NCW = / / Metro= = = Regional 145km Local 381 km Regional 211km Regional 81km Local 850km Regional 98km Local 1,063 km Local 790km

Total KMs of Local & Regional Roads = 3,619km Operations NCW - Roads Division

Staff

- 1 A/SEE - 1 ROADS ENGINEER - 2 TECHNICIANS - 2 SENIOR SUPERVISORS - 2 FOREMAN - 20 GENERAL OPERATIVES, DRIVERS AND SKILLED TRADES

Road No. Description Length (m) Total Cost (€) Milford Road, Dromcolloghier Roads Surface Dressing 2016 R-515 1200 €40,000 towards Feenagh R-519 2000 €60,000 Village - Glin Road Total roads surfaced dressed = 17km R-524 1000 €30,000 to Athea road - Glin R-523 1000 €30,000 to Ardagh Road R-521 1000 €30,000 Total cost = €403,500 SugarHill to Horans Cross, L-1330 2000 €50,000 Keale gate- Booster Road, L-1330 1000 €20,000 Upper Derreen, Athea L-1238 1000 €23,000 Ballycullane Lower, Glin L-1233 1000 €9,500 Galvins Road, Doonakenna L-1349 1000 €20,000 Upper Athea, Link Road L-52301 1000 €20,000 Curragh, Castlemahon L-1304 1000 €25,000 Cooleroe, Castlemahon L-1337 1800 €35,000 L-1542 700 €15,000 Drewscourt L1542 600 €15,000

R515-Milford Road, Dromcollogher Road Reconstruction 2016 Road No. Description Length Total Cost (m) (€)

Roads Reconstructed = 15km R523 Athea - CarrigKerry Road 1000 €100,000 R522 North Road, Dromcolloghier Road ( Outside GAA 1000 Total Cost = €1,417,000 Field) €120,000 R519 Kilmeedy Village towards Carrowmore 1000 €100,000 R576 Fealesbridge to N21, Abbeyfeale 1000 €100,000 L1324 Village 1000 €111,000 L1330 SugarHill, Rooska, Newcastle West 2000 €180,000 L52301 Link Road upper Athea ( Johns Roads) 1000 €70,000 L1330 Keale gate - Booster Road, Templeglantine 1000 €95,000 R524 Glin Village 410 €100,000 L6093 Tullyleague, Glin 750 €70,000 L12302 Killeany more, Glin 300 €20,000 L70702 Fairy Street, Athea 500 €40,000 L1333 Dunganville, Ardagh 1000 €80,000 L7098 Dromdeeveen, Broadford 500 €41,000 L52104 Glenville Ardagh (Smith O'Brien), Ardagh 800 €50,000 L7001 Ardagh old creamery road 200 €40,000 L7012 Gorteen, Feenagh ( Kilmallock area) 1300 €100,000

R522 Dromcollogher Severe Weather Funding 2016

Total 4.2km

Total cost €255,000

Road No Description M €

L70671 Port Abbeyfeale 900 60,857.00

L7052 Glenshesk, templegaltine 60 17,250.00

L7037 Cleanglass, Tournafulla 1000 52,440.00

L7024 Mount Plummer 1000 55,200.00

L1315 Glebe Monegea NCW 1000 51,750.00

R515 Templegaltine West 200 17,250.00

L1315 Glebe Monagea CIS & LIS Schemes

• LIS: Clouncourivane Castlemahon, €7,400.00 • CIS: Crean Newcastle West, €9,000.00 Bridge Rehabilitation Works

5 Structures

Total cost €126,000

Road No Description M € L6081 Knocknagornagh, Athea €50,000 L60722 White river bridge, Carrigkerry €35,000 L1226 Glenbaun, Carrigkerry €25,000 L1226 Knockdown, Athea €20,000 L6072 Glensharrold, Carrigkerry €13,000

L1226 Glenbaun Carrigkerry L 6081 Knocknagornagh Athea Low Cost Safety Improvement Schemes

Total cost €35,000

Road No Description M € L1311 / Coolygorman Cross, Broadford 20,000 L7026 L1312 / Ballygeal, Castlemahon 15,000 L1313

Coolygorman Cross, Broadford Low Cost Safety Improvement Schemes (continued)

Coolygorman Broadford. Ballygeal Castlemahon. General Municipal Allocation 2016

Total Cost €105,000

Road No Description M € Abbeyfeale - Pipe existing open drain near Funeral Home €20,000.00 Abbeyfeale – Overlay road at rear of Pet World €15,000.00

Mountcollins - Footpaths upgrades €10,000.00

Athea - Footpaths upgrades €10,000.00

Glin – Footpath upgrade (NCW03) €10,000.00

Broadford - Footpath upgrades €10,000.00 Newcastle West - Footpaths upgrades Cork Road €10,000.00

Knockaderry - Footpath upgrades €9,150.00

Footpaths in Ballyagran (NCW02) €10,850.00

Overlay Works, rear of Petworld Abbeyfeale. GMA Works 2016

Abbeyfeale Funeral home- Athea Pipe open drain.

