Global Centre of Rail Excellence Planning Pre

Total Page:16

File Type:pdf, Size:1020Kb

Global Centre of Rail Excellence Planning Pre A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES Contents 1. Introduction 2. Objectives, Trends and Benefits 3. Site and Context Analysis 4. Design Development 5. The Proposals 6. Policy Appraisal and Alignment 7. Summary & Conclusions A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES 1. Introduction A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES Introduction This Planning, Design and Access Statement has been prepared by Ove Arup and Partners Previous planning applications for development at the site were subject to Environmental Limited (Arup) on behalf of Welsh Government in support of a cross boundary outline Impact Assessment (EIA). Under the Town and Country Planning (Environmental Impact planning application (with all matters reserved), submitted to both Powys County Council Assessment) (Wales) Regulations 2017, the development has been deemed as requiring (PCC) and Neath Port Talbot County Borough Council (NPTCBC) for the development EIA, the scope of it having been agreed by both PCC and NPTCBC in a joint Scoping of a Global Centre of Rail Excellence (GCRE) at the site of Nant Helen Surface Mine, response in November 2019. Onllwyn at which coaling operations are coming to an end and final restoration by Celtic Energy was consented in June 2020 under a section 73 application 19/1899/REM. Given that the application is in outline with all matters reserved, it has been agreed that this document can be a combined Planning, Design and Access Statement which sets the In April 2020, Celtic Energy submitted two planning applications reference 20/0738/FUL context for the planning application and proposals therein. It considers the context to the (Powys) and P/2020/0362 (Neath Port Talbot) for a complementary earthworks scheme site and its surroundings, the design evolution of the proposals and the environmental to provide a comprehensive, flexible and adaptable landform across the entire site that impacts of the proposed development and assesses the material planning considerations could support a wide range of future uses which included the GCRE, establishing the against the policy background in justifying the granting of planning permission. It should earthworks formation and associated drainage and landscaping for two of the key be read in conjunction with the Environmental Impact Assessment. components of the rail testing facility, namely the high speed and infrastructure test track loops and rail line connections. Both were consented in July 2020. Procedures for dealing with cross boundary development are made within the Town and Country Planning (Fees for Applications, Deemed Applications and Site Visits) (Wales) Regulations 2015 (as amended) and provides that planning applications should be submitted in each jurisdiction and determined by each local planning authority concerned. In this case, a planning application will be submitted to both NPTCBC and PCC. Environmental Impact Assessment The site of the proposed development is more than 1 hectare in area and constitutes major development as defined within the Town and Country Planning (Development Management Procedure) (Wales) Order 2012 (as amended). Subsequently, the planning application has been scoped to accord with the requirements associated with major development as prescribed by the regulations. A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES Introduction Material Planning Considerations The nature and scale of the proposed development, in the context of the site’s location and features, creates several material planning considerations which have been broadly considered in a format that mirrors the EIA (construction and operation effects) and include; • Principle of development and the land use and the prevailing Development Plan policy context • Socio-Economic benefits • Geotechnical (land stability and contamination) • Construction Management (focused primarily on noise mitigation) • Hydrological Impact (sustainable drainage, water quality and flood risk) • Landscape and Visual Impact (national park, common land and rights of way) • Ecological Impact (SSSI, SINC, habitats and protected species) • Heritage Impact (Scheduled Monument) This Statement will focus on addressing the key aspects of the proposed development and those which give rise to potentially significant effects. Aspects which give rise to lesser effects are addressed at length within the EIA and are not duplicated here. A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES 2.Objectives, Trends and Benefits A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES Objectives GCRE aims to meet a number of objectives which have been developed to address the context associated with mining. issues and needs of the UK rail industry: • Deliver a UK-based modern and comprehensive rail testing facility to provide the capacity and capabilities for rigorous testing of rolling stock, infrastructure and integrated systems from prototype to implementation. • Act as a catalyst for the creation of a rail technology hub in Wales, providing a flexible, open-market platform for leading R&D activity that drives innovation. • Provide opportunities to work with industry to support skills development through high- quality employment in fair, secure and sustainable jobs that contribute to reducing regional inequality and promoting regeneration in Wales. • Develop and test rail sector principles, standards and specifications which improve the UK's competitive strengths as a world leader in achieving carbon neutrality, contributing to an overall decrease in carbon emissions across the rail