Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, , (((Appendix(Appendix I/Form 11))))

APPENDIX I (See paragraph ––– 6)6)6) FORM 1 (I) Basic Information: S. Item Details No. 1. Name of Project Proposed Expansion & Modification of “Champion Reef Golf CountyCounty” (now renamed as “ZionZion Hills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka 2. S. No. in the schedule Project or Activity -8 (b) 3. Proposed capacity/ area/ length/ The Proposed Expansion & Modification of “Champion Reef tonnage to be handled/ command area/ Golf CountyCounty” (now renamed as “ZionZion Hills Golf CountyCounty”) lease area/number of wells to be drilled. Project, details are as follows: Sr. Particular Existing Proposed Total After NoNoNo Details Expansion/ Expansion/ ... (for which Modificatio Modificatio EC already n (for which nnn Obtained) EC required) 1. Plot Area 564235.5 9 1,62,984.87 727220.46 Sq. mt. sq. m. sq. m. sq. m. A. 118397.35 57623.70 176021.05 Residential sq. m. sq. m. sq. m. Area B. Golf Area 313074.08 52640.45 365714.53 sq. m. sq. m. sq. m. C. Park Area 57198.54 18785.99 75984.19 sq. m. sq. m. sq. m. D. Parking 25607.10 10048.16 sq. 35655.26 Area sq. m. m. sq. m. E. Road 49958.52 23886.67 73845.19 Area sq. m. sq. m. sq. m. 2. Permissible 177596.02 86435.55 264031.57 F.A.R. Sq. sq. m. sq. m. sq. m. mt. (@ 1.5%) Proposed 71250.00 45463.00 116713.00 F.A.R. Sq. sq. m. sq. m. sq. m. mt. (0.60%) (79.00%) (66.00%) 3. Permissible 71038.00 34574.22 105612.63 Ground sq. m. sq. m. sq. m. Coverage Sq. mt. Proposed 50000.00 32338.00 82338.00 Ground sq. m. sq. m. sq. m. Coverage

Confident Projects Pvt. Ltd. 1 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

Sq. mt. 4. Built -up area 75000.00 47856.00 122856.00 (Total area sq. m. sq. m. sq. m. in sq. m.) F.A.R Area 71250.00 45463.00 116713.00 in sq. m. sq. m. sq. m. sq. m. Non F.AR 3750.00 2392.00 sq. 6142.00 sq. Area in sq. sq. m. m. m. m. 5. Green area 370272.62 71426.44 441699.06 sq.mt. sq. m. sq. m. sq. m. (65.62% of (43.82% of (60.74% of plot area) plot area) total plot area)

4. New/ Expansion/ Modernization Expansion & Modification

5. Existing Capacity/Area Etc. In earlier project planning the total plot area & total built-up area was 564235.59 sq. m. & 75000.00 sq. mt. respectively. After above said Expansion & Modification the proposal will have 727220.46 sq. m. plot area and total built up area of the project after expansion in project planning will be 122856.00 sq. m. Land document/Lease Deed is being enclosed as Annexure I 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’

7. Does it attract the general condition? If No, it does not attract the general condition, as General yes, please specify. Conditions are not applicable on S. No. – 8 projects of EIA Notification dated 14.09.2006 and amendments. 8. Does it attract the specific condition? If No, it does not attract the specific condition, as Specific yes, please specify. Conditions are not applicable on S. No. – 8 projects of EIA Notification dated 14.09.2006 and amendments. 9. Location: Plot/Survey/Survey No. Survey No: 01, 02, 03, 37, 43, 45, 46, 48, 50 of Vaggaiana Dinne village, Survey No: 03, Ramapura Dinne, Kasaba Hobli, Bangarapet, Kolar, Karnataka are the expansion area s. (Survey No…253, 356, 357, 358 of Hudukulla village, Sy No.s 161, 162, 163, 217, 218, of Siddanahally village, Sy Nos 5, 6, 13, to 15, 25, to 33, 36, 44 of Vaggainadinne village are part of the existing project that has already been approved) Village Hanchala Taluka Bangarapet

Confident Projects India Pvt. Ltd. 2 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

