YOUR BUSINESS – YOUR OPPORTUNITIES CONTENTS

1. High-Tech and Innovative Companies 2-3

2. Manufacturing companies Creation/modernization of manufacture . . . . . 4-5 Offset contract ...... 6-7. . Operating enterprises ...... 8-9 . 3. Development Transport Hub ...... 10-11. . Industrial Park ...... 12-13 . Technology Park ...... 14-15 . 4. Support of operating infrastructural complexes ...... 16-17 5. Wide number of investors Public-Private Partnership (PPP) ...... 18-19 Large-Scale investment project ...... 20-21 Social Service ...... 22-23. .

6. Financial support measures Subsidies ...... 24-25 . . Loans ...... 26-27

Annex 1. SEZ Technopolis . Land plots to be leased ...... 28-32

Annex 2. TRANSPORT HUBS to bid for ...... 33-37 HIGH-TECH SEZ Technopolis Moscow tenants are offered a number of AND INNOVATIVE COMPANIES financial incentives and non-financial services SPECIAL ECONOMIC ZONE TECHNOPOLIS MOSCOW

KEY INCENTIVES AND PRIVILEGES:

Corporate profit tax – 2% (regular rate – 20%) Property tax – 0% (regular rate – up to 2,2%) Transport tax – 0% Land tax – 0% (regular rate – up to 1,5%) Free customs zone – no taxes (import VAT), customs duties on imported foreign goods and equipment Land buyout – 1% of cadastral value (see Annex 1, pages 28-32) Legislative protection from adverse changes in federal laws on taxes and fees

SEZ TENANT STATUS MEANS:

Localization of enterprise inside of one of 5 SEZ Technopolis Moscow areas through space-lease or land-lease agreement Meeting the minimum investment, revenue and average salary level requirements

BROWNFIELD GREENFIELD KEY FIGURES Over 5 years: Over 5 years: Total investments ≥770 $/sq. m ≥3,8 mln $/ha Number of tenants – 65 Total revenue/year ≥3 100 $/sq. m ≥4,6 mln $/ha Planned investments – 748 mln $ ≥Average monthly income in Moscow Employment to be generated – 8 832 Average salary (last calendar year, according to Rosstat) AMONG THE SIGNIFICANT PROJECTS PAO «Micron» Largest Russia and CIS manufacturer and exporter of electronics Total investments – 24,3 mln $ Planned investments – 53,9 mln $ PRIORITY INDUSTRIES: Generated employment – 1 534

LLC «Bright Way Industries» Pharmaceutical manufacturer Microelectronics, Optics and Electronic Equipment Planned investments – 38,6 mln $ Energy Efficiency Employment to be generated – 368 Medtech, Medical Devices and Life Science ICT Exchange rate: 1USD=65,07 RUB Advanced Materials, Surfaces and Nanotech Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, Advanced Manufacturing 2–3 the Central Bank of the Russian Federation www.technomoscow.com/ Investor is offered a number of financial incentives in MANUFACTURING COMPANIES order to create/modernize manufacture CREATION/MODERNIZATION (through obtaining Investment Priority Project (IPP) OF MANUFACTURE status)*

*IPP status is granted through the agreement on an implementation of the investment project

INVESTOR:

on the basis of owned facilities (IPP aimed at creation of industrial complex): Provides ≥4,6 mln $ (but not less than 3,8 mln $/ha, excluding VAT) Investments in 5 years after getting IPP status

on the basis of leased facilities (IPP aimed at development of industrial production): Provides ≥4,6 mln $ (excluding VAT) Investments in 3 years after getting IPP status Meets following requirements: DEVELOPMENT CREATION OF INDUSTRIAL OF INDUSTRIAL COMPLEX PRODUCTION KEY FIGURES Total revenue/year (excluding VAT)** ≥4,6 mln $/ha ≥1 150 $/sq. m AMONG THE SIGNIFICANT PROJECTS Payroll fund/year** ≥1,5 mln $/ha ≥390 $/sq. m Formed automotive parts production (Special investment contract) ≥Average monthly income in Moscow Average salary Investor – LLC «ALPHA Automotive Technologies» (last calendar year, according to Rosstat) Planned investment in 2020 – 18,4 mln $ **indexed annually as of January 1, 2017 Meat products (Special investment contract) Investor – LLC «PC «ELIT GROUP INVEST» INVESTOR IS PROVIDED WITH PREFERENTIAL Planned investment in 2022 – 18,4 mln $ FINANCIAL TERMS: SIC on healthy food production (Special investment contract) Investor – LLC «NovaProduct AG» Corporate profit tax – 15,5% (regular rate – 20%) Planned investment in 2023 – 9,7 mln $ Property tax – 0% (regular rate – up to 2,2%) Land tax – 0,7% of assessed amount of tax Exchange rate: 1USD=65,07 RUB (currently – up to 1,5% of cadastral value) Average nominal exchange rate Land rental price – 0,01% of cadastral value 01 .01 .2019 – 01 .10 .2019, (currently – up to 1,5% of cadastral value) 4-5 the Central Bank of the Russian Federation MANUFACTURING COMPANIES Investor is offered an opportunity to localize production OFFSET CONTRACT in Moscow and sign a long-term supply contract

