Western District Council

Change to the District Plan – First Review

Plan Change 74 Coastal Hazards

Section 32 Report

Prepared by: Tony Clow, Senior Policy Analyst Resource Management

.

Contents

1.0 Introduction ...... 3 2.0 Resource Management Act 1991 ...... 7 3.0 Issue 1 – To proceed or not with a Plan Change ...... 8 4.0 Issue 2 – Naming of the Coastal Hazards ...... 11 5.0 Issue 3 – Coastal Erosion Area Maps ...... 12 6.0 Issue 4 – Coastal Erosion Area Rules ...... 16 7.0 Issue 5 – Coastal Erosion Area Access Yard ...... 20 8.0 Issue 6 – Coastal Inundation Area Maps ...... 23 9.0 Issue 7 – Coastal Inundation Area Rules ...... 24

Change to the District Plan – First Review – 27 August 2015 Page 2 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

1.0 Introduction

1.1. Purpose of the Plan Change

This Plan Change updates the District Plan Maps in response to a review of the ‘Coastal Protection Areas’ at Beach and . This review has identified land susceptible to coastal erosion and/or coastal inundation (flooding) within these areas over the next 100 years. This Plan Change also reviews the rules within ‘Section 8 – Natural Hazards’ of the District Plan to ensure the risks that coastal hazards pose to people and buildings can be avoided or mitigated. This review of the rules also affects the Coastal Protection Areas along the rural open coastline (rural zoned land within 100m of MHWS) including and the land east of Pukehina.

For clarity, it is not the purpose of this Plan Change to prevent coastal erosion or coastal inundation from occurring. Any preventative measures such as dune planting, dune re-nourishment or the construction of rock revetments cannot be implemented by the District Plan. Council can however implement or consider implementing these measures in other ways. It is also important to note that both dune re-nourishment and the construction of new rock revetments in the coastal marine area require resource consent from the Bay of Plenty Regional Council.

1.2. Coastal Protection Areas – History

The Coastal Protection Areas at and Pukehina were first introduced through the 1994 notification of the Proposed District Plan which was made Operative in 2002. The Coastal Protection Areas identified properties susceptible to coastal erosion and inundation over a 100 year timeframe. They were based on a 1993 technical report commissioned by Council and prepared by Professor Terry Healy of the University of Waikato titled ‘Coastal Erosion, Setback Determination, and Recommendations for Management of the Waihi-Bowentown and Pukehina Beach and Dunes’. The technical report produced a line showing the extent of what Healy called the ‘Coastal Hazard Zone’. This was then ‘right-aligned’ by Council to the landward edge of property boundaries for the purpose of identifying the Coastal Protection Areas in the District Plan. This is illustrated below.

Change to the District Plan – First Review – 27 August 2015 Page 3 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Controls on development to avoid or mitigate coastal hazard risk were later introduced through a variation to the Proposed District Plan in 1997. Submissions to this Variation opposed the same controls applying across the entire Coastal Protection Area and sought for less restrictive rules in areas of lower risk. In response, Council made a decision to separate the Coastal Protection Areas into ‘Primary Risk’ and ‘Secondary Risk’ so that such an approach could be taken. To do this, Council used Healy’s methodology to produce a line showing the extent of the area at most immediate risk. Council then right-aligned this to the landward edge of property boundaries so that any property seaward of or intersected by this line became Primary Risk and the remaining properties became Secondary Risk. This is again illustrated below.

Primary Risk represented properties immediately susceptible to coastal erosion whereas Secondary Risk represented properties susceptible to both coastal erosion and coastal inundation over a 100 year timeframe. This was appealed but later confirmed by the Environment Court in 2002. The Coastal Protection Areas (Primary and Secondary Risk) were then carried over, without change, into the Proposed District Plan First Review which was notified in 2009 and made Operative in 2012.

1.3. Coastal Protection Areas – Reasons for Review

In 2014, Council decided to review the extent of the Coastal Protection Areas at Waihi Beach and Pukehina. This was to ensure that the identification of coastal hazards was kept up to date with latest scientific knowledge and best practice as well as the requirements of Coastal Policy Statement (NZCPS) and Regional Policy Statement (RPS). Both the NZCPS and RPS require the identification of areas which are potentially at risk to coastal hazards over at least 100 years (including as a result of climate change). The District Plan must give effect to both documents. The requirements of the NZCPS and RPS as they relate to coastal hazards are further detailed in 1.4 below.

Change to the District Plan – First Review – 27 August 2015 Page 4 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

1.4. Relevant Legislation

New Zealand Coastal Policy Statement

Objective 5

This objective is to manage coastal hazard risks (taking account of climate change) by locating new development away from areas prone to such risks and considering responses including managed retreat for existing development in this situation and protecting or restoring natural defences to coastal hazards.

Policy 24

This policy requires the identification of areas in the coastal environment that are potentially affected by coastal hazards (including tsunami) over at least 100 years giving priority to the identification of areas at high risk of being affected. Coastal hazard risks are to be assessed having regard to national guidance and the best available information on the likely effects of climate change on the region or district.

Policy 25

For subdivision, use and development in areas identified as being potentially affected by coastal hazards over the next 100 years, this policy requires;

 avoiding increasing the risk of social, environmental and economic harm from coastal hazards  avoiding redevelopment, or change in land use, that would increase the risk of adverse effects from coastal hazards  encouraging redevelopment, or change in land use, where that would reduce the risk of adverse effects from coastal hazards, including managed retreat by relocation or removal of existing structures or their abandonment in extreme circumstances, and designing for relocatability or recoverability from hazard events  encouraging the location of infrastructure away from areas of hazard risk where practicable  discouraging hard protection structures and promoting the use of alternatives to them, including natural defences

Regional Policy Statement

Policy NH 11B

This requires incorporating the effects of climate change into coastal hazard assessments over a 100 year timeframe.

1.5. Coastal Protection Areas Review – Stage One

Tonkin & Taylor was commissioned by Council to undertake the review of the Coastal Protection Areas at Waihi Beach and Pukehina and commenced this in September 2014. This was broken into two stages. ‘Stage One’ was

Change to the District Plan – First Review – 27 August 2015 Page 5 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

first of all to look at whether a re-assessment of the Coastal Protection Areas was necessary or not. The Stage One report titled ‘Coastal Protection Area Review – Stage One’ is available on Council’s website at www.westernbay.govt.nz/planchange74. This determined that a re- assessment was necessary due to advancements over the last 20 years in scientific knowledge, techniques, methodology and observations of the factors used to determine the location of coastal hazards.

1.6. Coastal Protection Areas Review – Stage Two

‘Stage Two’ then re-assessed the extent of coastal hazards at Waihi Beach and Pukehina over a 100 year timeframe. The Stage Two technical report titled ‘Coastal Protection Areas Re-assessment Stage Two’ is available on Council’s website at www.westernbay.govt.nz/planchange74. The key outcome of the re-assessment are the maps identifying land susceptible to coastal erosion and coastal inundation over both a 0-50 year and 50-100 year timeframe, as follows;

Hazard Timeframes Section Coastal Erosion Hazard Zone (CEHZ) 2065 and 2115 Appendix A Coastal Inundation Hazard Zone (CIHZ) 2065 and 2115 Appendix A

The Stage Two technical report contains the following key information explaining the reasons for the coastal hazard maps;

 Explanations of and data sources for the coastal processes influencing coastal erosion and inundation such as water levels, tides, storm surge, sea level rise, waves, shorelines and beach profiles on p3  Previous assessment method used in 1993 by Terry Healy on p12  Re-assessment method for the CEHZ on p13  Re-assessment method for the CIHZ on p31  Summary and conclusions on p36.

1.7. Consultation

Council first informed potentially affected landowners of the Coastal Protection Areas Review for Waihi Beach and Pukehina when it commenced in September 2014. This was done through a letter and the creation of a project webpage. It targeted landowners with properties within the existing Coastal Protection Areas (Primary and Secondary Risk) as well as those landowners with properties directly adjoining these. A number of e-mail updates were also sent to those landowners who requested this.

Potentially affected landowners were then sent a second letter in early May 2015 to advise them that the Stage Two technical report was available on the webpage and that public open days were to be held at Pukehina (16 May) and Waihi Beach (23 May). The webpage also provided maps with instructions to help landowners determine if their properties had been identified with a coastal hazard. The public open days started with a

Change to the District Plan – First Review – 27 August 2015 Page 6 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

presentation which summarised the reasons for the review, its outcomes, the effects on landowners, and an explanation of the upcoming District Plan Change process. This was followed by a time for general questions from the floor and then a time to meet the project team and ask any property specific questions.

The webpage was updated following the public open days to include a copy of the presentation along with detailed notes, answers to frequently asked questions, and other background information. Throughout the consultation process, landowners were encouraged to contact the project manager if they had any questions or wanted further information. A large number of phone calls, e-mails and letters were received from landowners and were responded to. Upon request, the project team also attended the Pukehina Beach Ratepayers Association monthly meeting on 13 July 2015.

1.8. District Plan Response

In response to the Stage Two technical report and consultation, Council needed to decide whether to proceed with a Plan Change, and if so, how to map the two identified coastal hazards at Waihi Beach and Pukehina in the District Plan, and what development controls to have in place for these coastal hazards and those along the rural open coastline. This Section 32 Report explains the reasons behind each proposal in this Plan Change.

2.0 Resource Management Act 1991

2.1. Section 32

Before a proposed plan change can be publicly notified the Council is required under section 32 (“s.32”) of the Act to carry out an evaluation of alternatives, costs and benefits of the proposed review. Council’s assessment of the proposed plan change requires the following:

1) An evaluation report required under this Act must— (a) examine the extent to which the objectives of the proposal being evaluated are the most appropriate way to achieve the purpose of this Act; and (b) examine whether the provisions in the proposal are the most appropriate way to achieve the objectives by— (i) identifying other reasonably practicable options for achieving the objectives; and (ii) assessing the efficiency and effectiveness of the provisions in achieving the objectives; and (iii) summarising the reasons for deciding on the provisions; and (c) contain a level of detail that corresponds to the scale and significance of the environmental, economic, social, and cultural effects that are anticipated from the implementation of the proposal.

(2) An assessment under subsection (1)(b)(ii) must— (a) identify and assess the benefits and costs of the environmental, economic, social, and cultural effects that are anticipated from the implementation of the provisions, including the opportunities for— (i) economic growth that are anticipated to be provided or reduced; and Change to the District Plan – First Review – 27 August 2015 Page 7 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

(ii) employment that are anticipated to be provided or reduced; and (b) if practicable, quantify the benefits and costs referred to in paragraph (a); and (c) assess the risk of acting or not acting if there is uncertain or insufficient information about the subject matter of the provisions.

3) If the proposal (an amending proposal) will amend a standard, statement, regulation, plan, or change that is already proposed or that already exists (an existing proposal), the examination under subsection (1)(b) must relate to— (a) the provisions and objectives of the amending proposal; and (b) the objectives of the existing proposal to the extent that those objectives— (i) are relevant to the objectives of the amending proposal; and (ii) would remain if the amending proposal were to take effect.

4) If the proposal will impose a greater prohibition or restriction on an activity to which a national environmental standard applies than the existing prohibitions or restrictions in that standard, the evaluation report must examine whether the prohibition or restriction is justified in the circumstances of each region or district in which the prohibition or restriction would have effect.

2.2. Section 74

In accordance with Section 74(2A) of the Act, Council must take into account any relevant planning document recognised by an iwi authority and lodged with Council. There are no hapu or iwi management plans lodged with Council that relate to Waihi Beach or Pukehina or the rural zoned land along the open coastline east of Pukehina. The ‘Matakana and Rangiwaea Island Hapu Management Plan’ has been taken into account with respect to the rural zoned land along the open coastline at Matakana Island.

3.0 Issue 1 – To proceed or not with a Plan Change

3.1. Explanation

The reasons for, and outcomes of, the review of the Coastal Protection Areas are explained in the introduction to this report. The options of proceeding or not with a Plan Change are considered below.

3.2. Option 1 – Proceed with a Plan Change

Benefits . Identification of coastal hazards in the District Plan is kept up to date with current best practice and scientific knowledge. . District Plan will meet the requirements of the NZCPS by identifying all land at risk within 100 years. The Stage Two technical report shows that the District Plan no longer achieves this. . District Plan will correctly inform landowners/buyers of which land is at risk. . Allows controls on development (to avoid or mitigate coastal hazard risk) to be applied to all land at risk and removed from all land no longer at risk.