District Kolar State Karnataka 10. Nearest Railway station/ Airport along Bangarpet Railway station is at 8 km. with distance in Km. International Airport is at 60 Km. 11. Nearest Town, City, District Banglore City at 6 0 kms , Headquarters along with distance in Kolar town at 8 kms, Km. Bangarpet town at about 8 kms 12. Village Panchayats, Zila Parishad, Bangarpet Ta luka panchayat Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the Applicant Confident Projects India Pvt ... Ltd. 14. Registered Address Confident Projects India Pvt . Ltd. No.12, 1 st A cross road, 5 th A Block, Koramangala, Banglore - 560095 15. Address for correspondence: Project Proponent Environment Consultant Name Mr. P. Sunil Krishnan Mr. Sunil Dixit Designation (Owner/Partner/CEO) Authorized signatory (Authorization Letter is Associate Director enclosed as Annexure 1) Address Kolar Bangarpet Road, J.M. EnviroNet Pvt. Ltd. Hanchala, Bangarpet Post, S.C.O 16, Sector-10A, Gurgaon- Kolar 122001 (Haryana) Pin Code 563114 122001 E-mail president@confident - jm gurgaon @gmail.com group.com Telephone No. 09845327582 09971699906 Fax No. - - Details of Alternative Sites Examined, if None 16. any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects None 18. Whether separate application of N.A. interlinked project has been submitted?

Confident Projects India Pvt. Ltd. 3 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

19. If yes, date of submission N.A. 20. If no, reason N.A. 21. Whether the proposal involves None approval/clearance under: If yes, details of the same and their status to be given. (a) The forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government No order/ Policy relevant/ relating to this site? 23. Forest Land involved (Hectares) None 24. Whether there is any litigation pending - against the project and/or land in which the project is proposed to be set up? (a) Name of the court (b) Case No. (c) Orders/ Directions of the court, if any and its relevance with the proposed project.

(II)(II)(II) Activity 1.1.1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/ Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation NoNoNo wherever possible) with source of information data 1.1 Permanent or temporary Yes Barren land will be developed as golf course with few change in land use, land residential spaces. cover or topography including increase in intensity of land use (with respect to local land use plan). 1.2 Clearance of existing land, No It’s a barren land with negligible vegetation . Site vegetation and buildings? photographs showing the present condition of the site

Confident Projects India Pvt. Ltd. 4 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

have been enclosed as Annexure 333... 1.3 Creation of new land uses? Yes Barren land will be developed as golf course with few residential spaces. 1.4 Pre -construction Yes Detailed feasibility studies and investigation was carried investigations e.g. bore out for the proposed area. houses, soil testing? 1.5 Construction works? Yes Construction work for the expansion area will be started once all the permissions are received from relevant authorities. Other areas are at an advanced stage of completion. 1.6 Demolition works? No No demolition work will be undertaken . 1.7 Temporary sites used for Yes The construction l abours will reside on the site in well laid construction works or out make shift labour camps and all the construction housing of construction material will be stacked within the site premises only. workers? 1.8 Above ground buildings, Yes Few residential and service building structures will be structures or earthworks constructed. including linear structures, cut and fill or excavations 1.9 Underground works No No ne as basement is not proposed . including mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No Not Applicable manufacturing processes? 1.14 Facilities for storage of Yes Temporary sheds will be constructed for the storage of goods or materials? construction materials during construction phase as per the material requirement. 1.15 Facilities for treatment or All the debris generated in the Project will be utilized for disposal of solid waste or road sub base construction. liquid effluents? Scrap scaffoldings, fasteners, waste clamps, scrap wire ropes, TOR steel scrap, waste shuttering material and

Confident Projects India Pvt. Ltd. 5 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

metal drums, etc. will be sold to local scrap dealers for onward recycling. Wooden chips, shredded wood and wastages from removed shuttering, etc. will be mixed with the municipal waste and put to composting. Total STP of capacity 413 KLD is proposed (243 KLD for Existing + 170 KLD for Proposed Expansion & Modification) and proper sanitation facilities will be provided for construction workers. 1.16 Facilities for long term No Operational workers will be employed from nearby area housing of operational hence no such facility is required. workers? 1.17 New road, rail or sea traffic Yes There will be negligible increase in road traffic during during construction or construction phase which will be easily handled by operation? existing road network. 1.18 New road, rail, air No The existing road network near the site is sufficient and waterborne or other will be utilized. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No There will be no diversion or closure of the existing existing transport routes or transport routes and infrastructure. infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not envisaged transmission lines or pipelines? 1.21 Impoundment, damming, No Not envisaged culverting, realignment or other changes to the hydrology of watercourses or aquifers?