OFFSET CONTRACT TERMS:

Investments volume ≥15,3 mln $ Contract duration – up to 10 years Production localization in the territory of Moscow

INVESTOR IS PROVIDED WITH:

KEY FIGURES Guaranteed long-term public procurement Opportunity to be included in regional register of exclusive suppliers in case of faithful compliance with contractual Number of signed contracts – 3 obligations Planned private investments – 150 mln $ Land plots leasing at preferential rates and without AMONG THE SIGNIFICANT PROJECTS bidding (Large-Scale Investment Project) ZAO “BIOCAD” Opportunity to localize in SEZ Technopolis Moscow Production creation investments – 46 mln $ Contract duration – 10 years Moscow City support (tax incentives, financial support, etc .) Reduction of the initial price as a result of competition – 50% Production is to be localized in SEZ Technopolis Moscow

AO “R-Pharm” Production creation investments – 89 mln $ Contract duration – 10 years PROMISING AREAS FOR CONTRACTING Reduction of the initial price as a result of competition – 18,5% Production is to be localized in SEZ Technopolis Moscow Pharmaceutical and Medical Devices OOO “Gemamed” Production creation investments – 15 mln $ Municipal Equipment Contract duration – 10 years Food Production is to be localized in SEZ Technopolis Moscow Telecommunications equipment

Exchange rate: 1USD=65,07 RUB Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, 6-7 the Central Bank of the Russian Federation Operating enterprises are offered a number of financial MANUFACTURING COMPANIES incentives through obtaining one of the following special statuses: OPERATING ENTERPRISES Industrial complex Industrial park anchor resident Technology park anchor resident

SPECIAL STATUS IS AVAILABLE THROUGH MEETING THE REQUIREMENTS FOR:

Type of economic activity Moscow tax accounting For industrial complex: capital construction objects ownership or other real rights For industrial park anchor resident: location within industrial park For technology park anchor resident: location within technology park

AMONG THE ECONOMIC REQUIREMENTS:

INDUSTRIAL TECHNOLOGY INDUSTRIAL PARK ANCHOR PARK ANCHOR COMPLEX RESIDENT RESIDENT Total investments Over 5 years: Over 5 years: Over 5 years: (excluding VAT)* ≥1,5 mln $/ha ≥310 $/sq. m ≥310 $/sq. m Revenue/year ≥4,6 mln $/ha ≥3 100 $/sq. m ≥3 100 $/sq. m (excluding VAT)* Payroll fund/year* ≥1,5 mln $/ha ≥900 $/sq. m ≥900 $/sq. m ≥Average monthly income MAIN RESULTS Average salary in Moscow (last calendar ≥Average monthly income in Moscow year, according to Rosstat) (last calendar year, according to Rosstat) x 1,2 Average number of 100 None None Number of enterprises that are supported by the Moscow Government – 112 employees Number of enterprises that are granted Industrial complex status – 53 *indexed annually as of January 1, 2017.

AMONG THE RECIPIENTS OF GOVERNMENT SUPPORT • Leading Moscow enterprises (United Confectioners, MTZ «TRANSMASH», MAKIZ Pharma, Moscow Endocrine Plant, etc .) INVESTOR IS PROVIDED WITH PREFERENTIAL • Subsidiaries of international companies (Servier Rus, Pepsico, Bimbo QSR, etc .) FINANCIAL TERMS: • Generated employment >100 thous. people Corporate profit tax – 15,5% (regular rate – 20%) Property tax – up to (depends on type of status) 0% (regular rate – up to 2,2%) Land tax (for industrial complex) – 20% of assessed amount of tax Exchange rate: 1USD=65,07 RUB (currently – up to 1,5% of cadastral value) Average nominal exchange rate Land rental price (for industrial complex) – 0,3% of cadastral 01 .01 .2019 – 01 .10 .2019, value (currently – up to 1,5% of cadastral value) 8-9 the Central Bank of the Russian Federation DEVELOPMENT Investor is offered public-private partnership on TRANSPORT HUB transport hub construction

