Board Order ABP-304807-19

Total Page:16

File Type:pdf, Size:1020Kb

Board Order ABP-304807-19 Board Order ABP-304807-19 Planning and Development Acts 2000 to 2019 Planning Authority: Kerry County Council Planning Register Reference Number: 19/381 Appeal by the Organising Committee of NMWT@Ballylongford care of Tullahinnell South, Ballylongford, Listowel, County Kerry and by Ballylongford Windfarm Group care of JOAM Consulting Limited of Harbour View, Cromane Lower, Killorglin, County Kerry against the decision made on the 6th day of June, 2019 by Kerry County Council to refuse permission to the said Ballylongford Windfarm Group for the proposed development. Proposed Development: Construct a windfarm consisting of up to six wind turbines with an overall ground to blade tip height of up to 126.5 metres. The development will also include battery units, upgrading of existing access tracks and the provision of new internal access roads, the development and improvement of existing entrances onto the public road network, the provision of a wind anemometry mast (height up to 80 metres), a peat deposition area, underground electricity cables/cabling, an electricity substation with control room and associated equipment, temporary construction compound and all ancillary site and ground works. The windfarm is located in the townlands of Aghanagran Middle, Aghanagran Lower, Ballyline West and Tullahennell South, Ballylongford, County Kerry. The development will also consist of the connection of the proposed development, via underground electricity cables, to the existing ESB substation at Kilpaddoge, Tarbert, County Kerry. The ABP-304807-19 An Bord Pleanála Page 1 of 19 underground cable will be located n the townlands of Aghanagran Lower, Ballyline West, Ballymacasy, Lislaughtin, Glancullare South, Gurteenavallig, Meelcon, Carhoona, Farranawana, Doonard Upper, Doonard Lower, Tarbert and Kilpaddoge, County Kerry. Decision GRANT permission for the above proposed development in accordance with the said plans and particulars based on the reasons and considerations under and subject to the conditions set out below. Matters Considered In making its decision, the Board had regard to those matters to which, by virtue of the Planning and Development Acts and Regulations made thereunder, it was required to have regard. Such matters included any submissions and observations received by it in accordance with statutory provisions. Reasons and Considerations The Board had regard to: (a) the European, national, regional and local policy and targets with regard to the development of alternative and indigenous energy sources (including for renewable energy and wind energy in particular) and the minimisation of emissions from greenhouse gases, (b) the provisions of the Wind Energy Development Guidelines – Guidelines for Planning Authorities issued by the Department of the Environment, Heritage and Local Government in June 2006, ABP-304807-19 An Bord Pleanála Page 2 of 19 (c) the policies of the planning authority as set out in the Kerry County Development Plan 2015-2021, including the Wind Energy Strategy for County Kerry, 2012, (d) the location of the windfarm site in an area which is identified in the development plan as an area ‘Open for Consideration’ where it is the policy of the planning authority to facilitate the development of appropriate wind energy proposals, (e) the character of the landscape in the area and the absence of any ecological designation on or in the immediate environs of the wind farm site, (f) the characteristics of the site and of the general vicinity, (g) the pattern of existing and permitted development in the area, including other windfarms, (h) the distance to dwellings and other sensitive receptors from the proposed development, (i) the Environmental Impact Assessment Report submitted, (j) the Natura impact statement submitted, (k) the full documentation submitted with the planning application and at appeal stage, (l) the appeals and observation made in connection with the planning application, and (m) the report of the Planning Inspector. Appropriate Assessment The Board considered the Screening Report for Appropriate Assessment, the Natura impact assessment and all the other relevant submissions and carried out both an appropriate assessment screening exercise and an appropriate assessment in relation to the potential effects of the proposed development on designated European Sites. ABP-304807-19 An Bord Pleanála Page 3 of 19 Stage 1 Screening Assessment The Board agreed with the screening assessment and conclusion carried out in the Inspector’s report that the Lower River Shannon Special Area of Conservation (Site Code: 002165), and the River Shannon and River Fergus Estuaries Special Protection Area (Site Code: 004077) are the European sites for which there is a likelihood of significant effects. The Board was satisfied that all other European Sites could be screened out of any further