industry. Beyond the industry objectives, there are other reasons/drivers of change or desirable outcomes that play directly into either the site or the local context, chief among these are: • A transformational impact on the heads of valleys by regenerating the post-coal landscape and creating new socio-economic opportunities. • Interpretation of the historic environment and the transport heritage aspects of the mining context of the site and beyond given the presence of a section the linear tram road scheduled monument on the site. At present, accessibility is limited and there is no in-situ interpretation and one outcome of this scheme could be an improvement to the experience of using the local footpath network through narrative on the historic transport A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES The Case for Change The UK does not possess anything approaching such a high-quality facility as that planned • Removing risk from the introduction of new trains and other assets by allowing them to at GCRE. Both public and private sector organisations frequently use test facilities in be thoroughly tested prior to deployment. This would avoid the need for new trains Europe and the USA, supporting jobs and building competing expertise in other countries. being tested on the national network or rushed into service before all performance risks Moreover, these other facilities are often owned and operated by a single commercial had been dealt with (note issues with new inter-city trains; certain electrification assets; entity, which stifles access to testing and innovation. With projects such as HS2, and projects such as Crossrail). With infrastructure and rolling stock testing in a single CrossRail2, Northern Powerhouse Rail and the Cardiff Valleys transformation location, more robust systems integration testing can be conducted. approaching, together with the soon to be time-expired status of the majority of the UK’s signalling infrastructure (in itself an estimated £35 bn renewals programme from 2025), • Tackling ever-rising costs across the rail sector by allowing new technologies to be the need for safe and efficient testing to drive performance and cost-efficiency has never effectively tested and commissioned rather than committing them to operations before been greater. Operational independence and full open-market access is critical to allow they are fully developed. competition and innovation to flourish. • Generating high quality employment and economic opportunities for communities in GCRE will address a number of specific issues: South West Wales. • Supporting UK train manufacturers and encouraging the establishment of further UK • Providing further opportunities for sustainable technologies associated with the rail manufacturing facilities and testing capacity. sector (electric, battery, links to sustainable generation). • Supporting the development of a UK digital railway industry by providing high quality and safe testing facilities for digital signalling, train control and asset management technologies. • Delivering high-tonnage endurance testing of railway infrastructure particularly track and structures; such a facility will enable infrastructure to be rapidly tested and verified and would be unique in Europe, potentially attracting customers from around the world – Network Rail has a strong and confirmed interest in this element. A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES Industry Trends The rail industry faces substantial challenges and opportunities to exploit new, emerging and existing technology within a rail environment. For example: Traction Control Digitisation Design Hydrogen fuel cell battery packs European train control system Data transfer and communication Lightweight materials automated inspection and maintenance Discontinuous electrification Automatic train control 2040 diesel deadline A GLOBAL CENTRE OF RAIL EXCELLENCE IN WALES Research Trends The GCRE is the vehicle to create a rail technology hub for business and research, creating and strengthening
Recommended publications
  • 62Nd Euroconstruct Conference
    A-1103 WIEN, POSTFACH 91 TEL. 798 26 01 • FAX 798 93 86 ÖSTERREICHISCHES INSTITUT FÜR WIRTSCHAFTSFORSCHUNG 62nd Euroconstruct Conference The Prospects for the European Construction Market Country Reports December 2006 Munich, December 2006 Country Report 62nd Euroconstruct Conference Munich, December 2006 Ifo Institute for Economic Research at the University of Munich © EUROCONSTRUCT Munich, December 2006 This Country Report has been written and prepared by the EUROCONSTRUCT organisation from the country reports of the 19 EUROCONSTRUCT member institutes. The report has been edited and formatted by: Ifo Institute for Economic Research Poschingerstrasse 5, 81679 Munich Germany Tel.: ++49-89-9224-1388 or -1383 Fax: ++49-89-9224-2430 or -2383 E-Mail: [email protected] or [email protected] Website: www.ifo.de www.euroconstruct.org © EUROCONSTRUCT December 2006 All rights reserved Reproduction or passing-on of the whole or parts of the report is strictly forbidden without prior written authority from the Ifo Institute, acting on behalf of the EUROCONSTRUCT group. © EUROCONSTRUCT Munich, December 2006 Index Contents The Euroconstruct Network....................................................................... 5 Country Reports Austria ............................................................................................ 31 Belgium .......................................................................................... 45 Czech Republic.............................................................................. 63 Denmark........................................................................................
