T464459670.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

T464459670.Pdf THE REPUBLIC OF UGANDA Kibuku District Local Government is in the process of pre-qualifying competent service providers to Reference Number Subject of pre-qualification Reference Number Subject of pre-qualification constitute the register of providers for the financial year 2021/22, who will be called upon from time to KIBU/605/SUPLS-PRE-/21-22/0005 supply of books of accounts and accountable stationery KIBU/605/annual-tender/21-22/0011 Collection of market dues from Kagumu market in Kagumu time to quote/bid for the provision of works, supplies, and services during the financial year. KIBU/605/SUPLS-PRE-/21-22/0006 Supply of medical equipments and tools sub-county In the same vain, Kibuku District Local Government invites bids under open domestic bidding for the items KIBU/605/SUPLS-PRE-/21-22/0007 Supply of motor cycles KIBU/605/annual-tender/21-22/0013 Parking fees , loading and offloading fees collection in Kibuku specified below. KIBU/605/SUPLS-PRE-/21-22/0009 Supply of filling cabinets, bookshelves, notice boards town council Open Domestic Bidding KIBU/605/SUPLS-PRE-/21-22/0010 Supply of cleaning tools, materials and other small office KIBU/605/annual-tender/21-22/0014 Parking fees , loading and offloading fees collection in Bulangira equipments town council Procurement Subject of Procurement Bid Security KIBU/605/SUPLS-PRE-/21-22/0011 Supply of fuels and Lubricants KIBU/605/annual-tender/21-22/0015 Parking fees , loading and offloading fees collection in Kasasira Reference Number town council Pre-qualification for Services KIBU/605/WRKS/21- Siting, Drilling, Casting, and Installation of 15 Deep Boreholes 2% of the KIBU/605/annual-tender/21-22/0016 Parking fees , loading and offloading fees collection in Kadama 22/00001 Lot A under DWSCG. quoted sum Reference Number Subject of pre-qualification town council KIBU/605/WRKS/21- Siting, Drilling, Casting, and Installation of 10 Deep Boreholes 2% of the KIBU/605/SERVS-PRE-/21-22/0001 Repair and servicing of motor vehicles KIBU/605/annual-tender/21-22/0017 Parking fees , loading and offloading fees collection in Tirinyi 22/00002 Lot B plus 01 production well under DWSCG. quoted sum KIBU/605/SERVS-PRE-/21-22/0002 Repair and servicing of motor cycles town council KIBU/605/WRKS/21- Siting, Drilling, Casting, and Installation of 07 Deep Boreholes 2% of the KIBU/605/SERVS-PRE-/21-22/0003 Surveying of land in government institutions KIBU/605/annual-tender/21-22/0015 Collection of market dues from Tirinyi market in Tirinyi Town KIBU/605/SERVS-PRE-/21-22/0004 Engraving services, making logos, sign posts and name tags 22/00003 Lot C under DDEG. quoted sum council KIBU/605/SERVS-PRE-/21-22/0005 Emptying of pit latrines KIBU/605/WRKS/21- Construction of 2 Classroom Block at st. Joseph Kamolokini P/S 2% of the KIBU/605/annual-tender/21-22/0018 Collection of market dues from Kadama slaughter slab in Kadama KIBU/605/SERVS-PRE-/21-22/0006 Repair and servicing of computers and other IT services 22/00004 in Kagumu S/C under Education department under DDEG. quoted sum Town council KIBU/605/SERVS-PRE-/21-22/0007 Preparation of physical development plans in the District KIBU/605/WRKS/21- Construction of 2 Classroom Block at st. Luke Kiryolo P/S in 2% of the KIBU/605/annual-tender/21-22/0019 Collection of market dues from Kibuku slaughter slab in Kibuku 2200005 Tirinyi S/C under Education department under SFG. quoted sum Pre-qualification under frame work contracts (quote prices for items bidded for) Town council KIBU/605/WRKS/21- Construction of 2 Classroom Block at Mesula P/S in Kagumu S/C 2% of the KIBU/605/annual-tender/21-22/0020 Collection of