250,646 $22,787,951 Jef. $6,642,206 Wooton $8,704,760 $4,573,679 Pending Ullo NMFS 256 Jef. 7 VP Wooton Ullo Island NRCS Site onGrandTerre 11 Material Disposal SP of aDredged Vegetative Plantings Phase 4 Ullo, Dupre Shoreline Protection NRCS Landbridge Barataria Basin 9 SP Protection, Phase3 Shoreline Landbridge SP Barataria Basin Wooton and 2 Protection, Phases1 Ullo Shoreline NRCS $3,013,365 Landbridge 6 Barataria Basin $2,192,418 SP Shoreline Protection $877,592 Waterway EastSide EPA Barataria Bay $1,851,223 11 Pitre FD $284,550 Bayou Lafourche Dupre 2000 Reintroduction Into Mississippi River EPA 232 Jef. NMFS 5 FD Wooton 5 FD Siphon (Phase1) Bayou Lafourche Ullo NRCS Siphon 4 Myrtle Grove SP Protection Side Shoreline Waterway West Barataria Bay ct Numb Proj e er ( ct F Na edera me l)

Proj RSUllo,Dupre NRCS 8 7 and ect PPL Ty pe

Age n cy /Sp loWoo lq ,1 edn 4291NA$,5 $15,525,950 $489,103 Chaisson $6,152 Dupre, Ullo, $482,951N/A Pending 1,119 Plaq. Wooton Ullo Boasso, o nsor Se n ator Pitre Wooton, Pitre Wooton, Dove Dartez, Baldone, Triche, Wooton, Pitre,

Repre

sen ta tive Jef. 217 2001 $365,838 $3,560,349 $1,307,290 $5,019,900 $5,224,477 $3,560,349 $365,838 2001 217 $24,487,337 $1,500,000 Jef. Orl. N/A $1,500,000N/A N/A N/A Laf. Ter. a.2420*$,8,6 1,9,9 3,2 $15,204,620 $12,816,320 $1,283,862$11,496,297 $38,526 2004* 264 Laf. Jef. $17,515,029 $21,987,488 $1,826,285$25,908,814 $1,694,259 Pending 1,304 Laf. Jef. $9,700,000 $9,700,000 $80,400 $9,619,600N/A Pending 988 Asu. Asc. Laf.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat by purchasinggrazing rightsontheislandforlifeofproject(20 years). Grand TerreIsland.This objectivewasachievedthroughvegetation plantingsand The goalofthisproject istostabilizedredgedmaterialsitesontheeastern endof Bayou Rigolettesandtiesintothenorthernlimit ofPhases1and2. Bay Waterway,andextendsabout31,500feet southwardalongtheeastbankof Phase 4ofthisprojectbeginsattheintersection ofBayouRigolettesandBarataria structure tolimitsaltwaterintrusionintothearea. approximately 9,400linearfeetofrockmaterialandinstallationawatercontrol strategies includedarmoringthewesternbankofBaratariaBayWaterwaywith marsh fromincreasedwaterexchangeandrapidchangesinsalinity.Theproject This projectisintendedtoreduceerosionofthechannelbankandprotectexposed on theeastbankofBBWW. saltwater intrusion.Theprojectconsistsofinstallinga17,600linear-footrockdike (BBWW), toprotecttheadjacentmarshfromexcessivetidalaction,andprevent The objectiveofthisprojectistorebuildthebanksBaratariaBayWaterway project wasreauthorizedonthe11thPPLasBA-25b. introducing nutrientandsedimentladenriverwaterthroughlargesiphonpipes.This The goaloftheprojectistoreducemarshlossadjacentBayouLafourcheby *Construction Units1-3havebeencompleted. Bayou Rigolettesandapproximately2,700feet alongeachbankofHarveyCutoff. Parish, about9,600feetoftheshorelineprotection willbealongtheeastbankof Bayou PerotandthenorthshoreofLittleLake inLafourcheParish.InJefferson protection. Approximately26,000feetofprotection willbealongthewestbankof Phase 3ofthisprojectencompassesapproximately 41,000feetofshoreline Bayous PerotandRigoletteswithintheBarataria Basin. 1 and2ofthisprojectwillprovide35,000linear feetofshorelineprotectionalong located betweenLakeSalvadorandLittlebyreducingshorelineerosion.Phase This projectisdesignedtoprotectadeterioratedintermediate-to-brackishmarsh on the5thPPLasBA-25. Mississippi RiverwaterviaBayouLafourche.Thisprojectwasoriginallyauthorized and Terrebonnebasinsthroughreintroductionofsedimentnutrientladen The goaloftheprojectistorestoreandprotecthealthmarshesinBarataria River toadjacentwetlands. This willbeaccomplishedbydivertingwaterthroughasiphonfromtheMississippi The goaloftheprojectistoreducesaltwaterintrusionandnourishexistingmarsh. e ProjectSummary 32

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program BA-39 BA-38 BA-37 BA-36 BA-35 BA-34 BA-33 Project) (Complex BA-31 01a) (XBA- BA-30 (BA-32a) BA-29

State Proje

ytmM 2EABas otnJf 0 edn 26379NA$770 21275 $2,731,479 $2,192,735 $37,760 $2,693,719N/A Pending 400 Jef. Wooton $61,995,587 $66,492,384 $6,976,625$58,978,833 $537,622 Boasso Pending 534 EPA Plaq. 12 MC Wooton $1,994,410 Boasso NMFS $2,294,410 System 11 Sediment Delivery BI $22,572 Mississippi River $2,344,387 $1,880,700 Restoration N/A Mer toChalandPass $24,198 Island andPassLa $1,971,838 Pending Project: Pelican Island Complex 605 Barataria Barrier $2,320,189N/A Jef. Pending Wooton 161 Near RoundLake Plaq. Dedicated Dredging N/A Protection/ Wooton Ullo Shoreline USFWS Little Lake Boasso 11 MC NMFS N/A Basin Landbridge 11 on theBarataria BI Dedicated Dredging EPA N/A 10 Restoration FD Barrier Shoreline $2,312,023 Grand BayouPass N/A $1,856,203 Pass Chalandto $31,246 USACE 10 Basin N/A SD Pending Northwest Barataria $1,151,484 Reintroduction Into $2,280,777N/A $1,433,393 N/A $23,851 Pending Mississippi River Plaq. 403 Wooton Grove Jef. Diversion atMyrtle $319,700N/A Boasso Deauth. Wooton Delta Building USACE N/A Boasso 9 Laf. SD NMFS South ofEmpire 9 Pitre Delta Building BI Dupre Restoration EPA Terre Islands 9 East/West Grand MC (Deauthorized) Marsh Creation LA Highway1 ct Numb Proj e er ( ct F Na edera me l) C1 MSDpePteLf 1 edn 20254$18931$3,3 $35,994,929 $33,990,151 $2,022,574$31,829,321 $139,136 Pending 713 Laf. Pitre Dupre NMFS 11 MC SP

Proj

ect PPL Ty pe

Age n cy /Sp Chaisson Amedee, Ullo Wooton Boasso, o nsor Se n ator Quezaire Triche,

Repre

sen ta tive a.91Pnig$,1,2 / 4,6 $,9,3 $2,362,687 $1,899,834 $47,762 $3,002,114 $3,002,114 $2,314,925N/A Pending N/A 941 Laf. StJo. $3,002,114N/A Pending 8,891 Laf. Jef. Plaq.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat area withintheBarataria Basin,andplantingmarshvegetation. delivering, viapipeline, dredgedmaterialfromtheMississippiRiver toanadjacent The goalofthisproject istocreate/restore538acresofbrackishmarsh by Barrier IslandRestoration GrandeTerretoSWPass(BA-32). dune, andwetlandhabitats. Thisprojectwasfirstauthorizedonthe9th PPLas envision dedicateddredging oflocal,nearshoresandsourcestodirectly createbeach, the volumeofsandwithinactivebarriersystem. Conceptualprojectplans related surgeandwaveprotection,preventovertopping duringstorms,andincrease The objectivesofthisprojectistocreatebarrier islandhabitat,enhancestorm- the depositionofdredgedmaterialintoopenwater areas. critical areaoftheBaratariaBasin.Thisproject willcreateemergentmarshthrough Protection project(BA-27,BA-27c),willprotect thefunctionalintegrityofthis This project,inconjunctionwiththeBarataria BasinLandbridgeShoreline thereby protectingthemainlandshorelinefrom continuederosion. plantings. Thiswillprovideacontinueousbarriertoreducewaveandtidalenergy, deposition ofdredgedmaterial,thecreationtidalcreeksandponds,vegetation This projectwillpreventthebarrierislandfrombeingbreachedthrough ability ofthesefeaturestoregenerateandstabilize. Ultimately, theprojectwillrelaysedimenttobarriershorelineenhancing through thediversionandcaptureoffluvialsedimentfromMississippiRiver. The objectiveofthisprojectistocreatemarshinopenwaterareassouthEmpire dune andmarshhabitatontheeasternwesternendsofisland. and extendtheisland'slifeexpectancy.Dredgedmaterialwillbeusedtocreate The goalofthisprojectistostabilizeandbenefit1,575acresbarrierislandhabitat February of2005. areas. ThisprojectwasofficiallydeauthorizedbytheBreauxActTaskForcein adjacent toLouisianaHighway1usingdredgedmaterialfromtwoproposedborrow The objectiveofthisprojectwastocreatemarshhabitatinalargeopenwaterarea additional 532acresoffragmented,subsiding marsh. Little Lakeshoreline,create488acresofintertidal wetlands,andnourishan rates ofshorelineerosion.Thisprojectwillprotect approximately21,000feetof This projectisdesignedtoprotectareawetlands whichcurrentlyexperiencehigh banks andplacementofculvertsunderLAHighway20. the MississippiRivertonorthwestBaratariaBasinwetlands,withgappingofspoil to adjacentswampareas.Theprojectwillutilizeafreshwaterdiversion/siphonfrom The goalofthisprojectistorestorethenaturalhydrologicregimeandaddnutrients combination oftheseactions. of BayouDupont,theBaratariaBayWaterway,andWilkinsonCanal;ora Grove; dedicateddredgingfromtheMississippiRivertocreatemarshinvicinity box culvertsonthewestbankofMississippiRiverinvicinityMyrtle creation ofnewemergentwetlands.Theprojectwouldinvolveinstallationgated The objectiveofthisprojectistodivertMississippiRiverwaterandsedimentforthe e ProjectSummary 33

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program BS-12 BS-11 BS-10 (PBS-1) BS-09 (PBS-06) BS-07 (BS-04a) BS-04a (BS-03a) BS-03a BA-41 BA-40

State Proje

ufl aaeetO 4NC osoWoo lq 8 edn 15566 / / 15566 $1,595,676 $1,595,676 N/A N/A $2,053,216 $1,595,676 Pending $3,183,940 189 Plaq. $92,954 Wooton $1,155,200 $1,580,053 $1,155,200 $381,843 Boasso Pending NRCS $2,500,239 $15,179 267 $56,476 14 Plaq. OM Outfall Management $25,067 Wooton Resurrection and N/A $1,403,754 White Ditch Pending Boasso USFWS 501 Plaq. 10 $56,476N/A SD Deauth. Wooton at FortSt.Philip Delta Management Boasso 0 $2,468,908 USACE Plaq. $3,310 $65,747 10 Wooton SD Boasso $62,437 N/A Fort St.Philip $756,134 $32,862 Deauth. NRCS Diversion Northof $7,521 N/A Delta Building 8 Plaq. FD Wooton $25,341N/A $1,311,146 (Deauthorized) Deauth. Phase 1 Boasso $1,311,146 N/A USACE Freshwater Siphon, Plaq. $2,009,870 $2,522,199$4,536,000 $2,128,665 Upper OakRiver $397,464 4 Wooton SD 2002 N/A Boasso 802 (Deauthorized) Plaq. Grand BayCrevasse NRCS $3,211,887 Wooton N/A 3 OM $1,311,146 $3,221,887 Pending Boasso (Deauthorized) NRCS 116 $10,514 Outfall Management Jef. White’s Ditch 2 OM Wooton N/A Management $3,211,373 Ullo Diversion Outfall Pending Caernarvon NRCS 234 Plaq. 14 SP Wooton Marsh Creation Boasso Protection and NMFS Pen Shoreline South ShoreofThe 14 BI Island Restoration Mining/Scofield Riverine Sand ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat interior marsh. channel atthejunction with RiverAuxChenesinordertoforcewater intothe strategies alsoincludeinstalling awatercontrolstructureintheWhite Ditchoutfall construction ofanadditional siphonofsimilarsize.Theproject’sproposed rehabilitation orreplacement oftheexistingsiphonatWhiteDitchand the nutrients, andsediment intothemarsh.Thiswillbeaccomplishedthrough the The goalofthisproject istoreducetheerosionratebyintroducingfresh water, bays. enhance sedimentretentionandreducewaveenergy inoneofthelargereceiving banks ornaturalridges.Inaddition,linearvegetated terraceswillbeconstructedto constructed todivertfreshwaterandsediment intoareascurrentlyrestrictedbyspoil result ofthecrevasseatFortSt.Philip.Sixadditional artificialcrevasseswillbe The objectiveoftheprojectistoenhance delta-building processoccurringasa divert sedimentandnutrientstoadjacentwetlands. east descendingbankoftheMississippiRiver inthevicinityofFortSt.Philipto dredging aseriesofchannelarmorgapsthatwill bestrategicallylocatedalongthe area andenhancetheintegrityofdeltasystem. Projectstrategiesincluded This projectisintendedtoreducethelossofexisting marshinthe2,252-acreproject officially deauthorizedbytheBreauxActTask ForceinJanuaryof2003. freshwater, nutrients,andsedimenttoenhance marshhealth.Theprojectwas freshwater siphonandoutfallchannel.These strategies wouldhaveprovided deterioration intheprojectareaduetosaltwater intrusion,throughinstallationofa The primarygoalofthisprojectwastoreversethetrendinteriormarsh of 1998. area. TheprojectwasofficiallydeauthorizedbytheBreauxActTaskForceinJuly Grand Bayandtheadjacentmarshestocreate,restore,enhancewetlandsin head oftheJurjevichCanaltoestablishapathwayforfreshwaterandsedimentinto Project goalsincludedconstructionofarock-linedopeningthroughtherocksat Task ForceinJanuaryof1998. failure tosecurelandrights,theprojectwasofficiallydeauthorizedbyBreauxAct directly benefitedbytheCaernarvonFreshwaterDiversionproject.Becauseof sediment intothedeterioratingwetlandsinBretonSoundBasinthatarenot This projectwasdesignedtodirecttheflowofMississippiRivernutrientsand applicable. protection, 13,000feetofspoilbankrestoration,andvegetationplantingswhere flowthrough culvertswithwatercontrolat8sites,3plugclosuresarmor low-discharge periods.Theoutfallmanagementprojectincludesinstallationof nutrients fromtheMississippiRiverviaCaernarvondiversionstructureduring The objectiveofthisprojectistopromotebetterutilizationfreshwaterand revetment willbeconstructedalongthesouthshoreofThePenandBayouDupont. Approximately 1,000feetofconcretepileandpanelwall10,900rock nourish 107acresofmarshlocatedbetweenThePenandBaratariaBay. The goalsofthisprojectaretostopshorelineerosionandcreate74acres barrier marshcreationtoincreaselongevity. reinforce theexistingshorelinewithsand,andincreaseislandwidthback The goalsofthisprojectaretorepairbreachesandtidalinletsintheshoreline, e ProjectSummary 34

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program MR-12 DEMO) (MR- MR-11 12b) (XMR- MR-10 (PMR-10) MR-09 (XMR-12) MR-08 (MR-8/9) MR-07 (XMR-10) MR-06 (FMR-03) MR-03

State Proje

eietTa N 2EABas otnPa.110Pnig$,5,2 NA$925 18036 $1,880,376 $1,880,376 $29,245 N/A $1,502,817 $1,856,427 Pending $1,502,817 1,190 Plaq. $68,572 Wooton $1,340,730 Boasso $93,515 Pending EPA 12 N/A SNT Plaq. Wooton $1,600,000 Sediment Trap $1,911,487 $135,876$1,729,611 $46,000 Mississippi River Boasso 2002 USACE N/A Plaq. 9 FD Sites Demonstration Wooton Selected Diversion $3,983,259$5,473,934$4,732,653 $471,360 $298,034 Nutrients at Boasso Sediment and USACE 1999 Introduction of 2,386 6 $300,000 $58,310 Periodic DM Plaq. $9,591 Wooton Demonstration River Delta Boasso $48,719 N/A the Mississippi $2,857,790 Deauth. $119,835 NMFS Marsh Creationin $11,721 N/A Operations for 6 Plaq. Dredging SD Maintenance Wooton $108,114 N/A Dustpan Deauth. Boasso Crevasses N/A USACE $253,486 $393,778 $808,397$888,985 $241,720 Plaq. Delta Wide 1997 4 DM Wooton 936 Plaq. Boasso (Deauthorized) USACE Demonstration Wooton Material 3 $22,615,838 $16,339,854 $8,517,066 $1,845,470$4,607,552 Hopper Dredged SD Boasso Beneficial Useof USACE 2003 (Deauthorized) 9,831 3 Crevasse Plaq. SD Pass-a-Loutre Wooton Boasso Crevasse USACE Channel ArmorGap 1 SD Diversion West BaySediment ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat deposition. would consistofanarea dredgedoutoftheriverbedthatwouldforce sediment and 1aboveHeadofPasses intheMississippiRiver.Theproposedsediment trap the beneficialuseofmaterial dredgedfromasedimenttraplocatedbetween miles5 This projectwasreauthorized onthe12thPPLtocreateemergentwetlands through sediment inputconcentrations,butalsothesubsequent effectsintheoutfallarea. siphon. Monitoringoftheprojectwilldetermine notonlythecharacteristicsof pipeline dredgetoprovideincreasedsediment throughadiversionstructureor The demonstrationprojectisintendedtoshow theeffectivenessofusingahydraulic approximately 222,000cubicyardsofdredged material. deteriorated marshthathadconvertedtoshallow openwaterwasrestoredwith hydraulic dredgetocreateandrestoreadjacent marsh.Approximately40acresof routine maintenanceoftheMississippiRiverNavigation Channelbyusingadustpan This projectwasintendedtodemonstratethebeneficial useofdredgedmaterialfrom splays orcreatingnewones. Management AreaandtheDeltaNationalWildlifeRefugebyeithercleaningexisting intermediate marshinshallow,openwaterareasofthePass-a-LoutreWildlife The objectiveofthisprojectistopromotetheformationemergentfreshwaterand 2000. the projectwasofficiallydeauthorizedbyBreauxActTaskForceinNovemberof a-Loutre andRaphaelPasstocreatenewemergentmarsh.Duedesignproblems, the mouthofpassandbedepositedinshallowopenwaterareabetweenPass- The goalofthisprojectwastoconstructacrevasseallowsedimententernear costs attributedtorelocatingundergroundutilitiesinthearea. officially deauthorizedbytheBreauxActTaskForceinJulyof1998duetohigh Mississippi RiverbetweenPass-a-LoutreandRaphaelPass.Theprojectwas accomplished throughconstructionofacrevasseontheleftdescendingbank Marsh creationandrestorationwastheobjectiveofthisproject.Thistobe material fromtheoutfallchanneltoadjacentmarsh. gap intheMississippiRiverchannelbankarmorandadding125,000cubicyardsof Wildlife Refugearea.Theprojectconsistedofdeepeningtheexisting150-footwide increasing freshwaterandsedimentfromtheMississippiRivertoDeltaNational The implementationofthisprojectisintendedtorestorevegetatedwetlandsby second atthe50%durationstage. channel designtoaccommodateafull-scalediversionof50,000cubicfeetper River andmarshdevelopmentareas(2)modificationoftheinterimdiversion 20,000 cubicfeetpersecond(cfs)atthe50%durationstagesinMississippi phases: (1)initialconstructionofaninterimchanneltoaccommodateadischarge that iscurrentlyshallowopenwater.Adiversionchannelwasconstructedintwo The objectiveoftheprojectistorestorevegetatedwetlandsinWestBayarea e ProjectSummary 35

State State State State State State State State State Breaux Act Breaux Act Program A0cBi eCatsS / / hisnWoo t.1019 / / / / $175,000 $161,250 LA-01a N/A N/A 88 Jef. N/A N/A Damico GIBSB Ullo N/A N/A BS-06 N/A N/A SP N/A N/A 1990 BayouSegnette 1990 130 BA-16 15 StC. Jef. Wooton Wooton Chaisson BA-15x1 N/A Ullo N/A SP N/A N/A BaiedeChactas DM BA-05c QueenBess BA-05b BA-04 BA-03 MR-14 MR-13

State Proje

avdrD / / hisnWoo t.2 99NANANANA$342,276 N/A $500,000 N/A N/A $1,000,000 N/A N/A N/A N/A N/A 1999 N/A 28 StC. N/A N/A Wooton 1995 Chaisson $2,270,847 5 N/A N/A Jef. N/A DM 1997 Wooton N/A 100 StB. Ullo Salvador Odinet Program -Lake N/A N/A Dedicated Dredging N/A Boasso SP $6,081,800 N/A N/A N/A Breakwaters FD Grand IsleBaySide N/A N/A Restoration 2005 Hydrologic 2,035 Lake Lery N/A St.C Wooton Chaisson N/A N/A N/A SP N/A Extension Project 1992 Shoreline Protection $1,137,344 $1,137,344 Lake Salvador 718 Plaq. Wooton N/A Boasso N/A $1,076,328 $1,421,680N/A N/A Pending $1,076,328 FD 433 Plaq. $29,245 N/A N/A Wooton Diversion FD Hache Siphon Boasso West Pointeala N/A USACE $1,047,083 13 Pending Diversion SD 5,706 Naomi Siphon Plaq. Wooton Diversion Spanish Pass Boasso USACE 10 SD Sediment Diversion Benneys Bay ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp loWooton Ullo Boasso, o nsor Se n ator

Repre

sen ta tive lq ,1 92NANANANA$6,666,667 N/A N/A N/A N/A 1992 1,318 Plaq. Jef.

Pa rish

Acres Benefited 98NANANANA$1,373,151 N/A N/A N/A N/A 1998 1994,

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat adjacent tothewaterways. dredged material,andthereby nourishand/orrebuildthreatenedcoastal marshes hydraulic dredgealong inlandwaterwaysinLouisiana'scoastalzone todeposit Dedicated DredgingProgram. Thegoalofthisprogramistouseasmall, mobile Salvador WildlifeManagement Area.Thisprojectispartofthecoastwide state Two siteswerefilledutilizing dredgedmaterialadjacenttoBaieduCabanage onthe Fifteen 300-footbreakwaterswereconstructed ontheback-baysideofGrandIsle. The purposeofthisprojectwastoreduceerosion onthebaysideofGrandIsle. completed inMayof1997. was builtinpartnershipwiththeLakeBorgne BasinLeveeDistrictandwas into themarshnorthofLakeLeryandhelpprevent saltwaterintrusion.Theproject central edgeoftheSt.BernardParishRidge. This willdischargecollectedrainfall This projectinvolvedtheconstructionofapumping stationlocatedalongthesouth- shoreline alongthenortheasternportionofLakeSalvador.Theprotection Thepurposeofthisprojectistobuildarockdikethatwillprotectthemarsh Salvador andBaiedeChactasduCabanage. shoreline torestorethephysicalintegrityofmarshseparatingLake Approximately 300,000poundsofcrushedoystershellwereplacedon7,400feet the areahasbecomevegetated. original islandin1992toarmortheshoreline.Pelicannestscontinueincreaseand increase itssizein1991,andarockdikewasinstalledaroundtheperimeterof ( The purposeofthisprojectistorestoreQueenBessIslandasabrownpelican siphons is2,100cubicfeetpersecond. of therivernearPointealaHache,Louisiana.Themaximumdischarge the MississippiRiver,overlevee,andintoadjacentwetlandsonwestside This projectinvolvestheconstructionofeightparallelsiphonstodivertwaterfrom open waterreceivingareas. practicable, bydivertingMississippiRiverwaterandsedimentfromGrandPassinto The goalofthisprojectistocreateemergentmarsh,themaximumextent the 20-yearprojectlife. nourish, andmaintainapproximately4,510acresoffreshtointermediatemarshover areas inBenneysBay.Theprojectwoulddivertsedimentanefforttocreate, The objectiveoftheprojectistocreatevegetatedwetlandsinshallowopenwater was necessaryinthe1998-1999fiscalyearat a costof$300,000. appropriated forthedesignofthisstate-funded project.Maintenanceofthisproject separating BayouSegnettefromLakeSalvador. AdditionalCWPPRAfundswere This projectarmoredandre-definedapproximately 6,800linearfeetofshoreline p phase IICWPPRAproject. area withculturalresources.Thisprojectisdesigned asanextensionoftheBA-15 Louisiana. Themaximumdischargeofthesiphonsis2,100cubicfeetpersecond. the MississippiRiver,overlevee,andintoadjacentwetlandsnearNaomi, This projectinvolvestheconstructionofeightparallelsiphonstodivertwaterfrom Pelecanus occidentalis roject wasbuiltontheland(asopposedtoinshallowwater)avoiddredgingan e ) rookery.Dredgedmaterialwasaddedtotheisland ProjectSummary 36

PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP State State State State Program NGI MR-01b LA-01c LA-01b

State Proje ao enteS / / loDmc e.120 / / / / $33,000 N/A $18,000 $18,000 N/A N/A N/A N/A $96,938 N/A N/A N/A N/A N/A 2001 $377,500 N/A 1 N/A N/A Jef. N/A 2001 N/A Damico 1997 N/A 1 StB. Ullo N/A 2 Jef. N/A N/A Hutter N/A 1991 SP N/A Alario Boasso Bayou Segnette 2 N/A N/A Ullo 7 Laf. N/A SP StB. N/A 1991 Bayou Bienvenue N/A Pitre Odinet SP 23 Boasso Dupre Jef. Whiskey Canal Wooton N/A N/A N/A N/A SP SP Eighty ArpentCanal Ullo N/A N/A Fourchon SP Goose Bayou ao aceS / / hisnSihSC 01NANANANA$45,000 N/A N/A N/A N/A 2001 3 StC. Smith Chaisson N/A N/A SP Bayou Gauche rawtr PNANAUl ir e.5 95NANANANA$160,000 N/A N/A N/A $450,000 N/A 1995 N/A $1,080,017 50 Jef. N/A N/A Pitre N/A N/A Ullo N/A N/A N/A N/A SP 2005 6,719 Plaq. 26 N/A Breakwaters StC. Wooton North GrandIsle 2000 Wooton Boasso 66 Chaisson Jef. N/A N/A N/A N/A Wooton Diversions SD DM Small Sediment Ullo N/A Loutre N/A DM Program -Passa Dedicated Dredging Dupont Program -Bayou Dedicated Dredging ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited 92NANANANA$56,989 N/A N/A N/A N/A 1992 1991, 91NANANANA$1,010,500 N/A N/A N/A N/A 1991 1986,

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat fences weremaintainedin1997. promote sedimentaccumulationandminimize erosionalongtheshoreline.The Brush fenceswereconstructedin1991and1992 alongEightyArpentCanalto wildlife andfisherieshabitat. Segnette andLakeSalvador inordertoslowwaterflowandprovide additional Approximately 45,000Christmastreeswereplaced inanareabetweenBayou protect vegetationalongBayouBienvenue. The constructionofbrushfenceswillslowwater movement,trapsediment,and fences wereconstructedtopreventerosionat the intersectionoftwocanals. Whiskey CanalislocatednorthofLakeCataouatche inJeffersonParish.Thebrush 2000, 2001,2003and2005. maintenance wasperformedin1992,1993,1994, 1995,1996,1997,1998,1999, Brush fenceswerebuiltin1991alongacanal topreventshorelineerosion,and 1995, 1996,1997,1998,1999,2000,2001and2005. constructed andfilledin1991maintenancewasperformed1992,1993,1994, Bayou Cypress,LeFleur,andLaTour.Fenceswereoriginally accretion andvegetationgrowthattheshoreline.Thisprojectincludesothers The brushfenceswereconstructedtoprotecttheshorelineandpromotesediment 2004. Maintenancewas performedin2003and2004. and reduceshorelineerosion. Anadditional50feetofbrushfencewas addedin intersection ofGrandBayou andSimoneauxPonds,inordertoslow water exchange Approximately 50feet of brushfencewasconstructedalongBayouGauche, nearthe crevasses createdinSouthPass(2,3,and4)1990-1991. constructed onPass-a-Loutre(1,2,3a,and3b)in1990-1991,and;threenew 1987 fiscalyearatSouthPass,LoomisandPass-a-Loutre;fournewcrevasses These projectsinvolvetherefurbishmentofthreecrevassesconstructedin1986- 1995. Levee Districtsuppliedconstructionfunds.ConstructionwascompletedinJune construction funds,andwasinvolvedininspectiononly.Thelocal Louisiana Hwy1.TheDepartmentofNaturalResourcescontributedno of GrandIsletoprotectcampslocatedbetweenCaminadaBayandthewestside This projectwasauthorizedtoconstructsegmentedrockbreakwatersonthebayside marshes adjacenttothewaterways. deposit dredgedmaterial,andtherebynourishand/orrebuildthreatenedcoastal mobile hydraulicdredgealonginlandwaterwaysinLouisiana'scoastalzoneto the vicinityofPassaLoutre,Louisiana.Thegoalthisprogramistousesmall, The projecthascreatedapproximately26acresofsustainablefreshwatermarshin nourish and/orrebuildthreatenedcoastalmarshesadjacenttothewaterways. waterways inLouisiana'scoastalzonetodepositdredgedmaterial,andthereby goal ofthisprogramistouseasmall,mobilehydraulicdredgealonginland Pen. ThisprojectispartofthecoastwidestateDedicatedDredgingProgram.The Three siteswerefilledutilizingdredgedmaterialadjacenttoBayouDupontandThe e ProjectSummary 37

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation PCWRP Program

State Proje ig ig PNANADpePteLf 91NANANANA$1,600 N/A N/A N/A N/A 1991 1 Laf. Pitre Lake Salvador $52,604 Dupre Laf. N/A Goose Bayou N/A $21,626 N/A Laf. Pitre VP Dupre Pitre Plaq. Kings Ridge N/A N/A N/A Wooton Dupre N/A VP Boasso N/A N/A N/A Pointe AuChien $46,460 N/A VP N/A $41,000 N/A VP N/A N/A N/A Bay L'Ours N/A 1989 N/A 1 N/A Pass Laf. N/A 1988 Red Pass/Spanish 111 Pitre N/A Laf. Myrtle Grove N/A Dupre Pitre N/A N/A Bayou LaTour N/A N/A Dupre 1988 VP 2001 N/A 7 N/A StC. Kings Ridge VP 1 Laf. Wooton Chaisson Pitre Clovelly N/A N/A Dupre VP N/A Salvador WMA N/A SP Catfish Lake Temple Bay ct Numb Proj e er ( ct F Na edera me l) VP VP VP VP VP

Proj / / ur ir Laf. Pitre Jef. Dupre Wooton N/A N/A Ullo N/A N/A Plaq. Wooton StC. Boasso Wooton N/A N/A Ullo N/A N/A / / ur ir Laf. Pitre Dupre N/A N/A ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 11 28 1 46 21 48 24 9

Acres Benefited 92NANANANA$6,780 N/A $20,340 N/A N/A N/A N/A $2,400 N/A N/A N/A $28,250 1992 N/A N/A N/A $19,820 1992 N/A N/A N/A $53,558 N/A N/A N/A N/A $29,804 1991 N/A N/A N/A N/A 1991 N/A N/A N/A 1991 N/A N/A 1991 N/A 1991 92NANANANA$5,424 N/A N/A N/A N/A 1992

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat revegetate theshorelineofGrandBayouatPointe AuChien. in theVenicearea. single stemsofgiantcutgrass( behind newlyconstructedwavedampingdevices. gallon containerswereusedinasinglerowon1-footcenterstostabilizethebank were usedtostabilizethebankbehindnewlyconstructedwave-dampingdevices. erosion. provide alivingnaturalbarrierforprotection against wave-inducedshoreline planted toestablishvegetation alongasectionoferodedcoast. stabilize newsediment. used behindsedimentfencesandChristmastree fencesalongBayouLaTourtohelp to providestabilizationbehindarecentlyconstructed wavedampingdevice. used tovegetateanareaontheuppermostpartofaprotectionlevee. A totalof800galloncontainers ofsmoothcutgrass( Approximately 4,000singlestemsofsmooth cordgrass ( A totalof600singlestemssmoothcordgrass ( A totalof10,000singlestemssmoothcordgrass ( A totalof3,500singlestemssmoothcordgrass( A totalof13,050singlestemssmoothcordgrass( A totalof7,125singlestemssmoothcordgrass( A totalof400singlestemssmoothcordgrass ( erosion. provide alivingnaturalbarrierforprotectionagainstwave-inducedshoreline A totalof1,345smoothcordgrass( 48,000 linearfeetofshorelinetominimizeerosion. A totalof24,000smoothcordgrass( latifolia A totalof900smoothcordgrass( hurricane protectionlevee.Maintenancewasperformedin2003,2004and2005. Lake, justwestofGoldenMeadow,inordertostabilizethatparticularsectionthe Approximately 400feetofbrushfencingwasconstructedalongthebankCatfish a spoilbankbehindwave-reduction fence. A totalof800smoothcordgrass ( e ) plants,and900Californiabulrush( Zizaniopsis miliacea ProjectSummary Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora ) wereplantedoninteriormarsh Spartina alterniflora Spartina alterniflora Spartina alterniflora ) plants,900cattail( ) plantswereusedtostabilize Spartina alterniflora ) plantswereusedto ) plantswereusedalong ) wereusedto ) wereusedto ) and1,500 ) and1,425 ) wereused ) were ) were ) plants Typha ) were 38