    [Show full text]
  • 36Acorn Directory of Services Neath Port Talbot.Pdf
    FOREWORD Acorn was set up by a group of volunteers in August 2011 to promote positive mental health and improve the emotional health and wellbeing of individuals experiencing mental health issues in Neath Port Talbot. This directory has been produced because members of Acorn identified the need for information about services and support organisations to be easily available and in one place. It is estimated that one in four people will experience mental ill health at some point in their lifetime, so mental illness will, at one time or another impact on many of our lives, either directly or through family, friends or colleagues. It is important to be able to find the right help, support and guidance easily so we hope this directory will help to achieve this. We have tried to focus on local services, but where these don’t exist we have put together a section on national organisations, websites and help lines. If you would like to comment on the directory or contact members of Acorn please email: [email protected]. For further information, please contact Emma Jones on 01639 631 246. Michael Sheen Patron of Acorn Neath Port Talbot CONTENTS 1. Voluntary Sector 2. Advocacy Support Cymru 3. Alzheimer’s Society 4. Bipolar UK 6. Caer Las 8. Calan Dvs 9. Citizens Advice 11. Community Advice & Listening Line 12. Cruse Bereavement Care 13. Dewis 14. Free to Engage 15. Gofal 17. Hafal 18. Journeys 19. Mental Health Matters Wales 20. Mental Health & Well Being Volunteer Project 21. Mind 23. Neath Foodbank 24. Neath Port Talbot Carers Service 25.
    [Show full text]
  • NORTH WEST Freight Transport Strategy
    NORTH WEST Freight Transport Strategy Department of Infrastructure NORTH WEST FREIGHT TRANSPORT STRATEGY Final Report May 2002 This report has been prepared by the Department of Infrastructure, VicRoads, Mildura Rural City Council, Swan Hill Rural City Council and the North West Municipalities Association to guide planning and development of the freight transport network in the north-west of Victoria. The State Government acknowledges the participation and support of the Councils of the north-west in preparing the strategy and the many stakeholders and individuals who contributed comments and ideas. Department of Infrastructure Strategic Planning Division Level 23, 80 Collins St Melbourne VIC 3000 www.doi.vic.gov.au Final Report North West Freight Transport Strategy Table of Contents Executive Summary ......................................................................................................................... i 1. Strategy Outline. ...........................................................................................................................1 1.1 Background .............................................................................................................................1 1.2 Strategy Outcomes.................................................................................................................1 1.3 Planning Horizon.....................................................................................................................1 1.4 Other Investigations ................................................................................................................1
    [Show full text]
  • Planning, Taxi Licensing and Rights of Way Committee Report Application No: 18/1070/REM Grid Ref: 283050.34 211312.71
    Planning, Taxi Licensing and Rights of Way Committee Report Application No: 18/1070/REM Grid Ref: 283050.34 211312.71 Community Council: Tawe-Uchaf CC Valid Date: Officer: 03/12/18 Hugh Towns Applicant: Celtic Energy Ltd Location: Nant Helen Surface Mine, Coelbren, Neath Proposal: Variation of condition 2 of planning approval P/2011/0217 to allow an extension of time to allow extraction of all the coal and completion of restoration. Application Type: Variation of Condition The reason for Committee determination The application is accompanied by an Environmental Statement. Site Location and Description The Nant Helen Surface Mine covers an area of some 345 hectares and is located approximately 200m east of Penrhos; 350m south east of Cae’r-bont; 350m south of Caehopkin; 750m south of Abercrave; 725m west of Coelbren; 900m north-west of Onllwyn and 650m north of Seven Sisters. The north and west of the working area is covered by woodland, whereas the land to the south and east is open upland common land forming part of Mynydd-Y-Drum. A significant part of the site itself (184 hectares) also falls within the Mynydd-y-Drum Common. The SUSTRANS National Cycle Route 43 Celtic Trail East follows the northern and western boundary of the site. The opencast void has moved in a westerly direction during the operation of the Nant Helen series of sites, which began operations in 1986. The current void is located at the western end of the development within the area of Nant Helen Remainder. The overburden storage mounds are to the east of the void with the coal preparation plant, stocking area, offices and workshops located further to the east.