Confident Projects India Pvt. Ltd. 6 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

1.22 Stream crossings? No There is no stream passing through the project site. 1.23 Abstraction or transfers of Yes Source of water will be bore well of Existing phase , Rain water form ground or water harvesting and treated water from Sewage surface waters? treatment plant. 1.24 Changes in water bodies or No Not envisaged the land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes The existing road near by the site will be utilized for the materials for construction, transportation of material and personal. operation or decommissioning? 1.26 Long -term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during de - No Not Applicable commissioning which could have an impact on the environment? 1.28 Influx of people to an area Yes Construction phase in either temporarily or During the construction phase labours will be deployed permanently? on the site from nearby places. Influx of these people will be temporary in nature. Operation phase On completion of the project, operational workers will be employed from nearby areas 1.29 Introduction of alien No None species? 1.30 Loss of native species or No Natural vegetation will be retained. genetic diversity? 1.31 Any other actions? No Not envisaged

222.2. Use of Natural resources for construction or operatoperationion of the ProjectPro ject (such as land, water, materials or energy, especially any resources which are nonnon----renewablerenewable or in short supply): S. Information/checklist Yes/ Details thereof (with approximate quantities /rates,

Confident Projects India Pvt. Ltd. 7 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

No. confirmation NoNoNo wherever possible) with source of i nformation data 2.1 Land especially undeveloped Yes 1, 62,984.87 (Sq m) of undeveloped land will be used or agricultural land (ha) for Proposed Expansion & Modification. 2.2 Water (expected source & Yes Water requirement duri ng the operation phase: The competing users) unit: KLD total water requirement for the entire project after Expansion will be 1357 KLD. Which will be sourced from bore wells of Existing phase, Rain water harvesting and treated water from STP. The fresh water required will be 1006 KLD; the recycled water demand will be 351 KLD. From the total required fresh water 444 KLD will be utilized in domestic use and rest 562 KLD will be used in Irrigation & Landscaping. The waste water generation from domestic use during the operation phase will be 377 KLD which will be treated in STP of capacity 413 KLD and whole of the treated water available (359 KLD) will be used for irrigation and landscaping. Source of Water: Fresh water will be sourced from bore wells/municipal water supply, required necessary permission shall be obtained from competent authority. Apart from this water required for irrigation shall also be arranged from sewage treated water from Kolar Town to reduce fresh water requirement. 2.3 Minerals (MT) Yes Sand and aggregated will be used . 2.4 Construction material – Yes Steel Tons 3000 stone, aggregates, sand / soil Cement Bags 3,00 ,000 (expected source – MT) Sand Cum 26,000 Masonry No. 6,00,000 Jelly (20 mm) Cum 18 ,000 Jelly (40 mm) Cum 500

2.5 Forests and timber (sou rce – Yes All the timber used in construction will be certified MT) timber. 2.6 Energy including electricity Yes Karnataka Power Transmission Company Ltd. and fuels (source, competing (KPTCL).

Confident Projects India Pvt. Ltd. 8 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

users) Unit: fuel (MT), energy (MW) 2.7 Any other natural r esources Yes 50 KLD water will be required at Construction phase (Use appropriate standard and 1357 KLD water will be required at operation for units) entire project after Expansion & Modification. 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation NoNoNo whwhwhereverwh erever possible) with source of information data 3.1 Use of substances or materials, Yes Since this is a construction project, no storage of which are hazardous (as per hazardous chemical will be done, except the HSD used MSIHC rules) to human health for DG. Drums of HSD each (100 litre) for DG set will or the environment (flora, be stored as per MSIHC rules fauna, and water supplies) 3.2 Changes in occurrence of No During the constr uction period, adequate precaution disease or affect disease vectors will be taken to avoid stagnation of water to avoid (e.g. insect or water borne mosquito breeding. Labour will be provided with diseases) purified water to avoid spread of waterborne diseases. 3.3 Affect the welfare of people Yes The proposed project will create more employment e.g. by changing living opportunities during the construction and operational conditions? stage and thereby a substantial improvement in the socio-economic status. 3.4 Vulnerable groups of people No No such activity is envisaged. who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not envisaged

444.4... Production of solid wastes during construction or ooperationperation or decommissioning (MT/month(MT/month)))) S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmatconfirmationionionion NoNoNo wherever possible) with source of information data 4.1 Spoil, overburden or mine No Not applicable wastes

Confident Projects India Pvt. Ltd. 9 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