Change to the District Plan – First Review – 27 August 2015 Page 8 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Costs . For landowners, this may lead to increased costs of development to comply with rules or the loss of development potential. There may also be real or perceived impacts on property values and sales and the ability to get insurance. Effectiveness/ . Effective as it allows Council to identify all land at Efficiency risk and put rules in place to protect people and buildings from that risk. . Efficient because planning a response against coastal hazards before they occur rather than when they occur will reduce planning difficulties and costs to landowners over the long term. . The information available to Council shows a Plan Change is required. Proceeding now is efficient because the information is current. Risks of Acting/ . The information available to Council is Not Acting if there is considered to be sufficient for identifying land at uncertain or insufficient risk over the next 100 years. However, it is information about the acknowledged that there is no certainty that subject matter coastal erosion and inundation will actually occur in the identified areas within the specific timeframes. Therefore, there is a risk that acting now will lead to unnecessary restrictions and costs on landowners if the identified coastal hazards do not eventuate.

3.3. Option 2 – Do not proceed with a Plan Change

Benefits . Landowners will be not be affected any more than what they are at present. Costs . Identification of coastal hazards in the District Plan will not be kept up to date with current best practice and scientific knowledge. . District Plan will not meet the requirements of the NZCPS to identify all land at risk within 100 years. The Stage Two technical report shows that the District Plan no longer achieves this. . District Plan will not correctly inform landowners/buyers of which land is at risk. . Will not allow controls on development (to avoid or mitigate coastal hazard risk) to be applied to all land at risk and removed from all land no longer at risk. . Council will be seen as negligent for not responding to the new information it has available. Effectiveness/ . Ineffective as it does not allow Council to identify Efficiency all land at risk and put rules in place to protect people and buildings from that risk. . Inefficient because planning a response against coastal hazards when they occur will increase difficulties and costs over the long term. . The information available to Council shows a Plan Change is required. Not proceeding now is inefficient because it means a Plan Change is needed later whether initiated by Council or prompted by national or regional government. Change to the District Plan – First Review – 27 August 2015 Page 9 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Further up-to-date technical reports may be required if there is a significant delay. Risks of Acting/ . The information available to Council is Not Acting if there is considered to be sufficient for identifying land at uncertain or insufficient risk over the next 100 years. However, it is information about the acknowledged that there is no certainty that subject matter coastal erosion and inundation will actually occur in the identified areas within the specific timeframes. The risk of not acting now is that the coastal hazards will occur in this timeframe and people and property will be unnecessarily affected.

3.4. Preferred Option

The preferred option is:

Option 1 – proceed with a Plan Change.

3.5. Reasons

Council now has up-to-date research available on the areas at Waihi Beach and Pukehina that are susceptible to coastal hazards over the next 100 years. Council would be negligent to overlook this research. Proceeding with the Plan Change allows Council to keep the District Plan updated and in line with the requirements of the NZCPS. It will also correctly inform landowners and buyers of which land is at risk and help them prepare for the possible impacts of coastal hazards.

It is acknowledged that many landowners are concerned about increased development costs and loss of development potential. These are a direct consequence from natural hazard rules in the District Plan. Development costs are increased in hazard areas because of having to obtain resource consent and meet design requirements. Some loss in development potential may occur for any new properties identified with a coastal hazard and made subject to natural hazard rules. There could also be a loss of development potential for any existing properties identified where an opportunity to subdivide or develop is removed; however the existing rules have already removed many of these opportunities. Aerial photos also show that many properties have been fully developed already or developed in a way which would make it difficult to subdivide or add more dwellings.

It is also acknowledged that many landowners are concerned about decreased property values or potential to sell and difficulties with getting insurance. Concerns about property values and sales are largely based on landowner perceptions however. No evidence has been provided to show that the identification of coastal hazards decreases the sale values of properties, and it is the market not the District Plan which will decide what people are willing to pay for such properties. In terms of getting insurance, this will depend on the insurance company and the property in question. The consultation period has shown that landowners have had varying experiences with getting insurance.

Change to the District Plan – First Review – 27 August 2015 Page 10 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Ultimately, Council must take a longer term view on how coastal hazards may affect landowners. While overlooking a Plan Change at this stage may alleviate the concerns that existing landowners hold for the short term, it ignores the impacts that existing or future landowners may face in the long term which will be more significant. Waiting until coastal hazards start to pose an immediate threat to people and property is not an appropriate time to start planning for their effects. Taking action now will ensure new buildings are designed for the hazard (i.e. are relocatable or above flood levels). It will also ensure opportunities are maintained for relocating buildings in the future.

4.0 Issue 2 – Naming of the Coastal Hazards

4.1. Explanation

The Stage Two technical report identifies two coastal hazards at Waihi Beach and Pukehina over 0-50 year and 50-100 year timeframes as shown below.

Hazard Timeframes Coastal Erosion Hazard Zone (CEHZ) 2065 and 2115 Coastal Inundation Hazard Zone (CIHZ) 2065 and 2115

The District Plan also identifies an existing ‘Coastal Protection Area – Open Coastline’ for all rural zoned land within 100m of MHWS which includes Matakana Island and the land east of Pukehina. This only relates to coastal erosion and not coastal inundation.

Consideration needs to be given to how these hazards are named for the purposes of the District Plan.

4.2. Preferred Option

Rename the coastal hazards in the Stage Two technical report as follows;

Hazard Level of Risk Coastal Erosion Area Primary and Secondary Risk Coastal Inundation Area

Rename the existing ‘Coastal Protection Area Open Coastline’ as ‘Coastal Erosion Area – Rural’.

4.3. Reasons

General

The hazard names suggested clearly identify the relevant hazard and are consistent with how other hazards in the District Plan are named i.e. ‘Floodable Area’ and ‘Stability Area’. The name Coastal Protection Area has

Change to the District Plan – First Review – 27 August 2015 Page 11 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

not been re-used because it does not clearly identify the hazards plus also implies that the District Plan is seeking to prevent coastal erosion and coastal inundation from occurring which is not the case.

Waihi Beach and Pukehina

For the ‘Coastal Erosion Area’, the terms ‘Primary Risk’ and ‘Secondary Risk’ are suggested rather than ‘2065’ and ‘2115’ because they make it clear that the separation is based on different levels of risk and plan users may not understand the reference to the numbers or will focus on the years rather than the level of risk. Different rules will also apply to the different areas of risk. For the ‘Coastal Inundation Area’, separate risk areas are not required as the same rules will apply across the entire hazard.

Rural zoned land - Matakana Island and east of Pukehina

The term ‘Coastal Erosion Area – Rural’ clarifies that this feature only relates to the rural open coastline.

5.0 Issue 3 – Coastal Erosion Area Maps

5.1. Explanation

The Stage Two technical report identifies the CEHZ at Waihi Beach and Pukehina as lines on maps. Three options are considered for how to use these lines to identify the Coastal Erosion Areas (Primary and Secondary Risk) on the District Plan Maps. The land which is identified on the District Plan Maps will determine what land will be subject to the rules of Section 8 – Natural Hazards.

5.2. Option 1 - All properties (whether entirely or partially within a CEHZ in the Stage Two technical report) to be shown as Coastal Erosion Area in their entirety on the District Plan Maps.

Note: This option is the status quo of right aligning lines to the landward edge of property boundaries as discussed in Section 1.2 of this report.

Change to the District Plan – First Review – 27 August 2015 Page 12 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Benefits . Identifies at least 100 years of land at risk to coastal erosion so meets the requirements of the NZCPS. . Notifies landowners/buyers of risk in areas where this has been identified. . District Plan rules can be put in place to deal with risk in those areas where there is risk. . Rules will be easier for landowners to understand and for Council staff to administer if they apply to a whole property i.e. avoids possible confusion over what rules apply if a proposed dwelling crosses between Primary Risk, Secondary Risk, or areas not at risk. Costs . Not entirely accurate as it identifies ‘extra’ land not identified in the Stage Two technical report as being at risk. . Incorrectly notifies landowners/buyers of risk in areas where this has not been identified. . District Plan rules will affect a landowner’s use of their property. . District Plan rules that apply to ‘extra’ land will affect a landowner’s use of their property unnecessarily. . For any land identified at risk to a natural hazard, there may be real or perceived impacts on property values and sales and the ability to get insurance. Identifying ‘extra’ land in this case will create unnecessary concerns for landowners in this regard. Effectiveness/ . Effective as it identifies the land which is at risk Efficiency within 100 years and ensures that rules can be applied in those areas to deal with that risk. . Not efficient as it identifies some land not at risk. This unnecessarily restricts the use of such land and/or could lead to extra costs to comply. It also could lead to real or perceived effects on property values and sales and the ability to get insurance. Council staff will also spend time on processing applications where there is no risk.

5.3. Option 2 – Same as for Option 1 but exclude properties which only have a ‘minor’ portion identified within a CEHZ in the Stage Two technical report.

Note: This option was suggested by a number of landowners during the consultation period.

Change to the District Plan – First Review – 27 August 2015 Page 13 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Benefits . Avoids concerns for some landowners with respect to District Plan rules or any real or perceived impacts on property values and sales and the ability to get insurance. Costs . Identifies less than 100 years of land at risk to coastal erosion so fails to meet the requirements of the NZCPS. . Not entirely accurate as it fails to identify some land identified in the Stage Two technical report as being at risk. . Fails to notify some landowners/buyers that these areas are at risk. . Would not allow District Plan rules in these areas so would fail to deal with the risk. . Difficult to define what a ‘minor’ portion is. . Issues of fairness will arise when a ‘cut off point’ excludes some properties but includes others. Effectiveness/ . Not effective as it fails to identify all land which Efficiency is at risk within 100 years and District Plan rules cannot be applied to deal with the risk in any excluded areas. . Not efficient as overlooking this now will require changes to be made later.

5.4. Option 3 – Only those parts of properties identified as being within a CEHZ in the Stage Two technical report to be shown as Coastal Erosion Area on the District Plan Maps.

Note: This option was also suggested by a number of landowners during the consultation period. It is a significant change from the status quo.

Change to the District Plan – First Review – 27 August 2015 Page 14 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Benefits . Identifies 100 years of land at risk to coastal erosion so meets the requirements of the NZCPS. . Entirely accurate with the Stage Two technical report. . Correctly notifies landowners/buyers of the areas at risk. . District Plan rules will only apply to those parts of properties at risk. Costs . Associated District Plan rules will affect a landowner’s use of their property. . Possible confusion over what rules apply if a proposed dwelling crosses between Primary Risk, Secondary Risk, or areas not at risk. . For any land identified at risk to a natural hazard, there may be real or perceived impacts on property values and sales and the ability to get insurance. Effectiveness/ . Effective as it identifies the land which is at risk Efficiency within 100 years and ensures that rules can be applied in those areas to deal with that risk. . Efficient as it only applies to areas at risk. Avoids unnecessary restrictions, costs, and time with respect to land not at risk. Avoids any further real or perceived effects on property values and sales and the ability to get insurance. Council avoids spending time on processing applications where there is no risk.

5.5. Preferred Option

The preferred option is:

Option 3 – Only those parts of properties identified as being within a CEHZ in the Stage Two technical report to be shown as Coastal Erosion Area on the District Plan Maps.

The proposed changes to the District Plan Maps are shown in Attachment A of this report.

Change to the District Plan – First Review – 27 August 2015 Page 15 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

5.6. Reasons

This is the most accurate way of identifying land susceptible to coastal erosion over the next 100 years as it is directly based on the Stage Two technical report. It also meets the requirements of the NZCPS. Landowners and buyers will be correctly informed of which land is at risk because it will not be over or under identified. It also means District Plan rules will apply to all land at risk, but not to any land which is not at risk. This is the fairest approach and is less restrictive than the status quo. It also goes some way towards recognising landowner concerns about effects on development potential, property values and sales and getting insurance by not mapping or restricting land unnecessarily.

6.0 Issue 4 – Coastal Erosion Area Rules

6.1. Explanation

Section 8 - Natural Hazards already has some controls in place for managing coastal erosion risk. Below is a summary of the land use and subdivision rules that apply in the existing Coastal Protection Areas. This is to help readers understand the options that follow and any suggested changes.

Existing Coastal Protection Area - Primary Risk (Equivalent to Proposed Coastal Erosion Area – Primary Risk)

One dwelling per title is provided for within this area subject to resource consent (discretionary activity). Council supports applications provided that the hazard risk is addressed i.e. buildings are designed to be relocatable and are set back from the toe of the foredune as far as possible. Any additional dwellings, minor dwellings, or any accommodation or education facilities are non-complying activities meaning they are not provided for. Resource consent can still be applied for however applications are not likely to be supported. Subdivision is a prohibited activity meaning resource consent cannot even be applied for.