2 TYPES OF TRANSPORT HUBS:

Planar – open interceptive parking areas Extensive – a multi-level transport system with public transport stations, waiting area and commercial facilities in addition to parking areas (see Annex 2, pages 33-37)

INVESTOR:

Constructs transport hub (both commercial and technological facilities) Transfers technological facilities to the City

INVESTOR IS PROVIDED WITH:

Access to high transport and foot traffic flows Opportunity to construct commercial spaces, including KEY FIGURES office and commercial spaces Opportunity to construct residential real estate (in Number of transport hubs to be constructed under the Programme – 251 particular cases) Planned private investments – >10,7 bln $ Opportunity to sell, lease and operate office, commercial and residential spaces Current number of transport hubs under construction – 20 Opportunity to decrease (up to 75%) land rental costs Total private investments ≈2 bln $ for the 1st year (Large-scale Investment Projects, depending on the land-use density; Decree of the AMONG THE SIGNIFICANT PROJECTS Moscow Government No . 273-PP dated 25 04. .2006 “Ryazanskaya” transport hub “Improving the Procedure of Establishing Land Rent Rush-hour passenger flow forecast –111 thous. people Rates in Moscow») Planned investments ≈131 mln $

Exchange rate: 1USD=65,07 RUB Average nominal exchange rate The right of investment project realization is being 01 .01 .2019 – 01 .10 .2019, obtained on public competition 10-11 the Central Bank of the Russian Federation Industrial Park construction investor is offered DEVELOPMENT a number of financial incentives INDUSTRIAL PARK CONSTRUCTION (through obtaining IPP status)*

*IPP status is granted through the agreement on an implementation of the investment project

INDUSTRIAL PARK a complex of real estate under the single management, consisting of land plots with industrial, administrative, warehouse buildings and structures, and provided with energy carriers, engineering and transport infrastructure

INVESTOR:

Provides ≥31 mln $ (but not less than 3,8 mln $/ha, excluding VAT) Investments in 5 years after getting IPP status Meets following requirements:

Revenue/year (excluding VAT)** ≥6,9 mln $/ha Payroll fund/year** ≥1,5 mln $/ha ≥Average monthly income in Moscow Average salary (last calendar year, according to Rosstat) x 1,1

**indexed annually as of January 1, 2017

≤20 of the area of the capital construction object is KEY FIGURES taken up by non-core facilities . (stores, offices, food services etc.)

In 2019 was signed industrial park Nizhnie Kotly construction investment contract . INVESTOR IS PROVIDED WITH PREFERENTIAL Planned investments – 32 mln $ FINANCIAL TERMS:

The industrial park is intended for innovative manufacturing and R&D’s in natural and exact sciences, including nuclear medicine and radiation technologies . Corporate profit tax – 15,5% (regular rate – 20%) Property tax – 0% (regular rate – up to 2,2%) Land tax – 0,7% of assessed amount of tax Exchange rate: 1USD=65,07 RUB (currently – up to 1,5% of cadastral value) Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, Land rental price – 0,01% of cadastral value 12-13 the Central Bank of the Russian Federation (currently – up to 1,5% of cadastral value) Technology Park construction investor is offered a DEVELOPMENT number of financial incentives CONSTRUCTION OF TECHNOLOGY PARK (through obtaining IPP status)*

*IPP status is granted through the agreement on an implementation of the investment project

Technopark is an object of industrial and technological infrastructure aimed at the development of resident industrial companies

INVESTOR:

Provides ≥4,6 mln $ (but not less than 3,8 mln $/ha, excluding VAT) Investments in 5 years after getting IPP status Meets following requirements: Revenue/year (excluding VAT)** ≥9,2 mln $/ha Payroll fund/year** ≥3,1 mln $/ha ≥Average monthly income in Moscow Average salary (last calendar year, according to Rosstat) x 1,2

**indexed annually as of January 1, 2017.

KEY FIGURES INVESTOR IS PROVIDED WITH PREFERENTIAL FINANCIAL TERMS: Number of signed Technology Park Construction Investment Priority Projects (IPP) - 3 Planned investments >138,3 mln $ Corporate profit tax – 15,5% (regular rate – 20%) AMONG THE SIGNIFICANT PROJECTS Property tax – 0% (regular rate – up to 2,2%) «Calibr» technology park construction IPP Planned investments – 44,6 mln $ Land tax – 0,7% of assessed amount of tax (currently – up to 1,5% of cadastral value) “Strogino” technology park construction IPP. Extension of existing complex Land rental price – 0,01% of cadastral value Investments planned – 9,3 mln $ (currently – up to 1,5% of cadastral value)

