PROSPER: MOMENTUM IS BUILDING Vision SP20|20 “Saint Paul is home to some of the most creative people and industries in the country. We will continue to make Downtown Saint Paul the creative epicenter of the region by supporting and connecting world-class fine arts experiences, with innovative and adventurous programming. Saint Paul will continue to be the national model for revitalizing downtowns by expanding residential and commercial development, while creating jobs and attracting a new generation of talent.” — Mayor Chris Coleman Overview

A Bright Future »» Confidence in Saint Paul’s future has led to significant thought and energy about the future of Downtown Saint Paul. »» In 2010, Mayor Coleman and the City Council launched Rebuild Saint Paul 2015, an initiative to leverage $3 billion in a series of projects to bring growth and vitality to the city. »» In Downtown Saint Paul, this initiative built a strong foundation, invested in mass transit infrastructure, created a multi-model trans- portation hub, expanded housing options, and realized significant growth in health care facilities.

Saint Paul is on the Move! »» Downtown Saint Paul is a place where businesses prosper and workers and residents enjoy an unparalleled quality of life. Its unique mix of corporations and small businesses, green spaces and historic architecture, arts and entertainment venues, restaurants and markets, creates the energetic core of a strong community. »» Located on one of the world’s great rivers, downtown is compact and walkable, covering approximately one square mile. Plans for development of the Downtown Bike Loop, and completion of the Green Line Light Rail will enhance the mobility and vibrancy of the community.

1 Vision SP20/20

Overview

A Unique Opportunity »» Downtown’s evolution has already begun and the city is poised to realize its vision of a redefined downtown through redevelop- The Penfield ment of key sites to serve businesses and Lowertown Ballpark citizens. »» Downtown has a population of approxi- mately 74,000 workers and 8,100 residents. Its population has grown 28% in the past 10 Macy’s-Grace-Wabasha Ct. years (compared to a 17% average in major Pioneer Endicott Union Depot U.S. markets).

7 Corners Gateway »» Trends in increased density in urban cores will continue to push population growth in Central Station Custom House Downtown Saint Paul. »» Expanding residential options can serve as a catalyst to attract more people, which will 7 Corners Hardware RCGC West attract more retail and businesses. Development Sites West Side Flats »» Four large catalytic development sites have been identified in downtown. These sites provide opportunities to extend the vibrancy of the downtown through a mix of residential, Class A office space, retail, hotel, and public spaces. -- 7 Corners Gateway -- Macy’s-Grace-Wabasha Court -- Central Station -- RCGC West »» The following pages depict concepts for what these sites could become for Illus- tration purposes. It is unlikely that all sites could be feasibly developed at these levels. »» A number of significant development projects are in progress (e.g., Custom House and Lowertown Ballpark) and have been included to provide context. 3 Vision SP20/20

Unique Downtown Characteristics

Access and Transportation Downtown Saint Paul is conveniently served by three major vehic- ular routes: Interstates 94 and 35E, and Shepard/Warner Road. The addition of the Green Line Light Rail links Downtown Saint Paul with Minneapolis, Mall of America, and MSP International Airport. The development sites are all linked to these transportation routes and in many cases create “gateways” or “portals” to the vibrant activity and commerce within the downtown environment. There are two major transit studies underway to improve mobility in Downtown Saint Paul: adding streetcars on East/West 7th Street and Bus Rapid Transit on Robert Street.

Parks and Pathways Downtown Saint Paul is an urban environment which embraces the parks and open spaces that help organize its streets, districts, and neighborhoods. A City Parks Pedestrian Loop links Rice Park and Mears Park, bringing the east and west ends of downtown together. A proposed bicycle loop also embraces pedestrian movement, touching Kellogg Mall and a proposed Pedro Park, and will create a new north/south link.

