STRUCTURE PLAN FOR IKIRUN AND ENVIRONS (2014 – 2033)

State of Osun Structure Plans Project

NIGERIA

SOKOTO i KATSINA BORNO JIGAWA Y OBE ZAMFARA Kano Maiduguri KANO KEBBI

KADUNA B A UCHI Kaduna GOMBE NIGER ADAMAWA

PLATEAU KWARA Abuja ABUJA CAPITAL TERRITORYNASSARAWA O Y O T ARABA

EKITI Oshogbo K OGI OSUN BENUE ONDO OGUN A ENUGU EDO N L A a M g o B s R EBONY A ha nits CROSS O IMO DELTA ABIA RIVERS

Aba RIVERS AKWA BAYELSA IBOM

STRUCTURE PLAN FOR IKIRUN AND ENVIRONS (2014 – 2033) State of Osun Structure Plans Project

MINISTRY OF LANDS, PHYSICAL PLANNING AND URBAN DEVELOPMENT Copyright © United Nations Human Settlements Programme (UN-HABITAT), 2014 All rights reserved

United Nations Human Settlements Programme publications can be obtained from UN-HABITAT Regional and Information Offices or directly from: P.O. Box 30030, GPO 00100 Nairobi, Kenya. Fax: + (254 20) 762 4266/7 E-mail: [email protected] Website: http://www.unhabitat.org

HS Number: HS/050/15E ISBN Number(Series): 978-92-1-133396-1 ISBN Number:(Volume) 978-92-1-132669-7 Disclaimer The designation employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area, or of its authorities, or concerning delimitation of its frontiers or boundaries, or regarding its economic system or degree of development. The analysis, conclusions and recommendations of the report do not necessarily reflect the views of the United Nations Human Settlements Programme (UN- HABITAT), the Governing Council of UN-HABITAT or its Member States. Excerpts from this publication may be reproduced without authorisation, on condition that the source is indicated.

This State of Osun Structure Plans Project, was supervised by the United Nations Human Settlements Programme (UN-HABITAT), Nairobi and managed by the United Nations Human Settlements Programme Support Office (UN HAPSO), Abuja.

PROJECT MANAGEMENT: State Government of Governor: Ogbeni Rauf Aregbesola Honourable Commissioner for Lands, Physical Planning and Urban Development: Arc. Muyiwa Ige Permanent Secretary: Arc. Wale Ojo Director, Town Planning: Tpl Oladejo Ezekiel Akintunde Project Secretary: Tpl (Mrs) O. A. Oluwadare

UN-Habitat Director, Projects Office: Alioune Badiane Director, Regional Office for Africa: Axumite Gebre-Egziabher Senior Human Settlements Adviser: Doudou Mbye

UN HAPSO Habitat Programme Manager Kabir M. Yari National Programme Officer Paul Okunlola (Project Coordinator) Administrative Assistant Elizabeth Owolabi

Consultancy Team Chief Technical Adviser Professor Johnson Bade Falade Land Use Planning/Local Economic Development Dr. Femi Olomola (Team Coordinator) Urban Environment/Infrastructure Prof. Bola Ayeni Urban Governance/Gender/Anthropology Mrs. Olusade Taiwo Urban Services/Transportation Prof Samuel Oni GIS Assistant Kazeem Tijani

Design and Layout: Peter Cheseret FOREWORD

Historically, cities have been of Structure Plans to guide the growth and develop- acknowledged as major drivers ment of these cities and their environs over the next of the national economy, which 20 years, spanning the period 2014 to 2033. The contribute substantially to the participating cities are , Ede, , Iwo, Gross Domestic Product (GDP). Ikirun, Ila-, Ile-Ife, Ikire and . They also attract investments and create wealth, enhance This fully participatory project, which engaged all social development, human and levels of stakeholders in the communities, adopts technical resources and are repositories of knowledge the Rapid Urban Sector Profiling for Sustainability and agents of socio-political change. (RUSPS) methodology to propose the spatial contexts for promoting social, economic and cultural develop- Rapid population growth in the State of Osun, as is ment of the cities and their environs with respect to typical of Nigeria’s South West geopolitical zone, has the following identified thematic areas: Shelter and manifested in haphazard and uncoordinated physical slums; Local Economic Development; Transportation; development, overcrowding and diverse adverse conse- Urban Safety/Security; Disaster Risk Reduction; Basic quences for the teeming number of residents who flock Urban Services; Environment; Gender; Governance; to the cities in search of a better life. Consequently, our Heritage/Historic areas; and Land Administration. cities have become generally unsustainable, increas- ingly difficult to manage, and progressively unable to In addition, the Structure Plans seek to build capacity fulfil their potentials as engines of growth. and aid informed strategic decision-making among local communities, the Local Governments and State On assumption of office, my administration, with a Officials by setting the broad structure for the direction view to reposition the State of Osun to enable it attain of future growth of these cities, providing for the co-or- the potentials of its development agenda, adopted a dination of both present and future activities and public Six-Point Integral Action Plan as the foundation for services as well as in the provision of key infrastructure v charting future initiatives and programs of the State items like water, drainage, electricity and roads. government of Osun. The Integral Action Plan is hinged on the following six actions: We acknowledge that these Structure Plans would not be expected to solve all problems at the same time and ❚ Banish Poverty. would therefore be subjected to periodic evaluation and review in the course of implementation. ❚ Banish Hunger. I would like to express the appreciation of the Govern- ❚ Banish Unemployment. ment of the State of Osun to UN HABITAT and its Executive Director, Dr. Joan Clos, as well as officials in ❚ Restore Healthy Living. the Regional Office for Africa and the UN HABITAT Programme Support Office in Abuja for the Technical ❚ Promote Functional Education. Assistance extended to the State, the outcome of which is this very important document. I would also like to ❚ Ensure Communal Peace and Progress. commend all the consultants and technical experts who made tangible contributions to this effort towards It was obvious that in order to harness the potentials ensuring a better future for cities in the State of Osun. of the State’s significant urban population in achieving this laudable objective, the capacity of our cities to It is my privilege therefore, to recommend the Struc- support this development agenda and offer better ture Plan to all stakeholders in the State and urge living conditions to their residents had to be signifi- the full implementation of its recommendations and cantly enhanced. Hence, the O-Renewal Programme proposals by all concerned. was designed to regenerate a one-kilometre radius of the core areas in the nine largest cities in the State and, on the 9th of July, 2012, the State entered into a collaboration agreement for Technical Assistance with Ogbeni Rauf Aregbesola, the United Nations Human Settlements Programme Governor, State Government of Osun, (UN HABITAT), for the development and adoption Osogbo, Nigeria vi Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project b. a. on thefollowing platforms: on afocusedurbanregeneration programme centred Physical Planning andUrban Development, embarked sola administrationthrough ofLands, theMinistry PREFACE making components. to ensure validation ofthedatacollectionanddecision- Group Discussions andCityConsultationswere held RUSPS methodologyfollowing whichextensive Focus officials were alsotrainedontheapplicationof of Lands,Physical Planning andUrban Development Besides, consultantsandrelevant staffofthe Ministry hensive stakeholdermappingandengagementprocess. nature, whichinvolves acomprefully participatory - (UN HABITAT), wasfoundedonitsinclusive and the United Nations Human Settlements Programme the Structure Plans exercise undertheguidanceof for Sustainability (RUSPS) methodology adopted for The preference fortheRapid Urban Sector Profiling Ora sgo Ee Ilesa, Ede, Osogbo, areas in areas to regenerate a one-kilometre radius of the core The preparation of Str sustainable growth over theperiod2014to2033. nine cities asanoverall framework toguidetheir radius of25kilometres from thecore ofthese A state-wide n gun, the Ile-Ife, IkireandEjigbo. nine largest cities in the state, namely state, the in cities largest nine O-Renewal Programme designed Plan, the Ogbeni Rauf Aregbe- of itsSix-Point Integral Action and inlinewiththeoverall thrust ized ofthe country’s 36states which isoneofthemosturban- isation intheState ofOsun arising from unsustainableurban- In response tothechallenges ucture Plans spanning a w, krn Ila- Ikirun, Iwo, Planning andUrban Development, Osogbo Honourable CommissionerforLands,Physical Arc. Muyiwa Ige, possible. mented andperiodicallyreviewed tothebestextent proposals/recommendations are conscientiouslyimple- commitment toensuringthattheseStructure Plan and Urban Development, we would like topledge our On of Lands,Physical behalf of theMinistry Planning whoworkedthe Ministry tirelessly onthisproject. output; to and, deliveringthe entire a worthy staff of and stakeholders for their commitment other partners role onthisproject; theConsultantsand supervisory Programme Support Office(HAPSO)in Abujaforits theUN-HABITATfor theircontinuedsupport; notably theproject communitiesandtheirleaders butions tothesuccessfuloutcomeofthisproject, express ourprofound gratitudetoallwhomadecontri- towards theexecution ofthisproject. Ialsowishto initiating thiscollaborationwiththeUNHABITAT of theState ofOsun, Ogbeni RaufAregbesola for I wouldliketoespeciallycongratulatetheGovernor Integral Action Plan. aims andaspirationsoftheState ofOsun’s Six-Point provide aneffective spatialplatformforachievingthe comprehensivea very process whichwe believe will These Structure Plans are therefore theoutcomeof ACKNOWLEDGEMENTS

This Report has been produced cooperation and assistance of all the officials in the with the kind support and active various other State Ministries, Departments and collaboration of several people, Agencies (MDAs) who provided us with relevant data groups and institutions to who we and information for this report. owe our gratitude, although space would only permit mentioning a We specially acknowledge the support and few. coopera-tion of the Deputy Governor, Otunba Grace Titilayo Laoye, Obas in Council and commu-nity First, we would like to acknowledge and appreciate the leaders of the various communities covered in this vision and commitment of the Governor of the project, namely Ede, Ejigbo, Ijesa-land, Ikire, State of Osun, Ogbeni Rauf Adesoji Aregbesola, for Ikirun, Ila-Orangun, Ile-Ife, Iwo and Osogbo; his commitment to actualising this Technical Executive Secretaries of participating Local Cooper-ation with UN HABITAT and for the full Governments; members of commu-nity development support in providing the necessary operational and associations, Women and Youth Groups as well logistical resources for as seeing this project through as all trade and professional associa-tions, for to conclu-sion. attending to the requests for information and their various contributions and assistance to the success of We would also like to appreciate the Honourable the project, especially through their active participa- Commissioner for Lands, Physical Planning and Urban tion at the City Consultations in each city. Development, Arc. Muyiwa Ige, for his passionate Finally, we wish to acknowledge the selfless commitment and support to ensuring the comple- service rendered in various capacities including tion of the project on behalf of the State Government. consultants, Field Assistants and all those too Similarly, we wish to thank the various officials of the numerous to mention who in diverse ways Ministry who provided technical and logistic support, contributed to the successful completion of the in particular the Special Adviser to the Governor on project. vii Lands, Dr. Ayodele Owoade; the Permanent Secre- tary Ministry of Lands, Physical Planning and Urban Development, Arc. Wale Ojo; his predecessor, Mr. Kola Adetumbi; the Director of Town Planning, Tpl. Ezekiel Oladejo and, the Project Secretary, Tpl O. Dr Alioune Badiane A. Oluwadare as well as other Directors and Staff of Director, Projects Office the Ministry. In the same vein, we acknowledge the UN-HABITAT, Nairobi viii

Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project TABLE OF CONTENTS

Foreword...... V Acknowledgements...... Vi Table Of Contents...... Vii List Of Figures...... Ix List Of Tables...... Ix List Of Plates...... X Acronyms...... Xi Executive Summary...... Xii Ikirun Planning Area...... Xii Development Issues In Ikirun Planning Area...... Xiii Structure Plan Vision, Goals And Objectives...... Xiv

CHAPTER ONE: INTRODUCTION...... 1 1.1 Preamble...... 2 1.2 The Nature And Overall Purpose Of A Structure Plan...... 3 1.3 Methodology...... 4 1.3.1 Overview Of The Rusps Methodology...... 4 1.3.2 Desk Study And Fieldwork...... 5 1.3.3 Stakeholders’ Consultations ...... 5 1.3.4 Technical Reporting ...... 6 1.4 Defining kirunI Structure Plan Area...... 7 1.5 Lessons Learned ...... 7 1.6 Structure Of The Report...... 8

CHAPTER TWO: BACKGROUND TO IKIRUN PLANNING AREA...... 9 2.1 Location: National And Regional Setting ...... 10 ix 2.2 Ikirun Planning Area...... 13 2.3 Natural Environmental Factors...... 13 2.3.1. Climate...... 13 2.3.2. Vegetation...... 13 2.3.3 Geology And Soil...... 13 2.3.4. Relief And Drainage...... 14 2.4 History And Development Of Ikirun Planning Area...... 15 2.4.1 History...... 15 2.4.2 Population...... 15 2.4.3 Spatial Development Of Ikirun...... 17 2.4.4 Existing Land Use Patterns In Ikirun ...... 17

CHAPTER THREE: DEVELOPMENT ISSUES IN IKIRUN PLANNING AREA ...... 19 3.1 Profiling The Planning Area ...... 20 3.2 Development Issues And Priorities...... 20 3.2.1 Slums And Shelter In Ikirun Planning Area...... 20 3.2.2 Local Economic Development (Led)...... 26 3.2.3 Governance...... 31 3.2.4 Gender...... 33 3.2.5 Heritage...... 34 3.2.6 The Environment ...... 36 3.2.7 Basic Urban Services (Bus)...... 39 3.2.8 Transportation...... 43 3.2.9 Urban Safety...... 48 3.2.10 Disaster Risk Reduction...... 48 x Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 4.1 FOR IKIRUN AREA PLANNING CHAPTER FOUR:URBANFORMSANDALTERNATIVE GROWTH PATTERNS 6.3 6.2 6.1 CHAPTER SIX:POPULA 5.3 5.2 5.1 CHAPTER FIVE:STRUCTURE PLAN 7.1 CHAPTER SEVEN: STRUCTURE PL 4.2 CHAPTER EIGHT:STRUCTUREPLANIMPLEMENTATIONFORIKIRUN...... 79 8.3 APP APP APP APPENDIX 8.7 8.6 8.5 8.4 8.2 8.1

ENDIX 3 ENDIX 2 ENDIX 1 4.1.2 4.1.1 Urban Forms AndLandU 7.2.5 7.2.4 7.2.3 7.2.2 7.2.1 Pr Indicators For B Land Use Budget F 6.1.2 6.1.1 Population Pr 5.3.2 5.3.1 Goals AndObjectiv The Vision F 5.1.9 5.1.8 5.1.7 5.1.5 5.1.4 5.1.3 5.1.2 5.1.1 Context Of The Str Preferr 7.2.6 7.1 7.2.7 7.2.8 Monitoring Ev Sustainability Of P Capacity Building Procedur Institutional Frame Resource M 8.1.1 Pr 7.2.10 7.2.9 8.2.1 eamble eamble

ed Urban Form For Ikirun Urban Forms The Case For Mor Heritage, Cultur Transpor Basic Urban S Environment Local Economic Dev Shelter AndSlums Land Use Pr Projected P Basic AssumptionsFor P Objectives AndS Goal Of TheS The Habitat Agenda Nigeria Vision Millennium Dev Oseeds AndLocalEconomic E Urban AndRegional P Land Use Act (L National Housing P National Urban D Gender...... Sources O Phasing Of TheS Summary O Disaster RiskReduction Urban Safety . . e For Planning Approval AndDevelopment Control ...... obilisation AndFinancing Of Structure Plan or New (2014-2033) Ikirun ojections For Planning Ikirun Area aluation AndReview Of Structure Plan asic Urban Services tation ...... f Funding lan Implementation or Ikirun Planningor Ikirun Area work For Structure Plan Implementation opulation Figures ucture Plan: Visioning The Future es Of The Structure Plan 2014-2033 oposals f Action Areas ...... ervices TION GROWTH PROJECTIONS (2014-2033) tructure Plan For Planning Ikirun Area 20:2020 ...... ua) 1978 e And Tourism ...... 77 elopment Goals (Mdgs) trategies Of The Structure Plan For Planning AreaIkirun tructure Plan e CompactSettlements se Planning evelopment Policy 2012 ...... olicy 2012 ...... elopment ...... lanning Law1992 ...... opulation Projections ...... AN FORIKIRUN USEPROPOSALS (2014-2033)LAND ...... VISION, GOALS ANDOBJECTIVES ...... mpowerment AndDevelopment Strategies (Leeds) ...... 77 ...... 51 61 55 67 52 52 60 56 72 72 71 69 68 62 62 62 60 60 59 59 58 58 57 57 57 56 56 54 64 74 68 65 53 82 80 78 77 77 91 89 86 85 85 84 84 82 82 80 LIST OF FIGURES

Figure 1.1 The RUSPS Processes and Outputs ...... 5 Figure 1.2 The Ikirun Planning Area with Major settlements...... 7 Figure 2.1 Map of Nigeria showing the location of the State of Osun...... 10 Figure 2.2 Map of Osun showing Local Government Areas...... 11 Figure 2.3 State of Osun Showing Structure Plan Project Cities...... 12 Figure 2.4: The Ikirun Planning Area: Satellite Image of Planning Area...... 14 Figure 2.5: Contour Map of the Ikirun Planning Area...... 15 Figure 2.6: Orthophoto Map of Ikirun Planning Area...... 16 Figure 2.7 Number of Persons per Household (Percentage) in LGA...... 17 Figure 2.8 Number of Persons per Household (Percentage) in Ifelodun LGA ...... 17 Figure 2.9 Existing Land Use in Ikirun...... 18 Figure 3.1 O-REAP Activity Components...... 30 Figure 3.2 Road Network in Ikirun Township...... 44 Figure 3.3 Road Network in Ikirun Planning Area...... 45 Figure 4.1 Illustration of the Diverse City concept and the Compact City concept...... 53 Figure 4.2 Monocentric Model...... 53 Figure 4.3 Polycentric Model...... 53 Figure 4.3 Polycentric Model...... 53 Figure 4.4 Composite Model...... 54 Figure 6.1 Population Projection for Ikirun Planning Area (2014-2033)...... 63 Figure 6.2 Population Projections for LGs in Ikirun Planning Area (2014-2033)...... 63 Figure 7.1 Land Use Proposal for Ikirun Planning Area...... 68 Figure 7.2 Road Improvements in Ikirun and Environs...... 74 Figure 8.1 Organisational Structure for Implementation of the Structure Plan...... 83

LIST OF TABLES xi

Table 1.1 City Consultations and Participants...... 6 Table 2.1. Distribution of Population by Size, Class of Household, Number of Household and Sex in Boripe Local Government Area...... 16 Table 2.2 Distribution of Population by Size, Class of Household, Number of Household and Sex in Ifelodun LGA...... 17 Table 3.1 Elements of UN-HABITAT’s Five Shelter Deprivations as Measures of Slums ...... 21 Table 3.2 State of Osun: Distributions of Households by Type of Housing Unit...... 21 Table 3.3 State of Osun: Distribution of Households by Type of Toilet Facility...... 22 Table 3.4 State of Osun: Distribution of Households by Types of Fuel for Cooking...... 22 Table 3.5 Ikirun Planning Area: Distribution of Regular Households by Type of Housing Unit...... 22 Table 3.6 Ikirun Planning Area: Distribution of Regular Households by Ownership Status of Dwelling Unit...... 22 Table 3.7 Ikirun Planning Area: Distribution of Regular Households by Number of Exclusive Sleeping Rooms...... 23 Table 3.8 Ikirun Planning Area: Distribution of Regular Households by Tenure Status of Dwelling Unit...... 23 Table 3.9 Ikirun Planning Area: Distribution of Regular Households by Source of Water Supply for Domestic Purpose...... 23 Table 3.10 Ikirun Planning Area: Distribution of Regular Households by Type of Toilet Facility...... 23 Table 3.11 Ikirun Planning Area: Distribution of Regular Households by Method of Solid Waste Disposal...... 23 Table 3.12 Comparison between Actual Revenue Collection and Projected Revenue (3year Data: Ifelodun L.G.A)...... 31 Table 3.13 Comparison between Actual Budget and Budget Estimates (Ifelodun L.G.A)...... 32 Table 3.14 Comparison between Actual Budget and Budget Estimates (Boripe LGA)...... 32 Table 3.15 Local Government Secretariat Staff Structure (Ifelodun LGA)...... 32 Table 3.16 Quantity of Water Supply to Ikirun Township...... 39 Table 3.17 Road Development Activities in Ikirun...... 46 xii Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project Table 20 Table 8.1 Plate 9: Plate 21: Plate 8: Plate 6: Plate 4: Plate 20: Plates 16-17: Plates 14-15: Plates 12-13: Plates 10-11: Plate 7: P Plate 3: Plate 1: LIST OFPLATES Plate 2: Table 24 Table 9 Table 6.2 Table 21 Table 18 T Table 11 Table 5 Table 4 T Table 2 Table 1 Table 8.2 Table 7.5 Table 7.3 Table 7.2 Table 7.1 Table 6.3 Table 6.1 Table 26 Table 25 Table 23 Table 22 Table 22 Table 19 T Table 16 T Table 14 Table 12 Table 10 Table 8 Table 7 Table 6 Table 7.4 Table 6.4 Table 3.18 Plates 18-19: able 17 able 15 able 13 able 3 late 5:

S I R R P Pu S Pu A L Ik Ik A K A S V S S N M Angles of 1Curb Parking on one Side N D R S Q D P S R R R N R ofLines Abutting Streets R R P M M R R Flo R N C P A F C W W I L P P L ndiscriminate Parking of Vehicles and Traffic Control CoreIkirun in Area treet Lighting and Power Distribution in Ikirun treet View City Centre inIkirun tandards for Socio-Cultural Activity Areas tandards for Playgrounds Standardspace for Services ecurity Vehiclesecurity Donated by State Government et-Backs ofet-Backs Petrol Bays Filling from Centre-Lines of Abutting Roads actors likely to affect to Multi-mode Transport Systemthe in Planning Area opulation by each Type served to be of Facility and of Radius Catchment Area ercentage Area Devoted to Commercial Development by Size of Town opulation and Housing Planning Shortfalls inIkirun Area opulation Projections for and Environs Ikirun (2014-2033) ist of Rehabilitated inIkirun Roads ndicators for Urban Basic Services and Use Budget for Projected the Population (2014–2033) rivate and Public Health Centres inIkirun hasing Structure of Ikirun Plan (2014-2033) e-modelled Schools inIkirun Schools e-modelled and for School School the emodelled Handicapped the Children inIkirun ecommended Widths of Streets inResidential Areas ecommended Width of Carriageway inIndustrial Area/Estates forecommended Set-Backs Industrial Property from Lines Centre-Lines of Roads ecommended Standard use Land inIndustrial Area/Estates ecommended Widths of inCommercial Roads Area ofecommended Commercial Set-Backs Property from Lines Centre ecommended land Allocation inaCommercial Area/Market ecommended Maximum Plot Coverage ecommended Minimum Plot Area for Different Types of Housing ecommended Densities for Residential Developments olanut Bulk-packing Products Dealers for inNorthern Sale Nigeria pproach View Royal of Palace, Akirun Ikirun iew of Ikirun City of Centre.iew Ikirun ctivities forctivities Implementation Structure inIkirun Plan apacity building 2014-2033 activities omparison of Transport Modes lamisi Market umber of CarParking Spaces umber of Cars Parked to be along Curbs Furlong per at Different umber of Parking Gross spaces per Hectare of Commercial Development eighborhood Land Use Land eighborhood Estimates esign Standardesign for Elements of Various Types of Roads...... 95 esirable Site Areas for Health Facilities uantity of Potable Water supplied to be to aCommunity for Various Purposes irun Wasteirun Dump site Factory Siteirun ater Projects inIkirun ater Supply: Average Ila-Orangun Demand inIkirun, and Townships Osogbo inimum Dimensions for of Design Parking the facilities (Drive-in Layout) inimum Distance any between Two Buildings, to Back Back inimum of from Dwellings Set-Backs Plot Lines blic Water Supply Planning inIkirun Area blic Health Centres inIkirun or Area Requirements by Sizes of Families arge Size Waste Bin ...... 94 78 38 49 37 35 26 43 42 41 41 40 39 20 36 27 96 92 63 94 95 92 91 91 91 91 84 80 73 73 65 64 47 93 76 96 95 94 93 93 93 92 92 92 75 97 95 94 93 92 64 97 42 2 ACRONYMS

ANC Ante Natal Clinics BUS Basic Urban Services CBD Central Business Districts CBOs Community Based Organizations CEDAW Convention on the Elimination of all Forms of Discrimination Against Women CSR Corporate Social Responsibility EU European Union FOMWAN Federation of Muslim Womens Associations of Nigeria GRA Government Residential Area GSM Global System of Mobile Communication HIV/AIDS Human Immunodeficiency Virus/Acquired Immune Deficiency Syndrome LEEDS Local Economic Empowerment and Development Strategies LGA Local Government Area LGCs Local Government Councils MDGs Millennium Development Goals NBS National Bureau of Statistics NCMM National Commission for Museums and Monuments NDHS Nigeria Demographic and Health Survey NGOs Non-Governmental Organizations NITEL Nigerian Telecommunications Limited NPC National Population Commission NURTW National Union of Road Transport Workers CLEAN Osun State Agency for Solid Waste Management OSEPA Osun State Environmental Protection Agency OSRUWSSA Osun State Rural Water Supply and Sanitation Agency OSWC Osun State Water Corporation OVC Orphans and Vulnerable Children OWMA Osun Waste Management Authority PHCN Power Holding Company of Nigeria xiii PPP Public-Private-Partnership RUSPS Rapid Urban Sector Profiling for Sustainability RUWESA Rural Water Supply and Environmental Sanitation Agency SACA State Action Committee for AIDS SEEDS State Economic Empowerment and Development Strategy UNESCO United Nations Organization for Education, Science and Culture UN-HABITAT United Nations Human Settlements Programme WSSSRP Water Supply and Sanitation Sector Reform Programme xiv

Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project focus onthefollowing: and aidinformedstrategicdecision-making withmain In addition,theStructure Plan seeks to buildcapacity environs and unable tofulfilltheirpotentialsasenginesofgrowth. tions, whichmakethecitiesgenerallyunsustainableand well as deteriorating social and environmental condi- inadequate provision as ofinfrastructure andservices, and congestionwithininnercityneighbourhoods, uncoordinated physicaldevelopment, overcrowding consequences, notableamongwhichare haphazard and unfortunately, hasoccurred alongside several undesired growth over the past half Century. This phenomenon, experiencing unprecedented populationandspatial the country’s 36states,withtowns andcitiesinthestate geopolitical zone, ranksamongthemosturbanized of The State of Osun, locatedin Nigeria’s South West EXECUTIVE SUMMARY areas; andLandA the to t respect with area and economic social, which for Profiling iatr ik euto; ai Urban Basic Environment; Reduction; Risk Disaster Urban Transportation; Development; setal, the Essentially, Structure the of radius programme to O c P a initiated c Ogbeni S S t I Osun of development the guide would which initiative, This Settleme Human the period2014to2033. guide to framework strategy regeneration eai aes She areas: hematic ial urbanis ainable n order to effect to order n ities ag ooperation ix-Point tate l ans for nine of th of nine for ans rangun, te atcptr Rpd ra Sector Urban Rapid participatory the participating olw hog o te tt’ O-Renewal state’s the on through follow dpin f h Srcue ln for Plan Structure the of adoption o are Ou t actuali to Osun f presents State is af Aregbesola Rauf Plan nerl cin ln the Plan, Action Integral O rjc on project eind o eeeae one-kilometre a regenerate to designed s Gen utiaiiy RSS methodology, (RUSPS) Sustainability ogbo, prah adopted approach ree-m Ile-Ife, therefore sail otxs f contexts spatial for cities at dministration. ively core the nts o ad dqaey oiin t position adequately and ion der; Governance; Heritage/H Governance; der; e largest e the tr n slums; and lter e n over with d, Ilesa, Ede, address (UN-HAB Programme ih h Uni the with t utrl developm cultural areas city t ssanbe growth sustainable its h peaain f St of preparation the integrates the next 20 next the c proposals for proposals Ik z , ities te objectives the e hog a tech a through Ikirun, ire the in following o te preparation the for i c n these w, Ikirun, Iwo, hallenges the elements oa Economic Local an the Governor, State Safety/Security; years, r promoting or Ejigbo. d e Nations ted n o the of ent cities. S an and Ikirun capital of capital tate. identified of Services; was also was f its of ITAT), ructure of overall uns istoric nical over The Th Ila- the us- he e bounded on its northern side by Inishabounded on its northern (in Odo-Otin Osun North-East zone oftheState ofOsun andis Furthermore, iscentrally locatedwithinthe Ikirun eastern side. south whileIdi-Olo andAlaroka mountainslietoits Obaagun/Gbogi hillstotheNorth andAafohilltothe ofOsun State part north-eastern andissurrounded by Meridian. Thecityislocatedwithina valley, onthe Equator andlongitude4o40’eastoftheGreenwich cityislocated withinlatitude7o50’ofthe Ikirun Ororuwo, Aagba,Eko-Ende, Eko-Ajala andSabo. Area Iragbiji, includeIkirun, Ada, Iree, Iba, Obaagun, Territory. Themajorcommunitiesin the Planning definedasthe Osogbo Capital fall withintheterritory However, ofbothLocalGovernment someparts Areas Government Areas encompassingseveral communities. government areas, namelyBoripeandIfelodun Local by theState Government covers twomainlocal Background: The Planning AreaIkirun asdefined IKIRUN PLANNINGAREA for theStructure Plan. of thedatacollectionanddecision-makingprocesses were heldtoenhanceinclusiveness andallow validation areas. Focus Group Discussions andacityconsultation ITAT to collect required data onthe agreed thematic of theRUSPS methodologydeveloped by UN-HAB- Urban Development were trainedontheapplication ofLands, staff ofthe Physical Planning and Ministry Through theadoptedprocess, consultantsand relevant ❚ ❚ ❚ ❚ ❚ ❚ and roads. structure itemssuchaswater, sewerage, electricity to maximize efficiencyinthe provision ofkeyinfra- areaswithin particular orgrowth corridorsinorder Pro education, andsocialwelfare); development, employment, housing, transportation, ational publicandopenspaces)affectingeconomic (includingprovisionservices foradequaterecre- present andfuture commercial activitiesandpublic Pro and considerations; ical, environmental andsocio-economicconstraints growth ofthesecities,taking accountoftopograph- Setting thebroad str viding forastagedurbandevelopment strategy viding fortheco-ordination ofawide-range ucture forthedirection offuture local government) on the southern side by Osogbo, been extensive but largely unregulated, inadvertently the capital city of the State, on the east by Iragbiji contributing to the development of slums and shanties (in Boripe Local Government) and on its western in some areas of the city. In most cases, residential and boundary by Eko-Ende, a town within the same local other buildings were constructed haphazardly, with little government of Ifelodun. Hence major roads to other or no compliance with the extant physical planning towns converge at this nodal city. regulations, e.g. and building and health codes, zoning or sub-division regulations etc. There is also limited Population: It is estimated that the population of Ikirun presence of public facilities, infrastructure and ameni- city is 60,826 people (according to the 2006 national ties and the density is 439.98 persons per hectare. The population Census) spread over approximately 209 following thematic issues guided the profiling and Struc- traditional compounds. The estimated population for ture Plan preparation: the Planning Area, when adjusted to reflect portions outside the Planning Area, is estimated at 165,274 on Shelter and Slums, which covers issues of sanitation, the basis of the 2006 National Census. housing and security of tenure for a better and clean city; Local Economic Development, which takes into DEVELOPMENT ISSUES IN IKIRUN account the socio economic development, employ- PLANNING AREA ment situation and local economic base; Governance that is characterised by the institutional arrangements The various development issues in Ikirun Planning Area for the different kinds of urban governance existing in were reviewed through the profile studies and a city the planning area; Gender, which highlights the issues consultation was held in the city. of space for economic, political and social activities for women and the vulnerable groups thereby improving The predominant land use in Ikirun is residential. Over their access to opportunities and resources for wealth seventy percent of the existing land use is residential. creation and Heritage, which showcases the cultural The density and intensity of this land use varies from the norms and practices of the planning area while exploring xv central core area, which is densely. Residential density the deep traditional setting that defines their heritage in tends to fall as on moves from the center towards the order to aid their development. periphery. Commercial land use covers a total area of 9.74ha and accounts for 3.1% of the total land use with Environment covers all issues pertaining to the policy, a total of 797 properties identified for this category of legislative and institutional frameworks for environ- land use (O’ Renewal Report 2013). Ikirun is a commer- mental conservation to address issues that relate to cial nodal centre involving mostly distributive trading climate change; Urban Basic Services features several for several towns and other smaller settlements in the issues relating to education, water supply, health facil- north-eastern part of Osun. ities, electricity, telecommunication, sanitation and solid wastes; Land Administration covers the legisla- The Planning Area is characterized by mixed land uses tive framework for land administration, information with dysfunctional location of residential, commer- and management in the planning area; Urban Safety; cial and small scale industrial activities. Houses Disaster Risk Reduction; and Transportation assesses are usually prone to flooding and fire incidents partly the existing transport system (networks and the different because of sub-standard airspace between buildings modes) and auto park facilities within the planning area and lack of adequate drainages. Many houses are also in order to achieve a sustainable transport development. overcrowded single room apartments with a high occupancy ratio. Upon analysis of the key issues, the preferred alternative Findings from the Field study identified chronic housing growth pattern proposed for Ikirun Planning Area is deficiencies and poor social and environmental condi- The Composite Model, which allows the development tions characterized by slums and squalor in the core area of both the central and outskirt areas. This is based on of Ikirun city. Until the state-wide infrastructure rehabil- the goals and objectives of structure plan and it proffers itation and urban renewal programme recently initiated short, medium and long time planning to minimize the by the State Government of Osun, growth of Ikirun had cost of relocating a large number of people and buildings. xvi

Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project ❚ The specificobjectives are: sustainability.” youths, poverty reduction and environmental ensures employment generation especiallyamong cantly sustainthecityasastateindustrialhubthat human, andinfrastructural basethatwillsignifi- and inclusive nodalcitywithstrong social,economic, “To develop asadynamic,resilient, Ikirun liveable seen changesare likely, theStructure Plan visionis: andunforethe next20years isfraughtwithuncertainty - State, theinternationalandnationalpolicies.Although evidence from the consultation, the overall vision of the based onathorough analysisandunderstandingofthe local agenda. Therefore vision for the Structure Plan is theimplementationof communities andsupports also The visionfor Ikirun reflects theaspirationsof spill-over ofNigeria tootherparts ”. improvement of the welfare with a positive of its citizenry physical development oftheState ofOsun aswell asinthe Government thatwillresult service inthegrowth and provide anexcellent, efficientandeffective quality The overarching Mission statementfor Osun is“to OBJECTIVES STRUCTURE PLANVISION,GOALSAND ❚ will provide forlocalbusinesses; support structure andanimproved localenvironment that and environs andproviding homes andinfra- new Improving the overall environment ofthecityIkirun meeting theneedsofitsresidents. a more sustainablehumansettlement,efficientand ment the recommendations. These would make Ikirun resourcesas well toimple- asmobilisingthenecessary government, theprivate sector, NGOSandthepublic, therefore rely between oneffective the partnership The implementationof Ikirun Structure planwill ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ tectural, culturalorhistoricalinterest; buildings, andimprovement ofplaceslocal, archi- To promote rehabilitation of andpreservation structure; travel congestion, energycostsandutilitiesinfra- Reducing theimpactsofflooding,wastedisposal, walking, cycling, androad; publictransport Making aneasyplacetogetandaround Ikirun by meets localneeds; recreational activitiesandotherinfrastructure that healthcare, assets,communityservices, sporting tion andemployment culturaland opportunities, Supporting localcommunitylifethrough educa- leisure usesinanattractive setting; quality andquantityofcommercial, residential and Regenerating Core Ikirun area to provide improved homes,includingfamilyhousing; mix ofnew enhancing the publicrealm, and a more sustainable environs businesses and byenterprise, supporting Improving theoverall environment and ofIkirun 01

INTRODUCTION 2 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project proliferation of slums, inadequate urban infrastructure proliferation ofslums,inadequateurban infrastructure arerapid urbanizationin Ikirun housingshortages, Among thedevelopment challenges accompanying its environs. and distributioncentre for people within thecityand exist inthecity. hasthusbecomeamajortrading Ikirun nication, as well as many small and large scale businesses operationsofthepostandtelecommu - railway service, have influencedthegrowth of fromIkirun. the Apart Government are factorsthat headquarters alsoimportant establishment ofarailwaystationanditsstatusasLocal dous growth bothspatiallyandinpopulation.The Similarly, hasover Ikirun the years witnessed tremen- perceived bettersociallifeintheurbancentres. the cities, as people seek access to modern amenitiesand dwellers haverural alsoseenincreased migrationinto state. High unemployment andpoverty ratesamong tant spatialtransformationofmanysettlementsinthe fuelled by unprecedented populationgrowth withresul- is takingplaceintheState ofOsun, aphenomenon ofNigeria,As inmanyotherparts rapidurbanization PREAMBLE 1.1 Ed for n Plans Structure of preparation o ❚ ❚ Specifically, the Structure Plans are tofocus on: cities forthenext20years, over theperiod2014-2033. economic andsocialdevelopment goalsoftherespective spatial/environmental development objectives withthe The plansare toprovide aplatformforintegrating work toguide their development andfuture growth. astheframe- Plans fortheninecities,whichwouldserve of Osun toformulateandadoptlong-rangeStructure The overall objective oftheproject istoassistthe State ments Programme (U i environmental pollutionand inade n ❚ ❚ rder to addre ine partnership w partnership education, and social welfare/service); education, andsocialwelfare/service); development, employment, housing, transportation, ational public/openspaces) affecting economic (includingprovisionservices foradequaterecre- present andfuture commercial activitiesandpublic socio-economic constraintsandconsiderations taking accountoftopographical,environmental and developments andfuture growth ofthesecities, tures/parameters for guidinganddirecting present P S e, Ejigbo,Ila etting thebroad- landuseproposals andstruc roviding fortheco-ordination ofawide-range u rban areas, na areas, rban ss these chal - ith theUnited Nations Human Set Orangun, Ikire mely Osogbo, Il Osogbo, mely N View ofIkirunCityCentre.Plate 1:View -HABITAT), the undertook l enges, theStat and Ikirun. q uate services. uate services. Ife, Ilesa, Iwo, Ilesa, e-Ife, h following the e government tle- In ❚❚ Providing for a phased development of the cities activities in cities are undertaken in an orderly manner in particular areas or growth corridors, in order to and that the various land use proposals are properly maximize efficiency in the provision of key infra- integrated with related socio-economic and environ- structure items like water, sewerage, electricity and mental initiatives towards achieving sustainable roads. development.

The Structure Plan Project is also expected to achieve Thus, the Structure Plan for Ikirun Planning Area the following aims among others: has been conceived as a practical tool for integrating land use planning with economic, social development ❚❚ Strengthen capacities of relevant state Ministries, and environmental goals and objectives. It is flexible, Departments, Agencies and other key actors in the providing for long-term broad land use proposals State of Osun especially with respect to local partic- and strategies and has been undertaken with elabo- ipatory planning and Geographical Information rate involvement of stakeholders towards serving as system (GIS) applications; a framework for participatory decision-making and reconciliation of competing development and conser- ❚❚ Develop Structure Plans for each of the nine cities in vation interests. Through the Structure Plans, land-use a participatory manner; changes will be guided in a coherent and efficient manner with maximum benefits for the community. ❚❚ Identify priority interventions in each city for enhancing capacities for strategic urban management The Structure Plan is subject to continuous public and setting up a framework for their implementa- consultation, on-going involvement and negotiation. tion; Ideally, once adopted, all decisions on planning appli- cations are made in accordance with the Structure ❚❚ Contribute to improved land administration by Plan, unless other material considerations relating to establishing digital base maps for the nine cities; and, land-use development indicate otherwise.

❚❚ Build the capacity of the state to develop a well-rea- Essentially, a Structure Plan is meant to: soned, rationalized and implementable framework ❚

for addressing its urbanization challenges in the ❚ Generate and provide for development to meet the Chapter 1 Introduction context of sustainable social and economic growth. present physical, social and economic needs of the residents in the Planning Area in ways which do not compromise the needs of future generations, in 3 accordance with the principles of sustainability. 1.2 ❚❚ Create for the people living in the Planning Area THE NATURE AND OVERALL the best possible opportunities for work, housing, PURPOSE OF A STRUCTURE PLAN shopping, education and social interactions for meeting social and community needs, including assisting those within the community with particular disadvantages to improve their quality of life; and A comprehensive land use plan for cities is undertaken with community participation to evolve a rational ❚❚ Enhance and protect the built and natural environ- process for guiding new urban development, thereby ment of the Planning Area. focusing on producing clear statements about the forms and contents of such areas over a determined In summary, the Structure Plan for Ikirun Planning period of about 20 years. Development plans indicate Area is designed to make significant contributions clearly how local residents, landowners and other inter- towards achieving the goals of the State of Osun ested parties might be affected by land-use changes. Six-Point Integral Action Plan, the adapted Local Economic Empowerment and Development Strategy The Structure Plan for Ikirun and its environs is (LEEDS) by the constituent Local governments, the intended to be a statutory planning policy document, National Transformation Agenda and National Vision which focuses on land-use planning, development, 20:2020 programme, the HABITAT Agenda and the management and protection. The purpose of land Millennium Development Goals (MDGs) and the use planning is to ensure that physical development National Policies on Housing and Urban Development. 4 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project collection, analysis and formulation of land use plans. collection, analysisandformulation oflanduseplans. and communitytowards itsunderstandandusefordata of consultants,staffgovernment ministries,NGOs been hingedontheprincipleofbuildingcapacity Keffi. Theadoptionofthehas RUSPSmethodology cities, namely Lafia the state capital, and Doma, Karu towards thepreparation ofStructure Plans forfour utilise theRUSPS methodologyforcollectionofdata Anambra State. Nasarawa State was the second state to of Structure Plans forAwka, andOnitsha Nnewi in RUSPS wasfirstusedin Nigeria forthepreparation Gambia andNigeria (UN-HABITAT, 2006). countries includingEgypt, Ghana, Liberia,Kenya, it hasbeensuccessfullyemployed inseveral other proffered. Since 2003whenthistoolwasdeveloped, areas ofcapacitygapsuponwhichsolutionsshouldbe of acity’s improvement needs.It helpstoidentify andaction-orientedassessment fective, participatory The RUSPS methodologyisatoolforrapid,cost-ef- on anurbansectorprofile study in Somalia. while working withtheEuropean Commission (EC) which wasfirstdeveloped in2003 by UN-HABITAT canbebased.Thistoolisthe interventions RUSPS, urban assessmentuponwhichimmediateandlongterm In sodoing,UNHABITAT developed atoolforrapid urbanizing world’. planning, development andmanagement in arapidly for all’ and‘promoting sustainablehumansettlements cities with the twin goals of ‘providing adequate shelter socially andenvironmentally sustainabletowns and urbanization facingdeveloping countries,ispromoting The UN-HABITAT, in response to various challenges of 1.3.1 projections andlandusedesign. the future ofthecityandformulationlanduse data onthevarious thematicissuesaswell asforecasting in collectionofqualitative informationandsecondary literature, hosting of focus group discussions to assist supplemented by deskstudiesandreviews ofrelevant used tocollectrelevant dataandinformation.Thiswas ology. Questionnaires methods were andfieldsurvey Sector Profiling for Sustainability (RUSPS) method- ture Plan Planning forIkirun Area istheRapidUrban The approach adoptedforpreparation ofthe - Struc METHODOLOGY 1.3

Methodology Overview oftheRUSPS 6. 3. 1. structure planformulation: issues tobecovered intheprofiling ofcitiesforthe the consultantsandtoagree onthefollowing thematic ments andAgenciestopresent theirprogrammes to created for major Ministries, an opportunity - Depart and Urban Development. The RUSPS trainingalso Government andFederal ofLands,Housing Ministry Development, Osun Polytechnic andstaffoftheLocal Osun State ofPhysical Ministry Planning andUrban Osun Ministries, andAgenciesnotably, Departments Training includedselectedtechnicalstaffof State of inthemethodology.fied experts atthe Participants September, 2013,toproperly trainandinductidenti- three-day workshop onRUSPS from 24thto26th in theState ofOsun, UN-HABITAT organized a local capacity to formulate structure plans for cities To achieve the objective of building national and 1.1. the selectedcitiesinState ofOsun isshown inFig methodology intheformulationofStructure Plan for The diagrammatic representation oftheuse RUSPS cities were to: outprofiling studiesforthe The objectives ofcarrying 11. 10. 9. 8. 7. 5. 4. 2. ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ needed inthedifferent thematicareas; and opment andmanagementofhumansettlements. projects with the aim of achieving sustainable devel- including capacitybuildingandcapitalinvestment and more effective institutionalandfinancing; for developing enablinglocalpolicies,regulations the cityalongthematicissues; andthreatsweaknesses, opportunities (SWOT) of I I D P dentify capacity building needs and opportunities dentify capacity building needs and opportunities dentify priorityprojects areas forintervention rovide city-wideassessmentoftheimprovements evelop anunderstandingofthestrengths, G B U Local E S Gender; Environment; Transportation; Land A D H helter andSlums; asic Urban Services; rban Safety/Security; overnance; and isaster andRiskReduction; and eritage/Historic Areas. dministration. conomic Development; 1.3.2 Desk Study and Fieldwork The participatory RUSPS methodology enabled the consultants to identify development priorities for the Following the training and in line with the RUSPS thematic areas of the profile studies which formed the framework, consultants undertook desk studies and bases of formulating the Structure Plan. Additionally, field work for collection of both primary and secondary the peculiarities and anthropology of the city were data pertaining to the nine thematic issues. The aim of considered for the development of the Structure Plan the desk study was to enable the consultants to acquire for the Planning Area. additional necessary background data and information on the Planning Area. The information collected by 1.3.3 Stakeholders’ Consultations the consultants was discussed and analysed to gain a better understanding of the situation in the city. The The method of data collection entailed holding of consultants administered the RUSPS questionnaire to discussions and consultations with critical stakeholders all relevant stakeholders for each of the agreed themes. during the field work undertaken from January to June In addition, focus group discussions were held to 2013. Specifically, meetings and discussions were held collect required qualitative data and information on with stakeholder groups in the Planning Area and at critical issues of development. State and Local Government levels between February and March, 2013. Information sources utilised and reviewed included inter alia: In addition, the Ikirun City Consultation was held in Ikirun on Monday 22nd July 2013, at Ikirun Town a. Project Documents; Hall. A total of 365 participants attended the city b. Relevant Acts; consultation, comprising by government officials, tradi- c. Population Statistics; tional rulers, community based organizations (CBOs), d. Data Base on Business premises, institutions, Non-Governmental Organisations (NGOs), profes- infrastructure etc.; sional bodies, academic and research institutes, women e. Regulatory Frameworks; and youth organisations, trade organizations e.g. f. Programme Websites; and National Union of Road Transport Workers (NURTW) g. Land records, registration etc. and several others. Chapter 1 Introduction Following the desk studies, the RUSPS questionnaire as agreed to at the training was used for data collec- tion on the field from January to June 2013. 5

Figure 1.1 The RUSPS Processes and Outputs

Processes Outputs

Rusps Training Capacity Building for Rusps/Framework Agreed

Mobilization of Consultants Consultants Mobilized Citizens Sensitized

Fieldwork Relevant Data Acquired

Stakeholders’/City Consultation Priority Issues Agreed Consensus Built

Draft Structure Plan Report Draft Plan Produced

Technical Review of Draft Plan Comments Consolidated

Final Structure Plan Report

Source: UN-HABITAT 2009: Structure Plan for Awka and Satellite Towns, Nairobi. 6 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project The syndicategroups were classifiedasfollows: adopted. by voice acclamation and the City Declarations were sessionswherepresented theywere atplenary adopted cate groups, following which group outcomeswere in theRUSPS. Participants alsodiscussedinsyndi- tions oneachoftheeleven thematicissuescovered Sabo. Theconsultationfeatured technicalpresenta- Obaagun, Ororuwo, Aagba,Eko-Ende, Eko-Ajala and Iragbiji,ments, namelyIkirun, Ada, Iree, Iba, stakeholders from andotheradjoiningsettle- Ikirun Participants attheCityConsultationsrepresented consensus onprioritydevelopment issues. profile toachieving withaview for Ikirun, report todeliberateonthedraft stakeholders theopportunity The purposeoftheCityConsultationwastoafford T 22 July2013 Date ofCityConsultation 24 July2013 23 July2013 able Urban Planning- Local Economic Development 1.1CityConsultationsandParticipants Governance- Group 1 Group 3 Heritage Gender- Environment and Transportation Infrastructure Services and Group 2 Group 4 Urban Urban Ila-Orangun Osogbo Ikirun City 6. 5. 4. 2. 1. prepared thefollowing reports: ration of the structure plan, consultants for Cluster 1 echnical Reporting conducted and the City Consultations held for prepa- Following thedeskstudy, theprofiling studies 1.3.4 3. the appropriate sectionsofthisReport. Planning Area’ inthereport) have beenhighlightedin Planningfor Ikirun Area referred (henceforth toas‘The of significance to the formulation of the Structure Plan processes. The critical contributions of the stakeholders of the initiative for use in subsequent development nature involvement andcommendedparticipatory attheConsultationsappreciatedThe participants their I S City ConsultationsR I P List ofstakeholders.

ssues Paper forConsultationeachcity nception report. tructure Plan report foreachcity rofile studyofeachcity T Total Participants eport; and eport; Source: ConsultantsReports 344 365 247 ❚❚ Rapid scoping of urban areas is a useful tool for identifying development challenges to be addressed 1.4: and coming up with priority projects; DEFINING IKIRUN STRUCTURE PLAN AREA ❚❚ It is important that emphasis is laid on adoption of an integrated approach reflecting the multi-dimensional nature of urban planning and management- gover- nance, shelter and slum, environment, gender, The Ikirun Planning Area as defined by the State transport, basic urban services and local economic Government covers two main local government areas, development. All these dimensions need to be namely Boripe and Ifelodun Local Government Areas addressed in order to realize the ‘Inclusive City;’ as shown in Fig 1.2. ❚❚ The involvement and engagement of stakeholders (communities, local government officials, profes- sional groups, civil society organizations, etc.) is essential for credible identification of priority 1.5 issues for urban planning and management in and LESSONS LEARNED monitoring the implementation process.

❚❚ It is essential to identify existing capacity gaps for effective urban management to enable design of The lessons learned in applying Rapid Urban Sector appropriate means to fill the gaps: Profiling for Sustainability (RUSPS) in the preparation of Structure Plan for Ikirun Planning Area include the ❚❚ The RUSPS methodology offers eatgr scope for following: adopting a gender perspective to urban planning;

FIGURE 1.2 The Ikirun Planning Area with major settlements Chapter 1 Introduction 7 8 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project existing land and settlement patterns in Ikirun. existing landandsettlementpatternsinIkirun. ment andhistory STRUCTURE OFTHEREPORT 1.6 including geographical background Structure accountofIkirun Plan Area is the Introduction and Chapter 2 provides a general 1 Chapter chapters. eight into divided is report This ❚ ❚ ❚ USPS methodology creates for opportunities ❚ government’ own ratherthantheformerperception of‘itisfor ownership by whichtheprojects are acceptedastheir their involvement promotes inclusiveness and Securing ofthelocalpeoplethrough thesupport identified themselves; local peopleinapproaching theurbanproblems harnessing theproblem- solvingstrategiesofthe The R of thepeople,populationpattern, setting, the natural environ- Structure Plan. well asmodalities forreview andsustainabilityofthe institutional framework,monitoringandevaluation, as including phasingofproposed development, legaland discusses critical issues related toplanimplementation, standards forpresents theStructure Plan. Chapter8 7 presents theStructure Plan’s policies,strategiesand plan periodare contained in Chapter 6while Chapter projections forpopulationgrowth forthe ofIkirun the Structure Plan’s Vision, goalsandobjectives. The Chapter5isdevotedpatterns forIkirun. toadvancing Chapter 4discussesthealternative urbangrowth consultation heldinthetown. and issuesagreed uponby thestakeholdersatcity been highlightedintheprofile studiesconducted opmental issuesastheyrelate whichhave toIkirun, Chapter 3provides conciseaccountsofcriticaldevel - 02

BACKGROUND TO IKIRUN 10 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project F Nigeria andthe4thlargestinSouth West. of landarea, Osun ranksasthe28thlargeststatein a totallandarea of9,000square kilometers.In terms Lagos andOndo (Figure 2.1).The State of Osun has the country. Theother States are Oyo, Ogun, Ekiti, the sixStates intheSouth-west geo-politicalzone of States makinguptheNigerian Federation andoneof Government Area intheState ofOsun, oneofthe36 oftheIfelodun Local istheheadquarters Ikirun REGIONAL SETTING LOCATION: NATIONAL AND 2.1: igure 2.1MapofNigeriashowingthelocationStateOsun eastern sideofthecity. south whileIdi-Olo and Alaroka mountains lie tothe Obaagun/Gbogi hillstotheNorth andAafohilltothe ofthestateandissurrounded by part north-eastern Meridian. Thecityislocatedwithina valley on the Equator and longitude4o40’eastoftheGreenwich cityislocatedwithinlatitude7o50’ofthe Ikirun are O and 30LocalGovernment Areas andtheIfe EastArea Ikirun, Ejigbo,Iwo,IkireandIla- cities The are: Districts. Senatorial three the across The Statei sd ffice,Modakeke (Figure 2.2).The ninecitieswhich the focusof f, Ede, Ile-Ife, Ilesa, capital, State the Osogbo, ivided into hree Senatorial istricts t D the Structure Plans Orangun. Project are spread Figure 2.2 Map of Osun showing Local Government Areas 2: Background to Ikirun Chapter 2: Background Planning Area

11

Source: State Government of Osun 12 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project F igure 2.3StateofOsunShowingStructure PlanProject Cities Source: MinistryofLands,PhysicalPlanning andUrbanDevelopment,StateofOsun2013 Furthermore, Ikirun is centrally located within the 2.3.2. Vegetation Osun North-East zone of the State of Osun and is bounded on its northern side by Inisha (in Odo-Otin The Planning Area has evergreen high forest vegeta- local government) on the southern side by Osogbo, tion composed of many varieties of hardwood timber, the capital city of the State, on the east by Iragbiji such as a procera Terminalia Superba, Lophir, Khivo- (in Boripe Local Government) and on its western rensis, Melicia excelsa and Antiaris africana. Over most boundary by Eko-Ende, a town within the same local of the state, the natural vegetation has been degraded government of Ifelodun. Hence major roads to other by human activities, chief of which is the bush fallow towns converge at this nodal city. farming system. Others are fuel wood production, road construction, clay and sand quarrying and tradi- tional farming practices. An important aspect of the vegetation is the tree crop plantation. The major tree crops include cocoa, kola, oil palms, cashew and citrus, 2.2 among others. As a result of the degradation of the IKIRUN PLANNING AREA natural forest, exotic trees have been introduced as forest plantations. These include Tectona grandis (teak) and Gmelina arborea, Teminalia superba, a native species. The Ikirun Planning Area, which covers two main local government areas, namely Boripe Local Government Also, the natural tree species have given way to oil Area and Ifelodun Local Government Area, encom- palm (Elias guinensis), Gmelina and dense thickets. passes the following major communities: Ikirun, Mature forests still exist in the Owu forest reserve at Iragbiji, Ada, Iree, Iba, Obaagun, Ororuwo, Aagba, the southern part of the State. Part of this high forest Eko-Ende, Eko-Ajala and Sabo (Figure 2.3). has recently been cleared to make way for forest planta- tions of Tectona grandis and Gmelina arborea. While in the northern part of the state the derived savannah mosaic is predominant, in the extreme south and southeastern parts there still exist considerable areas of

2.3. undisturbed rainforest made up of climbers, heteroge- to Ikirun Chapter 2: Background Planning Area NATURAL ENVIRONMENTAL neous trees of hardwood genre and bamboo thickets FACTORS along river courses. Hardwood tress like Iroko, Afara and Mahogany are found in this forest region. 13

2.3.3 Geology and Soil 2.3.1. Climate The state of Osun presents a picture of a wide expanse Osun falls within the tropical rain forest zone and of land interlaced by a number of hills. The hills range Ikirun has a humid tropical climate characterized by from extensive watersheds from where a dense network distinct wet and dry seasons. The wet season extends of rivers, streams and erosion channels has developed. mostly between March and October while the dry According to Smyth and Montgomery (1962), Osun season lasts between November and February. The state overlies the metamorphic rocks of the basement mean temperature for the area is about 270C while the complex, the great majority of which are ancient, being mean annual rainfall is about 1300mm. of pre-Cambrian age. The rocks are strongly foliated and they occur as outcrops. The rainfall is heavy, ranging from 1200 to 1500 mm and falls for about eight months with the peak period The soils belong to the highly ferruginous tropical red in September. Temperature is high throughout the year soils associated with basement complex rocks. As a and this aids photosynthesis, which in effect favours the result of the dense humid forest cover in the area, the growth of dense forest. The temperatures range from soils are generally deep and of two types, namely, deep 27°C to 32°C with the maximum temperature recorded clayey soils formed on low smooth hill crests and upper around April. Generally, the dry season is short, lasting slopes and the more sandy soils on the lower slopes. from November to February during which the north- The well-drained clayey soils of the hill crest and slopes east (NE) trade wind prevails while the southwesterly are very important, because they provide the best soils wind dominates during the wet season. The average for cocoa and coffee cultivation. The lighter loams are yearly relative humidity is about 80%. more suitable for cultivating the local food crops, such as yam, cassava and maize. Soil degradation and soil erosion are generally not serious in the State of Osun. However, considerable hill wash is recorded along the slopes of the hills. 14 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project Efon-Alaaye hills,domedhillsinIlesa area andseveral out-crops inseveral places.Thenotablehillsare the The rugged with undulating areasrelief is andgranitic tourist attractionsofthestate. whichhasbecomeoneofthe given risetoawaterfall ljesa, there isasharpdrop intheelevation andthishas found at llesa, lgbajo, Okemesi, Elu and Oba. At Erin ridges, withthemore prominent hillsinthisregion by numerous domed hills and occasional flat topped is characterised part half of the state. The northern The region ofinselberglandscapecovers more than Yoruba highlands, while the second is thecoastal plain. ofthe first istheinselberglandscapewhichpart state. Two main relief regions may be identified; the area to 150m and below of the in the southern parts and descendsfrom analtitudeofover 450minljesa The topographyof Osun State isgenerallyundulating 2.3.4. Figure 2.4:TheIkirunPlanningArea: SatelliteImageofPlanningArea Relief andDrainage erosion gulliesalonghillslopesandvalleys. aspectofthereliefimportant istheprevalence of months, especiallyfrom November toMay. Another The channelsofthesesmallerstreams formany are dry with theproliferation ofmanysmallriver channels. complex rocks isusuallythatofwatershedmarked The drainagesystem over theareas ofbasement area. makes farmingaprominent economicactivityinthe the area is well of the soil drained and the fertility susceptible tosoilerosion thangentleslopes.However, off from soilerosion because steeperslopes are more steep, whichperhapsexplainswhytheregion isworse 2200 feetabove thesealevel. Thelandscapeisgenerally highandrangesbetween 900feetand generally very hills indifferent towns andvillages.Theelevation is Figure 2.5: Contour Map of the Ikirun Planning Area

2.4.2 Population 2: Background to Ikirun Chapter 2: Background Planning Area 2.4 The population of the State of Osun, according to the HISTORY AND DEVELOPMENT OF 2006 population census, is put at 3.42 million people, 15 IKIRUN PLANNING AREA compared to Bayelsa State with the least population of 1.78 million and Kano state officially with the highest population of 10.20 million people. The state ranks 19th position in population size and accounts for 2.45 2.4.1 History per cent of the National population. With 414 people per square km, State of Osun ranks 10th position in Ikirun is a historical Yoruba settlement, located in terms of population density compared with 44 for the Southwest of Nigeria. The city is named after a Taraba and 2649 for . man named Akinorun, a hunter, who founded the town a few centuries back. The State of Osun has 30 Local Government Areas and the Area Office, Modakeke. The Ikirun History has it that Akinorun had two sons, namely Planning Area comprises two main local governments Akinbiyi and Adedeji, who both ruled and died at which are Boripe and Ifelodun Local Government Igbo-Irele – the original site of Ikirun. However, due to Areas. The 2006 National Census has not been disagre- acute water shortage, the other children of Akinorun, gated beyond the level of local government areas, Oba-Ara, Gboleru and Adedeji moved out of Igbo– consequently, the population of the Planning Area is Irele to the present site of Ikirun. not specified. However, the populations of the two local government areas in the Planning Area - Boripe The title of the paramount ruler of Ikirun, known and Ifelodun are shown in Table 2.1 and Table 2.2. In as Akinrun, had its origin in the name of the town’s 2006, there were 30,081 households in Boripe Local founder, Akinorun and the city has been ruled by 15 Government Area with a total population of 138,742. kings since its inception. The reigning Oba of the city is This population consisted of 71,052 males and 67,690 Kabiyesi, Oba Raufu Olayiwola Adedeji II. Supporting females. In Ifelodun Local Government Area, there the king in the running of the day-to-day affairs of were 20,804 households in 2006 with a total popula- Ikirun are eight male and five female High Chiefs. tion of 96,444, comprising 48,567 males and 47,877 females (Table 2.2). 16 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T estimated populationforthePlanning Area, when imately 209traditionalcompounds.However, the hasapopulationof60,826spreadIkirun over approx- According to the2006National Population Census, F Total 11-15 Persons 6-10 Persons 2-5 Persons 1 Person Size Classes 21-25 Persons 16-20 Persons able igure 2.1. 2.6:OrthophotoMapofIkirunPlanningArea DistributionofPopulationbySize,ClassHousehold,NumberHouseholdand Sex in Boripe Local Government AreaSex inBoripeLocalGovernment o fHueod ecnaeMlsFmlsBothSexes Females Males Percentage No. ofHouseholds 30,081 16,415 8,784 3,710 742 136 294 29.20 54.56 12.33 0.45 0.97 2.46 National Census. Area, is estimated at 165,274 on the basis of the 2006 adjusted toreflect outsidethe Planning portions 71,052 30,430 27,368 31,342 26,555 3,404 2,483 2470 4798 Source: NationalPopulationCommission,Osogbo(2010) 67590 2,315 2099 5072 306 138,742 61,772 53,923 3,710 9,870 4669 4798 Figure 2.7 Number of Persons per Household Figure 2.8 Number of Persons per Household (Percentage) in Boripe LGA (Percentage) in Ifelodun LGA

