GOVERNMENT OF MINISTRY OF ROAD TRANSPORT & HIGHWAYS

LOK SABHA UNSTARRED QUESTION NO 3071 ANSWERED ON 3RD AUGUST, 2017

ROBS IN

3071. SHRI M. MURALI MOHAN:

Will the Minister of ROAD TRANSPORT & HIGHWAYS

सड़क परिवहन औि िाजमा셍ग मंत्री be pleased to state:

(a) the details of the Road Over Bridges being constructed/proposed to be constructed by National Highways Authority of India (NHAI) in and other parts of the State of Andhra Pradesh; (b) the funds released for construction of Morampudi flyover at Rajahmundry; and (c) the reasons for delay in construction of this bridge? ANSWER

THE MINISTER OF STATE IN THE MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

(SHRI PON. RADHAKRISHNAN)

(a) The details of the Road Over Bridges for construction by National Highways Authority of India (NHAI) in the State of Andhra Pradesh are enclosed at Annexure. (b) & (c) The project report for Morampudi flyover at Rajahmundry has been prepared. However, it has not yet been finalised by NHAI. Therefore, release of fund for the project is NIL at present.

ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 3071 FOR ANSWER ON 03.08.2017 ASKED BY SHRI M. MURALI MOHAN REGARDING ROBS IN ANDHRA PRADESH

Sl. DESCRIPTION OF ROB State NH Section NH No. NH KM No /RUB

1 2 3 5 6 8 Construction of ROB Km '9/4 of Andhra - Old 5 Km.20/3-4 between - 1 Guntur Pradesh New 16 Vejendla Stn. of Guntur- Bypass section. Construction of ROB at Km '7/100 of Andhra Chilakaluripet- Old 5 Km.421/5-7 between 2 Pradesh Vijayawada New 16 Krishna canal and Bypass Kolanukonda Stn. Construction of ROB at Km.2+500 of Vijayawada - Km.2+500 at Mangalagiri, Andhra Old 5 Vijayawada 3 Gundugolanu (Railway Pradesh New 16 Bypass Section of NH-5 Km.17/13-14 of GNT – Section KCC Section) Construction of ROB at Km.20+590 Km.20+590 at Vijayawada - of Andhra Old 5 Rayanapadu, Krishna 4 Gundugolanu Vijayawada Pradesh New 16 District (Railway Section of NH-5 Bypass Km.577/13-15 of Khazipet - Section Vijayawada Section) Construction of ROB at Km.45+870 at ROB at , Krishna Km.45+870 Vijayawada - District (Railway Andhra Old 5 of 5 Gundugolanu Km.450/13&15 between Pradesh New 16 Vijayawada Section of NH-5 Pedavutupalli and Bypass Ganavaram Stations in Section Vijayawada – Section) Andhra Chilakalurpet- Old 5 New 6L ROB on Ongole 6 3+450 Pradesh New16 Bypass (Koppalu) Andhra Chilakalurpet- Old 5 New 6L ROB on Ongole 7 8+970 Pradesh Nellore New16 Bypass (Pelluru) New 3L in repl. of existing Andhra Chilakalurpet- 8 5 1341+950 2L+3L ROB making 6L Pradesh Nellore ROB (Alluru road) 4L ROB across Andhra Cuddapah - 9 18 355.839 Secunderabad - Pradesh Dronachalam Andhra Cuddapah - 4L ROB across - 10 18 290+986 Pradesh Kurnool Guntakal line

Sl. DESCRIPTION OF ROB State NH Section NH No. NH KM No /RUB

Andhra Cuddapah - 4L ROB across Nandyal- 11 18 290+783 Pradesh Kurnool Yerraguntla Proposed line Construction of ROB at Vijayawada - Andhra Old 5 Km.860.505 (Rly. Km) 12 Visakhapatnam 704.606 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. Construction of ROB at Vijayawada - Andhra Old 5 Km.767.385 (Rly. Km) 13 Visakhapatnam 10.373 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. Construction of ROB at Vijayawada - Andhra Old 5 Km.874.602 (Rly. Km) 14 Visakhapatnam 11.287 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn. Construction of ROB at Vijayawada - Andhra Old 5 Km.748.030 (Rly. Km) 15 Visakhapatnam 730.21 Pradesh New 16 between Pendurthy - Section Kothavalasa Stn.

*****