5 Vision SP20/20 7 Corners Gateway

7 Corners Gateway The 7 Corners Gateway site is an important link between downtown and the West 7th Commercial District. It is the confluence of many important arterial roadways, as well as the “Gateway to Saint Paul” from the 5th Street exit from Interstate 94 and the Kellogg Street exit from Interstate 35E. It also forms a connection between a major parking venue and the to the south. There is an opportunity to create a mix of hotel, retail, and assembly space which will support activities at both Xcel Energy Center and RiverCentre. Good urban planning can capture this venue-related excitement as well as create safe passage for pedestrians navigating across 7th Street and Smith Avenue. The hotel is an “L” shape, situated to support the courtyard below and create a visual backdrop for the event space on Cleveland Circle. Skyways will connect the Smith Avenue Transit Center to the new hotel and, in turn, to the Xcel Energy Center. The SITE PLANNING SCENARIOS The above scenarios illustrate options two-story courtyard forms a great meeting space before and after events. A concept to close 7th Street for events would further for building forms which may occur on reinforce the”Event Courtyard and Plaza” as an extension of both Xcel Energy Center and this new development. the site. Development could occur organized around an open two-story The program for development illustrates: plaza as a single tower, multiple towers, or a combination of towers and Hotel 650 Rooms expanded building podium base. Ballroom/Event Space 22,000 s.f. Commercial/Retail 25,000 s.f. Courtyard/Amenity Space 50,000 s.f. 7 Vision SP20/20 7 Corners Gateway

Office West Exchange Street West 9th Street Housing

Courtyard

Courtyard

North Main Street

Housing

Parking Ramp West 6th Street

West 5th Street

Smith Avenue

Hotel

Skyway Ballroom Courtyard

Skyway

Hotel

7th Street West Kellogg Blvd

Excel Energy Center Parking Ramp

Holiday Inn MASTER PLAN OPPORTUNITIES An expanded master plan for this gate- way area may extend across 5th and 6th Streets. This new block would be linked via an elevated walkway above 5th Street reinforcing the “gateway experience” as one enters downtown.

This aerial view illustrates a conceptual development of the 7 Corners Gateway site. A hotel sits upon an elevated courtyard which links the hotel and ballroom/event space on Cleveland Circle.

8 This eye-level view illustrates the activity that might occur at both the street level and plaza level above. The hotel frames the plaza and ballroom/event space, while respecting the view of the cathedral beyond. A skyway links this development to Xcel Energy Center across 7th Street. It might be possible to convert 7th Street to a public plaza on event days which would allow pedestrians to safely and actively participate in pre- and post-event activities.

9 Vision SP20/20 RCGC West

RCGC West Public Pathway

Public Pathway

SITE PLANNING SCENARIOS The above scenarios illustrate options This unique piece of Saint Paul bluff line has housed business leaders, law enforcement, and commercial rail lines and provided for building forms which may occur on a transition from downtown to the historic Mississippi River. Its unique location and position on the Saint Paul skyline, nearly the site. Development could occur as a series of residential and hotel towers, three blocks in length along the Mississippi River, affords multiple development scenarios. This development can form a natural all situated on a residential bluff devel- pedestrian connection from downtown atop the 100-foot bluff to the river below. It will form a unique urban edge along Kellogg opment. Boulevard. A mixed-use development on this site can take advantage of not only a challenging site but also capture the beautiful views of the Mississippi corridor. Development at the base of the bluff can be lined with parking and housing, and also create a public pathway traversing the bluff to the river below — capturing the spirit and imagery of a European hill town. The program for this development illustrates: Hotel 400 Rooms Commercial/Retail 100,000 s.f. Housing (Tower) 300 Units Housing (Bluff) 150 Units

11 Vision SP20/20 RCGC West

This view illustrates the dynamic presence from across the Mississippi River as the hotel/housing tower grows from the bluff base of housing and parking below. The rhythm of the bluff housing units is reminiscent of the striated limestone bluffs that line the Mississippi River valley in this region. The unique form of the hotel/housing tower appears to “grow from the bluff below.” Kellogg Mall continues westward and forms the base and then appears to extend the top of the tower in an organic expression. The lower mass of the towers maintain the view and presence of the historic courthouse beyond.

12 This view of the public pathway evokes a sense of climbing the bluff from the river corridor to the downtown above. This pathway links Kellogg Mall and the Upper Landing Park as it weaves and climbs through housing, small restau- rants, and coffee shops embedded into the bluff.