Table 2.2 Distribution of Population by Size, Class of Household, Number of Household and Sex in Ifelodun LGA

Size-Class No. of Households Percentage Males Females Both Sexes 1 Person 2,806 13.48 2,433 373 2,806 2-5 Persons 11,671 56.09 19,900 19,734 39,634

6-10 Persons 5,269 25.32 18,000 18,703 36,703 to Ikirun Chapter 2: Background Planning Area 11-15 Persons 654 3.14 4,042 4,626 8,668 16-20Person 316 1.51 2,410 2,670 5,080 17 21-25 Persons 88 0.42 1,782 1,771 3,553 Total 20,804 48,567 47,877 96,444

Source: National Population Commission, Osogbo (2010)

2.4.3 Spatial Development of Ikirun 2.4.4 Existing Land Use Patterns in Ikirun Ikirun developed organically, as is common with most Yoruba settlements, growing radially from the Oba The predominant land use in Ikirun is residential. (Akirun)’s royal palace, the Oja-Oba market and the Over seventy percent of the existing land use is residen- Ikirun Central Mosque at the centre. tial. The density and intensity of this land use varies from the central core area, which is densely. Residen- The majority of buildings in Ikirun consist of the old tial density tends to fall as on moves from the center Brazilian-type housing stock, initially constructed of towards the periphery. Commercial land use covers a laterite walls and thatched roofs and much later, total area of 9.74ha and accounts for 3.1% of the total burnt bricks but lately of cement blocks with land use with a total of 797 properties identified for plastered-walls and painted. There are two local this category of land use (O’ Renewal Report 2013). government Housing Schemes/Estates and a few Ikirun is a commercial nodal centre involving mostly privately owned schemes in the Planning Area. distributive trading for several towns and other smaller settlements in the north-eastern part of Osun. 18

Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project F across amongwhichare Ikirun theAnglicanChurch, There are also several Churches and Mosques spread enterprises foundscattered across thecity. aswell asalliedsmall-scale machine fabricationfactory traditional cloth-weaving enterprises,amedium-sized are wood-mills,asachet Water production factory, Apart fromestablishedSteel anewly Rolling Mill, there igure 2.9ExistingLandUseinIkirun to several deities worshippedby somecityresidents. Equally, thecityisreplete withmanyshrinesdedicated Mosque, Sabo andseveral otherslocatedacross thecity. Mosque, Owodearea, theAnsar-ud-deenCentral mosques includetheCentralMosque atOja Oba, on Station Road, justtomentionafew. Prominent Methodist Church andCatholicCathedralChurch 03

DEVELOPMENT ISSUES IN IKIRUN PLANNING AREA 20 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project ration canbefoundinAppendix 1. sections ofthisReport, whiletheIKIRUN CityDecla- Plan have forIkirun beenreferred tointheappropriate are ofsignificancetotheformulation Structure The criticalcontributionsofthestakeholderswhich relevance tothefuture planningofthearea. in respect ofeachthethematicareas whichare of 22nd July 2013duringwhichconsensuswasreached onMonday,at the City Consultations held in Ikirun profile study were thereafter presented tostakeholders The various development issuesidentified inthe and Transportation.reduction Urban Basic Urban Services, Safety, Disaster andrisk ment, Governance, Gender, Heritage, Environment, These are Shelter and Slums, Local Economic Develop- thematic areas adoptedundertheRUSPS framework. Area between January and May 2013focused onthe The Profile studyconductedon Planning Ikirun PROFILING THEPLANNINGAREA 3.1 expectations. provisiondeficiency inhousingservices andunmet deferred maintenance of infrastructure and structures, Slum Creation isaproduct ofinadequatehousing, ❚ ❚ ❚ ❚ ❚ more thanoneofthefollowing attributes: to areas thatmanifestanyoneoracombinationof The definitionof “slums” bythe United Nations refers 3.2.1 PRIORITIES DEVELOPMENT ISSUESAND 3.2 ❚ ❚ ❚ ❚ ❚ Lack ofsecure tenure. infrastructure; Inadequate access to sanitation and other Inadequate accesstosafewater; Overcrowding; Poor qualityofhousing; structural PLANNING AREA SLUMS ANDSHELTER INIKIRUN Plate 2:Street inIkirunCityCentre View Table 3.1 Elements of UN-HABITAT’s Five Shelter Deprivations as Measures of Slums

Element Description Features of Acceptable Conditions 1 Structural quality or durability of A house is considered durable if it’s built • Permanent building materials are dwellings on a non-hazardous location and has a used for walls, roof and floor permanent structure, adequate enough • Compliance with building codes to protect its occupants from extremes • Building not in a dilapidated form of climatic conditions – e.g. rain, cold, • Dwelling not located on or near humidity etc. toxic wastes • Dwelling not located on flood plain • Dwelling not located on steep slope • Dwelling not located on a dangerous right of way 2 Sufficient living space that is not A dwelling unit is considered adequate if • Density of not more than 2 overcrowded it can provide living area for household persons per room members, if not more than three persons sharing the same habitable room 3 Access to improved water A household is considered to have • Piped connection to dwelling access to improved drinking water, (if • Public water stand pipe it has, at least 20litres/person/day for • Borehole family use), at a cost less than 10% • Protected Spring water of household income and without • Protected dug wells household members being subjected to • Rain water collection extreme efforts, especially to women and children 4 Access to Improved Sanitation A household is considered to have • Direct connection to a public access to improved sanitation if an piped sewer excreta disposal, either in the form of a • Direct connection to septic tank public or private toilet, is shared with a • Access to Pour-flush latrine or to reasonable number of people a Ventilated Improved Pit (V.I.P)

Latrine to Ikirun Chapter 2: Background Planning Area 5 Security of Tenure Security of tenure is the right of all • Evidence of documentation that individuals and groups to effective can be used as proof of secure protection by the State, against arbitrary tenure 21 or unlawful evictions. (Eviction is the • Household with formal title deeds permanent or temporary removal to both land and building against their will, from their homes or • Household with formal title deeds land they occupy, without access to to either land or residence legal or other forms of protection) • Household with enforceable agreements or any document as proof of tenure arrangement • De-facto or perceived protection from forced evictions

Source: “Affordable Land and Housing in Africa”- UN-Habitat (2004)

Table 3.2 State of Osun: Distributions of Households by Type of Housing Unit

YEAR SINGLE ROOM FLAT DUPLEX DETACHED BUILDING OTHER TYPES 2007 79.2 8.7 0.0 12.1 0.0 2008 81.9 7.1 0.0 11.0 0.0 2009 - - - - - 2010 77.9 8.4 0.2 13.5 - 22 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project of slumsandshantiesinsomeareas ofthecity. contributing to the developmentulated, inadvertently growth had been of extensiveIkirun but largely unreg- recently initiatedby theState Government ofOsun, structure rehabilitation andurbanrenewal programme core area city. of Ikirun Until the state-wide infra- conditions characterized by slumsand squalor inthe housing deficienciesandpoorsocialenvironmental Findings from theField studyidentifiedchronic Existing HousingStock T T T T FLDN2491825935 4 1738323882 378 382 358 3187 941 3650 559 10892 20429 IFELODUN OIE2502375235 1820 1 82654 206 98 219 2607 1198 3259 592 21307 29540 BORIPE SN701 52426794826698199 021394906 12399 9032 9090 98811 27696 94428 21687 452264 730313 OSUN SN701 55627591146497022 18543 2024 95740 44614 94111 21765 453516 730313 OSUN OIE2501766849 8325 1189 81 2358 1853 4695 628 19736 29540 BORIPE FLDN2491342825 8629 1 1339 114 2896 1816 2752 208 11304 20429 IFELODUN 075. . . 32003. . . 0.0 0.4 1.0 33.5 0.0 13.2 0.7 1.0 50.1 2007 NONE YEAR YEAR 0824030789003. . . 53.3 1.4 0.5 32.5 0.0 8.9 0.7 0.3 2.4 2008 2007 2008 094. . 75023. . . 0.2 0.6 3.0 37.1 0.2 17.5 1.2 - 40.3 2009 2009 2010 004. . . 43052. . . 4.5 2.3 3.5 25.9 0.5 14.3 5.8 0.8 42.5 2010 able able able able 3.5IkirunPlanningArea: Distribution ofRegularHouseholdsbyType ofHousingUnit 3.3StateofOsun:DistributionHouseholdsbyType ofToilet Facility 3.6IkirunPlanningArea: DistributionofRegularHouseholdsbyOwnership 3.4StateofOsun:DistributionHouseholdsbyTypes ofFuelforCooking Status ofDwellingUnit oa Headsof Total oa Houseon Total TOILET ON Household WATER ELECTRICITY a separate 0.8 1.2 0.8 0.3 stand or yard FLUSH TO SEWAGE Household Spouse to Head of Traditional/ traditional structure material made of Hut SEPTIC TANK Household FLUSH TO Member GAS 0.2 0.0 0.6 0.5 Other block of Flat in flats Household Member Relative but not BUCKET PAIL/ the public of division regulations, planning e.g. physical extant the with constructed haphazardly,constructed with In mostcases,residential andotherbuildingswere EOIEFRWO/RS COAL FIREWOOD/GRASS KEROSINE density is439.98personsperhectare. 27.1 45.7 51.7 58.3 ulig n hat cds znn o sub- or zoning codes, health and building detached house Semi- (Landlord) Privately regulations etc. There is also limited presence limited also is There etc. regulations COVERED Owned aiiis ifatutr ad mnte and amenities and infrastructure facilities, PIT Rooms/Let in house Employer UNCOVERED Private Source: NationalPopulationCommission 56.0 49.6 42.0 38.8 PIT Agency Private Improvised Other little ornocompliance Informal/ dwelling LATRINE VIP Ownership Public- Govt 15.9 3.5 5.1 1.8 Others OTHER TYPES Other Table 3.7 Ikirun Planning Area: Distribution of Regular Households by Number of Exclusive Sleeping Rooms

Regular No One Two Three Four Five Six Seven Eight & Household Sleeping Room Rooms Rooms Rooms Rooms Rooms Rooms Above Room Rooms OSUN 730313 77643 54732 85127 95082 118958 46235 110063 22377 120096 BORIPE 29540 1749 940 2313 3587 4639 2308 5011 1423 7570 IFELODUN 20429 3531 1094 2222 2785 2575 1030 2495 536 4161

Table 3.8 Ikirun Planning Area: Distribution of Regular Households by Tenure Status of Dwelling Unit

STATE Total Owned Owned but not Rented Occupied Squatting Others yet paid off rent-free OSUN 730313 432938 17318 208531 66000 3641 1885 BORIPE 29540 20056 597 5546 3171 112 58 IFELODUN 20429 11551 774 5981 1950 150 23

Table 3.9 Ikirun Planning Area: Distribution of Regular Households by Source of Water Supply for Domestic Purpose

STATE Total Pipe- Pipe- Tanker Well Bore- Rain River Dug out/ Other borne borne supply/ hole water Stream/ Pond/ inside outside water Spring Lake/ dwelling dwelling vendor Dam/ Pool

OSUN 730313 52098 66482 9299 340368 36807 48873 153542 4555 18289 Chapter 3: Development Issues in Ikirun Planning Area BORIPE 29540 1326 601 179 20085 2057 386 4718 70 118 IFELODUN 20429 1074 1960 490 10587 763 4098 1061 149 247 23

Table 3.10 Ikirun Planning Area: Distribution of Regular Households by Type of Toilet Facility

STATE Total Water Pit Latrine Bucket/ Toilet Public Nearby Other Closet Pan Facility in Toilet (bush/ (WC) another beach/ (different) field) dwelling OSUN 730313 102172 303553 14783 9507 55705 242056 2537 BORIPE 29540 3794 12068 439 463 2478 10257 41 IFELODUN 20429 2442 11363 573 290 1560 4130 71

Table 3.11 Ikirun Planning Area: Distribution of Regular Households by Method of Solid Waste Disposal

STATE Total Collected Buried by Public Unapproved Burnt by Other Household Approved Dump site Household Dump site OSUN 730313 51988 42960 122459 280247 219714 12945 BORIPE 29540 1845 1886 5608 13272 6804 125 IFELODUN 20429 1913 1080 4611 7288 4695 842

Source: National Population Commission 24 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project Th or the around 2012) the a with apartments room single overcrowded also are Act of1978. icate of Occupancy asprovided forintheLand Use secure inNigeria- through theissuanceofCertif to theirproperty. Thisisbecauselandtenure isonly Planning Area, manyresidents donothave legaltitles landtenure systemin Ikirun under thecustomary Though land ownership/occupation largelyoperates cultural practicesofthe Yoruba. . include low economicability, andtheapplicationof access by vulnerablegroups, notablywomen,toland todoso,otherfactorswhich haveproperty also limited women with high incomes who can afford to purchase Although there are noformalpoliciesthatconstrain urban poortorelocate from theslums. costshaveby the constrainedefforts construction land prices,highplanningstandards andhighbuilding law. However constraintslikerelatively certain high allottees upon fulfillment of relevant provisions of the of their gender. Land is only allocated to intended land allocation to prospective developers regardless topromote equalrightsforallapplicants efforts The Ifelodun Local Government Council ismaking still atamodeststage. slums inthecore areas ofthecity. Thedevelopment is avoid future extensive investments inrehabilitating anddiscourageslumdevelopment to the citizenry Scheme wasinitiatedtoaddress thehousingneedsof Road, The local government’sIkirun. Sites and Services and anotherschemeatDagbolu Village onOsogbo (recently renamed Oba RaufAdedeji Housing Estate) implementation of Eko-Ende Road Housing Scheme hadforoverin Ikirun three decadesembarked onthe The Ifelodun Local Government withheadquarters during festive periodsorfamilyfunctions. Ilesa andIfe areas andonlyreturned homeoccasionally abandoned or had residents who left for their farms in the sampledhouseholds,whileotherhouseswere either currently occupied,representing about42percent of core areas ofthecity, 673ofthemwere foundtobe tion ofhouses.Ofinthe the1612housessurveyed coreIkirun cityisthehighlevel ofseasonaloccupa- Another characteristicofthehousingsituationin aty eas o sbsadr arpc between airspace sub-standard of drainages. adequate of lack and buildings because residential, partly incidents fire of and flooding to prone usually are Houses location commer-cial dysfunctional with high occupancy ratio. In a study conducted by conducted study a In ratio. occupancy high e Planning Area is characterized by mixed land uses in needofmoderaterepair. tt gvrmn (-eea Rpr fr Ikirun for Report (O-Renewal government state lre ubr f h hue i Iiu and Ikirun in houses the of number large a state were found to be either dilapidated either be to found were state n sal cl idsra activities. industrial scale small and . Many houses Many 2. 1. in use.Theseare: In theState ofOsun, fourcategoriesoflandrecords are Land Administration blueprint forthePlanning Area. for developing a opportunity Planning an important lite towns. Hence theStructure planproject presents oranyofits satel- formal blueprintexistsforIkirun housing development andphysical planning, no are federal andState legislationandpolicies guiding urban poor, whether male or female. Although there specifically produced topromote accessto landforthe land usezoning map, masterplanorsimilarguidelines has neveropment. Ikirun hadaplanningblueprint like apply equallytoallcitizens inaccessinglandfordevel- respect tolandrightsforthepoor, sincethesamerules regulations andpracticesare notinconflictwith In Planning Ikirun Area, stateandlocalgovernment of another, sincetheyallare stakeholders. armoftheState every virtually government inoneway or administrationinvolves of theinputorparticipation of each financial year of government. Land governance provisionsbudgetary ofgovernment atthebeginning andare clearlystatedintheannual transactions vary tax. Thefeeschargeableondifferent land-related well aschargesforannualground rent andproperty generates fundsfrom premium paymentsonland,as operationaldemands.The to meetcontemporary State contributed totheinabilityofLandsDepartment documentation and humancapacityissues,whichhave signs ofinefficiency, with particularly regards to of Osun isyet tobefullyupdated,thesystemshows However, becauseLandAdministration intheState Local Government. andobtainsfinalapprovalpermit attheMinistry atthe Complex etc.,thedeveloper appliesforplanning Station, Hotel, Bank, School,Industry, Shopping case of major development projects like Petrol Filling the finalapproval todevelopment proposals. In the Governments andIfe-East Area Officeinthe Stategive Government inthe30Local level. Thedepartment physicalplanningfunctionsattheLocal perform The Town Planning andLand Department Services assessment andre-settlement issues. to suchactivitiesaslandacquisition,compensation in theirrespective areas ofjurisdictionwithrespect councils are involved inlandadministrationmatters of Osun at thestatelevel, whileLocalGovernment eral are involved inLandadministrationtheState Development and theOfficeof Surveyor-Gen- ofLands, The Physical Planning and Ministry Urban 3. 4. Po Deed ofS Deed ofAssignment; ofS Certificate wer ofAttorney. ublease; tatutory RightofOccupancy; tatutory Also, since Ikirun city has no land-use plan, land In Ikirun, the freehold customary land tenure regime management problems are prevalent in the form of is mostly adopted in transferring land rights by the lack of maps, insecurity of tenure under the customary majority of the citizenry while leasehold is limited system of ownership and the absence of clear demarca- to government-owned landed property. In all, land tion of plot boundaries. Where ownership tussles occur, administration policies in the city are far from being such conflicts are mostly resolved by the traditional equitable and beneficial to all. council as constituted by the King (Akirun of Ikirun) and the Courts of law. Field findings also revealed that Slums and Shelter Priority Issues informal land market thrives greatly in Ikirun, putting In summary, the following are the Slums and Shelter the volume of such transaction to approximately 80%, priority issues in Ikirun Planning Area: the outstanding 20% being accounted for by transac- tions within the two Town Planning Schemes being ❚❚ Rehabilitation of the deteriorating living environ- executed in the city by the local government authority ment within the traditional core of Ikirun. The Urban Renewal Programme has already started However, the traditional institution and the town to make some impacts in this direction within a planning authority of the local government (and in kilometre radius of the city centre. some cases the law courts) handle problems associated with security of tenure. More recently ❚❚ Provision of affordable housing for the generality of the newly established Mediation Centres are handling the populace, especially those at the lowest rungs of some problems related to land matters. the economic ladder. This could be achieved through a public private partnership arrangement in line with Government of the State of Osun remains the major the National Housing Policy. source of funding for slum upgrading in the state, with input from all related agencies. To accomplish ❚❚ Immediate passage of the State’s Urban and Regional this, the Lands Department has embarked on capaci- Planning law, to mitigate problems associated ty-building programmes with the support of the United unplanned urban growth, proliferation of slums and Nations Development Programme (UNDP) in the effective enforcement of the law relating to town areas of Geographical Information Systems (G.I.S) and planning.

computerisation of land administration system in the Chapter 3: Development Issues in Ikirun Planning Area State. ❚❚ Getting people sensitized on the benefits of devel- oping housing estates due to the unwillingness of However the dearth of competent professionals like slum dwellers to relocate consequent upon socio-cul- 25 town planners, estate surveyors and valuers as well tural and traditional religious values. as land surveyors among others, to handle land-re- lated issues efficiently appears to be a factor currently ❚❚ Digitalizing the land records and administra- retarding progress in this regard. tion system to facilitate land titling processes and improving access to land ownership for women, the Also, at the Local Government level, land administra- poor and other vulnerable groups. tion is not effective and people acquiring land have to apply for the global Certificate of Occupancy from the ❚❚ Provision of incentives for privately developed state in order to secure allocation. The State Ministry laid-out areas (Estates) to have adequate infra- of Lands, Physical Planning and Urban Development structures in place, to attract people away from the is currently in the process of establishing a Land Infor- overcrowded, insanitary living environments in the mation Management System (LIMS) – tagged OLIMS blighted areas of Ikirun city. – (Osun Land Information Management System). This will enhance the seemingly inadequate database ❚❚ Training of officers in the operation of computer on records on land title registration which has made it software related to land administration such as virtually impossible to determine either the average time digitalizing of documents; geo-referencing; vector- required to register land titles or the cost of registration. ization etc. Furthermore, the E-payment system introduced has reduced the level of corruption in land matters. ❚❚ Sensitising the public on the land acquisition process as well as the importance of paying property However, no local government authority in the state, tax and allied charges due on their individual landed including Ikirun, currently operates LIMS. It is expected and land-related properties. It is observed that trans- that the ongoing reform in land administration at the parency in land governance will be greatly enhanced State level will be extended to Local Governments in through the full digitization of land administration the state. in the State. 26 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project nient duetoincreased transactionscosts. orOsogbo, whichtheydonotfindconve- beneficiaries inthe Planning Area have togoeither Programme) credit to farmers but potential support administers theQIIP(Quick Impact Intervention the institution’s community. The Bank ofAgriculture caters almostexclusively forthefinancialneeds of while theOsun State Polytechnic Microfinance Bank bank’s loans.Other nearby banksare locatedinIree, tendered formsthemajorcriterionforsecuring farmers andtraders.The weight ofcollateral(s) loans from Ifelodun Microfinance Bank are individual account with thebank. Principal beneficiaries of though noRegistered Cooperative Society holdsan handles individualandprivate businessaccounts finance bankin Ifelodun Ikirun. Microfinance Bank There are three commercial banksandone Micro- service. the LGA,have beenretiring somecivilservants from had beennoterminationsofemployment ofrecent in employmenton new hasbeenlifted.Thoughthere MDA officesinthe Planning Area andanembargo Thereopportunities. are almost25 Federal and State securing jobsbecausethere are formalemployment few of the state. People face a number of constraints in level ofpoverty isnotashighinsomeotherparts although in challenges relativefacing Ikirun, terms the Poverty andunemployment are themain economic Economic Challenges 3.2.2 ❚ ❚ surveyors, land surveyors, etc. landsurveyors, surveyors, competent professionals, liketown planners,estate Human capacitybuildingtoaddress of thedearth DEVELOPMENT (LED) LOCAL ECONOMIC such have beenresisted several times. locations maynotbeappropriate, attemptstorelocate roads. According althoughsomemarket totheAkirun, and neighborhoodmarkets are prominent alongmajor specialty products. Apart from these,street trading different ofthestateandoutsideto buy andsell parts have specialmarket dayswhentraderscomefrom While mostofthemarkets operatedaily, fourofthem area are theAlamisi,Saturday andMonday Markets. Amola. Other informalmarkets outsidethecoverage the cityare Oja Baale, Oja Oke, Oja Oba, andOja organized. Existing traditionalretail markets within The markets network in Ikirun Township isnot Markets centre. mainly foundalongthemajorroads atthetownship actively engaged in commercial activities, which are traditional localindustry. are Thepeopleof Ikirun also and tobacco,thechiefcashcrops. Cotton weaving isa asacollectingpointforcotton cocoa belt,italsoserves and okra.Situated edgeofthemain atthenorthern like yams, maize, cassava, pumpkins, beans, kola nuts isasmallcentreIkirun fortradeinagriculturalproducts Major EconomicActivities viable formofcollateral. of the poor and the adoption of group guarantees as a to microfinance bankstocaterforthefinancialneeds qualifying forcredit. ThisisdespitetheCBNmandates the microfinance bankduetostringentconditionsfor collaterals are unlikelytobenefitfrom thefacilitiesof Hence, micro businessentrepreneurs whodonothave Plate 3:AlamisiMarket Efforts to enhance economic activities in the State of Ikirun is popularly known as “Agunbe Onile Obi” i.e. Osun by engaging the private sector have involved the “land of Kola-nuts” hence the advantage it has over construction of modern international markets to meet other towns in the trade in kola nuts from strategic the business needs of the people and investors. Towards locations. Immigrant traders from the Northern part this end government is employing the private-pub- of Nigeria cluster around a crescent on Station road to lic-partnership model by inviting developers to build sort and pack kola-nuts in big bags for transporting to modern markets at Ile-Ife, Ilesa, Ikirun, Ede and Northern parts of Nigeria such as Sokoto, Jega, Minna, Owena. Zaria, Yawuri, Koko, Kano, Maiduguri etc. Addition- ally, they transport traditionally woven baskets to the Given its nodal nature, Ikirun serves as a hub for North from this point while dry meat and onions and kola nut trade. The towns from where kola nuts are ground nuts are traded in return to Ikirun. supplied include Ada, Ila-Orangun, Ilahun, Ilase, Ibokun, Ilesa, Ipetu, Egbeda, Owena etc. Chapter 3: Development Issues in Ikirun Planning Area

27

Plate 4: Kolanut Dealers bulk-packing Products for Sale in Northern Nigeria

The dealers believe that the trade is very lucrative in Other Economic Activities Ikirun Township. Supplies are usually sold at Alamisi The nearby Micom Golf Resort in Ada presents a (Thursday market) and other markets in Ikirun potential opportunity for the establishment of spin-off Planning Area, while the dealers enjoy patronage from supportive services for the people of Ada and environs. Saare and (both major towns in Kwara state). The inflow of visitors generates demand for several services, for which young people with innovative ideas It appears a lot has however changed over the years can develop good business plans which may be funded as commercial activities have taken over agriculture by the operators, Angel Investors, if they are deemed to land in Ikirun thereby hampering the cultivation and meet a felt need in the resort. processing of Kola nuts. 28 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project widows are expectedtobeassisted. Widows Support Programme, thoughwhichabout62 ofSocialDepartment Ifelodun Services, L.G.Aundera fewer than1,000widows have beenregistered withthe not catered forunderstateprogrammes. Also,no programme tocaterfortheagedpeoplewhoare often the localauthorityisimplementingasupplementary the enormouschallengeofagedincommunity, thattheprogramme isinadequatetocaterfor observed tagged “Agba Osun”. However, as the L.G.A has and theaged,whobeneficiariesofa State programme able groups, notably the economically disadvantaged Programmes have beensetuptoprotect thevulner- Opportunities forVulnerable Populations the state. to achieve itsobjective ofbanishingunemployment in lished withtheaimofassistingstategovernment training for unemployed youths have also been estab- privateA few initiatives, such as pilotskillsacquisition beverages) andforbodycreams. they for of types different kernels, palm nuts, cashew include networks. international export Export Businesses of thecompanyishowever low. stillvery people atfullcapacity. Thelevel ofcapacityutilisation The millhasthecapacityforemployment of over 3,000 potential leadingproducer ofsteel products inNigeria. is alsolocatedonOsogbo-Ikirun Road andisnow a Prism Steel Mills Limited,aCompanysetupin2009 its clients. rising the meet to daily shifts three sizes. runs grade major ultra-fine of a limestone Limited, Company West include companies from low for recruited are provide skilled companies the which ties for residents thoughmostoftheopportuni- ofIkirun providesto Ikirun somepotentialjobopportunities located ontheOsogbo-Ikirun road andtheirnearness providedopportunities by theinstitution. towns besideIree from benefittingfrom themarket indigenes tendnottoaccommodatetradersfrom other college isonholidaysorthere isastrikeaction.The Planning Area butthepotentialischallengedwhen market for sale of many household products in the The State of Osun Polytechnic in Iree provides a ready businesses Some indigenesengageinprivate Ikirun export Currently, timber, charcoal and kolanut. The major markets major The kolanut. and charcoal timber, export of kola nut are in India and China, where China, and India in are nut kola of export r uuly sd s tmlns i dus and drugs (in stimulants as used usually are wie ehia pronl are personnel technical while workers, most ofthemajorindustrialenterprisesare and are registered withbothlocaland usd te ein These region. the outside tn Mrl Processing Marble Stone Major products export auatrr of manufacturer h factory The demand of demand local Government Secretariat. acquisition programmes formenandwomen attheold ment. TheLocal Government also organizes skills government withcollaboration oftheLocalGovern- the stateOYES by thestate beingrun intervention fromfor promoting accesstojobsforthepeopleapart The localgovernment however, hasinplacestrategies traditional leadermayneedtobeapproached. ture forthesupport. To acquire landforbusiness,the businesses in the area, but lack - a clear incentive struc ofentrepreneurssupportive whointendtosetup The Ifelodun andBoripeLocal Governments are RoleinLED Local Government key drivers forwealth creation. ment, economictransformationandagriculture asthe to boostfoodsecurity, jobcreation andyouth employ- O’YES (Osun Youth Empowerment Scheme)designed and Agriculture Programme (O-REAP)aswell asthe tandem with the objectives of Osun Rural Enterprise communal peaceandharmony. Thesepointsare alsoin unemployment, restore healthylivingandengender is designed to banish hunger, banish poverty, banish The State of Osun’s Six-Point Integral Action Plan Local EconomicDevelopmentPolicies enable themreturn toastateofeffective functionality. thereformsteps tosupport oftheseinstitutions to parency andaccountability. Government isinitiating them claim to have challenges related to issues of trans- form theyare notmeetingthispotentialasmanyof formal andinformalsectors.However intheirpresent level between astheyactanorganized the interface potential todrive economicdevelopment atthelocal Registered Cooperative Societies inthestatehave the economic status. promote activities andprojects thatimprove women’s of Muslim Women AssociationofNigeria etcto ture, ChristianAssociationofNigeria, andFederation the Market Women Association, Women inAgricul- collaboration with governments and other NGOs like has a strong and membership worksbase in Ikirun in Council for Women’s Societies (NCWS)Osun Branch Day”.annual fundraisingonthe“Ikirun The National raise fundsfor Township Development from the apart “Imolepe” festival isadistinctavenue forallclubsto partners. project assistance from governments and development acquainted witheachother, hencetheyare eligiblefor ations are actuallytrade groups and members are well strength ofabout15-30persons.Some oftheseassoci- tions (mostly clubs) are small groups with membership operating intheState ofOsun. Most oftheseassocia- By April, 2013, there were 343 registered associations Cooperative/Trade Associations Constraints and Economic Problems local officials in such cases. In other cases many of the The embargo on employment had not yet been lifted at projects are not backed with adequate funding, thereby the local government level though it had been lifted at compromising effective implementation at the local the state level. The major current economic problem government level. The key ongoing programmes at in the city is the lack of access to finance for engaging different levels of government are as follows: in economic activities and expanding the scope of existing activities. Federal Government LED Programmes and Strategies:

Capacity Building and Training ❚❚ National Directorate of Employment Programmes- Local government officials have undertaken some training of youth for skills acquisition and granting training on issues such as Income Generation, of start-up capital Monitoring and Evaluation and Empowerment through the support of UNDP, United Nations ❚❚ National Poverty Eradication Programme-(NAPEP) Children’s Fund (UNICEF) and the International (not very pronounced) Labour organization (ILO). By facilitating projects supported by these organizations, officials also gain ❚❚ MDG Conditional Grant Scheme exposure to some capacity building programmes. Though gaps exist in knowledge of contemporary LED ❚ Community Development Programme (World issues among officials, they lack the budget to support Bank Supported)FADAMA I, II,III the required training and official activities are under- taken to a large extent without adequate IT skills and ❚❚ SURE-P (a joint Federal and State programme being back up. Hence a lot of information is lost due to poor funded through the gains of the oil subsidy removal) documentation. The Local Government Library is in a dilapidated state and cannot support informed admin- State LED Programmes and Strategies istration of the state. As in other LGAs in State of Osun, the LGAs in the Planning Area are involved in the state government’s Economic Growth Sectors and Competitive LED strategies which include: Advantage ❚

One of the features which make the city competitive ❚ Farm Settlement Scheme Chapter 3: Development Issues in Ikirun Planning Area is its strategic location as a nodal city. Because it has good road network linkages and its nearness to the ❚❚ Massive agrarian revolution via O-REAP (Osun state capital, there are a number of potential business Rural Enterprise and Agriculture Programme; 29 opportunities in Ikirun. Ikirun is also one of the zones in which the State Government has developed an ❚❚ QIIP (Quick Impact Intervention Programme) industrial estate. ❚❚ Aquaculture Programme Local Economic Development Strategy There are currently a number of Federal, State and ❚❚ Osun Youth Empowerment Scheme (OYES) Local Government LED strategies being implemented in the Ikirun Planning Area towards promoting access Some of the major programmes include. to jobs for the people and they are all being adminis- tered through facilitation by the relevant government a) Quick Impact Intervention Programme agencies. For Federal and State funded projects, the (QIIP) is a short term intervention directed Local Governments act in identifying target beneficia- to fill apparent needs-gap of small to medium ries, guiding external personnel where necessary and scale farmers in order to engineer the process monitoring programme implementation. of food sufficiency and increased income of the people of Osun state through high impact However, some challenges are encountered when timely interventions. This is critical to the full the LGAs administer Federal Government designed blown impact of O-REAP’s large scale farming projects as there often seems to be a gap between their on the state. The strengthening of farmers’ design and the implementation. Many of such projects co-operatives had been a major achievement have therefore become moribund. Such projects of the programme while many farmers in the appear in many cases to be imposed programmes planning area have been able to access small with little consideration for effective local participa- loans through the facilitation of the Bank of tion and support for implementation is difficult for Agriculture. 30 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project F igure sun Rural Enterprise andAgriculture b) underlying philosophyofO-REAP, mainlyits of sometheimplementingagenciesto implementation One oftheinitialchallengesexperiencedin farm centres. month tocover toandfrom transportation ispaidattheendofevery 000 perparticipants eachyear. 50participants Stipends ofN4, – government isrequired torecruit between 20 will also be assisted with farmland. Each local techniques intheagriculturalpractices.They 610 youths annuallywithmodernskillsand of O–REAP Youth Academy which equips government approved the commencement attendant socialmenaceintheState ofOsun, I MDAs. approach, involving different implementing istration. Theprogramme adoptsanintegrated Six-Point Integral Action Plan oftheadmin- These are allwithintheframework ofthe increased householdincomeandState IGR. mation and Wealth Creation thatwillleadto Youth Empowerment; Economic Transfor - objectives, Food Security; Job Creation and Programme (O’REAP)hasasitsstrategic O 3.1O-REAPActivityComponents n order toarrest youth unemployment andthe of OREAP is the resistance c) ments have beenrecorded. being surmountedwhileanumberofachieve - terial approach. However over timetheseare private sector orientation and its inter-minis- of the9federalconstituenciesstate. area. Lifeacademiesare alsoestablishedineach effects onthelivelihood ofthecitizens ofthe area monthly with the attendant multiplier or indirectly injectedintotheeconomyofthis this schemeover tenmillionnairaisdirectly month. Thereforeof N20,000 every through the pilotphaseofschemeonanallowance Boripe localgovernment areas were admittedto Ov skills acquisitionandhumanrightseducation. include; functionaleducation,employment, positive change.Hence thebroad perspectives work, conscious ofglobalissuesanddriving responsible youths engagedinproductive designed tobreed acommunityofsocially is anotherLED-related initiative whichwas O sun Youth Empowerment Scheme(OYES) er 500candidatesfrom eachofIfelodun and Local Economic Development Priority Issues ❚❚ The dualisation of Old-Garage-Ikirun-Kwara State ❚❚ Provision of facilities and incentives to boost the Boundary road and associated support infrastruc- scope of trade in kola nuts through construction of ture in order to open up Ikirun to a large interstate conducive market spaces for the traders; markets;

❚❚ Provision of support for development of value added ❚❚ Provision of funding to support capacity building input for primary goods towards enhancing agricul- among public officials in LED and acquisition of IT tural value chains in the Planning area. The export skills. products in Ikirun require support to generate spin off activities for local producers in the value chain, 3.2.3 GOVERNANCE Such as the establishment of industries for processing Nicotine from kola nuts; Urban Governance is the exercise of political power in managing the resources and affairs of an urban settle- ❚❚ Building the capacity of exporters to enhance the ment to achieve its development objectives. In Ikirun quality of their products to meet international Planning Area the traditional institutions (Obas) standards. The exporters also require access to reliable cooperate effectively with the local governments for the intelligence that will facilitate networking with development of the city. Their opinions are respected potential markets in different parts of the world; by the community and local governments and their consent is important in matters relating to the city, ❚❚ Provision of warehouses for adequate storage of including, according to the Akirun Oba Abdulrauf produce and products before export to enhance Olawale Adedeji, providing monarchs with a platform competitiveness; for visioning towards the development of the city.

❚❚ Renovation of existing markets and construction of Resource Mobilisation toilet facilities in the markets; The Ifelodun Local government council has three major sources of revenue: first, the statutory monthly ❚❚ Upgrade of the existing railway station as planned so allocation from the Federal Government; and, second, that it can facilitate commerce effectively; its share from the state internally generated revenue

and third, the local government’s internally generated Chapter 3: Development Issues in Ikirun Planning Area ❚❚ Construction of roads to link all farm settlements; revenue (IGR). The main sources of local revenue are land rates, user charges, building permits, business ❚❚ Support for establishment of microfinance institu- licenses and sundry fees. Findings from the field survey 31 tions to boost access to credit; indicate that effectiveness of revenue collection at the Local Government level is rather low.

Table 3.12 Comparison between Actual Revenue Collection and Projected Revenue (3year Data: Ifelodun L.G.A)

Revenue 2009/2010 2010/2011 2011/2012 sources (Sample Actual Actual Actual Projected Projected Projected LG revenue Revenue Revenue Revenue Revenue Revenue Revenue items) Collected Collected Collection Land rates User charges 385,000 1000000 30000 1000000 1,213,000 1,220,000 Building 248,390 600000 323,430 600,000 1,138,005 1,150,000 permits Business 2,455,500 1,200,000 1,594,250 1,200,000 685,540 1,200.000 licences/fees

Sources: Consultants Field survey [2013] 32 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T revenue. Hence, effectiveness oftheLocalgovernment attention appearstobeplacedoninternallygenerated the federationaccountandstatewhileinsufficient Area. There isanundue reliance onallocationsfrom Local Government inthePlanning performance was palpableandconstitutesamajorset-backto Poor attitudeto revenue collectionatthelocal level Performance andAccountabilityIssues T is disparityinactualRecurrent Budget andRecur- Government Council(Table 3.5).Conversely, there than Actual Recurrent Budget inIfelodun Local in 2011theestimatedRecurrent Budget washigher estimates in2010and2012were consistent,though Actual Recurrent Budget andtheBudgeted Recurrent Budget Implementation T 2012 2011 Financial Year 2010

Junior andsupportstaff Middle-level staff professional] Senior staff [managerial/technical/ Department Middle-level staff professional] Senior staff [managerial/technical/ Office oftheChiefExecutive[townClerk] Chairman’s office Department able able able Financial Year Local Government Secretariat 3.15LocalGovernment Staff Structure (IfelodunLGA) 3.13ComparisonbetweenActualBudgetandEstimates(IfelodunL.G.A) 3.14ComparisonbetweenActualBudgetandEstimates(BoripeLGA) 2012 2011 2010 3,0,1.418203009,1,6.01,027,500,000 95,719,464.50 1,822,043,000 637,002,116.84 2,8,6.33491107330358 723,330,395.85 723,330,395.85 324,961,180 123,081,365.13 5,9,2.2110900073,159,385.69 1,180,900,000 456,698,425.52 3,1,0.3139,810,203.92 137,810,203.93 0,8,5.710090903165378 529,997,370 381,685,337.84 1,090,900,920 102,980,858.47 336,599,230 ACTUAL(N) Actual (N) RECURRENT BUDGET RECURRENT BUDGET officials/staff Total no.of ADMIN 210 40 75 23 4 2 4 ESTIMATES(N) 336,599,230 Budget(N) BUDGET of theavailable humanresources isineffective. about lack of funds to sustain their projects while use ered toberatherpoorasmostofficialscomplained isconsid- delivery not effectively managedasservice effective. Besides, even themodest revenue collectedis some officialsofthe LGAbelieve thelevel ismoderately in revenue collection is seen to be rather low, though 2011 and2012inBoripeLocalGovernment Council. is different from Capital Budget estimatesin2010, Ifelodun LGA. Conversely, theActual CapitalBudget Budget estimateswere the samefor2011and2012in Capital Budgets, Actual CapitalBudget andCapital Boripe LocalGovernment Council. With regards to rent Budget estimatesin2010,2011and2012 Number of Men 100 30 70 16 4 1 1 947,500.000 ACTUAL(N) Actual(N) N.A. Number of Consultants Field survey [2013] Sources: ConsultantsFieldsurvey CAPITAL BUDGET CAPITAL BUDGET Consultants Field Survey [2013] Source: ConsultantsFieldSurvey Consultants Field Survey (2013) Source: ConsultantsFieldSurvey Women 110 10 5 7 1 3 ESTIMATES(N) 947,500,000 506,100,000 Budget(N) BUDGET N.A. Remarks The two Local Governments in the Planning Area do 3.2.4 GENDER not have documents or policies in place articulating a vision for the management of the councils and the The Federal and State Ministries of Women Affairs practice of budgeting is neither systematic nor partic- and different NGOs have embarked on a number of ipatory, while participation in the process is very public awareness programmes to promote participa- limited among officials. Lack of equipment, relevant tion by women in public and political life in the State information, skilled staff, maintenance culture and of Osun. The National Council of Women’s Societies sustainability of facilities are some reasons given for is particularly active in this regard. However because poor performance of the Local government services. the Convention on the Elimination of all forms of Discrimination against Women (CEDAW) has not The Local Government authorities do not publish been domesticated in the state, there is no conscious documents on their activities and vision but have a attempt to ensure that the recommended affirmative published statement or charter that acknowledges action of a minimum 35% representation of women the citizens right of access to basic services. The Local in elective and appointive positions in Nigeria as government chairmen are currently appointed by the enshrined in the Nigerian Gender Policy is adhered to Governor of the State of Osun. in Ifelodun Local Government. Women randomly take an interest and when they lose to males in the elections The Local government authority does advertise tenders they give up. or publish a list of those awarded contracts. There is a regular independent audit of the Local Governments’ The major factors that constrain the advancement accounts, the result of which is widely dissemi- of women in the town include cultural and religious nated. The local authorities or governments in Ikirun factors, though interaction with traditional authori- Planning Area have an Ombudsman established within ties revealed that the interpretation of cultural beliefs the council to respond to complaints and allegations of rather than culture per se place a barrier on women’s corruption. participation in public life. In the traditional council membership comprise eight males and five females Representation and Social Empowerment (38.5%), which is a little above the minimum figure Information on gender representation in the local for affirmative action as endorsed by the National

government administration is not available because Gender Policy. Chapter 3: Development Issues in Ikirun Planning Area the data base is not readily accessible. Ifelodun Local Government does not have adequate ICT back up There is poor documentation of women’s participation hence data administration is manually handled. in public life in the city, but women are allowed to take 33 part in decision making processes. It is noteworthy that There is no differential water tariff structure in aid women in this city have a voice especially through the of the poor though public water taps are accessible Iyaloja in the case of market women. The Oba noted irrespective of income group. However, water supply is that the women recently took their stand on a matter irregular and most people depend on private arrange- about Oja Oba market near the palace where they ments for water. Water supply is free to the citizenry as contested his position on a heritage site. provided by the local governments. All levels of government are subject the provision of The Nigeria Police Force has in place a crime preven- the Gender Policy which stipulates the protection of tion policy that guides the activities of the institution, women from all forms of violence. However, there but the documentation is not readily available. Formal are claims that cases of violence against women are vigilante groups exist to complement the efforts of the sometimes not reported because people rarely consider police and there are written guidelines for their partic- domestic violence like wife battering seriously, as it is ipation. Intelligence reports are also prepared regularly believed that it can be handled informally in the family. to provide early warning alerts. There are documented guidelines that regulate Police and Community Dispute Resolution Issues Relations Committees for crime prevention. Family courts and Citizens Mediation Panels are being established in the state to serve as Government alter- The Local governments and the police force do not native to conflict resolution among the citizens of have a published crime prevention policy. There are the state. It is expected that this may handle cases of more men employed in the Local Government service domestic violence to some extent. Under the Commu- than women but the difference is marginal and there nity Development Act of 2003, the Police Community is no specific mechanism employed by Local govern- Relations Committee was established to support apart ments such as affirmative action, to ensure women’s from other issues the domestic violence against men representation in Local governments. and women at the community level. 34 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project data onatimelybasis. will enhancethegenerationof genderdisaggregated and feltneedforcapacitybuilding programmes that gender disaggregated data.There isbothaperceived militating againsteffective collectionandanalysisof analysis. ITcapacitygapsare also additional factors for datacollectionand gaps intermsofthemachinery used forplanningpurposesbecausethere are capacity personnel. Gender disaggregated data is not deliberately such asNGOs tobuildthecapacityofprogramme Development collaborateswithdifferent organisations forsupplies. The Ministry Women Affairs and Social also benefittedintermsofaccesstocredit andother for demonstrationtrainingtoitsmembers.Theyhave ment hasprovided Fish smokingkilnstothegroup in allthelocalgovernment areas andthestategovern- Women inAgriculture isrecognized asatradegroup the localgovernment officials. loans. Thesetrainingsindirectly buildthecapacityof 1,220 womenhadearlierbeentrainedandgranted processors from Under Ikirun. thesameprogramme, each ofthethree senatorialdistrictsamongwhowere O’ REAP Quick Impact Intervention training from sors ofGari. Recently, inthe 300womentookpart coordinate includetrainingandequippingproces- for womenwhichlocalgovernment officialshave to Some capacitybuildingprogrammes oftheimportant are by development especiallysupported partners. feeding, Women etc.These inpoliticalparticipation such asHIV/AIDS,Family Planning, Exclusive Breast- seek to build the capacity of officials on gender issues gender issueswhilethere are someprogrammes which have focalpersonsfor ments. Thesedepartments Education andSocial Welfare oftheLocalGovern- addressed by of staffofthe Departments Health, At theLocal government level, genderissuesare Institutional Setup schoolsinIkirun. awareness workshops insecondary Osun State holdsreproductive healthandHIV/AIDS Ifelodun(NYSC) in Ikirun, Local Government Area of (C-PETs), agroup oftheNational Youth Corps Service The AIDS inIkirun. Peer Educators’ Trainers Club PLWAs, Care forOVCs and sensitisationonHIV/ Voluntary Counsellingand Testing Care Services, of NGOs such asLife Vanguard andHope Alive provide Hope World Wide. by organizationssuchasUNICEFand been supported violence againstwomen.Some oftheseinitiatives have create awareness amongwomenontheneedtoreduce awareness campaignsandcapacitytakenstepsto Osun Branch and WARDC have through advocacy, (WADEM), National Council of Women Societies NGOs such as Women andDevelopment Movement 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. Planning Area include: Someof Ikirun. oftheHistorical sitesintheIkirun under thedirect authorityofKabiyesi, theAkirun historical areas land,allhistoricalareas inIkirun are guiding development orrestoration ofheritageor sites. Because there isnocityornationalregulation The Planning AreaIkirun hasnofewerthan10heritage 3.2.5 Governance andGenderPriorities Governance equity. toensure forfemaleparticipants is reserved gender empowerment. In NDEprogrammes a30%quota ment ofPhilippines have builtcapacitiesforeconomic ILO, the Central Bank of Nigeria (CBN) and Govern- National Directorate onEmployment (NDE),UNDP, Development (DFID)trainingonMDGswhilethe United Kingdom’s forInternational Department wide programme onviolenceagainstwoman, the UNICEF –ChildProtection training,Hope World- Training by include development supported partners ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ties, watersupplyandpolicestation. access ofsoftcredit formarket women. appropriate financialinstitutionstofacilitateeasier marketability ofproduct on improved packagingtechniquestoenhancethe Ther tive; I development policyprocesses.participation S relate tolocaldevelopment T P G mproving securityforwomeninmarkets isimpera- trengthening women’s groups foradvocacy and rovision ofultra-modernmarket withtoiletfacili- raining ofLGA officialson Genderissuesasthey overnment shouldestablishguaranteefundsin E O O I O Eseke Car I I O potentials. M defunct), Ikirun; I Kaa Agbadar town’s chiefsandforthecoronation ofkings; O

rele: City(now Theoriginatingsiteof Ikirun rele Shrine, Ikirun; le Ona Museum Iragbiji; ofArts, le Iya Oke; e isneedtoorganisetrainingformarket women ko Ende Water Dam, Eko-Ende; ke Ayee, Iba-Ikirun; ke Iragbiji; kelako Shrine (Eripa); ri Okuta Shrine: Themeetingplaceofthe rimolade C&SChurch, Ikirun; olepe: Annualcarnival festival withtourism HERITAGE e, Iragbiji; e Shrine, Ikirun; Plate 5: Approach View of Akirun's Royal Palace, Ikirun

Regulations, Legislations, Policy historical sites in Ikirun generates any revenue for the Since a national legislation to protect museums and city’s traditional administration and they do not enjoy antiquities was passed in 1939 as well as the Antiqui- any government (Federal, State or Local) support either. ties Ordinance (1953) to protect old buildings from This limits their ability to attain their full potentials as

being demolished, several other legislation aimed tourism attractions. They are so far being maintained Chapter 3: Development Issues in Ikirun Planning Area at protecting and preserving the Nigerian heritage through communal efforts and occasional donations and historic areas, had led to the identification of 55 from well-wishers both from within and outside the national monuments across the country. state. All listed heritage areas in Ikirun city are said to 35 be free from any legal or other encumbrances and can The 1946 Town and Country Planning Act recognizes thus be upgraded through partnerships and proper the need to list buildings of historic, architectural and funding. cultural heritage, while the 1992 Urban and Regional Planning Act provides for the mandatory preserva- Priorities tion of such buildings and similar sacred places. Since ❚❚ Government is to ensure preservation and renova- Ikirun Planning Area has not so far adopted land use tion of existing shrines and other heritage sites. plans these sites have been identified but have not been properly designated. Currently, Decree 77 of 1979 ❚❚ A survey of existing sites and needs assessment is to (Cap. 242 of 2000) guides development and resto- be conducted as basis for upgrading them to become ration of heritage and historical sites across Nigeria. tourist attraction

Also, the State government’s urban renewal project is ❚❚ Clear policies are to be articulated to address the conceived to transform the inner core of nine cities in roles and responsibilities of different stakeholders, the state, namely Osogbo, Ile-Ife, Iwo, Ila-Orangun, especially traditional institutions. Ikirun, Ikire, Ede and Ilesa whose tourism potentials are to be upgraded to attract tourists and investors. ❚❚ Capacities of relevant Local Government officials to be built to enable them effectively administer The programme would help to rehabilitate all dilapi- resources and attract external actors. dated structures close to the palaces of the cities and aid the development of the cultural heritage of the cities. ❚❚ Skills to de developed and employment opportuni- ties created to enable youths to support the tourism The Centre for Black Culture and International industry. Understanding is one of the support institutions that government intends to support. None of the listed 36 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project in publicareas (dunghills)andwaterwayswhich collect anddispose.Uncollected refuse isdumped generate more solidwastesthantheycaneffectively Planning Area people isanindicationthattheIkirun The incidenceofgarbagehipsindifferent ofthe parts Solid andLiquidWaste Management separate from watersources. rivers andwells. Pollutants fromare sewages difficultto compelled to drink and wash in untreated water from pose great healthrisksforthemanypeoplewhoare andopendefecation.Suchsewages humanwastes are contaminated,usuallyby humanwastesfrom rivers, streams, andwells. Some ofthesewatersources waterfrompeople resort naturalsources, torunning for thepeople.Since pipe-bornewaterisnotregular, Access remains tosafewaterinIkirun anurgentneed Water Pollution emerging astheindustrialzone inthestate. the issueisnotstrategicallyaddressed asthearea is exposed topollutantsderived from thesesources if People livingaround thearea are therefore potentially the iron recycling plant on the Osogbo-Ikirun Road. there isconstantemissionfrom heavyvehicles and ofthecountry,which isalsocommoninmanyparts air causedby theuseofcookingfuelsfrom firewood and industrialproduction. Apart from smokyindoor areIkirun poorenergyusepractices,vehicular emission Three principalman-madesources ofairpollutionin Air Pollution management. Area are airpollution,waterpollutionandsolidwastes city-wide environmental problems Planning inIkirun in limited territories of cities. Three of the most serious of issuesarisingfrom therapidconcentrationofpeople Urban environment issuescomprisethewidespectrum 3.2.6

THE ENVIRONMENT tate adherence tosafetystandards. so there is need to set up control mechanisms to facili- the long-termeffectcouldbeharmfultohumanhealth but The effectscannot bequantified inthe short-run close to residences.communication masts located very has numerous like other cities Ikirun in the country Communication Masts dump sitesandindrainagesare stillprevalent. are notprotected by thepublicanddefecationinrefuse water has also ledto gully erosion.run-off Drainages tocollectgarbage,poormanagementofthe service At thecore ofthecity, where there are nodrainsor the totalis5832kg/day. 2672 kg/day and when domestic wastes are included across the 30LocalGovernment Areas inthestateis of medicalwastegeneratedfrom healthfacilitiesspread form oflandfill. It isestimatedthatthetotalquantity and noman-madelagoonstotreat leachetesfrom any landfills totakethelesshazardous wastesfrom them; ical cords, noproperly constructed amputatedparts; others, suchasunclaimedcorpses,placentas,umbil- care facilities to properly incinerate medical wastes and because there are nostructures around themajorhealth- healthcare facilitiesare notbeingproperly managed Furthermore, wastesgeneratedinhospitalsandother problem. systems incitiesoftheState alsoremains amajor sewage disposal of flooding.Theabsencecentral contribute tothespread ofdiseasesandpossibility the regulating, monitoringandsettingstandards (O confirmed that: waste inthestate.StudiesbyOSEPA(2011)have Osun Policy andRegulatoryFramework WMA) location ofdumpsitesandmanagements State WasteManagementAgency is theagencyresponsiblefor Plate 6:IkirunFactorySite for Plate 7: Ikirun Waste Dump site

1. There is only one approved dumpsite in Ikirun Other responsibilities include provision of public 2. There are no approved collection centres. Wastes cemeteries, and assistance in the burial of paupers and are being dropped at junctions and along the animals. For these, the cooperation of the Police is

roads from where they are picked by the agency’s required. Chapter 3: Development Issues in Ikirun Planning Area drivers 3. Average volume of waste being generated daily is The state government enforces 24 regulations relating about 40 tons per day to waste and sanitation in Ikirun Planning Area. The 37 4. The agency has only three functional skip eaters state government is sensitizing the people of Ikirun as to convey waste from where they are being regards noise pollution triggered by religious activities. dumped to the dumpsite. With the declaration of a state of emergency in the The management of the environment is influenced by area of environmental sanitation in the state, a tree- existing policies at state or federal government levels. planting programme has also been flagged off with the launch of Igi Iye, i.e. Tree of Life, in an Implementation of the National Policy on Environ- attempt to halt the effects of degradation, pollution ment at the state level is said to be comprehensive and and losses associated with flooding and erosion. effective except in the area of modern wastes genera- tion such as polythene, plastics, e-waste and spent In order to address the reckless disposal of solid wastes motor engine oil from vehicles, which has also become in the city the authorities have appealed to residents a major problem. Plans have been made to build through various media to cultivate the habit of using mechanics villages and put in place systems for collec- refuse vans purchased by the government to dispose tion and re-processing of the used oil for. their wastes rather than drop them in waterways. Arrangements are also underway to provide more waste The National Environmental Standards and Regula- vans that could reach remote places in the city. The tions Enforcement Agency (NESREA) is a relatively governor has also declared compulsory environmental new federal government agency backed by comprehen- cleaning days for different artisans and traders with sive statutes and applies regulations and standards to emphasis on gutters and drainages on different days determining the location of sites for waste disposal and of the week. (National Mirror April 17 2013) Waste sanitation issues. management in public places is encouraged using large refuse bins located for easy disposal. NESREA encourages citizens to make demands on State and Local Governments to assist in the location of dumpsites in the same way they request for water supply or location of health facilities. 38 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project ❚ ❚ ❚ ❚ the Environment Sector. The following are priorities in some of the important Priority IssuesfortheEnvironment through theEnforcement Monitoring Unit. takes monitoring to ensure compliance with regulations living of the people of the state. The agency also under - Agency (OWMA) inrelation toensuringthehealthy edged theactivitiesofOsun Waste Management Oba Rauf The Akirun, Olayiwola Adedeji hasacknowl- ❚ ❚ ❚ ❚ S N S E generate wealth from: Participation (PPSP)operatorsconcerned could where applicable. Theprivate sectoror Private Sector be encouragedsuchthatwastes canberecycled reduction ofnoisepollution. tion and the creation of awareness of needs for religious activitiescanbemoderated through educa- on theotherhandcanbemonitored. Noise from associated withissuesofreligion. Industrial noise environmental issuesaffectthehealthofall. centres tobeestablishedinmajorurbanareas. standards doexist. Vehicle emissioncontrol testing tate lawsdoexistandshouldbeadoptedby LGs as orting of solid wastes at dumpsites needs hasto orting mission control hasnotbeenenforced even when oise pollutionremains adifficult problem as itis ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ tion. In order tomakethesemore effective, the embarked onaseriesofcampaignsin thisdirec- sanitation practices.Thepresent administrationhas Ther sustaining. willbeeffectiveof solidwasteinIkirun andself- timelines suchthatby year 2030,themanagement I ment toensure proper disposalofwaste strategic placesasalready planned by thegovern - Constr easily defrayed. public sothat administrative expensescanbemore the provision to general refuse collection services Collection ofuserfeesshouldalsobeenfor expedited. P priority agenda. D t is important thatgoalsaret isimportant setfortheagencieswith lans forproviding themechanic village mustbe isposal ofmedicalwastesshouldconstitutea • • • • production;rganic fertilizer • • e is a general need to further promote safe e isageneralneedtofurther metal recycling; bottle recycling; nylon recycling; plastic recycling; B O uction of proper sanitary landfillsitesin uction ofproper sanitary ogs production; io-gas Sources: Consultants Field Survey (2013) Sources: ConsultantsFieldSurvey Plate 8:ALargeSizeWaste Bin ced for government should partner with the private sector Water Supply to provide Public toilets in markets, bus stops, and Eko-Ende Dam is a major source of potable water open places; direct all schools to set up School health supply to Ifelodun Local Government comprising of clubs and give more encouragement to community- Ikirun, some major towns and a few other small settle- led total sanitation ments. Residents in these settlements are faced with water shortage and lack access to potable water. The ❚❚ It is important to build the capacity of staff of Osun alternative sources of water mainly include private Waste Management Agency (OWMA) to carry hand-dug wells, streams, and public hand-pump out their statutory functions more effectively. boreholes. A large percentage however relies on private Specif-ically, more staff is needed for hand-dug wells to meet their daily water needs as some monitoring and materials (refuse trucks, of the public facilities are no longer functional and compactors, pay loaders and bulldozers). efficient (Plate 7). Community involvement in monitoring is essential. Under the Ogun - Osun River Basin Development 3.2.7 BASIC URBAN SERVICES (BUS) Authority capital budget for 2012, five hand-pump boreholes were listed for construction at a cost of N2, The basic urban services considered in the Ikirun Struc- 142,857 each for Ifelodun Local Government Area to ture Plan include water supply, education, electricity ease the problem of water for the residents. However supply, heath, and communal facilities. the level of implementation could not be ascertained.

In Ikirun Planning Area, the social infrastructure and services still remain at a low level. However improve- ments are gradually taking place as the state and local governments have started to address many of the infra- structure constraints being experienced in Ikirun.