    [Show full text]
  • Proposed Solar Farm
    BRYN HENLLYS EXTENSION PROPOSED SOLAR FARM ENVIRONMENTAL STATEMENT PREPARED BY PEGASUS GROUP | AUGUST 2019 P18-2622 | LIGHTSOURCE BP Pegasus Group Project Directory Statement of Competence The following competent experts have been involved in the preparation of this Environmental Statement on behalf of Lightsource BP. EIA Coordination Pegasus Group is a Member of the Institute of Environmental Management and Assessment (IEMA) and one of the founding members of the IEMA Quality Mark. Competent experts involved in the co- ordination of the Environmental Statement include Chartered members of the Royal Town Planning Institute and IEMA. Landscape and Visual Pegasus Group is a Registered Practice with the Landscape Institute. Our Landscape Architects regularly prepare Landscape and Visual Impact Assessments (LVIA) as part of EIA. The LVIA has been prepared by a Chartered Member of the Landscape Institute to ensure compliance with appropriate guidance. Cultural Heritage The Heritage team at Pegasus Group specialises in archaeology, built heritage and the historic landscape. The team holds individual memberships of the Royal Town Planning Institute (RTPI), the Institute of Historic Buildings Conservation (IHBC) and the Chartered Institute for Archaeologists (CIfA). The Archaeology and Cultural Heritage chapter was authored and reviewed by members of the CIfA. Biodiversity This chapter has been prepared and separately reviewed by Avian Ecology professional ecologists who are full members of the Chartered Institute of Ecology and Environmental Management (CIEEM) and are experienced in the field of ecological impact assessment. Transport & Access Competent experts involved in the assessment, preparation and checking of the Traffic and Transport chapter variously have Chartered membership of the Institute of Logistics & Transport (CMILT), Membership of the Chartered Institute of Highways & Transportation (MCIHT) or Membership of the Institution of Civil Engineers (MICE).