This view at Kellogg Boulevard looking east illustrates the visual connection to the Mississippi River valley beyond through a large open landscaped plaza. Street level activi- ty brings life and excitement to the river bluff while forming an important pedestrian connection to the river below.

This view illustrates a dramatic night view of the downtown bluff line and the presence of the proposed development as a sculptural element on the skyline

13 Vision SP20/20 Macy’s-Grace-Wabasha Ct.

Macy’s-Grace-Wabasha Ct. CEDAR AVENUE

RESIDENTI ABOVE WABASHA STREET

Green Roof Park

RETAIL AND ENTERTAINMENT BELOW

RETAIL AND ENTERTAINMENT BELOW

The former Macy’s site has been home to department store retail establishments for over 50 years. This department store location has contributed to the life blood of Wabasha Street as a retail and pedestrian-oriented urban space. Wabasha Court and the former Grace Building site is an underutilized link between Wabasha Street, 6th Street, and 7th Place, and affords the opportunity to engage and energize the 7th Place pedestrian mall, and link St. Peter Street with its restaurants and cultural amenities to Wabasha Street. This mixed-use approach of retail/entertainment, office, and housing creates a 24-hour active urban place. The proposed Grace-Wabasha Court site development “completes the historic block” with a base of retail/entertainment and office with a boutique hotel above. The program for this development illustrates: SITE PLANNING SCENARIOS The above scenarios illustrate options Macy’s Site Grace-Wabasha Court Site for building forms which may occur Retail/Entertainment 171,000 s.f. 30,000 s.f. on the site. Development could occur Boutique Hotel 80 Rooms emphasizing a single tower, stepped towers of office and housing, or more Housing (Tower) 230 Condos densely organized towers on both Class A Office 400,000 s.f. sites. 15 Vision SP20/20 Macy’s-Grace-Wabasha Ct.

This aerial view illustrates a conceptual development for the Macy’s-Grace-Wabasha Court site. A two-story base of retail and entertainment lines Wabasha Street on both the Macy’s and Grace blocks. An office tower embraces an outdoor park atop the retail base. A second tower extends skyward as housing, taking advantage of the views of downtown and the river beyond. A boutique hotel rises above the retail/office base which completes the Hamm Building mass of the Grace site.

16 This eye-level view illustrates the activity that might occur at Wabasha Street looking north. A lively retail mix animates street level as the office and housing towers are set back from the street and invite one to the park above. The buildings embrace the sidewalks reminiscent of dense/active urban streetscapes, not unlike the character of Wabasha Street in its heyday as a retail destination.

17 Vision SP20/20 Central Station

Central Station Street First National Bank 5th Street

Public Park/Plaza Office

Commercial

LRT Central Station Line of Building Spanning Overhead Commercial

Cedar Street Commercial

Housing Lobby St. Paul Athletic Club

Pioneer Press

4th Street

Capitol City Ramp

SITE PLANNING SCENARIOS The above scenarios illustrate options The diagonal passage of the Green Line Light Rail Transit (LRT) and the creation of a station connecting 4th and Cedar Streets for building forms which may occur on the site. Development could occur provides for an opportunity to create a unique landmark development focused on a dynamic new public plaza/park in the heart as a single tower, multiple towers or a of the Central Business District of Saint Paul. combination of towers, and expanded building podium base. Development of this unique urban block will afford unparalleled access to LRT while providing direct linkages to the Union Depot and its planned regional links, Downtown Minneapolis, the Mall of America, and MSP International Airport. It will become a hub in the city center, as a public plaza/park linking Rice Park to Mears Park, and to the new Lowertown Ballpark. It will provide a unique office environment among amenities that will serve a growing downtown residential population.

19 Vision SP20/20 Central Station

This 3/4 block can support many development scenarios. Development can happen surrounding the LRT Central Station, span over top it, not unlike a Grand Central Station, or adjacent to it like a new emerging neighborhood. The public park/plaza can act as a focal point for arrival and departure, activities, as well as a backdrop for those activ- ities housed around and above it. The illustrated development scenario surrounds the LRT Central Station with office, retail, and housing in the following program: Class A Office 6 Floors @ 32,000 s.f./floor 192,000 s.f. Commercial and Retail Spaces 16,000 s.f. Housing ­­­­— 250 Apartments/Condos Private Deck/Amenity Spaces 32,000 s.f.