Table 3.16 Quantity of Water Supply to Ikirun Township Chapter 3: Development Issues in Ikirun Planning Area s/n Towns Average Daily Water Projected Population Average Water Demand Produced(m3/day) as at 2013 (m3/day) 1 Ikirun 3,333.70 88,972 10,677 39

Source: State of Osun Water Corporation (2013)

Plate 9: Public Water Supply in Ikirun Planning Area

Source: Consultants Fieldwork (2013) 40 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project They includeinadequatefacilities;obsoleteequipment; in provision of stable electricity supply in the area. A numberoffactorshave beenidentifiedasconstraints and itsimmediateenvirons. Eko-Ende Ikirun hastwofeedersthatserve Township 2200kva to 500kva. The 15mva, 33/11kv substation at tap-offs are at33/0.415kvandabout7nosrangingfrom ofthesubstationalongthisroute. The the construction of electricityandhadbeenconnectedtothegridbefore The Federal Government Collegeisamajorconsumer upgraded from 7.5mva, 33/11kv, to15mva, 33/11kv. Eko-Ende whichwasrecently junctioninIkirun, town isthrough a33/11kvsubstationlocatedat supply is concerned. The electricity supply for Ikirun to benefitfrom auniquepositionasfarelectricity centre locatedinOsogbo therefore enablesthecity capital oftheState ofOsun. The National control is located about Ikirun 22.2 kilometres from Osogbo, Electricity 12 LGAs underthesameprogramme. Hand-Pump Boreholes inPublic Primary Schoolsin The LGA isalsotobenefit from thedrillingof36 be drilledinIfelodun, andIfe North LGAs. Irewole LGAs while25handpumpboreholes are to boreholes are expectedtobedrilledinIfelodun and Water andSanitation Agency, eightmotorised Under theprogramme beingimplemented by Rural lation of133Hand-Pumps andMotorized Boreholes. payments underthecontractfordrillingandinstal- oftheproceeds oftheloantoeffect apply aportion tion Sub-programme inState ofOsun andintendsto implementation oftheRural Water Supply andSanita- from the African Development Fund (ADF)towards the Federal Government ofNigeria received financing toimproveIkirun watersupplynetwork. Furthermore, ment includethere-alignment ofpipelinenetwork in The waterprojectsby thestategovern undertaken - Plates 10-11:Street LightingandPowerDistributioninIkirun exercise. while thetrainingof health workers isacontinuous vehicles topatientsinthevarious healthinstitutions The stategovernment provides andambulance drugs however have onlymodestfacilitiesandpersonnel. Primary Health Care Centre. Thesehealthinstitutions State Hospital isavailable asareferral centre from the There isa Hospital Management Board at Iragbiji. A State encounter in thedaily discharge of theirduties. in Ifelodun LocalGovernment CouncilArea ofOsun workers, were oftheproblems thehealthworkers part bed spaces,hospitalequipmentandqualifiedhealth Health Care, the provision availability of of drugs, a poorstate.According totheDirector ofPrimary maternitycentresin afaircondition,thefew are in and Agbaleke. Though the Primary Health Centre is Centres are locatedatPonjo, Olonde, Iya-Ile Abojo, within the Old Secretariat Complex while Maternity The in Ikirun. Primary Health Centre issituated There are manypublicandprivate healthfacilities Health affect Ikirun. laws andalsoadapting federal government laws asthey recreation, thestategovernment isreviewing thestate youth during and after school hours. With regard to venues andplaygrounds for weekend forthe parties as watch footballmatches.Schoolpremises alsoserve especially intheevenings where peopletakedrinksand However, local residents have popular spots they visit There isalsonoorganized openspacefor recreation. closedupandhighdensitytown. isavery Ikirun Open Space/Recreational Facilities formers (11/0.415kv)are out-dated. among others,thoughmostofthedistributions Trans- grid (seePlate two);and poor maintenance of facilities inadequate electricitygenerationfrom thenational Consultants Field Survey (2013) Sources: ConsultantsFieldSurvey Plates 12 - 13: Public Health Centres in Ikirun Source: Consultants Field Survey (2013) Chapter 3: Development Issues in Ikirun Planning Area

41

Plates 14 - 15: Private and Public Health Centres in Ikirun Sources: Field Survey, UN- Habitat (2013) 42 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project schools; free lunch is served atschool,aswellschools; free asfree lunchisserved ‘Opon-Imo’ introduced isnewly tothesecondary renovating schoolsespeciallyclassrooms inIkirun. schools and finally,in secondary remodeling and computer hardware, computersoftware tostudents The stategovernment isproviding schooluniforms, Education been resuscitated. programme (ELSS)andabandonedhealthcentres have institutions through theExtended LifesavingScheme The stategovernment has renovated several health Plates 16-17:RemodelledSchoolandtheforHandicappedChildren inIkirun tions inIkirun institu- schools,there are tertiary and secondary afew atOke-Afo Apartas observed inIkirun. from primary The remodeling of schools is an on-going programme handicapped. down there facilities.AlsoinIkirun, isaschoolforthe now asmanyofthemare instateofdisrepair withrun schools. The public schools however are being upgraded of government andsecondary andprivate primary the physical reach of children as there are a number school uniform.Educational facilitiesare within Plates 18-19:Re-modelledSchools inIkirun Consultants Field Survey (2013) Sources: ConsultantsFieldSurvey Sources: FieldSurvey, UN- Habitat(2013) Priority issues for Basic Urban Services 3.2.8 TRANSPORTATION ❚❚ There is need for construction of a new Water works for Ikirun township; Intra-City Roads and Transportation Transportation in and around Ikirun is essentially ❚❚ Reservoir of the waterworks should be washed and by road. Oke-Afo Street, Station Road, Iree Road, maintained regularly; Eko-Ende Road, and Iragbiji Road are the major roads through which traffic flow is distributed within and ❚❚ There is need to provide boreholes and potable water around Ikirun. by the government for the people of Ikirun, Iragbiji township; Nearly all the roads within Ikirun lack the necessary facilities such as bus shelter lay-byes, side walkways, ❚❚ Government should repair all damaged water pipes; street lights, and drainage system and they are of poor quality. Around the city, the means of transportation ❚❚ Provision of street light and more transformers in include but are not limited to cars, taxis, mini commer- Ikirun, Iragbiji; cial buses popularly known as Korope, and commercial motorcycles also called Okada (see Plate One). In ❚❚ Provision and availability of pre-paid meters to the Ikirun, the public transport vehicles are mainly small populace required; blue buses, motor-cycles (okada) and taxis without uniform colour. ❚❚ Rehabilitation of all damaged and dilapidated primary school buildings; Traffic delays are often experienced around market areas especially on market days due to the busy traffic ❚❚ Government should employ more teachers and and structural defects in the growing Central Business create systems to supervise students to stay in school; Districts (CBDs). Occasional traffic delays also occur at the township centre where the ❚❚ There is need for renovation and equipping of indiscriminate parking of taxi cabs (kabu-kabu) is existing hospitals attributed to the commercial nature of the area. The non-availability of a standard market with lock ❚

❚ Construction of public toilets within the neighbour- up stalls leads to the encroachment of the right-of- Chapter 3: Development Issues in Ikirun Planning Area hoods; way on Ada-Ikirun Road by traders.

❚❚ Provision of modern library is very essential to aid Iragbiji is a linear and small settlement within the 43 access to knowledge and information; Planning Area located on a high altitude character- ized by the presence of massive rock mass affecting ❚❚ Adult education centres must be established in order the spread of population. The main road has no side to reduce the level of illiteracy and ignorance. drains, speed bumps and road signs, even at curved

Plate 20: Indiscriminate Parking of Vehicles and Traffic Control in Ikirun Core Area Sources: Consultants Field Survey (2013) 44 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project The major transportation issuesinclude: The majortransportation the junction-toIlesha/ , andtoIkirun). secured (3m-5m)inalldirections (from Ororuwo to re-planned withjunctionimprovements and setbacks core area atthecenterofsettlement needstobe but withoutroad shouldersforpedestrians.The condition, shallowsurface side drains (not concrete) Conversely, Ada isalargesettlementwithgoodroad conditions without potholes and side drains as well. Agba isasmallandlinearsettlementwithgoodroad isinfairconditionwithlowsurface traffic volume. areas. There are solar-powered street lightsandthe road The main road in hassidedrainsinsome Ororuwo improvement andsecuringofsetbacks. needs tobere-planned assynonymouswithjunction roads withinthesettlement.Thecore area of Iragbaji sections. There are pot-holesdottingthe few various F ❚ ❚ igure section. At Iragbaji, there are sidedrainsandstreet side walk,andbicycle lanesattheMethodist School except fortheabsenceofsidedrains,street light, The Aagbamain road sur 3.2RoadNetworkinIkirunTownship face isinafaircondition ❚ TheOke-Af ❚ ❚ slight erosion onsomesectionsoftheroad. at theMiddle School sectionwhichcontributes of light alongthemajorAagbaroad butnodrainage although drainsare areas. stableinfew (sand) which contributes to the shallowness of drains along theIkirun-Iragbaji Road are filled withearth condition.The existing drains fair road surface along theAda-Igbajo Road sectionshave butfew Igbajo-Ada Road. There are numerous potholes only insomeareas of andnotinmostotherparts Iragbaji. Most streets have shallow sidedrains settlementtoIgbajoIkirun through Aagbaand There from thecorearea includingOke-Afo is alsoapplicabletoallstreets radiatingorrunning setbacks of3mto5malready encroached upon.This adherence toplanninglawswithregards tosecuring turing ofthecore area (citycentre) entailsstrict sections are without road warning signs. The restruc- condition.The and fairroadvarious curved surface signs butithascompactandfunctionalcarriage is Class fromB road the centrerunning of oRoadasaClassBroadiswithout . Figure 3.3 Road Network in Ikirun Planning Area Chapter 3: Development Issues in Ikirun Planning Area

45

Inter-City Roads Ikirun-Kwara State Boundary Road. This route had been notorious for the high number of road accidents The state government and authorities of Boripe due to its extremely poor condition. The dualization is and Ifelodun Local Government Areas have segmented into three phases comprising Osogbo-Dag- commenced rehabilitation of several roads in the bolu (International Market) to Alamisi Market in area in order to reduce traffic congestion on major Ikirun (9.52 kilometres); Osogbo (Old-garage) to roads in Ikirun. Ikirun junction road (20.5 kilometres) and Ikirun-Ila Odo- Kwara State Boundary road (16.5 kilometres). Other roads are also under construction in the area. The ongoing work on the road includes construction of drainage on both sides, construction of bridges on When completed, the roads under construction will the waterways and grading of road surface to ensure contribute immensely to the economy of both Ikirun that the roads are accessible while the drainage system being a nodal town and the State of Osun as the roads would help prevent flooding in the community. will link the market hub at Dagbolu with a spur from Setbacks between houses and roads within Ikirun have the major roads to the market and to Alamisi Market in been encroached upon by property owners and devel- Ikirun. The major route will run from Old Garage and opers. directly to Ikirun and to the Kwara State boundary.

A number of industrial establishments are located on The State Government of Osun has commenced this route as well as the proposed market hub of the construction of the N17.8 billion road being handled state government and the popular Alamisi market, by SAMMYA Construction Company Limited as thereby contributing to development of an emerging part of the dualization of the 45 kilometres Osogbo- CBD in addition to the one at the core area of Ikirun. 46 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project network. Ororuwo- Agba-Ada islinkedby transportation Iragbiji- thus,Ikirun- emerging inthelongrun, planning areaThe Ikirun is more of a “conurbation” covered withconcrete slabs,usedassidewalks. The setbackscanbesecured andexistingdrainswhen setbacks (usedfortradingonbothsidesoftheroads). commercial hubs(future CBDs)are narrow without Roads especially roads within Ikirun linking the two and markings sectionsonthisroad. atvarious curved the entire corridor. There isneedformore road signs there are settlements.There are two zebra crossings on shallow forpedestrianswhere sidedrains,nosidewalk road potholes,few signs,very condition butwithfew Two) isaClassAroad withanimproved road surface The Ikirun–Iree-Ila–Orangun road (see Tables One and Classes ofRoadsinIkirun T 5. 4. 3. 2. 1. S/N able 3.17RoadDevelopmentActivitiesinIkirun Township Road. network ofIkirun Rehabilitation of Intercity Roads Intercity Roads Boundary. Ila-odo-Erin Ile-Kwara Garage)-Ikirun Road. (b). Osogbo(Old Market. Ikirun Junction/Alamisi Market- International (a).Osogbo-Dagbolu Dualization of: Township roads Rehabilitation of PROJECT ROAD LENTH 20.005 333.22 51.69 36.85 (KM) 9.52 CONTRACT SUM(N) 10,300,000,000.00 17,805,000,000.00 1,113,100,501.30 3,300,000,000.00 non-availability ofroad furniture. characterised by potholes,poordrainagesystem,and The ClassC areroads within Ikirun inbadstate agencies. the stateleaves mostofthedecision-making toother passive role, andlandusetoavery whereportation active involvementvery inthe coordination oftrans- rangingfrom alongabroad spectrum state canvary economic development activities. Roles in an individual intheirrole inlanduseand oftransport department There are considerable variations between thestate Ministry ofWorksSource: Ministry andTransport (2013) SAMMYA NIG.LTD DIRECT LABOUR DIRECT LABOUR HAJAIG CONST. CONTRACTOR RATCON LTD %COMPLETION 88.60% 59.25% 57.85 12.0 2.15 12.8 100 Table 3.18 List of Rehabilitated Roads in Ikirun

ROADS LENGTH (KM) 1. Total overlay of Monday Market-Idi Esu-Iragbiji-Igbajo Junction-Ada with Aagba spur (Ikirun 4 Township Segment) 2. Spot Rehabilitation and Total overlay of Ikirun (Idi-Esu)-Otan Ayegbaju-Ila-Ilale KWSB (Ikirun 4 Township Segment 3. Total Overlay of Alamisi-Idi Esu Round about, Ikirun 1.95 4 Rehabilitation of Ikirun Network of Township Road 20.005 5. Dualization of Osogbo-Dagbolu in Int’l Market-Ikirun Junction road (Alamisi Market) (Ikirun 3 Township Segment) 6. Osogbo (Old Garage)-Ikirun Road (Ikirun Township Segment) 4 7. Ikirun-Ila Odo-Kwara State Boundary Road (Ikirun Township Segment) 8 SUB TOTAL 44.955

Source: State Ministry of Works and Transport (2013)

It will be difficult to provide road furniture in Ikirun ❚❚ Sidewalks, side drains, and filling of potholes are due to the existing difficult situations in built-up area. required at the water scheme section of the Ada-Ag- Examples of public/private/community partnerships bajo Road section. Similarly, the road surface is being which provide or manage transport infrastructure are eroded. There is need for lay-byes or public parks for OSTRAMEC (Osun Traffic Management) and trans- vehicles at the market since most of them park on portation department in charge of transport union the road during market days. The non-availability activities. of a standard market with lock up stalls leads to the encroachment of the right-of-way of the Ada-Ikirun Road Accidents Road by traders. There is need to secure the setbacks

The State Government of Osun has procured 19 (3m-5m) to make provision for concrete side drains Chapter 3: Development Issues in Ikirun Planning Area ambulances equipped with modern gadgets to give that can be used as sidewalk. first-aid at accident sites and in transit to hospitals during the flag-off of the Special Ambulance Services ❚❚ There is need to rehabilitate the city square (the main 47 System and Emergency Response Team codenamed round-about) in Ikirun with secured setback on all O-Ambulance Under which the government plans to roads running from the core area. Avenues have to procure more ambulances to cover all accident flash be created for local and urban authority’s partici- points in the state. pation in the maintenance of roundabouts as State ministries are in charge and this creates problem of Some of the roads identified in the state on which maintenance. fatal accidents frequently occur include: the – Osogbo – Ikirun – Konta – Ijabe Expressway. The ❚❚ At Igbajo, there is need for junction improvement dualisation of the Ikirun – Konta – Ijabe Expressway and drains to withstand erosion and then the need is however ongoing. Strategic points have been identi- for sidewalk and provision of bicycle lanes. fied along these roads where ambulance ports will be constructed and ambulance vehicles stationed. ❚❚ The following roads and adjoining junctions need to be rehabilitated while their condition also needs to Black spots associated with road transport accident be improved in order to ensure safety and smooth prone areas include Alamisi Junction, Railway flow of commercial activities which the city is noted Crossing, Prism Steel Company area and Ayepe area. for: Odo-Amo to FGC, Owode Road, Idi ose, Baba Isale to Oke Amola, Oke Amola, Oke Ado, Transportation Priorities F.F Garden, Oke-Iroko, Olonde Street, Emiloju ❚❚ Traffic delays experienced at market areas especially Street (Emiloju Junction), Okiti Baba (Old Inisa on market days need to be controlled due to the Road) -(Unipetrol junction, Eko-Ende junction), busy environment and structural defects of the Oyedokun Street, Station Road (Monday market growing Central Business Districts (CBDs) in Ikirun junction), Odo-Eran Street and Okeba Road (Isosu Township. The sides of the roads in Ikirun also Junction, Roundabout). The roads also need to be need stabilization to prevent erosion by providing equipped with traffic/street lights, sidewalk, traffic concrete cover drains 5km on each road radiating signs, road markings, lay-byes and drainages to make from the center (core) of the settlement. Education them more users friendly. of road users is very important. 48 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project ❚ ❚ Urban SafetyPriorities to offerhelpthoseindistresses soonaspossible. personnel ofthesecurityoutfitswouldbeatscene immediately anyemergencyincidentsoccurwhile andothersarehospitals, fire to be notified service Management Agency(SEMA),securityagencies, Management Agency(NEMA),State Emergency ment outfits, including the National Emergency publicized toresidents ofthestate.Emergency manage- Communications Commission(NCC)whichhasbeen has athree-digit numbersuppliedby theNational area, onIdo-Osun Road inOsogbo. Thecallcentre lished by theState Government atthe Trade Fair The O’Emergency callcentre wastherefore estab- huge fueldumpbutithasnow beenabandoned. operate functionally, including a giant generator and a centrestate. The state ofthe art wasfully equipped to (NCC) establishedanEmergency CallCentre inthe In 2009, the Nigeria Communications Commission guaranteed. mised andthesafetyoflives wasnot andproperties safer thaninprevious years whensecuritywascompro - andpeoplenowfor SARSsecuritysurveillance feel Recently, thestategovernment purchased ahelicopter to monitorthesecuritysituationinstate. for patrol by the Special Squad Anti-Robbery (SARS) ment haspurchased more than150securityvehicles growth, development andprogress. The State Govern- Adequate securityengenderspeaceandconsequently 3.2.9 ❚ ❚ ❚ ❚ ❚ ❚ towards effective facilities accesstonew Information apparatustobeeffectively employed measures andproper useoffacilities Public awareness andeducationonpreventive sections forcommuters parks and spacesforbuses.There isneedforwaiting with concretestructed driveways intoandwithin the The various publicparks needtobe well recon- infrastructure. transport for various organisationsproviding orimproving Capacity building and training required as a priority URBAN SAFETY ❚ ❚ can leadtofire disaster. people todesistfrom indiscriminatebushburningthat The Ikirun. State Fire istherefore Service sensitizing of seasonisnoticeableinsomeparts during thedry The occurrence offire outbreak duetobushburning Fire Accidents flooding. in South Western Nigeria withoutanyincidentof Osun recorded theachievement ofbeingtheonlystate Aafo Streams Consequently, inIkirun. theState of being dredged intheState includeOdo-Fun, Pamoya, which include Otapete Stream in Iragbiji while streams dredging andde-siltingofsomenotoriousstreams was committedby theState Government forthe During theyear 2012,thesumofover N550million to arrestincluding Ikirun, the problem of flooding. of various streams intheState inseveral settlements, About N400 million has been released for the dredging the state. toensureIkirun thatnoflooddisasteris recorded in in some major rivers, notably in Osogbo, Ilesa and ofthestatetoallowin allparts free flow ofwaterways ment hadembarked ondredging ofrivers andculverts To address these concerns effectively, the state govern- of AfoandOsere streams. hasfloodconcernsderivingfrom theprofileparticular potential overflow in duringtherainingseason. Ikirun and floodingisinevitableasthestream bankshave the the heavydownpour ofrains,thechannelsare blocked where waste dumps appear to be increasing. During In there Ikirun, are streams thatpassthrough thetown Flooding early warningsystemstoforestall future possibilities. disasters. However there isneedtoensure existenceof ofsignificantnatural doesnothaveIkirun ahistory 3.2.10 ❚ ❚ Value re-orientation amongthecitizenry. utilization offacilitiesandprocess ofengagement. Mobilisation andcooperationin ofpublicsupport DISASTER RISKREDUCTION Chapter 3: Development Issues in Ikirun Planning Area

49

Plate 21: Security Vehicles Donated by State Government 50 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 04

URBAN FORMS AND ALTERNATIVE GROWTH PATTERN FOR IKIRUN PLANNING AREA 52 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project confusion and unnecessary travel demand. confusion andunnecessary land useplanningontheotherhandbringschaosand day toactivitiesinthatcity. Lackofadequate efficiency, intermsof outof movement andcarrying is properly integratedwithlanduse.Thisbringsabout by the community. In addition public transportation are locatedwhereservices theycanbeeasily accessed as markets andretail shops,schoolsandothersocial vein, usesthatrequire great accesstofunctionsuch while incompatibleusesare separated.In thesame land uses are groupedand complementary together that settlement. With adequateplanning,compatible will determineissuesofefficiencyandfunctionin The waythelandusesare arrangedinanysettlement on decisionsofindividuals,organisationsandagencies. Functional land useconsiderations in anycity are based local, regional, nationaloreven global. turing anddistributionwhoselinkagesmaybe Yet othersare productive activitiesrelating tomanufac- andleisure),sports orspecialneedssuchashealthcare. are institutionalandirregular, shapedby lifestyle(e.g. predictable, such ascommuting and shopping.Others activities, becausetheyoccurregularly andare thus a spatialimprint.Some landuseformsare routine locations and are ofactivitysystems which have part and distribution.Thesefunctionstakeplaceatspecific tude offunctions,suchasproduction, consumption economic, socialorculturalactivitiesimplyamulti- eral areas have lower levels ofaccumulation.Most corresponding land uses, such as retail, while periph- areas have ahighlevel ofspatialaccumulationand relates toarea oflandbuilt.For instance,central 2009). Theformer relates tolocation,whilethelatter and concentrationofthevarious landuses(Rodrigue, of spatial accumulation, which indicates the intensity where activitiesare takingplace.Thesecondisthelevel First is the nature of land use, which relates to places Essentially, urbanformisafunctionoftwoelements. PLANNING URBAN FORMSANDLANDUSE 4.1 before areas openingothernew inthe urban periphery. ofthecity be consolidatedinexistingdeveloped parts case basis.Asmuchaspossibledevelopment would forinnercityredevelopmentopportunity onacaseby from the city centre. This programme presents the best Renewal Programme”, covering onekilometre radius State ofOsun are benefitting from comprehensive “O most residents’ daily commute.Many citiesinthe locations, while reducing to new and other services cantly decreases thecostofproviding transitutilities addition toprotecting arableland,thisstrategysignifi- before drivingdevelopment todistantgreen fields. In need tofirstcreate incentives todevelop suchland, is nolongerneededfortheiroriginalpurposes.Cities or adjacenttoexistingcities.Most citieshave landthat avoid thisbysub-centres locatingcompactnew within extra burden Cityplannerscan ontransportation. land forurbandevelopment andatthesametimeplace opment willonlysucceedintakinggoodagricultural to grow insprawling,extensive andlow densitydevel- want theircitiestogrow. Allowing developments new City authoritieshave tomakechoicesonhow they Compactness ture percapitaonurbaninfrastructure. development ofhigherdensitiestominimize expendi- arable land.The Master planstrongly encouragesthe millionsofsquaretime andpreserve kilometres of conditions over tripdistances,save travel time,shorten community facilities.Thiswillensure bettertransit public spaces,schools,hospitals,placesofworshipand A higherdensityallows more peopletolive closerto road, electricity, telephone,waterandseweragesystems. costofphysicalinfrastructure suchas the construction lines.This reduces by thesame lengthofpublicservice the layout willbe,becausemore peoplewillbeserved area.certain Thehigherthedensity, themore efficient by urbanizationina or lessnumbersofpeopleserved its density. Density inanurbancontextmeansmore about is to use land more intensely, increase otherwise future generationsinevitable.One waytobringthis use of land resources for the benefit of present and reducing over time.Thismakesplanningandefficient daily. Thismeanstheamountoflandperheadis settlement isfixed. However, populationisgrowing The amountoflandavailable toanycountry, cityor Density 4.1.1 Settlements The CaseforMore Compact Figure 4.1 Illustration of the Diverse City concept and the Compact City concept

Existing community Dispersed City Compact City neighbouhood 1. Rapid urban expansion 1. Filling the vacant 2. Great land consumption and under-used land 3. Increase of services and within the town limits infrastructure provision cost 2. Limited consumption 4. More difficult and of land expensive administartion 3. Writing off and 5. Heightening of social sharing facilities and segregation and services isolation 4. Easier and more cost-effective administration

Shared facilities New neighbourhood and services

4.1.2 Urban Forms

FORM 1: MONOCENTRIC MODEL FORM 2: THE POLYCENTRIC MODEL This model proposes a strong high density city centre In the polycentric model there is no dominant city with concentration of commercial activities, jobs and centre. There are sub-centres, Jobs and amenities amenities. This will demand daily movement of people distributed in a near uniform manner across the built from the periphery to the centre. Most Yoruba cities up area. There is therefore no organized pattern of demonstrate this urban form, with all streets radiating movement. There is random movement of people from the Oba’s palace and with markets and commer- across the urban area. This model happens when cial activities in front of the palace. This model will some villages close to each, especially located on a require adjustments since most of the streets leading to major highway merge together but each has its distinct

the city centre are not wide enough to efficiently handle authority and identity. This model is not efficient and Chapter 4: Alternative Growth Pattern and Urban Forms the traffic and transportation demands. There is also is not recommended. the need to provide employment closer to where the people live to reduce unnecessary travels, pollution and Figure 4.3 Polycentric Model 53 traffic congestion.

Figure 4.2 Monocentric Model 54 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project Figure4.4CompositeModel city. andachieve abalancedgrowthjob opportunities ofthe encourage employment inareas presently deficientin and thegrowth ofmultipleactivity areas. It wouldalso tres theexistingCentralBusiness supporting District urban area. Thisoptionwould result inthesub-cen- be organized andmovement ofpeopleacross the withemployment Thereporting opportunities. will sub-centres. Thesesub-centres wouldbeself-sup- This modelhasadominantcentre andmultiple FORM 3:THECOMPOSITEMODEL centre withsub-centres tobecreated. networks willbecarefully plannedtolinkthecore city keep theiridentityandspecialisations. Transportation enable thesmallersettlements engulfed by urbanisation This proposal wouldensure balanceddevelopment and activity sub-centres forexpandingtheurbanform. Business District, andthecreation ofseveral land rehabilitation oftheexistingurbancore, theCentral the plannedlanduseswouldbebased.It involves the Thisisthe Ikirun. recommended model,uponwhich Form 3-TheComposite Model more appropriate for ments inaccordance withourculturalheritagemakes The needtoplanmore efficientandbefittingsettle- a conurbation. some villagesandsettlementsoutsidethecitytoform now mergedwithIragbiji andmaysoonmerge with growsIkirun andexpandsitsboundaries,thetown has Boripe and Ifelodun Local Governments. As thecity of environs, covers two Local Government Areas namely metropolis,Ikirun madeofthecityanditsimmediate IKIRUN PREFERRED URBANFORMFOR 4.2 05

STRUCTURE PLAN VISION, GOALS AND OBJECTIVES 56 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project a dynamicsystemofclearlydefined urbansettlements, Development Policy of Nigeria therefore, is ‘to promote for thecountry. Thegoalofthe revised National Urban initiative is to achieve the national goals and objectives One ofthe implicit aims of any urban development 5.1.1 6. 1. following: next 20 years. The documents reviewed include the vision fordeveloping Planning Ikirun Area duringthe documents andinitiatives towards comingupwiththe This chapter anumberofkeydevelopmentreviews ment. hinged onadoptingmissionsandvisionsofdevelop- 2003 tillnow, manydevelopment initiatives have been and Development Strategies (LEEDS).Dating from Strategies known asLocalEconomic Empowerment Plans andShort andMedium Term Poverty Reduction formulation andadoptionoflong-rangeLandUse include opment asagoodpractice.Theseopportunities foradoptingstrategicvisioning of devel- opportunities management ofurbanareas inNigeria whichcreate general development, especiallyfortheplanningand There are existinglegalandpolicyprovisions toguide ising theresources required fortheiraccomplishment. development initiatives, aswell aswork towards mobil- perspective ofgoodgovernance views andhuman able toagree onandtakebothbroad andlong-term of development, political leaders and the public are ments’ (UNDP1997; TUGI 2002).Through visioning measuretargets andbroadly acceptedperformance - responsible forgovernance musthave ‘a vision,goals, itself. Hence, toeffectively managetheprocess, those governance ofurbanareas forsuccessisahugetaskin ment iscentraltoeffective planning. Managing the Strategic visioninginpromoting sustainabledevelop- VISIONING THEFUTURE CONTEXT OFTHESTRUCTUREPLAN: 5.1 8. 7. 5. 4. 3. 2. The H The O Local E The U The Land-U The N The N

sun Six-point Integral Action Plan Policy 2012 National UrbanDevelopment Vision 20:2020and rban andRegional Planning Law1992 ational Urban Policy 2012 ational Housing Policy 2012 abitat Agenda. conomic Empowerment Strategies se Act 1978 ture and disastermanagement. slum upgrading,includingthe provision- ofinfrastruc ment andaddressing theissuesofurban renewal and need formaintenance,proper planningoftheenviron- ment and income generation. The policy stresses the to drive employsix geo-political zones in the country - establishment of skillacquisition centres ineachof the also help to build the capacity of thesector through the generation andwelfare ofthepeople,policywill growth andthegrowth ofGDPby drivingincome As housingoffersmore foreconomic opportunities system. mortgage a new withthegovernmentin partnership hencetheneedfor are houses expectedtosource forfundsandconstruct the modeofcontractorfinancing,inwhichcontractors regulator. In thisvein, policyis ahighpointofthenew government isexpectedtoconcentrateonitsrole asa the centralrole ofprivate sectorfinancing,whilethe sector, hadlacked.It whichthecountry emphasizes annually toaugmentinfrastructure development inthe ofonemillionhouses for allthrough theconstruction focused onachievingprovision ofadequatehouses approvedThis newly nationalhousingpolicyis able forpeopleintheinformalsector. their financialstatus,and,makeshousingloansavail- ensures thatallNigerians have ashelterirrespective of housing forNigerians whereby citizen counts, every include the introduction of a social element of mass secure tenure.’ Highlights policytherefore ofthenew at affordablewith infrastructure cost and with services housing in healthy environments safe and sanitary ensure thatallNigerians own orhave access todecent, The goalofthe revised National Housing Policy is ‘to 5.1.2 The keyobjectives toachieve thegoalsare asfollows: living andwell-being ofallNigerians’. ment, aswell asensures improved standard ofhealthy efficient urbanand regionalplanninganddevelop- which fosterssustainableeconomicgrowth, promotes ❚ ❚ ❚ ❚ ❚ ❚ them. to plan implementation and are accountable for out theirfunctionsandresponsibilities withregards ment andgoodgovernance plans, township plans,subject lation includingmaster/structure plans,regional use plansthatare prescribed by theplanning legis- E P A romotion of efficient urbandevelopment manage- nsuring thatalltiersofgovernment effectively carry doption andimplementationoftherangeland

National HousingPolicy2012 The Government intends that the Federal Ministry of ❚❚ To identify types and levels of the various physical Housing and Urban Development will work closely development plans, identify the procedures for the with State Governors in the area of enhancing urban preparation of these physical development plans development. Part of the plans is to build new cities. and lastly identify the administrative bodies that will be responsible for the execution of these various 5.1.3 Land Use Act (LUA) 1978 physical development plans according to the tiers or levels of government in the country. The Land Use Act (No 6) of 1978 harmonises the ownership and control of land in the country thereby ❚❚ To ascribe greater emphasis to issues of development providing a uniform legal basis for a comprehensive control, first, by creating a multi-disciplinary devel- national land tenure system. opment control department with wider powers of approving or rejecting development proposals from The purposes of the Land Use Act are: government agencies; second, by enforcing various development control mechanisms and orders against ❚❚ To make investment in agriculture attractive by erring developers; and third, by giving in-depth removing uncertainties in the control of land; consideration to the environmental implications of major development proposals to prevent environ- ❚❚ To curb speculation in urban land; mental degradation and decay.

❚❚ To make opportunities to access land generally avail- ❚❚ To ensure effective control in such other special cases able to all Nigerians throughout the country thereby as wastelands, tree preservation, buildings of special bringing about mobility of resources, especially architectural and historical significance and adver- human resources; and tisement.