revenue from ground rent and lock up renewal in 22/00006 under Education department under SFG. quoted sum Reference Number Subject of pre-qualification Kibuku Town Council. KIBU/605/Frame work- Supply of building materials for road works under force account mechanism KIBU/605/WRKS/21- Construction of 2 Classroom Block at Katyaime P/S in Nandere 2% of the PRE-/21-22/0001 (e.g. cement, road gravel, aggregates, river sand, hard core, water for road Disposal of obsolete items (Re-advert) 22/00007 S/C under Education department under DDEG quoted sum KIBU/605/WRKS/21- Rehabilitation of District Council Block under DDEG 2% of the works, culvert rings) under force account mechanism. KIBU/605/DISP/21-22/00001 Assorted Iron sheets, Windows, Doors, and pipes KIBU/605/Frame work- Supply of road tools, implements, safety devices and uniforms 22/00008 quoted sum KIBU/605/DISP/21-22/00002 Motor vehicle UG 0637R KIBU/605/WRKS/21- Construction of a staff house at Kadama HC III under PHC. 2% of the PRE-/21-22/0002 KIBU/605/DISP/21-22/00003 Motor vehicle Nissan KIBU/605/Frame work- Supply of computers, laptops, computer and photocopier consumables 22/00009 quoted sum KIBU/605/DISP/21-22/00004 Assorted Tyres KIBU/605/WRKS/21- Completion of a maternity ward at Tirinyi HC III under PHC. 2% of the PRE-/21-22/0003 including toner cartridges, flash disks, antivirus KIBU/605/Frame work- Provision of catering services 22/00010 quoted sum 1. a) All payments of non- refundable fee should be deposited on to Kibuku District Local Government KIBU/605/WRKS/21- Remodeling of Kibuku HC IV Labour suit to create rooms for 2% of the PRE-/21-22/0004 KIBU/605/Frame work- Provision of assorted office stationery General Fund Account No:01273550355290 DFCU Bank, Pallisa Branch. 22/00011 counseling, laboratory, immunization, and ANC under PHC. quoted sum PRE-/21-22/0005 A copy of the banking slip should be presented to the District Cashier for receipting. KIBU/605/SERVS/21- Provision of consultancy services for design of extension of 2% of the The receipt should be presented to the Head Procurement and Disposal Unit for 22/00001 Kasasira piped water system to Moru Parish, Kabweri piped quoted sum Annual tenders accessing bid documents. water system to Komodo village and supervision of drilling of b) Non- refundable fee is as follows: Nangaiza production well under DWSCG. Reference Number Subject of pre-qualification Category A & B………………………103,000/= KIBU/605/annual-tender/21-22/0001 Collection of market dues from Kibuku market in Kibuku Town KIBU/605/SUPLS/21- Supply of 2no. Motorcycles to Production department under 2% of the Category C,D,E, F, G ……………..53,000/= 22/00001 PMG. quoted sum council 2. Bidding will be conducted in accordance with open bidding procedures contained in the Local KIBU/605/annual-tender/21-22/0002 Collection of market dues from Bulangira market in Bulangira Government Public Procurement and Disposal of Public Assets registration 2006. Pre-qualification for works Town Council 3. Bids and all correspondences related to these tenders must be written in English returned in sealed KIBU/605/annual-tender/21-22/0003 Collection of market dues from Kadama market in Kadama Town Reference Number Subject of pre-qualification envelopes clearly marked “Tender for ………………………………and addressed to the Head council th KIBU/605/WRKS-PRE-/21-22/0001 General construction and Rehabilitation of buildings including Procurement and Disposal Unit. P.O. BOX 150, MBALE on or before 25 August 2021 at 11:00am KIBU/605/annual-tender/21-22/0004 Collection of market dues from Nangaiza market in Nangaiza fencing works which is closing date and time. sub-county 4. Three (3) copies must be submitted one of which should be