Government of India Ministry of Road Transport & Highways Lok Sabha
Total Page:16
File Type:pdf, Size:1020Kb
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS LOK SABHA UNSTARRED QUESTION NO 3071 ANSWERED ON 3RD AUGUST, 2017 ROBS IN ANDHRA PRADESH 3071. SHRI M. MURALI MOHAN: Will the Minister of ROAD TRANSPORT & HIGHWAYS सड़क परिवहन औि िाजमा셍ग मंत्री be pleased to state: (a) the details of the Road Over Bridges being constructed/proposed to be constructed by National Highways Authority of India (NHAI) in Rajahmundry and other parts of the State of Andhra Pradesh; (b) the funds released for construction of Morampudi flyover at Rajahmundry; and (c) the reasons for delay in construction of this bridge? ANSWER THE MINISTER OF STATE IN THE MINISTRY OF ROAD TRANSPORT AND HIGHWAYS (SHRI PON. RADHAKRISHNAN) (a) The details of the Road Over Bridges for construction by National Highways Authority of India (NHAI) in the State of Andhra Pradesh are enclosed at Annexure. (b) & (c) The project report for Morampudi flyover at Rajahmundry has been prepared. However, it has not yet been finalised by NHAI. Therefore, release of fund for the project is NIL at present. ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 3071 FOR ANSWER ON 03.08.2017 ASKED BY SHRI M. MURALI MOHAN REGARDING ROBS IN ANDHRA PRADESH Sl. DESCRIPTION OF ROB State NH Section NH No. NH KM No /RUB 1 2 3 5 6 8 Construction of ROB Km '9/4 of Andhra Chilakaluripet- Old 5 Km.20/3-4 between Guntur- 1 Guntur Pradesh Vijayawada New 16 Vejendla Stn. of Guntur- Bypass Tenali section. Construction of ROB at Km '7/100 of Andhra Chilakaluripet- Old 5 Km.421/5-7 between 2 Mangalagiri Pradesh Vijayawada New 16 Krishna canal and Bypass Kolanukonda Stn. Construction of ROB at Km.2+500 of Vijayawada - Km.2+500 at Mangalagiri, Andhra Old 5 Vijayawada 3 Gundugolanu Guntur District (Railway Pradesh New 16 Bypass Section of NH-5 Km.17/13-14 of GNT – Section KCC Section) Construction of ROB at Km.20+590 Km.20+590 at Vijayawada - of Andhra Old 5 Rayanapadu, Krishna 4 Gundugolanu Vijayawada Pradesh New 16 District (Railway Section of NH-5 Bypass Km.577/13-15 of Khazipet - Section Vijayawada Section) Construction of ROB at Km.45+870 at ROB at Gannavaram, Krishna Km.45+870 Vijayawada - District (Railway Andhra Old 5 of 5 Gundugolanu Km.450/13&15 between Pradesh New 16 Vijayawada Section of NH-5 Pedavutupalli and Bypass Ganavaram Stations in Section Vijayawada – Visakhapatnam Section) Andhra Chilakalurpet- Old 5 New 6L ROB on Ongole 6 3+450 Pradesh Nellore New16 Bypass (Koppalu) Andhra Chilakalurpet- Old 5 New 6L ROB on Ongole 7 8+970 Pradesh Nellore New16 Bypass (Pelluru) New 3L in repl. of existing Andhra Chilakalurpet- 8 5 1341+950 2L+3L ROB making 6L Pradesh Nellore ROB (Alluru road) 4L ROB across Andhra Cuddapah - 9 18 355.839 Secunderabad - Pradesh Kurnool Dronachalam Andhra Cuddapah - 4L ROB across Nandyal- 10 18 290+986 Pradesh Kurnool Guntakal line Sl. DESCRIPTION OF ROB State NH Section NH No. NH KM No /RUB Andhra Cuddapah - 4L ROB across Nandyal- 11 18 290+783 Pradesh Kurnool Yerraguntla Proposed line Construction of ROB at Vijayawada - Andhra Old 5 Km.860.505 (Rly. Km) 12 Visakhapatnam 704.606 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. Construction of ROB at Vijayawada - Andhra Old 5 Km.767.385 (Rly. Km) 13 Visakhapatnam 10.373 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. Construction of ROB at Vijayawada - Andhra Old 5 Km.874.602 (Rly. Km) 14 Visakhapatnam 11.287 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. Construction of ROB at Vijayawada - Andhra Old 5 Km.748.030 (Rly. Km) 15 Visakhapatnam 730.21 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. ***** .