❚❚ To re-allocate rural land to large-scale farming. ❚❚ To spell out in an unmistakable terms, the powers of the planning authority with respect to acquiring land The major provisions of the Act are: for planning purposes and its resultant payment of compensation as well as to further emphasise that the ❚

❚ All lands in a state are vested in the authority of the exercise of these powers by the planning authority Plan Vision, Chapter 5: Structure Goals and Objectives Governor; shall be governed by the appropriate sections of the Land-Use Act of 1978. ❚❚ Private ownership rights to urban land are limited to 57 0.5 hectares and rights are restricted for lease-holders ❚❚ To ensure that areas that need improvements of for a term of years; any kind are to be well attended to by the planning authority working in co-operation with the residents ❚❚ Rural land policy situates land for agricultural of such areas. purposes (except the exploitation of minerals) under the jurisdiction of local governments. Local govern- ❚❚ To ensure fairness, justice and equity to all, the ments are to issue customary certificate of occupancy Nigeria Urban and Regional Planning Law of 1992 rights; provides for the establishment of the Urban and Regional Planning Tribunal in each State of the ❚❚ The Acts forbids the alienation of land (urban or Federation and the Federal Capital Territory Abuja. rural) by sale, mortgage and assignment without the prior approval/consent of the Governor; and 5.1.5 OSEEDS and Local Economic Empowerment and Development ❚❚ Permits the revocation of interest over land and Strategies (LEEDS) payment of compensation for unexhausted improve- ment. The Mission Statement of Osun SEEDS is to provide an excellent, efficient and effective quality public service 5.1.4 Urban and Regional Planning that will result in the growth and physical develop- Law 1992 ment of State of Osun as well as in improvement of the welfare of its citizenry with a positive spill-over to other The Nigeria Urban and Regional Planning Decree No. parts of Nigeria. This Vision Statement encapsulates the 88 of 1992 is the first post-colonial planning legisla- Millennium Development Goals (MDGs) which the tion adopted in the country. The general aim of the Osun State Government has decided to pursue vigor- law is to facilitate preparation and implementation of ously. The Plan succinctly addresses different sectoral development plans and planning schemes with a view policy reforms and specifically recognises that effective to creating a better environment for living, working management of towns and cities is vital to a nation’s and recreation. The specific objectives of the law are growth and prosperity, which is becoming increas- as follows: ingly complex due to migration trends. The need for 58 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 4. 2. Action Plan ishingedonthe following sixactions: of Osun (www.osun.gov.ng). The Six-Point Integral the initiatives andprograms oftheState government Rauf Aregbesola administrationasthefoundationof The Six-Point Integral Action Plan wasadopted by the 5.1.6 planning. integrating socio-economicprogrammes withphysical of balancedandorderly development ofthestateby therefore totheachievement emphasized asimportant the preparation ofaRegional Development Plan was others. such asNEEDS,MDGs,and Vision 20:2020among frameworks forHuman andSpatial Development, subsisting nationalandinternational programmes and The programmes are toalargeextent consistentwith among others. waste disposaland,O’Schoolforschoolrehabilitation Reap empowerment; forrural O’ Waste for sustainable conflict resolution, O’ Yes for youth employment, O’ tion for environmental sanitation, O’ Mediation for include O’Renewal forslumupgrading,O’Sanita- various sectors of development. These programmes to eradicatepovertyefforts andlackofprogress inthe six-point agendaasthebedrock oftheadministration’s Several programmes have beenderived from the 5. 3. 1. of Osun mustbeableto: abundant” aspromised by theadministration,people the development promise of ‘freedom for all, life more intheirimplementation.combined efforts To engender ting, hence, the achievement of these actions require The elementsoftheagendaare related andcrosscut-

unemployment; po Sustain adignifyinglifestylesoastobanish Easily feedthemselv • • • • • order to promote communal peace and harmony. people, visitorsandbusinessesinthestate E functional education; Easily accesshealthcar H • njoy peaceandharmonyforthebenefitof ave ajobtobeengagedwithasbanish C Communal P F R B B verty; O ntoa Education. unctional ns Hunger. anish Poverty. anish estore Healthy Living. reate Workand Wealth. sun Six-point Integral Action Plan eace andProgress. es soastobanishhunger; e services soastopromote e services mation blueprintforalongterm planforstimulating The Nigerian Vision 20:2020isaneconomictransfor - economies intheworldby theyear 2020. on transformingNigeria into one ofthe20 leading development plan,the Vision 20:2020 whichfocuses In 2009,Nigeria embarked onplanningalong-term 5.1.8 ment. development incitiestoachieve sustainabledevelop- integrated inalltheMDGgoalsintopromoting spatial therefore,is important thatlanduseplanningis manifestation of the poverty facing all societies. It can largelytracedtoslumareas, which isthephysical the MDGgoalsifdisaggregated spatiallyinurbanareas sustainability, theUN-HABITAT hasarguedthatall Besides MDG Goal 7 which focuses on environmental ment. Goal 8: Develop for a DevelopGlobal partnership - sustainability by 2015ascontained inGoal 7. is consistentwiththeattainmentofenvironmental atpreparingeffort structure plansfortheselectedcities pollution, road conditionamongothers. The present challenges inthisregard vizdeforestation, urban State ofOsun isconfronted withseveral major Goal 7:Ensure Environmental Sustainability; diseases; Goal 6:CombatHIV/AIDS,Malaria andother Goal 5:Improve maternal health; Goal 4:Reduce ChildMortality; Women; Goal 3:Promote Gender Equality andEmpower schooling primary and girlsalikewillbeabletocompletefullcourseof It istargetedthatby 2015,children boys everywhere Goal 2:Achieve Universal Primary Education; poverty tohalfby 2015. ment anddevelopment Strategy (SEEDS)istoreduce as emphasized instateofOsun economicempower - The principaldevelopment objective ofgovernment Goal 1:Eradicate Extreme Poverty andHunger; namely: The MDGsare fashionedaround eightmaingoals, 5.1.7

Nigeria V (MDGs) Millennium DevelopmentGoals ision 20:2020 Nigeria’s growth and launching the country into a path Goal 2: To improve the living and working environ- of sustained and rapid socio-economic development. ments of Nigerians to ensure their well-being, high Fundamental to the vision are two broad objectives: living standard, social emancipation and their contri- butions to national economic growth. ❚❚ Optimizing human and natural resources to achieve rapid economic growth; and 5.1.9 The Habitat Agenda

❚❚ Translating growth achieved into equitable social The second United Nations Conference on Human development for all citizens. Settlements (Habitat II 1996) addressed two themes which were adopted as the basis for the Habitat The two broad objectives are defined across four major Agenda. These are: ‘Adequate shelter for all’ and dimensions: ‘promoting sustainable human settlement planning, development and management in a rapidly urbanizing • Social dimension: a specific, equitable, world.’ The Agenda provides a practical roadmap to an harmonious and just society, where every urbanizing world, setting out approaches and strategies citizen has a strong sense of national identity towards the achievement of sustainable development and citizens are supported by an educational in urban areas. The agenda recognizes the imperative and health care system that caters for all and need to improve the quality of human settlements sustains a life expectancy of not less than 70 which profoundly affects the daily lives and well-being years. of people.

• Economic dimension: a globally competitive economy that is resilient and diversified with a globally competitive manufacturing sector that is highly integrated and contributes no 5.2 less than 25% to Gross Domestic Product. THE VISION FOR NEW IKIRUN (2014-2033) • Institutional dimension: a stable and

functional democracy where the rights of the Plan Vision, Chapter 5: Structure Goals and Objectives citizen to determine their leaders are guaran- teed and adequate infrastructure exists to In the light of prevailing global challenges like climate support friendly and globally competitive change, erosion, deforestation and pollution among 59 business environment; and, others, require strategic and concerted efforts on the part of all stakeholders. The design and implementa- • Environmental dimension: a level of tion of Structure Plan is expected to not only identify environmental consciousness that enables the existing profile for achieving sustainable environ- and supports sustainable management of the mental development in the State of Osun, but also nation’s God-given natural endowment to produce a vision to which residents’ are committed to ensure their preservation for the benefit of contributing effectively in the nine selected cities. present and future generation. The vision for the Ikirun Structure Plan Area, which Thirty two thematic groups, including one on for is derived from the review of the general local and Urban and Rural Development, addressed the identi- international development goals and initiatives and the fied sectoral issues that formed the basis for the vision, priority issues identified by the stakeholders, is there- goals and strategies of the blueprint. The Thematic fore: Group on urban and rural development recognized the centrality of urban and rural development to achieve- “To develop Ikirun as a dynamic, resilient, ment of economic growth and situated the critical livable and inclusive nodal city with strong social, strategies to be adopted for the achievement of Vision economic, human, and infrastructural base that will 20:2020 in the context of two broad goals for the significantly sustain the city as a state industrial sector, namely: hub that ensures employment generation especially among youths, poverty reduction and Goal 1: To establish and promote good governance environmental sustainability.” structures and capacity for developing and managing dynamic, functional, healthy and safe human settle- ments systems at the three-tier government levels to achieve socio-economic and technological growths in the country. 60 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project the the “To “To Development Development Integral Integral urban urban Area Area the wishes of of wishes the .. ObjectivesandStrategiesofthe 5.3.2 a. Strategies: during theStructure Plan period: Planningfor bothmenandwomeninIkirun Area Contribute to achieving universal access to education Objective: c. b. a. Strategies: PlanningIkirun Area. growth, jobcreation andsustainablelivelihood in 2015 through thepromotion ofrapid and economic respect topoverty eradicationbeyond thetargetyear To consolidatethegainsofMDGprogramme with Objective: Structure Plan Planning forIkirun Area are asfollows: The objectives and Strategies for implementation of the 5.3.1 STRUCTURE PLAN2014-2033 GOALS ANDOBJECTIVESOFTHE 5.3 h oeal Goal overall The significantly significantly State State as as Ikirun aswellIkirun asitsenvirons. movement within ofpeople,goodsandservices establishment ofmasstransitsystemforefficient market andindustrialdevelopment. commercial andindustrialuses Allocation ofappropriate landforresidential, population considerations. and equitablespatialdistribution in linewith middle andseniorschools otherinstitutions Allocating appropriate land for outroad improvCarrying business parks, international fr private sectoractivitiessuchas mechanicvillage, Allocation oflandtobothformalandinformal

development and and development articulated articulated Area Structure PlanforIkirunPlanning Ikirun PlanningArea Goal oftheStructure Planfor Govern-ment Govern-ment Action Plan, the the Plan, Action Goals Goals the the contribute contribute in the Ikirun City Declaration” City Ikirun the in and Habitat Agenda, as well well as Agenda, Habitat and people in in people of of of the to to housing, housing, achieving the the achieving Osun’s policies on on policies Osun’s the the ement schemesand Structure ee trade zones for Ikirun Planning Planning Ikirun its its Millen-nium Millen-nium elementary, Six Six Plan goals goals Point Point of of as as is b. a. Strategies: Planning Area Achieve environmental sustainabilityinIkirun Objective: 1. Objectives: d. c. b. a. Strategies: 2. b. c. provision address theexistingimbalanceinhealthfacilities accessible facilitiesaccording toneeds.in healthy andsafelivingenvironment. air spaceandventilation towards achievinga safe andhealthyenvironment lation, pollutioncontrol amongotherstoachieve buildings, roads, drainages,sanitation,aircircu- Enforcing land use Allocating lands for the pr Ensuring citizens’ accessibilitytoimpro thr Promote genderequalityandempower women Rehabilitation andupgradingofexistingschools. sition centr landforvocationalReserving andskillsacqui- historic andculturalbuildingslandscapes the planperiod ities, housing and general environment during to water, sanitation,education,communalfacil- health care facilities; tenure toland. ment andensuringbetteraccesssecurityof control ofdev Enforcing planningstandards, enablinglawsand Planning Ar historicandheritagesitesinIkirun Conserving incompatible landuses waste managementmethodsandseparationof pollution by initiatinginternationallyacceptable Reduction intheincidencesofenvironmental Upgrading ofslumsthrough theimprov start-ups in Ikirun Planning inIkirun Areastart-ups ough participatory approaches to develop - ough participatory es aswell asincubatorsforbusiness ea and preserving andrehabilitatingea andpreserving elopment inrelation toset-back, standards and control for ovision of additional ed access ved 06

POPULATION GROWTH PROJECTIONS (2014-2033) 62 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project a. The plan’s assumptionsincludethefollowing: 6.1.1 recreation, andtransportation. basicurbanservices tics, are afunctionofthedemandsforhousing,work, demographic characteris- population and inparticular Thecurrent andanticipatedgrowthurban services. in other pursuits,movement andrequirements forbasic projected populationforwork, housing, recreation and future population,especiallyfocusingonneedsofthe for thePlanning Area have tofocusoncurrent and population are met.Essentially, landuseprojections planning toensure thattheneedsofgrowing Making future projections iscentraltolanduse for otherlanduseactivities. population istherefore usedtoestimatetheprojections wholesale trade,are notgenerallyavailable. Data on wholesale etc.Data onanyofthesevariables, especially commercial uses draw upon employment trends in turing employment trends andfuture spaceneedsfor industrial andcommercial usesare basedonmanufac- ment needs.Estimatesoffuture landrequirements for and estimates,whichare usedinscalinglanddevelop- ment constitute key elements in population forecasts land development thatoccurs,whiledataonemploy- urban economydeterminestheamountandnature of patterns (i.e.LocalEconomic Development). The population trends, urbaneconomyandemployment future landuse.Thesefactorsincludeamongothers Several factorsare involved inmakingprojections for IKIRUN PLANNINGAREA POPULATION PROJECTIONSFOR 6.1 the State ofOsun. cent, whichisthesameasGrowth Ratefor the National Population Growth Rate at 3.2 per Census, theNational Population hasestimated pull factorasaState capital.Going by the2006 occur on an annual growth rate of 3.4%, given its through naturalincrease andmigration,will That futur

Population Pr Basic Assumptionsfor e growth inthepopulationofIkirun ojections e. 2014 and395,370by 2033(Fig 6.1). 165,274 in2006hasbeenprojected to 213,999in Area disaggregated by LocalGovernments, whichwas The estimatedpopulationfigures for Planning Ikirun - 2033disaggregated by LocalGovernments. tion), asreflected inpopulations estimates for2014 inthePlanning Areaportions (30percentofpopula- per centofpopulation)andLocalGovernments with Governments predominantly inthePlanning Area (70 ojected PopulationFigures projections, figures are computed on the basis of Local In order toachieve credible populationestimates and 6.1.2 h. g. d. c. b. f. of goodsandservices. Osun toembracemanufacturingandprovision the goalofdiversifying the economyofState of substantially increase thisfigure tocontribute to of landallocation,whichistoolow andwill will radicallyimprove ontheexistingamount uses. of standards toensure equitabledistributionof allocation. andneighborhoodconceptsforspace theory district and town levels using the central place respect totheneedsofpeopleatneighborhood, madeinhierarchicalreservation fashionwith been basedontheplannedpopulation,withland education, healthandcommunalfacilitieshave hold populationsize andexisting shortages. especially thetotalpopulation,average house- conv isbasedonthe Land neededfortransportation That requirements. the percapitaspacestandards andfacilityspace estimated usinganumberofmethodssuchas result oftheprojections issetoutin Table 6.1: following formulaassetoutbelow forwhichthe method forpopulationprojection usingthe usingcompoundgrowthbe undertaken rate That thepopulationpr B P Land operational guide. 15% additionalforsocialinfrastructure asthe for anurbanarea forcirculation reserved and t= Time Periodt= Time r= RateofNatural Increase (3.0%) e=Base ofNatural Logarithm(2.71828) P= Base Population Nt= Future Population Where: Nt=P*e(r*t)

That thelandr rojections for provision as of suchbasic services road landuseallocationwillbebasedonaset Pr entional standard of 40% of total land use land use projection for industrial land use for housing is based on housing demand equired forcommercial useis ojections for Ikirun will ojections forIkirun Table 6.1 Population Projections for Ikirun and Environs (2014 - 2033)

LGA 2006 2014 2018 2023 2033 97550 125507 142340 166642 228340 Boripe (70%) (139358) (179296) (203371) (238060) (326200) 67724 88492 100155 119561 167030 Ifelodun (70%) (96748) (126417) (144507) (170801) (238614) Total 165274 213999 242495 286203 395370 OSUN 3423535 4035659 4404660 4936348 6287268

Source: NPC (2006); Consultant (2013)

Figure 6.1 Population Projection for Ikirun Planning Area (2014-2033) Chapter 6: Population Projections for I kirun Planning Area (2014-2033)

63

Figure 6.2 Population Projections for LGs in Ikirun Planning Area (2014-2033) 64 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T T Planning area. to bedeveloped around theexistingsettlementsin which comesto roughly some 3,400 hectares ofland to caterfortheneedsofestimatedpopulation, Table 6.3shows theestimatedlandusebudgetrequired PLANNING AREA LAND USEBUDGETFORIKIRUN 6.2 IKIRUN Area Planning Total additionallandrequired forfuture Development Waste transferanddisposalsites Circulation, Roadsandutilities Institutional use Commercial landuse Industrial development Space required forRecreation/organised openspaces Total landrequired forResidentialuse Current backlogofHousinginthetown Number ofHouseholdsat6personsperhousehold Additional populationtoplanfor Projected populationto2033 Population in2014 able 6.3LandUseBudgetfortheProjected Population(2014–2033) able 6.2PopulationandHousingShortfallsinIkirunPlanningArea Total) (70% of Ifelodun Total) (70% of Boripe LGAs (2006) 96748 97550 lation Popu- LGAs (Planning tal, 2006) Area To- Regular (20429) (29540) House- 14300 20678 holds Shortfall Housing (LGAs, (3531) (1749) 2006) 2472 1224 ning Area tion Plan- take-off year 2014. rate gives anestimatedbacklogof4,755personsforthe when projected to2014atthesamepopulationgrowth at all,istakenasthehousingdeficitfor2006.This, that atotalof3,696personsdidnothave anyrooms Population andHousing Census.Thedataindicating teristics andAmenitiesdatafrom the2006National Area isestimatedonthebasisofHousing Charac- The current housing backlog for the Planning Ikirun Popula- 165274 (Total, 2006) Planning Shortfall Housing (2006) (3696) 4755 2014 Area ed Pop- Project- 213999 ulation (2014) Total ed Pop- Project- 242495 ulation (2018) 181,371.0 395,370.0 213,999.0 Total 30,228.5 3,358.4 1,943.5 4,755.0 610.8 249.9 249.9 222.1 27.8 54.4 ed Pop- Project- 286203 ulation (2023) Total ed Pop- Project- 395370 ulation (2033) Total Indicators for assessment of basic urban services for the 6.3. purpose of projection are shown in Table 6.4. INDICATORS FOR BASIC URBAN SERVICES

Indicators for Basic Urban Services are based on local data on a range of variables which could potentially be used to assess future infrastructure needs based on the projections assumed in the previous chapter.

Table 6.4 Indicators for Basic Urban Services

Basic Urban Service Possible Indicators Indicators adopted 1. Education • Number of public and private primary schools located in 1. Additional primary schools required the planning area 2. Additional secondary schools • Number of public and private secondary schools located required within the planning area 3. Additional tertiary establishments • Number of tertiary establishments located within the required planning areas 2. Water Supply • Household Usage: Litres per person per day • Additional household requirements • Supply: Quantity of water supply to the planning area • Additional supply by state water by the state water corporation corporation 3. Electricity Supply • Kilo Watts hours (KWh) per annum per household • Additional household electricity • Kilo Watts supply to the planning area by the state required PHCN • Additional kilo watts supply

required Chapter 6: Population Projections for I kirun Planning Area (2014-2033) 4. Health • Number of public and private hospitals/Clinics located in • Additional hospital/clinics required the planning area • Additional hospital beds required 65 • Number of private and public hospital beds located in • Additional health workers required the planning area • Number of emergency patients attended to each year • Number of health workers available in the planning area 5. Sewage Disposal • Amount of kerbside waste disposed in the planning area • Additional kerb-side household • Number of reserved waste disposing lands available in waste generated the planning area • Additional reserved waste-land required 6. Recreation • Estimated amount of public access open space located • Additional recreational facilities in the planning area required • Number of indoor and outdoor sport centres/stadiums • Additional open spaces required located in the planning area • Number of churches, mosque, museums and art galleries located in the planning area 66 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 07 Chapter 7: Structure Plan for Ikirun Planning Area (2014-2033)

67 STRUCTURE PLAN FOR IKIRUN PLANNING AREA (2014-2033) 68 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project Figure7.1LandUseProposal forIkirun Planning Area given inFigure 7.1below. and integrated.Theproposed is landusefor Ikirun areland useandtransportation properly coordinated providing businessesandensuringthat spacesfornew arranging landusestocomplementeachother, This willbeachieved inthe Structure Plan through measures intheplantoreinforce thesefunctions. itsimmediatecityregioncial centre requires serving fortwolocalgovernmentsheadquarters andacommer- The unique asbothadministrativerole of Ikirun PREAMBLE 7.1 around roads. the majorproposed ring/arterial provision isthecompactmixed landusedevelopment areas, commercial andpublicinstitutions.On unique adequate provisions have beenmadeforindustrial urban expansionofexistingresidential areas. Similarly made forresidential land,intheformofaplanned courses from pollution. Adequate provisions have been opment aswell thedamsurrounding aspreserve water protect the goodagriculturallandfrom urbandevel - ofthetownland useinthewestern part inorder to etc. Theplanhasmadeprovisions foragricultural tial, commercial, industrial,publicspaces,recreational covers allthekeycategoriesofusessuchasresiden- The Land use proposals for the Planning AreaIkirun LAND USEPROPOSALS 7:2 To achieve effective land use planning in rapidly being developed by the local governments within growing cities, UN HABITAT advocates a three- Ikirun Planning Area, namely the Ifelodun Local pronged approach, involving: Government housing scheme which is about 65% completed; the Eko-Ende Road Scheme a. Preventive planning – planning in advance; (recently renamed Oba Rauf Adedeji Housing b. Planning at the scale of the problems; and Estate); and the estate at Dagbolu Village along c. Planning in phases, beginning with ensuring Osogbo Road, Ikirun as well as all other proposed adequate physical access and basic urban services, schemes already allotted for housing by the local especially water and sanitation. and State governments. 4. Improving access to serviced land through This will be achieved in the kirunI Structure Plan by construction of additional residential layout also locating land uses to complement each other and schemes and sites and services projects. ensuring that land use and transportation are properly coordinated and integrated. New Housing Development New housing development are recommended for Land use planning and design of the Structure Plan location at the Dagbolu Housing Scheme on is hinged on adopting integrated and participatory Osogbo Road as well as around the Federal approaches to land use budgeting and relating this Government College located on old Osogbo-Ikirun to the projected population. It also entails advancing Road. This location is in close proximity to the broad land use development control measures for new Dagbolu O-HUB Commodity market monitoring architectural design and redesign, building currently under construction. These shall development and redevelopment, as well as strict compliment the already existing Property implementation of the land use proposals as designed. Development Corporation Estate located at The land use proposals are guided by well-defined Orisa Elejin area on Osogbo Road, Ikirun. principles and identified priorities in line with the Since the preferred urban form for Ikirun Planning goals and objectives of the plan. area is the composite modal integrating the mono and polycentric models, new housing would be developed 7.2.1 Shelter and Slums in each in the other communities within the Ikirun

Planning Area with each residential development taken Chapter 7: Structure Plan for Ikirun Planning Area (2014-2033) To meet the housing needs of families in Ikirun, a as an integrated package provided with essential basic comprehensive approach to addressing the issue of urban services and facilities. In Nigeria, the private backlog of housing needs, improvement of existing sector is the leading provider of housing, being respon- 69 housing stock and provision of new housing units sible for about 84% of the housing stock nationally. and serviced land for housing has to be adopted. The Efforts are to be made to get all stakeholders in the Structure Plan for Ikirun therefore adopts a four-fold housing sector to play their roles effectively. strategy comprising: Urban Renewal 1. Upgrading all existing residential areas that The extension of the O-Renewal slum upgrading manifest the attributes of slums as defined by programme has been recommended for all blighted UN Habitat. This will focus on in-situ upgrading parts of Ikirun. This corrective measure will address the of existing housing together with provision of existing housing gaps in Ikirun and environs. However, comprehensive on-site infrastructure such as a preventive approach of not allowing slum formation roads, drainage, sanitation, water supply etc. in the first instance is recommended. Building on the This proposal is in line with the programme of the experience gained from these and other previous Urban state government to carry out urban upgrading Renewal schemes, basic strategies to be adopted to within one kilometer radius of the core of Ikirun. arrest the proliferation of slums in Ikirun and environs Consequently, the activity is to be extended to will include the following: cover all parts of the town and not just the older parts of the city. Attention will be paid to the ❚❚ Provide support to local government councils, the proper channelization and dredging of streams Property Development Corporation of Osun State which pose a hazard of flooding to residents. (PDCOS) as well as private sector housing providers, 2. Introducing in-fill housing programmes in to acquire and lay out sizeable parcels of land with the upgraded areas, where vacant land exist, to associated infrastructure in place before planning maximize the value and benefits of the new infra- approvals are given and housing construction structure being upgraded. commences on the sites; 3. Initiating new housing projects to cater for the expected population increase in the short, ❚❚ Ensure equal access to both the rich and poor in medium and long terms. The plan proposes the order to guarantee access to affordable housing for completion of all uncompleted housing schemes all strata of the anticipated population; in the city, particularly the housing schemes 70 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project Urban planningissues iity f ad, hscl lnig n Urban and Development. Planning Physical Lands, to of activities Ministry its development of reports periodic sustainable rendering for same and uses land various for schemes prepa-ration the for land of acquisition and infrastructure coordinating Capital policy as designated planning policy Government physical initiate programmes to is OSCTDA the broad areas, affected the for (OSTDA) Authority Development Territory Governments Specifically to ministry anchoring the expect to people for tendency ❚ ❚ ❚ ❚ ❚ less onerous thanhitherto. document-search and allied land governance activities Osun needstobefullydigitalized, inorder tomake The landadministrationsysteminthe State of Land Administration a largeextent. institutions thatrepresent theinterests ofthepeopleto milestones by all stakeholders including the traditional access toinformationonbenchmarks, roadmaps and Akirun’smeaningful, reflected views theneedforwide inter-ministerial committees.For urbanplanningtobe for synergy among allministriesthrough ‘effective’ the Structure Plan showed clearlythat there is need The facilitymappingetc. surveying, Local Government officialsinsuch areas asGISskills, Planning Area. There isneedtobuildthecapacityof was perceived inthetwoLocalGovernments inthe ofcapacityinrelationA dearth tourban planning state. Although ❚ ❚ ❚ ❚ ❚ suffering occasioned by their relocation; it isabsolutelynecessary, especiallytoalleviatethe Relocation andresettlement ofslumdwellers, where Adoption ofupgradingandr Upgrade slumsin-situ; Adopt pr pr Through demonstrated strong political support, only feasiblealternative; option for slum upgrading unless such becomes the than totalbulldozingofslumsasthepreferred essential ingredients forsustainabilityoftheproject; alized community-driven development initiatives as e h sl aec paig l te roles. the all playing agency sole the be omote community participation andinstitution- omote communityparticipation experience of the Urban Renewal programme and o-poor buildingcodesandstandards; at o Ieou ad Boripe and Ifelodun of parts r udr h Ou State Osun the under are ihn h faeok f h State the of framework the within many agenciesare involved, there n porme fr h area the for programmes and appear ertr; ntaig and initiating Territory; to bestand aiiis n services, and facilities ehabilitation, rather management of management f planning of alone t and etc

Capital in the Local hence is a the ❚ ❚ ❚ ❚ The following strategiesare recommended: framework tofacilitatehousingdelivery. in order toenhancetheoverall landadministration address capacitychallengesaffectingtheiroperations, both withinthesameMinistry, to itwillbenecessary Since landuseplanningandadministrationare ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ Impr huge percentage ofgovernment’s annualreceipts; tax,whichaccountforaproportionately property chargeable ondifferent land-related transactionsand and ground rent onparcels oflandleasedout,fees Revie control compensation assessment and settlement etc; oration onhandlinglandacquisition, development well as Surveyor-General’s office, involving collab- staff of Lands and Town as Planning departments Capacity buildingonLandGo Comprehensiv implementation strategies. Structure aswell astherecommended phasingand local governments abouttheprovisions ofthe Familiarising all staff ofther The Str Str policies andregulations by thestategovernment. in theState ofOsun through investment-friendly Ensuring the needsof“vulnerable” strataofsociety. friendly policiesinlandadministrationtocater Dev in thecity’s landadministrationsystem; working implementswillbringaboutimprovement issues proficiently as well astheprovision ofnecessary etc.tohandleland-related landsurveyors surveyors, of competentprofessionals liketown planners,estate Revie across theState ofOsun; Land Information Management System) for all land Fast-tracking establishmentofO-LIMS–(i.e.O ment ofprofessionally qualified managers; improved landdatabaseadministrationandrecruit- government level by improving efficiencythrough vectorization etc; training ofofficersonGIS/LIS,geo-referencing; tion oflandsrecords project whichistoalsoinvolve engthening theCapacityofPlanning Agencies elopment andadoptionofpro-poor andgender ovement oflandadministrationatthelocal w ofrevenue beinggeneratedfrom premium w of staffing positions to mitigate the dearth w ofstaffingpositionstomitigatethedearth ucture Plan recommends thefollowing; support to development of land support markets e implementationofthedigitaliza- elevant thestateand vernance systems for sun ❚❚ Ensure that adequate resources are made available in the town, such as market women associations, the annual budgets for the implementation of the transport unions and, building materials traders are plans organized and provided with training to improve their business management skills. In addition, a ❚❚ Establish an agreed coordination mechanism, special commer-cial or special use zone will be for ministries, department and agencies for the developed around the proposed outer ring road. successful implementation of the plans High Street Development ❚❚ Conduct training programmes for all relevant staff The following high streets are recommended for on plan implementation and development control. improvement/upgrading as mixed use zones:

Housing Finance ❚❚ Ikirun to Iragbiji to Ada in Boripe LGA corridor; One of the constraints militating against housing provision, beside land and infrastructure, is availability ❚❚ Ikirun to Eko Ajala to Eko Ende corridor; and access to housing finance. Adequate measures are therefore required to attract financiers and funding, ❚❚ Ikirun to Obaagun to Iree to Iba and Sabo corridor; both for owner-occupied and rented housing stock. The state Ministry of Commerce, Cooperatives and ❚ Oke-Afo Street. Empowerment would promote establishment of housing cooperatives and microfinance institutions to A detailed study and design is to be conducted to assist low and medium income earners to gain access to promote this mixed use proposal with a view to finance their housing units. increasing the density of the neighborhoods, creating adequate off street parking and promoting harmonious 7.2.2 Local Economic Development co-existence of different compatible land uses.