original. KIBU/605/WRKS-PRE-/21-22/0002 Construction of pit latrines KIBU/605/annual-tender/21-22/0005 Collection of market dues from Buseta market in Buseta sub- 5. Bids will be opened at 11:15 AM on the closing date at the Education Resource Centre. KIBU/605/WRKS-PRE-/21-22/0003 Protection of springs 6. Late submissions will not be accepted. KIBU/605/WRKS-PRE-/21-22/0004 Rehabilitation of boreholes county KIBU/605/annual-tender/21-22/0006 Collection of market dues from Kasasira market in Kasasira Town Kibuku District Local Government is not bound to accept the lowest, highest or any bid. Pre-qualification for Supplies Council KIBU/605/annual-tender/21-22/0007 Collection of market dues from Kameme market in Buseta sub- Reference Number Subject of pre-qualification county 1. Public Bid Notice 5th August, 2021 KIBU/605/SUPLS-PRE-/21-22/0001 Supply of Agricultural planting materials ,Agro vet chemicals, KIBU/605/annual-tender/21-22/0008 Collection of market dues from Lyama market in Kakutu sub- 2. Bid closing date 3rd September, 2021 inputs, entomology equipments, tree seedlings, nursery county 3. Evaluation process 06th-10th September, 2021 equipments and Livestock th KIBU/605/annual-tender/21-22/0009 Collection of market dues from Nabiswa market in Nabiswa 4. Display of BEB notice 13 September, 2021 KIBU/605/SUPLS-PRE-/21-22/0002 Supply of school furniture sub-county 5. Contract Signature After Solicitor General clearance KIBU/605/SUPLS-PRE-/21-22/0003 Supply of assorted office furniture and fittings KIBU/605/annual-tender/21-22/0010 Collection of market dues from Kapyani market in Nankodo KIBU/605/SUPLS-PRE-/21-22/0004 Supply and Installation of solar systems and equipments ACCOUNTING OFFICER/KIBUKU sub-county.
Recommended publications
  • Vote: 605 Kibuku District Structure of Budget Framework Paper
    Local Government Budget Framework Paper Vote: 605 Kibuku District Structure of Budget Framework Paper Foreword Executive Summary A: Revenue Performance and Plans B: Summary of Department Performance and Plans by Workplan C: Draft Annual Workplan Outputs for 2013/14 Page 1 Local Government Budget Framework Paper Vote: 605 Kibuku District Foreword In order to keep the development planning process of the District consistent with national policies,planning & budgeting is one way of documenting intervations in line with decentralisation frame work. The completion of the budget frame work process has set the foundation on which the planning and budgeting process for the financial year 2013/14 will be based & thus giving the opportunity to the local Government to identify projects which have a poverty focus approach and which are in harmony with the pillars of PEAP.While coming up with this BFP departments have had to refer to the bench marks set at the beginning of the financial year.This has therefore enabled the harmonisation of the District pririoties with the national ones, bearing in mind the result oriented management principle. The fact that this is an annual exercise, it is a reliable mechanism which provides a yard stick for realistic planning & budgeting in the local government and also provides a basis of comparision of the District achievements compared to national standards. The District is faced with a challenge of inadquate resources,there is need for our local Government to explore more into the existing and new sources of Local Revenue in order to ensure sustainability. Meanwhile we request the central Government to continue making available more resources to Kibuku District such that the gaps are filled in order to improve service delivery with the ultimate aim of reducing disparities and improving on the incomes and quality of life of our people.