This aerial view illustrates a conceptual development for the Central Station stie. The residential tower sits amongst a park on the roof of the office building below. The office building spans the LRT Central Station.

20 This street-level view illustrates the LRT Central Station situated amongst the park/plaza and beneath the office podium. A confluence of mass transit systems is organized around a vibrant urban plaza which links the upper levels of retail, commercial, office, and housing to the activities below.

21 Vision SP20/20 Custom House

Custom House Custom House

Connection The building may be served by a “river ” connecting to the , Lowertown, and the trail system on the north bank of the Mississippi River at the foot of Sibley Street. The river balcony would be similar to the “High Line” elevated linear park on the west side of New York City. The river balcony concept is included in the “Great River Passage” park plan adopted by the Saint Paul City Council for the down- project summary town riverfront.

apartment views

Images provided courtesy of Jim Stolpestad. The repositioning program will include approximately 200 • and exhibits on the history of the site and building • open-air walking/running course; market-rate apartments and related amenities, a hotel Apartment amenities currently planned for the sixth floor • and open-air dog walk. with approximately 150 rooms, food and beverage opera- 23 include: tions, self-storage facilities, parking, and other uses. hotel • a lounge incorporating the former U.S. Customs Service A limited service hotel is currently planned for tower floors Vision SP20/20 apartments teller area with large screen TV, seating, and wine two through five, with upscale layout, design, finishes, and storage room; Apartments will have features, finishes, and amenities customer appeal to fill a void in the present downtown equal or superior to any current apartment or condomini- • large courtyard with open-air pool, lounge area with fire lodging market. The hotel will have indoor guest parking um building in the downtown area. pit, lawn areas, and outdoor kitchen and bar; and may share the use of some apartment amenities such Apartment amenities currently planned for the lower floors • a large club room with kitchen and bar, dining areas and as the fitness center and pool area. seating, large screen TV area with seating, and fireplace; include: The hotel will have access to a high quality food and bever- • indoor resident parking and bike storage; • game room with tables for pool, shuffle board, and other age service, which will be run by either the hotel operator activities; • a lobby lounge; or a first-class independent restaurateur. It is hoped that • a large and well-equipped fitness center with a pilates/ the food and beverage operation will itself become a desti- • fully-equipped business center; yoga studio, sauna, exercise machines, free weights, par- nation to draw people to the building. • concierge, mail room and package storage areas; tial basketball court, climbing wall, and men’s & women’s • leasing lobby, conference room, and office space; locker rooms;

Custom House St. Paul custom house · january 2014 2 Custom House project summary project summary project summary apartment views apartment views ADAPTIVE RE-USE | St Paul Custom House Use_adaptiveLongitudinal re-use Section