Existing Coastal Protection Area - Secondary Risk (Equivalent to Proposed Coastal Erosion Area – Secondary Risk)

All buildings are provided for within this area subject to resource consent (restricted discretionary activity). Council supports applications provided that the hazard risk is addressed i.e. buildings are designed to be relocatable and are set back from the hazard as far as possible. Subdivision is a non- complying activity meaning it is not provided for. Resource consent can still be applied for however applications are not likely to be supported.

Change to the District Plan – First Review – 27 August 2015 Page 16 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Existing Coastal Protection Area - Open Coastline (Renamed to Coastal Erosion Area – Rural)

All buildings are provided for within this area subject to resource consent (discretionary activity). Council supports applications provided that the hazard risk is addressed i.e. buildings are designed to be relocatable and are set back from the hazard as far as possible. Subdivision is a discretionary activity meaning it is provided for subject to hazard risk being addressed.

Review/Options

The existing rules succeed in ensuring that new buildings are ‘hazard proofed’. However, the rules also allow resource consent applications to be made for subdivision and development which if approved can lead to other issues such as putting more people/buildings at risk or affecting the ability to relocate buildings.

In situations where beachfront dwellings need to be shifted further back from the toe of the foredune, there may not be sufficient space if there is another dwelling on the same property. In situations where the dwelling furthest from the road needs to be removed from the property altogether, this will be difficult if the dwelling closest to the road is not designed to be relocatable or is on a separate title (as this relies on the other landowner removing their dwelling first). The same applies for allowing minor dwellings and accommodation and education facilities for more than four people.

Option 1 looks at keeping the existing rules in place, while Options 2 and 3 look at changing the rules to prohibit subdivision and land use activities that may lead to intensification and relocation access issues. Options 4 and 5 are about allowing subdivision and conversions to cross lease titles to freehold titles where these issues can be avoided.

6.2. Option 1 – No changes to existing rules

Benefits . Existing rules are familiar to all plan users. . Existing rules already provide a level of protection for people and buildings against coastal erosion. . Maintains landowners’ expectations of development potential and avoids creating new or additional concerns regarding property values and sales and getting insurance. Costs . Existing rules provide for an increase in the number of people and buildings in areas at risk to coastal erosion. . Multiple dwellings or buildings on a site can also affect the ability to relocate those buildings furthest away from the road and affect the ability to shift buildings back if the toe of the foredune moves inland. . Will result in larger overall costs over the long term. . Existing rules allowing resource consent applications for non-complying subdivision and

Change to the District Plan – First Review – 27 August 2015 Page 17 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

land use are misleading and may lead to unnecessary costs as it is most likely that applications will be declined. Effectiveness/ . Not fully effective. While the existing rules Efficiency ensure individual buildings are set back from the hazard and designed to be relocatable, they also allow intensification which increases the number of people and buildings at risk and affects relocation. . Inefficient as allowing intensification will lead to planning difficulties and greater costs for landowners later on.

6.3. Option 2 – Prohibit the following development in all coastal erosion areas

. additional dwellings . minor dwellings . accommodation facilities (for more than four people) . education facilities (for more than four people)

Benefits . Avoids intensification which leads to an increase in the number of people and buildings in areas at risk. . Limits further relocation access issues associated with having multiple buildings on-site. . Reduces costs for landowners over the long term. . Prohibiting additional dwellings is consistent with the intention of the subdivision restrictions. . Within the Primary Risk Area, it removes uncertainty over whether these buildings (currently non-complying) would be allowed or not. Costs . Will reduce development potential for those properties where such activities are currently provided for. There may also be real or perceived impacts on property values and sales. Effectiveness/ . Effective as it avoids further intensification and Efficiency relocation access issues. . Efficient as it reduces planning difficulties and costs to landowners over the long term.

6.4. Option 3 – Prohibit subdivision of any titles which are entirely identified within a Coastal Erosion Area

Benefits . Avoids creating new lots and therefore intensification which leads to an increase in the number of people and buildings in areas at risk. . Prevents any further relocation access issues associated with having multiple buildings on-site. . Reduces costs for landowners over the long term. . Within the Secondary Risk Area, it removes uncertainty over whether a subdivision (currently non-complying) would be allowed or not. Change to the District Plan – First Review – 27 August 2015 Page 18 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

. Makes subdivision rules consistent between all Coastal Erosion Areas, rather than being prohibited, non-complying or discretionary. Costs . Will reduce development potential for those properties where such activities are currently provided for (open coastline hazard area only). . There may also be real or perceived impacts on property values and sales. Effectiveness/ . Effective as it avoids further intensification and Efficiency relocation access issues. . Efficient as it reduces planning difficulties and costs to landowners over the long term.

6.5. Option 4 – Allow resource consent applications for subdivision of any title which is only partially identified within a Coastal Erosion Area subject to the following matters;

. There will be no increase in the number of titles in the Coastal Erosion Area . Approved house sites are to be created outside of the Coastal Erosion Area . New title boundaries and approved house sites will not affect the relocatability of any existing or new buildings on the property

Benefits . Recognises that some titles may only have a very small portion of coastal erosion area identified and could possibly be subdivided without leading to intensification or creating relocation issues. . Matters of discretion ensure applications can be declined where intensification or relocation access issues could result. . Avoids unnecessary concerns relating to development potential and property values and sales. Costs . None Effectiveness/ . Effective and efficient as it could still allow Efficiency subdivision in cases where this would not lead to intensification or relocation access issues.

6.6. Option 5 – Allow controlled activity subdivision for conversion of fully developed cross lease titles to freehold titles

Note: The conversion of cross lease title to freehold title falls within the definition of subdivision under the Resource Management Act so would default to prohibited in the Coastal Erosion Area - Primary Risk, non- complying in the Coastal Erosion Area - Secondary Risk, and discretionary in the Coastal Erosion Area – Rural.

Benefits . Allows landowners to convert to a less complicated form of land tenure. . Will not result in intensification because both titles must already be fully developed. This also relies on proposed rules prohibiting additional dwellings and minor dwellings. . Will not create any new relocatability issues. Change to the District Plan – First Review – 27 August 2015 Page 19 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

These will already exist as the dwellings will already be in place and in different ownership. Costs . None Effectiveness/ . Effective at allowing conversion of cross lease to Efficiency freehold title without leading to intensification. . More efficient form of land tenure for landowners.

6.7. Preferred Options

The preferred options are 2, 3, 4 and 5.

The proposed changes to Section 8 – Natural Hazards are shown in Attachment B of this report.

6.8. Reasons

The rule changes avoid intensification within areas at risk to coastal erosion over the next 100 years. This will lead to fewer people and buildings being put at risk and will reduce costs to landowners over the long term. The rule changes also prevent multiple dwellings on-site so will avoid any further access issues with relocating buildings off-site.

7.0 Issue 5 – Coastal Erosion Area Access Yard

7.1. Explanation

The District Plan Maps currently show a 6m wide ‘access yard’ at the back of Secondary Risk properties adjoining the landward side of Shaw, Loop and Broadway Roads. The reason for these access yards is to provide alternative legal vehicle access if ever those roads are inaccessible due to coastal erosion. In the case of the Shaw Road access yard, 10 Edinburgh Street is also included to provide access onto Edinburgh Street. Resource consent is required for any building/structure within an access yard so that Council can ensure that future access is not compromised.

The owner of 10 Edinburgh Street approached Council staff earlier this year with a request for the access yard to be removed from ‘going through’ the dwelling because of its implications on selling the property. Council staff met with the owner to discuss this request and to look at alternative options and in doing so highlighted other issues with the alignment of the access yard. One issue is that the current alignment goes through and is therefore already blocked by the dwelling on 10 Edinburgh Street. Other issues are that the access yard goes through part of the dwelling at 72 Shaw Road and 74 Shaw Road is overlooked so will have no alternative legal access if ever needed. Council staff drafted a possible re-alignment to resolve those issues. This is shown below.

Change to the District Plan – First Review – 27 August 2015 Page 20 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Council staff then contacted and met with the owners of 72 and 74 Shaw Road to get their feedback. Both owners opposed the re-alignment because of a number of concerns relating to loss of development options, impacts on property values and sales, and whether the land is suitable for the construction of a road.

7.2. Option 1 – No change

Benefits . Acknowledges the concerns of the landowners at 72 and 74 Shaw Road regarding loss of development options and impacts on property values and sales. Costs . The access yard will continue to go through the dwelling at 10 Edinburgh Street. This blocks the access yard for all those who may depend on it in the future. It also is causing concerns for the landowner regarding selling the property. . The access yard will continue to go through part of the dwelling at 72 Shaw Road. This blocks part of the access yard and may also cause concerns about loss of development options and impacts on property values and sales. . 74 Shaw Road is left with no alternative legal vehicle access if this is ever needed. Effectiveness/ . Not effective as there is no clear access onto Efficiency Edinburgh Street for any of the properties that may depend on this access yard if ever Shaw Road is lost to coastal erosion. . Not efficient as it may lead to extra planning difficulties and costs to landowners in the future. May lead to arguments in the future over access.

Change to the District Plan – First Review – 27 August 2015 Page 21 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

7.3. Option 2 – Re-alignment

Benefits . The access yard is largely removed from the dwelling at 10 Edinburgh Street. It is removed from the elevated part of the site desired for views. This clears the access yard for all those who may depend on it in the future. It also removes part of the concern for the landowner regarding selling the property. . The access yard will no longer go through part of the dwelling at 72 Shaw Road. This clears that part of the access yard and may also resolve concerns about loss of development options and impacts on property values and sales. . 74 Shaw Road is given alternative legal vehicle access if this is ever needed. . The access yard is 3m either side of the property boundary so is a fair split between neighbours. Costs . The owner of 10 Edinburgh Street may still have concerns about the access yard going through part of the dwelling. . Does not address the concerns of the landowners at 72 and 74 Shaw Road regarding loss of development options and impacts on property values and sales. Effectiveness/ . Effective as it provides clear access onto Efficiency Edinburgh Street for any of the properties that may depend on this access yard if ever Shaw Road is lost to coastal erosion. . Efficient as it minimises planning difficulties and costs to landowners in the future. Will not lead to arguments in the future over access.

7.4. Preferred Option

The preferred option is Option 2 – the re-alignment.

Amend District Plan Map U04 as shown in Attachment A of this report.

7.5. Reasons

The re-alignment clears the access yard for those properties that may depend on it if ever Shaw Road is lost to coastal erosion. This provides a long term benefit for future landowners. It also resolves particular issues for each of the three properties. It largely removes the access yard from the dwelling at 10 Edinburgh and moves it to the non-elevated part of the site. It removes the access yard from the dwelling at 72 Shaw Road. It also allows 74 Shaw Road to have future legal access. The positioning of the access yard 3m on either side of the property boundary reduces the possible level of restriction on the properties at 72 and 74 Shaw Road.

Change to the District Plan – First Review – 27 August 2015 Page 22 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

8.0 Issue 6 – Coastal Inundation Area Maps

8.1. Explanation

The Stage Two technical report identifies the CIHZ at Waihi Beach and Pukehina as areas on maps. Just one option is considered for how to identify the Coastal Inundation Areas in the District Plan. That is to adopt the areas from the Stage Two technical Report. The land which is identified in the District Plan will be subject to the rules of Section 8 – Natural Hazards.

8.2. Option 1 – Show the areas as identified in the technical report.

Benefits . Identifies 100 years of land at risk to coastal inundation so meets the requirements of the NZCPS. . Entirely accurate with the Stage Two technical report. . Correctly notifies landowners/buyers of the areas at risk. . District Plan rules will only apply to those parts of properties at risk. Costs . Associated District Plan rules will affect a landowner’s use of their property. . Possible confusion over what rules apply if proposed dwelling crosses between an area of land identified and an area of land not identified. . For any land identified at risk to a natural hazard, there may be real or perceived impacts on property values and sales and the ability to get insurance. Effectiveness/ . Effective as it identifies the land which is at risk Efficiency within 100 years and ensures that rules can be applied in those areas to deal with that risk. . Efficient as it only applies to areas at risk. Avoids unnecessary restrictions, costs, and time with respect to land not at risk. Avoids any further real or perceived effects on property values and sales and the ability to get insurance. Council avoids spending time on processing applications where there is no risk.

8.3. Preferred Option

Option 1 – show the areas as identified in the Stage Two technical report.

The proposed changes to the District Plan Maps are shown in Attachment A of this report.

8.4. Reasons

Controls on development are needed to ensure that people and buildings are protected from coastal inundation. Putting in place the same controls that apply to floodable areas brings a consistent approach to the

Change to the District Plan – First Review – 27 August 2015 Page 23 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

management of all areas subject to flooding in the District. It also uses rules that have already been established and tested.