    [Show full text]
  • Author: Gorret Nabukenya Affiliation: Kadama Widows Association Email:[email protected]/[email protected] Tel: 256-774715385
    Author: Gorret Nabukenya Affiliation: Kadama Widows Association Email:[email protected]/[email protected] Tel: 256-774715385 Title: The relationship between population growth rate and climate change in Kibuku District-Uganda. Objective: To establish the relationship between population growth and climate change in Kibuku District,Eastern Uganda. Introduction: Climate change in lay man’s language is the general change in the rainy seasons, planting seasons as to people in Kibuku District. Population growth rate is the speed at which the population increases over a given period of time. There is a remarkable relationship between population growth and climate change more so in the developing world. The high fertility rate in the world more so in the developing countries has greatly contributed to the biggest global health threat of the 21st century. World population is projected to reach 9.1 billion by 2050 with most of this growth in developing countries. The study was conducted in 10 sub counties of Kibuku District that is Bulangira, Tirinyi, Kadama, Kirika, Kabweri, Kibuku Township, Kagumu, Buseta, Kasasira and Nabuli. The study was basically to establish the root causes and effects of climate change then find appropriate solutions. Results: 1352 respondents (902 Female, 450 Male) were reached by the use of the various means about the issue of population growth and climate change.1002 said that the area is commonly faced with famine due to change in seasons with longer dry seasons. Most of them attributed the change in climate to over deforestation that was carried out in search for fuel that is charcoal and firewood which is 99% of the fuel types commonly used.
    [Show full text]
  • Namutumba District HRV Profile.Pdf
    Namutumba District Hazard, Risk and Vulnerability Profi le 2016 Acknowledgment On behalf of office of the Prime Minister, I wish to express my sincere appreciation to all of the key stakeholders who provided their valuable inputs and support to this Multi-Hazard, Risk and Vulnerability mapping exercise that led to the production of comprehensive district Hazard, Risk and Vulnerability (HRV) profiles. I extend my sincere thanks to the Department of Relief, Disaster Preparedness and Management, under the leadership of the Acting Commissioner, Ms. Rose Nakabugo, for the oversight and management of the entire exercise. The HRV assessment team was led by Mr. Kirungi Raymond Disaster Preparedness Officer and the team of consultants (GIS/DRR specialists); Mr. Emmanuel M.O.Matua; Mr. Festus Kakungulu Mukasa; Mr. Ambrose Buyinza, and Mr. Benon Nabaasa Baguma who provided technical support. Our gratitude goes to UNDP for providing funds to support the Hazard, Risk and Vulnerability Mapping. The team comprised of Mr. Jose Neil A.C Manzano –Disaster Risk Management Advisor; Mr. Gilbert Anguyo - Disaster Risk Reduction Analyst, and Mr. Sidney Tupper – Climate Risk Management Specialist. My appreciation also goes to Namutumba District Team. The entire body of stakeholders who in one way or another yielded valuable ideas and time to support the completion of this exercise. Hon. Hilary O. Onek Minister for Relief, Disaster Preparedness and Refugees NAMUTUMBA DISTRICT HAZARD, RISK AND VULNERABILITY PROFILE i Executive summary Vulnerability assessment, hazard and risk mapping is an important exercise carried out by OPM in response to The National Policy for Disaster Preparedness and Management (Section 4.1.1) and also targeting to counteract vulnerability at community and local government levels by reducing the impact of the hazards where possible through mitigation, prediction, early warning and preparedness.
    [Show full text]
  • Draft Uganda Standard
    DUS 778 DRAFT UGANDA STANDARD Second Edition 2017-mm-dd Animal stock routes, check points and holding grounds — Requirements Reference number DUS 778: 2017 © UNBS 2017 DUS 778: 2017 Compliance with this standard does not, of itself confer immunity from legal obligations A Uganda Standard does not purport to include all necessary provisions of a contract. Users are responsible for its correct application © UNBS 2017 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilised in any form or by any means, electronic or mechanical, including photocopying and microfilm, without prior written permission from UNBS. Requests for permission to reproduce this document should be addressed to The Executive Director Uganda National Bureau of Standards P.O. Box 6329 Kampala Uganda Tel: +256 414 333 250/1/2/3 Fax: +256 414 286 123 E-mail: [email protected] Web: www.unbs.go.ug ii © UNBS 2017 – All rights reserved DUS 778: 2017 Contents Page Foreword ............................................................................................................................................................ iv Introduction ......................................................................................................................................................... v 1 Scope ...................................................................................................................................................... 7 2 Normative references ...........................................................................................................................