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje

ig ig PNANADpePteLf 94NANANANA$17,149 N/A N/A N/A N/A 1994 2 Laf. Pitre Shoreline Bayou Lafourche Dupre Fourchon N/A N/A VP Kings Ridge LaReussite Hache Plaq. West Pointeala Wooton Boasso Club N/A N/A Little LakeHunting VP Plaq. Lake Laurier Wooton Boasso Arpent Canal Plaq. N/A Lake Lery/Eighty N/A Wooton VP Boasso Lake Hermitage N/A N/A VP Yellow CottonBay Round Lake N/A N/A VP Bayou Dupont ct Numb Proj e er ( ct F Na edera me l) VP VP VP VP VP VP VP

Proj / / ur ir Laf. Pitre Laf. Dupre Pitre N/A N/A Dupre N/A N/A Plaq. Wooton Boasso Plaq. Wooton N/A N/A Boasso Jef. N/A N/A Wooton Ullo N/A N/A StB. Odinet Boasso N/A N/A Plaq. Wooton Boasso N/A N/A ect PPL Ty pe

Age n cy /Sp osoWoo Plaq. Wooton Boasso Ullo, o nsor Se n ator

Repre

sen ta tive

Pa rish 37 29 3 6 80 2 11 2 6 4 1

Acres Benefited 95NANANANA$18,304 N/A $26,829 N/A N/A N/A N/A $4,579 N/A N/A 1995 N/A $3,526 N/A N/A N/A 1995 $134,244 N/A N/A N/A $1,068 N/A N/A 1994 N/A N/A $6,780 N/A 1994 N/A N/A N/A $1,068 N/A N/A N/A N/A $6,144 1994 N/A N/A N/A N/A $4,435 1993 N/A N/A N/A N/A 1993 N/A N/A N/A 1993 N/A N/A 1992 N/A 1992 92NANANANA$8,088 N/A N/A N/A N/A 1992

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat 1,800 feetofwavedampeningfence. were usedtorevegetatealevee.Brokenordeteriorated boardswerereplacedon siphon. vegetation intheimmediateoutfallareaof WestPointealaHachefreshwater brackish marsh,totrapsedimentinthesamearea, andtoestablishfreshwater used toreducetheeffectsofwaveenergyonseveral deterioratingspoilbanksina gallon containersofCaliforniabulrush( protect theshorelineatbaseoflevee. pots ofgulfcordgrass( 10,000 "D"potsofmarshhaycordgrass( shoreline ofapipelinecanalthatrunseasttowest. peat potsofseashorepaspalum( erosion alongtheshorelineofRoundLake. wildlife habitatdiversity. protect theshorelinefrom erosionbyhighenergytidalcurrents,and improve mangrove ( outfall fromtheLaReussitefreshwatersiphon. were usedtoestablishmarshvegetationandtrap sedimentinthemarshreceiving Canal. openings tosmalllagoonsandprovideaprotectivebarrieralongtheEightyArpent induced shorelineerosion. along theshorelineofBayou Lafourchetoprovidealivingbarrieragainst wave- A totalof3,200gallon containers ofgiantcutgrass( A totalof1,000smoothcordgrass( A totalof250galloncontainersCalifornia bulrush ( A totalof400galloncontainerssmoothcordgrass( A totalof2,000galloncontainerssmoothcordgrass( help stabilizesediment. cordgrass ( A totalof110seashorepaspalum( A totalof1,000smoothcordgrass( reduction fenceforgroundstabilization. cordgrass ( A totalof110seashorepaspalum( A totalof1,875singlestemssmoothcordgrass( stems ofsmoothcordgrass( A totalof250seashorepaspalum( A totalof145galloncontainerssmoothcordgrass ( shoreline tostabilizethebankofBayouDupont. A totalof2,022smoothcordgrass( e Spartina alterniflora Spartina alterniflora Avicennia germinans Spartina spartinae Spartina alterniflora ) plantswereusedbehindawave-reductionfenceto ) plantswereusedtoplantvegetationbehindawave Paspalum vaginatum ) treeswereusedtoprotectandstabilizemud flats, ProjectSummary Paspalum vaginatum Paspalum vaginatum Paspalum vaginatum Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Spartina patens ) wereusedtostabilizetheleveeand ) plantswereusedtoprevent Spartina alterniflora Zizaniopsis miliacea Spartina alterniflora Spartina alterniflora ) wereusedtostabilizethe Schoenoplectus californicus Spartina alterniflora ) plantsand100smooth ) plantsand100smooth ) plantsand1,320single ) plantsand1,500black ) plantswereusedtoblock ) plantswereusedalongthe ) plants,and10,000"D" ) plantswere ) and300 ) wereused ) and120 ) plants ), ) 39

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje Simoneaux Ponds Bayou Segnette Plaq. Wooton Queen BessIsland Boasso N/A N/A VP Club Phase2 Little LakeHunting Pass 2 Red Pass/Spanish Myrtle Grove#2 Clovelly Farms Lake Cheniere New Canal Belair Scarsdale Big Mar Lake LeryShoreline ct Numb Proj e er ( ct F Na edera me l) VP Wooton VP Ullo N/A N/A VP VP VP Baldone VP Dupre Baldone N/A N/A VP Dupre N/A N/A VP VP VP VP VP

Proj / / hisnWoe StC. Wooten Chaisson Jef. N/A Alario N/A Boissiere N/A N/A Jef. Wooton Ullo N/A N/A Plaq. $4,056 Wooton Laf. Boasso N/A Pitre N/A N/A Dupre N/A N/A N/A N/A N/A Plaq. 1995 Wooton 30 Boasso Plaq. Wooton N/A N/A Boasso Plaq. N/A Wooton N/A Boasso N/A N/A / / osoOie StB. Odinet Boasso N/A N/A ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive e.5 Jef. 75 Laf. 1 Laf.

Pa rish 20 9 10 21 15 1 7 8 23

Acres Benefited 97NANANANA$8,000 N/A $5,085 N/A N/A N/A N/A $27,200 N/A N/A N/A 1997 $19,820 N/A N/A 1997 N/A $16,080 N/A N/A N/A $814 N/A N/A N/A N/A 1996 N/A N/A N/A 1996 N/A N/A $4,056 1996 N/A N/A 1996 N/A $4,056 N/A N/A N/A N/A 1995 N/A N/A 1995 97NANANANA$6,780 N/A N/A N/A N/A 1997 97NANANAN/A N/A N/A N/A 1997 N/A N/A N/A N/A N/A N/A N/A 1996 N/A 1996

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$2,967 $52,160 $320 timate

Current

Co st Es timat erosion. used tovegetatealowcanalleveeforprotectionagainstwave-inducedshoreline marsh areawhichisnowbeinginfluencedbytheCaernarvonFreshwaterDiversion. were usedtointroduceanemergentfreshwaterplantspeciesinaoncebrackish shoreline atthebaseofaleveeandtostabilize thelevee. containers ofgulfcordgrassplants( vegetative bufferalongseveraldeterioratingislands andadegradedspoilbank. and 1,000baldcypress( vegetation were usedtoabsorbboat-generatedwaveenergyandprovideaseedsourceforre- A totalof1,000tradegallons ofCaliforniabulrush( traffic. shoreline erosioncausedbybothwind-generated waveenergyandfrequentboat 375 tradegallonsofgiantcutgrass( A totalof375tradegallonsCaliforniabulrush ( containers ofmarshhaycordgrass( A totalof400tradegallonssmoothcordgrass ( A totalof840galloncontainersCalifornia bulrush ( on theuppermostpartofaprotectionlevee. pots ofmarshhaycordgrass( A totalof1,340"D"potsgulfcordgrass( A totalof120galloncontainersCaliforniabulrush( A totalof500galloncontainerssmoothcordgrass( Caernarvon FreshwaterDiversionproject. used toestablishemergentfreshwatervegetationintheimmediateoutfallareaof A totalof500tradegallonsCaliforniabulrush( A totalof500tradegallonsCaliforniabulrush( deposits. Lery shorelinetoreduce shorelineerosionandvegetatepredominately baresilt 500 tradegallonsofgiant cutgrass( A totalof500tradegallons ofCaliforniabulrush( intended foragricultural purposes. were usedtorevegetate openbodiesofwaterwhichwereoncepump-off areas soil stabilityontheedgesofdisposalarea andtoenhancewildlifehabitat. trade gallonsofsmoothcordgrass( Approximately 430tradegallonsofblackmangrove ( Cheniere. planted toreduceshorelineerosionalongtwooilfieldcanalsinthevicinityofLake A totalof6,520tradegallonssmoothcordgrass( bank. californicus Approximately 40tradegalloncontainersofCaliforniabulrush( e ) wereplantedtoreducewake-inducedshorelineerosionalongacanal Taxodium distichum Spartina patens ProjectSummary Spartina alterniflora Spartina patens Zizaniopsis miliacea Zizaniopsis miliacea Spartina spartinae Spartina spartinae ) plantswereusedtovegetateanarea ) seedlingswereusedtoforma Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora ) plants,and2,000tube Schoenoplectus californicus Avicennia germinans Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus ) wereusedtoprotect ) wereplantedtoprovide ) wereusedtoreduce ) wereusedalongtheLake ) plantsand1,340"D" Schoenoplectus ), 2,000tube ) were ) and688 ) were ) and ) were ) and ) ) ) ) 40

VegetationVegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje lvlyLveV / / ur ir a.3 99NANANAN/A N/A N/A N/A 1999 34 Laf. $2,712 Pitre Dupre N/A N/A N/A VP N/A Clovelly Levee N/A Scarsdale '98 N/A 1998 Big Mar'98 9 Plaq. '98 Wooton N/A Laf. Lake LeryShoreline N/A VP Boasso Pitre N/A Bayou Dupont Jef. N/A VP Dupre Pitre N/A Bay JoeWise N/A VP Ullo StC. Wooton Fourchon '98 N/A N/A Chaisson VP Plaq. N/A N/A Elmer's Island VP Wooton Boasso Allemands N/A Bayou Des N/A Plaq. VP Wooton Delacroix Corp. StB. Boasso Odinet N/A N/A Boasso VP Cane RidgeSlough N/A N/A VP Sebastopol Canal eari 9 PNANABas otnPa.1 99NANANANA$8,475 N/A N/A N/A N/A 1999 14 Plaq. Wooton Boasso N/A N/A VP Delacroix '99 ct Numb Proj e er ( ct F Na edera me l) VP VP VP

Proj / / osoWoo lq 019 / / / / $8,475 N/A N/A N/A N/A 1998 30 Plaq. Wooton Boasso Plaq. Wooton N/A N/A Boasso StB. N/A Odinet N/A Boasso N/A N/A ect PPL Ty pe

Age n cy /Sp osoWoo Plaq. Wooton Boasso Ullo, o nsor Se n ator

Repre

sen ta tive

Pa rish 7 11 23 15 15 11 8 2 3

Acres Benefited 98NANANANA$9,600 N/A $8,000 N/A N/A N/A N/A N/A N/A $13,560 1998 N/A N/A $18,358 1998 N/A N/A $8,814 N/A N/A N/A $6,780 N/A N/A N/A N/A 1998 $4,746 N/A N/A N/A 1998 N/A $1,017 N/A N/A 1998 N/A N/A N/A 1997 N/A N/A N/A N/A 1997 N/A 1997 98NANANANA$2,400 N/A N/A N/A N/A 1998

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$20,340 timate

Current

Co st Es timat new sandfrombeingerodedbywinds. created bynewlyconstructedsand-trappingfencesegments. cordgrass ( bitter panicum( introduce vegetationthatwerehistoricallyknown tooccurinthisarea. 600 giantcutgrass( A totalof600Californiabulrush( A totalof500tradegallonsgiantcutgrass( A totalof1,000bitterpanicum( inch potsofmarshhaycordgrass( After theconstructionofsandfencesfordunebuildingpurposes,atotal3064- 150 giantcutgrass( A totalof150Californiabulrush( 500 giantcutgrass( A totalof500Californiabulrush( causing breachesintoanadjacentinteriormarsh. used alongadeterioratingcanalbanktopreventboat-wakeinducederosionfrom A totalof700Californiabulrush( used topreventerosionalongSebastopolCanal. A totalof150Californiabulrush( A totalof1,000baldcypress( Freshwater Diversionproject. emergent freshwatervegetationintheimmediate outfallareaoftheCaernarvon Arpent Canal. block openingstosmalllagoonsandprovidea protectivebarrieralongtheEighty gallons ofCaliforniabulrush( planted toprovidehabitatforvariousbirdspecies. A totalof400nursery-grownblackmangrove( 1,500 feetofshorelinetopreventerosion. causing thebankstoerodeintoadjacentmarsh. along areasoftheDelacroixCanalinPlaqueminesParish,whereboattrafficis used toestablishvegetationalonganoilfieldpipe canal. A totalof300tradegallonsCaliforniabulrush ( erosion duetoboattraffic. areas oftheDelacroixCanal tocreateavegetativebufferanddecrease shoreline A totalof1,250giantcutgrass ( to boattraffic. provide avegetationbuffer alongahurricaneprotectionleveewhich haserodeddue A totalof3,000giantcutgrass ( e Spartina patens Panicum amarum Zizaniopsis miliacea Zizaniopsis miliacea Zizaniopsis miliacea ) tubeswereusedtostabilizesanddunesthat Taxodium distichum Schoenoplectus californicus Zizaniopsis miliacea Zizaniopsis miliacea Panicum amarum ProjectSummary Spartina patens Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus ) plantswereusedaroundthefencetoprevent ) tradegallonswereusedtoestablish ) tradegallonswereusedonapproximately ) tradegallonswereusedtoprovideabuffer Zizaniopsis miliacea Avicennia germinans ) plantsand1,0144-inchpotsof Schoenoplectus californicus ) seedlingswereusedtore- ) tubesand1,000marshhay ) tradegallonswereused along ) tradegallonswereused to ) plantswereusedto ) tradegallonsand ) tradegallonsand ) tradegallonsand ) tradegallonswere ) tradegallonswere ) and500trade ) treeswere ) were 41

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje edwV / / ur ir a.2 01NANANANA$16,048 N/A $9,058 N/A N/A N/A N/A N/A N/A 2001 23 N/A Laf. 2001 Pitre 11 $12,204 Jef. Dupre Wooton N/A $5,424 N/A N/A VP Ullo StC. N/A N/A N/A N/A Wooton VP Meadow Chaisson East Golden N/A N/A N/A N/A $1,356 Pump-in VP Barataria Waterway N/A N/A 2000 N/A Allemands Bayou Des N/A 21 Plaq. 2000 N/A 2 Wooton Simoneaux Ponds- 9 $8,475 Boasso Plaq. N/A Queen BessIsland2 Wooton N/A N/A N/A VP Boasso Jeff. N/A N/A Reggio Canal Damico 2000 N/A N/A VP 2 Ullo StC. Port Sulphur N/A Jef. N/A Wooton N/A VP Chaisson Pitre Bayou Bardeaux N/A N/A N/A 1999 VP Ullo 14 Burchell Canal N/A Plaq. N/A VP Wooton N/A N/A Boasso VP Grand Isle N/A N/A VP Canal Bayou Dupont off Ollie CanalPump- erRneCnlV / / osoWoo lq 720 / / / / $7,558 N/A N/A N/A N/A 2001 17 Plaq. Wooton Boasso N/A N/A VP Deer Range Canal ct Numb Proj e er ( ct F Na edera me l) VP VP

Proj / / hisnWoo StC. Wooton Jef. Chaisson Wooton N/A N/A Ullo N/A N/A ect PPL Ty pe

Age n cy /Sp osoWoo Plaq. Wooton Boasso Ullo, o nsor Se n ator

Repre

sen ta tive

Pa rish 11 8 37 5 7 11

Acres Benefited 00NANANANA$8,000 N/A $5,600 N/A N/A $4,932 N/A N/A N/A N/A N/A N/A 2000 N/A N/A 2000 N/A N/A 2000 N/A N/A N/A N/A 2000 N/A N/A N/A 2000 99NANANANA$8,000 N/A N/A N/A N/A 1999

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$1,600 $6,000 timate

Current

Co st Es timat on theislandtoprovidecoverandnestingareas forthenativebirdsinarea. planted toprovidecoverfornestingbirdpopulations. establish avegetativebarriertoslowshoreline erosionalongthebayou. A totalof1,000tradegallonsgiantcutgrass ( for agriculturalpurposes. used torevegetateopenbodiesofwaterwhich wereoncepump-offareasintended A totalof700Californiabulrush( A totalof8224-inchpotsblackmangrove ( that wereerodingtheexisting marsh. shorten thefetchlength withinthisareatotryreducethewind-generated waves A totalof2,000smooth cordgrass( confined area. establish avegetativecoveroverthenewlycreated spoilareathatiswithina A totalof2,571smoothcordgrass( wave energy. canal banktoreducetheerosioncausedbybothboattrafficandwind-generated California bulrush( A totalof1,000giantcutgrass( A totalof8004-inchpotsblackmangrove( 100 giantcutgrass( A totalof100Californiabulrush( A totalof1,250tradegallonsCaliforniabulrush( the SimoneauxPonds. generated waveenergyandfrequentboattraffic.Thisbankseparatesthecanalfrom vegetation bufferonthecanalbankandtoreduceerosioncausedbybothwind- erosion. used alongtheshorelineandinteriormarshwhichhasundergoneheavywave plants and500tradegallonsofgiantcutgrass( A totalof500tradegallonsCaliforniabulrush( new spoilfrom erodingintothecanal. to vegetateanewlycreated spoilareaonthebanksofDeerRangeCanal, tokeepthe A totalof5,257smooth cordgrass( boat traffic. vegetative bufferonthebayoubanktoreduceerosioncausedbywaveenergyand californicus A totalof200tradegalloncontainerseachCaliforniabulrush( planted tocreateavegetativebufferalongsandtrappingfence. Approximately 1,0004-inchcontainersofbitterpanicum( were usedinanoldpump-offordertore-vegetatetheareaanddecreaseflooding. e ) andgiantcutgrass( Schoenoplectus californicus Zizaniopsis miliacea Zizaniopsis miliacea ProjectSummary Zizaniopsis miliacea Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora Spartina alterniflora Spartina alterniflora ) tradegallonswereusedtocreatea Avicennia germinans Avicennia germinans Zizaniopsis miliacea Zizaniopsis miliacea ) tradegallonswereusedonthe Schoenoplectus californicus Schoenoplectus californicus ) tradegallonsand800 ) wereplantedtocreatea ) tradegallonswereused to ) plugswereplacedto ) barerootplugswereused Panicum amarum ) tradegallonswere ) tradegallonsand Schoenoplectus ) plantswere ) treeswereused ) treeswere ) wereusedto ) were ) ) 42

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje ego'2V / / osoWoo lq 420 / / / / $9,600 N/A $11,200 N/A $4,500 N/A N/A N/A Plaq. Wooton N/A N/A N/A Boasso $6,000 2002 N/A N/A N/A 14 $8,000 Plaq. VP N/A N/A Wooton N/A Pelican Island N/A Boasso N/A 2002 N/A 2002 N/A 16 N/A '02 Plaq. VP N/A Simoneaux Ponds 1 Wooton N/A Jef. Boasso Reggio '02 Wooton N/A N/A Jef. N/A $8,085 N/A Ullo 2002 VP Wooton N/A Bayou Mandeville N/A 7 N/A N/A 2002 Ullo VP Jef. 11 Jonathan Davis N/A Wooton $5,000 Jef. N/A N/A VP Wooton Ullo Bridge CU#2 N/A Barataria Land N/A N/A Ullo N/A Jef. VP N/A Wooton N/A N/A Grand IsleDemo N/A VP 2001 Ullo N/A Restoration 10 N/A Queen BessMarsh Laf. N/A VP N/A Pitre Grand Isle2001 2001 Dupre N/A Jef. Myrtle Grove N/A N/A Wooton VP Demonstration Ullo Kings RidgeMarsh N/A N/A VP Barataria Waterway hl sadByV / / osoWoo Plaq. Wooton Boasso N/A N/A VP Shell IslandBay ct Numb Proj e er ( ct F Na edera me l) VP VP

Proj / / hisnWoo StC. Wooton Chaisson N/A N/A Plaq. Wooton Boasso N/A N/A ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 8 2 6 23 5 18

Acres Benefited 03NANANAN/A $6,500 N/A N/A N/A N/A N/A N/A 2003 N/A 2002 N/A N/A N/A N/A N/A $3,200 2002 N/A N/A N/A N/A N/A N/A 2001 N/A 2001 03NANANAN/A N/A N/A N/A 2003

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $6,400 $4,000 $12,000 $4,800 timate

Current

Co st Es timat Pelican Islandandaidin thecollectionofnewsanddeposits. gallons ofseaoats( A totalof500plugsgiantcutgrass( planted. dredged inthesummerof2001.Atotal6,000 linearfeetofcanalbankwere separates thecanalfrompond. used tovegetatethecanalbankprovideavegetativebufferprotectlandthat A totalof400tradegallonsCaliforniabulrush( fiber logswereusedtorecreatesomeoftheislands thathaveeroded. ( This canalbankplantingused1,200tradegallon containersofCaliforniabulrush Mandeville. Atotalof7,000linearfeetcanal bankwereplanted. ( This canalbankplantingused1,400tradegallon containersofgiantcutgrass that hadbeenerodingandsubsiding. californicus A totalof1,000tradegalloncontainersCaliforniabulrush( 3,000 linearfeetwereplanted. amarum This beachplantingused1,0004-inchcontainersofbitterpanicum( 5,000 linearfeetofinteriormarshwereplanted. ( This interiormarshplantingused2,000barerootplugsofsmoothcordgrass that isprotectingtheKingsRidge. of coconutfibermatswereusedtoprotectmarshandattemptreclaimsome A totalof870tradegallonssmoothcordgrass( indirectly affectedbythedepositofspoilinvicinity. used toestablishvegetationinashallowpondtheinteriormarshthathadbeen A totalof1,000Californiabulrush( planted onShellIsland toenhancewildlifehabitatandstabilizesoils. A totalof8004-inchcontainers ofbitterpanicum( exposed tohighwaveaction. alterniflora Approximately 500tradegalloncontainersofsmoothcordgrass( vegetation alonewillpromotesomedunecreation. planted tostabilizethebaresandonbeachofGrandIsleanddetermineif Approximately 2,0004-inchcontainersofbitterpanicum( A totalof8004-inchcontainers ofblackmangroves( Schoenoplectus californicus Zizaniopsis miliacea Spartina alterniflora e ) tocreateavegetativematholdandcollectsandonthebeach.Atotalof ) wereplantedtoestablishvegetationinanopenmarshareathatwas ) and50feetofcoconutfiberlogswereplanted tostabilizemarshland Uniola paniculata ) tovegetateanewlycreatedspoilbankalong Bayou ) tore-establishvegetationafteradiebackin2000.Atotalof ) toestablishvegetationalongthecanalbank that was ProjectSummary Schoenoplectus californicus Zizaniopsis miliacea ) wereplantedtostabilize thesandyareasof Spartina alterniflora Schoenoplectus californicus Panicum amarum Avicennia germinans Panicum amarum ) and500feetofcoconut Schoenoplectus ) tradegallonswere Spartina Panicum ) and200trade ) and225feet ) were ) were ) were 43

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje atLtl aeV / N/A N/A VP St.C Wooton East LittleLake N/A N/A Chaisson VP N/A N/A Jeff. Demonstration VP Fence Wooton Christmas Tree Boasso Laf. Demo '04 Simoneaux Ponds N/A Jeff. N/A Pitre VP Wooton Myrtle Grove'04 Dupre Ullo N/A Plaq. N/A VP Lake DesAllemands N/A Wooton N/A VP Jef. Boasso Wooton Cypress Tree N/A N/A Bayou Perot VP Ullo Jef. Wooton Mandeville II N/A N/A Bayou VP Jef. Ullo Wooton Goose Bayou N/A N/A VP Ullo Northwest Pen N/A N/A VP N/A Terrace Demo N/A Barataria Waterway VP Perot Demo. Lake/South Bayou North Little iiIln PNAN/A N/A VP Fifi Island ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp osoWooton Boasso Wooton Boasso Pitre Dupre osoWooton Boasso o nsor Se n ator

Repre

sen ta tive ef 220 / / / N/A N/A N/A N/A N/A N/A N/A 2005 12 N/A Jeff. 2005 6 Jeff. N/A N/A N/A N/A 2003 12 Laf. ef 220 / / / N/A N/A N/A N/A 2005 12 Jeff.

Pa rish 1 14 1 69 9 9 9 5

Acres Benefited 04NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2004 N/A N/A N/A N/A 2004 N/A N/A N/A N/A 2004 N/A N/A N/A N/A 2004 N/A N/A N/A N/A 2004 N/A N/A N/A 2003 N/A N/A 2003 N/A 2003

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $1,275 $8,000 $750 $1,500 $11,200 $3,200 $6,400 $8,700 $8,000 $1,000 $9,500 $8,000 timate

Current

Co st Es timat embankment. were plantedinordertovegetateanewlycreatedspoilareaandprotectthe will growinChristmastreefencing. 5,000 feetofshoreline to vegetatenewlydredgedmaterial. miliacea been unsuccessful. this projectwastoestablishvegetationinareas whereconventionalplantingshave cutgrass ( Seventy-five feetofcoconutfibermatsand100 feetofcoconutfiberlogswithgiant the areawith2,000plugsofsmoothcordgrass ( The goalofthisprojectwastoestablishvegetation inanewspoilareabyplanting ( Approximately 150feetofcoconutmatsimpregnatedwithgiantcutgrass planted toestablishtreesinnewlydepositedspoil. Approximately 3,000baldcypresscypresstreeseedlings( californicus A totalof700tradegalloncontainersCaliforniabulrush( shoreline. californicus A totalof800tradegalloncontainersCaliforniabulrush( because oftherockjettythathasbeenbuiltinfrontprojectarea. californicus A totalof800tradegalloncontainersCaliforniabulrush( A totalof1,500barerootplugssmoothcordgrass( feet ofsmoothcordgrass( possibility ofvegetatingtheareasbehindshorelineprotectionstructures. miliacea and 300feetofcoconutfibermatsimpregnatedwithgiantcutgrass( 5,000 feetofshoreline to vegetatenewlydredgedmaterial. A totalof2,000smooth cordgrass( 1,000 cutstolonsofroseaucane( The goalofthisprojectwastoplantatotal 2,500 feetofinteriormarshusing A totalof1,000tradegalloncontainerssmoothcordgrass( A totalof2,000smooth cordgrass( Zizaniopsis miliacea e ) wereplantedtoestablishvegetationonanewlydredgedcanal. ) wereplacedalongthesouthernendofBayouPerottoassess Zizaniopsis miliacea ) and700tradegalloncontainersofgiantcutgrass( ) wereplantedtoattemptcreateavegetativebufferalongthebayou ) wereplantedtoestablishvegetationinashallowareathatissilting ) wereusedtoestablishavegetativebufferaround apeninsula. Spartina alterniflora ) wereplantedinSimoneauxPonds.Theobjective of ProjectSummary Phragmites australis Spartina alterniflora Spartina alterniflora ) impregnatedcoconutfiberlogs Spartina alterniflora Spartina alterniflora ) todetermineifcutstolons ) plugswereplantedon ) plugswereplantedon Taxodium distichum Schoenoplectus Schoenoplectus Schoenoplectus Spartina alterniflora Zizaniopsis Zizaniopsis ). ) and300- ) were ) 44

WRDA Section 204/1135 Section 204/1135 Section 204/1135 Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program BS-08

State Proje o2. MNANAUl otnJf 2 99NANANANA$140,000 N/A $1,370,000 N/A N/A 80 N/A Jef. N/A Wooton N/A Ullo N/A 1999 N/A 125 N/A DM Jef. N/A Wooton 1996 115 Ullo Jef. II) Wooton N/A Terre Island(Phase N/A DM Waterway, Grand Barataria Bay Ullo N/A N/A to 24.5 DM Waterway, Mile31 Barataria Bay I) Terre Island(Phase Waterway, Grand Barataria Bay N/A Lake Verret N/A VP Ollie Canal N/A N/A N/A N/A VP VP Bayou PetitLiard N/A Lake N/A Little Lake/Round VP King/Rawle Bayou Lafourche N/A N/A VP West BayouDupont ieso DNAUAEBoasso USACE N/A FD Diversion Freshwater Caernarvon ct Numb Proj e er ( ct F Na edera me l) PNAN/A N/A VP N/A N/A VP

Proj

ect PPL Ty pe

Age n cy /Sp ur ir s.92005 9 Asu. Pitre Dupre Wooton Boasso Wooton Boasso Pitre Dupre 2005 Pitre 12 Laf. Dupre Pitre Dupre Wooton Boasso o nsor Se n ator dntPa.1,0 91NANANANA$24,818,800 N/A N/A N/A N/A 1991 16,000 Plaq. Odinet Wooton,

Repre

sen ta tive l.1 05NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2005 12 N/A Pla. N/A N/A 2005 12 N/A Pla. N/A N/A 2005 14 N/A Laf. N/A 2005 14 Laf. N/A N/A 2005 12 Jeff.

Pa rish

Acres Benefited 02NANANANA$100,000 N/A N/A N/A N/A 2002 1999,

Con

st ruction Completi / / / N/A N/A N/A N/A N/A N/A N/A N/A

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $8,000 $8,000 $10,000 $10,000 $8,000 $6,400 $8,000 timate

Current

Co st Es timat bay sideofGrandTerre Island.ConstructionwascompletedinSeptember of1999. yards ofmaterialdredged fromBaratariaBayWaterwaytocreatewetlands onthe This Section204project providedforthebeneficialplacementof500,000 cubic was completedinSeptemberof1999. 31 and24.5oftheBaratariaBayWaterwayto createmarshhabitat.Construction This Section204projectutilizeddredgedmaterial takenfromazonebetweenmiles Terre Island.Constructionwascompletedin December of1996. yards ofdredgedmaterialfromBaratariaBay Waterway tocreatewetlandsonGrand This Section204projectprovidesforthebeneficial placementof500,000cubic wildlife enhancement. Thisprojectcandivertupto8,000cubicfeet per second. the MississippiRiverto coastalbaysandmarshesinBretonSoundfor fishand This projectdivertsfreshwater anditsaccompanyingnutrientssediment from dredge canalbank. californicus A totalof1,000tradegalloncontainersCaliforniabulrush( establish vegetationonnewlydredgedmaterial. 1,000 tradegalloncontainersofsmoothcordgrass( The goalofthisprojectwastoplantatotal5,000feetinteriormarshusing bank. 6,250 feetofinteriormarshtoestablishvegetationalonganewlydepositedspoil A totalof2,500smoothcordgrass( suction dredgeproject. 6,250 feetofinteriormarshtoestablishvegetationonanewspoildepositfrom A totalof2,500smoothcordgrass( length withintheinteriorponds. californicus A totalof1,000tradegalloncontainersCaliforniabulrush( planted toestablishvegetationonanewlydredgedspoilbank. A totalof800tradegalloncontainersgiantcutgrass( were plantedtoestablishavegetativebufferalongcutbank. A totalof1,000tradegalloncontainersGiantcutgrass( e ) wereplantedalongacanalbanktoestablishvegetationonnewly ) wereplantedon5,000feetofinteriormarshtodecreasethefetch ProjectSummary Spartina alterniflora Spartina alterniflora Spartina alterniflora Zizaniopsis miliacea ) plugswereplantedon ) plugswereplantedon Zizaniopsis miliacea Schoenoplectus Schoenoplectus ) to ) were ) 45 PPL: Impact AssistanceProgramprojects. WRDA=Water ResourcesDevelopmentAct;FEMA=FederalEmergencyManagmentAdministration projects;CIAP=Coastal 204/1135= WaterResourceDevelopmentActSections204and1135beneficialuseofdredged materialprojects; Restoration Program(ChristmasTreeProgram);Vegetation=DNR/NRCS/SWCCVegetation PlantingProgram;Section funded primarilybytheStateofLouisianathroughCoastalRestorationDivision;PCWRP=Parish CoastalWetlands USACE=U.S. ArmyCorpsofEngineers. Resources ConservationService;NWRC=National WetlandsResearchCenter;USFWS=U.S.FishandWildlifeService; Program: Project Type: Agency/Sponsor: Trapping; OM=OutfallManagement;BI=Barrier Island;SD=SedimentDiversion. Creation; SP=ShorelineProtection;FD=Freshwater Diversion;VP=VegetationPlanting;SNT=SedimentandNutrient Other Other WRDA Program FTL-01 CIAPFIFI BA-01 PriorityProjectList(asauthorizedeachyear bytheBreauxActTaskForce).