Exchange rate: 1USD=65,07 RUB Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, 14–15 the Central Bank of the Russian Federation SUPPORT OF OPERATING Operating infrastructural complex is offered a number INFRASTRUCTURAL COMPLEXES of financial incentives

OPERATING INFRASTRUCTURAL COMPLEX IS ENTITLED TO BE GRANTED ONE OF THE FOLLOWING STATUSES:

Industrial park Technology park

IN ORDER TO BE GRANTED A STATUS INVESTOR SHOULD MEET THE REQUIREMENTS FOR:

Moscow tax accounting For industrial park: ≥50% of the area of the capital construction object is used for manufacturing activities; land plot area ≥8 ha

INDUSTRIAL PARK TECHNOLOGY PARK Total investments In 5 years: In 5 years: (excluding VAT)* ≥2,3 mln $/ha ≥0,77 mln $/ha Total revenue/ year ≥6,9 mln $/ha ≥9,2 mln $/ha (excluding VAT)* Payroll fund/year* ≥1,5 mln $/ha ≥3,1 mln $/ha ≥Average monthly income in ≥Average monthly income Moscow in Moscow Average salary (last calendar year, (last calendar year, according to Rosstat) x 1,1 according to Rosstat) x 1,2

*Indexed annually as of January 1, 2017

INVESTOR IS OFFERED A NUMBER OF FINANCIAL INCENTIVES:

Corporate profit tax – 15,5% (regular rate – 20%) Property tax – 0% (regular rate – up to 2,2%) Land tax – 0,7% of assessed amount of tax Exchange rate: 1USD=65,07 RUB (currently – up to 1,5% of cadastral value) Average nominal exchange rate Land rental price – 0,01% of cadastral value 01 .01 .2019 – 01 .10 .2019, (currently – up to 1,5% of cadastral value) 16–17 the Central Bank of the Russian Federation WIDE NUMBER OF INVESTORS PUBLIC-PRIVATE PARTNERSHIP (PPP)

PPP is offered for infrastructure investors in the following fields:

Transport infrastructure Health care facilities Education facilities Culture facilities Sports facilities

INVESTOR IS OFFERED A NUMBER OF FINANCIAL INCENTIVES* KEY FIGURES (THROUGH THE CONCLUSION OF INVESTMENT PROJECT IMPLEMENTATION AGREEMENT):

Moscow is PPP development leader in Russia Total assessment of PPP contracts concluded since 2013 >13,8 bln $ Corporate profit tax – 15,5% (regular rate – 20%) 8 Moscow cableway projects with >384 mln $ investment potential are currently under Property tax – 0% (regular rate – up to 2,2%) studying Land tax – 0,7% of assessed amount of tax (currently – up AMONG THE SIGNIFICANT PROJECTS to 1,5% of cadastral value) Northern backup highway of Kutuzovsky Prospekt construction – major inner-city road concession Land rental price – 0,01% of cadastral value (currently – Planned construction investments – 615 mln $ up to 1,5% of cadastral value) Duration of concession – 40 years *Total investment for education, culture and sports facilities ≥122,9 mln $ Length – 10,3 km in 5 years Daily traffic –47 thous. vehicles Final commissioning – 2021

Cableway between «Skhodnenskaya» and «Rechnoy vokzal» metro stations Planned construction investments – 49 mln RUB Duration of concession – 25 years Length – 23 km Passenger flow forecast –19 thous. people/day Concession agreement conclusion with public competition winner – 2019

Exchange rate: 1USD=65,07 RUB Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, 18–19 the Central Bank of the Russian Federation Investor is offered a number of financial incentives in WIDE NUMBER OF INVESTORS order to implement investment project (through the conclusion of investment project LARGE-SCALE INVESTMENT PROJECT implementation agreement)

LARGE-SCALE INVESTMENT PROJECT - significant investment project for the deployment of vacant urban land plots, aimed at increasing the number of jobs and investment amounts

REQUIREMENTS TO APPLICANTS:

The legal entity must be incorporated in Moscow Development density: not less than 4 000 sq m/ha. 75% of the facility area must be used for industrial and production processes

INVESTOR IS GRANTED:

A land plot on lease without a bidding process for 6 year constructing period Opportunity of reimbursement of 50% of costs (up to 1,5 mln $) for technological connection Personal manager