    [Show full text]
  • BD22 Neath Port Talbot Unitary Development Plan
    G White, Head of Planning, The Quays, Brunel Way, Baglan Energy Park, Neath, SA11 2GG. Foreword The Unitary Development Plan has been adopted following a lengthy and com- plex preparation. Its primary aims are delivering Sustainable Development and a better quality of life. Through its strategy and policies it will guide planning decisions across the County Borough area. Councillor David Lewis Cabinet Member with responsibility for the Unitary Development Plan. CONTENTS Page 1 PART 1 INTRODUCTION Introduction 1 Supporting Information 2 Supplementary Planning Guidance 2 Format of the Plan 3 The Community Plan and related Plans and Strategies 3 Description of the County Borough Area 5 Sustainability 6 The Regional and National Planning Context 8 2 THE VISION The Vision for Neath Port Talbot 11 The Vision for Individual Localities and Communities within 12 Neath Port Talbot Cwmgors 12 Ystalyfera 13 Pontardawe 13 Dulais Valley 14 Neath Valley 14 Neath 15 Upper Afan Valley 15 Lower Afan Valley 16 Port Talbot 16 3 THE STRATEGY Introduction 18 Settlement Strategy 18 Transport Strategy 19 Coastal Strategy 21 Rural Development Strategy 21 Welsh Language Strategy 21 Environment Strategy 21 4 OBJECTIVES The Objectives in terms of the individual Topic Chapters 23 Environment 23 Housing 24 Employment 25 Community and Social Impacts 26 Town Centres, Retail and Leisure 27 Transport 28 Recreation and Open Space 29 Infrastructure and Energy 29 Minerals 30 Waste 30 Resources 31 5 PART 1 POLICIES NUMBERS 1-29 32 6 SUSTAINABILITY APPRAISAL Sustainability
    [Show full text]
  • No. 27251. 2 B
    THE LONDON GAZETTE, NOVEMBER 2X, 1900. 8009 Micbaelstone-terrace, Somerset-place, Ebbw Vale- specified time, and a copy of this advertisement as row, Merthyr-row, Tyisha-row, Victoria-terrace, published in the London Gazette will be deposited, Woodland-row, Miners-row, Colliers-row, Park- on or before the 3Qth day of November instant, row, Copper-row,- Engine-row, Tir Arthur-row, for public inspection, at the office of the Clerk of Tewgoed-row, Undeb-row, Ynisavon-row, Hazel- the Peace for the county of Glamorgan, at Car- ; wood-row, Gower-street, Pelly-s'reet, Tymaen- diff, in the said county, and at the Rural District slreet, and St. Davids-row, Cwmavon ; Station- Council's offices. • terrace, Standert-tetrace, Gethius row, Penybank, And notice is hereby lastly given, that every Brynbedd, and Brick-row, Seven Sisters ; Front- local or other public authority, company, or per- row, Onllwyn; Station-road, Crynant : Railway- son desirous of bringing before the Board of terrace, Cory-street, Yeo-street, Company-street, Trade any objection respecting the application Lyons-row, a new street in course of construction must do so by letter addressed to the Board of from Station-road to west of Companv-street, to be Trade, marked on the outside of the cover enclos- known as John-street, Resolven ; Oddfellows- ing it " Electric Lighting Acts," on or before the street, Bethania-street, Abernanl-terrace, and 15th day of January, 1901, and a copy of such White Hart-row, Glynneath; Railway terrace, objection must also be forwarded to the under- Venallt-terrace, Cwmgwrach. mentioned Solicitors or Parliamentry Agents.
    [Show full text]
  • Working Timetable
    BOOK PF Private and not for publication WORKING TIMETABLE SUNDAY 13 DECEMBER 2015 to SATURDAY 14 MAY 2016 FREIGHT AND DEPARTMENTAL SERVICES Section PF11 AWRE AND PATCHWAY TO BRIDGEND PF11 - AWRE AND PATCHWAY TO BRIDGEND Mondays to Fridays 14 December to 13 May 12345678910111213141516 Signal ID 6V66 6V35 6B59 6V29 6V04 6V04 6V81 6V66 3Z23 6M77 6H30 6H30 0B59 3Z01 3Z33 6V97 Orig. Dep. Time 12.07 18.05 17.18 19.13 19.59 19.59 18.32 12.30 23.13 15.43 23.42 23.56 00.05 19.57 23.10 14.46 Orig. Loc. Name Redcar B.S.C. Masborough Exeter Beeston Sims Kingsbury Sdgs Kingsbury Sdgs Masborough Redcar B.S.C. Bristol Barton Cwmbargoed Llanwern Llanwern Cardiff Tidal T.C. Didcot T.C. Bristol Barton Beeston Sims Ore T. F.D. Alphington Road Mcintyre Ltd F.D. Ore T. Hill W.R.D. Opencast Colly. Exchange Sdgs Exchange Sdgs Hill W.R.D. Mcintyre Ltd Dest. Loc. Name Margam T.C. Margam T.C. Derby Hope (Earles Margam T.C. Margam T.C. Margam T.C. Derby Bristol Barton Cardiff Tidal T.C. R.T.C.(Network Sidings) Dbs R.T.C.(Network Hill W.R.D. Rail) Rail) Timing Load 60H66S22 60-TR40 60H66S16 60H66S16 60H66S16 60H66S16 60-66S22 60H66S22 UTU-R 60H66S18 60-66S08 60-66S08 LD75 UTU-R UTU-R 60H66S18 Operating Characteristics YQYY Y Y Q Q Dates Of Operation FSX TThO ThO FSX ThO WO MWO Sun ThO MO Sun FSX FO ThO ThO MO Awre dep 1 ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... mgn 2 ..