State Proje BreauxAct=CoastalWetlandsPlanning,ProtectionandRestorationAct(CWPPRA);State=Restoration projects HR=HydrologicRestoration;DM=Beneficial UseofDredgedMaterial;MM=MarshManagement;MC=Marsh

rn er sadS / / loWoo e.1 03NANANANA$2,076,816 N/A N/A $3,000,000 N/A N/A N/A 2003 N/A 10 Jef. N/A Wooton N/A Ullo 2003 N/A N/A 126 SP Jef. Grand TerreIsland Restoration onWest Wooton Fisheries Habitat Ullo N/A N/A SP Restoration Project USACE N/A Fifi Island FD Diversion Freshwater Davis Pond c

EPA=EnvironmentalProtectionAgency;NMFS=National MarineFisheriesService;NRCS=Natural t Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp Dupre Chaisson, Ullo, Heitmeier, Boissiere, Boasso, o nsor Se n ator hpedSC 30020 / / / / $106,000,000 N/A N/A N/A N/A 2001 33,000 StC. Shepherd Damico, Alario, Pitre, Wooton, Smith,

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 2) Con & Lan s tr d uction Cost rights size andquantity. Beginning withBreauxActPPL10,projectcosts areforPhaseIonly.Vegetationprogramprojectcostsestimatedbasedon programs arefromDNR'sContractandBudget Section.BaselineCostandCurrentEstimatebothincludecontingencyfunds. Baseline CostEstimatesandCurrentforBreauxActprojectsarefromtheUSACE. Costsforotherrestoration N/A=Not Applicable. Anticipated AcresBenefited: Tan.=Tangipahoa, Ter.=Terrebonne,Ver.=Vermilion. Orl.=Orleans, Plaq.=Plaquemines,StB.=St.Bernard,StC.=St.Charles,StJo.=St.JohntheBaptist, StM.=St.Mary,StT.=St.Tamman Parish:

Ope

Asc.=Ascension,Asu.=Assumption,Cal.=Calcasieu,Cam.=Cameron,Ibe.=Iberia,Jef.=Jefferson, Laf.=Lafourche, ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co

N/AforBreauxActdemonstrationanddeauthorizedprojects. st Es timate

Current

Co st Es timat Engineers aspartofthenation’scoastaldefensesystem. Historic Places,wasconstructedinthe19thcenturybyU.S.ArmyCorpsof West GrandTerreIsland.FortLivingston,whichislistedontheNationalRegisterof construction ofthisprojectwasexpeditedfortheprotectionFortLivingstonon in 2002,theerosionratesalongWestGrandTerreIslandgreatlyaccelerated.The Grand TerreIslandandprotectFortLivingston.Asaresultoftropicalstormsystems This projectconsistsofarockdikebuilttoconservetheGulfshorelineWest Assistance Plan(CIAP)of2001fortheconstructionanddesignthisproject. protection. Anadditional$999,500wascontributedfromtheCoastalImpact protected bytheinstallationofapproximately10,000linearfeetrockshore Approximately 100acresofexistingisland(GrandIsle&FifiIsland)willbe can divertupto10,650cubicfeetpersecond. This willcountersaltwaterintrusionandhelpoffsetmarshsubsidence.project framework oftheBaratariaBasinbyprovidingfreshwater,nutrients,andsediment. The purposeofthisprojectistomaintainandenhancetheexistingecological e ProjectSummary plant y, REGION 3

INTRODUCTION wetlands, which impairs plant health and Region 3 encompasses the productivity and ultimately results in marsh Terrebonne, Atchafalaya, and Teche- loss. Shoreline erosion along the fringes of Vermilion Basins. It extends from Bayou bays and large lakes has also contributed to Lafourche on the east, to Freshwater Bayou the basin’s significant land loss. Wetland on the west, and south from the Gulf of loss in the western portion of the Terrebonne Mexico to the boundary of the coastal Basin is less severe, and is primarily wetlands on the north. It covers all or part attributed to excessive marsh inundation and of the following parishes: Lafourche, ponding of water. Terrebonne, Assumption, Iberville, St. The Atchafalaya Basin includes Martin, Iberia, St. Mary, Lafayette, and Atchafalaya Bay and adjacent marshes to the Vermilion. north. This is a very important area for This region covers 1,140,450 acres wildlife because it is the site of active delta of vegetated wetlands. These wetlands are building, which naturally builds new habitat. classified as approximately 368,550 acres of This area includes the Wax Lake Delta, the cypress-tupelo swamp and bottomland Atchafalaya River Delta, and the “Jaws”, a forests; 298,300 acres of fresh marshes; smaller delta. 92,700 acres of intermediate marshes; Throughout Region 3, shoreline 240,700 acres of brackish marshes; and erosion has been severe along large lakes 140,200 acres of saline marshes. and bays. Generally, there is support both Estimates of land loss from Region 3 from parish governments and the public in indicate that between 1990 and 2000, a total Region 3 to maintain present habitats in of 46,976 acres of wetlands were lost (an areas above the GIWW, and to restore average of 4,672 acres per year). habitats in areas below the GIWW. The central and eastern portions of Coast 2050 identified specific the Terrebonne Basin have experienced ecosystem strategies for protecting and extensive losses of fresh and brackish sustaining the region’s coastal resources. marshes. Altered hydrology and an These specific ecosystem strategies can be intermediate to high natural subsidence rate grouped into one of the following five have led to excessive flooding in these general categories: restoring swamps;

46 restoring and sustaining marshes; protecting River Delta, Leeville #1, Vermilion Bay and bay, lake, and Gulf shorelines; restoring Rainey Wildlife Preserve, Shark Bayou, barrier islands; and maintaining brackish Weeks Island at GIWW, Hammock Lake, conditions in the Vermilion, West Cote St. Martin Parish, Bayou Lafourche, Kern- Blanche, and East Cote Blanche bay Stovall, and Pecan Island. In 2005, the complex, while reducing turbidity and Pecan Island Christmas Tree Project was sedimentation. constructed and the Hammock Lake project was refurbished. PROJECT SUMMARIES A total of 197 restoration projects DNR/NRCS/SWCC Vegetation Planting have been authorized for Region 3 (Figures Program 8 and 9, Table 3). Project-specific Since 1988, a total of 108 vegetation information is presented below, organized planting projects have been implemented in by project funding source. Region 3. Several phases, spanning multiple years, exist for many of the planting CWPPRA projects. The vegetation planting projects A total of 50 projects have been that were constructed in 2005 in Region 3 authorized under the direction of CWPPRA are Marsh Island Levee, Island Outpost, in Region 3, which is anticipated to benefit GIWW Mandalay, Harry Bourg 20,971 acres of wetlands at a cost of Corporation, Avoca 2005, and McIlhenny $188,718,995. This includes the East Marsh Canal. Island Marsh Creation (TV-21) project which was authorized in 2005 on the 14th Section 204/1135 Project Priority List. Within Region 3, one Section The CWPPRA Task Force officially 204/1135 project was constructed in 1991, deauthorized four projects in Region 3: and one was constructed in 2002. The Wine Lower Bayou LaCache Hydrologic Island Restoration project, constructed in Restoration (TE-19), Flotant Marsh Fencing 1991, rebuilt the island with the use of Demonstration (TE-31), Bayou Boeuf Pump dredged material. The Houma Navigation Station (TE-33), and Marsh Creation East of Canal, Wine Island Barrier Island the Atchafalaya River-Avoca Island (TE- Restoration project, constructed in late 2002, 35). investigated the feasibility of using dredged material from the bar channel area to create State 50 acres of wetlands in deteriorated marshes Twelve projects have been and open water areas. implemented in Region 3 and funded by the Wetlands Trust Fund. These projects are Other currently estimated to benefit 5,199 acres of Within Region 3, one project was land at a cost of $10,024,032. constructed with funding from a NOAA grant in 2002. The Brown Marsh Small Parish Coastal Wetlands Restoration Dredge Marsh Creation Project consists of a Program thin layer marsh creation/nourishment over The following twelve Christmas tree 44 acres in Lafourche Parish. The Rainey projects have been constructed within Refuge project, completed in 2005, consists Region 3: Pelican Point/Shark Island, of constructing 35,000 linear feet of terraces GIWW near Hanson Canal, Atchafalaya in shallow open water.

47 48

Figure 8. Location of Breaux Act projects authorized in Coast 2050 Region 3. 49

Figure 9. Location of State, PCWRP, Vegetation, Section 204/1135, FEMA, and Other projects in Coast 2050 Region 3. Table 3. Restoration projects completed or pending in Coast 2050 Region 3.

l) e drights & edera , F on Dat e r ( & Lan nc e e n, a ig s t timate timat inten Es Numb De a Es t nsor ive , M st t c me pe o at g s Sp t Co Co Na Ty / en uction Completierin uction Cost ion, e ct ct cy s tr e tr at e e n ator ish s s r n r Project Summary

Program State Proje Proj Proj PPL Age Se Repre Pa Acres BenefitedCon Engin Cost Con Ope Monitoring Cos Baselin Current The objective of this project is to enhance natural delta growth by re-opening Natal Channel and Castille Pass. Natal Channel was re-established with a 120-foot wide, 10-foot deep, 8,800-foot long channel and Castille Pass with a 190-foot wide, 10- DM foot deep, 2,000-foot long channel. Material dredged (700,925 cubic yards) as a AT-02 Atchafalaya MC result of construction was strategically placed at elevations mimicking natural delta

Breaux Act Breaux (PAT-2) Sediment Delivery HR 2 NMFS Gautreaux Smith StM. 2,232 1998 $190,588 $1,676,356 $665,202 $907,810 $2,532,147 lobes.

The project includes creating a new western delta lobe behind Big Island to enhance the accretion of land beyond the west bank of the Atchafalaya River. Construction included dredging of a main stem and five branch channels designed to mimic DM natural channel bifurcations. Dredged material was strategically placed at elevations AT-03 MC mimicking natural delta lobes. Re-opening the channels is allowing continued

Breaux Act Breaux (XAT-7) Big Island Mining HR 2 NMFS Gautreaux Smith StM. 1,560 1998 $513,254 $5,948,384 $615,766 $4,136,057 $7,077,404 natural sediment transport and marsh growth.

Castille Pass The Castille Pass project was intended to re-establish the sedimentation processes AT-04 Channel Sediment that lead to subdelta development in this area of the Atchafalaya Delta. This project

Breaux Act Breaux (XAT-11) Delivery SD 9 NMFS Gautreaux Smith StM. 589 Pending $1,809,682 $9,222 $36,888 $1,484,633 $1,855,792 consists of dredging and extending Castille Pass to promote subdelta development. The objective of the project is to maintain emergent wetlands in this area by providing supplemental freshwater, nutrients, and sediment from the Atchafalaya River via the Gulf Intracoastal Waterway (GIWW). Project features include a water Grand Bayou control structure on Bayou Pointe au Chien just south of its junction with St. Louis TE-10 Hydrologic Pitre, Canal, the relief structure on Grand Bayou, and the pipeline structure on Grand

Breaux Act Breaux (XTE-49) Restoration HR 5 USFWS Dupre Baldone Laf. 199 Pending $1,601,868 $2,637,807 $3,970,047 $5,135,468 $8,209,722 Bayou Canal. 50 For this demonstration project, smooth cordgrass ( Spartina alterniflora ) suited to Falgout Canal the salinity and habitat type of the Falgout Canal area was planted along the canal TE-17 (TE-Planting and protected by 6 types of wave-stilling devices. This is a subproject of the

Breaux Act Breaux 17) Demonstration VP 1 NRCS Dupre Dartez Ter. N/A 1997 $36,330 $82,075 $90,879 $144,561 $209,284 Vegetation Plantings project.

Timbalier Island For this demonstration project, sand fences were installed and vegetation suited to TE-18 (TE-Planting the salinity and habitat type of Timbalier Island was planted in several areas on the

Breaux Act Breaux 18) Demonstration VP 1 NRCS Dupre Baldone Ter. N/A 1996 $50,575 $158,611 $97,558 $372,589 $306,745 island to trap sand and buffer wind and wave energy.

The project would have reduced marsh loss rates and improved fish and wildlife Lower Bayou habitat quality by restoring natural north-south water exchange with estuarine water LaCache Hydrologic bodies and by reducing flow through the numerous dredged canals in the area. TE-19 (TE-Restoration Because of problems with landrights and navigation, the project was officially

Breaux Act Breaux 19) (Deauthorized) HR 1 NMFS Dupre Baldone Ter. N/A Deauth. $92,808 N/A $6,818 $1,694,739 $99,625 deauthorized by the Breaux Act Task Force in February of 1996.

The project objective is to restore the coastal dunes and wetlands of the Eastern Isles Dernieres. Approximately 3,925,000 cubic yards of sand were dredged from Eastern Isles adjacent waters and used to build a retaining dune which was then hydraulically TE-20 (TE-Dernieres, East filled to create an elevated marsh platform. Sand fences and vegetation were also

Breaux Act Breaux 20) Island BI 1 EPA Dupre Baldone Ter. 9 1999 $466,359 $7,784,527 $511,530 $6,345,468 $8,762,416 installed to stabilize the sand and minimize wind-driven transport. The project is intended to reduce saltwater intrusion and tidal flushing in the Point au Fer marshes, due to unplugged canals and beach overwash, without reducing TE-22 freshwater back flooding from the Atchafalaya River. This project involved plugging (PTE- Point Au Fer Canal SP a number of canals and stabilizing the Mobil Canal/Gulf of Mexico breach to prevent

Breaux Act Breaux 22/24) Plugs HR 2 NMFS Dupre Dartez Ter. 375 1997 $230,196 $2,062,750 $942,262 $1,069,589 $2,855,208 saltwater intrusion into the interior of the island.

(Region 3) 51

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program vii) (PTE-15- TE-29 (PTE-26b) TE-28 15bi) (PTE- TE-27 /33) 23/26a (PTE- TE-26 (XTE-67) TE-25 (XTE-41) TE-24 (PTE-27) TE-23

State Proje

eosrto I5NC ur adn e.NA19 2041$,7,6 2148 $1,497,538 $200,401$1,373,569 $221,418 $1,795,388 1997 N/A Ter. $2,428,376 $4,717,928$5,279,558 Baldone $2,630,026 $221,156 2000 Dupre 297 NRCS Ter. 5 BI Dartez Demonstration Dupre $4,844,274 $566,235$6,401,038 $139,313 $7,106,586 Breakwaters NRCS Raccoon Island 1999 1,239 3 HR Laf. Baldone $3,729,587 Restoration Dupre Hydrologic $2,046,971 Brady Canal EPA $142,636 3 $3,156,091 BI $430,859 2000 Restoration 1,913 Whiskey Island Laf. Pitre Au FerIsland Dupre Restoration, Point NMFS Hydrologic $517,918 3 Sediment Inputand 1999 Lake Chapeau BI $10,099,253 109 Ter. Baldone Phase I $157,804 Island Restoration, Dupre East Timbalier $6,907,897 EPA 2 $10,774,974 Island BI Dernieres, Trinity Eastern Isles Restoration Headland West BellePass ct Numb Proj e er ( ct F Na edera me l) MC 3 NMFS Dupre Dartez Ter. 509 1999 $599,221 $3,602,934 $1,177,832 $4,149,182$5,379,987 $3,602,934 $599,221 1999 509 Ter. Dartez Dupre NMFS 3 MC HR $4,854,102 $908,272$5,246,257 $598,449 $6,752,978 1998 474 Laf. Pitre Dupre USACE 2 SP DM

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat and bysurveysofthegulf floorbetweentheshorelineandbreakwaters. monitoring changesin the shoreline,waveenergy,andelevationsalong thebeach, the beach,andprotectseabird habitat.Projecteffectivenesswasdetermined by the islandtoreduce rateofshorelineretreat,promotesedimentdeposition along coverage. Eightsegmented breakwaterswereconstructedalongtheeastern endof This demonstrationproject'sgoalistoreduce shoreline erosionandincreaseland Superior Canal. outlets andbymaintainingthebanksalongBayou DeCade,TurtleBayou,and would bereducedbydecreasingthecross-sectional areasofnaturalandman-made segment oftheMauvaisBoisRidge.Tidalscouring andrapidwaterexchangerates Penchant intoafresh/intermediatemarshthat encompasses thewestern-most nutrient deliveryintothearea.Theprojectpromotes freshwaterflowfromBayou between thefreshandestuarinezonesbyenhancing freshwater,sediment,and The objectiveoftheprojectistomaintain highly-fragmented transitionalmarshes July 1998andadditionalvegetationseeding/planting wascarriedoutinSpring2000. with smoothcordgrass( filling inthebreachatCoupeNouvelle(134acres). Theinitialvegetationplanting Whiskey Island.Theprojectconsistsofcreating 523acresofbackislandmarshand The projectisintendedtocreateandrestorebeaches andbackislandmarsheson completed. dune platform,installationofsandfencing,andvegetationplantingshavebeen shoreline ofEastTimbalierIsland.Theprojectalsoincludedaerialseedingthe sediment andplacementofthematerialinthreeembaymentsalonglandward East TimbalierIsland.Theprojectcalledfortheminingof890,000cubicyards The objectiveofthisprojectistostrengthenandthusincreasethelifeexpectancy to stabilizethesandandminimizewind-driventransport. +4.0 feetatthebaysideofisland.Sandfencesandvegetationwerealsoinstalled hydraulically filledtocreateanelevatedmarshplatformslopingfromthedune dredged fromadjacentwatersandusedtobuildaretainingdunewhichwasthen the IslesDerniereschain.Approximately4,850,000cubicyardsofsandwere The projectobjectivesincludetherestorationofTrinityIsland(dunesandmarsh) pathways. access canalsandgappingartificialspoilbankstorestorenaturalhydrologic Atchafalaya Bayandtherestorationofislandhydrologybypluggingoilfield separation oftheisland'stwomajorwatershedsutilizingdredgedmaterialfrom Chapeau area.Theprojectcomponentsincludedthere-establishmentofahydrologic watersheds, andtore-establishthenaturaldrainagepatternswithinLake establish thehydrologicseparationofLocustBayouandAlligator The objectivesoftheprojectaretorestoremarsheswestLakeChapeau,re- to anchor17,000linearfeetofthewesternsideBellePassandBayouLafourche. structure wasplacedintheEvansCanal,andplugsonothercanals.Riprapused materials tocreate184acresofmarshonthewestsideBellePass.Awatercontrol marshes onthewestsideofBayouLafourchethroughusededicateddredged The projectgoalsincludereducingtheencroachmentofTimbalierBayinto e Spartina alterniflora ProjectSummary ) onthebayshorewascompletedin 52

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program 11a) TE-37 (TE DEMO) (CW- TE-36 (CW-5i) TE-35 (PTE-26i) TE-34 (XTE-32i) TE-33 (TE-7f) TE-32a 54b) (XTE- TE-31 45/67b) (XTE- TE-30

State Proje - as rainB P ur adn e.12Pnig$,4,2 $,6,7 $1,4 $,9,2 $10,518,139 $7,393,626 $214,448 $9,161,771 $1,141,920 Pending $471,925$460,222$530,283 102 Ter. Baldone N/A $58,358 Dupre 2000 EPA N/A Ter. 9 BI Dartez Marsh Creation Dupre New CutDuneand NRCS 7 SNT Demonstration Dartez Marsh Enhancement Gautreaux Thin MatFloating USACE 6 MC (Deauthorized) River -AvocaIsland of theAtchafalaya NRCS Marsh CreationEast 6 HR Plan, Increment1 Gautreaux Natural Resources EPA Penchant Basin $7,600,863 6 HR $5,752,404 $367,066 $106,960 $10,370 (Deauthorized) $145,041 Station $6,570,105 Bayou BoeufPump Dupre $96,590N/A USFWS Deauth. $885,717 FD6 N/A 2000 Ter. 215 Management Laf. Dartez Hydrologic Gautreaux Introduction and NRCS Freshwater Pitre Boudreaux Basin 4 North Lake VP Dupre NRCS (Deauthorized) 4 Demonstration Fencing BI Flotant Marsh Phase 2 Island Restoration, East Timbalier ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp ur atzTr ,5 edn 16904$,2,4 $,1,4 $14,103,051 $14,103,051 $2,710,949 $1,669,054 $9,723,048 Pending 1,155 Ter. Dartez Dupre Gautreaux, o nsor Se n ator t emi t.NADat.$,5 NANA$5,0 $3,452 $150,000 N/A N/A $3,452 Deauth. N/A StM. St. Germain Dartez, $4,104,081 $9,831,306$10,519,383 $5,453,945 $961,357 Smith, Pending 603 Ter. Dove Baldone, Dartez,

Repre

sen ta tive e.NADat.$645NA$4 $6,438,400 $66,869 $443 $66,425 N/A Deauth. N/A Ter. StM.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat restoring thelittoraldrift andaddingsedimentintothenear-shoresystem. habitat, andlengthenthe structuralintegrityoftheeasternIslesDernieres by by HurricaneJuan(1985). Theprojectwillcreatebarrierislanddunes andmarsh that wasoriginallycreated byHurricaneCarmen(1974)andsubsequently enlarged The objectiveofthisproject istoclosethebreachbetweenEastand Trinity Islands, water movementonthefloatsinareaswithand withoutavailablesediment. thick, continuallyfloatingmatsfromathin-mat flotantandtodeterminetheeffectsof sediment onthesemarshes.Theobjectiveofthe projectistoinducedevelopmentof enhance thinfloatingmatsofmarsh,aswell theeffectsofwatermovementand The purposeofthisdemonstrationprojectisto evaluatetechniquestocreateand officially deauthorizedbytheBreauxActTaskForceinJulyof1998. delivery strategyfromAtchafalayaRivertoTerrebonnewetlands.Theprojectwas management strategyfortheVerretBasin,andevaluatingalong-termriverwater WRDA. Theprojectcomponentsconsistedofimplementingalong-termwater of theBreauxActwithfloodprotectionandnavigationneedsgenerallycoveredby The purposeofthisprojectwastolinkthewetlandsprotection/restorationobjectives construction ofwatermanagementstructures,andafloodprotectionprovision. structure, buildingabridgeforLouisianaHighway57overtheoutfallcanal, Bayou Pelton,dredgingofanoutfallchannel,installationamajorwatercontrol diversity withintheprojectarea.Projectplansincludeenlargementofaportion Navigation Canalinordertoreducesaltwaterintrusionandpromotevegetation The projectobjectiveistoseasonallyintroducefreshwaterfromtheHouma Breaux ActTaskForceinOctoberof2001. for thisprojectwerenotfeasible.Thewasofficiallydeauthorizedbythe engineering constraints.Therestorationtechniquesthatwereoriginallysuggested was difficultyinlocatinganappropriatesitefordemonstrationandaddressing different fencingtechniquesusedtoconserveandrestorefloatingmarshes.There The purposeofthisdemonstrationprojectwastodeterminetheeffectiveness the createdareafromerosion. been placedontheexistingbreakwaterinfrontofislandwhichwillhelpprotect Island byplacingdredgedmaterialalongitslandwardshoreline.Additionalrockhas The projectgoalistostrengthenandincreasethelifeexpectancyofEastTimbalier The projectwasofficiallydeauthorizedbythe BeauxActTaskForceinJulyof1998. be considerablyhigherthanoriginallyplanned makingiteconomicallyunjustifiable. benefited 434acresatacostof$6,438,400,the costoftheprojectwasestimatedto Chute" andplacingitintheAvocaIslandarea. Althoughtheprojectwouldhave The projectconsistedofthebeneficialusedredged materialfromthe"CrewBoat erosion, subsidence,saltwaterintrusion,herbivory, andhurricanedamages. The majorproblemsintheprojectareainclude hydrologicalterations,interiormarsh physical integrityoftheareaduringtransition towardgreaterriverineinfluence. Basin hydrologywithrestorationandprotectionmeasuresaimedatmaintainingthe The objectiveoftheprojectistocombinelong-termrealignmentPenchant e ProjectSummary 53

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program TE-47 TE-46 TE-45 TE-44 TE-43 Project) (Complex TE-42 DEMO) (XTE- TE-41 45a) (XTE- TE-40 (PTE-28) TE-39

State Proje

ln etrto I1 P ur adn e.15Pnig$,1,5 NA$418 29890 $3,742,053 $2,998,960 $24,198 N/A $3,717,855 Pending 195 Ter. Baldone Dupre EPA 11 BI $2,006,373 $550,491 $1,453,746 $499,531 $2,503,768 Pending Flank Restoration Whiskey West N/A $31,727,917 $1,608,052 $2,058,780$26,516,586 Ship Shoal: $433,646 Ter. Pending Baldone 604 and MarshCreation Ter. Shoreline Protection Dupre Boudreaux USFWS Dartez West Lake 10 SP Dupre USFWS Demonstration 10 Shore Protection SP Terrebonne Bay Dartez Gautreaux Restoration NRCS Landbridge Mechant 10 North Lake $16,234,679 $20,090,068 SP $2,089,562 $17,959,237 $125,406 Dupre USFWS 2004 Terrebonne 9 273 Critical Areasin HR Ter. Restoration of GIWW Bank Baldone $495,611 $396,489 USFWS Terrebonne $71,346 $406,429$17,836 to Central Dupre Pending 9 Atchafalaya Water SP 207 Move Existing EPA Ter. Demonstration 9 Protection BI Dartez Mandalay Bank Dupre NRCS Creation Dune/Marsh 9 Timbalier Island FD Introduction Freshwater South LakeDeCade ct Numb Proj e er ( ct F Na edera me l) C1 SW ur atzTr 4 edn 12972NA$252 13234 $1,322,354 $1,322,354 $22,572 $1,299,782N/A Pending 145 Ter. Dartez Dupre USFWS 11 MC SP

Proj

ect PPL Ty pe

Age n cy /Sp ur atzTr / 03$6,8 13329$2,7 $1,194,495 $263,189$1,383,249 $120,776 $1,869,659 2003 N/A Ter. Dartez Dupre Gautreaux, o nsor Se n ator ir,Dv t.NAPnigNANANANAN/A N/A N/A N/A N/A Pending N/A StM. Pitre, Dove Baldone, Dartez,

Repre

sen ta tive a.36Pnig$,2,2 / 1,5 $,3,8 $1,735,983 $1,735,983 $14,954 $1,721,029N/A Pending 366 Laf. Ter.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat protecting mainlandshoreline fromcontinuederosion. Shoal. Thisprojectwill provideabarriertoreducewaveandtidalenergy, thereby Whiskey Islandthroughthedepositionofdredged materialtransportedfromShip This projectisintendedtorebuilddunesanda marshplatformonthewestflankof design includesthree230to300foot-longreplicates ofeachtreatment. prevent shorelineerosionwhileencouragingoyster reefformation.Theproject A-Jacks This demonstrationprojectisintendedtotest several applicationsofconcretemats, and repairingafixed-crestweiralongBayouRaccourci. the plantingofsmoothcordgrassonshoreline, theconstructionofvariousplugs, between brackishandlow-salinityhabitats.Projectfeaturesincludemarshcreation, shoreline andtheSmallBayouLaPointeRidge)whichprovidesahydrologicbarrier The projectwillhelptomaintainandrestorethelandbridge(LakeMechantnorth the TerrebonneBasin. The projectwillbenefitdeterioratingmarshesincentraland/oreasternportionsof excess freshwaterseasonallyavailableintheGulfIntracoastalWaterway(GIWW). This projectisintendedtoreducemarshlossthroughtheimproveddistributionof marsh. restore theeasternendofTimbalierIslandbydirectcreationbeach,dunes,and the expenseoferosionalongeasternend.Theobjectivethisprojectisto end ofTimbalierIslandisundergoinglateralmigrationbyspit-buildingprocessesat Timbalier Islandismigratingrapidlytothewest/northwest;therefore,western Lapeyrouse Bayouwillberemoved. protection willbeimplementedadjacenttotheproposedstructureandaweirin and sedimentintroducedintothemarshessouthoflake.Inaddition,shoreline bank ofLakeDeCade.ThiswillincreasetheamountAtchafalayaRiverwater This projectwillincludetheconstructionofawatercontrolstructureinsouthern of marshhabitatthroughthedepositiondredged material. dike tostoperosionalongthewesternshoreline ofLakeBoudreauxandthecreation intrusion. Thisobjectivewillbeaccomplished throughtheconstructionofarock to lakewaveenergyandrestoreinteriormarsh lostfromsubsidenceandsaltwater This projectisintendedtoprotecttheshoreline fromerosionduetodirectexposure shoreline stabilizationmaterials. stabilize/armor selectedcriticallengthsofdeterioratedchannelbankswithhard The projectobjectiveistorestorecriticallengthsofdeterioratedchannelbanksand and preventingbankerosion. project willevaluateseverallow-costsolutionsforrestoringhabitatinblowoutareas were treatedtodeterminethecost-effectivenessofdemonstratedapproaches.The restoring organicsoilsthatcanbeeasilyeroded.Intactbanksandbreakthroughs This demonstrationprojectisintendedtodevelopnewtechniquesforprotectingand e ® , andtechniquesforestablishingshorelineoyster reefsfortheirabilityto ProjectSummary 54

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program (XTV-25i) TV-13a (PTV-19) TV-12 (XTV-27) TV-11b (PTV-18) TV-09 (TV-04) TV-04 (FTV-03) TV-03 TE-50 TE-49 TE-48

State Proje

okS SC ateu rt e.21Pnig$,8,0 / 1864 14897 $1,498,967 $1,498,967 $118,664 NRCS 6 $1,380,303N/A Pending HR $196,817 $337,283 $940,065$886,030 $351,930 241 Ver. 1999 Increment 1 Restoration, 441 $1,008,634 Hydrologic $333,510 $1,012,649 Frith $154,701$524,439 Ver. Oaks/Avery Canals Gautreaux 1995 USACE Hebert Gautreaux 378 9 Ver. SP NMFS Sediment 5 Little VermilionBay Hebert SNT Trapping Gautreaux $1,436,161 $5,173,062$6,029,987 $4,128,061 NRCS $465,765 Lock 1999 2 Belle IsleCanalto SP 2,223 Bank Stabilization- StM. Freshwater Bayou $1,526,000 $509,401$1,185,882 $327,703 $2,022,987 Smith Protection Gautreaux 1996 Bay Bank NRCS Canal/Vermilion 65 Boston 3 Ver. $2,229,876 $2,229,876 HR $44,659 Hebert Gautreaux Restoration USACE Hydrologic 1 $2,185,217N/A Cote Blanche Pending SP 143 StM. Dupre Protection EPA Dartez Cutoff Bank Gautreaux 13 Vermilion River USACE BI 12 Platform Creation SD Back Barrier Whiskey Island Building Diversion andLand Avoca Island Creation Protection/Marsh Shoreline Raccoon Island ct Numb Proj e er ( ct F Na edera me l) C1 RSDpeBloeTr 6Pnig$,8,6 61605 2016 77771 $1,270,948 $7,797,791 $220,156 $1,480,162$6,166,005 Pending 16 Ter. Baldone Dupre NRCS 11 MC SP

Proj

ect PPL Ty pe

Age n cy /Sp ateu Hebert Gautreaux Romero, o nsor Se n ator atzTr 4 edn 27144NA$ $,9,9 $2,751,494 $2,293,893 $0 $2,751,494 N/A Pending 540 Ter. Dartez Baldone,

Repre

sen ta tive e.1020 4345$,5,6 9670 $2,367,700 $473,455$1,455,061 $996,700 $2,873,104 2002 160 Ver. Ibe.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat River tocreatenewmarshareasinLittleVermilion Bay.Dredgedmaterialwas This projectisdesignedtooptimizetheretention ofsedimentfromtheAtchafalaya Freshwater BayouLock. the easternbankofFreshwaterBayouCanal,between BelleIsleCanaland induced erosion.Thisobjectivewillbeachieved byconstructingarockdikealong Canal, andtoprotecttheinteriorwetlandsfrom increasedtidalexchangeandwake- The goalofthisprojectistostoperosionalong thebankofFreshwaterBayou sedimentation andlandaccretion. the bay.Sedimentfenceswereinstalledbehind thebulkheadtoencourage the channelfromexistingshorelineat mouth ofthechannelandextendsinto A rockbulkheadwasinstalledparalleltothebanks ofBostonCanalonbothsides Vermilion Bayshorelineandpreventfurtherregression oftheBostonCanalbanks. through thedissipationofwaveenergy.Theproject willstabilize15milesof The objectiveofthisprojectistoconservevegetated wetlandsbyreducingerosion been accomplishedthroughtheuseofbothstructuralandnon-structuralfeatures. deposition, andtore-establishvegetationinerodedareas.Theseobjectiveshave interior marsh,todevelopahydrologicregimeconducivesedimentandnutrient reduce excessivetidalfluctuationsandrapidexchangetopreventscouringof The primaryobjectivesoftheprojectaretoreduceshorelinelossfromwaveerosion, integrity ofseveralthousandacrestheOnionLakewetlandcomplex. with a6,520-footrockbreakwatertomaintaintheshorelinepositionandprotect The eastbankoftheVermilionRiverCutoffwasstabilizedbyarmoringshoreline eastern portionsofWhiskeyIsland. on theisland'sbackbarrierareatowidenmarshplatformcentraland protective barrierforbackbayandinlandareas.Dredgedmaterialwillbedeposited The goalofthisprojectistoenhancethestructuralfunctionWhiskeyIslandasa increase projectwetlandbenefits. considering theadditionofamarshcreationcomponentutilizingdredgedmaterialto wetlands bytheendof20-yearprojectlife.Thedesignteamis water areasincentralAvocaIslandtocreateandprotect143acresofemergent The projectobjectiveistodivertfreshwater,sediment,andnutrientsintotheopen used tocreatemarshonthebaysideofisland. Breakwaters Demonstration(TE-29)project.Inaddition,dredgedmaterialwillbe and aterminalgroinalongthegulfsideofisland,adjacenttoRaccoonIsland accomplished throughtheconstructionofeightadditionalsegmentedbreakwaters of theislandandcreatingmorelandalongnorthernshoreline.Thisgoalwillbe from anencroachingshorelinebyreducingtherateoferosionalongwesternend The goalofthisprojectistoprotecttheRaccoonIslandrookeryandseabirdcolonies p induced waveerosion. Bayou PetiteAnse. Avery Canaltoredirect additionalwaterflowthroughoneparticular section of this project,willincorporate theuseoflow-sillstructuresplacedat outfallof were constructed.Anadditional state-fundedproject(TV-13),located adjacentto north oftheGIWWand eastofOaksCanal.Vegetationwasplanted androckdikes Intracoastal Waterway (GIWW) banklines,andtostabilizewaterlevel fluctuation This projectisdesigned toprotecttheVermilionBayshorelineand Gulf

laced tocreateemergentmarsh,therebyprotecting theexistingshorelinefromwind- e ProjectSummary 55

State Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program RI TV-21 TV-20 (PTV-13) TV-19 (XTV-30) TV-18 (PTV-20) TV-17 (CW-05) TV-16 19b) (PTV- TV-15 (TV-5/7) TV-14

State Proje

earD / / ur adn e.1719 / / / / $1,400,000 N/A N/A N/A N/A 1994 197 $1,193,606 Ter. $1,193,606 Baldone Dupre N/A $2,254,912 N/A N/A $2,254,912 DM N/A $1,193,606 Pending N/A $1,229,337 189 $1,229,337 Repair Ibe. Raccoon Island $41,101 Hebert N/A $2,254,912 Pending Romero $1,188,236N/A Pending NRCS 329 StM. 14 278 MC Ibe. Smith Marsh Creation Gautreaux Hebert East MarshIsland NRCS Romero 13 USACE SP Shoreline Protection 9 Bayou Sale SP Redirection Freshwater Commercial Canal Gautreaux Protection/ $3,392,135 NMFS Creation andShore Weeks BayMarsh $3,167,400 9 SNT Sediment Trapping $405,294 Terracing and $2,548,187 Four MileCanal 8 $438,654 Bridge SP Lake PortageLand 2004 1,999 StM. Demonstration Smith Sediment Trapping Gautreaux Chenier AuTigre NMFS Hebert 6 SNT Romero USACE at "TheJaws" 6 Sediment Trapping HR Restoration Hydrologic Marsh Island ct Numb Proj e er ( ct F Na edera me l) P6NC ateu rt e.NA20 8,2 4738$929 $500,000 $624,999 $88,323$457,388 $79,289 2001 N/A Ver. Frith Gautreaux NRCS 6 SP SNT

Proj

ect PPL Ty pe P ateu rt e.2 04$2,8 7981 1229 $1,013,820 $192,239 $1,265,891 $323,781$749,871 2004 24 Ver. Frith Gautreaux EPA NRCS/

Age n cy /Sp o nsor Se n ator eetVr 6 04$5,9 27969$737 $5,086,511 $3,443,962 $658,497$2,739,659 $47,357 2004 167 Ver. Hebert Frith,

Repre

sen ta tive Ver. 408 2001 $602,995 $3,166,547 $1,373,747 $4,094,900$5,194,162 $3,166,547 $602,995 2001 408 Ver. Ibe.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat money wasalsoutilized forthisprojectbyLDWFandTPCG. Engineering &Environmental Consultants,Inc.,andBeanDredging. Federalgrant Management andConservation District,T.BakerSmith&Son,Inc., Coastal Terrebonne ParishConsolidated Government(TPCG),SouthTerrebonne Tidewater Louisiana Department of WildlifeandFisheries(LDWF)/FurRefuge Division, Department ofNatural Resources (LDNR)/CoastalRestorationDivision (CRD), repair RaccoonIslandfrom stormdamage.Cooperatorsincludethe Louisiana This projectwasacooperativeeffortthatutilized dredgedmaterialandvegetationto create marshbehindthetwoeasternmostexisting rockdikes. of theinteriormarshprimarilycausedbyhurricane damage.Theprojectwillalso The goaloftheprojectistore-createbrackish marshhabitatintheopenwaterareas constructed paralleltotheexistingeasternshoreline ofEastCoteBlancheBay. between thebreakwaterandexistingshoreline. Aforeshorerockdikewillbe The projectgoalistoreduceand/orreverseshoreline erosionandcreatemarsh water. across CommercialCanaltoreducetidalenergy andredirectAtchafalayaRiver shore/bank areaswithsheetpilerevetment.In addition,alow-sillweirwillbeplaced dedicated placementofdredgedmaterial,re-vegetating criticalareas,andarmoring will beachievedbytheconstructionofaretentionleveeandchannelplugs, The objectiveofthisprojectistostopshorelineandbankerosion.This sedimentation intheopenwaterareasbetweenterraces. Four MileCanal,toabatewave-inducedshorelineerosionandfacilitate ( This projectincludesconstructionandplantingofterraceswithsmoothcordgrass The objectiveofthisprojectistopreventtheshorelinesouthLakePortagefrom the projectarea. wave fetch.Distributarychannelswillbedredgedtodeliverwaterandsediment wetlands. Thiswillbeachievedbyconstructingwetlandterraces,therebyreducing The objectiveoftheprojectistoinducesedimentationcreateemergentvegetated gulf waterandthebrackishmarsh,whichliesimmediatelybehindchenier. Mexico sideofthechenierisexpectedtoactasabufferbetweenhighersalinity coastline thathavealreadyeroded.IncreasedsedimentaccretionontheGulfof shoreline fromon-goingerosiononChenierAuTigre,andbuildupportionsofthe that aredesignedtotrapandretainsedimentfromgulftides,stabilizetheexisting This demonstrationprojectisintendedtotesttheeffectivenessofrockbreakwaters and isolationofLakeSandfromVermilionBaywitharockdike. the northeastendofMarshIsland,protectionshorelinewithrock, hydrology. Theprojectincludedconstructionofnineplugsinoilandgascanalsat including thenorthernshorelineofLakeSand,andtohelprestorehistorical The objectiveoftheprojectistostabilizenortheasternshorelineMarshIsland, b consist ofbackfillingacanalandarmoringthebeachwithrock. Spartina alterniflora reaching andcreatinganotherpassfromVermilionBaytotheGulf.Theprojectwill e ) withinLittleWhiteLakeandVermilionBay,along ProjectSummary 56

State State State State State State State State Program V0bYlo ao PNANAGuraxSihSM 219 / / / / $194,500 N/A N/A N/A $440,000 N/A N/A 1992 52 StM. N/A Smith TV-06 Gautreaux N/A N/A N/A SP N/A 1995 YellowBayou TV-02b 333 Ter. Baldone Dupre TE-14 $1,023,487 N/A N/A HR LowerPetitCaillou N/A TE-07b N/A N/A TE-03 N/A 1993 1,655 Ter. TE-02 Baldone Dupre N/A N/A MM MontegutWetland TE-01 SBG

State Proje

oto tutrsM / / oeoHbr b.6319 / / / / $453,500 N/A N/A $192,016 N/A N/A N/A 1993 N/A 643 Ibe. N/A Hebert Romero N/A N/A 1995 N/A MM Control Structures 150 Marsh Island Ter. Baldone Dupre N/A N/A VP Planting Point FarmRefuge 171 $9,400 Ter. Baldone N/A Dupre 1,300 Ter. N/A N/A MM N/A Dartez Dupre Wetland N/A Bayou LaCache N/A N/A MM N/A 1993 Wetland Falgout Canal 1 Ter. Dove Gautreaux N/A N/A VP GIWW Spoilbank alongthe ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited 96NANANANA$1,189,494 N/A $1,560,000 N/A N/A N/A N/A N/A 1996 1991, N/A N/A 1995 1993,

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat exclusion deviceswasalsotested. to reducefurtherbankerosion.Theeffectivenessofdifferenttypesnutria bracing, gatesupports,walkwaysandstructuralsteelshop-fabricatedflapgates. consisting offour48inchdiametersteelpipeswithdiaphragmplates,pipe prefabricated steelpipestructurewithflapgates.Theis135feetinlength, Marsh ManagementAreawasconstructed.Thestructureisafourbarrel A watercontrolstructureinBayouLaCacheneededtocompletetheBushCanal seven watercontrolstructures,andconstructionofapumpingstation. project designconsistedofleveeconstructionandmaintenance, canals throughouttheregion'shistory,havealtereditsoriginalhydrology.The community. Anthropogenicchanges,suchastheconstructionofpipelineandaccess habitat bymoderatingwaterfluxandtidalenergyinthedeterioratingwetland marsh andcypress-tupeloswamp,reducesaltwaterintrusion,improvewildlife The primaryobjectivesoftheprojectweretoprotectapproximately8,000acres between interiormarsh ponds. banks werebreachedand ditcheswereconstructedtofacilitatewater movement units andthesurrounding waterbodies.Withinthemanagementunits, canalspoil 1993 atthenortheastand southeastunitstocontrolwaterexchangebetween the Flap-gated/stoplog culverts andearthencanalplugswereinstalledin Octoberof open-water areas,andincrease waterfowlfoodwithinthewatermanagement units. The objectivesofthisprojectweretoreducethe rateoflandloss,revegetateshallow erosion. constructing anoystershellbermadjacenttothe water'sedgetoreduceshoreline to stabilize7,465feetoftheEastCoteBlanche Bayshoreline.Thiswasachievedby acres ofinteriormarshbetweenJacksonBayou andtheBritish-AmericanCanal The objectivesoftheprojectweretomaintain theintegrityofapproximately2,000 former farmlandwithinthePFRA. seedlings ofbitterpecan( farmlands withinthePointFarmRefugeArea (PFRA).Approximately108,900 This projectwasdevelopedtocreatebottomland hardwoodforestsinformer northern spoilbankofBoudreauxCanalandthe easternshoreofLakeBoudreaux. and promotesheetflowoverthemarshsurface, andshorelinestabilizationalongthe include fiveplugsontheperimeterofproject areatocontainthepumpdischarge discharged intoLashbrookCanalandflowstheprojectarea.Projectfeatures project areapriortoentryintoLakeBoudreaux.Outfallfromthepumpingstationis by re-routingfreshwaterdischargefromtheLashbrookpumpingstationthrough The objectiveofthisprojectistodecreasesaltwaterintrusionintothearea two existingfixed-crestweirsbyinstallingstop-logsandflapgates. included maintenanceofapproximately3.5milesleveeandthemodification habitat inthePointeauChienWildlifeManagementArea.Theprojectdesign The projectobjectivewastoprotectandenhance4,200acresofdegradedwetland with blackwillow( This projectplanted8,000feetofspoilbankalongtheGulfIntracoastalWaterway ( Quercus michauxii e Salix nigra ) (withnutriaexclusiondevices)wereplanted on300acresof Carya aquatica ) andbaldcypress( ProjectSummary ), wateroak( Taxodium distichum Quercus nigra ), andcowoak ) inaneffort 57

PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP State State State Program V0aHmokLk PNANAGuraxSihSM 919 / / / / $558,426 N/A N/A N/A N/A 1992 29 StM. Smith Gautreaux N/A N/A SP Hammock Lake TV-02a 4355NP1 TV- TV-13b TV-11

State Proje IWS / / oeoHbr b.519 / / / / $154,331 N/A N/A N/A $74,438 N/A N/A 1992 $50,966 Ibe.5 N/A N/A $133,280 Hebert Romero N/A N/A 34 N/A N/A Ibe. N/A SP N/A Hebert N/A N/A 1991 Romero GIWW N/A Gautreaux 2 N/A N/A Weeks Islandat N/A Laf. SP N/A 1991 N/A SP Pitre Shark Bayou N/A 1 StM. 1991 Dupre Smith Preserve 26 N/A Gautreaux Rainey Wildlife N/A Ter. Vermilion Bayand SP N/A Dartez N/A Gautreaux SP Leeville #1 N/A Ibe.3 N/A SP Hebert Delta Atchafalaya River Romero N/A Canal N/A GIWW nearHanson SP Island Pelican Point/Shark yrmr on PNANAGuraxSihSM 619 / / / / $684,610 N/A N/A N/A N/A 1998 26 StM. Smith Gautreaux N/A N/A SP N/A N/A Cypremort Point SP Quintana Canal/ Frith Gautreaux Structures N/A N/A Oaks/Avery SP Bank Protection Freshwater Bayou ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp ateu Hebert Gautreaux Romero, o nsor Se n ator eetVr 1 93NANANANA$126,815 N/A N/A N/A N/A 1993 319 Ver. Hebert Frith,

Repre

sen ta tive e.5119 / / / / $2,177,025 N/A N/A N/A N/A 1994 511 Ver. Ibe. e.1020 / / / / $700,000 N/A N/A N/A N/A 2000 160 Ver. Ibe.

Pa rish

Acres Benefited 03NANANANA$17,250 N/A N/A N/A N/A 2003 1996, $19,000 N/A N/A N/A N/A 2003 1991,

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat Shark Bayoutodecreaseshorelineerosion. Vegetation wasplantedalong15,000linearfeet oftheWeeksBayshorelinenear Pelican PointandSharkIslandinIberiaParish. Brush fenceswereconstructedin1991topreventthecontinuedshorelineerosionof 1994, 1995,1996,1997,1998,1999,2000,2001, 2003and2004. originally constructedandfilledin1992maintenance wasperformedin1993, accumulation ofsedimentadjacenttoWeeksIsland inIberiaParish.Fenceswere Brush fenceswereconstructedtoprotecttheshoreline andpromotethe 2000 and2003. and filledin1993maintenancewasperformed in1994,1995,1997,1998,1999, accumulate sedimenttopromotemarshcreation. Fenceswereoriginallyconstructed adjacent toVermilionBayprotecttheshoreline fromcontinuederosionandto Vegetation hasbeenplantedalongtheshoreline andinteriormarshalong in 1992,1993,1994,1995,1996,1997,1998, 1999,2000,2001,and2003. adjacent toLouisianaHwy1inLeeville,Louisiana, andmaintenancewasperformed Brush fenceswerebuiltin1991topromotesedimentaccretionalongacanal performed in1992and2003. delta. Fenceswereoriginallyconstructedandfilledin1991maintenancewas Brush fenceswereconstructedtopromotetheaccumulationofsedimentinanactive 2003 and2004. constructed andfilledin1991maintenancewasperformed1992,1993,1998, miliacea bulrush ( Hanson's Canalfromboat-inducedwavesanderosion.Atotalof1,000California Brush fenceswereconstructedtoprotecttheshorelinealongGIWWnear 1998, 1999,2000,2001 2003,2004and2005. filled in1992andmaintenance wasperformedin1993,1994,1995, 1996, 1997, were plantedadjacentto thebrushfences.Fenceswereoriginallyconstructed and erosion. Approximately 5,000plugsofsmoothcordgrass( Cote BlancheBayfrom HammockLake,andtoprotecttheadjacent marsh from Brush fenceswereconstructed topreventerosionoftheshorelineseparating West Quintana Canal. along theVermilionBay/QuintanaCanalintersectandsouthbankof Vermilion Bayshorelineandapproximately3,375linearfeetofforeshorerockdike The projectfeaturesapproximately3,650linearfeetofrockbreakwatersalongthe structure in1996and2001. original projectwasconstructedin1994;however,repairsweremadetothe extending northtotheconfluenceofBelleIsleBayouandFreshwaterBayou.The project featureconsistsoftheconstruction24,000linearfeetrockdike, marshes thatseparateFreshwaterBayouandinteriorwaterbodies.Thedominant This projectconservesvegetatedwetlandsbymaintainingthephysicalintegrityof flow throughtheportionofBayouPetiteAnsesouthGIWW. low-sill structuresattheoutfallofOaksandAveryCanalstoredirectmorewater This projectenhancedtheadjacentCWPPRA-fundedTV-13abyinstalling e Schoenoplectus californicus ) plugswereplantedadjacenttotheGIWW.Fencesoriginally ProjectSummary ) and1,000giantcutgrass( Spartina alterniflora Zizaniopsis ) 58

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation PCWRP PCWRP PCWRP PCWRP Program

State Proje elns-PaeIV / / ateu mt t.919 / / / / $16,020 $2,825 N/A $10,453 N/A N/A $56,500 N/A N/A N/A N/A N/A N/A N/A N/A 1991 N/A N/A 9 1991 N/A StM. N/A $78,736 2 Smith 1991 Ter. $6,500 Gautreaux N/A 17 N/A Dartez 1991 N/A Ver. N/A VP N/A 92 $3,354 Dupre Hebert Wetlands -PhaseI Ibe. Gautreaux N/A Jackson Bayou N/A N/A Hebert N/A N/A VP N/A N/A Levee Stabilization Romero VP N/A N/A N/A N/A N/A Dartez VP N/A North 1988 Dupre Vermilion Bay N/A $22,500 N/A 133 1988 N/A Ter. N/A Bay VP Baldone 17 Vermilion-Weeks N/A N/A Laf. 1988 $148,850 Dupre Shoreline Pitre 83 N/A N/A Lake DeCade N/A Ter. N/A VP Dupre Dartez Timbalier Island N/A N/A N/A Dupre N/A VP Pointe auChien N/A N/A N/A VP 1996 Gautreaux N/A N/A Lake DeCade 1 N/A Laf. Gautreaux SP N/A 1993 N/A Pitre N/A Pecan Island SP 0 Dupre Ibe. Kern-Stovall N/A Hebert N/A SP Romero Bayou Lafourche N/A N/A SP St. MartinParish xo PNANARmr Hebert Romero N/A N/A VP Oxbow Franz-Petite Anse ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator eetVr 120 / / / / $18,000 $18,000 N/A N/A N/A N/A N/A N/A N/A 2005 N/A 31 Ver. 2004 Hebert 42 Frith, Ver. Hebert Frith,

Repre

sen ta tive e.18 Ter. b.14 Ibe.

Pa rish

Acres Benefited 91NANANAN/A N/A N/A N/A 1991 92NANANAN/A N/A N/A N/A 1992

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $16,000 $11,784 timate

Current

Co st Es timat herbivory. alterniflora Approximately 4,005single-stemmed plantsofsmoothcordgrass( panic grass( saltgrass ( stabilize thelevee.Theseincludedcommonbermuda ( Six marshgrassspecieswereplantedonaspoilbank inTerrebonneParishorderto induced erosion. gallon containerswereusedtoprotectthenorth shoreofVermilionBayfromwave A totalof2,500smoothcordgrass( from wave-inducederosion. were usedtocreateastandofvegetationthatwill protecttheWeeksBayshoreline A totalof20,000singlestemssmoothcordgrass ( additional wind-bornesand. Timbalier Islandtostabilizethesand,preventitslossduewinds,andtrap A totalof11,600marshhaycordgrass( stabilize thebankbehindnewlyconstructedwavedampingdevices. A totalof12,290smoothcordgrass( barrier againstwave-inducederosion. australis bulrush ( A totalof6,000smoothcordgrass( californicus A totalof2,666tradegalloncontainersCaliforniabulrush( ( Vermilion Parishplantedatotalof3,719tradegallonsCaliforniabulrush filled in1996andmaintenancewasperformed1997,2000,2001,20032004. shoreline erosionfromboat-inducedwaves.Fenceswereoriginallyconstructedand Wave dampingfenceswereconstructedalongBayouLafourchetominimize 1999, 2000,2001,2003and2004. and filledin1993maintenancewasperformed1994,1995,1996,1997,1998, their projectsatWeeksIslandandSharkBayou.Fenceswereoriginallyconstructed St. MartinParishhaspartneredannuallywithIberiaandworkedtogetheron paspalum ( were plantedtostabilize cutbanks. along acutbank. alterniflora Approximately 4,000singlestemmedplantsofsmoothcordgrass( A totalof2,946single-stemmed plantsofsmoothcordgrass( Schoenoplectus californicus e Schoenoplectus californicus ) plantswereusedtorestoreanerodingshorelinebyprovidingavegetation Distichlis spicata Paspalum vaginatum ) wereplantedtorenourish marshthathadbeensubjectedtonutria ) wereplantedtodamptheeffectsofwaveenergies createdbywind ),13,330 linearfeet,wereplantednearPecanIsland. Panicum sp.),gulfcordgrass( ), marshhaycordgrass( ) ontheKern-Stovallproperty. ). ProjectSummary Spartina alterniflora Spartina alterniflora Spartina alterniflora ) plants,and2,000roseaucane( Spartina patens Spartina spartinae Spartina patens Spartina alterniflora Cynodon dactylon ) plantswereusedon ) singlestemplantsand500 ) plants,400California ) plantswereusedto Spartina alterniflora Schoenoplectus ), andseashore Spartina Spartina ), Atlanticcoastal Phragmites ) plants ), seashore ) 59

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje orLau a PNANADpeDre e.519 / / / / $2,712 $13,025 N/A N/A $13,763 N/A N/A N/A N/A N/A N/A N/A N/A 1995 1994 $2,949 N/A 5 18 Ter. Ter. $3,774 N/A N/A Dartez Dartez $11,600 1994 Dupre Dupre N/A N/A 1 N/A N/A Ter. N/A N/A N/A $14,400 VP VP N/A N/A Dartez Four LeagueBay Gautreaux N/A N/A N/A N/A N/A N/A Levee VP 1994 Lake Boudreaux N/A N/A $16,020 N/A Frith 5 L.L. &E. StM. Gautreaux 1994 N/A $10,543 N/A N/A N/A Smith 1994 N/A 5 Gautreaux VP Ibe. SW PecanIsland#2 7 N/A N/A $38,205 N/A N/A N/A Hebert Ibe. 1994 VP Romero Bayou Milhomme Hebert N/A N/A 9 N/A N/A Romero Ibe. N/A VP Thibodeaux Oxbow N/A Hebert N/A N/A N/A N/A VP Romero 1992 Petite Anse#6 N/A N/A N/A N/A 9 StM. VP 1992 18 Petite Anse#5 Smith N/A Ter. Gautreaux 1992 Dartez N/A N/A 65 McIlhenny Oxbow VP Ibe. Dupre Hebert N/A N/A Wetlands Romero VP Jackson Bayou N/A N/A VP Shoreline Lake Boudreaux Oxbow Bayou PetiteCarlin leHmokV / / ur atzTr 95NANANANA$1,356 N/A N/A N/A N/A 1995 2 Ter. Dartez Dupre N/A N/A VP Blue Hammock ct Numb Proj e er ( ct F Na edera me l) PNANARmr Hebert Romero N/A N/A VP

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive e.18 Ver. a.8 Cam.

Pa rish

Acres Benefited 94NANANAN/A N/A N/A N/A 1994 92NANANAN/A N/A N/A N/A 1992

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $24,000 $6,820 timate

Current

Co st Es timat and stabilizealeveethroughtheestablishment ofvegetation. 8,000 peatpotsofmarshhaycordgrass( most severe. levee breaches.Sedimentfencewereconstructed at42siteswhereflotantlosswere retain flotantanddetritalmaterialinafreshwater marshandtoformplugsinspoil used toprotectandstabilizealeveethroughtheestablishmentofvegetation. wave erosion. were usedtoprotectasegment ofFourLeagueBayshorelinefromwind-generated planted inanopenpondareaoninteriormarsh. A totalof400gallonscontainers ofsmoothcordgrass( A totalof700galloncontainerssmoothcordgrass ( A totalof75Californiabulrush( additional shorelineerosion. along theprotectionleveeonBayouMilhomme toestablishabufferagainst A totalof435Californiabulrush( spoil. ( A totalof1,000singlestemsand140galloncontainerssmoothcordgrass to holdnewspoilinplace. ( A totalof2,500singlestemand200galloncontainerssmoothcordgrass to holdnewspoilinplace. ( A totalof3,000singlestemand300galloncontainerssmoothcordgrass alterniflora A totalof340galloncontainersand445singlestemssmoothcordgrass( A totalof855galloncontainerssmoothcordgrass( paspalum ( A totalof1,545smoothcordgrass( within theintertidalzone. smooth cordgrass( This projectwasdesigned topreventshorelineerosionbyestablishing astandof Petite Carlinfromwave-inducederosion. A totalof4,000peatpotsseashorepaspalum ( were plantedtostabilizedcutbanksonbothsidesoftheOxbow. A totalof1,705single-stemmedplantssmoothcordgrass( decrease openwaterareasbyrebuildingthemarsh. enhance perennialsintheareatoincreasewildlife food,totrapsediments,and Spartina alterniflora Spartina alterniflora Spartina alterniflora e Paspalum vaginatum ) and34galloncontainersofgiantcutgrass( Spartina alterniflora ) plantswereusedtorevegetatemudflatsandstabilizenew ) wereusedtointroduceadaptablerevegetationonmudflats ) wereusedtointroduceadaptablerevegetationonmudflats ) plantswereusedtoprotecttheshorelineofBayou Schoenoplectus californicus ProjectSummary Schoenoplectus californicus Spartina alterniflora Spartina patens ); 200galloncontainers wereinstalled Paspalum vaginatum Spartina alterniflora Spartina alterniflora Spartina alterniflora ) plantswereusedtoprotect Zizaniopsis miliacea ) plantsand1,000seashore Spartina alterniflora ) plantswereusedto ) plantswereused ) wereusedto ) and ) were Spartina ) plants ) were ) 60

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje ao iun PNANAGuraxDre e.219 / / / / $1,220 $14,069 N/A N/A $1,600 N/A N/A N/A $3,390 N/A N/A N/A N/A N/A 1996 N/A $1,085 N/A N/A 1996 2 Ter. 24 N/A $33,600 N/A Ibe. N/A Dartez 1996 Gautreaux Hebert N/A N/A N/A 2 $22,400 Romero N/A N/A StM. VP 1996 N/A N/A Smith N/A Bayou Piquant N/A VP N/A Gautreaux 6 Ter. N/A N/A N/A N/A Dartez $2,712 N/A VP Mudflats Gautreaux 1996 Bayou Carlin N/A N/A 2 N/A N/A N/A StM. Jaws '96 VP 1995 Smith 15 Gautreaux N/A N/A Ibe. H Bar 1995 $35,161 N/A Hebert N/A Smith VP 10 N/A Gautreaux Romero Ibe. N/A Bayou Sale'96 N/A N/A Hebert N/A N/A N/A VP VP Romero 1995 N/A Land Company N/A St. MaryParish N/A 5 VP Ter. N/A #8 Dartez Bayou PetiteAnse N/A Dupre #7 1995 Dartez N/A Bayou PetiteAnse N/A 60 VP Dupre StM. Bayou DeCade N/A Smith N/A VP Gautreaux N/A Lake DeCade N/A VP Hidalgo One otgtLveV / / ur adn e.119 / / / / $640 N/A N/A N/A N/A 1996 1 Ter. Baldone Dupre N/A N/A VP Montegut Levee ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive t.13 StM. 5 Ter.

Pa rish

Acres Benefited 96NANANAN/A N/A N/A N/A 1996 N/A N/A N/A N/A 1995

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$8,800 $16,000 timate

Current

Co st Es timat erosion andtrapavailablesediments. to establishastandofemergentvegetationthatwillprotecttheshorelinefrom erosion andtrapavailablesediments. to establishastandofemergentvegetationthatwillprotecttheshorelinefrom California bulrush( within theinteriormarsh. for boat-generatedwaves, andfiltersuspendeddetritalmaterialsothat itisretained used tore-establishemergentvegetationona natural bayoubank,provideabuffer A totalof180Californiabulrush( available sediment. establish astandofemergentvegetationthatwill preventshorelineerosionandtrap A totalof2,075smoothcordgrass( prevent thelossofsedimentalreadyestablished. used toestablishastandofemergentvegetation thatwilltrapavailablesedimentand A totalof200Californiabulrush( situated inafreshmarsh. bulrush ( A totalof300giantcutgrass( erosion andtrapavailablesediment. were usedtoestablishastandofemergentvegetationthatwillpreventshoreline A totalof160tradegallonsCaliforniabulrush( A totalof8,400singlestemssmoothcordgrass( A totalof5,600singlestemssmoothcordgrass( potentially extensiverootmass. increase protectiontothisembankmentbyprovidingsoilstabilitythrougha A totalof400roseaucane( emergent vegetationthatwillpreventshorelineerosionandtrapavailablesediment. cutgrass ( A totalof200smoothcordgrass( A totalof80tradegallons ofsmoothcordgrass( p feet ofsheetpilewereinstalled. shoreline erosionandtrapavailablesediment. californicus Approximately 1,100tradegallonsofCaliforniabulrush( of Californiabulrush( This projectintendstorestoreanerodingshorelineusing400tradegalloncontainers

rovide shorelinestability toanareaoftheMontegutleveewhereapproximately 200 e Schoenoplectus californicus Zizaniopsis miliacea ) wereusedtoestablishastandofemergentmarshthatwillprevent Schoenoplectus californicus Schoenoplectus californicus Phragmites australis Zizaniopsis miliacea ) tradegallonswereusedtoestablishastandof ProjectSummary Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora ) tradegallonswereusedalongsideacanal ) tradegallons,and1,533giant Spartina alterniflora ) galloncontainerswereusedto Schoenoplectus californicus Spartina alterniflora Spartina alterniflora ) tradegallonsand200California ). ) tradegallons,1,533 ) tradegallonswereusedto Schoenoplectus ) tradegallonswere ) tradegallonswere ) wereusedto ) wereused ) wereused ) 61

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje agu aa PNANADpeDre e.2 98NANANANA$15,153 N/A $2,373 N/A N/A $13,560 $13,560 N/A N/A N/A N/A N/A N/A 1998 N/A $6,400 26 N/A N/A Ter. 1998 N/A Dartez N/A N/A 4 Dupre Ter. $3,390 N/A N/A 1998 N/A N/A Dove N/A VP 1998 N/A 23 StM. Dupre 23 N/A Falgout Canal Ter. $9,600 N/A Smith N/A N/A Gautreaux VP N/A Pitre Bayou Chauvin N/A N/A N/A 1997 N/A VP Dupre 9 N/A N/A Humble Canal StM. N/A N/A N/A VP $4,640 Smith 1997 N/A $1,627 Gautreaux Bayou Blue N/A 6 N/A N/A N/A Ter. VP N/A N/A Ter. N/A Dartez N/A Gautreaux 1997 Dartez Hidalgo Two N/A N/A N/A 14 Dupre N/A 1997 Laf. VP N/A Lake HatchGIWW N/A 14 N/A N/A Pitre Laf. VP N/A Dupre Lake DeCade Pitre 1997 N/A N/A 1997 N/A Dupre 7 VP Ibe. Bayou BlueCanal 3 N/A N/A Ibe. Hebert VP Romero Hebert Bayou Faleau Romero N/A N/A VP N/A N/A Tigre Lagoon#1 VP Washout eieAs 1 PNANARmr eetIe 619 / / / / $25,600 N/A N/A N/A N/A 1998 26 Ibe. Hebert Romero N/A N/A VP Petite Anse#15 ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 23

Acres Benefited 97NANANAN/A N/A N/A N/A 1997

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$16,000 $9,600 timate

Current

Co st Es timat were plantedtoreduceshorelineerosionontheleveesofLakeDeCade. exclusion deviceswereusedtoprotecttheplants. were plantedalongthespoilbankwherecutbankisabsentorlesssevere.Nutria sediments. provide alivingbarrieragainstwave-inducedshorelineerosionandtrapavailable re-establish apipeline canal bankwhereerosionwereoccurring. A totalof2,235tradegallons ofgiantcutgrass( used toreduceboat-inducedshorelineerosion ontheedgeofapipelinecanal. A totalof350Californiabulrush( wave-induced marsherosion. used tocreateastandofemergentvegetation that willprovidealivingbarrieragainst A totalof2,000Californiabulrush( the interiormarsh. generated waves,andfiltersuspendeddetrital materialsothatitisretainedwithin establish emergentvegetationonanaturalbayou bank,provideabufferforboat A totalof1,800tradegallonsCaliforniabulrush ( trap availablesediment. to establishastandofemergentvegetationthat willpreventshorelineerosionand A totalof800tradegallonssmoothcordgrass( levee. which allowswaveenergytodestroyfragile,organicfreshwatermarshbehindthe used tocreatealivingnaturalbarrieracrossbreachesintheIntracoastalCanallevee A totalof500Californiabulrush( A totalof1,200tradegalloncontainerssmoothcordgrass( A totalof580smoothcordgrass( in dangerofbreachingintoanadjacentoilfieldcanal. induced shorelineerosionandprotectanareawheretheVermilionBayis establish astandofemergentvegetationthatwillcreatelivingbarrieragainstwave- trade gallonsofsmoothcordgrass( A totalof60tradegallonsroseaucane( available sediments. used toprovidealiving barrieragainstwave-inducedshorelineerosion andtrap A totalof6,400vegetative plugsofsmoothcordgrass( Approximately 2,000tradegalloncontainersofroseaucane( exclusion deviceswereusedtoprotecttheplants. alterniflora Approximately 1,200tradegalloncontainersofsmoothcordgrass( and 200tradegallonsofroseaucane( e ) wereplantedalongthetidalinterfaceofspoilbanks.Nutria ProjectSummary Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora Schoenoplectus californicus Phragmites australis Phragmites australis Zizaniopsis miliacea Spartina alterniflora Schoenoplectus californicus ) tradegallonswereusedto Spartina alterniflora ) plantswereusedto ) plantswereusedtore- Phragmites australis Spartina alterniflora ) tradegallonswere ) tradegallonswere ) plantsand180 ) tradegallonswere Spartina ) wereusedto ) wereused ) were ) ) ) 62