    [Show full text]
  • Covid-19 Vaccination Sites by District In
    COVID-19 VACCINATION SITES BY DISTRICT IN UGANDA Serial Number District/Division Service point Abim hospital Alerek HCIII 1 Abim Marulem HCIII Nyakwae HCIII Orwamuge HCIII Adjumani Hospital Dzaipi HCII 2 Adjumani Mungula HC IV Pakele HCIII Ukusijoni HC III Kalongo Hospital Lirakato HC III 3 Agago Lirapalwo HCIII Patongo HC III Wol HC III Abako HCIII Alebtong HCIV 4 Alebtong Amogo HCIII Apala HCIII Omoro HCIII Amolatar HC IV Aputi HCIII 5 Amolatar Etam HCIII Namasale HCIII Amai Hosp Amudat General Hospital Kalita HCIV 6 Amudat Loroo HCIII Cheptapoyo HC II Alakas HC II Abarilela HCIII Amuria general hospital 7 Amuria Morungatuny HCIII Orungo HCIII Wera HCIII Atiak HC IV Kaladima HC III 8 Amuru Labobngogali HC III Otwee HC III Pabo HC III Akokoro HCIII Apac Hospital 9 Apac Apoi HCIII Ibuje HCIII Page 1 of 16 COVID-19 VACCINATION SITES BY DISTRICT IN UGANDA Serial Number District/Division Service point Teboke HCIII AJIA HCIII Bondo HCIII 10 Arua Logiri HCIII Kuluva Hosp Vurra HCIII Iki-Iki HC III Kamonkoli HC III 11 Budaka Lyama HC III Budaka HC IV Kerekerene HCIII Bududa Hospital Bukalasi HCIII 12 Bududa Bukilokolo HC III Bulucheke HCIII Bushika HC III Bugiri Hospital BULESA HC III 13 Bugiri MUTERERE HC III NABUKALU HC III NANKOMA HC IV BUSEMBATYA HCIII BUSESA HC IV 14 Bugweri IGOMBE HC III LUBIRA HCIII MAKUUTU HC III Bihanga HC III Burere HC III 15 Buhweju Karungu HC III Nganju HC III Nsiika HC IV Buikwe HC III Kawolo Hospital 16 Buikwe Njeru HCIII Nkokonjeru Hospital Wakisi HC III Bukedea HC IV Kabarwa HCIII 17 Bukedea Kachumbala HCIII
    [Show full text]
  • District Constituency Municipal Division/Subcounty/Town/Division
    District Constituency Municipal Division/Subcounty/Town/Division HOIMA BUHAGUZI COUNTY BUHIMBA TOWN COUNCIL KAKUMIRO BUGANGAIZI WEST COUNTY IGAYAZA TOWN COUNCIL KAKUMIRO BUGANGAIZI WEST COUNTY KITAIHUKA KAKUMIRO BUGANGAIZI WEST COUNTY KIKWAYA KAKUMIRO BUGANGAIZI WEST COUNTY KIJANGI KAKUMIRO BUGANGAIZI WEST COUNTY KISENGWE KAKUMIRO BUGANGAIZI WEST COUNTY KYABASAIJA KAKUMIRO BUGANGAIZI WEST COUNTY KAKINDO TOWN COUNCIL KAKUMIRO BUGANGAIZI EAST COUNTY KATIKARA KAKUMIRO BUGANGAIZI EAST COUNTY KISIITA TOWN COUNCIL KAKUMIRO BUGANGAIZI EAST COUNTY KIBIJJO KIBAALE BUYANJA COUNTY KABASEKENDE KIBAALE BUYANJA COUNTY KASIMBI KIBAALE BUYANJA COUNTY KARAMA MASINDI BUJENJE COUNTY KABANGO TOWN COUNCIL MASINDI BURULI COUNTY KYATIRI TOWN COUNCIL BULIISA BULIISA COUNTY BIISO TOWN COUNCIL BULIISA BULIISA COUNTY BUTIABA TOWN COUNCIL KIRYANDONGO KIBANDA NORTH COUNTY KARUMA TOWN COUNCIL KIBOGA KIBOGA EAST COUNTY LWAMATA TOWN COUNCIL KAYUNGA NTENJERU COUNTY NORTH BUSAANA TOWN COUNCIL KAYUNGA NTENJERU COUNTY SOUTH KANGULUMIRA TOWN COUNCIL KAYUNGA NTENJERU COUNTY SOUTH NAZIGO TOWN COUNCIL KYANKWANZI BUTEMBA COUNTY BYERIMA KYANKWANZI BUTEMBA COUNTY KYANKWANZI TOWN COUNCIL KYANKWANZI BUTEMBA COUNTY BANDA LWENGO BUKOTO COUNTYSOUTH KINONI TOWN COUNCIL KYOTERA KAKUUTO COUNTY KASENSERO TOWN COUNCIL KYOTERA KAKUUTO COUNTY MUTUKULA TOWN COUNCIL MPIGI MAWOKOTA COUNTY SOUTH BUWAMA TOWN COUNCIL MPIGI MAWOKOTA COUNTY SOUTH KAYABWE TOWN COUNCIL MUBENDE KASAMBYA COUNTY KASAMBYA TOWN COUNCIL SSEMBABULE LWEMIYAGA COUNTY KYEERA SSEMBABULE LWEMIYAGA COUNTY NABITANGA SSEMBABULE LWEMIYAGA
    [Show full text]
  • Public Expenditure Tracking on Road Infrastructure in Uganda: the Case Study of Pallisa and Soroti Districts