assessment, because of the nature and conservation objectives of the European Sites and the distance of the development site from the European Sites. Stage 2 Appropriate Assessment The Board considered the Natura impact statement and all other relevant submissions and carried out an appropriate assessment of the implications of the proposed development for European Sites, namely the Lower River Shannon Special Area of Conservation (Site Code: 002165), and the River Shannon and River Fergus Estuaries Special Protection Area (Site Code: 004077) in view of the sites’ conservation objectives. The Board considered that the information before it was adequate to allow the carrying out of an appropriate assessment. In completing the Appropriate Assessment, the Board considered, in particular, the following: (i) the likely direct and indirect impacts arising from the proposed development both individually or in combination with other plans or projects, (ii) the mitigation measures which are included as part of the current proposal, and ABP-304807-19 An Bord Pleanála Page 4 of 19 (iii) the conservation objectives for the European Sites. In completing the Appropriate Assessment, the Board accepted and adopted the Appropriate Assessment carried out in the Planning Inspector’s report in respect of the potential effects of the proposed development on the aforementioned European Sites, having regard to the sites’ conservation objectives. In overall conclusion, the Board was satisfied that the proposed development, by itself or in combination with other plans or projects, would not adversely affect the integrity of the European Sites in view of the sites’ conservation objectives. Environmental Impact Assessment The Board completed an environmental impact assessment of the proposed development, taking into account: (a) the nature, scale and extent of the proposed development, (b) the Environmental Impact Assessment Report (EIAR) and associated documentation submitted by the applicant in support of the planning application including at appeal stage, (c) the submissions from the planning authority, the appellants, the observer and the prescribed bodies in the course of the application and the appeal, and (d) the Planning Inspector’s report. ABP-304807-19 An Bord Pleanála Page 5 of 19 The Board considered that the Environmental Impact Assessment Report, supported by the documentation submitted by the applicant, adequately considers alternatives to the proposed development and also adequately identifies and describes the direct, indirect, secondary and cumulative effects of the proposed development on the environment. The Board agreed with the examination, set out in the Planning Inspector’s report, of the information contained in the Environmental Impact Assessment Report and associated documentation submitted by the applicant and submissions made in the course of the planning application. The Board considered and agreed with the Inspector’s reasoned conclusions, that the main significant direct and indirect effects of the proposed development on the environment are, and would be mitigated, as follows: Biodiversity There will be habitat loss due to the construction of access roads, substation, hardstanding, cable trench and felling of trees. There will be general disturbance during construction and operation phases. These will be mitigated by the mitigation measures outlined in the Construction and Environmental Management Plan (Appendix 15A Volume 2 of Environmental Impact Assessment Report), pre-construction mammal surveys, invasive species management plans, and the appointment of an Environmental Clerk of Works. Hydrology and Water Quality Potential indirect effects could be caused by the increase in run-off, such as soil erosion and sediment release into the receiving watercourses. The Construction and Environmental Management Plan, Site Drainage Management Plan (Appendix 2 Volume 2 of Environmental Impact Assessment Report) and Surface Water Management Plan, all detail the mitigation measures to be taken to mitigate any significant effect. ABP-304807-19 An Bord Pleanála Page 6 of 19 Landscape and Visual Possible cumulative impact arising from the proximity of the adjoining windfarm at Tullahennell, particularly on the R551 which forms part of the Wild Atlantic Way. It is considered, however, that the visual impact would not justify a refusal of planning permission having regard to the overall benefits of the proposed development, and in particular having regard to the context which is that of a highly moderated working landscape. The Board completed an environmental impact assessment in relation to the proposed development and concluded
Recommended publications
  • Archaeological Survey, Lislaughtin Graveyard, Ballylongford, Co. Kerry