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje oorePm-nV / / ur adn e.1 00NANANANA$8,000 $16,000 $14,400 N/A N/A N/A N/A N/A N/A N/A N/A Ver. N/A N/A Hebert 2000 N/A Gautreaux $9,492 N/A 2000 11 N/A Ter. 2000 N/A 23 VP Baldone N/A Ter. 21 Laf. Baldone Dupre Camp Canal N/A Dupre N/A Pitre $14,880 N/A VP N/A Ter. Dupre Cocodrie Pump-in N/A $14,880 VP N/A N/A Dartez N/A N/A VP N/A Shell Canal Dupre N/A N/A 2000 N/A Ibe. N/A N/A VP 32 Levee Hebert Ter. N/A Company Canal Romero $16,000 Dartez N/A N/A Demo N/A N/A Dupre Bayou Chauvin#2 VP N/A 1999 N/A N/A N/A 21 1999 VP Ibe. N/A Planting 21 Maintenance StM. Hebert 2000 Iberia Romero N/A Smith Canal Gautreaux Houma Navigation N/A N/A VP N/A N/A N/A StM. Tigre Lagoon#2 VP 1999 Smith 23 Gautreaux Ver. Revised N/A Hidalgo #3- N/A Frith VP Gautreaux Burns Point#1 N/A N/A VP Corporation #4 Vermilion asCnlV / / ateu eetVr 620 / / / / $26,442 N/A N/A N/A N/A 2000 36 Ver. Hebert Gautreaux N/A N/A VP Oaks Canal ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 5 17 4 2

Acres Benefited 00NANANAN/A N/A N/A N/A 2000 N/A N/A N/A N/A N/A N/A 2000 N/A N/A 2000 N/A N/A N/A N/A 1999

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$4,400 $4,800 $2,400 $1,280 timate

Current

Co st Es timat to producealivingbarrier ofplantstoslowerosioncanalbanksand levees. planted tofillvoidsinthePetiteAnse#7and#8vegetationprojects. were usedtoestablishvegetationonanewpump-in area. A totalof1,000tradegallonssmoothcordgrass ( trade gallonsofCaliforniabulrush( A totalof1,000tradegallonsgiantcutgrass ( natural revegetation. along CompanyCanaltoestablishavegetation barrierandtoprovideseedfor A totalof1,800tradegallonsgiantcutgrass ( energy anddecreasebankerosion. along theshorelineofHoumaNavigationCanalinordertobufferboat-wave A totalof1,400tradegallonssmoothcordgrass( prevent shorelineerosion. to aidinsedimenttrapping,andestablishastandofemergentvegetationthatwill A totalof1,860tradegallonssmoothcordgrass( trap availablesediments. to establishastandofemergentvegetationthatwillpreventshorelineerosionand A totalof1,860tradegallonssmoothcordgrass( wildlife habitat. californicus A totalof2,000tradegalloncontainersCaliforniabulrush( source availablefornatural regeneration. levees, accreteavailable sediment,providehabitatforwildlife,andmake aseed produce alivingbarrier ofvegetationthatwillslowerosioncanal banks and A totalof5,200smooth cordgrass( Approximately 1,100plugs ofsmoothcordgrass( trade gallonsofCaliforniabulrush( A totalof500tradegallonssmoothcordgrass( A totalof600bare-rootedplugssmoothcordgrass( shoreline erosionandtrapsedimentinanoilfieldcanal. californicus Approximately 160tradegalloncontainersofCaliforniabulrush( narrow canalbankwhichhaserodedalmostinto theadjacentmarsh. revegetate aninteriormarshthathassubsided nearthecanalbankandtoprotecta a wind/wavebreakinopenwaterareaswithin themarsh. establish avegetativebarriertoslowshorelineerosionalongthebayouandactas e ) wereplantedtoreducefetch,slowwaterexchange,andprovide ) wereplantedtocreateanemergentstandofvegetationthatwillreduce ProjectSummary Spartina alterniflora Schoenoplectus californicus Schoenoplectus Californicus Zizaniopsis miliacea Zizaniopsis miliacea Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora ) plugswereusedto Schoenoplectus ) wereusedto ) wereplantedto Schoenoplectus ) and1,000 ) wereused ) wereplanted ) and1,000 ) plants ) wereused ) wereused ) wereused ) were 63

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje on aeV / / ateu mt t.620 / / / / $3,606 N/A $3,500 N/A N/A N/A $21,173 N/A N/A N/A 2001 N/A $9,120 6 StM. N/A N/A $11,700 N/A Smith 2001 Gautreaux N/A 7 N/A N/A N/A StM. $10,202 N/A VP N/A Smith Gautreaux N/A 2001 N/A N/A Round Lake N/A 4 N/A StM. VP N/A $7,320 N/A N/A 2001 Demonstration Smith Establishment Gautreaux 11 N/A N/A Colony Ter. $16,352 StM. N/A N/A 2001 N/A Dartez VP Smith 10 N/A Gautreaux $4,800 N/A N/A Hammock Lake Laf. Dupre N/A 2001 Baldone N/A N/A N/A VP N/A N/A 20 N/A VP Dupre Hammock Bayou Ibe. $6,780 N/A N/A N/A Hebert N/A VP N/A 2000 Romero Pointe N/A Small BayouLa N/A 8 N/A N/A N/A Ibe. VP Demo 2000 N/A Interior Marsh Hebert Lake Cheniere N/A 23 StM. Romero 2000 GIWW N/A Bayou Carlin- N/A Smith N/A 7 Gautreaux VP Ibe. N/A Tigre Lagoon#2 N/A N/A Hebert 2000 VP Romero 12 StM. Company #3 N/A St. MaryLand N/A Smith VP Gautreaux Petite Anse#9 N/A N/A VP Luke's Landing aihLn aa PNANAGuraxHbr e.2 01NANANANA$11,204 N/A N/A N/A N/A 2001 23 Ver. Hebert Gautreaux N/A N/A VP Parish LineCanal ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 21

Acres Benefited 01NANANAN/A N/A N/A N/A 2001

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$8,000 timate

Current

Co st Es timat logs wereusedtoprotecttheexistingmarsh. gallons ofsmoothcordgrass( available sediment,and provideseedfornaturalrevegetation. southeast ofCypremort Point,inordertoreducetidalexchangeinto the marsh,trap along theshorelineofRound Lake,aninteriorlakelocatedaboutthree miles erosion. additional sedimentandprotecttheshorelineof HammockLakefromfurther along theshorelineofHammockLakenearCypremort Pointinordertoaccrete Hammock Bayou,andtotrapadditionalsediment. Blanche Baytodecreasetherateofshoreline erosion, tostabilizethebankof plugs wereplacedalongHammockBayounear itsconfluencewithWestCote A totalof560smoothcordgrass ( habitat. this particularshallow-waterarea,andtoprovide additionalfisheriesandwildlife planted inagridformationtoencourageongoing, self-sustainingmarshgrowthin Cypremort Point,betweenHammockLakeand OysterLake.Vegetationwere Oyster Lakeinanexpansivemudflat,approximately twomilessoutheastof A totalof1,000smoothcordgrass( A totalof360smoothcordgrass( A totalof640smoothcordgrass( A totalof300tradegallonsblackmangrove( shoreline, andreclaimmarsh. to createastandofemergentvegetationthatwillnarrowthebayou,reestablish A totalof1,800Californiabulrush( erosion andtrapavailablesediment. were usedtoestablishastandofemergentvegetationthatwillpreventshoreline A totalof1,830tradegallonssmoothcordgrass( A totalof2,044tradegallonsCaliforniabulrush( sediment, andprovideaseedsourceforfutureregeneration. used tocreateastandofemergentvegetationthatwillreduceshorelineerosion,trap A totalof600Californiabulrush( seed sourcefornaturalregenerationofemergentvegetation. and wave-inducederosiontidalscouring,totrapsediments,providea to createstandsofemergentvegetationthatwillprovidealivingbarrieragainstboat A totalof1,000tradegallonssmoothcordgrass( buffer againstshoreline erosionandtrapavailablesediment. along ParishLineCanal, justwestoftheIberia/Vermilionparishline, toprovidea A totalof2,000smooth cordgrass( levee thatencompassesLakeDeCade. californicus A totalof1,000tradegalloncontainersCaliforniabulrush( erosion andtrapavailablesediment. were usedtoestablishastandofemergentvegetationthatwillpreventshoreline e ) wereplantedtocreateavegetativebufferalongthebacksideof Spartina alterniflora ProjectSummary Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Avicennia germinans ), and500feetofcoconutfiber Spartina alterniflora Spartina alterniflora Schoenoplectus californicus ) tradegallonswereplaced ) tradegallonswereplaced ) tradegallonsand1,000 ) plugswereplacednear ) tradegallonswereplaced Schoenoplectus ) tradegallonswere ) plantswereused ), 600trade ) plants ) wereused ) 64

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje ryDc oeV / / ateu atzSM 220 / / / / $8,480 N/A $7,040 N/A N/A $8,560 N/A N/A N/A $13,400 N/A N/A 2002 N/A N/A $10,600 12 N/A StM. N/A 2002 Dartez N/A N/A Gautreaux 10 $4,000 StM. N/A N/A N/A 2002 Dartez VP N/A N/A Gautreaux N/A Gray DuckHole 12 N/A Ibe. $4,800 N/A N/A N/A VP Hebert N/A 2002 Romero N/A $8,000 Avoca Island 23 N/A Ibe. N/A N/A 2002 N/A VP Hebert N/A N/A GIWW Delcambre 11 Romero Ter. N/A $24,000 2002 N/A Dartez N/A N/A N/A VP 11 N/A Dupre Laf. Union OilCanal N/A N/A N/A N/A 2002 Pitre N/A VP N/A 7 Dupre Flotant Demo Ter. 2002 Falgout Canal N/A N/A N/A Dartez 11 VP Laf. Dupre N/A Restoration 2002 Pitre N/A GIWW Cypress N/A VP 34 Dupre Laf. Bayou Colyell N/A N/A Triche VP Chaisson Grand Bayou N/A N/A VP Bayou Folse ryeV / / ateu atzSM 020 / / / / $7,200 N/A N/A N/A N/A 2002 10 StM. Dartez Gautreaux N/A N/A VP Treyne ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat generated waveenergy;5,000linearfeetofcanalbankwereplanted. revegetation; 5,300linear feetwereplanted. islands, toprovidewildlifehabitat,and aseedsourcefornatural were donetocreatealivingbarrierofplants slowerosionontheleveeand planted alonganerodingleveeandonislands thatprotectaninteriormarsh.This A totalof1,060tradegalloncontainersgiant cutgrass( A totalof880tradegalloncontainersgiant cutgrass( natural revegetation;5,350linearfeetwereplanted. available sedimentandestablishstandsofvegetation toserveasaseedsourcefor the abilityofplanttoproducealivingbarrier againsterosion,andtoaccrete trade galloncontainersofsmoothcordgrass( Several activelyerodingareasalongtheGIWW wereplantedwithatotalof1,070 plantings onthebankswithandwithouttrees; 10,050linearfeetwereplanted. and protecttheinteriormarshbehindbanks,tocompareeffectivenessof alterniflora This erodingcanalbankwasplantedwith3,350smoothcordgrass( were planted. terraces tofiltersedimentandreducewaveenergy;4,600linearfeetofinteriormarsh matting torestoreandestablishfloatingmarshshowtheuseofvegetative with 300giantcutgrass( bulrush ( This interiormarshdemonstrationused800tradegalloncontainersofCalifornia bank wereplanted. seedlings torestoreavegetativecorridoralongtheGIWW;5,000linearfeetofcanal This canalbankplantingused500barerootbaldcypress( generated waveenergy;3,000linearfeetofcanalbankwereplanted. ( This canalbankplantingused600tradegalloncontainersofsmoothcordgrass ( This canalbankplantingused1,000tradegalloncontainersofCaliforniabulrush giant cutgrass( This projectconsistsofacanalbankplantingusing1,000tradegalloncontainers vegetation ininteriorponds;15,000linearfeetwereplanted. a vegetativebufferalongthenewspoilmaterialonBayouFolseandtorestore trade galloncontainersofCaliforniabulrush( open waterarea;4,500 linear feetwereplanted. vegetation, andtoaccrete availablesedimenttoslowsedimentationof theinterior to dropoutoftheflowing water,toencouragegrowthofsubmerged aquatic were placedacrossaneroding marshareatoslowwatermovement allowsediment A totalof900tradegallon containersofgiantcutgrass( p linear feetwereplanted. Spartina alterniflora Schoenoplectus californicus lanted inseveralareastoslowerosionandprotect interiormarshes;atotalof4,400 e Schoenoplectus californicus ) plugstoproducealivingbarrierslowtheerosionofcanalbanks Zizaniopsis miliacea ) tocreateavegetativebufferagainstwind-andboat- Zizaniopsis miliacea ) tocreateavegetativebufferagainstwind-andboat- ProjectSummary ) andaninteriormarshplantingusing2,000 ) and600feetofcoconutfibermattingplanted Spartina alterniflora Schoenoplectus californicus ) plugstodemonstratetheuseoffiber Zizaniopsis miliacea Zizaniopsis miliacea Zizaniopsis miliacea Taxodium distichum ) todemonstrate Spartina ) tocreate ) were ) plants ) were ) 65

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje ryDc oe2V / / ateu atzSM 320 / / / N/A N/A N/A $6,132 N/A N/A N/A 2003 VP 23 N/A N/A Brady CanalII StM. N/A VP Dartez Gautreaux N/A Burns Point2 N/A N/A VP N/A Gray DuckHole2 N/A N/A $6,376 N/A VP 2002 Catfish BayouSouth N/A N/A 11 $4,000 VP N/A Ver. Delcambre Canal Hebert N/A Gautreaux N/A N/A N/A VP N/A Protection Project Ter. N/A Management VP N/A Castex Water Dartez N/A Laf. Maintenance Dupre Vermilion Pitre N/A N/A N/A N/A 2002 Dupre VP N/A Lake Boudreaux 7 N/A N/A Ver. 2002 VP Hebert 6 Raphael Canal Gautreaux StM. N/A Dartez N/A Gautreaux VP Delcambre Terraces N/A N/A VP Boy ScoutCamp nacmn 0 PNAN/A N/A VP Enhancement '03 Habitat GIWW Wildlife ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp ur Dartez Dupre Smith Gautreaux Hebert Gautreaux Hebert Romero Dupre Dupre Chaisson, o nsor Se n ator atzTr 320 / / / N/A N/A N/A N/A 2003 23 Ter. Dartez Pitre

Repre

sen ta tive e.1 03NANANAN/A N/A N/A N/A N/A N/A N/A N/A 2003 11 N/A Ter. N/A N/A 2003 1 StM. N/A N/A N/A N/A 2003 4 N/A Ibe. 2003 28 Ver. a.5 03NANANAN/A N/A N/A N/A 2003 51 Laf.

Pa rish 11 23

Acres Benefited 02NANANAN/A N/A N/A N/A N/A N/A N/A 2002 N/A 2002

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $16,000 $8,000 $16,000 $8,000 $720 $4,000 $19,680 $16,000 $1,165 timate

Current

Co st Es timat poor survival;4,600linearfeetwereplanted. plants toslowerosionofcanalbanksandlevees,fillingapsareaswith cordgrass ( vegetation plantingprojects.Atotalof1,533tradegalloncontainerssmooth This projectcomplementedtheOaksCanal,CampandParishLineCanal stabilizing smallterraces;4,782linearfeetwereplanted. to providewildlifehabitat,anddeterminetheeffectivenessofsmoothcordgrassin alterniflora This demonstrationprojectused1,594plugsofsmoothcordgrass( create vegetativeterraces;2,500linearfeetwereplanted. in anopenwaterarea,andtodeterminethefeasibilityofusinggiantcutgrass planted inlargecellstocreateislandsofvegetation,provideemergentvegetation A totalof500tradegalloncontainersgiantcutgrass( slow erosiononthebayoubankandtotrapavailable sediments. enhancement. to establishavarietyof treesonanewlymanagedareaaswellfor wildlifehabitat illinoinensis energy. were plantedtoprovideavegetativebufferagainstwind-andboat-generatedwave create vegetativeterracesinalargepond. were plantedtocreatealivingbarrierslow erosion onanewlyrebuiltleveeandto 1,200 tradegalloncontainersofCaliforniabulrush ( A totalof800tradegalloncontainersgiant cutgrass( A totalof1,000tradegalloncontainerssmoothcordgrass( action onanewlyestablishedlevee. alterniflora Approximately 2,000tradegalloncontainersofsmoothcordgrass( and 340tradegalloncontainersofgiantcutgrass( planted tocreateavegetative bufferalongtheinteriorsideofalevee system. A totalof1,000tradegallon containersofgiantcutgrass( vegetation thatwillreducewaveinducedshoreline erosion. californicus A totalof90tradegalloncontainersCalifornia bulrush( A totalof1,000plugssmoothcordgrass( available sediments. planted alongthebanksofDelcambreCanalto slowshorelineerosionandtrap A totalof2,120tradegalloncontainerssmoothcordgrass( levels. which willpreventscouringcausedbyflapgatesrecentlyinstalledtomanagewater californicus A totalof2,000tradegalloncontainersCaliforniabulrush( oak ( A totalof3,300bareroot treesincludingbaldcypress( e Quercus virginiana Spartina alterniflora ) toestablishvegetationonnewlybuiltterracespreventtheirerosion, ) wereplantedtoestablishavegetativebufferslowtheeffectsofwave ) wereplantednorthofBurnsPointtocreatean emergentstandof ) plantswereusedtoformavegetativebarrierintheinteriormarsh ), sawtoothoak( ), shumardoak( Q. acutissima ) wereusedtoprovideacontinuouslivingbarrierof ProjectSummary Q. shumardii ), andwateroak( Spartina alterniflora Zizaniopsis miliacea Schoenoplectus californicus ), wildpecan( Taxodium distichum Zizaniopsis miliacea Zizaniopsis miliacea Zizaniopsis miliacea Schoenoplectus Q. nigra Spartina alterniflora Spartina alterniflora Schoenoplectus ) wereplantedto Spartina Spartina Carya ) wereplanted ) were ), live ) were ) and ) were ) ) ) 66

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje as sadLveV / N/A N/A VP Marsh IslandLevee N/A N/A VP Development '04 Terrebonne Land N/A N/A VP Jaws SpoilDisposal N/A N/A VP N/A N/A GIWW Lockport VP Bourgeois N/A N/A VP Ver. Hebert N/A N/A Romero Audubon VP N/A N/A VP Apache '04 Tigre 2 Cheniere Au N/A N/A Tigre VP Cheniere Au N/A N/A VP South LakeDeCade N/A N/A VP Delcambre Marsh Island Outpost ct Numb Proj e er ( ct F Na edera me l) PNAN/A N/A VP

Proj

ect PPL Ty pe

Age n cy /Sp oeoHbr b.6 2005 60 Ibe. Hebert Romero Dartez Dupre Smith Gautreaux Pitre Dupre Smith Gautreaux Frith Gautreaux Dartez Dupre Hebert Romero Dartez Dupre Hebert Gautreaux oeoSihIe 2005 9 Ibe. Smith Romero o nsor Se n ator

Repre

sen ta tive e.3 04NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2004 34 N/A N/A Ter. N/A 2004 N/A 26 N/A St.M N/A 2004 N/A N/A 1 N/A Laf. 2004 N/A N/A 39 St.M N/A N/A N/A 2004 23 N/A Ver. N/A 2004 N/A 23 Ter. N/A N/A N/A N/A N/A N/A 2003 6 N/A N/A Ver. 2003 22 N/A Ter. 2003 6 Ver.

Pa rish 7

Acres Benefited 04NANANANA$5,160 N/A N/A N/A N/A 2004

Con

st ruction Completi / / / N/A N/A N/A N/A / / / N/A N/A N/A N/A

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $24,000 $18,000 $4,200 $19,986 $13,332 $16,000 $5,800 $15,360 $5,400 $2,250 $6,000 timate

Current

Co st Es timat amarum A totalof3,225feetgulfcoastlinewereplantedwithbitterpanicum( alterniflora pump-off area. act asnaturalterracestodampenwaveaction and slowwatermovementinanold root baldcypresstress( establish vegetationonmudflatsandcanalbankstopreventerosion. further erosionoftheshoreline. to establishvegetationonnewlyaccretedsandbehindrockbreakwatersandstop natural regeneration. establish vegetativestandsthatwillprovidewildlifehabitatandaseedsourcefor with naturallyoccurringvegetation. cutgrass ( fetch length. californicus A totalof3,000tradegalloncontainersCalifornia bulrush( ( Approximately 750tradegalloncontainerseach ofCaliforniabulrush alterniflora both giantcutgrass( A totalof300feetcoconutlogsand ofcoconutmatsimpregnatedwith californicus trade galloncontainersand150plugsofCaliforniabulrush( A totalof180tradegalloncontainersgiantcutgrass( A totalof1,667plugssmoothcordgrass( 2,000 tradegalloncontainersofCaliforniabulrush( The goalofthisprojectwastoreducethefetchlengthaninteriorpondbyplanting Approximately 1,450plugsofsmoothcordgrass( A totalof9,600feetCaliforniabulrush( A totalof1,350plugssmoothcordgrass( increase diversityofwetland plants. protect arapidlyeroding shorelineontheisland,tocreatewildlifehabitat, andto Jamaican sawgrass( before undesirablespecies becameestablished. linear feettoestablishdesirable woodyplantspeciesonthenewlyrebuilt levee A totalof4,500trees approximately15specieswereplantedona total of54,000 reduce wind-generatedwaveerosion. gallons wereplantedtoestablishavegetativebufferthatwilltrapsedimentand bulrush ( A totalof750tradegallons ofgiantcutgrass( Schoenoplectus californicus e ), gulfcordgrass( Schoenoplectus californicu Zizaniopsis miliacea ) toestablishvegetationonanewlyaccretedbeach. ) wereusedtoestablishvegetationonanewly establishedspoildeposit. ) wereplantedtoestablishvegetationinanopen pondtoreducethe ), 1,109plugsofsmoothcordgrass( Zizaniopsis miliacea Cladium mariscus Taxodium distichum Spartina spartinae ), smoothcordgrass( ) wereplantedtostabilizeanewlycreatedmudflat ProjectSummary s), roseaucane( ) wereplantedalong3,750 linearfeetto ) andsmoothcordgrass( Schoenoplectus californicus Spartina alterniflora Spartina alterniflora ) wereplantedtoestablishvegetation ), andsmoothcordgrass( Zizaniopsis miliacea Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Phragmites australis Zizaniopsis miliacea Schoenoplectus Schoenoplectus ) wereplantedto ) wereplantedto Spartina ), California ), and300bare ) wereplanted Spartina ) trade Panicum ), andgiant ), and ), 1,670 ). 67

FEMA FEMA FEMA FEMA FEMA FEMA Section 204/1135 Section 204/1135 Vegetation Vegetation Vegetation Vegetation Program 81785 DSR- 81784 DSR- 81559 DSR- 81560 DSR- 81558 DSR- 81557 DSR- 81558 DSR-

State Proje etrto MNANADpeBloeTr 020 / / / / $1,000,000 N/A N/A N/A N/A 2002 50 Ter. Baldone Dupre N/A N/A Restoration DM Barrier Island Canal, WineIsland Houma Navigation McIlhenny Canal Avoca 2005 N/A N/A VP Corporation Harry Bourg GIWW Mandalay FM 99 MNANADpeBloeTr / 00NANANANA$7,070 $181,394 N/A $551,653 N/A N/A N/A $253,579 $633,179 N/A N/A N/A N/A N/A N/A N/A $218,165 2000 N/A N/A N/A N/A N/A Ter. N/A 2000 Baldone N/A N/A N/A N/A Ter. Dupre 1996 N/A Baldone N/A 70 N/A N/A MM N/A Ter. Dupre 1995 1996 N/A $1,007,000 Baldone (FEMA 1999) N/A N/A Falgout Canal 25 25 SP Dupre Ter. Ter. N/A N/A Baldone Baldone N/A (FEMA 1999) 1995 N/A Timbalier Island DM 4,000 Dupre Dupre Ter. Repair (FEMA) N/A Timbalier Island N/A Baldone N/A N/A N/A DM DM Protection (FEMA) Dupre N/A East IslandRepair N/A N/A (FEMA) SP Wine Island N/A 1991 37 (FEMA) Ter. Maintenance Canal Levee Baldone Houma Navigational Dupre N/A N/A DM Restoration Wine Island ct Numb Proj e er ( ct F Na edera me l) PNAN/A N/A VP N/A N/A VP N/A N/A VP

Proj

ect PPL Ty pe

Age n cy /Sp ateu rt e.2 2005 23 Ver. 2005 Frith Gautreaux 24 St.M 2005 Dartez 12 Gautreaux Ter. Dartez 2005 Dupre 12 Ter. Dartez Gautreaux o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi / / / N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$13,332 $11,701 $8,000 $8,000 timate

Current

Co st Es timat Tropical StormIsadore. schedule ofthisprojectwasexpeditedduetotheimpactHurricaneLiliand at themouthofnavigationchannelinTerrebonneBay.Theconstruction Disposal Site.Theprojectareaisapproximately35milessouthofHouma,Louisiana dredged materialfromthebarchannelareainlieuofOceanDredgedMaterial This Section204/1135projectinvestigatedthefeasibilityofbeneficiallyusing flapgate culvertswascompleted byTerrebonneParishConsolidated Government. tropical stormsandhurricanes inthefallof1998.Theinstallation thenew This FEMAprojectreplaced flapgatesonwatercontrolstructuresdamaged during series oftropicalstorms andhurricanesinthefallof1998. This FEMAprojectrepaired sandfencingonTimbalierIslanddestroyed duringa was alsoplantedtostabilize thesand. provided a300-foot-wideelevatedmarshplatform tostabilizetheisland.Vegetation This FEMAprojectclosedamajorbreachcreated byHurricaneAndrewand also plantedtostabilizethesand. Terrebonne ParishprojectdestroyedbyHurricane Andrewin1992.Vegetationwas This FEMAprojectconstructedanelevatedmarsh platforminanareaofa planted withvegetationtostabilizethesediment. dredging project.Theislandwasrepairedtopre-Hurricane Andrewconditionand of dredgedmaterialfromascheduledHouma Navigational Canalmaintenance This FEMAprojectwasacooperativeventure withtheUSACEinbeneficialuse Houma NavigationCanaldamagedbyHurricane Andrewin1992. This FEMAprojectinvolvedtherepairofsegments ofthewesternbank maintenance dredgingprojecttorestoreWineIsland. included theuseofbeneficialdredgingfromascheduledHoumaNavigationalCanal This Section204/1135projectwasacooperativeeffortwiththeUSACEand and toprovideaseedsourcefornaturalregeneration. establish vegetationonthecanalbanktopreventerosion,providewildlifehabitat, A totalof3,333smoothcordgrass( trade gallonsofCaliforniabulrush( A totalof1,000tradegallonsgiantcutgrass( californicus A totalof1,000tradegalloncontainersCaliforniabulrush( a hightrafficarea. californicus A totalof1,000tradegalloncontainersCaliforniabulrush( regeneration. shoreline erosion,andtoprovidewildlifehabitatwithaseedsourcefornatural create alivingstandofvegetationtoactasnaturalterrace,helpprevent e ) wereplantedtoestablishvegetationonnewlydredgedmaterial. ) wereplantedtoestablishavegetativebufferbecauseofwaveactionin ProjectSummary Spartina alterniflora Schoenoplectus californicus Zizaniopsis miliacea ) plugswereplantedto Schoenoplectus Schoenoplectus ) wereplantedto ) and1,000 68 Impact AssistanceProgramprojects. WRDA=Water ResourcesDevelopmentAct; FEMA=FederalEmergencyManagmentAdministrationprojects;CIAP=Coastal 204/1135= WaterResourceDevelopmentAct Sections204and1135beneficialuseofdredgedmaterialprojects; Restoration Program(ChristmasTreeProgram); Vegetation=DNR/NRCS/SWCCVegetationPlantingProgram;Section funded primarilybytheStateofLouisianathrough theCoastalRestorationDivision;PCWRP=ParishWetlands USACE=U.S. ArmyCorps ofEngineers. Resources Conservation Service;NWRC=NationalWetlandsResearch Center;USFWS=U.S.FishandWildlifeService; Program: Agency/Sponsor: PPL: Project Type: Trapping; OM=OutfallManagement;BI=Barrier Island;SD=SedimentDiversion. Creation; SP=ShorelineProtection;FD=Freshwater Diversion;VP=VegetationPlanting;SNT=SedimentandNutrient Other Other FEMA/CIAP FEMA FEMA FEMA FEMA Program R-1BonMrhM / / ir ur a.4 02NANANANA$473,365 N/A N/A N/A N/A 2002 44 Laf. Dupre N/A N/A MC Pitre RaineyRefuge N/A RAINEY N/A MC BrownMarsh BRM-01 PW-1728 PW-1646 PW-1906 81787 DSR- 81786 DSR- PriorityProjectList(as authorizedeachyearbytheBreauxActTask Force).

State Proje BreauxAct=CoastalWetlandsPlanning,Protection andRestorationAct(CWPPRA);State=Restorationprojects HR=HydrologicRestoration;DM=Beneficial UseofDredgedMaterial;MM=MarshManagement;MC=Marsh

FM)M / / ur adn e.NA20 / / / / $1,093,962 N/A $267,059 N/A N/A N/A $64,092 N/A N/A $581,566 N/A 2005 $89,940 N/A N/A Ter. N/A N/A Baldone N/A N/A Dupre N/A 2005 N/A N/A N/A N/A N/A MM Ibe. N/A N/A Hebert 2005 N/A (FEMA) N/A Romero N/A Montegut Wetlands St.M 2000 N/A N/A 1,259 N/A Smith HR Ter. 2000 Gautreaux Repairs (FEMA) Baldone N/A Marsh Island N/A Ter. N/A Dupre HR Baldone Repairs (FEMA) N/A N/A Cote Blanche Dupre SP N/A N/A (FEMA 1999) VP Whiskey Island 1999) East Island(FEMA c

EPA=Environmental Protection Agency;NMFS=NationalMarineFisheries Service;NRCS=Natural t Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp ateu Frith Gautreaux o nsor Se n ator

Repre

sen ta tive e.6020 / / / / $851,869 N/A N/A N/A N/A 2005 640 Ver.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 3) Con & Lan s tr d uction Cost rights Parish: N/A=Not Applicable. size andquantity. Beginning withBreauxActPPL10,projectcosts areforPhaseIonly.Vegetationprogramprojectcostsestimatedbasedon programs arefromDNR'sContractandBudget Section.BaselineCostandCurrentEstimatebothincludecontingencyfunds. Baseline CostEstimatesandCurrent forBreauxActprojectsarefromtheUSACE.Costsotherrestoration Anticipated AcresBenefited: Tan.=Tangipahoa, Ter.=Terrebonne,Ver.=Vermilion. Orl.=Orleans, Plaq.=Plaquemines,StB.=St.Bernard, StC.=St.Charles,StJo.=St.JohntheBaptist,StM.=St.Mary,StT.=St.Tamman

Ope

Asc.=Ascension,Asu.=Assumption,Cal.=Calcasieu, Cam.=Cameron,Ibe.=Iberia,Jef.=Jefferson,Laf.=Lafourche, ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co

N/AforBreauxActdemonstrationanddeauthorized projects. st Es timate

Current

Co st Es timat 6,147 roseaucane( over 44acresinLafourcheParish. The projectfeaturesconsistedofathinlayermarshcreation/nourishment material. reconstructing 17,000linearfeetofanexistingearthenleveeusingoff-siteborrow occurred duringHurricaneLiliin2002.Theprojectconsistedofrefurbishingand This FEMAprojectrepaireddamagetotheMontegutWetland(TE-01)that maintenance workpaidforbyCWPPRA. project damagedduringHurricaneLiliin2002.Thealsoincludedminor minor repairofnavigationaidsontheMarshIslandHydrologicRestoration(TV-14) This FEMAprojectconsistedofrepairstoareasstonepaving,dikes,and maintenance workpaidforbyCWPPRA. project damagedduringHurricaneLiliin2002.Thealsoincludedminor minor repairofnavigationaidsontheCoteBlancheHydrologicRestoration(TV-04) This FEMAprojectconsistedofrepairstoareasstonepaving,dikes,and completed inAugust2000. CWPPRA fundswerecombinedwiththeFEMAforrepairs.Repairs hurricanes duringthefallof1998.ThisareaispartaCWPPRAprojectand vegetation torepairareasofWhiskeyIslanddamagedbytropicalstormsand This FEMAprojectinvolvedtheinstallationofsandfencingandplanting cordgrass ( series oftropicalstormsandhurricanesinthefall1998.Atotal4,280smooth Pelto shorelineofEastIsland.ThisareaispartaCWPPRAprojectdamagedby This FEMAprojectinvolvedtheplantingofmarshvegetationonduneandLake the CoastalImpactAssistancePlan(CIAP). spoil ononesideoftheborrowarea.Anadditional $391,763wascontributedfrom The terraceswerecreatedbydredginginshallow openwaterareasandpilingthe The projectconsistsofconstructingapproximately35,000linearfeetterraces. e Spartina alterniflora Phragmites australis ), 500blackmangrove( ProjectSummary ) wasplantedinApril2000. Avicennia germinans ), and plant y, REGION 4

INTRODUCTION primary source of freshwater inflow is the Region 4 encompasses the Mermentau River. The natural drainage of Mermentau and Calcasieu/Sabine the Lakes Sub-basin has been interrupted by hydrologic Basins. It extends from the canals and water control structures. The western bank of the Freshwater Bayou sub-basin contains Grand and White Lakes, Canal, westward to the Louisiana/Texas and functions similar to a freshwater border in Sabine Lake, and from the marshes reservoir. Drainage occurs eastward to just north of the GIWW, south to the Gulf of Freshwater Bayou Canal, southward to the Mexico. It covers all or part of Vermilion, Gulf of Mexico, and westward to the Cameron, and Calcasieu parishes. Mermentau River and Mermentau Ship This region covers approximately Channel. 768,210 acres of coastal wetlands. These The Calcasieu/Sabine Basin is a wetlands are classified as approximately 520 shallow, coastal wetland system with acres of cypress-tupelo swamps; 9,590 acres freshwater input at the north end from the of bottomland hardwood forests; 354,600 Sabine and Calcasieu rivers. Water acres of fresh marshes, 171,700 acres of circulates between Calcasieu and Sabine intermediate marshes; 198,600 acres of lakes via the GIWW and interior canals. brackish marshes; and 33,200 acres of saline Both lakes are connected to important marshes. shipping corridors and are also used for Estimates of wetland loss from recreation. As in the Mermentau Basin, Region 4 indicate that between 1990 and many wetlands in this basin are actively 2000, a total of 34,688 acres of wetlands managed, with water control structures in were lost (an average of 3,468 acres per the Cameron-Creole Watershed, Sabine year). National Wildlife Refuge, and on private The Mermentau Basin extends from lands. Freshwater Bayou Canal westward to The major objectives within this Louisiana Highway 27, and is divided into region are to reduce the salinities of the two sub-basins: the Lakes Sub-basin north marsh habitats in the western and southern of the Grand Chenier Ridge complex and the areas and to convert most of the Lakes Sub- Chenier Sub-basin to the south. The basin’s basin to fresh marsh. The objective for the

69 Chenier Sub-basin is to convert the existing Parish Coastal Wetlands Restoration saline and brackish marshes to brackish and Program intermediate marshes respectively by the The ten Christmas tree projects year 2050. The overall objective for the implemented in Region 4 are Cameron Calcasieu/Sabine Basin is to create fresher Creole, Kelso Bayou, Portie Lakes, Ellender conditions by the year 2050. Bridge, Black Lake, Goose Lake, Cameron Coast 2050 identified specific Creole #2, and Prien Lake. Two sites were ecosystem strategies for protecting and maintained in 2004: Cameron Creole #2 and sustaining the region’s coastal resources. Prien Lake. The PCWRP is responsible for These specific ecosystem strategies can be building approximately 8,723 linear feet of grouped into one of the following five fences in Region 4 since 1990. general categories: restoring and sustaining This program also includes the first wetlands, controlling salinity in the phase of two vegetation projects, Collicon Calcasieu/Sabine Basin, protecting bay and Lake and Turner’s Bay, where 1,200 plants lake shorelines, restoring and maintaining were installed along 6,000 linear feet of barrier islands and shorelines, and shoreline/bankline to reduce erosion and to maintaining critical landforms. promote sediment accumulation.