KEY HOUSING - 236,483 SF HOTEL - 236,483 SF

RETAIL/COMMERCIAL - 8,073 SF

The repositioning program will includeThe approximately repositioning 200 program • and will exhibits include onapproximately the history of200 the site• and exhibitsbuilding on the history• open-air of the walking/runningsite and building course; • open-air walking/running course; PUBLIC MARKET/ HIGH LINE - 31,465SF market-rate apartments and related market-rateamenities, aapartments hotel and related amenities, a hotel Apartment amenities currently plannedApartment for the sixth amenities floor currently• and open-airplanned fordog the walk. sixth floor • and open-air dog walk. AVAILABLE - 100,395 SF with approximately 150 rooms, food andwith beverage approximately opera- 150 rooms, food and beverage opera- include: include: hotel hotel PARKING - 117,290 SF tions, self-storage facilities, parking, andtions, other self-storage uses. facilities, parking, and other uses. (72,966 SF SUB-BASEMENT) • a lounge incorporating the former U.S.• a Customs lounge incorporating Service the former U.S. Customs Service A limited service hotel is currently plannedA limited for tower service floors hotel is currently planned for tower floors apartments apartments teller window area with large screen TV,teller seating, window and areawine with large screen TV, seating, and wine two through five, with upscale layout, twodesign, through finishes, five, andwith upscale layout, design, finishes, and storage room; storage room; Apartments will have features, finishes,Apartments and amenities will have features, finishes, and amenities customer appeal to fill a void in thecustomer present appealdowntown to fill a void in the present downtown equal or superior to any current apartmentequal oror condominisuperior to- any current• large courtyardapartment with or condomini open-air pool,- lounge• large area courtyard with fire with open-airlodging pool, market. lounge The area hotel with will fire have indoorlodging guest market. parking The hotel will have indoor guest parking um building in the downtown area. um building in the downtownpit, lawn area. areas, and outdoor kitchen andpit, bar; lawn areas,Repositioning and outdoorand maykitchen share and the bar; use of some apartmentand mayamenities share thesuch use of some apartment amenities such Apartment amenities currently planned forApartment the lower amenities floors currently• a large planned club for room the lowerwith kitchenfloors and bar,• a dininglarge club Customareas room and with House askitchen the is fitnessan and iconic bar, center dining historic and areas pool structure and area. as locatedthe fitness where center the and pool area. seating, large screen TV area with seating,seating, and largefireplace;City screen of Saint TV Paularea with had seating, its beginnings and fireplace; — at the Lower Levee steam- HOUSING include: include: The hotel will have access to a high qualityThe foodhotel andwill beverhave -access to a high quality food and bever- HOUSING boat landing on the Mississippi River. • indoor resident parking and bike storage;• indoor resident parking• andgame bike room storage; with tables for pool, shuffle• game board, room and with other tables age for service,pool, shuffle which willboard, be runand otherby either age the service, hotel operator which will be run by either the hotel operator activities; activities; • a lobby lounge; • a lobby lounge; The 17–storyor building a first-class was independent constructed restaurateur. in phasesor a first-classIt isin hoped1934, independent that 1939, restaurateur. It is hoped that • a large and well-equipped fitness center• a large with andand a pilates/well-equipped 1961, andthe functioned foodfitness and centerbeverage as thewith operation city’s a pilates/ main will post itselfthe foodoffice become and for abeverage desti 79 -years operation will itself become a desti- • fully-equipped business center; • fully-equipped business center; yoga studio, sauna, exercise machines,yoga free studio, weights,until sauna, parits -last exercise postalnation machines, tooperations draw peoplefree weights, moved to the building. parout- in early nation 2013. to draw During people its to the building. AVAILABLE • concierge, mail room and package storage• concierge, areas; mail room and package storage areas; peak years after World War II, the building and the adjacent Union tial basketball court, climbing wall, andtial men’s basketball & women’s court, climbing wall, and men’s & women’s Depot were the third busiest Post Office operation in the nation. HOTEL • leasing lobby, conference room, and office• leasing space; lobby, conferencelocker room, rooms; and office space; locker rooms; HOUSING/ HOTEL HOUSING/ PUBLIC MARKET/ HIGH LINE LOBBY HOTEL LOBBY PARKING KELLOGG BLVD

SECOND Custom House St. Paul Custom House St. Paul Images provided courtesy of Jim Stolpestad. STREET custom house · january 2014custom house · january 2014 2 2 St Paul Custom House © 2013 Exeter Realty Group and BKV Group Inc 24 12/03/2013repositioning Custom House is an iconic historic structure located where redeveloped and repositioned during 2014 and 2015. the City of Saint Paul had its beginnings at the Lower Redevelopment will include the replacement of all elec- Levee steamboat landing on the Mississippi River. trical and mechanical systems and the installation of new The 17-story building was constructed in phases in 1934, on the building tower to match the historic look 1939, and 1961, and functioned as the city’s Main Post of the original windows. Heating and cooling will continue Office for 79 years until its last postal operations moved to be provided by Saint Paul District Energy, Inc. out in early 2013. During its peak years after World War II, New streetscape improvements will surround the building the building and the adjacent Union Depot were the third on the east, north, and west sides with wider sidewalks, busiest Post Office operation in the nation. new lighting fixtures, trees, and other features. Exterior 180 kellogg boulevard The building was acquired by Ironton Custom House LLC, lighting will be added to the building tower to draw atten- an affiliate of Exeter Realty Group, in 2013 and will be tion to its place on the riverfront skyline Custom House St. Paul custom house · january 2014 1 project summary