    Archaeological Survey, Lislaughtin Graveyard, Ballylongford, Co. Kerry. September 2010 Client: The Heritage Office, Kerry County Council, County Buildings, Ratass, Tralee, Co. Kerry. RMP No.: KE003-016 Surveyors: Daire Dunne Tighearnach Dunne Contact details: 3 Lios na Lohart, Ballyvelly, Tralee, Written by: Laurence Dunne Co. Kerry. Tel.: 0667120706 E-mail: [email protected] Web Site: www.ldarch.ie Archaeological Survey, Lislaughtin Graveyard, Ballylongford, Co. Kerry. Table of Contents Introduction ............................................................................................................................................2 Site Location & Description ...............................................................................................................3 Lislaughtin Friary ..................................................................................................................................4 Medieval Lislaughtin Friary complex .............................................................................................5 Approach and parking ........................................................................................................................7 Entrance ...................................................................................................................................................8 Boundaries ..............................................................................................................................................8 Pathways .................................................................................................................................................9
    [Show full text]
  • Roinn Cosanta. Bureau of Military
    ROINN COSANTA. BUREAU OF MILITARY HISTORY, 1913-21 STATEMENT BY WITNESS. DOCUMENT NO. W.S. 967 Witness John (Jack) Lynch, Listowel, Co. Kerry. Identity. Member of Kilflynn Coy. Irish Vol's Co. Kerry, - 1913 ; Lieut. Lixnaw Coy. Irish Vol's. Co. Kerry, 1917 - . Subject. Kilflynn and Lixnaw Irish Volunteers, Co. Kerry, 1913-1921. Condition, if any, Stipulated by Witness. Nil File No S.2283 Form Statement by Mr. John (Jack Lynch, ex T.D. Listowel, County Kerry. born in Stack's hi the I was Kilflynn, Mountain, year 1891. to the I was I went local National School until 15 years of age. I first joined the Volunteers at Kilflynn when they were first formed there in the year 1913. Two Ten, ex-British soldiers named Collins and Sheehy, were the drill instructors. The strength of the Company was about 100 men. About August, 1914 our two drill instructors as well as a number of men in the Company were called up as they were on the British Army Reserve. This, as well as Redmond's call on the Volunteers to defend the shores of Ireland, was the cause of the breaking up of the Company and it ceased to exist. It was not, until early 19l7, that the Volunteers were reorganised at Learn, Lixnaw. I and a few other men in the area had got into touch with members of a Volunteer Company which had been in existence in Tralee for some time previously, so we decided to reorganise the Lixnaw Company. Our first Company Captain was Tom Shanahan.
    [Show full text]
  • Chapter 14 Cultural Heritage.Pdf
    EIAR SHRONOWEN WIND FARM Chapter 14 | CULTURAL HERITAGE 14 CULTURAL HERITAGE 14.1 INTRODUCTION This Cultural Heritage impact assessment was undertaken with regard to a proposal to construct a wind farm, known as Shronowen Wind Farm, in County Kerry. A full description of the proposed development and its components has been provided in Chapter 2 of this EIAR. This chapter assesses the impacts on the wider cultural heritage and archaeology of: • Twelve (12 No.) proposed turbines at Shronowen • Proposed Substation • Peat Deposition Areas • Two temporary site compounds • Access trackways and internal trackways • Grid connection to the adjacent 110kV OHL • Proposed alternative grid cable connection route 14.1.1 Scope of Assessment 14.1.1.1 Conventions, Legislation and Guidelines This report was undertaken with due regard to: • National Monuments Act, 1930 to 2014. • European Union (Environmental Impact Assessment) (National Monuments Act 1930) (Section 14D) (Amendment) Regulations 2020 (S.I. No. 528/2020). • Heritage Act, 1995, as amended. • European Convention on the Protection of the Archaeological Heritage (the ‘Valletta Convention’) ratified by Ireland in 1997. • Council of Europe Convention on the Protection of the Architectural Heritage of Europe (the ‘Granada Convention’) ratified by Ireland in 1997. • Framework and Principles for the Protection of the Archaeological Heritage, 1999, Department of Arts, Heritage, Gaeltacht and the Islands. • The Architectural Heritage (National Inventory) and Historic Monuments (Miscellaneous) Provisions Act, 1999, as amended. • The conservation principles as set out by International Council on Monuments and Sites (ICOMOS) in the Venice and Burra Charters. • Planning and Development Act, 2000, as amended. • The publication in 2011 of the Architectural Heritage Protection-Guidelines for Planners by the Department of the Environment Heritage and Local Government (DoEHLG).