PROJECT SUMMARIES DNR/NRCS/SWCC Vegetation Planting A total of 181 restoration projects Program have been authorized for Region 4 (Figures Since 1988, a total of 125 vegetation 10 and 11, Table 4). Project specific planting projects have been implemented in information is presented below, organized Region 4. Several phases, spanning multiple by project funding source. years, exist for many of the planting projects. Projects completed in 2005 are CWPPRA Tebo Point Cutgrass, Little Florida, Eroded A total of 34 projects have been Terrace Demonstration, Flotant Creation, authorized under the direction of CWPPRA Highway 384, Christmas Tree Fence 2005, in Region 4, which is anticipated to benefit PPG/Port, West Cove, Texas Point Mudflat, 25,985 acres of wetlands at a cost of Chenier Tree Maintenance, and Ship Canal - $90,654,742. Hackberry. The CWPPRA Task Force officially deauthorized three projects in Region 4: Section 204/1135 Compost Demonstration (CS-26), SW Shore There are four Section 204/1135 White Lake Demonstration (ME-12), and projects in Region 4: Brown Lake and Dewitt-Rollover Vegetative Plantings Calcasieu River & Pass Phases I, II, and III. Demonstration (ME-08). These projects created approximately 982 acres of wetlands. These projects utilized State dredged material from routine maintenance Eight projects have been of the Calcasieu Ship Channel to benefit implemented in Region 4 and funded by the areas along the shore of Calcasieu Lake and Wetlands Trust Fund and/or local Parish areas within the Sabine National Wildlife funds. These projects are estimated to Refuge. benefit 1,972 acres of land at a cost of $10,582,546.

70 71

Figure 10. Location of Breaux Act projects authorized in Coast 2050 Region 4. 72

Figure 11. Location of State, PCWRP, Vegetation, and Section 204/1135 projects in Coast 2050 Region 4. Table 4. Restoration projects completed or pending in Coast 2050 Region 4.

l) e drights & edera , F on Dat e r ( & Lan nc e e n, a ig s t timate timat inten Es Numb De a Es t nsor ive , M st t c me pe o at g s Sp t Co Co Na Ty / en uction Completierin uction Cost ion, e ct ct cy s tr e tr at e e n ator ish s s r n r Project Summary

Program State Proje Proj Proj PPL Age Se Repre Pa Acres BenefitedCon Engin Cost Con Ope Monitoring Cos Baselin Current

The project area falls within the Cameron-Creole watershed management area, which has been adversely impacted by saltwater intrusion and loss of sediment due to channelization and water diversion of the Calcasieu River. The project provides CS-04a Cameron-Creole needed maintenance for the existing 19 miles of levee and five major structures

Breaux Act Breaux (CS-04a) Maintenance HR 3 NRCS Theunissen Frith Cam. 2,602 1997 N/A N/A $3,736,718 $3,719,926 $3,736,718 which make up the Cameron-Creole Watershed Project.

The project is intended to restore, to the extent possible, the natural hydrology of the area. A reduction in marsh loss and improved water conditions are expected to occur Brown Lake following project implementation. The project includes rebuilding the Alkali Ditch CS-09 (CS-Hydrologic Theunissen, Kleckley, levee, utilizing dredged material from the Calcasieu River when available, as well as

Breaux Act Breaux 09) Restoration HR 2 NRCS Cain Frith Cam. 282 Pending $481,841 $1,467,259 $1,252,790 $3,222,800 $3,201,890 rebuilding water control structures and canal plugs.

The project objectives are to re-establish the shoreline (hydrologic boundary) between Sweet Lake and the Gulf Intracoastal Waterway (GIWW), to reduce lake turbidity and tidal exchange, and to halt erosion and trap sediment needed to rebuild marsh along the northern and northwestern shorelines of Sweet Lake. This project Sweet Lake/Willow includes construction of rock embankments on the GIWW to close off the lakes, CS-11b Lake Hydrologic vegetation plantings to reduce erosion, and construction of earthen terraces

Breaux Act Breaux (CS-11b) Restoration SP 5 NRCS Theunissen Frith Cam. 247 2001 $408,208 $3,195,025 $639,762 $4,800,000 $4,944,107 combined with vegetation plantings in open water areas to promote revegetation.

The project goal is to restore historic water circulation patterns within the Cameron- Creole Watershed. This objective will be accomplished by slowing the rapid

73 CS-17 Cameron Creole movement of saline waters that enter the watershed from Calcasieu Lake. The project

Breaux Act Breaux (FCS-17) Plugs HR 1 USFWS Theunissen Frith Cam. 865 1996 $73,158 $345,381 $572,756 $660,460 $991,295 consisted of the installation of two sheetpile plugs in the lakeshore borrow canal.

The goal of this project is to protect 13,000 acres of fresh marsh from deterioration associated with the anticipated failure of the existing west levee. The original design Sabine National was to reconstruct 5.5 miles of eroded levee. The project was redesigned to include CS-18 Wildlife Refuge 1,000 feet of levee reconstruction and 5.5 miles of rock armor. Vegetation plantings

Breaux Act Breaux (FCS-18) Erosion Protection SP 1 USFWS Theunissen Frith Cam. 5,542 1995 $200,185 $1,010,568 $391,903 $4,895,780 $1,602,656 were used to reduce erosion from boat traffic. The goal of this demonstration project is to reduce marsh erosion from interior open West Hackberry water wave energy using vegetation plantings consisting of smooth cordgrass CS-19 Vegetative Planting (Spartina alterniflora ). In addition, wave-stilling hay bale fences were utilized to

Breaux Act Breaux (FCS-19) Demonstration VP 1 NRCS Theunissen Frith Cam. N/A 1994 $36,830 $125,461 $96,514 $213,947 $258,804 protect the vegetation plantings. The project is intended to create a hydrologic regime conducive to restoration, protection, and enhancement of the Mud Lake area by using various types of water control structures and vegetation plantings. Structural components include culverts CS-20 East Mud Lake with flapgates, two variable crest weirs, three earthen plugs, and repair of an existing

Breaux Act Breaux (PCS-24) Marsh ManagementMM 2 NRCS Theunissen Frith Cam. 1,520 1996 $248,569 $1,150,868 $2,696,499 $2,903,635 $3,375,936 levee.

The purpose of this project is to restore the natural hydrology of the project area and Highway 384 eliminate high salinities and severe water fluctuations to reduce marsh loss. The CS-21 Hydrologic project features included the installation of flapgated culverts and a shell plug

Breaux Act Breaux (PCS-25) Restoration MM 2 NRCS Theunissen Frith Cam. 150 2000 $154,447 $163,278 $740,829 $700,717 $1,058,554 installed along the Calcasieu Lake shoreline to repair a breach.

The goal of this project is to stabilize six miles of the Gulf Intracoastal Waterway (GIWW) channel bank with a rock armored breakwater. A 35,000 foot limestone breakwater was constructed to prevent continued erosion of the levee and to prevent CS-22 Clear Marais Bank encroachment of the GIWW into the project area. Vegetation plantings were used to

Breaux Act Breaux (PCS-27) Protection SP 2 USACE Cain Kleckley Cal. 1,067 1997 $562,832 $2,229,644 $903,612 $1,741,310 $3,696,087 enhance the bank protection and promote sediment trapping.

(Region 4) 74

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program (PCS-26ii) CS-30 16) CS-29 (CS (SA-1)) (XCS-48 CS-28 (XCS-48) CS-27 (XCS-36) CS-26 (XCS-56) CS-25 (PCS-26i) CS-24 47/48i) (XCS- CS-23

State Proje - tblzto P9NC anJhsCl 320 3087 13530 1974 37241 $1,740,044 $3,742,451 $109,774 $1,325,370 $310,817 2001 83 Cal. Johns Cain NRCS SP9 Theunissen NRCS Stabilization 9 Ridge WestBank HR GIWW -Perry Restoration Culverts Hydrologic Black Bayou 8 MC Increment 1 NMFS Marsh Creation, $370,594 $255,391 $78,818$137,273 $39,299 Sabine Refuge Deauth. 6 HR N/A Cam. Restoration Frith Hydrologic Theunissen Black Bayou $2,223,518 $244,881$1,465,996 EPA $578,213 $2,289,090 1999 4 MC 1,203 Cal. (Deauthorized) Demonstration Johns Compost NRCS 4 SNT Cain NRCS $1,404,081 $4,581,454$4,528,915 Demonstration $2,778,535 $346,299 4 Plowed Terraces 2000 SP 953 Cam. Protection Perry RidgeShore Frith Theunissen USFWS 3 MM Island Canal, andHog Gully Canal, WestCove at Headquarters Control Structures Refuge Water Replace Sabine ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe SW huisnFai a.2420 5587$,2,8 2,7 $15,724,965 $555,857$2,828,886 $27,672 $3,412,415 2002 214 Cam. Flavin Theunissen USFWS USACE/

Age n cy /Sp Cain Frith, Johns Cam. 3,594 2001 $764,796 $3,775,897 $1,431,920 $6,316,800$5,972,613 $3,775,897 $764,796 2001 Frith, 3,594 Cam. $325,641 Johns Cain $299,690 Theunissen, $45,425 $214,428 $65,788 2000 N/A Cam. Frith,Johns Cain Theunissen, o nsor Se n ator ors a.50Pnig$9,5 42749$6,1 $5,900,387 $893,356$4,227,449 $266,110 $5,386,152 Pending 540 Cam. Morrish Kleckley, Frith,

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat along thebanktoprevent furthererosion. to allowfortheuseofdouble bargetraffic.Theprojectconsistedof installing rock Intracoastal Waterway (GIWW) inanareawhichwasdredgedtoadepth of30feet This projectwasauthorized toinstallrip-rapalongthenorthernbank oftheGulf Lock andtheSchoonerBayouCatfishPoint watercontrolstructures. over theculverts.Operationofstructurewill beincoordinationwithCalcasieu box culvertswithsluicegatesinBlackBayou andrelocatingLouisianaHwy384 contributed tomarshlossandshorelineerosion. Thisprojectconsistsofinstalling The projectobjectiveistodischargeandremove excesswater,whichhas Ship Channel. Sabine NationalWildlifeRefugeusingmaterial dredgedfromtheCalcasieuRiver marsh fringe.Theprojectconsistsof5 creationsites(5cycles)withinthe nourishment inadjacentmarsheswhilereducing openwaterfetchanderosionof block thewind-inducedintroductionofsaltwater. Additionally,itwillincrease The projectisintendedtostrategicallycreate marsh inlarge,openwaterareasto the BreauxActTaskForceinJanuary2002. amended materialsandtreetrimmings.Theprojectwasofficiallydeauthorizedby medium foremergentvegetation,anddeterminingsettlementratesofthecompost compostable material,usingcompostamendedmaterialinprovidingagrowth This projectwasauthorizedtoevaluatetheeffectivenessofusingtreetrimmingsas the GIWWfromPerryRidgetoVintonDrainageCanal. (GIWW). Arip-rapbreakwaterwasplacedalonglowareasofthenorthernbank intrusion byrepairingthenorthernspoilbankofGulfIntracoastalWaterway excessive energyimpactsoninteriormarshes,andreducethepossibilityofsaltwater The projectisintendedtoreducetidalscour,waveactionfromboats,andother saltwater intrusionintotheinteriormarshes. increase crosssectionalareaformovementofestuarinespecies,andhelptocurtail and HeadquartersCanalwillbeoperatedtoeffectivelydischargeexcesswater, area’s interiormarshes.ThenewstructuresonHogIslandGully,WestCoveCanal, avenues ofwaterpassagethatallowtoflowfromsalineareasintotheproject This projectwasauthorizedtoreplacethewatercontrolstructuresonthreemajor and reducessaltwaterintrusion. wetlands, andtocreateahydrologicheadthat increasesfreshwaterretentiontime designed toallowfreshwaterfromtheGulfIntracoastal Waterway(GIWW)intothe This projectincludedtheconstructionofspoilbanks,weirs,plugs,andculverts fluctuations, increasedsalinities,higherwaterlevels,andexcessiveexchange. including reducedfreshwaterinflow,increasedmagnitudeanddurationoftidal The projectgoalsaretoreducewetlandlossresultingfromhydrologicchanges medium basefortheestablishmentofemergentvegetation. earthen terracesservedaswave-stilling,sediment-trappingstructuresandprovideda procedure forconstructingearthenterracesinshallowopenwaterareas.Thirty-eight This demonstrationprojectisintendedtodevelopanddemonstrateanon-traditional e ProjectSummary 75

Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program (XME-29) ME-13 (PME-6) ME-12 (PME-15) ME-11 (ME-09) ME-09 (ME-08) ME-08 (XME-21) ME-04 CS-32 CS-31

State Proje

akSaiiainS RSGuraxFihVr 1 98$2,7 $,8,7 $3,5 $,9,1 $2,543,313 $3,998,919 $632,258 $1,682,077 $228,978 1998 511 Ver. Frith Gautreaux NRCS $1,526,136 $914,679 $1,530,812 $155,912$460,221 5 SP 2003 Bank Stabilization 378 Freshwater Bayou NRCS Ver. 3 SP $61,112$851,775 $314,236 $1,177,668 Frith $1,227,123 Theunissen (Deauthorized) 1994 NRCS Demonstration 247 White Lake 8 Cam. Southwest Shore HR Frith Theunissen Restoration USFWS Hydrologic N/A 1 Humble Canal Ver. SP Frith Gautreaux Protection NRCS Refuge Shoreline National Wildlife 1 Cameron Prairie VP (Deauthorized) Demonstration Vegetative Plantings Dewitt-Rollover $14,155,234 $19,252,492 Wetland Protection $621,000 Freshwater Bayou $12,964,592 $569,642 2002 10 330 Restoration HR Cam. Hydrologic East SabineLake Frith Theunissen NRCS 11 SP Management Project Holly BeachSand ct Numb Proj e er ( ct F Na edera me l) SP 2 NRCS Theunissen Frith Ver. 1,593 1998 $285,397 $1,019,875 $2,150,032 $2,770,093$3,455,303 $1,019,875 $285,397 1998 1,593 Ver. Frith Theunissen NRCS 2 SP HR

Proj

ect PPL Ty pe SW huisnFihCm 2 edn 14026$,3,1 $613 64071 $1,489,441 $6,490,751 $66,183 $1,490,296$3,939,219 Pending 225 Cam. Frith Theunissen USFWS NRCS/

Age n cy /Sp ateu rt e.N/A Ver. Frith Gautreaux Theunissen, o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited euh 3,3 5,6 $,2 $191,003 $92,012 $3,722 $36,830$51,460 Deauth. 1994 euh 2,5 2,2 $162 $126,062 $103,468 $61,692 $21,752 $20,025 Deauth. 1996

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat Force inFebruary1996becausenoplantsremained. coastal wetlands.ThisprojectwasofficiallydeauthorizedbytheBreauxActTask mudflat, therebyestablishingavegetationbufferbetweentheGulfofMexicoand plantings ofsmoothcordgrass( This demonstrationproject'spurposewastoinvestigatetheabilityofvegetation into theintermediatemarshes. 100 feetfromtheexisting shorelinetopreventFreshwaterBayouCanal fromeroding Intracoastal Canal.A23,193 linear-footrockdikewasconstructedapproximately by preventinginteriorditches fromconnectingFreshwaterBayouCanal totheOld The objectiveofthisproject istoprotecttheintegrityofMermentau RiverBasin drain fromthemarshtoriver. protect theareafromMermentauRiversaltwater intrusionandallowhighwaterto 18-inch diametercorrugatedaluminumpipewith screwgate.Thisstructurewill long corrugatedaluminumpipeswithflapgates andweirdropinletsalongwithone constructing awatercontrolstructureconsisting offive48-inchdiameterby50-foot The objectiveofthisprojectistorestorehistorical hydrologytotheprojectareaby the refuge. to theexistingspoilbank,therebyterminating theencroachmentofGIWWinto Project featuresincludeconstructionofapproximately 2.5milesofrockdikeparallel National WildlifeRefugeadjacenttotheGulf IntracoastalWaterway(GIWW). The projectgoalsaretoprotecttheemergentwetlandsofCameronPrairie of openwaterareas,andrestoringprotectingmarsh. scour, reducingerosionontheeasternshoreofSabineLake,turbidity reducing elevatedsalinitieswithinfreshandintermediatemarshes,tidal 36,623 acresoftheSabineNationalWildlifeRefuge.Specificgoalsinclude vegetation plantingstorestorethehistoricalhydrologicregimeapproximately This projectutilizeswatercontrolstructures,shorelineprotection,terraces,and Plan (CIAP)fortheconstructionofthisproject. CS-01. Anadditional$4,728,125wascontributedbytheCoastalImpactAssistance was originallyauthorizedonthe9thPPLasacomplexproject,HollyBeachProject, fencing, vegetationplantings,andmonitoringoftheshorelineresponse.Thisproject This objectivewasaccomplishedthroughbeachrenourishment,installationofsand maintaining theintegrityandfunctionalityofremainingchenier/beachridge. The purposeoftheprojectistoprotectexistingcoastalwetlandsbyrestoringand higher waterlevelfluctuations,onvegetationcover. capability oftheinteriorwetlandstomediateeffectsincreasedsalinityand and includedtheconstructionofseveralwatercontrolstructurestoimprove Bayou Canalfromshorelineerosion.PhaseIIoftheprojectwascompletedin1998 consisted ofa10,000linear-footrockdiketoprotectthewestbankFreshwater This projectwasconstructedintwophases.PhaseIcompleted1995and Breaux ActTaskForce inOctoberof1998andisnolongermonitored. damping highenergywaveaction.Theproject wasofficiallydeauthorizedbythe determine ifCaliforniabulrush( Lake shorelineandpreventbreachingintoDeep Lake.Theprojectwasinitiatedto The objectiveofthisdemonstrationprojectwas tostabilizeonemileoftheWhite e Spartina alterniflora Schoenoplectus californicus ProjectSummary ) tocolonizeanewlyaccreted ) iseffectiveat 76

State Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Breaux Act Program DBannDthS / / anKeke a.4019 / / / / $12,440 N/A N/A N/A N/A 1991 480 Cal. Kleckley Cain N/A N/A SP Brannon Ditch BD LA-06 ME-22 ME-21 ME-20 ME-19 ME-18 42a) (XME- ME-17 07a) (PME- ME-16 (XME-22) ME-14

State Proje

Dm)S 3UAEGuraxFihVr / edn 30890 43340 $5,4.0 10000 $1,055,000 $1,000,000 $250,847.00 $360,809.00$443,344.00 Pending N/A Ver. $1,588,085 $19,673,929 Frith Gautreaux USACE $51,398 $1,049,029 13 $13,836,340 SP $1,049,029 $1,823,181 Pending $2,358,420 $16,872 844 $2,358,420 Ver. (Demo) $4,218 Demonstration $62,997 Frith Improvements $1,209,196 Pending Gautreaux Foundation USACE Shoreline Protection 540 Cam. 12 N/A SP $2,295,423 Shoreline Protection Pending South WhiteLake $1,212,557 $9,635,224$5,796,174 $3,936,862 Frith $654,654 $2,408,478 $1,929,888 Theunissen 440 USACE 2004 Mer. $14,863 11 213 SP Cam. Shoreline Protection Frith Grand Lake Theunissen $2,393,615 N/A USFWS Pending Frith 11 $1,556,598 Theunissen $1,245,278 HR 920 USFWS $124,798 Cam. Restoration Project 10 Chenier Hydrologic $1,400,600$31,200 Pending SP South Grand Frith Theunissen 144 Cam. NMFS Protection 10 Landbridge Frith SP Grand-White Lakes Theunissen NRCS Stabilization 9 Gulf Shoreline HR $2,185,900 $424,321$1,616,090 $351,542 $2,862,806 Rockefeller Refuge 2003 Restoration 442 USFWS Hydrologic Ver. Little PecanBayou 9 FD Frith Gautreaux of Highway82 NMFS Introduction South Freshwater 7 SNT Terracing Pecan Island ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp ateu rt e.26Pnig$1,4 40691$2,8 $6,051,325 $817,946$4,036,941 $227,882 $607,138 Pending 296 Ver. Frith Gautreaux Theunissen, o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat breakwaters inorderto enhanceaccretionandincreasethestabilityof thissite. discharge. Smoothcordgrass ( wave actionfromboats andthecurrentfromBrannonDitchduringperiods ofhigh experienced shorelineerosion inexcessof25feet/year.Thebreakwaters willreduce of theGIWWacrossfrom BrannonDitchinCalcasieuParish.Thisarea has This projectincludedthe constructionofwoodenbreakwaterfences along 2,200feet This to means (ME-22) tolerances. Protection a Shoreline design as Lake White settlement structures South the dike project. consolidation into rock incorporated and be beneath will shoreline project capacity be foundation of will a goal bearing feasibility This as the exists. increase sand determine foundation soil to using poor is relatively achieved a project where demonstration structures this protection of goal The water areas. the occasionalwaveoverwashandreduction ofturbidityintheinterioropen aquatic vegetationhabitatcreationisexpected tooccurbehindthestructuredue through theconstructionofaforeshorerockdike. Marshaccretionandsubmerged This projectisintendedtoreduceerosionalong thesouthernWhiteLakeshoreline from SuperiorCanaltoTeboPoint. frontal passages.Projectfeatureswillinclude constructionofarockbreakwater Grand Lake,whichiscausedbyhighwaveenergy associatedwithstormwindsand The objectiveofthisprojectistoreduceerosion alongthesouthernshorelineof will alsobeintroducedintotheprojectareaattwoseparatelocations. into theprojectarea.Freshwater,sediment,andnutrientsfromMermentauRiver use ofdredgedmaterialtocreatetwo200-acrecellsthatwillstopsaltwaterintrusion This projectisintendedtorestoretheHogBayouwatershedhydrologythrough planted earthenterracestoprotectthelandbridge. Project featuresincludeconstructionofhardstructureshorelinestabilizationand southeastern shorelineofGrandLakeandthewesternColliconLake. This projectisintendedtoprotectfreshwaterwetlandsbystoppingtheerosionof Mexico shoreline,extendingapproximatelyfromBeachProngtoJosephHarbor. project wouldentailconstructionofanearshorebreakwateralongtheGulf approximately 39feetperyearwithsubsequentdirectlossofsalinemarsh.The The projectwilladdressRockefellerRefugeGulfshorelineretreat,whichaverages collector channelwithinthemarsh. through GrandChenierRidgetoassistinexcesswaterremoval,andexcavationofa constructing afreshwaterconveyancechannelwithtwowatercontrolstructures lakes subbasinbyinstallingawatercontrolstructurewithinLittlePecanBayou, The projectobjectivesincludeprovidingameanstoremoveexcesswaterfromthe Project featuresincludedtheconstructionofearthenterracestoreducewaveaction. The goalofthisprojectittoconvertareasopenwaterbackvegetatedmarsh. plugs tofacilitatewaterflowfromthelakessubbasinsouthintocheniersubbasin. Louisiana Hwy82toallowwaterflowacrossthechenier,andremovalof approximately eightwatercontrolstructures,breachingspoilbanksinareasnear sediment inputintheprojectarea.Projectcomponentsincludeinstallationof This projectwasauthorizedtoaddresssaltwaterintrusionandlackoffreshwater e Spartina alterniflora ProjectSummary ) wasalsoplantedbehind the 77

PCWRP PCWRP PCWRP State State State State State State State Program SS aieTrae N / / huisnFihCm 1 90NANANANA$190,047 N/A $173,433 N/A N/A N/A N/A N/A N/A 1990 SSB 110 Cam. N/A 1989 Frith Theunissen N/A Cam. ME-01 N/A N/A SNT Frith Theunissen SabineTerraces N/A CS-ST N/A SP BlindLake CS-BL 88 Cam. Frith Theunissen CS-04a-1 N/A N/A SP CS-02 HollyBeach CS-01

State Proje es ao PNANATense rt a.119 / / / / $45,245 N/A $69,900 N/A N/A N/A N/A N/A 1991 N/A 1 Cam. N/A 1990 Frith Theunissen 8 Cam. N/A N/A SP Frith Theunissen Kelso Bayou N/A N/A SP Cameron-Creole oteLksS / / huisnFihCm 92NANANANA$32,500 N/A N/A N/A N/A 1992 2 Cam. Frith Theunissen N/A N/A SP Portie Lakes tblzto PNANATense rt a.1 90NANANANA$66,000 N/A $487,152 N/A N/A N/A N/A N/A N/A 1990 10 Cam. N/A 1992 Frith Theunissen 84 $700,000 Ver. N/A N/A SP Frith N/A Gautreaux Stabilization N/A Sabine Shellbank N/A FD $516,474 N/A Introduction N/A N/A Freshwater Pecan Island N/A N/A 1999 N/A Cam. N/A Frith Theunissen N/A N/A 1994 N/A 1,200 HR Cam. Frith Automation Theunissen Structure Cameron-Creole N/A N/A MM Marsh Management Rycade Canal ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited 94NANANANA$8,437,000 N/A N/A N/A N/A 1994 1993, 1992, 1991,

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat 1996, 1999,2003and2004. originally constructedand filledin1991andmaintenancewasperformed in1993, sediment depositionalongKelsoBayouinCameron Parish,Louisiana.Fenceswere Brush fenceswereconstructedtore-establish the erodedshorelineandpromote and maintenancewasperformedin1992,1994, 1997,and2003. intrusion intheinteriormarsh.Fenceswereoriginally constructedandfilledin1990 Brush fenceswereconstructedtotrapsediment andactasabarriertoslowsaltwater and 2003. constructed andfilledin 1992andmaintenancewasperformedin1996, 1998,1999, shoreline andinteriormarsh adjacenttoPortieLake.Fenceswereoriginally Brush fenceswereconstructed todecreaseerosionbytrappingsediment alongthe without impediment. during construction,andallowingnaturaldistribution ofsedimentandorganisms use ofpermanentstructuresarelowercost,less disturbanceofthenaturalhabitat currents todepositclamshellontheshoreline. Thebenefitsofthisdesignoverthe The purposeofthisprojectwastoprovidenatural shorelineprotectionbyusingtidal channel waterfromWhiteLaketothesouthmarshes. structures andapproximately5,700linearfeet ofearthenembankmentneededto the saltwaterintrusionfromsouth.Theproject consistsoftwowatercontrol The purposeofthisprojectistointroducefreshwater fromthenorthtocounteract promote thedepositionofsuspendedsediment. reducing wind-generatedwaveenergy,increaseoverallprimaryproductivity,and interface, re-establishemergentmarshvegetation,reducefringeretreatby Sabine NationalWildlifeRefuge.Thiswillincreasethelengthofmarsh-water planted withsmoothcordgrass(Spartinaalterniflora)inopenwaterareasofthe A totalof128earthenterraceswereconstructedinacheckerboardpatternand miliacea The secondphaseofthisprojectincludedplantinggiantcutgrass( limestone breakwateralongthesouthsideofGIWWadjacenttoBlindLake. breaching intoBlindLake.Theprojectconsistedofplacing2,339linearfeet The purposeofthisprojectwastopreventtheGulfIntracoastalWaterwayfrom in theSabineNationalWildlifeRefuge. to manipulate.Automationofthesestructureswillimprovemanagementcapabilities east shoreofCalcasieuLake.Thesestructuresareremotelylocatedanddifficult This projectconsistsofautomatingthreeexistingwatercontrolstructuresalongthe reducing waterflowsthroughRycadeCanalandBlackLake. The projectisdesignedtostabilizesalinitiesandwaterlevelsintheareaby in 2003utilizingmarinemattressfoundationsandarmorstone. Beach, Louisiana.Eighteenoftheexistingbreakwaterswereraisedand/orextended and ninebreakwaterswereconstructedin1994betweenCalcasieuPassHolly 21 breakwaterswereconstructedin1992,1993, to theeastnearCalcasieuPass.Atotalof34breakwaterswereconstructedin1991, shoreline byexpandingprotectioninphasesfromOceanView,Louisiana The objectiveofthisprojectistoprotectthemarshnorthGulfMexico e ) alongtheinsideofbreakwatertoenhanceaccretionprocess. ProjectSummary Zizaniopsis 78

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP PCWRP Program

State Proje aieNRV / / huisnFihCm 918 / / / / $39,076 N/A $4,408 N/A $7,468 N/A N/A N/A $9,100 N/A N/A N/A N/A N/A $7,468 1988 69 Cam. N/A N/A N/A $58,500 N/A 1988 Frith Theunissen N/A 23 N/A N/A N/A Ver. 1987 N/A N/A VP 12 $67,500 Frith N/A Cam. N/A Gautreaux N/A 1987 Sabine NWR $87,500 N/A Frith N/A N/A Theunissen 4 N/A VP N/A Cam. N/A $9,500 1986 N/A Rollover Bayou N/A VP N/A Frith $14,495 N/A 12 Theunissen Cam. 2001 N/A N/A N/A Grand Lake N/A N/A N/A Frith VP 1 $52,500 Theunissen Cal. N/A N/A N/A Brown Lake N/A N/A Flavin N/A VP Theunissen N/A 1998 $43,561 N/A N/A N/A N/A 3 Grand Lake N/A 1996 Cam. SP N/A N/A N/A 2 Frith 1997 Cal. N/A Theunissen Prien Lake N/A Kleckley 1994 Theunissen N/A N/A 9 N/A Cam. 1 SP N/A N/A Cameron Creole#2 N/A Cal. Frith SP 1993 N/A Kleckley Theunissen N/A 2 Turner Bay N/A Cam. Cain N/A SP 1992 N/A Frith N/A Collicon Lake Theunissen SP 2 N/A Cal. N/A Goose Lake Kleckley SP Mount Black Lake N/A N/A SP Ellender Bridge alr a PNANATense rt a.1 98NANANANA$5,387 N/A N/A N/A N/A 1988 10 Cam. Frith Theunissen N/A N/A VP Mallard Bay ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat vegetation thatwillprotecttheshorelinefromerosionandtrapavailablesediment. cutgrass ( the SabineNationalWildlife Refugetoprovideabarrieragainsterosion. A totalof15,000smoothcordgrass( induced erosionandtrapavailablesediment. a standofemergentvegetationthatwillprovide alivingbarrieragainstwave- A totalof2,060smoothcordgrass( vegetation thatwillprotecttheshorelinefrom erosionandtrapavailablesediment. cutgrass (Zizaniopsismiliacea)plantswereused tocreateastandofemergent A totalof2,520smoothcordgrass( vegetate amarshcreationprojectareathatutilized spoildisposal. A totalof10,483smoothcordgrass( A totalof2,520smoothcordgrass( 2003, 2004and2005. were originallyconstructedandfilledin2001maintenancewasperformed located justsouthofLakeCharles,tore-establishtheoriginalshoreline.Fences Approximately 700feetofbrushfencewerebuiltalongtheshorelinePrienLake, filled in1998andmaintenancewasperformed1998,1999,2001,2003,2005. erosion andoftheinteriormarsh.Fenceswereoriginallyconstructed Brush fenceswereconstructedtoslowwaveactionandpreventcontinuedshoreline performed in1997,1998,1999,2000,and2003. Fences wereoriginallyconstructedandfilledin1996maintenancewas Brush fenceswereconstructedtoprotecttheinteriorshorelineofTurnerBay. erosion, promotesedimentaccumulation,andenhancefishhabitat. Vegetation wasplantedalongtheshorelineofColliconLaketoslow and maintenancewasperformedin19952003. erosion atthisintersection.Fenceswereoriginallyconstructedandfilledin1994 Brush fenceswereconstructedalongtheGIWWatGooseLaketoslowshoreline 1998, 2000,and2003. constructed andfilledin1993maintenancewasperformed1994,1995,1996, of theBlackLakeshorelinebywind-generatedwaves.Fenceswereoriginally Brush fenceswereconstructedtodecreasewindfetchandpreventcontinuederosion performed in1993,1995,1996,1999,and2003. Fences wereoriginallyconstructedandfilledin1992maintenancewas Brush fenceswereconstructedtoprotectmarshthatwasexposedtheGIWW. available sediment. vegetation thatwillprovide alivingbarrieragainstwave-inducederosion andtrap bulrush ( A totalof1,600giantcutgrass ( e Schoenoplectus californicus Zizaniopsis miliacea ) plantswereusedtocreateastandofemergent Zizaniopsis miliacea ProjectSummary Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora Spartina alterniflora ) plantswereusedtocreate astandofemergent ) plantsand250California ) plantswereusedtocreate ) plantsand5,000giant ) plantsand5,000giant ) plantswereusedwithin ) plantswereusedto 79

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje sadV / / ateu rt e.2 92NANANANA$17,470 N/A $42,000 N/A N/A N/A $4,000 N/A $12,543 N/A N/A 1992 N/A 29 N/A $11,340 N/A Ver. N/A Frith N/A N/A 1992 Gautreaux N/A 24 N/A Cam. N/A N/A VP N/A N/A 1991 Frith Theunissen $2,400 N/A N/A 2 N/A 1991 Island Ver. N/A Southwest Pecan VP N/A 11 N/A Cal. Frith $58,760 Gautreaux 1991 Kleckley Lake Levee Newman's Black N/A N/A N/A 5 Cain $9,100 Cam. VP N/A White LakeSouth N/A N/A N/A Frith VP Theunissen $22,200 N/A N/A N/A N/A Brannon Ditch N/A VP 1990 N/A N/A N/A $32,500 5 Cam. N/A N/A N/A Fence N/A Frith Sweetlake Hyacinth 1990 Theunissen N/A N/A 48 N/A Cam. N/A N/A Fina MudLake 1989 VP Frith N/A 4 Theunissen Cam. N/A 1989 Blind Lake N/A N/A Frith 14 VP Theunissen Cam. N/A Sabine Terraces 1988 N/A N/A Frith Theunissen VP 36 Cam. N/A N/A Brown Lake VP Frith Theunissen N/A Lacassine N/A VP Black Lake aeo roeV / / huisnFihCm 819 / / / / $36,716 N/A N/A N/A N/A 1992 28 Cam. Frith Theunissen N/A N/A VP Cameron Creole ct Numb Proj e er ( ct F Na edera me l) PNANATense Frith Theunissen N/A N/A VP

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive a.58 Cam.