ADAPTIVE RE-USE | St Paul Custom House Use_adaptiveLongitudinal re-use Section

KEY Redevelopment will include the replacement of all electrical and HOUSINGmechanical - 236,483 SF systems and the installation of new windows in the HOTELbuilding - 236,483 SF tower to match the historic look of the original windows. Heating and cooling will continue to be provided by Saint Paul RETAIL/COMMERCIAL - 8,073 SF District Energy, Inc. PUBLIC MARKET/ HIGH LINE - 31,465SF

AVAILABLEThe - 100,395repositioning SF program will include approximately 200 projectmarket-rate summary apartments and related amenities, a hotel with projectPARKING summary - 117,290 SF approximately (72,966 SF SUB-BASEMENT) 150 rooms, food and beverage operations, CONNECTION | St Paul Custom House Site_ DIAGRAM self-storage facilities, parking, and other uses. connectionADAPTIVE RE-USE | St Paul Custom House 1 TheUse building_adaptiveLongitudinal may be served by a “river re-use Section balcony” connecting to the downtown core, Lowertown, and the trail system on 1 St Paul Saints New Ballpark the north bank of the Mississippi River at the foot of Sib- 2 ley Street. The river balcony would be similar to the “High KEY Line” elevated linear park on the westHOUSING side of the New York HOUSING HOUSING - 236,483 SF City. The river balcony concept is included in the “Great 2 St PaulHOTEL Farmers’ - 236,483Market SF River Passage” park plan adopted by the City Council for RETAIL/COMMERCIAL - 8,073 SF the downtown riverfront. 4 3 PUBLIC MARKET/ HIGH LINE - 31,465SF Completion of at least the apartment component of the AVAILABLE 3 UnionAVAILABLE Depot - Green - Line100,395 SF project is currently scheduled for the fall of 2015. PARKING - 117,290 SF (72,966 SF SUB-BASEMENT) HOUSING/Apartment reservations are presently beingHOTEL accepted. custom HOTELcontact house 4 Skyway to the Central Business District HOUSING/ PUBLIC MARKET/ HIGH LINE LOBBYFor further information and leasing inquiries, contact: HOTEL 6 Ironton Custom House LLC LOBBY PARKING Kellogg Mall, St Paul c/o Exeter Realty Group 5 5 KELLOGG HOUSING 332 Minnesota Street HOUSING BLVD Suite W2300 St. Paul, MN 55101 SECOND 6 Mississippi River’s Edge St Paul Custom House STREET© 2013 Exeter Realty Group and BKV Group Inc 651.294.2440 10/16/2015 “river balcony” AVAILABLE [email protected] St Paul Custom House HOUSING/ HOTEL © 2013 Exeter Realty Group and BKV Group Inc 12/03/2013 HOTEL repositioning HOUSING/ PUBLIC MARKET/ HIGH LINE LOBBY HOTEL Custom House is an iconic historic structureLOBBY located where redevelopedPARKING and repositioned during 2014 and 2015. KELLOGG the City of Saint Paul had its beginningsBLVD at the Lower Redevelopment will include the replacementSECOND of all elec- Levee steamboat landing on the Mississippi River. STREET trical and mechanical systems and the installation of new St Paul Custom House Custom House St. Paul © 2013 Exeter Realty Group and BKV Group Inc The 17-story buildingImages12/03/2013 provided was courtesyconstructed of Jim Stolpestad. in phases in 1934, windows on the building tower to match the historic look custom houserepositioning · january 2014 3 1939, and 1961, and functioned as the city’s Main Post of the original windows. Heating and cooling will continue Custom House is an iconic historic structure located where redeveloped and repositioned during 2014 and 2015. Office for 79 years untilthe its City last of Saintpostal Paul operations had its beginnings moved atto the be Lowerprovided by Saint Paul District Energy, Inc. 25 Redevelopment will include the replacement of all elec- out in early 2013. DuringLevee its peak steamboat years landingafter World on the War Mississippi II, River. Vision SP20/20 New streetscapetrical improvements and mechanical will systems surround and the the installation building of new the building and the adjacent Union Depot were the third The 17-story building was constructed in phaseson the in 1934,east, north,windows and on westthe building sides towerwith towider match sidewalks, the historic look busiest Post Office operation in the nation. 1939, and 1961, and functioned as the city’snew Main lighting Post fixtures,of the original trees, windows. and Heatingother features. and cooling Exterior will continue Office for 79 years until its last postal operations moved to be provided by Saint Paul District Energy, Inc. 180 kellogg boulevard The building was acquiredout byin earlyIronton 2013. CustomDuring its House peak years LLC, after Worldlighting War will II, be added to the building tower to draw atten- New streetscape improvements will surround the building an affiliate of Exeter theRealty building Group, and thein adjacent2013 and Union will Depot be weretion the to third its place on the riverfront skyline on the east, north, and west sides with wider sidewalks, Custom House St. Paul busiest Post Office operation in the nation. new lighting fixtures, trees, and other features. Exterior custom house · january 2014 1 180 kellogg boulevard The building was acquired by Ironton Custom House LLC, lighting will be added to the building tower to draw atten- an affiliate of Exeter Realty Group, in 2013 and will be tion to its place on the riverfront skyline Custom House St. Paul custom house · january 2014 1 Lowertown Ballpark