    [Show full text]
  • Day 7 012908 Tralee
    ORAL HEARING PROPOSED LIQUEFIED NATURAL GAS (LNG) REGASIFICATION TERMINAL LOCATED ON THE SOUTHERN SHORE OF THE SHANNON ESTUARY IN THE TOWNLANDS OF RALAPPANE AND KILCOLGAN LOWER, CO. KERRY HEARD BEFORE THE INSPECTOR, MR. ANDREW BOYLE ON TUESDAY, 29TH JANUARY, 2008 AT THE BRANDON HOTEL, TRALEE, CO. KERRY - DAY 7 I hereby certify the following to be a true and accurate transcript of recordings of the evidence in the above-named action. 7 APPEARANCES KERRY COUNTY COUNCIL: MR. T. SHEEHY FOR THE APPLICANT (SHANNON LNG): MR. HUGH O'NEILL SC MR. JARLATH FITZSIMONS BL INSTRUCTED BY: NICOLA DUNLEAVY SOLICITOR MATHESON ORMSBY PRENTICE OBJECTORS: MR. J. McELLIGOTT MS. GRIFFIN MR. NOEL LYNCH MS. JOAN MURPHY MR. DONNCHA FINUCANE MS. EILEEN O'CONNOR MR. E. McELLIGOTT MRS. LILY O'MAHONY MR. RAYMOND O'MAHONY MR. TIM MAHONY MR. THOMAS O'DONOVAN MR. MICHAEL FINUCANE MR. RICHARD O'SULLIVAN MR. DES BRANIGAN COPYRIGHT: Transcripts are the work of Gwen Malone Stenography Services and they must not be photocopied or reproduced in any manner or supplied or loaned by an appellant to a respondent or to any other party without written permission of Gwen Malone Stenography Services. INDEX WITNESS EXAMINATION PAGE MR. BIGGANE - SUBMISSION 5 - 13 MR. RUSSELL - SUBMISSION 15 - 16 MR. BIGGANE - CROSS-EXAMINATION 17 - 45 MS. LYDEN - SUBMISSION (AIR QUALITY) 45 - 61 MS. LYDEN - SUBMISSION (CUMULATIVE IMPACTS) 62 - 80 MS. LYDEN - CROSS-EXAMINATION 81 - 103 MR. LYNCH - SUBMISSION 107 - 131 MR. SHEEHY - SUBMISSION 134 - 151 - CROSS-EXAMINATION 152 - 187 MS. C. GRIFFIN - CLOSING SUBMISSION 198 - 206 MS. McMULLIN - CLOSING SUBMISSION 206 - 210 MR.
    [Show full text]
  • County Project Name Promoter Name Sub-Theme LEADER Grant Amount
    County Project Name Promoter Name Sub-Theme LEADER Grant Amount Kerry "Love Lauragh" Rural Tourism Initiave Lauragh Community Council Rural Tourism €1,328.23 Kerry Abbeydorney Community Playground Abbeydorney Community Playground Basic Services for hard to reach €96,996.00 Development Committee Development Committee communities Kerry All Kerry Tourism - Movable Exhibit All Kerry Tourism Marketing CLG Rural Tourism €9,222.69 Trailer/Stand Kerry An Ghleanna De-fib Project Comhlacht Forbartha an Gleanna Basic Services for hard to reach €1,378.92 Cuideachta Faoi Theorainn Ráthaíochta communities Kerry Antique Furniture Restoration Joop Duyn & Sons Antique Furniture Enterprise Development €2,209.28 Restoration Kerry Ardfert Community Council CLG - Ardfert Community Council CLG Rural Towns €14,081.04 Feasibility Study for a Community Sports Complex in Ardfert Kerry Asbestos Roof replacement on Cromane Community Council Basic Services for hard to reach €51,585.75 Community Centre communities Kerry Austin Stacks Hurling & Football Club - Austin Stacks Hurling & Football Club Basic Services for hard to reach €35,892.00 Connolly Park Community Halls Upgrade communities Kerry Ballybunion Community Centre - Ballybunion Community Centre Basic Services for hard to reach €11,123.25 Upgrades communities Kerry Ballybunion Community Forum Clg - Ballybunion Community Forum CLG Rural Towns €6,250.00 Moya Festival Workshops Kerry Ballybunion Community Forum Ltd - Ballybunion Community Forum CLG Rural Tourism €9,633.60 Tourism Marketing Strategy Kerry Ballybunion
    [Show full text]