    Public expenditure tracking on road infrastructure in Uganda: The case study of Pallisa and Soroti Districts RESEARCH REPORT 2 Nyende Magidu Jeff Geoffrey Alumai Winnie Nabiddo DECEMBER 2010 Acknowledgements This report synthesizes findings from a study to review the infrastructure public expenditures in two selected districts in Uganda under the central government transfers. The research was conducted by the Economic Policy Research Centre (EPRC). The team gratefully acknowledges the support received during the study particularly the local government staff more especially from the engineering department, finance as well as the assistant secretaries at the lower local governments. The team appreciated especially the strong support and encouragement by the Chief Administrative Officers (CAOs) who made access to information easy. The core study team was supported by interns from Makerere University who included Kisame Keith and Alikwani Abbey whose valuable inputs made the preparation of the report easy. This research report was prepared by Nyende Magidu (team leader), Jeff G. Alumai and Winnie Nabiddo. Dr. Sarah Ssewanyana provided valuable comments throughout the preparation of the report. i List of Acronyms/Abbreviations AfDB African Development Bank BOQs Bill of Quantities CAIIP Community Agriculture Infrastructure Improvement Programme CDO Community Development Officer DANIDA Danish International Development Agency FGD Focus Group Discussions GDP Gross Domestic Product GoU Government of Uganda IFAD International Fund for Agricultural
    [Show full text]
  • Assessment Form
    Local Government Performance Assessment Kibuku District (Vote Code: 605) Assessment Scores Accountability Requirements % Crosscutting Performance Measures 65% Educational Performance Measures 93% Health Performance Measures 90% Water & Environment Performance Measures 72% 605 Accountability Requirements 2019 Kibuku District No. Summary of requirements Definition of compliance Compliance justification Compliant? Annual performance contract 1 Yes LG has submitted an annual performance • From MoFPED’s The LG submitted an Annual contract of the forthcoming year by June 30 inventory/schedule of LG Performance Contract on the basis of the PFMAA and LG Budget submissions of performance on15/07/2019 04:03 through guidelines for the coming financial year. contracts, check dates of the on line platform submission and issuance of [email protected] and it was receipts and: received by MoFPED on the same day. o If LG submitted before or by due date, then state The Performance Contract ‘compliant’ hard copy was physically delivered and stamped o If LG had not submitted received by MoFPED on or submitted later than the 30/7/2019 under reference due date, state ‘non- CR/213/5 compliant’ Since the submission dead • From the Uganda budget line date was extended from website: 30th June 2019 to 31st www.budget.go.ug, check August 2019 the DLG was and compare recorded date compliant. therein with date of LG submission to confirm. Supporting Documents for the Budget required as per the PFMA are submitted and available 2 Yes LG has submitted a Budget that includes a • From MoFPED’s Procurement Plan for the forthcoming FY inventory of LG budget The LG submitted a Budget by 30th June (LG PPDA Regulations, submissions, check for the FY 2019/2020 on 2006).
    [Show full text]
  • Kibuku Q3.Pdf