    [Show full text]
  • Investment Policy Review – Philippines
    OECD Investment Policy Reviews PHILIPPINES Contents OECD Investment Policy Reviews Chapter 1. Philippine reform environment: Successes and challenges Chapter 2. Legal protection of investment in the Philippines Chapter 3. Investment promotion and facilitation in the Philippines PHILIPPINES Chapter 4. Competition policy in the Philippines Chapter 5. Infrastructure investment in the Philippines Chapter 6. Responsible business conduct in the Philippines Also available in this series: Nigeria (2015), Botswana (2014), Mauritius (2014), Myanmar (2014), Tanzania (2013), Jordan (2013), Mozambique (2013), Malaysia (2013), Costa Rica (2013), Tunisia (2012), Colombia (2012), Kazakhstan (2012), Zambia (2012), Ukraine (2011), Indonesia (2010), Morocco (2010), Viet Nam (2009), India (2009), China (2008), Peru (2008), Russian Federation (2008), Egypt (2007). OECD Investment Policy Reviews http://oecd.org/daf/inv/investment-policy/countryreviews.htm PH PHILIPPINES L Consult this publication on line at http://dx.doi.org/10.1787/9789264254510-en. This work is published on the OECD iLibrary, which gathers all OECD books, periodicals and statistical databases. Visit www.oecd-ilibrary.org for more information. ISBN 978-92-64-25450-3 20 2015 01 1 P OECD Investment Policy Reviews: Philippines 2016 This work is published under the responsibility of the Secretary-General of the OECD. The opinions expressed and arguments employed herein do not necessarily reflect the official views of OECD member countries. Please cite this publication as: OECD (2016), OECD Investment Policy Reviews: Philippines 2016, OECD Investment Policy Reviews, OECD Publishing, Paris. http://dx.doi.org/10.1787/9789264254510-en ISBN 978-92-64-25450-3 (print) ISBN 978-92-64-25451-0 (PDF) Series: OECD Investment Policy Reviews ISSN 1990-0929 (print) ISSN 1990-0910 (online) The statistical data for Israel are supplied by and under the responsibility of the relevant Israeli authorities.
    [Show full text]
  • Heritage Audit
    Dulais Valley Partnership Heritage Audit May 2008 Background The Dulais Valley Partnership works in partnership with a number of agencies, such as the local authority, education and training institutions, Economic Development Agencies, voluntary organisations, democratically elected representatives and active community members to find solutions to the social and economic deprivation of the Dulais Valley. The staff of the Dulais Valley Partnership works with local volunteers, implementing a number of projects. In January 2008 a Community Heritage Officer was appointed on a two year Heritage Lottery funded project. Part of the role was to carry out a heritage audit of the Dulais Valley to inform plans and link with the wider framework. Sources consulted The basis of the audit involved consulting readily available archaeological and historical information from various sources including databases, documentary and cartographic. The following repositories of information were consulted: • West Glamorgan Archive Service (WGAS) : Historic maps including OS maps from 1876 to the present day, Tithe Map circa 1845 • Royal Commission for Ancient and Historic Monuments in Wales (RCAHMW) : National Monuments Record (NMR) • CADW : Listed Buildings • Glamorgan Gwent Archaeological Trust (GGAT) : Sites and Monuments Record (SMR) • Countryside Commission for Wales (CCW): Sites of Special Scientific Interest (SSSI) • Acciona Energy UK Ltd: Sites within the site boundary and within a 1 km study area. Scheduled Ancient monuments (SAM) Workshops and Open Days As well as the above sources a Workshop was held at the DOVE Workshop on Wednesday 5 March 2008 with members of the Cwm Dulais Historical Society. The aim was to identify sites of significant heritage interest.