9.0 Issue 7 – Coastal Inundation Area Rules

9.1. Explanation

Section 8 - Natural Hazards does not contain any controls on development that are specifically to deal with the risks of coastal inundation. Now that a Coastal Inundation Area has been identified, rules need to be put in place to ensure effects from this hazard can be avoided or mitigated.

9.2. Option 1 – Do not introduce rules

Benefits . Avoids increasing compliance costs for landowners in the short term. . Maintains landowners’ expectations of development potential and avoids creating new or additional concerns regarding property values and sales and getting insurance. Costs . Will not protect people and buildings from coastal inundation if and when this occurs. . Landowners will have increased costs over the long term if buildings are damaged or need to be removed. . Council would be negligent not to put controls in place knowing the hazard has been identified. Effectiveness/ . Not effective as it does not protect people and Efficiency buildings from coastal inundation. . Not efficient as it will lead to planning difficulties and increased costs in the future.

9.3. Option 2 – Apply the same rules that are in place for the existing floodable areas in the District Plan as follows;

Require restricted discretionary resource consent for the following activities;

. Buildings/structures . Earthworks over 5m³ . Closed board fences, retaining walls, raised gardens, concrete and block walls

Have regard to the following matters of discretion to address the hazard;

. Minimum floor levels for buildings/structures . The extent to which any activity affects the function of flow paths or the capacity of ponding areas

Change to the District Plan – First Review – 27 August 2015 Page 24 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Benefits . Protects people and buildings from the effects of coastal inundation through imposition of minimum floor levels and maintaining natural features which assist with managing flood risk. . Reduces costs to landowners over the long term. . Does not restrict the number of dwellings or buildings on-site provided they are ‘hazard proofed’. This gives certainty to landowners about development potential. . Provides a consistent approach to the management of floodable areas in the District. Costs . There will be extra compliance costs for landowners through having to obtain resource consent and meet the design requirements. Effectiveness/ . Effective at protecting people and buildings from Efficiency the coastal inundation. . Efficient as it avoids larger costs for landowners over the long term.

9.4. Option 3 – Apply the same subdivision rules that are in place for the existing floodable areas in the District Plan

Benefits . Protects people and buildings from the effects of coastal inundation through imposition of minimum floor levels and maintaining natural features which assist with managing flood risk. . Reduces costs to landowners over the long term. . Does not restrict the number of dwellings or buildings on-site provided they are ‘hazard proofed’. This gives certainty to landowners about development potential. . Provides a consistent approach to the management of floodable areas in the District. Costs . There will be extra compliance costs for landowners through having to obtain resource consent. Effectiveness/ . Effective at protection people and buildings from Efficiency the hazard. . Efficient as it avoids larger costs for landowners over the long term.

9.5. Preferred Option

The preferred options are 2 and 3.

The proposed changes to Section 8 – Natural Hazards are shown in Attachment B of this report.

9.6. Reasons

Controls on development are needed ensure that people and buildings are protected from coastal inundation. Putting in place the same controls that apply to floodable areas brings a consistent approach to the management of all areas subject to flooding in the District. It also uses rules that have already been tested.

Change to the District Plan – First Review – 27 August 2015 Page 25 of 27 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Attachment A

District Plan Maps / Legend

Change to the District Plan – First Review – 27 August 2015 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management 2-8 2-8 2-8 S24 2-8 7 S1 10 9 2-8 T 12 11 h e 14

2-8 13 T e 16 15 r r 18 a 17 c

20 T 2-8 e

19 h

19 22 e 21 24 E s 23 p 26 l 28 a n 2 30 a 32 d view Road e Sea 23 34 W 11 15 1 ( 4 4A 34 w e 19 3 5 7 9 b s 1 3 17 21 ) t 13

6A 6 S 18 24 5 4 t 10 14

r e 2 4 6 8 7B 6 8 e 16 20 22 t 12 8 10 Pacific Road 9 10 10 11 19 23 9 S1 1 3 5 7 27 13 15 17 21 25 CNR

14 61 60 12 61A 58B 59 56 52 15 58A 1 10 3 54 50 5 48 44 17 4 6 8 35 d 46 7 a 57 33 o 55 O 42 40 19 12 9 R 53 ce 51 an 38 e Vie 34 11 f w R 30 21 Hin y 47 oad 36 23 em 31A 31 F 30 45 32 28 1 oa 28 43 3 Roa 26 22A 41 26 25 5 9 d 24 7 19 41B 39 27 22 20 16 35 24 11 13 18 37 CNR 17 21 27 22 20 15 15 Fy 12A 31 29 16 29 fe R 18 17 oad 16 14 33 29 12 12 25 14 27 8 31 25 21 21 10 8 19 10 6 6 23 15 13 4 33 1 4 7 3 2 35 32 2 21 1 37 34 3 2 19 2 5 23 17 36 4 J 1 11 1A 9 e 3 38 7 3 8A 4 n 41 9 6 2 k 40 8 i 43 5 4 1 n 1 42 s 5A 5B 11 7 45 10 3 8B 6 o n 44 13 e 9 6 47 u 12 8 5 S 15 46 n 11 t 49 14 r 7 e e 48 17 v 16 10 7 10 e 51 A 13 e 12 9 t u 52 S24 19 e 15 852 55 50 18 n 53 n 11 52 21 i e 14 14 r 20 17 v a 18 16 13 e 34 54 23 A 36 M 22 19 t u 38 28 55 t 32 16 15 n 25 u 18 40 20 56 21 e 30 24 n 42 l v l 20 17 44 9 27 23 A 28 22A 58 26 a 46 22 19 e 48 26 W 24 22 29 28 25 g 60 24 21 a 39 22 31 v 41 24 27 26 23 a 43 37 30 6 S 45 35 26 11 B 28 25 55A e S 47 33 31 ca 8 49 a 1 rbo 31 30 27 c ro 27 51 13 57 h ug 29 20 3 5 h R 32 29 R 7 o 25 64 9 ad 29 23 59 o 31 20 a 16 24 d 18 18 61 8 10 14 21 ( 2 4 6 20 22 w 12 16 63 b ad 57 19 ) Brighton Ro 49 53 65 37 41 45 14 23 33 17 M 15 19 27 55 59 11 29 43 47 51 a 67 39 7 9 31 35 67 y 12 1 3 21 25 o 17 26 69 13 22 24 r 18 20 14 16 V 10 4B 10 12 13 i 71 e 4 6 w 2

8 73 11 T D47 e j Leo Street r 75 23 25 1 r 6 17 31 2 9 a c 77 15 e 4 27 29 3 7A 19 21 7B 13 4B 4A 1 5 9 11 2 79 3 17A 5 15A D 5 i 6 l 7 l 81 o 2 80B n 3 4 80A 8 9 8A S t 82 10 r 1 e 11

10A e 13 28 12 t . 1A 84 12A 2 Drive 21A 2 wns 86 15 5 Bro 1B 85 14 3 20 18 5

0 88A 17 14 12 88 16

O 10 8 4 9 87 90A D 16 6 18 T 2 90

3 22 11 89 & 92 13 20 3 16 12 0 w 17 18 / 24 Vie 18 18 14 22 0 ra 9 15 94 15-17 18 18 24 0 o 11 18 10

2 26 h 7 5 1 19 24A 2 To 13 23 8 26 5 21 19 3 30

/ 11-13 15 21 6 28A N 32 28B

H 23

17 91 4 r 34 15 2 30 P e 30A a b 19 4A 3 l D182 m m 26 13 j 1 2A 32B u 21

28 93B 7 G N 34 23 30 93C r 2A

e 11 25 o c 32 10A v 36 n 27 9 100 e 4 2 e 39 27 93A 6 c 8 i 34 29 17

L 10

31 29 l ) 38 a 31 7 wb t t ( i 36 22 Stree g 35 31 en i 33 5 12 Que 3 D 18 1 e 24 33 38 n 16 5 Z 3 a L 14 1A N h 2 I 35 1 alp 12 26 L 40 R 20 11 7 . 10 16A 51 9 1 d 851 42 8 99 28 106 100 e 44 37 4 6 2A 3 v r e s e R t h

g Waihi Beach i U01 r y

p U01 U02 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U03 U04 September 2015

C ° U01 852 S24

oad Brighton R 59 47 49 53 57 55 59 45 51 28 22 24 26 Leo Street

2 1 31 3 4A 4B 5 6 7 8A 8 9 10A 10 11

12 13 .

2 12A 14 2 15 5

3 17 0 16 O 19 D 18 1 T 21A 21

& D 2

20 3 i

3 l 12 l 3

0 o

/ 22 1 n 5 0 ue 10 24 n 0 e S Av 2 24A t rk r Pa 4 7 2 26 8 e

5 e 2

3 9 t 25 / 6 6 28A S N 28B 27 h H 8 a 11 4 30 r 2 29 w

e 30A R 13 b 32A 10 4A o

m 31 2A 32B a u 15 34 33 12 d

N ( 2A 33A w e 17 35A b

c 14 36 ) n 4 2 35 e 19 37 c i wb) L t ( e 21 l e Str 39 18 a en t ue 38 i Q 41 S24 g i 3 1 40 43B 20 D

5

Z 45 2 1A 42 43A t N ee 25 I tr

L S 44 h

. t 100 1 be 22 27 d 46 iza e 2A 3 48 El 49B 24 29 v r e s e R t h

g Waihi Beach i U02 r y

p U01 U02 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U03 U04 September 2015

C ° U02 35 36 33 31 5 7 22 93C 3 1 38 31 38 18 24 12 5 33 3 16 e 14 1A e 1 35 n v a 12 26 D182 100 40 i L 20 j H r h 2 lp 10 51 100 il 1 D 16A 851 11 7 a l 42 R 8 28 9 v s ie n 6 2A w 3

44 w 37 ) R o b 4 5B r 4 o 46 B (w 4A a 5A 39 d 99 d 106 6 48 a 7 o R h c a 10 e B 12 14 16 16A 18 18A 20B 22 24A

8 26 W ils on R ad o Ro a ch d Bea (w jD243 ihi b Wa ) 61

60

59 1/57 6/57 5/57 4/57 16 3/57 2/57 18 14 12 26 93 20 ! 28 10 50A 32 24 22 8 30 48A 95 34 7 50 ! 36 Drive 46A Ocean Breeze 53 40 38 48 17 9 4 46

19 11 44

V9 42 e 27 25

c 2 42 a

44 l 21 15 13 6 46 P 3 10 8 !95 48 2 23 53 40 29 12 50 31 id 5 47 a m 33 r 14 45 e 1 45A 35 M 16 3 t 43 n 7 e 18 c 41 s 9 20 re 2 C 11 2A 22 e 4 h T 4A 24 13 26A 15 6 26 28A 17

28 19 8B 1 !95 3 5 21 Road 23 arm 25 F 30 27 WAI_BCH 32 4 29 34 31 36 55A 33 39B 49 T 43A h 51B 38 e 41A 55 35 45 47B C 41 43 51A 53 r e 47A s 37 39A 40 c e n See also Appendix 7 42 t

44 66 60 62 56 58 64 48 52 54 46 50 48A 46A

46B-C 46D

46E

46C

. 2 2 5 3 0 O D T

&

3 0 / 0 0 2 2

5 46F 3 / N

H See also Appendix 7 r e b m u N e c n e c i L l a t i g i D

Z N I L

. d e v r e s e U01 U02 R t h

g Waihi Beach i U03 r y

p U03 U04 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U05 September 2015