  • Master Dl Map Front.Qxd
    www.corkkerry.ie www.corkkerry.ie www.corkkerry.ie www.corkkerry.ie www.corkkerry.ie www.corkkerry.ie www onto log or fice of .ie .corkkerry Full listing available every week in local newspapers. local in week every available listing Full power surfing, diving, sailing, kayaking, sailing, diving, surfing, explored, it is no surprise that that surprise no is it explored, Listowel Classic Cinema Classic Listowel 068 22796 068 Tel: information on attractions and activities, please visit the local tourist information tourist local the visit please activities, and attractions on information marinas and some of the most spectacular underwater marine life to be to life marine underwater spectacular most the of some and marinas Tralee: 066 7123566 www.buseireann.ie 7123566 066 Tralee: seats. el: Dingle Phoenix Dingle 066 9151222 066 T Dingle Leisure Complex Leisure Dingle Rossbeigh; or take a turn at bowling at at bowling at turn a take or Rossbeigh; . For further For . blue flag beaches flag blue ferings at hand. With 13 of Ireland's Ireland's of 13 With hand. at ferings and abundance of of of abundance Killarney: 064 30011 064 Killarney: Bus Éireann Bus travelling during the high season or if you require an automatic car or child or car automatic an require you if or season high the during travelling Tralee Omniplex Omniplex Tralee 066 7127700 7127700 066 Tel: Burke's Activity Centre's Activity Burke's Cave Crag crazy golf in golf crazy and Castleisland in area at at area For water lovers and water adventure sport enthusiasts County Kerry has an has Kerry County enthusiasts sport adventure water and lovers water For Expressway coaches link County Kerry with locations nationwide.
    [Show full text]
  • Constituency of Kerry
    CONSTITUENCY OF KERRY REFERENDUM 36TH AMENDMENT OF THE CONSTITUTION BILL 2018 - 25TH MAY 2018 I, Padraig Burke being the Returning Officer for the Constituency of Kerry, hereby give notice of the polling stations for the constituency. 57. Ballyheigue Community Centre Ballyheigue 115. Gneeveguilla NS Gneeveguilla 171. Scoil Chillín Liath An Chillín Liath (Killeenleigh) MUNICIPAL DISTRICT: TRALEE Booth 1 (1-695) LI Booth 1 (1-462) AK (Killeenleigh NS) (354) FU Polling Polling Polling Districts & Polling 58. Ballyheigue Community Centre Ballyheigue 116. Gneeveguilla NS Gneeveguilla Station No. Station No. of Electors Letters Booth 2 (696-1408) LI Booth 2 (463-969) AK 172. Killorglin NS Killorglin 1. St Patrick NS Arabella 59. Ballylongford NS Ballylongford 117. Tooreencahill Reaboy Booth 1 (1-712) GO Ballymacelligott (523) TC Booth 1 (1-672) LK Community Centre (290) BE 173. Killorglin NS Killorglin 2. Ardfert NS Ardfert 60. Ballylongford NS Ballylongford Booth 1 (1-526) TD Booth 2 (673-1168) LK 118. Barraduff NS Headford Booth 2 (713-1456) GO (463) AS 3. Ardfert NS Ardfert 61. Kilconley NS Beale 174. Killorglin NS Killorglin Booth 2 (527-1055) TD (555) LM 119. Killcummin NS Kilcummin Booth 3 (1457-2175) GO 4. Caherleheen NS Ballyseedy 62. Killury NS Causeway Booth 1 (1-444) AT 175. Killorglin NS Killorglin Booth 1 (1-452) TF Booth 1 (1-466) LN 120. Killcummin NS Kilcummin Booth 2 (445-938) AT 5. Caherleheen NS Ballyseedy 63. Killury NS Causeway Booth 4 (2176-2474) GO Booth 2 (453-910) TF Booth 2 (467-933) LN 121. Holy Cross Mercy Primary Killarney Rural Dromin (391) SC 6.