4.2 Municipal waste (domestic and Yes Designated well designe d areas inside the project site or commercial wastes) will be identified with appropriate signages for segregation of solid waste and disposal of non biodegradable materials like glass, cardboard, paper, plastic, metal, electronic waste etc. Biodegradable waste shall be composted on-site, mixed with dried STP sludge and used as manure in the Golf Course as well as in the parks. 4.3 Hazardous wastes (as per Yes Used oil from DG set will be stored carefully and will Hazardous Waste Management be handed over to authorized vendor for disposal. Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes STP sludg e will be dried, composted and will be used from effluent treatment as manure 4.7 Construction or demolition Yes All the debris generated in the p roject will be utilized wastes for road sub base construction. Scrap scaffoldings, fasteners, waste clamps, scrap wire ropes, TOR steel scrap, waste shuttering material and metal drums, etc. will be sold to local scrap dealers for onward recycling. Wooden chips, shredded wood and wastages from removed shuttering, etc. will be mixed with the municipal waste and put to composting. 4.8 Redundant machinery or No All the machinery will be hired on contract basis and equipment hence there will be no redundant machinery or equipment 4.9 Contaminated soils or other No No soil contamination will take place. materials 4.10 Agricultural waste s No No t Applicable 4.11 Other solid wastes No Not envisaged 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/ Checklist Yes/ No Details thereof (with approximate quantities/ rates, No. confirmation whewhereverrever possible) with source of information data

Confident Projects India Pvt. Ltd. 10 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

5.1 Emissions from combustion of Yes During construction phase: exhaust emissions from fossil fuels from stationary or vehicles and other construction machinery like mobile sources excavators, compressors, concrete pumps, etc. 5.2 Emissions from production No Not Applicable processes 5.3 Emissions from materials Yes Fugitive emissions will be generated, while handling handling including storage or and transportation of construction materials to site, transport this will be temporary in nature. 5.4 Emissions from construction Yes DG sets will be operated only as a backup power at activities including plant and project site. Adequate provision will be made to equipment mitigate the problem. 5.5 Dust or odo r from handling of Yes Fugitive dust emissions will be generated due to materials including movement of vehicles and material handling. construction materials, sewage and waste. 5.6 Emissions from incineration of No Not applicable waste. 5.7 Emissions from burning of No Not applicable waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not envisaged sources

6.6.6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. Information/Checklist Yes/ No Details thereof (with approximate quantities/ rates, No. confirmconfirmationation wherever possible) with source of information data 6.1 From operation of equipment Yes Noise generation from construction equipments used e.g. engines, ventilation plant, for drilling, cutting operations. All DG sets will be crushers covered by acoustic encasements as per statutory rules and will conform to noise standards. The DG sets will be mounted on anti vibration mounts to reduce the impacts of vibration. During operation phase, noise & vibrations will be generated due to operation of DG sets (as emergency backup).

Confident Projects India Pvt. Ltd. 11 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

6.2 From industrial or similar No Not A pplicable processes 6.3 From construction or Yes All the machineries deployed for the construction demolition work will be of highest standards and it is estimated that these equipments will generate the noise level in between 81-90 dB (A). Adequate safety measures will be deployed and Ear plugs with other PPEs will be provided to construction workers those who work near the noise generating equipment. 6.4 From blasting or piling No Not applicable 6.5 From construction or Yes Some noise will be generated from vehicular operational traffic movement in the construction and operational phase but that will be mitigated with green belt and well maintained vehicles 6.6 From lighting or cooling No Not applicable systems 6.7 From any other sources No Not Envisaged

7.7.7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwgroundwater,ater, coastal waters or the sea: S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation NoNoNo wherever possible) with source of information data 7.1 From handling, storage, use or No The used oil from DG sets will be carefully stored in spillage of hazardous materials HDPE drums at isolated storage, and periodically sold to authorized recyclers. 7.2 From discharge of sewage or No Total S TP of capacity 413 KLD is proposed (243 KLD other effluents to water or the for Existing + 170 KLD for Proposed Expansion & land (expected mode and Modification) place of discharge) 7.3 By deposition of pollutants No There is no air pollution due to proposed project. emitted to air into the land or into water 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term No Not envisaged