INVESTOR IS OFFERED A NUMBER OF FINANCIAL INCENTIVES (THROUGH THE CONCLUSION OF INVESTMENT PROJECT IMPLEMENTATION AGREEMENT):

Corporate profit tax – 15,5% (regular rate – 20%) Property tax – 0% (regular rate – up to 2,2%) Exchange rate: 1USD=65,07 RUB Land tax – 0,7% of assessed amount of tax Average nominal exchange rate (currently – up to 1,5% of cadastral value) 01 .01 .2019 – 01 .10 .2019, the Central Bank of the Russian Federation Land rental price – 0,01% of cadastral value 20–21 (currently – up to 1,5% of cadastral value) Social Service Investor is offered a number of financial incentives (through obtaining IPP status*) for construction/upgrading capital development projects SOCIAL SERVICE aimed at elderly population and disabled persons servicing with accommodation

*IPP status is granted through the agreement on an implementation of the investment project

INVESTOR:

Provides ≥2,6 mln $ (but not less than 3,8 mln $/ha, excluding VAT) investments in 3 years after getting IPP status Meets following requirements:

Revenue from main activity ≥90% Payroll fund/year** ≥1,5 mln $/year ≥Average monthly income in Moscow Average salary (last calendar year, according to Rosstat)

**indexed annually as of January 1, 2017.

INVESTOR IS PROVIDED WITH PREFERENTIAL FINANCIAL TERMS:

Corporate profit tax – 15,5% (regular rate – 20%) Property tax – 0% (regular rate – up to 2,2%) Land tax – 0,7% of assessed amount of tax (currently – up to 1,5% of cadastral value) Land rental price – 0,01% of cadastral value (currently – up to 1,5% of cadastral value)

Exchange rate: 1USD=65,07 RUB Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, 22–23 the Central Bank of the Russian Federation FINANCIAL SUPPORT MEASURES SUBSIDIES

EQUIPMENT:

To pay interest on loans for the purchase of certain types of equipment – up to 3,1 mln $ per year For lease payments for the purchase of certain types of equipment – up to 1,5 mln $ per year

CONSTRUCTION:

Partial reimbursement of interest on loans for creation and development of technology park and (or) industrial park property complex – up to 4,6 mln $ per year

NETWORKS:

For reimbursement of costs for technological connection to the utilities systems or increase of their technological capabilities – up to 1,5 mln $ per year per land plot (≤50% of actual costs incurred)

Exchange rate: 1USD=65,07 RUB Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, 24–25 the Central Bank of the Russian Federation FINANCIAL SUPPORT MEASURES LOANS

RECIPIENTS:

SEZ Technopolis Moscow tenants – 2% Innovative territorial clusters participants – 2% Technology and industrial parks tenants and residents – 2% Technology and industrial parks managing companies – 2% Industrial complexes – 2% Current exporters – up to 5% Companies planning to export – up to 5%

TERMS:

Loan amount – 0,077 to 3,1 mln $ Loan period – up to 5 years Interest rate – 2-5% Collateral – property pledge and guarantees/sureties Loan share in project financing – not more than 70%

INTENDED USE:

Purchase of new equipment – up to 100% of the loan amount Working capital financing to pay for raw materials, consumables and parts – up to 50% of the loan amount Refinancing loans for the purchase of new equipment – up to 70% of the principal balance R&D and PDW costs – up to 30% of the loan amount for scientific enterprises, up to 10% for other enterprises Industrial engineering services costs – up to 10% of the loan amount Acquisition of rights to results of intellectual activity – up to 10% of the loan amount Purchasing software for industrial needs – up to 30% of the loan amount for scientific enterprises,up to 10% for other enterprises Expenses for holding exhibitions, conferences and presentations (participation fee, stand construction, rental of exhibition equipment) abroad – up to 50% of the loan amount

Exchange rate: 1USD=65,07 RUB Cost of certification abroad, obtaining patents and certificates – up to 50% of the loan amount Average nominal exchange rate 01 .01 .2019 – 01 .10 .2019, Expenses for transportation of products outside the Russian Federation 26–27 the Central Bank of the Russian Federation – up to 50% of the loan amount ANNEX 1. GREENFIELD «ALABUSHEVO», SEZ TECHNOPOLIS MOSCOW. ZELENOGRAD LAND PLOTS TO BE LEASED

Alabushevo

Occupied

Vacant

21 PLOT 77:10:0003005:1001, 77:10:0003004:1005

Surface area: 0,95 ha Cadastral value: 630 000 $ Buyout price for the tenant: ≈6 300 $