C ° U03 1 38 41 43B 18 20 5 3 40 42 45 1A 43A et tre 25 2 44 S 1 eth 22 100 zab 27 46 Eli 2A 3 24 29 48 49B 4 5B 49A 26 31 4A 5A 50 51 33 6 7 52 53B 28 53A 106 9 52A 54 35 55 30 10 11A 56A 37 11 57 32 56B 12 H 13B 58A 59 39 il 13A 34 l 58B 60 14 v 15B 61 41 ie 15A 16 w 17B 36 62A 63 43 16A R o 17A 62B 18 a 65 38 45 18A d 19 64 20A 66 67 40 47 20B 21 66A 69 22 68 42 49 23 24 70 71 73 44 51 24A 25 72A 26 73 53 27 72B 75 46 S 74 h 55 29 D 77 48 a w 76 il 79 30 l 57 S24 31 o 50 50 R 32 n o S 81 a d et t 32A e r 9A tr ( t S 78 e w 34 ot e 59 Sc t 83 9 b 3A 80 ) 36 et 61 35B 85 tre 82 y S 35B lar 63 37 Hil 2 82A 4 84 65 38 39 6 8 67 41 86 10 40 54 67 8 88A 42 43A 56 69 43 88B 87 44 90 58 71 45 89 60B 46 92 60A 73 46 47 91 48 94 75 49 93 62 50 96 77 52 51A 51 53B 98 95 64 50A 40 79 54 100 53A 97 48A 66 81 50 55 32 102 46A 53 51 99 68 83 48 49 43 34 104 46 47 41 30 104A 101 70 85 44 45 106 42 28 103 87 35 Edi 72 37 31 nbu 40 D188 33A 29 rgh 89 38 j 35A St 105 74 36 25 reet 91 47 34 10 32 30A 24 33 31A 27 23A 45 19 76 93 28jD142 45A 30 23B 21 78 1 jD144 20 15 95 43 26 17 41 D14322 j 97 D143 18 2 1 j t 11 37 16 e 14 e 2A r 1 4 1A 35 12 t 9 10 S 7 4A 3 33 8 n 5 6 o l 6 3 31 l 29 i 4 5 27 D 2 23 8A 21 7 19 8B 2 10A 17 9 15 2 1 10B 13 9A 12 11 11 3 7 25 2A 14 13 5 2 9 5 15A 7A 16 1A 3 1 15B 1B 7 18 17B 1 6 5 3 3 9 20 17A 19A 7 57A 7 8 11 20A 22A 19 10 59 21 5 22 10A 49 9 oad 9 51B 55A 23 o R 12 47B 57 Ott 55 11 14 53 t 24 47A 51A cen 6 4 13 res 10 8 13 16A e C 72 74 26 6 15 45 Th 25 16B 70 2 18 68 72A 28 2 17 60 27 4 2 15 6 ce 20 19 62 64 30 la 66 32 29 8 n P 10 22 58 rso 1A 21 36 tte 17 24 36 31 Pa 12 10 1 26 23 34 19 56 3 38 33 14 S 26A 25

C 11 n 19 28 i e

t 16 l 27

40 r 18 l u 5 35 9 C 30

46D s 21 42 16 r 29 6 18 e 32 4 37 s S 2 A 7 . 44 c 23 e WAI_BCH v 7 14 32A 2 37 23 e a 31 S24 e 20 f 2 21 n o n t 34 5 19 25 r u 12 33

3 t 46 48 h 33 t e 22

0 e 36 re H 10 R St O 17 29 r 5 41 e o y 1 3A D r 24 a A 7 50 e T 8 d f 43 15 o 35 & 56 26

52 r d 3B

3 6 45 13 9 7 37A 8

0 2 / 56A P 37

0 4 47 l 40 2A 0 54 a 39 60 11 c

2 5 4 e 42 10

2 4 58 49 41A 5 62 3A 28 42A

3 41B / 6 4 51 3B 1 44 2 N 10 12 64 8 ive 3 H See also Appendix 7 12 r 32 43 2 53 D 46 T r e ry 9 30 h e 6 u 11 an b e 14 b L 14 s 11 48 us id 5A L

m D g 55 17 45 13 o u 8 An 66 o 16 5B 50 p N 19 47A 15 e 46F 20 68 25 47 18

c 52 29 15 49A n 17 e 70 21 54 49 20 c

i 51 12 18 57 29 23 19 L

15 l 13 56 22 a 74 27 t 72 21 i 11 53

g 59 7

i 58 76 14 23 24 D 96 5 55 ! 78 9 60 Z 12 23 57A 26 N e 25 I 80 61 3 riv 10 57 L 82 D 6 10 I 62 28 d 8 21 a

. r 4 84 oa 26 n 27 d 59 gb 7 64 30 e on2 3 3A 13 28 24 19 P 66 61 29 32 v L l a r 96 ! c e e s e U01 U02 R t h

g Waihi Beach i U04 r y

p U03 U04 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U05 U06 September 2015

C ° U04 72 74 27 5 7 56 58 53 22 24 96 78 76 59 11 14 55 21 23 ! 9 60 12 23 57A 26 80 e 10 25 61 3 riv 6 62 57 28 82 D 10 21 Ia rd n 84 Ra 8 27 bo 4 59 ng e 26 P 64 30 Lo o 7 19 l 96 3A 28 a 61 29 ! 2 c 3 e 66 32 C 13 24 17 31 63 r 63 4 e 9 11 68 T 34 s 15 h c 30 65 33 e 6 e 9A 22 70 L 36 65 n 13 35 o t 67 o C 8A 20 72 p i 11 37 38 t 18 69 r 67 8B 16 u 14 74 s 12 9 76 39 71 A 69A 10 40 v 7 76 e 69B 73 41 86A n 78 u 5 42 e 80 75 81 4 86B 3 2 77 43 44 S et e 97 1 re a 79 ! 9 t f 7 s S 82 o !97 ard r 45A t dw h 45B m Pla E 1 84 p eafoa ce 11 3 R oo S o L 6 86 a he 14 3A d T 48 46 8 12 1A 83 91-93 10 88 48 !97 3B 88A 85 90D 90C 90B 95-97 90 3C 87 99A 92 88 87 94 90A 3D 5 96

99B 7 98 100 3 1

102 2 104

106 108

110

112 114B

116

See also Appendix 7

WAI_BCH

128

. 2

2 122 5 3 0 O D T

&

3 0 / 0 0

2 105 2

5 118 118A 3 / N H r 126 e b m u jD175 N e c n e

c 118A i L l

a 116 t i 10 g i 118B D

Z 100 119

N 118C I L

. d e 12 v r e s e U03 U04 R t h

g Waihi Beach i U05 r y

p U05 U06 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U07 September 2015

C ° U05 24 26

28

30

32

34

36

37 T 38 h

39 e

L

o 40 41 o p 42

43 44

45A S24 83 46

85

87 87

9 5 7 100 3 11 1 P 13 Isla la Glen c 15 102 e 6 16 2 4 104 14 8 10 12

106 108 110

112

114A 116 114B

118

120

122

124

126

128

130

132 S e a 134 fo r 136 th 136A R S24 o a 138 d 140

142

144 146

148

150

152 128 154

156

158

160

See also Appendix 7 162 164B 165 WAI_BCH 166 167 166

2

169

168 . 168A 2 171 4 2 ue 1 5 en

3 v 2 173 A 0 o ak 3 3 O e M 3 u

D 6 n 6 6 5 T 4 e v & 175 8 A 170 7 3

0 n / le 177 10 9 0 an 172 12 0 H 2 1 179 12 11 2

5 174

3 3 181 14 13 / 176 N 5 16

H 178A

183 r 5A 178B 185 e 14 7 18 e b 183A u 15 en m H 180 3 v u 9 A a 187 to 17

N i

n n 14A l 182 o e e 11 B 20 c n 2 19 n A e 13 184 10 v 2A 2A 22 c 21 i e

L n 2 15 186 l u 191 24 23 a e t i 17 188 g 12 i 193 26 25 D 19 190 195 S24

Z 28 192 30 27 N 21 197A I

L 23A 30 197 199A . 119 194 d 23 25 32 e 27 196 199 201 34 v r e s e U04 R t h

g Waihi Beach i U06 r y

p U05 U06 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U07 U08 September 2015

C ° U06 17 188 191 23 19 190 193 195 26 28 25 27 21 197A 30 10 192 30 WAI_BCH 23A 197 23 194 199A 32 12 25 199 196 201 34 27 29 198 203 36 H 29A 31 200 205 38 a 38 n 31A 202 40 le 207 8 6A 40 n 33 40 A 204 42 v 209 7 See also Appendix 7 6 e 35 206A e 8 10 n nu 44 u D146 5 e e 37 206B j Av 10 4 a 4 12 1 n 12 39 208 Tu 42 14 5 6 e B u 46 41 210 211 r en 44 C e 16 Av 3 46 r a 18 s 211 213 e k er 5 43 s e rf 46 22 c r Su 7 24 e s B n 45 212 9 214A 215 48 r 20 t o 51 44 26 11 a 13 50 d 46 28 15 214 217 w 53 42 a 216 52 y 40 30 19 17 219 R 55 35 o 32 218 S 54 a R 38 e 221 d 57 33 e a e f l 34 220 o S24 23 r 223 56 R 21 t 59 31 o h 58B 119 222 a 25 R 225 29 d 27 28 o 58B 61 224 a 36 30 26 d 227 60 63 27 127 226 62A 32 229 62B 105 25 24 226 64 22 228 231 64 23 20 14 65 230 e 16 1 nu 21 18 ve 67 147 232 n A 66 19 12 rli Ma 69 10 234 235 68 17 236 8 15 125 237 70 238 13 239 72 36 S8 240 11 240 241 74 242 243 76 123 246 245 248 78 245 248 247 80 252 82 82 250 254 249 ad o 254A 251 84 R 256A n o 258 86 rt 253 e 256B m 260A 88 E 262 255 260B 257A 264 90 264A 257 266 259 92 266 261 268 270 S8a U13/1 272 263 274 276 265

278 280 282 284

3 286 1 61 288 5

!86 aiiti 61 W venue A 4 6 S8 149 151 153 d 145 147 292C oa 292D R 143 155 U13/1 i

u 296 141 86 U13/1 n 157 ! u t 139 S8 u 106 159 o 302 K 108 er 137 iv 161 304 R 104 u 110 ia 135 163 Wa 102

114

100 112 116 . 2 2 5

3 86

0 96 98 94 92

O 90 88 D T

&

3 0 / 133 82 0 K 0 84

2 o u 2 131 t 5 u 76-78 80 3 n / u N i

H R 129 r o e a b d m 12 10A u 14 127 N

e 11 10

c 8 n 125 e

c 8A i

L 9A l S a 123

t 6 i 9B e g 5 a 72 i 7

D 8 V 74

i

Z 121 s 4 70 t

N a I 3

L I 6 sl

. a nd 4 2 2 d V 4 68 e 9 ist 2 1 119 66 U13/18

v a r e s e U05 U06 R t h

g Athenree i U07 r y

p U07 U08 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U09 U10 September 2015

C ° U07 61 63

65

67

69

70 72

74

76

78

247 80 82 249 82

251 84 253 86 255 88 257A 90 B 257 r o 266 92 a 259 d 266 w 268 ue a 261 en y Av R in 94 o 270 lph a Do d 272 263 96 274 265 98

276 267 100

278 269 102 280 271 104 282 271 106 284 273 275 273A 108 3 286 277 110 1 288 5 279 112 114 enue 281 Waiiti Av 290 283 116 2 ue 6 4 292A 285 en Av 292D ore 118 292B ac 292C 298 lb A 287 300 296 302 306 302 304

. 2 2 5 3 0

O U13/1 D T

& S e 3 a

0 S24 / S8 fo 0 r 0 th 2 R 2 o 5 a 3 / U13/17 d N U13/12 H r e b m u N e c n S8a e c i L l a t i g i D

Z N I L

. d e v r e s e U06 R t h

g Athenree i U08 r y

p U07 U08 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r U09 U10 September 2015

C ° U08 24B d a o 6 R 24A m 401 lo 23A P 403 S8 21 22 405 S8 405 21 407B 20 1 407A 402 409 19 3 18 5 411 S24 404 d 17 16 a 14A o 7 413 R 9 15 13 io 11 P 415 14B 13 406 11 S8a 417 419 12 17 15 9 e 10 410 423 c 421 a 7 l 19 S11 408 412 425 P 8 5 i 6 21 21A 414A 429 o 427 n 414 3 a 4 1 429A k U13/12 416 a 3 5 431 5 7 W 7 418 23 1 3 9 1 11 13 15 26 7 420 422A 1 433 2 2 9 433 25 11 422 17 29 27 T 13 15B 424 4 a 19 ta 435 4 6 8 14 i 426 2 16 31 R 15A 6 o 17A 21 8 a 428 437 18 33 d 17 10 P 12 a 19 439 p 35 37 21 20 a 23 10 u 432 441 22 n a 39 12 434 26 h 443 i 25 14 25 R 41 16 24 o P 445 28 i 436 a 27A o 43 18 d 16A 27 447 27B R 18 30 o 45 47 32 a 31 d 20 449 29 49B 47 22 57 449 451 36 33 34 33A 49 35 51 5B 453 438 - 38 3A 53 24/29 37 5A 440 455 55 59 40 3B 7 457 1A 1B a 9 42 hu P 459 Tu la S c 11 e 461 4A e a 2 4B fo 41 r 13 t 463 442 h 6 R 43 o 465 15 a d 467 48 45 8 17 469 47 12 50 10 12 471 49 10A S 10 52 5 e 51 a 8 473 3 P C la re 54 53 c s 446 475 3 e t 448 56 477 55 1 479 58 57 481 60

483 62 d 64 3 ar 485 lev 12A 1 ou 10 n B w 8 487 to 4B 452 en 6 w 4 6 Bo 2 8 489 10 491 456 12 493 14 495 11 497 499 9 501 454 503 34

458

458 508 508

508

. 2 2 5 3 0 O D T

& S10 3 0 / 0

0 490 2 2 5 3 / N H r e b m u 480 N e c n e c i L l a t i g i D 102 Z S8 !