Confident Projects India Pvt. Ltd. 12 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

build up of pollutants in the environment from these sources? 8.8.8. Risk of accidents during construction or operation of the Project, which could affect human health or the environmenenvironmentttt S. Information/ Checklist Yes/ No Details thereof (with approximate quantities/ rates, No. confirmation wherever possible) with source of information data 8.1 From explosions, spillages, No HSD for DG set is the o nly hazardous material fires etc from storage, involved. Storage, handling and disposal of used oil handling, use or production of will be under proper surveillance. Fire fighting system hazardous substances will be provided adequately. 8.2 From any other causes No Not Applicable 8.3 Could th e project be affected No The project is not subjected to any natural disaster. by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequconsequentialential devedevelopment)lopment) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation NoNoNo whewhereverrever possible) with source of information data 9.1 Lead to development of Yes With upcoming of Golf Course and suppor ting supporting, facilities, ancillary infrastructure, employment opportunity will be development or development increased in the area. stimulated by the project which The project provides a well designed residential could have impact on the housing area for the occupants. environment e.g.: Internal roads, rainwater harvesting, etc will be  Supporting infrastructure provided (roads, power supply, waste or waste water treatment, etc.)  Housing development  Extractive industries

Confident Projects India Pvt. Ltd. 13 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

S. Information/ Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation NoNoNo whewhereverrever possible) with source of information data  Supply industries  Other 9.2 Lead to after -use of the site, which No Not envisaged could have an impact on the environment 9.3 Set a precedent for l ater Yes With the improvement in the socioeconomic status developments of the people in the area, later developments are expected. 9.4 Have cumulative effects due to No Not if all pro jects are planned with proper mitigation proximity to other existing or practices. planned projects with similar effects

(III) Environmental Sensitivity: S. Areas Name Aerial distance (within 15 km.) Proposed project NoNoNo /Ident location boundary ityityity 1.1.1. Areas protected under international No None conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2.2.2. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other Yes Natural Lakes adjacent to project site. water bodies, coastal zone, biospheres, mountains, forests. 3.3.3. Areas used by protected, important No None or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4.4.4. Inland, coastal, marine or No Natural lakes , un derground water

Confident Projects India Pvt. Ltd. 14 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

S. Areas Name Aerial distance (within 15 km.) Proposed project NoNoNo /Ident location boundary ityityity underground waters 5.5.5. State, National boundaries No None within 15 kms but Karnataka – Andra Pradesh Boundary at about 24 kms in South East direction 6.6.6. Routes or facilities used by the Yes Sta te highway 5 at about 750 meters in East public for access to recreation or direction. other tourist, pilgrim areas 7.7.7. Defense installations No No defense installation in the neighborhood. 8.8.8. Densely populated or built -up area Yes Kolar town at 8 kms and Banglore city at 60 kms 9.9.9. Areas occupied by sensitive man - Yes 1. Primary, Secondary and Higher Secondary made land uses (hospitals, schools, school available at Hanchala Gate, about 1 km places of worship, community towards East direction and Sulekunte Village facilities) about 5 kms in SW direction 2. Primary health Center at Dodda hasala and Hudukula which are at 7.7 kms in N direction and 5.6 kms in NW direction respectively 3. Someshwar Temple at 9.5 kms in N direction. 10.10.10. Areas containing important, high Yes Ground water, Surface resources. Agriculture quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11.11.11. Areas already subjected to pollution No Not applicable. or environmental damage. (those where existing legal environmental standards are exceeded) 12.12.12. Areas susceptible to natural hazard No Earthquake seismic zone II but th e construction is which could cause the project to earthquake resistant and as per the NBC norms present environmental problems which takes care of environmental threat. (earthquakes, subsidence, landslides, erosion, flooding or extreme or

Confident Projects India Pvt. Ltd. 15 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

S. Areas Name Aerial distance (within 15 km.) Proposed project NoNoNo /Ident location boundary ityityity adverse climatic conditions)

Confident Projects India Pvt. Ltd. 16 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

(IV) Proposed terms of Reference:

PROJECT / LAND USE  A site plan showing the project site and its surroundings with physical features and topographical details, such as land use, contours and drainage pattern, along with photographs of the site from all four sides, should be included in the background information.  List the kind of activities that are proposed or likely to come up in the complex  Examine in detail the proposed site with reference to impact on infrastructure covering water supply, storm water drainage, sewerage, power, etc., and the disposal of treated/raw wastes from the complex on land/water body and into sewerage system.  Examine existing education and health facilities, police and other services and include adequate provisions in the proposal BASELINE ENVIRONMENTAL STUDIES  To examine the baseline status of the project site and its surrounding area, one season baseline monitoring will be done for the project and results will be incorporated in EIA/EMP Report to be prepared for the project.  Study the existing flora and fauna of the area and the impact of the project on them will be conducted.  Adequate rainwater harvesting proposals to recharge ground water, which should be made with due safeguards for ground water quality. Maximize recycling of water and utilization of rainwater ENVIRONMENT:  Make provision of tree plantation as a measure for mitigation of dust and noise in the proposed complex. Landscape plan, tree plantation and open spaces along with species proposed in the complex, may be described.  Make adequate provision for wastewater treatment facilities.  Assess soil erosion in view of the soil characteristics, topography and rainfall pattern.  Describe solid waste management and their disposal scheme.  Arrangements for hazardous waste (Used / spent oil from DG sets) management through registered recyclers.  Solid wastes will be segregated into organic and inorganic components. Both the biodegradable & non-biodegradable/ recyclable wastes will be sold to authorized vendors for recycling of non- biodegradable wastes and disposal of biodegradable waste. Dewatered / dried sludge from STP will be used as manure in horticulture.  Air dispersion modelling to access the impact of project on Ambient Air Quality.  Examine separately the details for construction and operation phases both for Environmental Management Plan and Environmental Monitoring Plan.  Provisions made for safety in storage of materials, products and wastes may be described.

Confident Projects India Pvt. Ltd. 17 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

 Disaster management facility shall be provided. ENERGY CONSERVATION:  Application of renewable energy/alternate energy, such as solar energy may be described including solar water heating in the guidelines for entrepreneurs.  Use of local building materials should be emphasized during construction.  Provide for conservation of resources, energy efficiency and use of renewable sources of energy in the light of ECBC code TRAFFIC MMANAGEMENT:ANAGEMENT:  Traffic management plan including parking areas may be described.  Adequate parking provision and parking space should be provided.  Provide adequate approach road for entry and exit to project site. PROJECT SPECIFIC ADDITIONAL SUGGESTIONS PROJECT DETAILS:  Specify clearly as to whether there is displacement of population due to this project.  Submit contour plan, Master plan, Services layout, car parking plan, traffic circulation plan elevation section plan, perspective view plan and area demarcation plan.  Dual plumbing system shall be proposed for recycling of the treated water and submit the hydraulic design of STP with dimension of each component.  Valid license along-with collaboration agreement and revenue record of the area of the project.  Submit detailed Solid waste management plan.  Water recharging system (water harvesting) will provide as per standard guidelines. WELFARE & SAFETY MEASURES FOR LABOURS  Submit Health & Safety plan as per Noida construction workers rules.  Signed copy of Company’s Environment and Safety Policy  Submit social activities if any, are to be under-taken.  Emergency preparedness plan. ELECTRICAL HAZARDS:  Submit the detailed design about lightening arrestors along with electrical safety plan along-with line diagram indicating standards and codes.  Submit the electricity load and backup calculation of D.G sets  Submit detailed earth pits plan with design details  Submit the Noise and vibration reduction plan. FIRE AND SAFETYSAFETY::::  Submit fire fighting plan along –with diagram indicating standards & codes.  Fire fighting & fire rescue plan.

Confident Projects India Pvt. Ltd. 18 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

ENERGY CONSERVATION:  Submit energy conservation measures giving the energy saved by using non conventional.  Sources of energy along –with calculation regarding the energy saved.  Submit study of simulation of incidence of sunlight to assess the orientation building.  List of the energy saving construction material to be used for construction activities. AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE PROJECT:  An undertaking will be submitted regarding the no construction activities of the project An undertaking for the assurance of the supply of the water from Municipal Authority and supply from hired private water tankers (from safe zone An agreement for supply of water through tankers from safe zone /MOU for the utilization of STP treated water during construction phase will be submitted.

 An undertaking will be submitted that we will use low sulphur diesel/ HSD (0.25%) for their Gen sets. FOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROPROJECJECTT FROM RESPECTIVE AUTHORITIES FOR THE PROJECT:  Permission from the Airport Authority regarding the height of the building.

(V)(V)(V) Undertaking "I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 10/04/2017 Place: Bangalore

Signature of the applicant (Authorized Signatory)

NOTE: 1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the

Confident Projects India Pvt. Ltd. 19 J.M. EnviroNet Pvt. Ltd. Proposed Expansion & Modification of “ChampionChampion Reef Golf CountyCounty” (now renamed as “ZionZion HillsHills Golf CountyCounty”) Project at Kasaba Hobli, Bangarapet, Kolar, Karnataka (((Appendix(Appendix I/Form 11))))

requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden "thereon (at the stage of EC)." 3. All correspondence with the Ministry of Environment & Forests including submission "of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specifics project".

Confident Projects India Pvt. Ltd. 20 J.M. EnviroNet Pvt. Ltd.