22 PLOT 77:10:0003005:1005 Surface area: 0,77 ha Cadastral value: 513 000 $ Buyout price for the tenant: GREENFIELD «ALABUSHEVO» ≈5 130 $

23 PLOT 77:10:0003005:1003 29 Surface area: 0,92 ha 30 Cadastral value: 2.1 614 000 $ 31 Buyout price for the tenant: ≈6 140 $ 5 10

24 PLOT 77:10:0003005:1006

https://technomoscow .com/ Surface area: 0,5 ha Cadastral value: 21 334 000 $ 22 24 23 Buyout price for the tenant: ≈3 340 $ 28 ж/д 29 ОЭЗ «Технополис «Москва» площадка «Алабушево»

Санкт-Петербург 2,3 Административно-деловой центр

M10

Москва 0,67 га 28 «Компания 8 «ЭЛТА» Пожарное депо

Техническая зона ЛЭП ТП6 500кв 29.1 0,55 га РП5 0,3 га 29.2 Мост 1 «Исткомпис Рус»

GREENFIELD 30 1,24 га GREENFIELDТехническая «Евроклима Рус» Техническая «ALABUSHEVO», зона ЛЭП 110кв зона ЛЭП 110кв

Круговая развязка Платформа «Алабушево» ПРОЕЗД 5557 «ALABUSHEVO», ZELENOGRAD ПРОЕЗД 683 2.1 ZELENOGRAD 31 4,41 га 0,79 га «Интертрансстрой» (Х-8)

«Брайт Вэй Индастриз» КПП 2 «Р-Опра» РП6 (РФарм) (Велфарм) «ПК-137»(BIOCAD) 2.2 3 Лабораторно-промышленные корпуса 12, 13 2,13 га 1 4,5 га 3,01 га 6,65 га 0,75 га «ЦРП 4 ЭЛТЕКС-МСК» 0,88 га 1,59 7а га ПРОЕЗД 4803 7 «АйЭмТи» 0,84 га 8 «ТВК» 1,50 га ПРОЕЗД 683 Платформа «Алабушево»КПП 1 14 «НСХ РУС» 6 25

0,77 га 0,70 га 14 2,61 3,39 5 га га 1,50 га 11 Occupied 10 2,09 га Планируемый для присоединения «МПК «Миландр» земельный участок Моспромстрой

9 1,11 га 0,60 га 27 РТП7 Vacant «Рокор» 0,53 га 26 ПРОЕЗД 6029 2,11 «Термико» РТП4 15 га 0,36 га ТП2 1,24 га ПРОЕЗД 684 13 12 1,08 га 1,03 га 15 «Гринго» «НПО ЭЛАР» 0,45 га 32 14 «Объединённая электронная компания» (Гексагон) 2.1 PLOT 77:10:0003001:1078 0,42 га «ЦТБ» 1,25 га ТП3 0,79 га Дорожная сеть 33 ТП4 «Авиаль» Surface area: 4,41 ha 0,42 га РП3 Occupied 16 Cadastral value:2,02 га 2 772 000 $«СовЭлМаш» Vacant КПП 4 17 Автостоянка на 900 а/м Buyout price2,00 га for the tenant: подстанция “Сигма” РП2 «ГДЦ ЭНЕРДЖИ ≈27 720 $ГРУПП» «НИИ Микроприборов» РТП1 18 29 PLOT 77:10:0003002:1091 0,35 га 19 1,03 га 17 ООО «САПФИР- Surface area: 0,85 ha КПП 3 ИНВЕСТ» КПП 3 Among the other land plots that are20 available for leasing: Cadastral value: ЗАО НИИ ЭСТО 544 000 $ 1,06 га 21 5 10 PLOT 77:10:0003003:1001 PLOT 77:10:0003003:1010«Электроимпекс» Buyout price for the tenant: 0,95 га 19 ≈5 440 $ 22 «Диагностика М» Surface area: 1,110,77 га ha Surface area: 1,5 ha 23 УСЛОВНЫЕ ОБОЗНАЧЕНИЯ ШТ. ГА % Cadastral value:24 0,92 га Cadastral value: МОСКВ Количество земельных участков 36 47,12 100 0,50 га 961 000 $ 711 000 $ ТП1 Земельные участки занятые 78 ЦТП16 30 26 36,8 А PLOT 77:10:0003002:1096 резидентами ведущими деятельность Buyout price for the tenant: Земельные участки занятые Buyout price for the tenant: 6 4,09 9 потенциальными резидентами ≈9 610 $ ≈7 110 $ Таможенный терминал Свободные участки 4 6,23 Surface area: 1,24 ha 13 ПРОЕЗД 5371 Строящиеся и построенные объекты инфраструктуры площадки «Алабушево» Cadastral value: Запланированные к строительству объекты подстанция ОАО «МОЭСК» «СИГМА» таможенный терминал инфраструктуры площадки «Алабушево» 800 000 $ Границы охраняемой территории строительства зоны Buyout price for the tenant: ≈8 000 $