N U13/14 I L

. d e v r e s

e U10 R t h

g Pios Beach i U11 r y

p U11 U12 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r September 2015

C ° U11 7 9

11

13

15 8 17 12 12 10 10A 10 5 51 S 8 3 e 53 a 6 3 C re 55 1 s 4 tP

l 2 57 a c 5 e 7B 7A S24 9

12A 11 3 12B 10 13 8 14 6 4B 2B 15 4 2A 4A e 17 8 6 ac 2 Pl U13/12 10 a 19 naw 18 21A 491 Ka 1 12 Te 21B S11 493 3 20 14 23 5 26 495 24B 11 25 497 9 24A 28 27 22 B 499 30 o 7 w 29 e 501 32 n 31 to 38 w 503 n 33 34 40 B 36 o 458 u 35 le 42 46 v a 44 rd 37 458 48 54B 39 50 54A 508 508 508 S 41 e 52

a 508 f o

. 56 r 45 2 508 508 th 58 43 47A

2 508 R 5 508 o 3 508 508 a 62 47B 0 508 d 60

O 508 51

D 508 508 508 508 64 49 T 66 57B & 508 53 57A

3 70

0 508 508 68B / 68A 55 59 0

0 72 74A

2 508 61 2 74B 5 490 76A 65A

3 63 / 508

N 67 76B 80 82 65B H r 78 e b m u N e c n e ad c o i R

L th r l afo a e 510 t S i S10 g i 102 S10

D ! 102 Z ! N I L

U13/13 . d e v r e s e R t h

g Pios Beach i U12 r y

p U11 U12 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r September 2015

C ° U12 !60

S24

163

S20 V14/11

S22

oe SBS6 isl led k B ar P ue en Av

1

721

719

717

S21 714 715

713 712 711 709

710

. 707 2 2

5 705 3 0 708 703 O

D 701 T

706 P & uk 699 3 704 e

0 h / in 697 0 694 a 0 P 2 ar 695 2 692 ad 5 e

3 693 /

N 690 691 H r e 689 b 688 m u 687 N

e 686 685 c n e 683 c i L

681 l 684 a t i g i 679 D 674 Z N I L

. 672 d e 670 v r e s e U151 R t h

g Pukehina i U155 r y U154 p U155 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m

o U156 r September 2015

C ° U155 695 693

691

689

687 685 686 683 681 684

679 674 677 675 672 673 669 670 671 665 667 668 659 663 666 657 661 664 651 662 660 655 649 650 653 643 648 647 646 641 645 644 637 639 642 631 635 640 638 633 627 636 634 629 625 619 632 621 622 617 620 615 611 609 616 613 603 614 607 601 593 612 605 595 587 610 599 608 597 591 585 606 589 604 583 577 Puk 594 ehin 581 a Pa 571 592 586 rade 575 573 590 588 584 580 569 567 582 578 565 563 576 561 574 572 570 559

568 557 555 566 553

564 551 549 562 547 560 545 558 543 556

554 550 539 529 548 552 546 527 525 544 523 521 538 536 519 517 540 534 515 532 513 530 511 S21 509 528 507 526 524 505 503 520 522 518 501

516 499

. 564A 512 491

2 514 2 5 3

0 510A 506 O 504 D T 502

& 508 510

3 500 0 / 0

0 498 494 2 2 5 3

/ 496 N

H 490 r e 488 b m u N e c n e c i L l a t i g i D

Z N

I 442A

L 442

. d e v r e s e

R U155 t h

g Pukehina i U156 r y

p U156 o C

n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m U157 o r September 2015

C ° U156 513 511 509 507 505

503 501 516 499 514 512 491 510A 489

506 487 485 504 502 483 481 508 500 494 479 510 498 477 475 492 496 486 484 465 490 463 461 488 482 476 474 459 457 480 455 564A 466 478 472 445 470 464 443 441 460 468 462 439

437 435 458 454 452 446 433 456 431 450 438 442A 448 444 425 436 427 430 440 434 428 422 403 401 432 399 426 420 414 395 424 397 Pu 412 k 418 eh 393 in 389 416 400 a 398 Pa 391 410 396 ra de 387 385 383 442 394 392 402 390 381 388 379 359

386 384 357 382 353 355 374 358 349 351 356 354 372 347 352 343 345 341 350 348 339 360 346 344 337 333 342 340 335 338 331 329 336 327 325 322 318 297 316 320

314 295 312 291 293 287 304 298 289 285 296

283 294

. 300

2 292 281 2

5 290 3

0 288 286 O D T

284 &

3 282 0 /

0 280 0

2 260 278 2 5 3 / N H r e b m u N

308 e c n e c i L l a t i g i D

Z N I L

. d e v r e s e R

t U156 h

g Pukehina i U157 r y

p U157 o C

n Scale 1:5000 (A4) U158 Revision Date: PC 74 w 0 50 100 150 200 250m o r September 2015

C ° U157 297

295 293

291 289 285 296 287 281 294 283 279 292 277 290 267 288 286 265 263 284 282 261 259 280 278 257 237 276 274 235 233 260 258 231 256 250 227 254 246 223 252 240 221 219 238 244 234 217 242 215 216 213 236 211 209 205 224 214 207 212 210 208 206 203 201 204 199 202 218 197 195 200 198 193 Pu ke 189 202A 196 hi 191 na 194 P 192 a ra 187 185 190 de 183 181 308 188 186 179 184 177 175 182 180 171 180A 173 178 176 169 167 174 165 163 172 170 161 159 168

158B 166 155 157 164 162 153 151 160 147

149

.

2 156 143

2 154

5 145 3 141 0 152 O

D 150 148 139 T

& 146

3 0 / 144 0 0

2 142 140 2 131 5

3 138

/ 129 N

H 136 127 r 158A e 134 b

m 132 u

N 130

e 128 c n e

c 126 i L l 124 a t i g i D

Z N I L

. 4 d e v r e s e R t

h U157

g Pukehina i U158 r y

p U158 o C n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m U159 o r September 2015 C ° U158 131 138 129 127 136 125 134 123 132 121 119 130 128 117

126 124 115 113 111 122 120 158A 109 e c 107 118 la P r 105 103 e 116 in rd 114 99 a G 101 112 95 97 110 4 108 93 106 104 89 91 102 87 100 79B 98 83 79C 96 94 79A 73 92 75 90 86 P 88 uk 71 69 67 eh 82 in a 84 80 Pa 65 63 ra de 61 78 76 72 57 70 66 55 68 53 60 58 33 50 31 62 29 46 48 27 25 52 38 36 34 23 42 21 40 26 24 19 22 20 28 17 15 4 18 13 16 6 3 14 11 5 8 12 7 10 7 9 12 5 307 C 8 14 os 11 te 6 3 16 llo C 13 18 re 4 1 s 15 20 ce nt 2 22 17 19B 24 26 19A 348

28 346

.

2 337 30

2 344

5 32 3 0 V14/15 O 341 342 D T

&

3 0 / 0 0 2 2 5

3 d / a

N o R H

r h c e a b e m B

u a n

N i 275 h e e c k

n u

e P c i L l a t i g i D

Z N I L

. d e v r e s e R

t U158 h

g Pukehina i U159 r y

p U159 o C n Scale 1:5000 (A4) Revision Date: PC 74 w 0 50 100 150 200 250m o r September 2015 C ° U159 t F o B L A ( T ( h 2 1 _ _ _ f o a h l " " " " " e ) ) l

M Reserves r

y e Significant Features Infrastructure

Structure Plan

T " " " " " m T C ! u e

_ _ _ e e o d " " " " " n h

! !! o e a r f i e d

r d m s " " " " " n g P a _ _ _

e ! t

" " " " " i

a p i l d r H r ! n e o n ! l l " " " " " e

y

i

n i _ _ _ e a a c

P

g i n " " " " " ! t n ! d ! n e h y a t " " " " " g i s c

f r _ _ _ q n R W i

e k e z u a

e d o a a w o r g e

S N C B C O O S V R R K P E S L F D A M S R W W W S R G n n t d t i a e i e F t

e 5 o d h r i r i d o i

t u i a r s t i t t n e n

o u u e e e e o

m u u r

i l i e

a a a g r S

0 r o o o n N o d a a b n o i e p r s i i p t l l s s s s a u p d t t l i u s Z w l n m l t s c t t p r r m m

w a p s s i d r i C

e t f k f l E e c a u u e e i e o i i r t m m d c f a n n t g i e o a

o t b t t e o C s / e p e H n f e c a g r r r r r r B t e r

r t m a a u C i n e

P n l d s u

( h l a a v v v d w w s t z u c n a n l w

i d e d

S

n n e

S o a a t d t c a

3 a a e e e r e A . h y l l a a o t

n - i e a a 4

A

s h l e d d e a r

n n L u d

7 e

; t c T e H H ,

R d

: f s n

i p

2 i A M t t w s c t

s s i i t

t h t c p e k i h o l e a e e 0

D r n n

e t P e a t f e p o h i e e o

e a 0 n E n e c r

e p n

& u i

r r a b

g g t 1

g E r t e r w c e r r l S a e l S & r e

l e s d

a l s o o i e i i m

i P

s t e y a

s p t t d c s L a l m b L L s t a t h s p i

n

a a a h n g y r r

e S

o o m o a s e s a a t e a a y e F i l

h g g c l q c d p a

u B l n c r e e o 8 k 2 o n n u o i e h n e e n t

f n

a n i a d

O

u i r m o a g t d d t g s a

e

S c h y l

a m S u

d F F

t e

u ) o s s i u s t E l F

e

t c d t o n

a i e u t e c c e e n u n r - k

r l r c d n o a a t e

u o v

r h t a a l a a d r

n i h i 4 r o n b e e t r l c f

o s c i p p

e e

t t s a

e e S a a m l 0 F r o u u

f t o

o o o

a e e a r s u c a i t m s a r f r f r r e r g y

n e e r s e

d

t e M e e r d a

i F F i i a C

a

o u e p c

e l

P

B a n f n a ( a e e t o B a

o

n

d i t S u n l n r a P

/ i d e

a a R l n

n

n o

H

r r

b e r 9 i a R t

p l F t t e e u a

i . s u k a n g

a u u

a i k

e R l g

h r

e e

d i n n

c n r r i /

o B ) u a i

e W n e e

s g r

a d

r

l R g

u A t s

v d a o e a

u s . , a

. t n

-

a / e t A u r

U r s r y h

r r e t

v e

t n e r

y n S a P

i u f

e a c o s o c

p c d

t r e r t

i

m u

n i v n n a

O

i r t t g e

e r y

r d a

s s

v y i .

l

n

a r h e

o n t u h a d r b e d

l

s s e a v

i a i t h c e n r a i t

n h w v d t w e y R i t o h e r i n k v s

t . h i s e i o n

D a t e :

S e p

Zones d d d d d t Zone Overlays Land Hazards e d d d d d } m d d d d d b d d d d d e d d d d d } r d d d d d

2 d d d d d 0 d d d d d 1 R I H C C A S S S S S S S F C C C C C M T T Q I F E E D F L R R M 5 n d o i l N i u l t t t t t t t l l e o o o o o o o o i u u u f o d r a e e l e e a a a a a a a s w e

i t s r m m a a a a a r r L a T o n u t n d t c c u b b b b b b b t a a s a r i n s s s s s

e i r d g s t t t i d r i i i i i i i i c m m t 1 l l u r r r k i c l l l l l l l t t t t t

e

y r t f i i i i t i i

e y i i a a a a a C u R 0 t t t t t t r a i m r t y H R c c l e e e y y y y y y

i a n e l l l l l l U 0 a i i n e B E

e t a a r r A t t d

i t P P P P P u A A A A A A y y m c c l a D n n r i s o f z n

a r b r f

A i i r r r r r r r r r r r

t i e e T T a a u a a e g

o o o o o d I P r l e e e e e e a B r s e a c l l n l r n r r e t t t t t e a a a a a a e

n

a a a d l e e e e e u t T P

d s a

n

a s B - r E n n c c c c c ------i r i a

n k o t l

t

a M o t t t t t s s d i M x ( y L G M M M M

r d i i i i i s a 2 ( n m m o o o o o u y i c

a t i

n A l R a e i i n i i ) s n n n n n

F n l n n n n n H u i i g T n n i d s s

e d o t d d d d d - - - - - s

P a i a e s s e s L a

r o e e e e s i A I O S P i i e g r r o i ) n i r n o o n d n n n n l v a n y c i s e r e n

p u p n n e e

i l B e c t A c m m U C B

e n

e s n Z

e 2 L L o S n 1 d d t e a t o s i i n i

n n a e

a n r s n C S d y e e t t l t

e i b a Y

o a o

A R B a r a a n n y r i c u s d r s e

d k f t R

k a f l B i e i n s a r e

k r 1 r i 6 e m r

( 1 )

Attachment B

Section 8 Natural Hazards

Change to the District Plan – First Review – 27 August 2015 Section 32 Report: Plan Change 74 – Coastal Erosion and Inundation A2458233 Prepared by: Tony Clow, Senior Policy Analyst Resource Management

Section Contents

Natural Hazards ...... 2 8. Natural Hazards ...... 2 Explanatory Statement ...... 2 8.1 Significant Issues ...... 3 8.2 Objectives and Policies ...... 4 8.3 Activity Lists ...... 5 8.4 Matters of Control ...... 9 8.5 Matters of Discretion ...... 10 8.6 Stability Requirements - The Minden Lifestyle Structure Plan Area ...... 14 8.7 Other Methods ...... 17

28 September 2013 Section 8 – Natural Hazards 1

Natural Hazards

8. Natural Hazards

Explanatory Statement

The Western Bay of Plenty District is subject to a range of actual or potential natural hazards which will or may adversely affect human life, property or other aspects of the environment. The principal hazards affecting the District are coastal erosion and coastal inundation (temporary flooding from storm surge), tsunami, land instability, flooding, earthquake, and volcanic eruption.