    [Show full text]
  • 38Th Annual Report of the Registrar General for Ireland (1901)
    IY- 1+IG DETAILED AUA EO o E EGISA-GEEA (IEAI A GEEA ASAC O E UMES MARRIAGES, BIRTHS, AND DEAT S REGISTERL+'D IN IRELAND DURING THE YEAR 191 ASMIE USUA O E OISIO O AY 7 IC CA K S 3 IC CA i A & 7 IC CA 9 GRNERAL SUMMARY. POPULATION. MARRIAGES, THEIR NUMBER AND THEIR RELATION TO POPULATION, RELIGIOUS DENOMINATIONS, AGES, AND CIVIL CONDITION. BIRTHS, THEIR NUMBER AND THEIR RELATION TO POPULATION. DEATHS, THEIR NUMBER AND THEIR RELATION i o POPULATION, AGES, AND CAUSES. EMIGRATION ; WEATHER. Presented to Parliament by Command of his Mltajesty. DUBLIN: PRINTED FOR HIS MAJESTY'S ' STATIONERY OFFICE, 13Y CAI A CO 35 3 & 37 GEA SA SEE A o e ucase eie iecy o oug ay ooksee om E O &Y 11 Gao See ui ; o Es a SOISWOOE Eas aig See ee See EC a 3 Aigo See Wesmise SW ; o Ois a oY Eiug 19 [C 15] ice s EAA age —I is aaga seco ie o « 19 " ea 1 191" age 31---akeaie Uio o ' 1 " ea "5 " i as coum age 9-am Uio Maes a emaes Seeme Quae o " 1 " ea " 1" age 151----I oe i-eie causes 5 yeas coum o cc " ea " 3" COES EO GEEA SIIMM i AGE ouaio Maiages is eas a Emigaio i 191 a e eious yeas ., 1 ume o Iis egisaio Oices 2 ume o Seaces ec a e Geea egise Oice uig e yeas 1-191 • wi Amou o ees eceie 2 oceue i cases o Oeces agais e egisaio Acs 2 ae e 1 o e ouaio eesee y e Maiages is a eas egisee i eac oice a Couy i 191 3 MAIAGES ei ume i ooio io e ouaio .
    [Show full text]
  • For Inspection Purposes Only. Consent of Copyright Owner Required for Any Other Use
    For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:23:59:44 Archaeological Assessment, Dredging and Dumping Development, Tarbert Power Plant, River Shannon Estuary, Co. Kerry. Document prepared by: Boland Archaeological Services Ltd. , Arden Road, Tullamore, Co.Offaly, Tel. and Fax: 0506-41488 Mobile 087 2653468 Data Acquisition: Mr. Donal Boland Data Processing and Interpretation: Mr. Donal Boland Historical Data: Mr. Rory McNeary Geophysical survey conducted under The National Monuments Act 1930-1994: Licence No. 02R181 020120 Client: Electricity Supply Board BAS Ltd. Report Number BAS 01-01-03 For inspection purposes only. Consent of copyright owner required for any other use. Boland Archaeoloaical Services Ltd.: BAS 01-01-03 Page-2 EPA Export 26-07-2013:23:59:44 Archaeological Assessment, Dredging and Dumping Development, Tarbert Power Plant, River Shannon Estuary, Co. Kerry. CONTENTS 1. INTRODUCTION 1.1 Introduction 1.2 The Site 1.3 The Development 1.4 Historical and Archaeological Background 1.5 Sites and Monuments Record of Tarbert 1.6 Shipwrecks Listed for the Area of Tarbert 2. THE SITE SURVEY 2.1 The Site Survey Design 2.2 The Foreshore Surveys 2.3 Dredge and Dump Site Surveys 3. IMPACTS CONCLUSIONS MITIGATION 3.1 Impacts 3.2 Conclusions 3.3 Mitigation 4. BIBLIOGRAPHY For inspection purposes only. Consent of copyright owner required for any other use. 4.1 Geophysical References 4.2 Historical Sources Boland Archaeoloaical Services Ltd.: BAS 01 -01 -03 Page-3 EPA Export 26-07-2013:23:59:44 Archaeological Assessment, Dredging and Dumping Development, Tarbert Power Plant, River Shannon Estuary, Co.