Pa rish

Acres Benefited 91NANANAN/A N/A N/A N/A 1991

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$99,088 timate

Current

Co st Es timat against wave-inducederosionandtrapavailable sediment. create astandofemergentvegetation.Thisvegetation willprovidealivingbarrier accreted behindthestate-fundedshorelineprotection project(BrannonDitch)to roseau cane( A totalof4,310seashorepaspalum( A totalof10,500single-stemmedplantssmooth cordgrass( provide avegetationbufferagainstwave-induced erosion. A totalof1,000singlestemsgiantcutgrass ( A totalof4,200singlestemssmoothcordgrass ( ( A totalof2,000feetfencewereconstructedtopreventwaterhyacinth erosion andtrapavailablesediment. stand ofemergentvegetationthatwillprovidealivingbarrieragainstwave-induced A totalof400giantcutgrass( earthen terracesinordertostabilizetheandcreatenewmarsh. A totalof20,800smoothcordgrass( vegetate amarshcreationprojectareathatutilizedspoildisposal. A totalof10,483smoothcordgrass( Wildlife Refuge,locatednorthwestofGrandLakeandadjacenttotheGIWW. ( A totalof1,500giantcutgrass( induced erosionandtrapavailablesediment. a standofemergentvegetation.Thiswillprovidelivingbarrieragainstwave- A totalof13,000smoothcordgrass( increase foodproduction forwildlife. turbidity, encouragegrowth ofsubmergedaquaticvegetation,trapsediment, and to createalivingfence which willreducewind-generatedwaveaction, reduce were plantedtostabilizethebaseofalevee. wave-induced shoreline erosionandtrapavailablesediment. to createastandofemergent vegetationthatwillprovidealivingbarrier against A totalof12,000single stemsofsmoothcordgrass( cordgrass ( A totalof24,000single-stemmedplantsand386one-gallonplugssmooth Eichhornia crassipes Taxodium distichum e Spartina alterniflora Phragmites australis ) treeswereusedtoprotectanislandinLacassineNational ) fromencroachingontotheadjacentbank. Zizaniopsis miliacea Zizaniopsis miliacea ) wereplantedtostabilizethebaseofalevee. ProjectSummary ) plantswereusedinanareaofsedimentthat Paspalum vaginatum Spartina alterniflora Spartina alterniflora Spartina alterniflora Zizaniopsis miliacea Spartina alterniflora ) plantswereusedtocreatea Spartina alterniflora ) plantsand10,000baldcypress ) plantswereusedon128 ) plantswereusedto ) plantswereusedtocreate ) plantswereusedinorder Spartina alterniflora ) wereusedto ) and100 ) wereused ) 80

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje

we aeMrhV / / huisnFihCm 119 / / / / $4,515 $8,000 N/A N/A N/A $13,560 $6,560 N/A N/A N/A N/A N/A N/A N/A $13,831 1995 N/A N/A 11 1994 Cam. N/A N/A N/A 23 Cam. $11,500 Frith Theunissen N/A N/A 1994 N/A Frith N/A $9,256 Theunissen N/A N/A 1994 VP 23 N/A Cam. Sweet LakeMarsh N/A N/A 9 N/A VP Cam. N/A Frith Theunissen N/A 94 MudLake Frith $64,136 1994 N/A Theunissen N/A N/A N/A VP 23 N/A Cam. N/A Boudreaux Lake N/A VP N/A $3,771 N/A Frith Theunissen 1994 N/A Shoreline N/A N/A $5,424 N/A 23 Tebo Point N/A Cam. 1993 VP N/A Frith 4 N/A Shell Western N/A Theunissen Ver. $8,000 N/A N/A N/A Frith N/A VP N/A 1992 Gautreaux Little PecanBayou N/A N/A 7 N/A N/A Cam. N/A VP N/A White LakeSouth 1992 Frith Theunissen N/A 4 Cam. 1992 N/A N/A Fina MudLake N/A VP Frith 9 Theunissen Cal. N/A Brown Lake Kleckley N/A 1992 N/A VP 11 Cain Cam. Doland Lease N/A N/A Frith VP Theunissen Walker GIWW N/A N/A VP Living Fence Cameron Creole ct Numb Proj e er ( ct F Na edera me l) PNANATense Frith Theunissen N/A N/A VP

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive a.15 Cam.

Pa rish

Acres Benefited 92NANANAN/A N/A N/A N/A 1992

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$8,000 timate

Current

Co st Es timat were usedtoprovideavegetationbufferagainstwave-inducederosion. and increasefoodproduction forwildlife. reduce turbidity,encourage growthofsubmergedaquaticvegetation, trapsediment, were usedtocreatealiving fencewhichwillreducewind-generated wave action, erosion hasnegatively affected themarsh. order tore-establishstandsofemergentvegetation intheinteriormarshes,where available sediment. vegetation thatwillprovidealivingbarrieragainstwave-inducederosionandtrap A totalof666tradegallons ofCaliforniabulrush( A totalof2,000plugssmoothcordgrass( production forwildlife. encourage growthofsubmergedaquaticvegetation, trapsediment,andincreasefood create alivingfencewhichwillreducewind-generated waveaction,reduceturbidity, A totalof2,000Californiabulrush( barrier againstwave-inducedshorelineerosion andtrapavailablesediment. plants wereusedtocreateastandofemergent vegetationthatwillprovidealiving A totalof820galloncontainersCalifornia bulrush( increase foodproductionforwildlife. turbidity, encouragegrowthofsubmergedaquatic vegetation,trapsediment,and to createalivingfencewhichwillreducewind-generated waveaction,reduce A totalof2,040Californiabulrush( negatively affectedthemarsh. establish standsofemergentvegetationintheinteriormarsh,whereerosionhas A totalof2,000smoothcordgrass( vegetation bufferagainstwave-inducederosion. A totalof2,314giantcutgrass( used tovegetateamarshcreationprojectareathatutilizedspoildisposal. A totalof16,034singlestemssmoothcordgrass( ( A totalof1,095singlestemsand100galloncontainersCaliforniabulrush A totalof800galloncontainerssmoothcordgrass( in theCameronCreolewatershed. A totalof1,000Californiabulrush( planted tostabilizethebaseofalevee. A totalof1,300galloncontainerssmoothcordgrass( Schoenoplectus californicus e ) wereusedinordertocreateastandofemergent Zizaniopsis miliacea ProjectSummary Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora Schoenoplectus californicus Spartina alterniflora ) plantswereusedtoprovidea Spartina alterniflora Schoenoplectus californicus Spartina alterniflora ) plugswereusedtore- ) plugswereusedto ) plantswereused ) wereusedin ) plugswereused ) were ) plants ) were ) ) 81

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje

hrln PNANATense rt a.1 95NANANANA$4,515 $3,390 N/A N/A N/A N/A N/A $5,661 N/A N/A N/A 1995 Frith Theunissen N/A 11 Cam. 1995 N/A N/A N/A VP $6,102 7 Frith Cam. Theunissen N/A $3,675 N/A Frith N/A N/A Marsh Theunissen VP West GumCove N/A N/A 1995 N/A N/A N/A $7,160 VP Shoreline Johns 14 Umbrella Bay Cam. N/A N/A Cain N/A $7,160 Frith Marsh Theunissen N/A Savanne Neuville N/A $1,132 N/A N/A VP N/A N/A N/A N/A 1995 VP Sabine GIWW $8,160 N/A N/A 15 N/A Cam. N/A 1995 N/A Marsh Frith N/A 8 Grosse Savanne N/A Theunissen Cam. N/A 1995 N/A N/A N/A Frith $22,400 N/A VP 24 Theunissen Black BayouMarsh N/A Ver. N/A 1995 N/A N/A N/A N/A VP Frith 24 Gautreaux 1995 Arco RoadMarsh Ver. N/A N/A N/A 1 N/A 1995 Frith Cal. VP Gautreaux Vermilion Corp#2 Kleckley 12 Cam. N/A N/A N/A Cain VP Frith Vermilion Corp#1 Theunissen N/A N/A N/A N/A VP 1995 N/A VP Fence (Phase2) 64 Cam. Brannon Ditch Frith Marsh Theunissen North GrandLake N/A N/A VP Brown LakeMarsh ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive a.1 95NANANANA$5,424 N/A N/A N/A $6,102 N/A 1995 N/A 13 Cam. Cal. N/A N/A N/A 1995 10 Cam. Cal.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat shoreline erosionandtrap availablesediment. used tocreatealivingfence whichwillreducewind-generatedwave action,slow A totalof666tradegallonsCaliforniabulrush ( increase foodproductionforwildlife. turbidity, encouragegrowthofsubmergedaquatic vegetation,trapsediment,and used tocreatealivingfencewhichwillreduce wind-generatedwaveaction,reduce A totalof500tradegallonsCaliforniabulrush ( sediment, andincreasefoodproductionforwildlife. action, reduceturbidity,encouragegrowthof submerged aquaticvegetation,trap plants wereusedtocreatealivingfencewhich willreducewind-generatedwave A totalof835tradegallonsCaliforniabulrush ( increase foodproductionforwildlife. turbidity, encouragegrowthofsubmergedaquaticvegetation,trapsediment,and used tocreatealivingfencewhichwillreducewind-generatedwaveaction, A totalof900tradegallonsCaliforniabulrush( and increasefoodproductionforwildlife. reduce turbidity,encouragegrowthofsubmergedaquaticvegetation,trapsediment, were usedtocreatealivingfencewhichwillreducewind-generatedwaveaction, A totalof542tradegallonsCaliforniabulrush( A totalof1,056tradegallonsCaliforniabulrush( A totalof1,056tradegallonsCaliforniabulrush( provide abarrieragainstwave-inducedshorelineerosion. Approximately 200feetofanexisting2,000footsedimentfencewererepairedto sediment. alterniflora Approximately 1,020tradegalloncontainersofsmoothcordgrass( vaginatum A totalof1,400tradegalloncontainerseachseashorepaspalum( creation area. increase foodproduction forwildlife. turbidity, encouragegrowth ofsubmergedaquaticvegetation,trapsediment, and used tocreatealivingfence whichwillreducewind-generatedwave action,reduce A totalof800tradegallons ofCaliforniabulrush( wave-induced shorelineerosionandtrapavailable sediment. to createastandofemergentvegetationthatwill providealivingbarrieragainst A totalof900tradegalloonssmoothcordgrass ( and increasefoodproductionforwildlife. reduce turbidity,encouragegrowthofsubmergedaquaticvegetation,trapsediment, were usedtocreatealivingfencewhichwillreducewind-generatedwaveaction, and increasefoodproductionforwildlife. reduce turbidity,encouragegrowthofsubmergedaquaticvegetation,trapsediment, were usedtocreatealivingfencewhichwillreducewind-generatedwaveaction, e ) andseashoresaltgrass( ) wereplantedtoprotecttheshorelinefromerosionandtrapavailable ProjectSummary Distichlis spicata Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus ) wereplantedonamarsh Spartina Paspalum ) wereused ) were ) were ) ) were ) ) were ) ) 82

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje ic PNANACi lclyCl 519 / / / / $10,400 N/A N/A N/A $14,916 N/A 1997 $34,320 N/A 15 $12,679 Cal. N/A Kleckley N/A N/A Cain N/A N/A N/A N/A N/A VP $7,280 N/A N/A $157,840 1997 N/A N/A N/A 25 Frith Ditch Theunissen Ver. GIWW WestAlkali 1997 N/A N/A N/A N/A 49 N/A Frith 1997 Cam. VP Gautreaux Black BayouCutoff N/A 22 $5,424 $5,560 N/A Frith Cal. N/A N/A Theunissen Kleckley VP Platform One1997 N/A N/A N/A N/A N/A N/A VP Cain $5,560 1996 N/A N/A Collicon Lake N/A N/A N/A 1996 10 $5,085 VP Ver. N/A 226 Cam. N/A N/A Goose Lake Frith N/A Gautreaux Frith N/A Theunissen N/A N/A N/A N/A N/A N/A 1995 1995 VP N/A SW PecanIsland#3 N/A VP 11 14 Cam. Cam. N/A N/A Frith Frith Marsh Theunissen 1995 Theunissen East MudLake N/A N/A 11 N/A 1995 N/A N/A Cal. VP VP Shoreline (Phase2) 12 Tebo Point Cam. Johns Frith Cain Marsh Theunissen Welfare Bridge N/A N/A N/A N/A VP VP Webb GullyMarsh Marsh West Hackberry as PNANATense rt a.2 97NANANANA$15,840 N/A N/A N/A N/A 1997 23 Cam. Frith Theunissen N/A N/A VP Marsh Marseillaise Bayou ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive a.1 97NANANANA$7,797 N/A N/A N/A N/A 1997 13 Cam. Cal.

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat against wave-inducedshoreline erosionandtrapavailablesediment. were usedtocreateastand ofemergentvegetationthatwillprovidea livingbarrier A totalof1,300tradegallons ofsmoothcordgrass( A totalof2,200tradegallonsCaliforniabulrush ( A totalof4,290tradegallonsCaliforniabulrush ( trade gallonsofCaliforniabulrush( A totalof1,120tradegallonssmoothcordgrass( sediment, andincreasefoodproductionforwildlife. action, reduceturbidity,encouragegrowthofsubmergedaquaticvegetation,trap were usedinordertocreatealivingfencewhichwillreducewind-generatedwave A totalof910tradegallonsCaliforniabulrush( erosion aswellprovideaseedsourceforfutureregeneration. were usedinordertoestablishemergentvegetationthatwillpreventshoreline A totalof19,730tradegallonssmoothcordgrass( against wave-inducedshorelineerosionandtrapavailablesediment. used tocreateastandofemergentvegetationthatwillprovidelivingbarrier A totalof820tradegallonsCaliforniabulrush( increase foodproductionforwildlife. turbidity, encouragegrowthofsubmergedaquaticvegetation,trapsediment,and used tocreatealivingfencewhichwillreducewind-generatedwaveaction, A totalof800tradegallonsCaliforniabulrush( increase foodproductionforwildlife. turbidity, encouragegrowthofsubmergedaquaticvegetation,trapsediment,and used tocreatealivingfencewhichwillreducewind-generatedwaveaction, A totalof820tradegallonsCaliforniabulrush( increase foodproductionforwildlife. turbidity, encouragegrowthofsubmergedaquaticvegetation,trapsediment,and used tocreatealivingfencewhichwillreducewind-generatedwaveaction, A totalof750tradegallonsCaliforniabulrush( a seedsourcefornaturalrevegetationofemergent vegetation. provide anaturalpassivehydrologicbafflethat willslowtidalexchangeandprovide were usedtorevegetatetheoldbanksofbayou. Thisre-vegetationprocesswill A totalof1,150tradegallonssmoothcordgrass ( A totalof1,980tradegallons ofCaliforniabulrush( barrier againstwave-inducedshorelineerosion andtrapavailablesediment. plants wereusedtocreateastandofemergent vegetationthatwillprovidealiving barrier againstwave-inducedshorelineerosion andtrapavailablesediment. plants wereusedtocreateastandofemergent vegetationthatwillprovidealiving interior marsh,andtopreventthelossofmarsh sediment. protect theleveeofGIWWfromerodingfurther,toslowwatermovementin vegetation inalargearea ofshallow,openwater. against wave-inducedshoreline erosionandtore-establishareasofemergent were usedtocreateastand ofemergentvegetationthatwillprovidea livingbarrier e ProjectSummary Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora ) plantswereusedto ) plants ) and750 ) plants ) plants ) ) were ) were ) were ) were ) ) ) 83

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje mrlaBy# PNANATense rt a.2 98NANANANA$19,200 N/A $39,680 N/A N/A $2,000 N/A N/A N/A $8,136 N/A $1,356 N/A 1998 N/A N/A 28 Cam. N/A N/A N/A 1998 N/A Frith Theunissen 57 N/A Cam. N/A $12,204 N/A N/A N/A 1998 VP Frith Theunissen N/A Umbrella Bay#2 $20,320 N/A 3 Cam. N/A N/A N/A $20,320 VP N/A 1998 Grosse Savanne#3 N/A Frith N/A 1998 Theunissen 14 Cal. N/A N/A 2 N/A Kleckley N/A Ver. N/A VP Theunissen Mallard BayGIWW N/A N/A Frith Cam. N/A N/A Gautreaux $6,400 N/A VP Prien LakeMarsh 1998 Frith N/A N/A Theunissen N/A N/A VP 21 N/A N/A Ver. $8,800 1997 N/A Corporation #3 N/A VP Vermilion 29 Frith 1997 N/A Cam. Gautreaux N/A 35 Marsh #2 Cam. N/A Frith North GrandLake N/A Theunissen N/A VP N/A Frith N/A Theunissen N/A Platform Two VP N/A N/A N/A N/A 1997 VP Marsh #2 9 Grosse Savanne Cam. N/A 1997 Frith Theunissen #2 13 Cam. Black BayouMarsh N/A N/A VP Frith Theunissen N/A Sweet Lake N/A VP Shoreline #3 Tebo Point as 2V / / huisnFihCm 719 / / / / $18,720 N/A N/A N/A N/A 1998 27 Cam. Frith Theunissen N/A N/A VP Marsh #2 Marseillaise Bayou ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 17

Acres Benefited 98NANANAN/A N/A N/A N/A 1998

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$12,000 timate

Current

Co st Es timat A totalof2,400tradegallons ofCaliforniabulrush( A totalof4,960tradegallonsCaliforniabulrush ( barrier againstwave-inducederosionandtrap availablesediment. plants wereusedtocreateastandofemergent vegetationthatwillprovidealiving A totalof250tradegallonsCaliforniabulrush ( vegetation inalargeareaofshallow,openwater. against wave-inducedshorelineerosionandto re-establishareasofemergent were usedtocreateastandofemergentvegetation thatwillprovidealivingbarrier A totalof1,200tradegallonssmoothcordgrass ( A totalof200tradegallonsCaliforniabulrush( A totalof1,800tradegallonsCaliforniabulrush( A totalof2,540tradegallonsCaliforniabulrush( A totalof1,040tradegallonsCaliforniabulrush( and increasefoodproductionforwildlife. reduce turbidity,encouragegrowthofsubmergedaquaticvegetation,trapsediment, were usedtocreatealivingfencewhichwillreducewind-generatedwaveaction, A totalof800tradegallonsCaliforniabulrush( A totalof1,100tradegallonsCaliforniabulrush( A totalof2,340tradegallons ofCaliforniabulrush( p freshwater marsh. along thebacksideofaprotectionleveethatis preventingsaltwaterintrusionintoa trap availablesuspendedsediment. were plantedtoprovidealivingbarrieragainstwave-inducedshorelineerosionand A totalof1,500tradegalloncontainerssmoothcordgrass( barrier againstwave-induced shorelineerosionandtrapavailablesediment. plants wereusedtocreate astandofemergentvegetationthatwillprovide aliving sediment, andincreasefoodproductionforwildlife. action, reduceturbidity,encouragegrowthof submerged aquaticvegetation,trap plants wereusedtocreatealivingfencewhich willreducewind-generatedwave energy inalargeopenareaoferodedmarsh. plants wereusedtocreateastandofemergentvegetationthatwillreducewave sediment, andincreasefoodproductionforwildlife. action, reduceturbidity,encouragegrowthofsubmergedaquaticvegetation,trap plants wereusedtocreatealivingfencewhichwillreducewind-generatedwave trap sediment,andincreasefoodproductionforwildlife. wave action,reduceturbidity,encouragegrowthofsubmergedaquaticvegetation, alterniflora and 1,000tradegallonsvegetativeplugsofsmoothcordgrass( barrier againstwave-inducedshorelineerosionandtrapavailablesediment. plants wereusedtocreateastandofemergentvegetationthatwillprovideliving vegetation inalargearea ofshallow,openwater. barrier againstwave-induced shorelineerosionandtore-establishareas ofemergent plants wereusedtocreate astandofemergentvegetationthatwillprovide aliving

lants wereusedtocreateastandofemergentvegetationthatwillreducetheerosion e ) wereusedtocreatealivingfencewhichwillreducewind-generated ProjectSummary Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Spartina alterniflora ) plants Spartina ) ) ) ) ) ) ) ) ) ) ) 84

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje

eosrto PNANATense rt a.920 / / / / $5,424 N/A $6,780 N/A N/A $1,243 N/A N/A N/A $15,730 N/A N/A N/A 2000 N/A 9 N/A Cam. N/A 2000 N/A Frith Theunissen 12 N/A Cam. 2000 N/A N/A $8,136 N/A $12,000 Frith VP Theunissen 2 Cam. Demonstration N/A N/A N/A N/A GIWW Cutgrass N/A 2000 Frith VP Theunissen $27,200 27 Demonstration N/A Cam. N/A N/A Sonde N/A Cal. California Bulrush- VP Frith N/A Theunissen Johns N/A Demonstration N/A $2,034 Fence N/A Christmas Tree N/A Cain N/A VP N/A N/A N/A Cam. Mermentau River N/A 2000 N/A 1999 VP $14,916 N/A Frith 14 17 Theunissen Cam. N/A Cal. Bridge Marsh I-10/Sabine River N/A Kleckley N/A N/A N/A Frith Theunissen VP N/A 1999 Cain Lacassine Bayou N/A N/A 39 N/A N/A Cam. VP N/A N/A VP Demonstration 1999 Frith Deepwater Cutgrass Theunissen N/A 3 N/A Cam. N/A Ditch VP N/A GIWW WestAlkali Frith 1999 Theunissen 25 Marsh #4 N/A Cam. N/A Grosse Savanne VP Cal. Kleckley Frith Theunissen Kelso Bayou Mount N/A N/A N/A VP N/A Cotton WellRoad VP Shoreline West Turner'sBay ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 41 11 14

Acres Benefited 00NANANAN/A N/A N/A N/A N/A N/A N/A 2000 N/A 2000 N/A N/A N/A N/A 1999

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$24,000 $8,000 $9,600 timate

Current

Co st Es timat successful, thiswouldeliminatetheneedforyearly maintenance. This vegetationwouldassistinsedimenttrapping, andserveasawindbreak.If runners wereusedtoestablishlivingvegetation withinasectionofbrushfence. reduction andsediment trapping. establish emergentvegetation inanactivelyerodingarea.Thiswillaid inwave determine thesuitability ofplantinggiantcutgrassinvarioussoiltypes, andto A totalof800tradegallons ofgiantcutgrass( of plants. to monitortheeffectsofvariationsinsalinity and flooddurationongrowthvigor A totalof1,000Californiabulrush( A totalof100tradegallonsand200feetroseau cane( to protectandslowerosionofnewlyrebuilt criticallyerodingsectionsoflevee. A totalof2,320tradegallonssmoothcordgrass ( wave erosion. waters, tocreateemergentvegetation,andalivingbarrieragainstwind determine ifcutgrasscansuccessfullybeplantedinopenanddeep(18-24inches) A totalof1,200giantcutgrass( wave-induced shorelineerosionandtrapavailablesediment. to createastandofemergentvegetationthatwillprovidelivingbarrieragainst A totalof1,500tradegallonssmoothcordgrass( A totalof3,400tradegallonsCaliforniabulrush( sediment. provide alivingbarrieragainstwave-inducedshorelineerosionandtotrapavailable A totalof300tradegallonssmoothcordgrass( A totalof2,200tradegallonsCaliforniabulrush( to protecttheshorelinefromerosion. californicus Approximately 3,000tradegallonsofCalifornia bulrush( Lacassine. californicus A totalof1,000tradegalloncontainersCaliforniabulrush( erosion andtrapavailablesuspendedsediment. alterniflora Approximately 1,200tradegalloncontainersofsmoothcordgrass( and increasefoodproductionforwildlife. reduce turbidity,encouragegrowthofsubmergedaquaticvegetation,trapsediment, were usedtocreatealivingfencewhichwillreducewind-generatedwaveaction, marsh. and provideasedimentsourceinordertoacceleratetherevegetationofthiseroded were usedtoprovidealivingfencethatwillreducefetch,watermovement, e ) wereplantedtoprovidealivingbarrieragainstwave-inducedshoreline ) wereplantedtoprovideanaturallivingbarrier ofemergentvegetation ) wereplantedtore-establishtheshorelineofGIWWandBayou Zizaniopsis miliacea ProjectSummary Schoenoplectus californicus Zizaniopsis miliacea Spartina alterniflora Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus ) tradegallonswereusedto Phragmites australis Schoenoplectus Schoenoplectus ) plantswereused ) wereusedto Spartina ) wereusedto ) wereused ) wereused ) ) ) 85

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje

rdeV / / huisnFihCm 120 / / / / $8,000 N/A N/A $1,277 N/A N/A $21,266 N/A 2001 N/A N/A 11 Cam. $5,751 N/A N/A Frith Theunissen $7,479 N/A N/A N/A N/A N/A VP $2,089 2001 N/A N/A N/A 2 N/A Cam. 2001 Bridge Kleckley N/A GIWW -Pontoon N/A 46 Cam. N/A Cain $1,539 N/A N/A Frith N/A Theunissen N/A 2001 N/A VP $8,000 Choupique Bayou N/A N/A N/A 7 $6,780 N/A Cam. VP 2001 N/A N/A 11 N/A 2001 Frith N/A M.O. Miller Cam. Theunissen 4 N/A N/A Cam. Frith N/A N/A Theunissen VP N/A $20,340 Frith N/A Theunissen Sonde Demo2 N/A N/A N/A California Bulrush VP N/A N/A N/A 2001 N/A VP N/A N/A Grand Lake Cam. Superior Canal- N/A 2000 N/A 2000 Frith 11 Theunissen Cam. Beach 12 Jim Erbelding N/A Cal. N/A N/A Frith VP Theunissen Johns N/A N/A Demonstration N/A 2000 Maintenance Cain VP Smooth Cordgrass 34 N/A Cal. N/A VP Marsh #5 Grosse Savanne Johns Cain GIWW Gum CoveFerry- N/A N/A VP West PerryRidge ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat use ofvegetation. designed totesttheeffectivenessoftrappingandaccumulatingsandwithsole to stabilizeduneslocatedontheeastsideofJimErbeldingRoad.Thisprojectwere feet wereplanted. trapping, andtoprovide wildlifeandfisherieshabitat.Approximately 5,000linear vegetation inanactively erodingarea,toaidinwavereductionandsediment soils andsignificantwave energy.Otherobjectivesaretoestablishemergent determine thesuitability ofplantinggiantcutgrassindeeperwaterareas withloamy planted indeeper-waterareas(1.5-2feet)with loamysoils.Thiswasdoneto A totalof1,000tradegalloncontainersgiant cutgrass( an areawithlittlevegetation. wildlife andfisherieshabitat,toprovidea seedsourcefornaturalregenerationin along BayouChoupiquetoreducebankerosion, trapavailablesediment,provide A totalof150tradegallonssmoothcordgrass ( available sediment,andprovideadditionalhabitat forbothfishandwildlife. levees, andcanals.Thisprojectwereconstructed toreduceshorelineerosion,trap placed justsouthofGrandChenieralongexisting infrastructuresuchasroads, A totalof4,000tradegallonssmoothcordgrass ( tolerance ofbulrushinhighsalinitymarshes. near theHighway384HydrologicRestoration (CS-21)projectareatodeterminethe A totalof660Californiabulrush( Canal placed todecreaseshorelineerosionalongGrandLakeshoreline,neartheSuperior A totalof1,000tradegallonsgiantcutgrass( A totalof3504-inchcontainersbitterpanicum( terraces werefertilizedwiththreedifferentfertilizationregimes. terraces whicharenotexhibitingvigorousgrowth.Approximately30,750feetof effectiveness offertilizingsmoothcordgrass( This project,locatedjusteastofBlackBayou,wasinitiatedtodeterminethe A totalof1,000tradegallonsCaliforniabulrush( on thesouthbankofGIWW. were usedtoprovideanaturallivingbarrieragainstwave-inducedshorelineerosion A totalof1,000tradegallonssmoothcordgrass( A totalof3,000tradegallonsCaliforniabulrush( action, reduceturbidity,andestablishareasofemergentvegetation. plants wereusedtocreatealivingfencewhichwillreducewind-generatedwave protect againstwindfetchandaidindecreasingwaterturbidity. vegetation andtoprovideanatural,livingbarrierofemergentvegetation.Thiswill plants wereusedtoprovideaseedsourcefornaturalregenerationofemergent e ProjectSummary Schoenoplectus californicus Spartina alterniflora Zizaniopsis miliacea Spartina alterniflora Panicum amarum Spartina alterniflora Spartina alterniflora Schoenoplectus californicus Schoenoplectus californicus Zizaniopsis miliacea ) plantswereplaced ) onconstricted ) plantswere ) wereplanted ) wereplaced ) were ) plants ) were ) ) 86