While acknowledging the Council’s statutory responsibilities, this section recognises the constraints imposed by the nature of some potential hazards affecting the Western Bay of Plenty District as well as the limitations of the level of existing information.

Areas considered most at risk from coastal erosion and coastal inundation are those already developed for urban purposes and which adjoin the open coastline (e.g. Waihi Beach (including Bowentown) and Pukehina). These stretches of coastline concerned have been the subject of a detailed study commissioned by Council. The study findings are reflected in that land identified on the District Planning Maps as being within the ‘Coastal Protection Area’ through the identification of ‘Coastal Erosion Areas’ and ‘Coastal Inundation Areas’. The Coastal Erosion Areas have been divided into primary risk and secondary risk based on 0-50 year and 50-100 year risk timeframes. There is also a ‘Coastal Erosion Area – Rural’ in place for rural zoned areas adjoining the open coastline e.g. Matakana Island and east of Pukehina.

The Coastal Protection Area has been divided into two parts, the Primary Risk Area and the Secondary Risk Area. The Primary Risk Area includes all private properties within the Coastal Protection Area that are considered to be subject to an immediate threat from coastal hazards. The Secondary Risk Area includes all land in the remainder of the Coastal Protection Area. All private property within the Secondary Risk Area is likely to be affected by coastal hazards at some future time but within the next 100 years.

The main area of known land instability is in the Minden where there exists land with the potential to slip when saturated. These and other potentially unstable areas have been identified on the District Planning Maps.

Heavy rain is a common feature of the Bay of Plenty Region and this may increase with global climate change. Low-lying areas, especially those in proximity to watercourses are at risk from inundation, scour and sedimentation. Within established urban areas land known to be susceptible to flooding exists in parts of Waihi Beach, , and Pukehina. Again, such land has been identified on the Planning Maps.

2 Section 8 - Natural Hazards 12 July 2014

Land identified on the Planning Maps as being at risk from the foregoing hazards is subject to various controls on development either through District Plan rules or other methods outside the District Plan. In many cases because of the quality of existing information such identification is very ‘broad brush’ and where more detailed study of specific areas eliminates land from the identified potential hazard then otherwise complying development will be able to proceed through the resource or building consent processes without additional restriction (e.g. consent or Section 74 Building Act 2004 notices). Nevertheless there are some areas where Council has good information on the level of hazard risk and in these areas it is considered appropriate to control the intensification of development.

The Western Bay of Plenty adjoins the Taupo Volcanic Zone and is therefore considered to be subject to a high risk from earthquakes as well as at risk from volcanic eruptions originating from outside the District. Notwithstanding the limitations of addressing these potential natural hazards through the District Plan, much is achievable in terms of public education and preparedness through other methods such as emergency management plans.

8.1 Significant Issues

1. The Western Bay of Plenty District is subject to a range of actual or potential natural hazards which will or may adversely affect human life, property or other aspects of the environment. The principal hazards affecting the District are coastal erosion, and coastal inundation, tsunami, land instability, flooding, earthquake, and volcanic eruption.

2. Areas actually or potentially under threat from such natural hazards as coastal erosion, coastal inundation, and land instability and flooding can be identified in advance. Specific areas more at risk than others from some hazards such as earthquakes and volcanic eruptions are more difficult to identify in advance and the potential effects of the hazards themselves so widespread and devastating that avoidance or control through the District Plan is not realistically possible.

3. Some areas now known to be at risk from actual or potential hazards have already been developed for urban purposes.

4. Some natural hazard avoidance, remedial, or mitigation measures have the potential to adversely impact on natural character and on significant ecological values existing within the coastal and other environments.

28 September 2013 Section 8 – Natural Hazards 3

8.2 Objectives and Policies

8.2.1 Objectives

1. Minimisation of the threat of natural hazards to human life, property and the natural and physical environment.

2. Protection of the existing natural character of the coastal environment and other natural features having recognised ecological, landscape or other significance to the District.

8.2.2 Policies

1. Adopt the best practicable options (including the ‘do nothing’ option) in the management of areas actually or potentially at risk from natural hazards and where possible adopt avoidance rather than mitigation or remedial measures.

2. Control or prevent the establishment of activities which have the potential to increase the extent to which natural hazards have or may have an adverse effect on human life or the natural or built environment.

3. Enable the development or redevelopment of land already subdivided or otherwise developed for urban purposes in areas now known to be at risk from natural hazards only where any likely adverse effects can be avoided or appropriately mitigated.

4. Ensure that new subdivision, land use activities or other development is located and designed so as to avoid the need for further hazard protection works.

5. Ensure that where hazard protection works are necessary their form, location and design are such as to avoid or mitigate potential adverse environmental effects.

6. Enable natural ecosystems in currently undeveloped areas to migrate inland as a result of dynamic coastal processes (including sea level rise as predicted by recognised national or international agencies).

7. Encourage the conservation and enhancement of natural features such as sand dunes and wetlands which have the capacity to protect existing developed land.

8. Prevent the use of concrete and block work foundations, floors and walls in the Primary Risk Area Coastal Erosion Areas.

4 Section 8 - Natural Hazards 12 July 2014

8.3 Activity Lists

The following rules apply to those activities which are located within Natural Hazard Features identified on the District Planning Maps.

Explanatory Note: For the purpose of interpretation, the Coastal Protection Erosion Area – Rural Open Coastline means land adjoining the open coastline, zoned Rural and within 100m of MHWS, and this description shall take priority over the District Planning Maps with regard to location.

8.3.1 Permitted Activities

(a) All Identified Natural Hazards

(a) (i) Buildings/Structures within an Approved Building Site – Natural Hazards.

(b) Stability Areas – Minden

(b) (i) Buildings/Structures within Stability Area - Minden C.

(c) Floodable Areas (not including Coastal Inundation Areas)

(c) (i) Buildings/Structures where evidence establishes:

- A building/structure will be located clear of the natural hazard (floodable area) irrespective of the extent of the natural hazard (floodable area) shown by the Planning Maps; or

- A building/structure will not be affected by the natural hazard (floodable area)

(b) (ii) Support poles associated with electricity lines.

(b) (iii) Uninhabited farm buildings including, but not limited to, pump sheds, implement sheds and storage sheds, provided that an appropriate notice under s73 of the Building Act has been attached to the title.

Explanatory Note Suitable evidence may include, but is not limited to, aerial photographs, site inspections from Council engineers, and engineering assessments from a suitably qualified person.

28 September 2013 Section 8 – Natural Hazards 5

8.3.2 Controlled Activities

(a) All Identified Natural Hazards

(i) Updates to cross lease flat plans which incorporate consented building developments (ii) Conversion of cross lease titles to freehold titles where each cross lease title has at least one lawfully established dwelling

(a)(b) Stability Areas – Minden

(i) Subdivision where all of the proposed privateways and building sites are within Stability Area - Minden C

8.3.3 Restricted Discretionary Activities

(a) Coastal Protection Erosion Area – Secondary Risk

(i) Buildings/Structures not within an Approved Building Site – Natural Hazards

(b) Floodable Areas and Coastal Inundation Areas

(i) Buildings/Structures not within an Approved Building Site – Natural Hazards (ii) Earthworks over 5m3 (iii) Closed board fences, retaining walls, raised gardens, concrete and block walls

(c) Stability Areas – Minden (A, B1, B2 & U)

(i) Buildings/Structures not within an Approved Building Site – Natural Hazards (ii) Subdivision, except if in accordance with 8.3.2 (a) (iii) Filling, excavation and other development (iv) Vegetation removal (v) Disposal of stormwater and wastewater

8.3.4 Discretionary Activities

(a) Coastal Protection Erosion Areas – Primary Risk and Rural Open Coastline

(i) Buildings/Structures not within an Approved Building Site (ii) Construction of new public roads

6 Section 8 - Natural Hazards 12 July 2014

(iii) Reticulated Infrastructure (iv) Coastal and river protection works including groynes and sea walls (v) Subdivision within the Coastal Protection Area - Open Coastline (vi) Buildings/Structures within the identified access yard

(b) Coastal Erosion Area – Access Yard (Waihi Beach only)

(i) Buildings/Structures

(b)(c) Floodable Areas and Coastal Inundation Areas

(i) Subdivision

(c)(d) Stability Areas – Landslip and General

(i) Buildings/Structures not within an Approved Building Site – Natural Hazards (ii) Subdivision (iii) Construction of new roads (iv) Reticulated Infrastructure

8.3.5 Non-Complying Activities

(a) Coastal Protection Area – Primary Risk

(i) Minor dwellings (ii) Additional dwellings (iii) Education Facilities for no more than four persons (iv) Accommodation Facilities for no more than four persons

(b) Coastal Protection Area – Secondary Risk

(i) Subdivision (excluding minor boundary adjustments)

(a) Coastal Erosion Areas

(i) Subdivision of titles which are partially identified within a Coastal Erosion Area, excluding;

- Minor boundary adjustments - Updates to cross lease flat plans which incorporate consented building developments as provided for in Rule 8.3.2 (a) (i)

28 September 2013 Section 8 – Natural Hazards 7

- Conversion of titles from cross lease to freehold as provided for in Rule 8.3.2 (a) (ii)

Explanatory Note: For the purpose of this rule, minor boundary adjustments means an adjustment of boundary between two adjoining lots and which will not increase the risk or potential risk to existing buildings or future buildings from coastal erosion or inundation.

8.3.6 Prohibited Activities

(a) Coastal Protection Erosion Areas

(i) Minor dwellings (ii) Additional dwellings (iii) Education facilities for more than four persons (iv) Accommodation facilities for more than four persons (v) Fixed (i.e. non-portable) solid waste management facilities including sanitary landfills and the disposal of hazardous substances (public or private) in the Primary and Secondary Risk Areas. (vi) Subdivision of titles which are wholly identified within a Coastal Erosion Area, excluding; - Minor boundary adjustments - Updates to cross lease flat plans which incorporate consented building developments as provided for in Rule 8.3.2 (a) (i) - Conversion of titles from cross lease to freehold as provided for in Rule 8.3.2 (a) (ii)

Explanatory Note: For the purpose of this rule, minor boundary adjustments means an adjustment of boundary between two adjoining lots and which will not increase the risk or potential risk to existing buildings or future buildings from coastal erosion.

(ii) Subdivision (excluding minor boundary adjustments) within the Primary Risk Area of the Coastal Protection Area. See Rule 8.3.5(b) for definition of minor boundary adjustment.

8 Section 8 - Natural Hazards 12 July 2014

8.4 Matters of Control

8.4.1 Controlled Activities – Subdivision and Buildings within Stability Area - Minden C

Council reserves control over the following matters (a) Protecting each lot and surrounding lots from instability or erosion by:

(i) Managing earthworks within the site. (ii) Controlling the location and formation of building sites, roads, accessways, tracks or privateways within the subdivision. (iii) Controlling the location and type of wastewater and stormwater treatment and disposal systems. (iv) Detailing requirements for the retention or planting of vegetation including species selection that will help stabilize any cut slope or fill batter. (v) Requiring the collecting and piping of stormwater, or its management by way of soakage or discharge to ground or to natural waterways, including the collection of roof water, as appropriate. The preference is for collection and discharge of stormwater to the base of gulleys at a rate that mimics natural catchment flow rates. (vii) Avoiding erosion or natural hazards or mitigating these hazards when they cannot be avoided;

(b) Building sites should be set back from existing waterbodies and ephemeral flowpaths to the extent that any risks to buildings from instability and flooding are avoided.