There is an urgent need for immediate measures to Town Centre Redevelopment improve the economic base of Ikirun and raise the The town centre redevelopment, in line with the income levels of majority of its residents. The Structure O-Renewal programme, is to be expanded with provi-

Plan strongly recommends adoption of the following sion of basic facilities like public toilets, markets, Chapter 7: Structure Plan for Ikirun Planning Area (2014-2033) measures to boost the local economic base, employ- library, bus terminus, upgraded township roundabouts ment and income. and upgrading of Oja Oba, the Akirun’s Palace and Square as well as Osere waterfront. 71 Commercial Land Use The Plan recommends the upgrading of all existing Urban Agriculture markets in the area to make them function properly Ikirun has a number of streams running through the city and effectively as a way of boosting the economy which are at present prone to causing flooding in some within the Planning Area and providing employment. neighbourhoods. These river banks and flood plains Currently, commercial land uses are largely unorga- however provide fertile grounds for both rain-fed and nized. Commercial activities occur along the major irrigation farming. Urban Agriculture plays a critical traffic distributors, mainly at the township centre and role in ensuring food security, providing employment around the Oba’s palace. For a meaningful develop- and reducing poverty. As a deliberate policy, urban ment more organized commercial activities would be agriculture is being integrated into the economic base of developed around transportation nodes in new areas in the city. The Department of Planning in collaboration addition to the commercial facilities recommended as with the Department of Agriculture in the respective part of the integrated residential development, local governments in Ikirun town and environs are to identify and allot suitable sites for allocation to inter- Industrial Land Use ested farmers. Agricultural extension services are to There are few industrial establishments along Ikirun- be provided in support of the scheme, which could Osogbo-Offa road. Provision has been made in the be integrated with a waste recycling scheme by which plan for adequate land on this axis for industrial area. biodegradable solid waste would be converted into This area is to be better organized to provide space for compost for use on these farms. relocation of service industries and other industries that would use iron and steel as their raw materials to In addition to urban agriculture, the structure plan benefit from clustering and agglomeration. strongly recommends the preservation of fertile agricul- tural land. In this vein, the land on the north western Small Businesses part of the town around the Eko-Ende dam has been Small and informal businesses are the backbone of the allocated for agriculture. This presence of large body economy. As a deliberate policy mixed land uses will of water will ensure an all year round cultivation of be allowed in some new residential neighborhoods to crops through both rain fed agriculture and irrigated provide good accommodation to small business. In farming. addition it is recommended that trade associations in 72 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 3. 1. steps inrespect ofeducationintheplanningarea: in the state. The Structure Plan proposes thefollowing anticipation ofdemographicgrowth andsocialchange infrastructure isrequired intheeducationalsector tion of schoolsinthePlanning Area, though additional The stategovernment isembarking onthe rehabilita- Education services: This Structure Plan addresses thefollowing basicurban facilitiesetc. and sport and healthcenters,cemeteries,firerecreation service, Centre, public parking areas, educational institutions electricity, solidwastemanagement,publictoilet,civic equitable access to affordable water, sanitation services, urban growth. The Structure Plan alsoseekstoensure tomeetbacklogsandmatchfutureland reservation coverage by making adequate to basic urban services The Structure Plan aimstoimprove accessand 7.2.4 6. 5. 4. 2. 1. Planning Area: proposes the following toaddress wastedisposalinthe an eyesore inthePlanning Area. The Structure Plan ities, poor environmental conditions have constituted ineffective andabsenceofwastedisposalfacil- sewages Due poor hygiene practices, to poor maintenance, very Solid andLiquidWaste Disposal 7.2.3 primary schools in Ikirun, whichare schoolsinIkirun, inpoor primary and safedisposal. through waste sorting, compostingandrecycling.through wastesorting, in order toprovide incomeandemployment Practically collect liquidwaste effectiv Construct wastedisposalsite. systems, includingsanitary Allocate andreser r dealing withcollection,transportation Adequately planawastemanagementsystem awayfowl water carry Pr Sustaining thepr within thearea Provide adequaterefusecollectionfacilities

ovide adequatedrainagesystem(drains)to Basic UrbanServices Environment , explore theissuesofwastetowealth particularly thecommercialareas. ve landforwastemanagement e sewages thatcaneffectivelye sewages esent rehabilitation ofall ecycling 2. have beenadopted. for watersupply, hence,alternative sources ofwater has proved insufficient in meeting the growing needs major source of potable water to Ifelodun LGA yet this the residents town. ofIkirun The Eko-Ende damisthe Inadequate watersupplyisamajorproblem facedby Water Supply 4. 3. 2. 3. 1. Planning Area are asfollows: Structure Plan proposals for health development in the hospital equipmentandqualifiedhealthworkers. The toimproveefforts bedspaces, availability ofdrugs, tion andthestategovernment ismakingconcerted Health facilitiesinthePlanning Area are infaircondi- Health laboratory andminiweather station. laboratory e-library, sick-bay, sciencelaboratories,music for thephysicallydisabledaswell asoflibraries, facilities wouldbeprovided withaccessroutes accommodate risingstudentpopulation.The schoolsto classrooms forpublicsecondary state ofrepairs ofadditional andconstruction Impr Pr Reser Pr private) and landscapeofallhealthfacilities(public each level ofcare. relevant diagnosticequipmentpermissiblefor Counseling and Testing facilitiesandother Maternity Centres andprovide withHIV/AIDS Iba, Ada Iragbiji, Sabo Health and Ikirun and ments inEko-Ende, Eko-Ajala, Obaagun, Iree, bed spacestheprovision ofandhospitalequip- where necessary, by increasing availability of health facilities of Ikirun Structurehealth facilitiesofIkirun Plan Area. Pr Impr existing andproposed residential areas visual andotherteachingtools. Osun School for theHandicapped, especially campus oftheOsun State University. ovision ofadequatehealthpersonnelinall ovision ofcommunityhealthcentres inboth ovision ofrequired facilitiesfortheState of ove/rehabilitate andmaintainthestructures ove andupgradeexistinghealthfacilities, ving land for the site for a new satellite ving landforthesiteanew Table 7.1 Water Supply: Average Demand in Ikirun, Ila-Orangun and Osogbo Townships

Towns Average Water Average Water Population Projection Produced (m3/day) Demand (m3/day) (2013) 1 Ikirun and Environs 3,333.70 10,677 290,125 2 Ila Orangun and Environs 2,704.50 9,295 123,188 3 Osogbo and Environs 15,641.67 4,9148 1,067,467

Source: State of Osun Water Corporation (2013)

The following are proposals are made for water supply 5. Re-organization and strengthening of the in Ikirun Planning Area under the Structure Plan: capacity of the State Water Corporation to carry out its statutory functions 1. Provision of funds for projects to source water 6. As a short term measure, the drilling and instal- from the Eko-Ende dam to other parts of Ikirun lation of Hand-Pumps and Motorized Boreholes town to bridge the current shortfall. 2. Installing functional boreholes to complement 7. Completion of drilling of 36 Hand-Pump supplies Boreholes in Public Primary Schools in 12 LGAs 3. Rehabilitate existing distribution system and under the same programme. When these projects extend water supply to deprived areas. are completed, it is expected that the water situa- 4. Introduce effective system of cost recovery for tion will improve tremendously in Ikirun and sustainability of operations environs.

Table 7.2 Water Projects in Ikirun

PROJECT LOCATION REMARKS 1 Relocation of pipeline Alamisi Market to Eko-Ende road • Awaiting release of funds Chapter 7: Structure Plan for Ikirun Planning Area (2014-2033) Junction Ikirun 2 Construction of Walkway on Eko- Eko-Ende • Completed Ende Dam Gate • Eko-Ende Water works supply 73 3 Procurement of Generating set for Eko-Ende Waterworks • Completed Eko-Ende Waterworks • For lighting • Eko-Ende Waterworks supply

Source: State of Osun Water Corporation (2013)

Electricity Supply Recreation Centres Several constraints have been highlighted in respect of There are inadequate organized open spaces for recre- the provision of stable electricity supply in the Ikirun ation in the Planning Area. Similarly, open spaces, Planning Area. The following recommendations to especially those within school premises serve as improve electricity supply in the Planning Area are playground for the youth and also serve as venues proposed under the Structure Plan: for week end parties. The following proposals are recommended under the Structure Plan to encourage 1. Extension of electricity reticulation to un-served recreational activities in the Planning Area: neighbourhoods to improve access and coverage 2. The planning authority in collaboration with 1. Land will be reserved for the following recre- appropriate Power agencies will identify and ational activities: allocate land for location of required facilities in a) Development of open spaces, parks, stadium new developing areas (in Ikirun) and mini sports centre in Iree, 3. Exploring the possibility of investment in the Iragbiji and Agbaa Museum and tourist attrac- Independent Power Production sector as a way tions. of ensuring an adequate generation of power for commercial and industrial prosperity will be b) Development of parks (mini-amusement) and explored; playgrounds in each residential, neighbour- 4. Harvesting non renewable energy sources to hood and communities. augment electricity supply in the area. c) Provision of a sports hall, swimming pool and games hall in city stadiums. 74 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project F d. c. b. a. ties suchas: thediversityinfrastructure of urbanactivi- tosupport for andplanningthelandrequired fortransportation Planning Area are tobeintegratedby makingprovision Transportation andlanduseinteractions within the Land UseandTransportation 7.2.5 2. igure travel triptohealthcentres, schoolsandshops facilities. expansion willgeneratetravel andneedforne corridor. Thesustenanceofthepresent highway materials (scrapsetc)alongtheOsogbo-Ikirun Industrial activities-haulageofindustrialraw Environs. Environs, andEnvirons, Ikirun Ila-Orangun and local government headquar Administrative activitiesatthe statesecretariat, andtheextensionof Ikirun Adequate utilization of the Lake in North-West Residential landuseactivitiessuchasadditional market various the at activities Commercial Railway Corporation. between the stategovernment andtheNational activities. This will require closecollaboration line totheLakeboosttourismandtourist and Ikirun; (MDS andOke-fia;settlementareas)ofOsogbo

7.2RoadImprovements inIkirun andEnvirons Transportation ters with Osogbo and the existing railway w f. e. ie y leitn cneto, n achieve and congestion, other mobility-relatedgoals. alleviating by projects travel time decrease safety, transportation improve are to planned and state usually goal as project’s intentional a of part These regulations. related and programme through support would land Transport of Ministry State The general. with congestion)andeconomicdevelopment in educational development (early arrival atschool highway infrastructure as a means of supporting The structure plan recommends investment in Improving ofClassCroads roads within surface goals. congestion decrease will environs and Ila-Orangun and Ikirun Osogbo, Oshogbo, IkirunandIla-Orangunenvirons circulation be will eeomn pooas n h Srcue Plan Structure the in proposals development n nrsrcue enhancement infrastructure an n achieve and discouraged seily ls C od in roads C class especially dpin f transportation- of adoption travel nlecs r seldom are influences te mobility-related other ie y alleviating by time improved through sal not usually are Multi-mode Transport System 2. Forecast future population and employment Multi-mode transportation also known as multi-mo- growth, and identify major growth corridors. dalism, refers to a transport system that offers users 3. Identify current and projected future transport diverse transport options that are effectively integrated, problems and needs, and various projects and in order to provide a high degree of accessibility even strategies to address those needs. for non-drivers. Multi-modal transport system involves 4. Evaluate and prioritize potential improvement all the various modes of transportation in singularity projects and strategies-light rail to link the lake, (walking, cycling, automobile, public transit, etc.) and junction’s improvement at the centre of the the connections among modes. Multi-modal trans- settlement (including traffic signals etc.) portation system is complicated because modes differ 5. Develop long-range plans and short-range in various ways, including their availability, speed, programs identifying specific capital projects and density, costs, limitations, and most appropriate uses. operational strategies. 6. Develop a financial plan for implementing the Planning a multi-mode transport system typically selected projects and strategies. includes the following steps: This results in an integrated transport chain where the 1. Monitor existing conditions of roads especially strength of each alternative is properly utilized. For numerous potholes on the road, indiscriminate instance, combined passenger transport (from Ikirun parking of taxi cabs at the core areas, trading of to Iragbiji to Aagbaa to Ada) can be organized in the right of ways of major roads radiating from different ways to efficiently transport people from one the core. place to another.

Table 7.3 Comparison of Transport Modes

Name Description Availability Speed Density Costs Destination Passenger Passenger Cost per trip Served Travel speeds Volumes Heavy rail Relatively large, higher-speed trains Limited to High Low Average

operating entirely on separate major corridors Chapter 7: Structure Plan for Ikirun Planning Area (2014-2033) rights-of-way, with infrequent (Oshogbo-Ikirun- stops, providing service for inter- Ilorin) state movement. 75 Light Rail Transit Moderate size, medium-speed Limited to ______(LRT) trains, operating mainly on major corridors separate rights-of-way, with proposed for variable distances between Ikirun Lake stations, providing service between Tourist Centre urban neighborhoods and commercial centres. Taxis Relatively small lower, lower-speed Limited to major Medium High Low to medium taxis, operating primarily on urban corridors in streets, with frequent stops which Osogbo, Ikirun provide service along major urban and Ila-Orangun corridors. Fixed route bus Buses on scheduled routes transit Proposed for Widely available in Ikirun Low to medium High Low to Oshogbo-Ikirun. medium Bus Mass Transit A bus system with features that Limited to major Medium to High Low to medium provide a high quality of service. corridors of high Proposed for Oshogbo-Ikirun-Ila- Osogbo, Ikirun Orangun. and Ila-Orangun Express bus Limited stop bus service designed Limited to major High High Low to medium for commuters and special events. corridors Para-transit Small buses or vans that provide Widely available High High Low (Korope) transit service, generally on tracks. Personal Rapid Small, automated vehicles that Limited to major Low to Low to Medium to high Transit (PRT) provide transit service, generally corridors medium medium on tracks. Vanpool Proposed for Abattoir in the Not available ______planning areas of Osogbo, Ikirun available/ and Ila-Orangun proposed Shared taxi Private taxis that carry multiple Limited to busy Medium to Low to Medium to high customers corridors in Ikirun high medium Conventional Taxi Proposed ______Proposed High Proposed low Proposed service (own by the medium state) 76 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project promotion oflayouts that: on issuesofsustainableurban mobility, includingthe behaviour. Roads and design standards would focus speeds, through understandingandaddressing driver would beusedtoimprove efficiency, slowing traffic cannot beoveremphasised.in Ikirun Road design The desire forsafe,attractive andvibrantstreets existing builduparea butjustattheurbanperiphery. centre. Theouterring road isplannedoutside the upgrading ofexistingstreets around thecore urban ring road will be achieved through the connection and has provided tworingroads, inner and outer. The inner In order toimprove urbanefficiency, thestructure plan Roads andDesignStandards T Inaccessibility Prioritization Management Roadway Designand Connectivity Transport Network Land UseFactors Mobility Substitutes Affordability Integration User information Transportation Options Mobility Transport Demand NAME able 7.4Factorslikelytoaffect toMulti-modeTransport SysteminthePlanningArea increased mobility costsof The valueofinaccessibilityandexternal efficiency inIkirunandEnvirons Various strategiesthatincrease transportsystem Ikirun anditsenvirons affect vehicletraffic, mobilityandaccessibility in How road designandmanagementpractices paths, andtherefore thedirectness The densityofconnectionsbetweenroads and mix affect accessibility Degree thatfactorssuchaslandusedensityand in Ikirun. delivery servicesthatsubstituteforphysicaltravel The qualityenvirons oftelecommunicationsand and itsenvirons options relative toincomesofpeopleinIkirun The costtousersoftransportandlocation Ikirun parking facilities(forbuses,lightrailandtaxi)in system linksandmodes,includingterminals The degree ofintegrationamongtransport accessibility options. information availabletousersonmobilityand The quality(convenienceandreliability) of environs. and prestige are proposed inIkirunandIla frequency, convenience,comfort,safety;price Quantity factorsincludeavailability, speed, taxi, deliveryservices,andtelecommunications. including walking,cycling,ridesharing,transit, The quantityandqualityofaccessoptions, environs. The distanceandspeedoftravelinIkirunits conditions (times,priceslevelsofservice,etc.). and businesseswouldchooseundervarious The amountofmobilityandaccessthatpeople DESCRIPTION levels ofpermeabilityandlegibilityfor allusers,in connectivity between destinationstopromote higher Road Networks shouldbedesignedtomaximize Principles forRoadDesign Standards ❚ ❚ ❚ ❚ ❚ ❚ ❚ ❚ demands Provide amixoflandusestominimize transport minimize greenhouse gasemissions; Promote efficientuseoflandandenergy, and around; Are easytoaccessforallusersand findone’s way minimize theneedtousecars; Priorities walking,cycling and andpublictransport, Must beconsidered intransportplanning conventional transportplanning. Prioritization mustnotbeundervaluedin implementation. All factorsmustbeconsidered infuture effects ofroadway connectivityonaccessibility. Conventional planningseldomconsidersthe Ikirun anditsenvirons implementation, mobilityandaccessibilitywith Consider landuseissuesintransportplan telecommunication options. Transport planimplementationmustconsider should befairtoall. Automobile operatingcostsandtransitfares Ikirun onthelongrun. evaluated inOsogboandIla-Orangunwith connections betweenothermodesmustbe Automobile transportmustbewellintegrated comprehensive forIkirunanditsenvirons. dealing withaparticularmodeorlocationand Frequently considered andprovided when quality factorswhichmustnotbeoverlooked. level-of-service, andsomeimportantservice considered, usingindicatorssuchasroadway Motor vehicleoptionsandqualityare conditions inIkirun mobility withsupportfurniture androad surface encouraged mobility, particularlyvehicle Conventional transportplanningprimarily bicycles) inIkirun motorized low(needtobeencouraged-useof Motorized traveldemandishighbutnon CURRENT CONSIDERATION particular more sustainable forms of transport. This 7.2.7 Gender will allow people to move from place to place in a direct manner with greater route choice. The following Mainstreaming Gender into Urban Planning principles should guide the layout and design of roads: Gender mainstreaming is an often neglected area in urban planning in Nigeria. In practice, this means city ❚❚ Connectivity and permeability; road networks that administrators must create laws, rules and regulations can be easily navigated and are well connected. that benefit men and women equally. The goal is to provide equitable access by all to city resources. ❚❚ Sustainability: Priority should be given to the needs of walking, cycling and public transport, and the In Ikirun Planning Area, market relocation has been need for car-borne trips should be minimized; resisted for long as women prefer the existing locations despite the promise of better accommodation at new ❚❚ Safety: Streets, paths and cycle routes should provide sites. Public awareness and enlightenment will play a for safe access by users of all ages and major role in this respect as consensus will be required on such sensitive issues among the diverse stakeholders. Safety of Pedestrians, Cyclists and Motorists The issue of toilet in markets was also a major front Public enlightenment of road users, pedestrians, cyclists burner issue in the Planning Area. and motorists, is very essential. This can be one of the most cost effective ways of reducing road accidents. A With regards to Security, a more robust security set number of types of programs can be implemented: up is to be developed involving the Nigerian Police, community patrols and alternative security all working ❚❚ In-schools, pedestrian and cycling classes can be in harmony, while street lights are to strategically integrated with school trip management programs located around black spots. (reducing child auto travel to, and traffic around schools), personal safety and fitness, and physical 7.2.8 Urban Safety education programs. Urban safety and effective access to rescue in time of ❚❚ Public education campaigns targeting motorists, trouble is important. Activities by vigilante groups

cyclists, and pedestrians covering cyclists and pedes- are to be enhanced, while fire stations and additional Chapter 7: Structure Plan for Ikirun Planning Area (2014-2033) trians rights and safety skills (such as Go Green’s Police Stations are to be provided within the palace “Share the Road” campaigns). square. The site currently used as Traffic Warden’s office would be upgraded with IT facilities to serve as the 77 Although many communities have some programs, proposed security post. The existing fire service station few communities have enough pedestrian and cycling along Station road would be upgraded, while a new fire programs to educate a significant portion of the popula- station is proposed at the city centre. tion. Responsibility for such programs is fragmented, and there is seldom stable funding. Some peculiar characteristics that need attention include: 7.2.6 Heritage, Culture and Tourism • Closeness of buildings to the road The absence of maps specifically describing all heritage sites within the Planning Area, coupled with the very • Poor structural conditions of the building poor sanitary conditions within the national monument areas is to be addressed by the implementation of the 7.2.9 Disaster Risk Reduction Structure Plan. Programmes for upgrading heritage or historic areas will be [participatory, actively involving A sizeable number of dilapidated buildings are to be all stakeholders – residents, traditionalists, NGOs and found within residential areas in Ikirun and environs, CBOs through dialogues to build consensus as laid some of which are unsafe and unfit for habitation. down in the Conservation Management Plan. The drainage systems – primary, secondary and tertiary – especially River Osere and its tributaries The Local Government Councils in the Ikirun also require adequate attention. The existing Planning Area do not grant financial assistance towards drainage system and water courses are poorly the physical development or maintenance of histor- managed (indiscriminate dumping) and ical/heritage sites like shrines, palaces etc. This will be maintained, which results in annual flooding. addressed by harnessing contributions from all stake- Attention is also to be paid to the existing gully holders including indigenes in the Diaspora. erosion sites at Ponjo and Oke-Iroko areas, while flood prone areas are to be redeveloped. 78 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T 7.2.10 tions willbepursuedtoreduce disasterrisksalongwith stringent enforcement of Development Control regula- Effective storm waterandwastemanagementas well as 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 able 7.5ActivitiesforImplementationinIkirunStructure Plan Develop systemforstreet addressing andrevenue generationinIkirun Establishment ofUrbanSecurityAssociation Action PlanforLightRailTransit andBusTransit forIkirun Establishment ofRefuseDisposalandrecycling industryinIkirun gardens, recreation facilities,healthandeducationfacilities Acquisition Planfordesignatedlandsvariouslanduseproposals including housing,commerce, industry, parksand Action Planforsolidwastemanagement Suburban ElectricitySupplyExtension Suburban Water supplyextension Landscape Improvement PlanforIkirunParks,Gardens, andRecreational facilities. Action PlanforEcologicalProblems Control. electricity, shops,plazas,educationalandhealthfacilities). Design andInfrastructure PlanforPlannedsuburbanHousingExpansioninIkirunandEnvirons (includingwater, Provision ofessentialinfrastructure andbasicservicesinApproved LayoutinIkirun New Schools,HealthCentres, Plaza,BusinessParksinIkirunandEnvirons. Location andSiteDesignforproposed formarketsinIkirun,Iree, Aagbaa,AdaandIragbiji disaggregation ofdatabygender Establish UrbanObservatoryinIkirunfordatacollection,monitoringandevaluationreview ofstructure planand Transportation Improvement PlanforStateandLocalRoads Transportation improvement planforFederalroads Location andDesignofNewIndustrialEstate,BusinessParksforIkirunEnvirons Comprehensive SolidWaste ManagementPlanforIkirun Landscape Improvement PlanforIkirunParks,Gardens, Recreational facilities Action PlanforEcologicalProblems Control andConservationofEcologicalSites electricity, shops,plazas,educationalandhealthfacilities). Design andInfrastructure PlanforPlannedsuburbanHousingExpansionofIkirunandEnvirons (includingwater, Action Planforproviding essentialinfrastructure andbasicservicesinApproved Layout Action PlanForNewSchools,HealthCentres, Plaza,BusinessParksinIkirunandEnvirons. Osogbo Junction Location andSiteDesignforIkirunNewMarketsElectrical,Timber, FoodandBuildingMaterialsalongIkirun– disaggregation ofdatabygender Establish UrbanObservatoryinIkirunfordatacollection,monitoringandevaluationreview ofstructure planand Transportation Improvement PlanforFederal,StateandLocalRoads Location anddesignofGuidelinesforBusinessParksinIkirunEnvirons. Location andDesignofNewIndustrialEstateforIkirun-Iragbiji-Ada-Aagba-Iree Conurbation Comprehensive SolidWaste ManagementPlanforIkirun Housing UpgradingplanforIkirunandEnvirons Action planforRedevelopmentoftheIkirunCBDs PROPOSED ACTIVITY Summary ofActionAreas Osere stream. and landscaping.Asetbackof15misproposed for enhanced watercoursemanagement,urbanagriculture 08

79 80 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project (c) (b) (a) mentation oftheStructure Plan are: forIkirun strategies tobeconsidered toachieve effective imple- decisions affectinglanduse. In doingthis,somebasic organizations responsible for making and influencing by theState Government, Local Governments and contained intheStructure Plan willbeimplemented government withothers.Thepolicies orinpartnership implementation, eitherdirectly by organsoftheState strategic planwithlegalbackingwillberequired forits ensure thatitsstatedobjectives are achieved. Assuch,a facilitate theharnessingofallrequired resources to of aneffective implementationframework thatwill The execution ofa Structure Plan requires theadoption PREAMBLE 8.1 T 1 able 8.1PhasingofIkirunStructure Plan (2014-2033) capacity buildinginthedifferent thematicareas; mentation process through generaland specific individuals thathave roles toplayinthe imple- Empowerment ofthevarious agenciesand reforms andinstitutionalframework required; Formulation ofPolicy and legallandusestandard Heritage; Development, Urban Safety Governance and Gender, Basic Urban LocalEconomic Services, relating to Shelter andSlums, Environment, approaches toimplementation ofpolicies Adoption ofintegratedandparticipatory Adopt StrategyforLinkingandFunding IkirunwithNationalRailLines ARTICULATION ANDADOPTIONOFIMPLEMENTATION POLICIES Adopt StrategyforMainstreaming safetymeasures intourbandesign standards andinstitutionalframe-workforefficient administrationof Adopt StateofOsunStrategyforfundingStructure Planandharness including planning,resources mobilization, administration inStateof Establish UrbanObservatoryinIkirun fordatacollection,monitoring Review andenforce planningstandards andcontrol developmentin Formulate andadoptStateofOsunStrategyforpro-poor accessto relation toset-back,air-space andventilationtopromote ahealthy and evaluationreview ofstructure plananddisaggregation of and establishmentofWarehouse forGoods’StorageattheCBD Adoption ofAffirmative ActionandDomesticationofCEDAW in Establish anewadministrativestructure forUrbangovernance Formulate andadoptthenecessarylegal,policylanduse Osun withclearroles forurbanplanningandmanagement. donors’ andDFIfundsfordevelopment. State and Local Governments ofOsun State andLocalGovernments and safelivingenvironment planning inthestate. land ownership data bygender management. Projects tion of Ikirun Structuretion ofIkirun Plan isasshown in Table 8.1. The proposed phasingschedulefortheimplementa- preparing theirannualdevelopment plans. scenarios. Thisistoassistgovernment agenciesin mediumandlongterm been classifiedintoshort, proposed phases of the Structure Plan have therefore and practicable implementation of theproposal. The consideration has been givenimportance, for flexibility For effective phasingoftheplaninorder ofpriority be carriedoutby technocratsandstakeholders. tive execution ofthedevelopment projects. Thisisto implementation strategieswouldbeadoptedforeffec- A five year periodic ofthe review Structure Plan andits implemented progressively over theperiod. a periodof20years (i.e.2014-2033)anditistobe The planninghorizon for Ikirun Structure Plan isfor 8.1.1 (e) (d) monitoring ofthestructure plan. structure forimplementationand regulatory Establishment ofamanagementbaseand cooperative andmicro-finance funds; Community based fund raising procedures, e.g. zations, Public Private Partnership (PPP)and Annual Budgets, Nongovernmental organi- Resources maybedrawnfrom Government’s zation and implementation of the Structure Plan. of fiscal policies for Articulation resources mobili- Phasing oftheStructure Plan (2014-2017) Short Term √ √ √ √ √ √ √ √ √ √ Medium Term (2018-2024) √ √ √ (2025-2034) Long Term √ √ Short Term Medium Term Long Term Projects (2014-2017) (2018-2024) (2025-2034) 2 FORMULATION OF ACTION PLANS √ √ √ Adoption of Action plan for Redevelopment of the Ikirun CBDs √ outside O-Renewal scheme Adoption of Housing Upgrading Plan for Ikirun Planning Area √ Adoption of Comprehensive Solid Waste Management Plan for Ikirun √ Adoption of Transportation Improvement Plan for Federal, State and √ Local Roads Adoption of Action Plan For New Schools, Health Centres, Plaza, √ Business Parks in Ikirun Planning Area. Adoption of Action Plan for providing essential infrastructure and √ basic services in Approved Layout Adoption of Action Plan for Ecological Problems Control and √ Conservation of Ecological Sites Adoption of Landscape Improvement Plan for Ikirun for Parks, √ Gardens, Recreational facilities Adoption of Action Plan for providing essential infrastructure and √ basic services in Approved Layouts in Ikirun Design and Infrastructure Plan for Planned suburban Housing √ Expansion in Ikirun Planning Area (including water, electricity, shops, plazas, educational and health facilities). 3 IMPLEMENTATION/PHASING OF ACTION PLANS AND PROJECTS √ √ √ Suburban Water supply extension √ √ √ Suburban Electricity Supply Extension √ √ √ Establishment of Refuse Disposal and recycling industry in Ikirun √ √ √ Establishment of Urban Security Association √ Develop system for street addressing and revenue generation in Ikirun √ Housing Upgrading programme for Ikirun Planning Area √ √ √ Chapter 8: Structure Plan Implementation Provision and improvement of Health Facilities: Equip, modernize and √ √ √ Staff hospitals. Expansion plan for Education Facilities both Primary and Secondary √ √ √ 81 Schools. Locate and develop Executive Business District √ √ √ Rehabilitation of Ikirun, Iree, Iragbiji, Aagba and Ada markets to √ √ accommodate lock-up stalls. Implement Plan for Upgrading Motor Parks in Ikirun Planning Area. √ √ √ Implement Restoration Plan for Amusement Park and Gardens. √ √ √ Implement Plan for Maintenance Ikirun- Iree- Iragbiji- Ada -Aagba √ √ √ Roads Implement Beautification Plan for Ikirun and other settlements √ √ including traffic lights and landscaping, erection of monuments Location and Design of New Industrial Estate for Ikirun- Iragbaji- √ √ Ada- Aagba- Iree Conurbation Location and adoption of design Guidelines for Business Parks in √ Ikirun Planning Area. Location and Site Design for Ikirun New Markets for Electrical, √ √ Timber, Food and Building Materials along Ikirun –Osogbo Junction Location and Design of New Industrial Estate, Business Parks for √ √ √ Ikirun and Environs Location and Site Design for proposed for markets in Ikirun, Iree, √ √ √ Aagbaa, Ada and Iragbiji 82 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 3. 2. 1. following: This will include mobilization of resources from the government andprivate initiatives. appropriate fundingandallocationofresources from The successofthisstructure Plan isanchored on 8.2.1 from internationaldonorfundinginstitutions. tion withnon-governmental organisationsandsupport arrangements,collabora- public-private-partnership programmes to encourage private investment through the implementation. These willinvolve adoption of for operationalandlogisticssupport able allnecessary activities. In addition,thegovernment istomakeavail- government to accommodate the proposed phasing is tobemadeavailable intheyearly budgetofthestate Adequateof funds will beofvital importance. funding financing structure that would assist in the mobilization tation ofanyplanorproject, thedevelopment ofa In order toachieve effective andsmoothimplemen- PLAN FINANCING OFSTRUCTURE RESOURCE MOBILISATION AND 8.2 program. planning responsibilities and capital worksservice be updatedannuallytoreflect strategic resource plan, allocated timelines,resources andresponsibilities will tation Program includingprioritized actionswith the implementationprocess, thedetailedImplemen- of sector andotherkeystakeholder groups. Asapart institutions andwithactive involvement oftheprivate State Government, adjoiningLGAs andtraditional be executed inphasesasshown in Table 8.1by the Implementation ofthevarious landuseproposals will Local/International • Corporate International • • Development • • Build Public • Donations • • P I The G

felodun andBoripeLocalGovernments artnerships, suchas: artnerships,

Sour Individuals ments Build arrangements overnment oftheState ofOsun ces ofFunding