    [Show full text]
  • A Socio-Economic Plan for Killorglin 2018-2021
    A Socio-Economic Plan for Killorglin 2018-2021 A Socio-Economic Plan for Killorglin 2018-2021 The Socio-Economic Plan for Killorglin 2018-2021 was commissioned by South Kerry Development Partnership CLG and Kerry County Council. Funded by the Department of Rural and Community Development, it was prepared by Ian Dempsey, Prescience, between June and September 2018. Prescience wishes to acknowledge the active contribution of the many organisations and individuals in Killorglin, who throughout the process, gave willingly of their time and who shared their perspectives, ideals and ambitions. 1 | Page A Socio-Economic Plan for Killorglin 2018-2021 Table of Contents Page Executive Summary 3 1. A Governance Model 4 2. Methodology & Process 9 3. SWOT Analysis 16 4. The Shared Vision 25 5. Objectives 27 6. A Smart Strategy for Killorglin 31 7. Resources & Funding 48 8. Monitoring, Review & 56 Evaluation 9. A Socio-economic Profile of 61 Killorglin 10. Appendices 83 2 | Page A Socio-Economic Plan for Killorglin 2018-2021 Executive Summary This socio-economic plan has been shaped by the people of Killorglin and reflects local ambition for enhanced liveability, quality of life and quality of place in the town and its environs. It has been framed within an understanding and appreciation of the town’s unique assets and resources as well as of the critical global and local trends, influences and drivers of change that will radically affect and shape social, economic, and environmental landscape in Ireland. Profound political, demographic, technological and cultural changes are reshaping Irish towns. To sustain and thrive, towns like Killorglin must deploy their assets and resources to great effect, innovating and collaborating to create a socially diverse, economically vibrant and sustainable future.
    [Show full text]
  • Appendix Iii – Non-Technical Summary
    SEA ENVIRONMENTAL REPORT APPENDIX III – NON-TECHNICAL SUMMARY FOR THE DINGLE PENINSULA VISITOR EXPERIENCE DEVELOPMENT PLAN for: Fáilte Ireland 88-95 Amiens Street Dublin 1 by: CAAS Ltd. 1st Floor 24-26 Ormond Quay Upper Dublin 7 MAY 2020 SEA Environmental Report Appendix III: Non-Technical Summary Table of Contents Section 1 Introduction and Terms of Reference ..................................................... 1 Section 2 The Plan ................................................................................................... 2 2.1 Overview ......................................................................................................................... 2 2.2 Relationship with other relevant Plans and Programmes ...................................................... 3 Section 3 The Environmental Baseline .................................................................... 5 3.1 Introduction .................................................................................................................... 5 3.2 Likely Evolution of the Environment in the Absence of the Plan ............................................ 5 3.3 Biodiversity and Flora and Fauna ....................................................................................... 5 3.4 Population and Human Health ........................................................................................... 6 3.5 Soil ................................................................................................................................. 6 3.6 Water ............................................................................................................................
    [Show full text]
  • Roinn Cosanta
    ROINN COSANTA. BUREAU OF MILITARY HISTORY, 1913-21 STATEMENT BY WITNESS. DOCUMENT NO. W.S. 1,088 Witness Patrick Sheehan, East Commons, Ardfert, Co. Kerry. Identity. Captain Ardfert Company Irish Volunteers, Co. Kerry, Subject. Ardfert Company Irish Volunteers, Co. Kerry, 1914-1921. Conditions, if any, Stipulated by Witness. Nil File No. S.2400 Form BSM2 STATEMENTBY PATRICK SHEEHAN, East Commons, Ardfert, County Kerry. I was born in East Commons, Ardfert, in March 1895. I was was of sent to Ardfert National School until I 15 years age. When I left school to workwent on father's farm. I my I joined the Volunteers when they were first formed in Ardfert in the spring of 1914. Our drill instructors were ex-British soldiers named Garrett Firnane, Martin Sullivan and Dinegan. The strength of the Company was approximately 100 men. We drilled with wooden rifles for a time. After Redmond's speech at Woodenbridge, County Wicklow, in which he called on the Volunteers to defend the shores of Ireland by joining the British Army, the Volunteers in Ardfert broke up and ceased to exist. Early in 1917 the Company was re-formed here. The strength at first was approximately 25 men. I was appointed Company Captain, John Carmody of Tubridmore became 1st Lieutenant and Jim Carmody, Tralee Road, Ardfert, became 2nd Lieutenant. We paraded and drilled three times a week and had route marches. By the end of the year our membership increased to about 55 men. I was then the chief drill instructor having at the time studied drill manuals on the subject.
    [Show full text]