Lowertown Ballpark The Lowertown Ballpark will be located in a vibrant neighborhood on the east end of Downtown Saint Paul. Lowertown is well-known for its thriving arts community, beautiful parks, unique historic character, and a booming farmer’s market. It was recently recognized as home to the highest concentration of hipsters in the U.S. Lowertown has experienced rejuvenation in recent years, with the emergence of new housing, bars, restaurants, and businesses bringing jobs and energy to the area. The neighborhood is home to the recently renovated Union Depot, a multimodal transportation hub that serves as the Saint Paul anchor of the Central Corridor Green Line LRT. The Lowertown Ballpark will be the official home of the Saint Paul Saints and will also host youth and amateur baseball teams from across the region. The ballpark will be about more than just baseball — the facility will host more than 100 non-baseball events annually. The approximately 7,000-seat ballpark will be owned by the City of Saint Paul and operated by the Saint Paul Saints.

27 Vision SP20/20 Lowertown Ballpark

Design by others. Images provided courtesy of Ryan Companies. The Lowertown Ballpark will create the next chapter in Saint Paul’s storied history of amateur baseball. The city has been home to a regional ballpark since 1930, beginning with Lexington Park, the original in the 1950s, and the current Midway Stadium, which was built in 1982. The new ballpark incorporates elements of Lowertown’s historic architecture — blackened steel, timber, and load-bearing masonry — to become a new connection for the eastern edge of Downtown Saint Paul. Its innovative design designates that the playing field and entire seating bowl be located below street level, reducing the overall visual impact of the ballpark on the neighborhood while enhancing entry plaza connections and accessibility.

28 A true regional economic asset, the Lowertown Ballpark will help Minnesota attract a variety of regional and national events, from college baseball tournaments to world-class concerts. It will build on major public and private investments in Downtown Saint Paul to help further enhance the Lowertown neighborhood. The project will create almost 500 full- and part-time jobs, bring 400,000 visitors to Downtown Saint Paul, and spur millions of dollars in economic impact annually.

View from the concourse area looking toward Lowertown to the west Design by others. Images provided courtesy of Ryan Companies.

29 Vision SP20/20 Contact: CECILE BEDOR Director, Planning and Economic Development 25 West 4th St. Suite 1300 Saint Paul, MN 55102 651-266-6628 [email protected] MARCH 2014

PROSPER: MOMENTUM IS BUILDING Vision SP20|20

SAINT PAUL | MADISON

380 St. Peter Street, Suite 600 651.222.3701 Saint Paul, MN 55102 bwbr.com