O Private O perate perate

organizations

Donor

finance Partnerships

and

and

NGOs Own

Agencies

institutions

T

(BOO) ransfer

(PPP) and

arrange (BO priv ate T) - 9. 8. 6. 4. 3. 2. 1. ❚ structure fortheimplementationofStructure Plan. the Structure Plan. Figure 8.1 shows the organization toachievingthedesignedobjectives of important very ment ofastrong Institutional framework istherefore government andtheotherstakeholders.Theestablish- an intergradedapproach thatwillinvolve boththe Effective implementation ofthe Structure Plan requires STRUCTURE PLANIMPLEMENTATION INSTITUTIONAL FRAMEWORKFOR 8.3 unding from multilateralanddevelopment 4. 7. 5. Committee (PF&PC). be considered by theProgramme Finance andPolicy tation. It willalsoprovide annualbudgetestimatesto work plansandreview theprogramme forimplemen- The basistoapprovePIC willmeetonaquarterly ❚ put inplace.Membership willincludethefollowing: approach intheimplementationprocess shouldbe key stakeholders,whichwillallow foraparticipatory Committee (PIC) comprisingbothgovernment and management oftheplan,aProject Implementation For efficientandeffective implementationand S tructure Plan Implementation Committee(PIC). f. d. c. a. Local Government level: in theStructure Plan Area tion; Environment and Works and Transport Ministries: Agriculture; Finance; Health; Educa- Planning andUrban Development (MLPPUD) the ChairmanofCommittee Infrastructure Bank etc. African Development Bank, Bank ofIndustry, finance agenciessuchasthe World Bank and F h. g. e. b. D A A D The D The S The D The P H The E irectors from thefollowing atthe Departments onourable CommissionerofLands,Physical Chairman from one of the Local Governments irector from eachofthefollowing State urveyor Generalurveyor ofthe State ermanent Secretary, MLPPUD xecutive Governor oftheState, whowill be Education T U F T W P Community D irector ofLands,MLPPUD irector of Town Planning, MLPPUD inance, Budget andAdministration ublic health wo representatives ofthecommunity own Planning Permit authority rban renewal Agencyand orks andtransport evelopment Figure 8.1 Organisational Structure for Implementation of the Structure Plan

CHAIRMAN GOVERNOR OF THE STATE OF OSUN

STRUCTURE PLAN IMPLEMENTATION COMMITTEE

The Programme Finance and Policy Committee (PF&PC)

The chief technical adviser/ Programme officer

Monitoring & Evaluation

Enlightenment Operational Communication

It is proposed that a Chief Technical Adviser, who 13. Auditor General of the State would double as Programme officer, be appointed to 14. Auditors General of participating Local Govern-

ensure effective participation and coordination of all ments Chapter 8: Structure Plan Implementation relevant State Ministries and departments of Local 15. The Secretary to the State Government Secretary Governments, CBOs, NGOs, the traditional institu- This committee will approve the annual budget for the tion and the organized private Sector. project and give policy direction for implementation 83 of the project. The Honourable Commissioner for ❚❚ The Programme Finance and Policy Committee Lands, Physical Planning and Urban Development (PF&PC): The implementation of the tructureS Plan will be custodian and overall manager of the will require the input of both the executive and legis- Structure Plan Project. lative arms of government as well as the support of stakeholders down to the grassroots. This committee The Chief Technical Adviser/Programme Officer: The will include the following: responsibilities of Chief Technical Adviser/Programme Officer will include the following: 1. The Deputy Governor of the tateS Chairman 2. Chairman, Budget Committee of the State • Advisory, managerial and technical support to Assembly the MLPPUD, the Planning Permit Authority 3. Honourable Commissioner for Lands, and the Urban Renewal Agency, Physical Planning and Urban Development 4. Honourable Commissioner for Finance • Provision of work plans, 5. Honourable Commissioner for Environment 6. Honourable Commissioner for Health • Monitoring and evaluation of work done, 7. Honourable Commissioner for Justice 8. Honourable Commissioner for Women Affairs • Preparation of quarterly and annual project 9. Honourable Commissioner for Works and reports, Transport • Liaison with the Ministry and participating 10. Chairman, Local Government Service Commis- agencies to prepare all necessary documen- sion tation for the consideration of the PIC and 11. Representative of the Head of Service PF&PC. 84 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T in thestate. process plans forapproval andmonitor developments Government Level. Theseauthoritiesandoffices areto Local Planning Permit Offices(LPPO)attheLocal establish District Planning Permit Offices(DPPO)and (PPA) located in the State MLPPUD.ThePPA would Development Control isthePlanning Permit Authority The department responsible for Plan Approval and CONTROL APPROVAL ANDDEVELOPMENT PROCEDURE FORPLANNING 8.4 transparency andaccountability Participatory approaches tourbanplanningmanagement, Gender inDevelopmentalprocess Land tenure securityforthelandincome Development process control, monitoringand Evaluation retrieval andurbaninfomanagement Application ofGISinlandusePlanning,informationstorageand engage theirLGsforeffective governance. CBOs andCBAsthatwillassistpeopleatthegrassroots levelto Creating awareness anddevelopingthecapacityofNGOs,FBOs, change, deforestation, pollution,floodingetc Workshops onDisasterManagement,securityissues,climate Proposed capacitybuildingprogramme able 8.2Capacitybuildingactivities2014-2033 ences. 8.2 shows someofidentifiedcapacitybuildingprefer- been identified in various sections of this plan. Table time tofacilitatedevelopment. Thecapacityneedshave permit are processed andapproved withinaspecified training ofstaff.Thiswillensure thatapplicationsfor strengthened through provision ofequipmentand Level and DPPOatthedistrictlevel willneedtobe regular training.ThePPOattheLocal Government Plan Permit Authority are tobeenhancedthrough The capacitiesoftheofficesstateMLPPUDand enforcement andmonitoringoftheplan. be fullyharnessedforthesuccessfulimplementation, the growth ofanyorganization. Potentials ofstaffare to Training and re-training of human resources isvital to CAPACITY BUILDING 8.5 (2014-2018) Short Term √ √ √ √ √ √ √ Medium Term (2019-2023) √ √ √ √ √ √ √ (2024-2033) Long Term √ √ √ √ √ √ √ 8.6 8.7 SUSTAINABILITY OF PLAN MONITORING EVALUATION AND IMPLEMENTATION REVIEW OF STRUCTURE PLAN

Sustainable implementation of the Structure Plan For the Structure Plan to respond effectively to would involve the general cooperation of the State emerging scenarios, it would be necessary to provide Government and other stakeholders. Implementation opportunities for monitoring, evaluation and review of procedure must be guided with vigor, commitment and the plan from time to time. It is recommended that a transparency. Technical support would be sought by the quarterly monitoring schedule and an annual review State Government where necessary and cooperation of of the performance of the plan are adopted. As may non-governmental organizations as well as bilateral and be expected in any monitoring and review exercise, it multilateral institutions would be explored. may be necessary to input new plans and projects into the Structure Plan for Ikirun Planning Area, particu- larly when the need for such developments arises. The project implementation committee would responsi- bility for developing indicators for plan performance, evaluation and review from time to time. Chapter 8: Structure Plan Implementation

85 86 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 3. 2. 5. 4. 1. A. Agreed onseveral criticalthematicissuesandresolved asfollows: in-depthdiscussions; divided intofoursyndicategroups forfurther Acknowledge thattheCityConsultationfeatured elaboratetechnicalpresentations ofkeyissueswithparticipants engagementofferedconstructive toallstakeholdergroups towards contributingtothedevelopment ofthecity; approach adoptedfortheexercise. Inparticipatory particular, appreciated for theparticipants theopportunity (UN HABITAT), Planning theselectionofIkirun Area Planning Area fortheStructure Plan Project andthe Appreciate thecollaborationbetween theState ofOsun andtheUnited Nations Human Settlements Programme political development ofthestate andthenation; Note anditspivotal thehistoricalantecedentsofIkirun role inthepromotion ofsocial,cultural,economicand the sustainablefuture development Planning ofIkirun Area, we dohereby agree andstatethatwe: After deliberating exhaustively on the issues raised in the City Profile studies towards determining the bestpath for onMondaytation heldinIkirun 22nd July, 2013. mettodeliberateonseveral issuesidentifiedintheprofileand civilservants studiesonthecity, attheCityConsul- tions, women’s groups, tradeassociations,securityagencies,youths, non-governmental organisations,themedia representatives ofvarious groups inthecityincludingtraditionalinstitutions,communitydevelopment associa- We theindigenes,residents Planning andstakeholdersintheCityofIkirun Area, theState ofOsun, comprising Held onMonday 22ndJuly, 2013 APPENDIX 1

URBAN PLANNING,SHEL LOCAL ECONOMICDEVELOPMENT: for theState ofOsun, togive legalmuscletotheimplementationofadoptedStructure Plans forthestate. the O-Renewal programme andurgeanextensionoftheprogramme toperi-urbanareas around thetown. • • • orderly development Planning ofIkirun Area are implementedandrespected, including takingstepsto: Land Use Planning andorderly development Planning ofIkirun Area. ated socio-economicbenefits. stakeholders shouldbesensitized andempowered toregister their Title Deeds toenablethemreap theassoci- U U I U Commend theeffor n linewiththecurrent towards efforts computerizingtheLand Information System (O-LIS)inthestate, rge theState Government toexpediteactiononthefinalpassageof Urban and Regional Planning Bill rge theState Government measures toensure ofOsun toadopt necessary thatplansandregulations forthe rge theState Government toadoptstrategiesdiscouragelandspeculationensure landavailability for (SMEs) Facilitate accesstolandandpromote access tosocialhousingforthepoor tures where necessary, especiallyinIfelodun LocalGovernment Area; the provision plots,housingandassociatedinfrastructure aswell astheremoval ofserviced - ofillegalstruc C THE IKIRUNCITYCONSULTATION DECLARATION reate incentives for private investments inagriculturalvalue-added Small andMedium ScaleEnterprises FOR IKIRUNPLANNINGAREA,STATE OFOSUN MINISTRY OF LANDS, PHYSICAL PLANNING ts oftheState Government outtherenewal ofinner areas ofthecitythrough incarrying ON PREPARATION OFSTRUCTURE PLAN AND URBAN DEVELOPMENT TER ANDSLUMS, • Provision of warehouses to keep goods before sending them abroad • Establishment of industries for processing Nicotine from kola nut • Provide modern markets and rehabilitate existing ones to facilitate local economic growth in Ikirun Planning Area; • Construction of roads to link farm settlements • Develop business incubators for Youths with innovative business ideas. • Facilitate access to credit by informal sector operators through innovative approaches • Dualisation of Old-Garage-Ikirun-Kwara State Boundary road, to open up Ikirun Planning Area to a big interstate market

B. URBAN ENVIRONMENT AND INFRASTRUCTURE:

1. Commend the efforts at ensuring egularr refuse collection and urge the state government to sustain the efforts and provide safe solid waste disposal sites to meet the needs of the growing population of Ikirun Planning Area as well as promote safe disposal of wastes from hospitals 2. Commend the state government’s efforts towards combating flooding and erosion. However, Government is urged to embark on the channelization of rivers in the city and the reconstruction of broken down drainage channels 3. Urge the State Government to: • Commence the dredging of rivers to eliminate flooding and related incidents; • Empower Planning Agencies to prevent building on flood plains, steep slopes and waste sites • Pass Legislation on a law to reduce noise pollution within the town

C. GENDER, GOVERNANCE AND HERITAGE

1. Commend the efforts of the State government in enhancing the status of women and vulnerable groups in the State of Osun; 2. Urge the State Government to take appropriate steps to further improve women’s access to opportunities and resources for wealth creation 3. Ensure the achievement of affirmative action in occupation of leadership positions in all sectors 87 4. Commend the efforts of the tateS government in developing and restoring Heritage sites in the town 5. Urge the State Government to exploit the extensive tourism potentials associated with the state’s rich cultural heritage by upgrading all heritage sites to further boost tourism in the town 6. Commence rehabilitation of Ayinkunugba water fall, Igbo Egungun and Idi – Ogun and upgrade the Isinro festival to conserve Heritage and boost tourism

D. BASIC URBAN SERVICES AND TRANSPORTATION

1. Commend the efforts of the tateS Government towards the delivery of Basic Urban Services, notably through measures to improve of potable water, electricity supply, provision of educational services and delivery of health care services to all, especially children, women and the elderly; 2. Urge the State Government to further accelerate its efforts towards the provision of adequate basic urban services, including decent education, health, water supply, parks and recreation for all areas of Ikirun Planning Area etc, include the following; • Promote Public-Private Partnership in the provision and management of basic urban services and build the capacity of agencies and civil society organisations • Construction of boreholes and potable water by the government for the people of Ikirun, Iragbiji township • Facilitate coordination of activities and build capacity among operatives of safety agencies to promote urban safety and risk reduction • Construction of fire station and Motor Park/Garage for NURTW in Ila town ship 3. Commend the efforts of the State Government towards enhancing urban mobility, notably through the upgrading and rehabilitation of roads in Ikirun, the O-Renewal Programme and other schemes to promote an integrated and coordinated multi-nodal transportation in the town 4. Further urge the State Government to accelerate the repair of all urban roads and commence construction of modern garage for National Union of Road Transport Workers (NURTW), to facilitate economic and social welfare of the State of Osun 88 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. Signed by: CityConsultation,this22nddayofJuly,Ikirun 2013. totheimplementationofthisDeclaration. Thisisthe commitment andsupport Declaration ofstakeholdersatthe We theundersigned,asrepresentatives ofallStakeholders present CityConsultation,pledgeourfull attheIkirun R R R R R R R R R Local G epresentative ofReligious Groups epresentative of Trade Groups epresentative of Youths epresentative of Women Groups epresentative ofNGOs epresentative ofCSOs epresentative ofCommunityAssociations epresentative ofMinistry epresentative of Traditional rulers overnment Chairman : ...... : ...... : ...... : ...... : ...... : ...... : ...... : ...... : ...... : ...... APPENDIX 2

IKIRUN: SUMMARY OF KEY DEVELOPMENT ISSUES

URBAN PLANNING, SHELTER AND SLUMS, LOCAL ECONOMIC DEVELOPMENT GROUP 1 ISSUES DISCUSSED DECISIONS REACHED 1 Shelter and slums • There is need for enforcement of Town Planning rules and regulations to avoid improper construction of houses; • Government should enforce regulations to ensure good ventilation within the courtyards and houses; • Government should provide low cost housing scheme in Ifelodun Local Government; • There is need for government to ensure availability of land in the town for construction of houses; • Government should enact new laws on purchase of land. • There is need for provision of recreation centres within Ikirun township 2 Local Economic • Government should provide warehouses to keep goods before sending them Development abroad; • There is need for renovation of existing markets and construction of toilet facilities; • There is need for establishment of industries for processing nicotine from kolanuts; • Government should upgrade the existing railway station; • There is need for construction of roads to link farm settlements • The dualisation of Old-Garage-Ikirun-Kwara State Boundary road is also expected to open up Ikirun to a big interstate market URBAN ENVIRONMENT AND INFRASTRUCTURE GROUP 2 ISSUES DISCUSSED DECISIONS REACHED 1 Urban Environment • Government should endeavour to dredge the major rivers in Ifelodun Local Government; 89 • Provision of public dustbins with stipend provided to maintain it; • There is need for rehabilitation of roads; GENDER- GOVERNANCE-HERITAGE GROUP 3 ISSUES DISCUSSED DECISIONS REACHED 1 Gender • There is need for improving Security for women in markets; • There is need to organise training for market women on how to package goods for marketing; • Government should assist with provision of Loan opportunities for market women; 2 Governance • Government should assist with provision monthly stipend for aged people; • Legislation of a law to reduce noise pollution within the town; • Provision of security in the town; • Provision of ultra modern market with toilet, water supply and police station. 3 Heritage and Historic Sites • Government should ensure preservation and renovation of existing shrines (such as the Sango shrine) and Mosques 90 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project GROUP 4 Transportation/Urban 4 Provision ofBasicServices 1 Mobility SUSDSUSDDECISIONSREACHED and energy) (Education, health,water ISSUES DISCUSSED Provision • • • • • • • • • • • • • • • • There • • BASIC URBANSERVICES ANDTRANSPORTATION (NUR Provision ofadulteducationcentres; Provision library; ofhigherinstitutionandmodern There isneedforprovision ofpublictoilets; and itsenvirons; There isneedforprovision ofelectricitytransformersandelectricpolesforIkirun There isneedforConstructionofmore toiletswithintheneighbourhood; villages; The existinghospitalshouldbeequippedandnewonesbuiltinneighbouring There isneedforrenovation ofexistinghospitals school; shouldemploymoreGovernment teachersandsupervisedstudentstostayin There isneedforreconstruction ofdamagedprimaryschoolbuildings; Provision andavailabilityofpre-paid meterstothepopulacerequired; Provision ofstreet lightandmore transformerrequired inIkirun,Iragbiji; shouldrepairGovernment alldamagedwaterpipes; for thepeopleofIkirun,Iragbijitownship; There isneedforprovision ofboreholes andpotablewaterbythegovernment Reservoir ofthewaterworksshouldbewashedasandwhendue; There isneedforconstructionofanewWater worksforIkiruntownship; There isneedforprovision ofadditionalhigherinstitutions(University)inIkirun; TW);

is

need

of

modern

for

introduction

garage

for

of

National

a

transport

Union

scheme

of

Road

with

Transport

low-priced

Workers

fares. APPENDIX 3

RECOMMENDED LAND USE DESIGN STANDARDS

Table 1 Neighborhood Land Use Estimates

Land Use Percentage of Developed Area Residential (dwelling plots) 50 – 60 Local/neighborhood commercial (market) area 3 – 4 Parks, playgrounds and other organized open spaces (recreation) 10 – 12 Roads and streets (right-of-way) 15 – 20 Public and semi-public uses (schools, clinics, worshipping places, cemeteries, etc) 15 – 20 Industrial 7-10

Table 2 Recommended Densities for Residential Developments

Gross Density Net Density Types of Dwellings No of dwellings No of persons No of dwelling No of persons per hectares per hectares per hectares per hectares

Bungalow (detached) Low density 4 – 5 40 – 50 6 – 8 60 – 70 Medium density 6 – 8 50 – 60 8 – 12 70 – 100 High density 8 – 10 60 – 80 12 – 16 100 – 130

Semi-detached and Row housing Low density 10 – 12 40 – 50 16 – 20 130 – 160 91 Medium density 12 – 14 50 – 60 20 – 24 160 – 180 High density 14 – 16 60 – 70 24 – 28 180 – 240

Multiple-Family Dwellings Low density 16 – 18 140 – 160 28 – 32 240 – 280 Medium density 18 – 20 160 – 180 32 – 36 280 – 320 High density 20 – 24 180 – 299 36 – 40 320 – 360 Special density 24 – more 200 – more 40 – more 360 – more

Table 3 Floor Area Requirements by Sizes of Families

Minimum No. of Floor area in sq meter Floor area in sq meter Family size habitable of rooms minimum desirable 4 2 40 50 6 3 50 70 8 4 65 85 10 5 82 100 12 6 95 120

Table 4 Recommended Minimum Plot Area for Different Types of Housing

Minimum plot in sq. meter Types of Residential Development Detached Housing Semi-detached Housing Row House Rehabilitation of slum dwellers and improvement of 240 160 120 sub-standard area Low-cost housing in urban areas 360 240 180 Normal housing development 500 333 250 92 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T T T T T T Banks Commercial establishments Department stores Markets Convenience shops Types ofResidentialDevelopment sub-standard areas Rehabilitation ofslumdwellersandimprovement of Types ofResidentialDevelopment Development Types ofcommercial Other uses Streets, walks,parkinglotsetc Utilities, servicesandfacilities Organized openspaces Shops/Stalls Land Use Small Size ofTown Normal housingdevelopment Low-cost housing Rehabilitation ofslumdwellersandimprovement ofsub-standard areas Types ofResidentialDevelopment Large Medium Low-cost housinginurbanarea sub-standard areas Rehabilitation ofslumdwellersandimprovement of Normal housingdevelopments Low-cost housing Normal housingdevelopment able 10RecommendedSet-BacksofCommercial Property Linesfrom Centre LinesofAbuttingStreets able 9RecommendedlandAllocationinaCommercial Area/Market able 8Percentage Area DevotedtoCommercial DevelopmentbySizeofTown able 7MinimumDistancebetweenanyTwo Buildings,Backto able 6MinimumSet-BacksofDwellingsfrom PlotLines able 5RecommendedMaximumPlotCoverage Major street 15 –20 15 –20 12 –15 50,000 –250,000 - - Above 250,000 Detached Housing Below 50,000 Population Maximum percentage plotcoverage Front 4.5 50 50 40 3 6 Minimum set-backinmetres Collector street Percentage ofDevelopedArea Semi-detached Housing 12 –15 15 –20 12 –15 12 -15 - Commercial area aspercentage of Set-back inmetres Minimum Distanceinmetres Side 65 60 50 3 3 3 10 –12 15 –20 10 –15 15 –20 30 –40 total developedarea 3.0 –4.5 2.0 –3.0 4.5 –6.5 4.5 6 6 Local street Row House 9 –12 9 –12 - - - Rear 65 65 60 3 3 3 Table 11 Recommended Widths of Roads in Commercial Area

Type of Road Width in metres Carriageway Right-of-way Major Commercial Road 15 24 Minor Commercial Road 12 22 Local Commercial Road 9 18 Path (walk) 3 6

Table 12 Number of Parking spaces per Gross Hectare of Commercial Development

Type of commercial development No. of parking spaces per hectare of site area Market i. Minor 15 – 25 ii. Major 25 – 30 Department Stores i. Small 25 – 30 ii. Large 30 – 45 Commercial Offices 25 – 30 Banks 30 – 45

Table 13 Recommended Land use Standard in Industrial Area/Estates

Land Use Percentage of Developed Area Worksheds 50 – 55 Organized open space 10 – 15 Utilities, services and facilities 20 – 25 Roads, parking lot etc. 15 – 20 Other uses 5 – 10 93

Table 14 Recommended Set-Backs for Industrial Property Lines from Centre-Lines of Roads

Types of Road Set-backs in metres Minimum Desirable Highway 24 30 Major Road 18 21 Collector Road 15 18 Access Street 12 15

Table 15 Recommended Width of Carriageway in Industrial Area/Estates

Types of Road Width of Carriageway in metres Minimum Desirable Highway 15.0 18.0 Major Road 13.2 15.0 Collector Road 10.8 12.6 Access Street 9.0 10.8 94 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T T T T Health office Dispensary Maternity home Maternity Health centre District hospital General hospital Commercial Total Civic Industrial Domestic Purpose Central orStatehospital Types ofhealthyfacility District hospital General hospital Central orStatehospital Types ofhealthfacilities Specialized hospital Health centre Maternity home Maternity Dispensary Health office OtherRoad CollectorRoad MajorRoad Within CityLimits Trunk ‘C’Road Trunk ‘B’Road Trunk ‘A’ Road Outside CityLimits Types ofabuttingroad able 19QuantityofPotableWater tobesuppliedaCommunityforVarious Purposes able 18DesirableSiteAreas forHealth Facilities able 17PopulationtobeservedbyeachType ofFacilityandRadiusCatchmentArea able 16Set-BacksofPetrol FillingBaysfrom Centre-Lines ofAbuttingRoads Quantity ofwatertobesuppliedinlitre percapitalday Population tobeserved ½ million-1 100,000 –150,000 150,000 –300,000 30,000 –50,000 20,000 –30,000 15,000 –20,000 10,000 –15,000 Minimum Minimum Served theentire populationofthestate 114 2.5 0.5 2.5 12 14 16 72 20 40 2 6 Set-back inmetre from thecentre lineoftheroad Site Area inHectares Radius ofcatchmentarea inKm. 15 21 30 20 25 30 Desirable Desirable 70 –100 30 –40 40 –60 15 –20 10 –15 100 200 2.5 10 20 50 30 24 50 4 –7 2 –3 4 1 4 Table 20 Space Standards for Services

Services Population to be served Site area in hectares Site coverage Post and Telegraph Central post office More than 750,000 0.65 – 10 Post office 750,000 – 50,000 0.35 – 5.0 30% - 331/2% Sub-Post office 50,000 – 25,000 0.18 – 2.5 30% -331/2% Agency 25,000 – 10,000 0.625 30% - 331/2%

Telephone Exchange Line per 1,000 Population Large Towns 5 – 10 7.5 30% - 331/2% Medium Size Towns 2 – 3 5.0 30% -331/2% Small Towns 1 – 2 2.5 30% - 331/2% Fire Stations One Fire Station to 3.75 – 50 hectares per fire 25% - 30% serve 25,000 – 50,000 station population

Table 21 Recommended Widths of Streets in Residential Areas

Types of Street Width in Metre Carriage-Way Right-of-Way Major residential street 15 30 Collector street 12 24 Local residential street 9 18 Lop (crescent) street, cull-de-sac (dead-end) street or close 8 15 Path (walk) 3 6

Table 22 Design Standard for Elements of Various Types of Roads

Number of Width of Width of right Minimum radius Minimum safe carriage lanes carriage way in of way in of vertical curve sight distance in metres metres in metres metres 95 Major road 3 or more 10 or more 20 or more 75 130 Secondary road 3 – 4 10 – 13.2 16 – 20 60 90 Local Street 2 – 3 7.2 – 10 12 – 16 45 65 Service Street 2 7.2 12 30 65 Cul-de-sac 2 7.2 12 Cycle Track 1 1.8 – 2.4 3 – 4.5 Pedestrian walk 1 1.8 – 3.0

Table 22 Number of Cars to be Parked along Curbs per Furlong at Different Angles of 1 Curb Parking on one Side

Angle of curb parking Number of car spaces Dimension (metre) per furlong of road 1800 (Parallel) 30 5 x 2.5 300 (Angle) 35 5 x 2.5 450 (Angle) 40 5 x 2.5 600 (Angle) 45 5 x 2.5 900 (Perpendicular) 50 5 x 2.5 96 Structure Plan For Ikirun and Environs (2014 - 2033) State of Osun Structure Plans Project T T Churches andMosques Restaurants Cinemas andTheatres Hospitals Hotels Administration Areas Industrial Premises (b) Shops Minor Major (a) Regional Shopping andcommercial centres High densityareas Medium densityareas Low densityareas Residential Types ofdevelopment Width ofstallin able 24NumberofCarParkingSpaces able 23MinimumDimensionsfortheDesignofParkingfacilities(Drive-inLayout) metres 2.4 2.4 2.7 2.7 2.7 2.7 2.4 2.4 Angle ofisle parking 450 300 900 600 450 300 900 600 1 carparkingspaceto10-15worshippers 1 carparkingspaceto10-15seats 1 carparkingspacetoevery15-20seats 1 carparkingspacetoevery45beds 1 carparkingspacetoevery5-8bedrooms (b) 1carspaceforevery30sq.m.ofgross floorspace (a) 4carspacesforevery60-100sq.mofadministrativefloorspace;or (b) 1carspacetoevery7-10employees (a) 3carspacesforevery60-100sq.mofindustrialfloorspace,or 1 carspacetoevery10sqofgross floorspace 1 carspaceper10sqmofshoppingandcommercial frontage 2 carsspacesper10sqmofshoppingandcommercial frontage 3 carsspacesper10sqmofshoppingandcommercial frontage (b) Onanaveragetwocarsforeachdwellingunit 12-16Carspacespergross hectare ofresidential development 8-12Carspacespergross hectare ofresidential development (a) 6-8Carspacespergross hectare ofresidential development Number ofcarparkingspaces Width ofIslein metres 8.0 6.0 3.6 3.6 8.0 7.0 3.6 3.6 perpendicular to Depth ofstall Isles inmetre 7.0 6.5 6.0 4.5 1.8 2.0 6.0 5.0 parallel toIslein Width ofstall metre 2.5 3.3 3.6 6.0 2.4 3.0 3.6 5.0 depth inmetre Unit parking 21.0 21.0 16.0 14.0 21 20 16 14 Table 25 Standards for Playgrounds

Types of Game Game Area Dimensions Clearance in metres in metre Sides Ends Football 45 x 90.0 6 9 Netball 15 x 30 2.5 3 Basket Ball 14.0 x 26.0 2.5 3 Volley Ball 9.0 x 18 2.5 3 Lawn Tennis i. Single 15.0 x 24 3.0 6 ii. Double 10.8 x 24 2 6 Tennis Court 8.0 x 21 1.8 3 Hockey 55.0 x 92 3 5 Cricket 126 x 126 Wicket 20m apart 6 6 Badminton i. Singles 5.1 x 13.5 1.8 3 ii. Doubles 6 x 13.5 1.8 3 Table Tennis 1.5 x 2.7 1.2 1.8 Polo 18. x 288 9.0 15 Rugby 560 x 100.0 10.0 20

Table 26 Standards for Socio-Cultural Activity Areas

Particulars Community Church/ Mosque Public Library Museum Cemetery Burial Centre ground Population to be 10,000-25,000 5,000-15,000 25,000-50,000 50,000-100,000 50,000-100,000 served by a unit facility Radius of service 0.5 – 0.75 0.5 -1.0 1.0 – 2.0 2.0 – 4.0 1.0 – 3.0 areas in km Site area in hectares 1 – 2 1 – 2 0.5 – 1 1.11 – 2 2.5 – 5 97 Site Coverage 30% - 35% 25% - 33% 30% - 35% 30% - 35% ------Number of car 4 – 6 5 – 8 4 – 6 5 – 8 5 – 8 parking spaces per 100 visitor/patrons Unprecedented population and spatial growth experienced over the past half Century in the State of Osun, South West Nigeria, has resulted in various undesired conditions in its cities. These include haphazard and uncoordinated physical development, overcrowding and congestion within inner city neighborhoods, inadequate provision of infrastructure and services, as well as deteriorating social and environmental conditions, which make the cities generally unsustainable and unable to support the state’s development objectives anchored on its Six-Point Integral Action Plan.

The Osun Structure Plans Project was therefore initiated to address the challenges of unsustainable urbanization using the Rapid Urban Sector Profiling for Sustainability (RUSPS) methodology and also guide the development of the nine largest cities over the next 20 years, as a follow-up to the ongoing ‘O-Renewal’ regeneration programme for core areas in these cities.

The Structure Plan for Ikirun and Environs seeks to build capacity and aid strategic decision- making with main focus on setting the broad structure for the direction of future growth of the city, taking account of topographical, environmental and socio-economic constraints and considerations; providing for the co-ordination of present and future commercial activities and public services as well as proposing a staged urban development strategy within growth corridors to maximize efficiency in the provision of key infrastructure and services.

HS Number: HS/050/15E ISBN Number(Series): 978-92-1-133396-1 ISBN Number:(Volume) 978-92-1-132669-7

UNITED NATIONS HUMAN SETTLEMENTS PROGRAMME P.O.Box 30030,Nairobi 00100,Kenya; Tel: +254-20-7623120; [email protected]

www.unhabitat.org