(c) For subdivision and development in the Minden Stability Areas regard shall be had to the stability information requirements in Rule 8.6.

8.4.2 Controlled Activities – Updates to cross lease flat plans and conversion of cross lease titles to freehold titles

Council reserves control over the following matters;

(a) The relevant provisions of Section 12 – Subdivision and Development.

(a) The subdivision activity performance standards and matters of control which apply to controlled activity subdivisions within the applicable zone.

28 September 2013 Section 8 – Natural Hazards 9

8.5 Matters of Discretion

8.5.1 Restricted Discretionary Activities

8.5.1.1 Coastal Protection Erosion Area – Secondary Risk

(a) Extent to which the building/structure is relocatable, taking into account the design, location of the building/structure and access to remove the building/structure.

(b) Types of building materials used, Avoidance of the use of concrete and block wall foundations, walls and flooring, except that for sheds and garages (used for non-habitable purposes) all of these are allowed other than concrete and block walls.

(c) Buildings/structures should be located as far away from the hazard as possible.

(d) Any new information or assessment undertaken by a suitably qualified person/s which confirms that the land is not in fact subject to the natural hazard concerned.

(e) The potential environmental effects of or likely to result from the proposal.

8.5.1.2 Floodable Areas and Coastal Inundation Areas

(a) The effect of the proposal (including the design of any building/structure) proposed buildings/structures on the capacity of ponding areas and function of overland flow paths.

(b) The design of the building/structure.

(b) The appropriate minimum finished floor level of the proposed building/structure.

Notes:

This is the combination of the flood level plus an additional freeboard height as stipulated in Council’s Development Code.

Council can provide specific flood levels for all Coastal Inundation Areas and for some but not all of the Floodable Areas. Where specific flood levels are unknown, applicants may be required to engage a suitably qualified engineer to undertake a flood level assessment for the property.

For Waihi Beach Floodable Areas (Planning Maps A03 and U01-U04) this shall be based on the 2% AEP (inclusive of climate change).

10 Section 8 - Natural Hazards 12 July 2014

and an additional freeboard height, as stipulated in Council’s Development Code.

(d) Verifiable new information which demonstrates that the subject site is not in fact under threat from flooding the identified hazard.

8.5.1.3 Stability Areas – Minden A, B1, B2 & U

Council shall have regard to the following matters in addition to 8.4.1:

(a) Subdivision shall be accompanied by a geotechnical report prepared by a suitably qualified person showing a building site capable of being approved and confirming as a minimum that:

(i) Earthworks required in forming each building site and access roads and/or privateways in the subdivision shall avoid or mitigate adverse effects on the stability of the land within the site and will have no adverse effects on the stability of adjacent land

(ii) Each building site will be required to be set back an appropriate distance, as recommended by a geotechnical engineer, from any terraces or steep slopes to the extent that there are no adverse effects on the stability of the land or any adjacent land.

(iii) Stormwater and wastewater systems can be constructed and operated within each lot with no adverse effects on the stability of the adjacent land.

(iv) For subdivision and development in the Minden Stability Areas regard shall be had to information requirements in Rule 8.6

8.5.2 Discretionary/Non Complying Activities

The matters in 8.4.1 and 8.5.1 and the following matters shall be used as a guide for assessing Discretionary Activities and Non-Complying Activities:

(a) Stability Areas

(i) The design, location and materials of the building/structure

(ii) The extent to which the proposal addresses any identified natural hazard.

28 September 2013 Section 8 – Natural Hazards 11

(iii) Any verifiable information which confirms that the property is in fact not under any threat from the hazard.

(iv) For subdivision and development in the Minden Stability Areas regard shall be had to information requirements in Rule 8.6.

(b) Coastal Protection Erosion Areas – Primary Risk and Rural

(i) Extent to which the building/structure is relocatable, taking into account Tthe design, location and materials of the building/structure and access to remove the building/structure.

(ii) Avoidance of the use of concrete and block wall foundations, walls and flooring, except that for sheds and garages (used for non-habitable purposes) all of these are allowed other than concrete and block walls.

(iii) The degree to which the ability of buildings or structures to be relocated is affected.

(iv) The extent to which the proposal addresses any identified natural hazard and the degree to which the physical risk to buildings/structures from coastal erosion can be avoided or mitigated.

(ii)(v) Additions and alterations to existing buildings should be landward of the existing building.

(iii)(vi) New buildings or significant redevelopment of existing buildings should be situated as far back from the toe of the foredunes as practicable. The most recent measurements of the toe of the foredune are available from Council.

(vii) Imposition of consent conditions requiring that where the toe of the foredune comes within a distance of a building/structure which may put it at immediate risk (minimum of 8m), the building/structure is to be relocated a sufficient distance back from the toe of the foredune to mitigate that risk. The distances specified in the conditions will depend on the latest scientific information available to Council.

(iv) The extent to which the proposal addresses any identified natural hazard.

12 Section 8 - Natural Hazards 12 July 2014

(viii) The impact that the proposal will have on the natural character of the coastal environment, recognising the ecological values of the dune area, and dune restoration.

(ix) Registration of an encumbrance instrument on the title to address any of the matters above.

(vi) Any verifiable information which confirms that the property is in fact not under any threat from the hazard.

(vii)(x) Scientific information from a suitably qualified coastal expert which demonstrates that the land within the Secondary Risk Area of the Coastal Protection Erosion Area is not under any actual or potential risk from coastal erosion hazard. For the purpose of meeting this rule any assessment of coastal hazards shall include those standards outlined in the Bay of Plenty Regional Coastal Environment Plan.

(viii) The degree to which the ability of buildings or structures to be relocated is affected.

(ix) The degree to which the physical risk to buildings or structures from coastal erosion can be avoided and coastal inundation can be avoided or mitigated.

(c) Coastal Erosion Areas

For subdivision of titles which are partially identified within a Coastal Erosion Area:

(i) There shall be no increase in the number of titles located (wholly or partially) within the Coastal Erosion Area.

(ii) All approved buildings sites are to be located outside of the Coastal Erosion Area.

(iii) The extent to which new title boundaries and new building sites affect the ability of any new or existing buildings/structures within the Coastal Erosion Area to be relocated.

28 September 2013 Section 8 – Natural Hazards 13

8.6 Stability Requirements - The Minden Lifestyle Structure Plan Area

The Minden Lifestyle Structure Plan area is divided into five stability risk areas i.e. A, B1, B2, C and U Stability Areas (see Planning Maps). The following provisions set out a description of each stability area followed by the stability requirements applying to development in that area.

(a) Stability Area A

Description ‘An area in which processes or factors have been identified which indicate that past or active erosion or mass movement is evident or is likely to occur and which presents or may present an identifiable hazard to structures within the delineated area’.

Area A may be summarised as land subject to or likely to be subject to instability.

Stability Assessment Building, subdivision or other development including excavation, filling, removal of vegetation (excluding noxious plants), disposal of stormwater or domestic wastewater into or over the area delineated will not be permitted unless the following documentation is produced to the satisfaction of the Council.

Geomorphological and geological evidence and a ‘stability analysis’ demonstrating that the proposed development area will not be subject to instability or be inundated by debris from upslope, and how the proposed development will ensure that any structure will not become damaged by land slippage arising on or off the site.

A stability analysis shall include:

(i) Topographical Survey (if not already available);

(ii) Definition of the nature and continuity of the strata over the whole area of land involved and to a depth below which slipping is most unlikely, by means of test pits and/or continuous recovery core drilling;

(iii) Definition of the density, effective stress shear strength parameters, residual shear strength parameters and the sensitivity of the soil in each stratum in which sliding is possible;

(iv) Definition of ground water levels and piezometric pressures in the strata during extreme infiltration conditions;

14 Section 8 - Natural Hazards 12 July 2014

(v) Analysis of possible mechanisms of failure, relevant to the specific geomorphology of the site using effective stresses;

(vi) A professional opinion as to the stability of the ground.

Even with a thorough stability analysis, complete avoidance of all risk cannot be obtained and no guarantee of safety expected.

(b) Stability Area B1

Description ‘Area B1 is land where mass movement is evident or where the slope gradient is such that instability or erosion could occur, particularly if developed’.

Area B1 may be summarised as land potentially subject to instability.

Stability Assessment Building, subdivision or other development including excavation, filling, removal of vegetation (excluding noxious plants), disposal of stormwater or domestic wastewater into or over the area delineated will not be permitted unless the following documentation is produced to the satisfaction of the Council.

Geomorphological and geological evidence and a ‘stability analysis’ as outlined in 8.6(a) demonstrating that the proposed development area will not be subject to instability or be inundated by debris from upslope, and how the proposed development will ensure that any structure will not become damaged by land slippage on or off the site.

Restrictions on and requirements for subdivision, building or other development are the same as for Area A but it shall be sufficient to demonstrate that the risks of instability and damage are at an acceptable level.

(c) Stability Area B2

Description ‘Area B2 is land where the slope gradient is such that instability is not considered likely to occur, and no mass movement is evident, but is similar to land where instability and erosion has occurred elsewhere in the Western Bay of Plenty in similar materials due to cutting and/or filling and/or on site disposal of stormwater’.

The risk of instability or erosion is greater in areas delineated B1 than B2.

28 September 2013 Section 8 – Natural Hazards 15

Area B2 may be summarised as land potentially subject to instability but less so if there is no onsite disposal of sewage or stormwater concentration, no significant vegetation removal, no significant cutting or filling.

Stability Assessment Buildings, subdivision or other development such as excavation, filling, removal of vegetation (excluding noxious plants), disposal of stormwater or domestic wastewater into or over the area delineated will be allowed to proceed only if supported by the following documentation to the satisfaction of the Council.

A ‘stability assessment’ demonstrating that the proposed development will not result in the risks of instability or damage being at an unacceptable level.

A stability assessment shall include:

(i) Topographical Survey (if not already available);

(ii) (Definition of the nature and continuity of the strata over the whole area of land involved and to a depth below which slipping is most unlikely, by means of test pits and/or drilling, and/or auguring;

(iii) Assessment of the density, relative strength and the sensitivity of the soil in each stratum in which sliding is possible;

(iv) Assessment of ground water levels and piezometric pressures in the strata during extreme infiltration conditions;

(v) A professional opinion as to the stability and instability of the ground.

A stability assessment is likely to be sufficient where there will be no significant interference with existing vegetation, no cutting or filling in excess of 0.5m in depth and no in ground disposal of stormwater runoff.

(d) Stability Area C

Description ‘Area C is land not considered to be at risk from instability. A stability analysis or stability assessment would not generally be required’.

16 Section 8 - Natural Hazards 12 July 2014

Council reserves control however over a number of matters relating to subdivision and development to ensure the protection of each lot and surrounding lots from any potential instability or erosion.

(e) Stability Area U

Description ‘Area U is land that has not undergone geotechnical analysis and therefore the risk of instability is uncertain’.

Because of this unknown risk, all subdivision and development occurring within Area U requires Restricted Discretionary resource consent and applications must be accompanied by a specific stability analysis to determine the level of risk and appropriate mitigation measures.

8.7 Other Methods

8.7.1 Building Act 2004

Where as a result of stability investigations the land in question is found to be subject to or likely to be subject to slippage, but the building work itself will not accelerate or worsen the situation or affect other land, then Council may grant a building consent subject to the title being notated that the land is subject to or is likely to be subject to slippage pursuant to Section 72 of the Building Act 2004.

This will be used to exercise control over buildings within identified hazard prone areas. Such controls may include restrictions relating to building design and damage liability. Information on known site specific potential natural hazards will be recorded on Council's Geographic Information System and provided with all Project and Land Information Memoranda.

8.7.2 Coastal Protection Works

The construction, repair and maintenance of coastal protection structures such as sea walls and the implementation of ‘dune care’ programmes will be achieved pursuant to Council’s powers under other legislation including the Reserves Act 1977 and the Local Government Act 1974.

Resource consents from the Regional Council are required for any coastal protection works within the coastal marine area (i.e. below MHWS).

8.7.3 Earthworks and Vegetation Removal

Consents to these activities are likely to be also required from the Regional Council.

28 September 2013 Section 8 – Natural Hazards 17

8.7.4 Civil Defence

Civil Defence plays an important education role. This, along with the emergency management plans is aimed at mitigating potential hazards as well as preparedness for emergencies.

18 Section 8 - Natural Hazards 12 July 2014