    [Show full text]
  • Envt1635-Lp-Ldp Reg of Alt Sites
    Neath Port Talbot County Borough Council Local Development Plan 2011 –2026 Register of Alternative Sites January 2014 www.npt.gov.uk/ldp Contents 1 Register of Alternative Sites 1 2014) 1.1 Introduction 1 1.2 What is an Alternative Site? 1 (January 1.3 The Consultation 1 Sites 1.4 Register of Alternative Sites 3 1.5 Consequential Amendments to the LDP 3 Alternative of 1.6 What Happens Next? 4 1.7 Further Information 4 Register - LDP APPENDICES Deposit A Register of Alternative Sites 5 B Site Maps 15 PART A: New Sites 15 Afan Valley 15 Amman Valley 19 Dulais Valley 21 Neath 28 Neath Valley 37 Pontardawe 42 Port Talbot 50 Swansea Valley 68 PART B: Deleted Sites 76 Neath 76 Neath Valley 84 Pontardawe 85 Port Talbot 91 Swansea Valley 101 PART C: Amended Sites 102 Neath 102 Contents Deposit Neath Valley 106 Pontardawe 108 LDP Port Talbot 111 - Register Swansea Valley 120 of PART D: Amended Settlement Limits 121 Alternative Afan Valley 121 Amman Valley 132 Sites Dulais Valley 136 (January Neath 139 2014) Neath Valley 146 Pontardawe 157 Port Talbot 159 Swansea Valley 173 1 . Register of Alternative Sites 1 Register of Alternative Sites 2014) 1.1 Introduction 1.1.1 The Neath Port Talbot County Borough Council Deposit Local Development (January Plan (LDP) was made available for public consultation from 28th August to 15th October Sites 2013. Responses to the Deposit consultation included a number that related to site allocations shown in the LDP. Alternative 1.1.2 In accordance with the requirements of the Town and Country Planning (Local of Development Plan) (Wales) Regulations 2005(1), the Council must now advertise and consult on any site allocation representation (or Alternative Sites) received as soon as Register reasonably practicable following the close of the Deposit consultation period.
    [Show full text]
  • Weekly List of New Planning Applications. Week Ending 1 Sep 2020
    Weekly list of new planning applications. Week ending 1 Sep 2020 Application No. P2020/0693 Officer Andrea Davies Type Full Plans Ward Pontardawe Date Valid 21st August 2020 Parish Pontardawe Town Council Proposal Change of use of shop to residential accommodation in association with existing dwelling, removal of shop front and construction of front extension. Location 73 High Street Pontardawe Swansea Neath Port Talbot SA8 4JN Applicant’s Name & Address Agent’s Name & Address TFMG Holdings 001 Limited Mr John Davies 12 High Street JD Architectural Services Pontardawe 61 Gwyrddgoed Road Swansea Pontardawe SA8 4HU Swansea United Kingdom SA8 4NL United Kingdom Easting 272364 Northing 204275 ********************************************************************************** Application No. P2020/0705 Officer Helen Bowen Type Discharge of Conditions Ward Onllwyn Date Valid 26th August 2020 Parish Onllwyn Community Council Proposal Details to be agreed in association with Condition 3 (car parking scheme) of P2020/0375 granted on 6/7/20 Location Ty Caris Roman Road Banwen Neath SA10 9LH Applicant’s Name & Address Dr Elizabeth Hill O'Shea Ty Caris Roman Road Banwen Neath SA10 9LH Easting 285605 Northing 209628 ********************************************************************************** Page 1 of 9 Application No. P2020/0708 Officer Matt Fury Type Proposed Lawful Ward Margam Development Certificate Date Valid 24th August 2020 Parish Port Talbot Proposal Single storey side and rear extension. (Lawful Development Certificate Proposed) Location
    [Show full text]