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje as PNANATense rt Cam. Frith Theunissen N/A N/A Cam. VP $4,400 Frith Theunissen Cam. Marsh 3 N/A N/A Marseillaise Bayou N/A Frith VP Theunissen $70,000 N/A Fence Demo2 N/A N/A Christmas Tree VP Cam. N/A $24,000 N/A Channel-SW Frith Cam. Theunissen Calcasieu Ship N/A Frith N/A N/A N/A N/A Theunissen $3,200 Cam. VP 2002 Lacassine A-Jacks N/A N/A N/A Frith N/A VP 6 Theunissen N/A Cam. N/A Demonstration N/A N/A DU TerraceTop $3,200 Frith N/A 2002 VP Theunissen N/A 107 Cam. N/A Briggs Marsh N/A N/A N/A VP N/A Frith 2001 Theunissen Trident Dock 34 N/A N/A Cam. N/A N/A VP 2001 Frith N/A Theunissen DU Terraces 5 Cam. N/A N/A N/A VP Frith Theunissen 2001 N/A Marsh #6 5 N/A Cam. Grosse Savanne VP Frith Maintenance Theunissen Living Fence Cameron Creole N/A N/A VP Grand Lake-GIWW hrln PNANATense rt Cam. Frith Theunissen N/A N/A VP Shoreline Sabine Lake ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish 23 2 23 11 25 11 17

Acres Benefited 03NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A 2003 N/A N/A N/A 2003 N/A N/A N/A 2003 N/A N/A N/A N/A N/A N/A 2002 N/A N/A 2002 N/A 2002 03NANANAN/A N/A N/A N/A 2003

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es $16,000 $1,000 $16,000 $8,000 $13,104 $8,000 $12,000 timate

Current

Co st Es timat the mosteffectiveincolonizingnewlyconstructed terraces. wildlife andfisherieshabitat.Atotalof2,750linearfeetwereplanted. actively erodingarea,toaidinwavereductionandsedimenttrapping,provide withstand extremelystrongwaveenergies,toestablishemergentvegetationinan were plantedinanextremelyhigh-wave-energyareatodemonstratetheirability A totalof550tradegalloncontainerssmoothcordgrass( determined. Atotalof46,500linearfeetwereplanted. if any,iseffectiveinincreasinggrowthrateofsmoothcordgrasswillbealso root plugson3footspacingwillbecompared.Whichformoffertilizerapplication, terraces. Theeffectivenessoftradegalloncontainerson5footspacingversusbare smooth cordgrasstradegalloncontainerswereplacedonnewlybuiltdragline A totalof5,500smoothcordgrass( A totalof3,000tradegallonsCaliforniabulrush( water hyacinthproblems. to monitortheeffectivenessofgiantcutgrassindeeperwaterareaswithsubstantial A totalof400tradegallonsgiantcutgrass( shoreline betweentheGIWWandGrandLakeshorelines. 200 tradegallonsofgiantcutgrass( A totalof200tradegallonsCaliforniabulrush( of emergentvegetation thatwillprovidealivingbarrieragainstwave erosion. californicus A totalof2,000tradegallon containersofCaliforniabulrush( refilling withChristmastrees. sediment trapping.Ifsuccessfulthisprojectwould eliminatetheneedforyearly australis A totalof100tradegalloncontainersand200 feetofroseaucane( plantings willbeobserved. addition comparisonsconcerningtheeffectiveness ofsingleversusdoublerow of thevegetationtostabilizeshorelinesinextremely highwaveenergysites.In alterniflora Approximately 2,000tradegalloncontainersof smoothcordgrass( planted toexaminetheeffectivenessofgiantcutgrass asavegetativebarrier. A totalof1,000tradegalloncontainersgiant cutgrass( A totalof1,1504-inchpotsmarshhaycordgrass( clarity. were plantedtoprovidealivingbarrieragainstwaveactionandimprovewater Approximately 1,000tradegalloncontainersofgiantcutgrass( saltgrass ( bitter panicum( reduce turbidity,andestablishareasofemergentvegetation. were usedtocreatealivingfencewhichwillreducewind-generatedwaveaction, and introduceseedfor natural regeneration. alterniflora Approximately 1,500trade galloncontainersofsmoothcordgrass( e ) wereplantedinbrushfencestoserveasawind breakandassistin Distichlis spicata ) wereplantedintheCalcasieuShipChannel to demonstratetheability ) wereplantedontheSabine Lakeshorelinetopreventerosion ) wereplantedonthenorth endofLittleChenierRoadtocreateastand Panicum amarum ), 90ofgulfcordgrass( ProjectSummary ) wereplantedtodeterminewhichspecies Spartina alterniflora Zizaniopsis miliacea Zizaniopsis miliacea Schoenoplectus californicus Spartina spartinae Schoenoplectus californicus Spartina patens ) plugsandatotalof6,000 ) wereusedtoprotectthe Zizaniopsis miliacea Spartina alterniflora Schoenoplectus Zizaniopsis miliacea Phragmites ) plantswereused Spartina Spartina ), 908of ), and36of ) were ) and ) ) ) 87

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje

ercsV / / huisnFihCm 920 / / / / $34,000 N/A $750 N/A $8,320 N/A N/A N/A N/A N/A $16,000 2004 N/A N/A 59 N/A Cam. N/A $9,600 Frith N/A $6,228 Theunissen N/A 2004 N/A N/A N/A 41 2004 N/A N/A VP Cam. N/A 12 Cam. Frith N/A Theunissen N/A Terraces N/A Frith Rockefeller N/A Theunissen 2004 N/A VP N/A N/A N/A 28 N/A Chenier Creation Cam. VP Johnson Bayou N/A Frith N/A Theunissen 2004 2004 GIWW N/A 18 N/A Highway 384- 12 Cam. VP Cam. Frith Frith Theunissen Theunissen Hackberry DU Terraces- N/A N/A N/A N/A VP Cam. VP Beach Reclamation Cam. Frith Theunissen Frith Theunissen Tops N/A N/A Apache Terrace N/A VP N/A VP DU Terraces2 Mount Cam. N/A N/A 2003 Frith Cam. VP Theunissen Lacassine Bayou N/A Frith N/A Theunissen Moss Lake VP N/A N/A Cam. VP Highway Grand Chenier Frith Theunissen N/A Bayou N/A South ForkBlack VP Catfish Lake ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator Kleckley

Repre

sen ta tive Cal.

Pa rish 51 11 3 11 5 23

Acres Benefited 03NANANAN/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2003 N/A N/A N/A N/A 2003 N/A N/A N/A N/A 2003 N/A N/A N/A 2003 N/A N/A 2003 N/A 2003

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es

$42,664 $7,696 $2,400 $8,000 $3,200 $16,000 timate

Current

Co st Es timat 240 tradegallonsofCaliforniabulrush( existing terracestocontrolerosion. mulberry ( spacing wereplantedon terracestocontrolerosionandestablishwildlife habitat. 3,038 vegetativeplugs on 3-footspacing,and3,202vegetativeplugs on5-foot A totalof200tradegallons ofCaliforniabulrush( were planted:liveoak( This projectplantedbarerootedandcontainer growntrees.Thefollowingspecies ( interior bayousthroughtheplantingsof500trade gallonsofgiantcutgrass The objectiveofthisprojectwastostoperosion onthebanksofGIWWand A totalof4,000plugssmoothcordgrass( inch potsofseashorepaspalum( Approximately 1,0004-inchpotsofbitterpanicum( terraces. four inchpotsofsaltgrass( Approximately 8004-inchpotsofmarshhaycordgrass( deteriorating marsh. were plantedonthesouthwestbankofMossLaketoslowerosioninarapidly seed sourcefornaturalregeneration. were plantedsouthofHwy.82toprotecttheremaininginfrastructureandestablisha newly plantedplants. will bedemonstratetheeffectiveofvariousfertilizersonsuccessandvigor ( A totalof2,000tradegalloncontainersand6,666plugssmoothcordgrass low salinityareas. were plantedtodeterminetheeffectivenessoftwospeciesreduceerosionin giant cutgrass( Approximately 962tradegalloncontainersof A totalof300tradegalloncontainerssmoothcordgrass( A totalof1,000tradegalloncontainerssmoothcordgrass( exchange insmalladjacentponds. planted toslowerosionontheshorelineofGIWWandwater 200 tradegalloncontainersofCaliforniabulrush( A totalof200tradegalloncontainersgiantcutgrass( A totalof2,000tradegallonsCaliforniabulrush( locust ( native vegetationonanewlydepositedsandbeach. protect theshorelineandtrapavailablesediments. were plantedtocreateastandofemergentvegetationthatwillactaswavebreak Zizaniopsis miliacea Spartina alterniflora e Gleditsia triacanthos Morus rubra ), 300tradegallonsofroseaucane( ) wereplantedontheDuckWingterraces.Theprojectresults ), commonpersimmon( Quercus virginiana Distichlis spicata ) torecreateanaturally occurringchenierridge. Paspalum vaginatum ProjectSummary Schoenoplectus californicus Spartina alterniflora ), hackberry( ) wereplantedtovegetatethetopsof Diospyros virginiana Schoenoplectus californicus Schoenoplectus californicus Schoenoplectus californicus Panicum amarum ) wereplantedtoestablish Spartina patens Zizaniopsis miliacea Celtis laevigata Phragmites australis Spartina alterniflora Zizaniopsis miliacea Spartina alterniflora ) wereplantedon ). ), andhoney ) and384- ) and800 ), red ) and ) were ), ) and ) ) ) ) 88

Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Vegetation Program

State Proje etCv PNANATense rt a.620 / / / / $4,000 $8,000 N/A N/A N/A $1,350 N/A N/A N/A N/A N/A $16,600 N/A 2005 N/A N/A 6 2005 N/A Cam. 12 $1,200 Cal. Frith N/A N/A Theunissen Johns 2005 N/A N/A N/A N/A VP Mount 3 Cal. $16,000 N/A N/A Kleckley N/A $8,400 West Cove N/A VP Mount 2005 N/A N/A N/A N/A 24 $8,000 PPG/Port N/A Cam. VP N/A $8,000 N/A Frith N/A N/A Theunissen Fence 2005 2005 Christmas Tree N/A N/A N/A N/A 1 VP N/A N/A Cam. N/A Highway 384 N/A Frith $16,000 N/A 2005 Theunissen N/A 2005 23 N/A Cam. N/A N/A N/A 16 VP N/A Cam. Frith Flotant Creation 2004 Theunissen N/A Frith N/A 11 Theunissen 2005 N/A Cal. N/A N/A Demonstration VP 12 N/A Eroded Terrace Cam. Johns N/A VP Frith Cain Little Florida Theunissen N/A N/A N/A 2004 N/A N/A VP VP Tebo PointCutgrass 23 Laf. Frith Canal Theunissen Vinton Drainage N/A N/A VP Demonstration 2 Maintenance Smooth Cordgrass ea on ufa PNANATense rt a.1 05NANANANA$8,000 N/A N/A N/A N/A 2005 12 Cam. Frith Theunissen N/A N/A VP Texas PointMudflat ct Numb Proj e er ( ct F Na edera me l)

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights

Ope

ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co st Es timate

Current

Co st Es timat mudflat andtoplantCaliforniabulrush( marshhay cordgrass( water movement,decreaseturbidity,andcreate habitat. lines acrosstheopenwaterareastoactasvegetative terracestobreakwindand for atotalof2,500linear feettoslowerosiononanactivelyeroding shoreline. A totalof500tradegallons ofsmoothcordgrass( establish wildlifehabitat. planted foratotalof5,000linearfeettoestablish vegetationtoreduceerosionand A totalof1,000tradegallonssmoothcordgrass ( serve asawindbreakandassistsedimenttrapping. ( The goalofthisprojectistoplant150tradegallons and150stolonsofroseaucane The goalofthisprojectistoplantsmoothcordgrass( species, otherswillhavemultiplespecies. anchored inplaceandhavefloatsattachedtothem.Somematswillbeasingle species activelygrowinginthematsaquietwaterarea.Thewillbe The goalofthisprojectistoplacecoconutfibermatswithearlysuccessionalflotant ( bulrush ( The goalofthisprojectistoplantandanchor1,000tradegallonsCalifornia planted tohelpstoperosiononthebeachbytrappingsandparticles. A totalof7,000linearfeet4-inchpotsbitterpanicum( living barrieragainstwave-inducederosionandtrapavailablesediment. 5,000 feetwereplantedtocreateastandofemergentvegetationthatwillprovide A totalof1,000tradegallonsgiantcutgrass( planted toslowerosiononaleveeneartheVintonDrainageCanal. 500 tradegalloncontainersofCaliforniabulrush( A totalof500tradegalloncontainersgiantcutgrass( miliacea bulrush ( plantings werenotsuccessful.Approximately1,000tradegallonsofCalifornia The projectgoalwillbetolookatestablishingvegetationonterraceswhereinitial mudflat tostabilizethe sedimentsandacceleratetherateofaccretion. planted foratotalof5,000 linearfeettoestablishvegetationonanactively accreting A totalof1,000tradegallons ofsmoothcordgrass( Phragmites australis Zizaniopsis miliacea e Schoenoplectus californicus Schoenoplectus californicus ) wereplantedonplowedterracesthatareexperiencingerosion. Spartina patens ) toestablishvegetationonerodedterraces. ) inChristmastreefencesforatotalof1,500linear feetto ProjectSummary ) onmudflattoprotectandstabilizealarge ) and1,000tradegallonsofgiantcutgrass ) and1,000ofgiantcutgrass( Schoenoplectus californicus Zizaniopsis miliacea Spartina alterniflora Schoenoplectus californicus Spartina alterniflora Spartina alterniflora Spartina alterniflora Zizaniopsis miliacea Panicum amarum Zizaniopsis ) foratotalof ) inseveral ) wereplanted ) were ) were ) and ) and ) were ) were 89 PPL: Impact AssistanceProgramprojects. WRDA=Water ResourcesDevelopmentAct; FEMA=FederalEmergencyManagmentAdministrationprojects;CIAP=Coastal 204/1135= WaterResourceDevelopmentAct Sections204and1135beneficialuseofdredgedmaterialprojects; Restoration Program(ChristmasTreeProgram); Vegetation=DNR/NRCS/SWCCVegetationPlantingProgram;Section funded primarilybytheStateofLouisianathrough theCoastalRestorationDivision;PCWRP=ParishWetlands USACE=U.S. ArmyCorps ofEngineers. Resources Conservation Service;NWRC=NationalWetlandsResearch Center;USFWS=U.S.FishandWildlifeService; Program: Project Type: Agency/Sponsor: Trapping; OM=OutfallManagement;BI=Barrier Island;SD=SedimentDiversion. Creation; SP=ShorelineProtection;FD=Freshwater Diversion;VP=VegetationPlanting;SNT=SedimentandNutrient Section 204/1135 Section 204/1135 Section 204/1135 Section 204/1135 Vegetation Vegetation Program PriorityProjectList(asauthorizedeachyear bytheBreauxActTaskForce).

State Proje BreauxAct=CoastalWetlandsPlanning,Protection andRestorationAct(CWPPRA);State=Restorationprojects HR=HydrologicRestoration;DM=Beneficial UseofDredgedMaterial;MM=MarshManagement;MC=Marsh

aker PNANATense rt a.1 05NANANANA$8,000 N/A Pass PhaseIII Calcasieu River& N/A N/A Pass PhaseII N/A N/A Calcasieu River& N/A N/A 2005 Pass PhaseI Calcasieu River& 12 N/A Cam. 2005 Frith Theunissen 1 Brown Lake Cam. N/A N/A VP Frith Theunissen N/A Hackberry N/A Ship Canal- VP Maintenance Chenier Tree c

EPA=Environmental Protection Agency;NMFS=NationalMarineFisheries Service;NRCS=Natural t Numb Proj e er ( ct F Na edera me l) CNANATense rt a.10019 / / / / $1,560,804 N/A $1,560,804 N/A N/A N/A $1,560,804 N/A N/A N/A 1999 1,070 N/A $1,132,435 Cam. N/A Frith N/A Theunissen N/A 1996 N/A N/A 1,070 N/A Cam. MC N/A DM Frith N/A Theunissen 1992 N/A N/A 1,070 N/A Cam. MC DM N/A Frith Theunissen 1999 315 N/A Cam. N/A MC DM Frith Theunissen N/A N/A MC DM

Proj

ect PPL Ty pe

Age n cy /Sp o nsor Se n ator

Repre

sen ta tive

Pa rish

Acres Benefited

Con

st ruction Completi

Engin

Cost eerin o g n Dat , De s e ig n,

(Region 4) Con & Lan s tr d uction Cost rights N/A=Not Applicable. Anticipated AcresBenefited: size andquantity. Beginning withBreauxActPPL10,projectcosts areforPhaseIonly.Vegetationprogramprojectcostsestimatedbasedon programs arefromDNR'sContractandBudget Section.BaselineCostandCurrentEstimatebothincludecontingencyfunds. Baseline CostEstimatesandCurrent forBreauxActprojectsarefromtheUSACE.Costsotherrestoration Tan.=Tangipahoa, Ter.=Terrebonne,Ver.=Vermilion. Orl.=Orleans, Plaq.=Plaquemines,StB.=St.Bernard, StC.=St.Charles,StJo.=St.JohntheBaptist,StM.=St.Mary,StT.=St.Tamman Parish:

Ope

Asc.=Ascension,Asu.=Assumption,Cal.=Calcasieu, Cam.=Cameron,Ibe.=Iberia,Jef.=Jefferson,Laf.=Lafourche, ra Monitoringtion, Cos M a inten

anc t Baselin e, &

e Co

N/AforBreauxActdemonstrationanddeauthorized projects. st Es timate

Current

Co st Es timat aide inwavereductionandsedimenttrapping. of 5,000linearfeettoestablishemergentvegetationinanactivelyerodingarea A totalof1,000tradegallonssmoothcordgrass( growth rateofseedlingtrees,andtoincreaseoveralllong-termsurvival. around treestodecreasecompetitionforlight,water,andnutrients,increase The goalofthisprojectistofertilizeallsurvivingtreesandspraybermudagrass National Wildliferefugeatanelevationconducive tomarshcreation. million cubicyardsofmaterialwasdeposited in threephaseswithintheSabine the areabetweenmile7.5and11.5ofCalcasieuShipChannel.Atotal4 This Section204projectprovidesforthedisposalofdredgedmaterialremovedfrom National Wildliferefugeatanelevationconducivetomarshcreation. million cubicyardsofmaterialwasdepositedinthreephaseswithintheSabine the areabetweenmile7.5and11.5ofCalcasieuShipChannel.Atotal4 This Section204projectprovidesforthedisposalofdredgedmaterialremovedfrom National Wildliferefugeatanelevationconducivetomarshcreation. million cubicyardsofmaterialwasdepositedinthreephaseswithintheSabine the areabetweenmile7.5and11.5ofCalcasieuShipChannel.Atotal4 This Section204projectprovidesforthedisposalofdredgedmaterialremovedfrom area neartheCalcasieuRiver,16milessouthofLakeCharles,Louisiana. 315 acresoflandatanelevationconducivetomarshcreationintheBrownLake Approximately 1.6millioncubicyardsofdredgedmaterialwerepumpedtocreate e ProjectSummary Spartina alterniflora ) foratotal plant y, Table 5. Coastwide restoration projects and programs.

al) e t t r s & t de nsor ive , , st t c e me pe o at n Dat g ce s Sp t o & n Co Co Na Ty / en uction erin , ghts Co uction Cost ion, na e te te ct ct cy s tr e n i tr at e a a e e n ator ish s dr s r im im n r n t t Project Summary

Program State ProjeNumber (FProj Proj PPL Age Se Repre Pa Acres BenefitedCon CompletiEngin Desig La Con Ope Maint MonitoringBaselin Cos Es CurrentEs Nutria Harvest for Wetland This project will enable the Louisiana Department of Wildlife and Fisheries to LA-03a Restoration establish an economic incentive program to trap and control nutria, which are

Breaux Act Breaux (CW-7) Demonstration N/A 6 USFWS N/A N/A N/A N/A N/A N/A N/A N/A $2,140,000 $2,140,000 contributing to coastal wetland loss, by promoting the consumption of nutria meat. The goal of the project is to eliminate or significantly reduce damage to coastal wetlands resulting from nutria herbivory. The implementation of an incentive payment program, beginning with the 2002-2003 trapping season, will compensate licensed trappers $4 for each nutria tail delivered to a collection center. In 2003, a Coastwide Nutria total of 308,160 nutria tails, worth over 1.2 million dollars in incentive payments,

Breaux Act Breaux LA-03b Control Program N/A 11 NRCS N/A N/A N/A 14,963 N/A $727,182 $2,362,500 $9,858,657 $68,864,870 $13,012,998 were collected from 342 participants. The goal of this project is to develop and test unique and previously untested Floating Marsh technologies for creating floating marsh for potential use in fresh and intermediate Creation zones. This project is a demo project that will be used to test the feasibility of Demonstration buoyant vegetated mats/artificial islands to convert open water marsh areas and

Breaux Act Breaux LA-05 Project N/A 12 NRCS N/A N/A N/A N/A Pending $276,219.00 $384,976.00 $419,696.00 $1,080,891 $1,080,891 canals into fresh and intermediate marsh zones. The DNR Public Information Office provides a variety of printed materials, educational videos and cds, fact sheets, website information, and a traveling wetlands exhibit for the public. Other department outreach efforts include participating in conferences, workshops, civic events, and school activities. Much of the agency’s educational outreach is in partnership with the Breaux Act Task Force committees and the America’s WETLAND campaign. As a result of working with several noted authors, writers and reporters, the Public Information Office has contributed to the publishing of hundreds of national articles over the past years. In October 2004, National Geographic Magazine published a widely recognized report on the value and benefits of the state’s wetlands entitled Gone with the Water. To contact the Louisiana Department of Natural Resources’ Public Information Office

90 Coastal Wetlands [email protected]

Other Public Outreach N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A $400,000

The NRCS-LDNR/CRD Biomass Program is a multiyear programmatic initiative to accelerate the collection, testing, and release of important coastal wetland restoration plants. The Biomass Program began in 1999 in conjunction with the LDNR/CRD NRCS Biomass Small-Dredge Program with emphasis on plant performance and dedicated dredged Production sediment. This program is an important coastal restoration initiative that is

Other Program VP N/A NRCS N/A N/A N/A N/A N/A N/A N/A N/A $80,000 $80,000 advancing coastal wetland plant technology development and transfer. This multi-year cooperative agreement will study productivity of endemic wetland plants, with the goal of identifying specific environmental conditions for maximum growth of a number of varieties (i.e., cultivars) within four plant species. The NWRC Biomass information obtained will facilitate matching plant species and varieties to expected Production environmental conditions at restoration sites, thereby increasing the likelihood of

Other Program VP N/A NWRC N/A N/A N/A N/A N/A N/A N/A N/A $384,500 $1,007,600 successful revegetation efforts.

Program: Breaux Act=Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA). Anticipated Acres Benefited: N/A for Breaux Act demonstration and deauthorized projects. Project Type: VP=Vegetation Planting. Baseline Cost Estimates and Current Cost Estimates for Breaux Act projects are from the USACE. Costs for other restoration PPL: Priority Project List (as authorized each year by the Breaux Act Task Force). programs are from DNR's Contract and Budget Section. Baseline Cost and Current Cost Estimate both include contingency funds. Agency/Sponsor: NRCS=Natural Resources Conservation Service; NWRC=National Wetlands Research Center; Beginning with Breaux Act PPL 10, project costs are for Phase I only. Vegetation program project costs are estimated based on plant USFWS=U.S. Fish and Wildlife Service. size and quantity. NA=Not Applicable.

(Coastwide) Table 6. Status of all authorized Breaux Act projects (as of November 2005).

Status Region 1 Region 2 Region 3 Region 4 Coastwide Total

Constructed 8 1427212 72 Constructed and 0002 0 2 Deauthorized Breaux Act Deauthorized 4941 0 18 Engineering and 6 2319101 59 Design Phase Total Authorized 18 46 50 34 3 151

Table 7. Summary of all constructed/implemented coastal restoration projects (as of November 2005).

Total Program Region 1 Region 2 Region 3 Region 4 Coastwide Constructed

Breaux Act* 8 1427232 74

Section 204/1135 5324 0 14

FEMA 10110 0 12 Federal WRDA 0200 0 2

Other** 1220 2 7

State 610128 0 36 Dedicated Dredging 0300 0 3 Program State Fontainebleau State 1000 0 1 Park Mitigation Coastal Wetlands 0000 1 1 Public Outreach PCWRP 7 8 12 10 0 37

Vegetation 43 95 108 125 0 371

Total Constructed 72 137 174 170 5 558 * The total of 74 constructed Breaux Act projects includes 72 constructed projects and 2 constructed and deauthorized projects. ** Other Federal projects include the Lake Pontchartrain Mitigation Project, Fifi Island Restoration Project, Fisheries Habitat Restoration on West Grand Terre Island, Brown Marsh Small Dredge Marsh Creation Project, Rainey Refuge, and the NRCS and NWRC Biomass Production Programs.

91 Table 8. Fifteen critical LCA projects and large-scale studies. LCA Near-Term Projects Recommended for Conditional Authorization * Mississippi River Diversion at Hope Canal (CWPPRA project: River Reintroduction into Maurepas Swamp, PO-29) Mississippi River Diversion at Bayou Lafourche (CWPPRA project: Mississippi River Reintroduction into Bayou Lafourche, BA-25b) Mississippi River Diversion at Myrtle Grove with Dedicated Dredging (CWPPRA project: Delta Building Diversion at Myrtle Grove, BA-33) Barataria Basin Barrier Shoreline Restoration (Critical Reaches) Mississippi River Gulf Outlet Environmental Restoration Features

LCA Near-Term Projects Recommended for Future Authorization ** Multi-purpose Operation of Houma Navigation Canal Lock Terrebonne Basin Barrier Shoreline Restoration Maintain Land Bridge Between Caillou Lake and the Gulf of Mexico Mississippi River Diversion at Convent/Blind River Increase Amite River Diversion Canal Influence by Gapping Spoil Banks Mississippi River Diversion at White’s Ditch Stabilize Gulf Shoreline at Point au Fer Island Convey Atchaflaya River Water to Northern Terrebonne Marshes Modification of Caernarvon Diversion Modification of Davis Pond Diversion

Large-Scale, Long-Term Projects for Implementation ** Mississippi River Hydrodynamic Study Mississippi River Delta Management Study Third Delta Study Chenier Plain Freshwater and Sediment Management and Allocation Reassessment Study Acadiana Bays Estuarine Restoration Study Upper Atchafalaya Basin Study/Modification of Old River Control Structures Operation

* Detailed descriptions of the five LCA projects recommended for conditional authorization can be found at http://www.lca.gov/main_report.aspx, Attachments 1-5, p. 17-174.

** Descriptions of the 10 LCA projects recommended for future authorization and the LCA large-scale studies can be found at http://www.lca.gov/main_report.aspx, Chapter 3 Plan Formulation, p. 39-58.

92 Table 9. Inactive state projects for which no funding exists. Project Project Name Parish Number BA-03-b Naomi (LaReussite) Diversion Enlargement of Capacity Jefferson/ Plaquemines BA-04-b West Pointe a la Hache Diversion Enlargement Plaquemines BA-06 U.S. Highway 90 to GIWW Wetland Outfall Management Plaquemines BA-07 Couba Island-Restore Canal Closure St. Charles BA-08 Lake Cataouatche Shore Protection St. Charles BA-09 Salvador WMA Gulf Canal Project St. Charles BA-11/12 Tiger/Red Pass Diversion and Outfall Management and Grand/Spanish Pass Plaquemines Diversion BA-13 Hero Canal Diversion Plaquemines BA-14 Little Lake Marsh Management Jefferson BA-17-a City Price Diversion - Home Place Plaquemines BA-17-b City Price Diversion - Happy Jack Plaquemines BS-01-a Bohemia Diversion Structure - Operation of Existing Structure Plaquemines BS-01-b Bohemia Diversion Structure Outfall Management Plaquemines BS-04-b White's Ditch Diversion Siphon Enlargement Plaquemines BS-05 Bayou LaMoque Diversion Outfall Management Plaquemines CS-04-b Cameron-Creole Watershed Freshwater Introduction from GIWW Cameron CS-05-a Sabine Freshwater Introduction Cameron CS-06 Black Lake South Shore Protection Cameron CS-07 Black Lake West Shore Protection Cameron CS-08 Black Lake North Marsh Management Cameron CS-10 Grand Lake Ridge Marsh Management Cameron CS-11-a Sweet Lake/GIWW Bank Restoration (Phase 1) Cameron CS-12 Black Bayou Ridge Freshwater Introduction Cameron CS-13 Back Ridge Freshwater Introduction Cameron CS-14 Tripod Bayou Control Structure Cameron CS-15 Boudreaux/Broussard Marsh Protection Cameron CS-16 Black Bayou Culverts Cameron ME-02 Hog Bayou Wetland Restoration and Enhancement Cameron ME-05 White Lake Shore Protection Vermilion ME-06 Big Burn Marsh Management Cameron ME-07 Deep Lake Marsh Protection Vermilion ME-10 Sawmill Canal Water Management (PD) Cameron MR-02 Pass a Loutre Sediment Fencing Plaquemines MR-04 Tiger Pass Wetland Creation(PD) Plaquemines MR-05 Pass a Loutre Sediment Mining (PD) Plaquemines PO-01-b Violet Siphon Diversion Enlargement St. Bernard PO-01-c Violet Siphon Diversion Outfall Management St. Bernard PO-02-b Alligator Point Shore Protection Orleans PO-03-a LaBranche Wetland Complete Management Plan St. Charles PO-04 Bonnet Carre´ Freshwater Diversion St. Charles PO-05-a SE Lake Maurepas Wetland - Reduce Ponding of Water St. John PO-05-b SE Lake Maurepas Wetland - Small Diversion of Miss. River Water St. John

Continued

93 Table 8. Continued. Project Project Name Parish Number PO-07 North Shore Wetland Marsh Restoration St. Tammany PO-11 Cutoff Bayou Marsh Management Orleans PO-12 West LaBranche Wetland Management St. Charles PO-13 Tangipahoa/Pontchartrain Shore Protection Tangipahoa PO-14 Green Point/Goose Point Marsh Restoration St. Tammany PO-15 Alligator Point Marsh Restoration Orleans TE-05-a Grand Bayou Wetland Protection and Enhancement Terrebonne TE-08 Bayou Pelton Wetland Protection Terrebonne TE-09 Bully Camp Marsh Management Lafourche TE-11 Isles Dernieres Cut Closure Terrebonne TE-12 Bird Island Restoration Terrebonne TE-13 Trinity Bayou Pilot Project Terrebonne TE-16 St. Louis Wetland Restoration Terrebonne TE-21 Falgout Canal South Wetland Creation (PD) Terrebonne TV-01-b Shark Island/Weeks Bay Protection Iberia TV-05-1 Marsh Island Canal Backfilling - Increment 1 Iberia TV-07 Marsh Island Sediment Fencing - Restoration Iberia TV-08 Redfish Point Shore Protection Vermilion TV-10 Weeks Bay Shore Restoration Iberia

94

CONCLUSIONS

Since 1989, the LDNR and its coastal restoration projects. Also, the partners have been engaged in an effort to America’s WETLAND campaign will restore, preserve, and enhance Louisiana’s educate the nation and solicit national coastal wetlands, which are disappearing at a support for saving Louisiana’s vanishing current rate of 24 square miles per year. At coast. Furthermore, technological advances this rate, an area the size of a football field is have enabled the public and scientific lost every 38 minutes. To date, 635 professionals to acquire information and data restoration projects have been authorized on all restoration projects through the OCRM throughout the coastal zone to ameliorate the website. These developments, and the state’s wetland loss. As of November 2005, continued dedication of scientists, engineers, the coastal restoration program has landowners, and the public will help to constructed 74 Breaux Act projects, 41 state protect and restore Louisiana’s coast. projects, 35 federal projects, 371 vegetation Knowledge is a powerful tool in the projects, and 37 PCWRP projects. Despite conservation of natural resources, not only these efforts, land loss remains a significant for wetland scientists and project engineers, problem in Louisiana. but also for concerned citizens. By Restoration project types range from remaining aware and informed of coastal large freshwater diversion projects, which problems and restoration efforts, individuals divert a portion of a river’s flow, sediment, can help preserve Louisiana’s wetlands. and nutrients into entire basins, to small Show your support by promoting vegetation projects, which involve planting wetland restoration efforts, working with salt- and flood-tolerant marsh plants to non-governmental coastal organizations, stabilize eroding soils. attending local meetings, and conserving Among those projects already wetland resources by following fishing and constructed, many have proven to be hunting regulations. Help by participating in successful. Examples include beneficial use beach clean-ups, environmental education of dredged material and marsh creation programs, and in LDNR’s Christmas tree projects, which have created vegetated marsh program either by donating your tree after the habitat in areas that previously contained holiday season or by volunteering your time deteriorated wetlands or open water. to repair and create Christmas tree fences. Sediment diversion projects have also been Through concern and participation, citizens successful in creating marsh in the form of can play a role in the success of wetland crevasse-splays in areas that were once restoration programs and can personally shallow open water. Data collected from contribute toward the goal of saving a these projects are not only used to evaluate national treasure. the effectiveness of individual restoration Please visit our website at projects, but also to guide the planning and www.dnr.louisiana.gov/crm for more design of future projects. information regarding LDNR coastal The LDNR and its partners have restoration projects. For any other worked tirelessly to determine the most information or questions, please call 1-888- efficient and productive manner to address 459-6107 or write to the Louisiana Louisiana’s catastrophic land loss problem. Department of Natural Resources, Coastal Cooperative initiatives like the Louisiana Restoration Division, P.O. Box 44027, Coastal Area Ecosystem Restoration Plan Capitol Station, Baton Rouge, Louisiana and the Governor’s Advisory Commission on 70804-4027. Coastal Protection, Restoration, and Conservation are aimed at improving the ability to design and implement effective 95