Among the other land plots that are available for leasing:

31 PLOT 77:10:0003002:1101 30 Surface area: 0,79 ha Cadastral value: 508 000 $ 31 Buyout price for the tenant: ≈5 080 $ SPACES FOR RENT. BROWNFIELD. ANNEX 2. TECHNOPOLIS MOSCOW TRANSPORT HUBS TO BID FOR

Spaces available in buildings : №5 and №24 «PYATNITSKOE SHOSSE 2» (SZAO, ) Total vacant area: ≈13 000 sq . m Spaces available: 500 to 5 000 sq . m Rush hour passenger flow forecast More info: Rental price: 75 $/sq. m «Pyatnitskoye Shosse» Bus routes 12,4 thous. people 7 thous. people

Land plot: Area within the territory plan project - 77,8 ha BUILDING №5 Area within transport hub facilities placement line - 38,2 ha Commercial property placement area - 1,87 ha

Total area: 220 000 sq . m «AMINYEVSKOYE SHOSSE» (ZAO, Ochakovo-Matveevskoye) Floor 1 Rush hour passenger flow forecast Ceiling height – 8 m (6,75 m to beam) «Aminyevskoye Shosse» Station of Moscow Bus routes More info: Floor load – not limited metro station Railways Column pitch – 12/12 62,3 thous. 15,2 thous. 39,2 thous. people people Floor 2 people Land plot: Ceiling height – 11 m (8 m to beam) Area within the territory plan project - 77,8 ha Area within transport hub facilities placement line - 24,1 ha 69,48 MWt – electric capacity available Floor load – 1,5 t/sq . m Commercial property placement area – 0,50273 ha 156 Gcal/hour – thermal capacity available Column pitch – 12/24 500 DN – piped water supply

«NOVOKOSINO» (VAO, Novokosino, Reutov) Rush hour passenger flow forecast More info: «Novokosino» Bus routes BUILDING №24 metro station 20 thous. people 8,2 thous. people Total area: 100 000 sq . m Land plot: Floor 1 Area within the territory plan project - 47,4 ha Area within transport hub facilities placement line - 24,7 ha Ceiling height – 7 m Commercial property placement area - 12,7 ha Floor load – 5 t/sq . m Column pitch – 6/12 Perimeter of the plot is surrounded by capital wall «MNYOVNIKI» (SZAO, Khoroshyovo-Mnyovniki) Floor 2 Rush hour passenger flow forecast «Mnyovniki» Bus routes More info: Ceiling height – 8,8/7 m Metro station 69,48 MWt – electric capacity available Floor load – 0,8-5 t/sq . m 7,2 thous. people 1,8 thous. people 156 Gcal/hour – thermal capacity available Column pitch – 6/12 Land plot: 500 DN – piped water supply Perimeter of the plot is without walls Area within the territory plan project - within Mnyovnikovskaya Poyma territory plan project Area within transport hub facilities placement line - 45,9 ha Commercial property placement area - 22,1 ha 32 33 «BOROVSKOYE SHOSSE» (ZAO, Novo-Peredelkino) «YUGO-VOSTOCHNAYA» (YUVAO, -)

Rush hour passenger flow forecast Rush hour passenger flow forecast More info: «Borovskoye Shosse» Bus routes More info: «Yugo-Vostochnaya» Bus routes metro station metro station 10,8 thous. people 3 thous. people 7,5 thous. people 5,1 thous. people Land plot: Area within the territory plan project - 14,8 ha Land plot: Area within transport hub facilities placement line - 11,7 ha Area within the territory plan project - 10,8 ha Commercial property placement area - 4,1293 ha Area within transport hub facilities placement line - 10,4 ha Commercial property placement area - 0,64 ha

«TIMIRYAZEVSKAYA» Link - active «PETROVSKO-RAZUMOVSKAYA» (SAO, Timiryazevskiy) (SAO, SVAO, Timiryazevskiy, Butyrskiy) Rush hour passenger flow forecast Rush hour passenger flow forecast More info: «Petrovsko-Razumovskaya» «Petrovsko-Razumovskaya» Bus routes More info: «Timiryazevskaya» «Timiryazevskaya» station Bidding: metro station station of Moscow Railways metro station of Moscow Railways 24,8 thous. people 24 thous. people 6,2 thous. 17,5 thous. people 8,5 thous. people Land plot: people Bus routes Area within the territory plan project - 54,1 ha Area within transport hub facilities placement line - 28,1 ha 7,3 thous. people Commercial property placement area - 4,23 ha