    Local Government Quarterly Performance Report Vote: 605 Kibuku District 2013/14 Quarter 3 Structure of Quarterly Performance Report Summary Quarterly Department Workplan Performance Cumulative Department Workplan Performance Location of Transfers to Lower Local Services and Capital Investments Submission checklist I hereby submit _________________________________________________________________________. This is in accordance with Paragraph 8 of the letter appointing me as an Accounting Officer for Vote:605 Kibuku District for FY 2013/14. I confirm that the information provided in this report represents the actual performance achieved by the Local Government for the period under review. Name and Signature: Chief Administrative Officer, Kibuku District Date: 07/08/2014 cc. The LCV Chairperson (District)/ The Mayor (Municipality) Page 1 Local Government Quarterly Performance Report Vote: 605 Kibuku District 2013/14 Quarter 3 Summary: Overview of Revenues and Expenditures Overall Revenue Performance Cumulative Receipts Performance Approved Budget Cumulative % Receipts Budget UShs 000's Received 1. Locally Raised Revenues 119,896 58,230 49% 2a. Discretionary Government Transfers 1,361,658 906,927 67% 2b. Conditional Government Transfers 9,785,883 8,248,562 84% 2c. Other Government Transfers 328,784 567,480 173% 3. Local Development Grant 487,365 414,261 85% Total Revenues 12,083,586 10,195,461 84% Overall Expenditure Performance Cumulative Releases and Expenditure Perfromance Approved Budget Cumulative Cumulative % % % Releases Expenditure
    [Show full text]
  • Roads Sub-Sector Annual Budget Monitoring Report FY2019/20
    ROADS SUB-SECTOR ANNUAL BUDGET MONITORING REPORT FINANCIAL YEAR 2019/20 NOVEMBER 2020 Ministry of Finance, Planning and Economic Development P.O. Box 8147, Kampala www.finance.go.ug ROADS SUB-SECTOR ANNUAL BUDGET MONITORING REPORT FINANCIAL YEAR 2019/20 NOVEMBER 2020 TABLE OF CONTENTS ACRONYMS ..................................................................................................................................ii FOREWORD.................................................................................................................................iii EXECUTIVE SUMMARY ...........................................................................................................iv CHAPTER 1: INTRODUCTION .................................................................................................1 1.1 Background ................................................................................................................................1 1.1.1 Sub-sector Objectives and Priorities .......................................................................................1 1.1.2 Sector Financial Performance .................................................................................................2 1.2 Rationale/purpose ....................................................................................................................3 1.3 Report outline ...........................................................................................................................3 CHAPTER 2: METHODOLOGY ................................................................................................4
    [Show full text]
  • National Population and Housing Census 2014