NCW-Cork Rd Broadford Development Fund Allocation 2016

Total Cost €221,000

Road No Description M €

Glin Public Realm €70,000

Cois Na Feile Abbeyfeale €91,000

Market Yard NCW €50,000

River Arra wall, NCW €10,000

Cois Na Feile Abbeyfeale. Development Fund Allocation 2016 (continued)

• River Arra Wall NCW • Market Yard NCW Housing Estates Taking In Charge.

Development Current Status Action.

Knights Court Tommy Conway original LCCC preparing snag list, (Cullinagh) developer. Brother taking with costings. over the bond. Arra View Snag issued to the (Boherbui) bondholder Dec 2016

Hawthorn Drive Snag with the bond holder, (Boherbui) Seamus Bradddish, No progress at present as working on Deal manor Rathkeale. Carrig Desmond All road works complete. (Churchtown) Awaiting sign off by IW.

Cois Teampaill Roads snag list with the (Roche) Ardagh Rd. bond holder since 31st May 2016. Developer awaiting IW snag list. Cluain Arra Bank /bond holder have (Gortboy) been requested to complete outstanding works. Dunquin and Developer has stated that Some works are still Glenquin the works are done. outstanding. List of (Knockane) outstanding works sent to planning . The Paddocks Snag with the developer, Snag list done on the 7th of (Nautic, Old Cork first attempt to rectify snag July 2016. Awaiting Rd ) was not satisfactory. completion. Glebe (Monagea) Bond claimed, road works (Martin O’Sullivan) complete. Outstanding issues remaining with treatment plant. Housing Estates Taking In Charge (continued)

Development Current Status Action.

Ellis Wood (Nautic) Snag done on the 30th Aug Snag done on the 30th Aug Abbeyfeale 2016 issued to Planning. 2016 issued to Planning.

Gleann Daire Snag with the Bond Holder. (Ardagh) Awaiting cctv survey before finalising claimdown. Rathronan (Athea) Bond claimed, works Take In Charge early 2017. recently completed. Banemore Unfinished Estate, safety (Broadford) works/fencing carried out.

Cluain Dara Unfinished Estate. Safety (Broadford) works/fencing carried out. Riverside No request for taking in (Abbeyfeale) charge. The Bracken No request for taking in (NCW) charge.

Remedial works to group water scheme Housing Maintenance • 592 social houses in Newcastle West MD. €320,000 for ordinary maintenance and pre-letting works. Additional funding for 4 No Syrian houses. 903 repair requests/call outs received and responded to. 17 houses returned and re-let, & 7 short term vacant houses at present.

Disabled Person Grants & Private House Grants

• The total allocation for NCW Social Housing Disabled Persons Grants for 2016 was €95,000.

• 16 Jobs completed, mainly bathroom adaptations and wheelchair ramps, also one small extension for autistic child, totalling €92,000 expended.

• Allocations for Private House Grants of €684,000

• 175 grants in total, 49 MAGS, 26 HAGS, 100 HOPS, totalling €683,800 expended.

Cemeteries:

• 30 graveyards in NCW district. • General maintenance budget €26,000. • 13 graveyards with refuse bin collection €2550.00/yr • Springfield Broadford: Access road and fencing €20,000. • Holy Cross Athea: Pier & wall €1800.00 • Monagea: Restoration works €1500.00 • St Marys Abbeyfeale: Lighting and tree works.

Cemeteries (continued)

• Springfield Broadford. • Monagea.

Other Works.

CLAR: (Safety package for schools & community facilities) Funding of €59,000 allocated, works will be carried out in early 2017 in various locations.

Town & Village Renewal Scheme: Allocation of €97,000 with 15% matched funding, for Abbeyfeale, NCW and Athea. Works will be carried out in early 2017.

GST: €1.3million available. Project Manager and Technician in place full time roles. Part 8 lodged for fencing, gates and signage, works approx €500,000. Plans-extend from Rathkeale to Ballingarrane to , and incorporate Barna Tunnel.

Athletics Hub: €450,000 funding in place. (50% Hinterland with matched funding by LCCC)

Other Works (Continued) Other Works (Continued)

• REDZ: €42,000 allocated with 15% matched funding from LCCC for NCW.