Land plot: Area within the territory plan project - 25 ha Area within transport hub facilities placement line - 14 ha Commercial property placement area - 2,00 ha «SAVYOLOVSKAYA» Link - active

(SVAO, SAO, Butyrskiy and Savelovskiy) More info: Rush hour passenger flow forecast Bidding: «MAMYRY» (NAO, Mosrentgen) «Savyolovskaya» «Moskva Savyolovskaya» Rush hour passenger flow forecast More info: metro station station of Moscow railways Metro station 7,5 thous. people 12,5 thous. people

20,4 thous. people Bus routes Land plot: 5,9 thous. people Area within the territory plan project - _ Land plot: Area within transport hub facilities placement line - 45,6 ha Commercial property placement area - 17,39 ha Area within the territory plan project - 4,5 ha Area within transport hub facilities placement line - 4,5 ha Commercial property placement area - 0,281 ha

«ALMA-ATINSKAYA» (YUAO, Brateevo) «LUKHMANOVSKAYA» (YUVAO, VAO, Vykhino-Zhulebino, Rush hour passenger flow forecast More info: -Ukhtomskiy) «Alma-Atinskaya» Bus routes Rush hour passenger flow forecast metro station More info: «Lukhmanovskaya» Bus routes 10,5 thous. people 4,7 thous. people metro station Land plot: 15,7 thous. people 12,5 thous. people Area within the territory plan project - 57,24 ha Area within transport hub facilities placement line - 8,45 ha Land plot: Commercial property placement area - 3,14 ha Area within the territory plan project - 151,4 ha Area within transport hub facilities placement line - 46,6 ha 34 35 Commercial property placement area – 9,33 ha «UL. DMITRIYEVSKOGO» (VAO, Kosino-Ukhtomskiy)

Rush hour passenger flow forecast «Ulitsa Dmitrievskogo» Bus routes More info: metro station 7,5 thous. people 1,5 thous. people «TEREKHOVO» (SZAO, Khoroshyovo-Mnyovniki) More info: Land plot: Rush hour passenger flow forecast Area within the territory plan project - 43,22 ha «Terekhovo» Bus routes Area within transport hub facilities placement line - 34,14 ha metro station Commercial property placement area – 2,56 ha 7,7 thous. people 1,1 thous. people

«PECHATNIKI» (YUVAO, Pechatniki) Rush hour passenger flow forecast «Pechatniki» «Tekstilschiki» metro Bus routes More info: «MOLODYOZHNAYA» (ZAO, Kuntsevo) metro station station (Pechatniki) More info: 12,9 thous. people 41,16 thous. people 4,8 thous. people Rush hour passenger flow forecast Land plot: «Molodyozhnaya» Bus routes Area within the territory plan project - 178,0 ha metro station Area within transport hub facilities placement line - 36,7 ha 15,8 thous. people 13,7 thous. people Commercial property placement area – 3,75 ha

«KLENOVIY BULVAR» (YUAO, Nagatinskiy Zaton) «KOMMUNARKA» (NAO, p. Sosenskoye) Rush hour passenger flow forecast More info: «Klenoviy Bulvar» Bus routes More info: metro station Rush hour passenger flow forecast 13 thous. people 10,08 thous. people Metro station

Land plot: 14,2 thous. people Area within the territory plan project - 18,7 ha Area within transport hub facilities placement line - 8,67 ha Commercial property placement area – 1,05 ha

«LERMONTOVSKIY PROSPEKT» (Kosino) (YUVAO, Vykhino-Zhulebino) Rush hour passenger flow forecast «Lermontovskiy Prospekt» Bus routes More info: metro station 47,1 thous. people 9,8 thous. people

Land plot: Area within the territory plan project - 77,0 ha Area within transport hub facilities placement line - 43,3 ha Commercial property placement area – 5,247 ha 36 37 Цветовые решения

То же и для англоязычных версий.

5

DEPARTMENT OF INVESTMENT AND INDUSTRIAL POLICY OF MOSCOW

Tel.: +7 (495) 620-20-00 ext. 22111, 22073, 22072, 22067, 22065

investment_friendly@mos .ru

INVEST IN MOSCOW!

TENDERS IN MOSCOW:

WWW./EN.INVESTMOSCOW.RU/TENDERS