    SELECTED SOCIO ECONOMIC INDICATORS Total Census Population Administrative units (August 2014) 1969 9,535,051 1980 12,636,179 Districts 112 1991 16,671,705 Counties 181 2002 24,227,297 Sub counties 1,382 2014 34,856,813 Municipalities 22 Town councils 174 2014 Census Population Demographic indicators (2011) Males 16,935,456 Female 17,921,357 Crude Birth Rate 42.1 Rural 28,430,800 Total Fertility Rate 6.2 Urban 6,426,013 Sex Ratio at birth 103 Kampala Capital City 1,516,210 Health Indicators (2011) Household population Infant Mortality Rate 54 Number of households 7,353,427 Maternal Mortality Rate 438 Average household size 4.7 Contraceptive Prevalence Rate 30 Population in households 34,350,070 HIV Prevalence rate 7.3 Annual Population growth rates (percent) 2013 Economic Indicators 1991-2002 3.20 GDP at current market prices 58,865 billion Shs Per capita GDP at current market 2002-2014 3.03 prices 1,638,939 Shs GDP at constant (2002) market 1969-2014 2.88 prices: Growth rate 4.7 percent Sex ratio (percent) Per capita GDP growth rate 1.1 percent Contribution of agric to GDP at 1991 96.5 current market prices 20.9 percent 2002 95.3 Reserves -234.7 million US$ 2014 94.5 Inflation rate 5.5 percent Budget deficit excl. grants as a % GDP (2013/14) -5.9 percent Population Density (persons per Sq km) 1991 85 Tourism – Number in 2013 2002 123 Resident departures 378,000 2014 174 Non- resident departures 1,188,000 Projected population (Millions) Resident arrivals 478,000 2015 35.8 Non-resident arrivals 1,206,000 2020 40.4 Visitors to National parks 214,000 2025 46.7 NATIONAL POPULATION AND HOUSING CENSUS 2014 PROVISIONAL RESULTS NOVEMBER 2014 REVISED EDITION UGANDA BUREAU OF STATISTICS Plot 9, Colville Street, P.O.
    [Show full text]
  • Political Decentralisation and Good Governance
    POLITICAL DECENTRALISATION AND GOOD GOVERNANCE ACASE STUDY OF NAMUTUMBA TOWN COUNCIL IN NAMUTUMBA DISTRICT BY SEWAVA FRANK BPA144132/143/DU A RESEARCH REPORT SUBMITTED TO THE COLLEGE OF HUMANTIES AND SOCIAL SCIENCES AS A PARTIAL FULFILLMENT FOR THE AWARD OF BACHELORS’ DEGREE IN PUBLIC ADMINISTRATION OF KAMPALA INTERNATIONAL UNIVERSITY AUGUST, 2017 DECLARATION I, Sewava Frank do here by declare that this work is original and has never been submitted to any other institution for award of any degree where the work of others has been used, reference has been ma~ ere of. Signed: ~ Date: ~ SEWAVA FRANK BPA/44132/1431DU APPROVAL This research report titled “Political decentralization in promoting good governance”: A case study of Namutumba Town council has submitted by Sewava Frank for examination with my approval as the university supervisor and it’s now ready for presentation for the award of a Bachelor of public Administration of Kampala International University. Signed~ Date: ..~- AHEEBWA SANURA (Supervisor) DEDICATION I dedicate this piece of work to my beloved Daddy and Mammy because he really struggled too much for my being and completion of my studies, for supporting me both morally and financially. May the Almighty God reward them abundantly. ACKNOWLEDGEMENT I extend a vote of thanks to a number of people who unreservedly, contributed towards the accomplishment of this research work and my studies at large. I also would like to acknowledge the assistance and role played by the following personalities as they have been engines behind my success. I cannot say exactly how grateful I am to my supervisor. His guidance in this study is beyond measure.
    [Show full text]