WORKPLAN FOR VALIDATION WITH THE GOLD STANDARD

UPM UMWELT-PROJEKT-MANAGEMENT GMBH

SICHUAN RURAL POOR-HOUSEHOLD BIOGAS DEVELOPMENT PROGRAMME CPA SCHHBG-2014-074 TO 087

UNFCCC REF. NO. : 2898

GS. 1239

Date: 2014-11-05

TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstraße, 20 45141 Essen, Germany Phone: +49-201-825-3335 Fax: +49-201-825-3290 www.tuev-nord.de www.global-warming.de

WORKPLAN FOR VALIDATION WITH THE GOLDEN STANDARD: RURAL POOR- HOUSEHOLD BIOGAS DEVELOPMENT PROGRAMME GS 1239, CPA SCHHBG-2014-074 to 087 TÜV NORD JI/CDM Certification Program

UPM UMWELT-PROJEKT-MANAGEMENT GMBH has commissioned the TÜV NORD JI/CDM Certification Program (CP) to carry out the validation under GS of the project of activities, “SICHUAN RURAL POOR-HOUSEHOLD BIOGAS DEVELOPMENT PROGRAMME” GS 1239, CPA SCHHBG-2014-074 to 087 The PoA had been registered under GS with reference No. 1239. As the request to GS toolkit, the DOE must prepare a validation workplan, and do this together with both the project developer and other relevant stakeholders and upload it to the Registry. After communicate with the representative, the following workplan of validation was made.

1. Composition of the audit team

3) 4) 5)

1)

2) Name Company

site visit

-

Scheme

Status

Technical

Function

Verification

On

Competence

Qualification

Host country

competence competence competence

Mr. ZHAO, Xuejiao TN TL LA - Ms.

Mr. , Xue Mei TN China TM LA 15.2 Ms.

Mr. WANG, Wei TN China - TE 1.1 Ms.

Mr. LI lianfei TN China OTB) - - Ms.

Mr. 1.1/15. Winter, Stefan TN Cert TRB) SA Ms. 2

Mr. Saalmann, TN Cert FAB) SA - Ms. Martin

All team members together held the technical competence of scope 1.1 and 15.2, also hold the host country competence, and they will be on site visit during the inclusion process of 14 CPAs from SCHHBG-2014-074 to 087. Further TR that appointed will also hold the competence for assessing the project.

2. Gold Standard validation time frame 2 WORKPLAN FOR VALIDATION WITH THE GOLDEN STANDARD: SICHUAN RURAL POOR- HOUSEHOLD BIOGAS DEVELOPMENT PROGRAMME GS 1239, CPA SCHHBG-2014-074 to 087 TÜV NORD JI/CDM Certification Program

period contents comments 2014-11-05 CPA Passports, and CPA-DDs for Nb. SCHHBG- 2014-074 to 087, uploaded to GS Registry in the GS website. 2014-11-10 Relevant documents of each CPA will be public at GS registry for two months for Stakeholder feedback round. 2014-11-24~28 Onsite visit for the CPA inclusion Nb. SCHHBG- 2014-074 to 087. 2014-12-01~10 Issue draft validation report and findings for the CPA inclusion. 2014-12- PP give replies to findings and TUV-Nord issue final 11~2014-12-31 validation reports. 2015-01-01 Validation feedback form by Gold Standard ~2015-01-31

3. Documents to review

The documents that are going to be reviewed (but not limit to) are list as following Approval for CPA Statement on Aerobic Sludge Application by Rural Biogas Association GOLD STANDARD PROGRAMME DESIGN CONSULTATION REPORT Programme Design Documents GOLD STANDARD PASSPORT

4. Explanation on validation of LSC,SFR, DNHA, SD Matrix The LSC and SFR had been validate during the PoA registered under UNFCCC, the DNHA and SD Matrix will be validated under local laws, guidelines and crosscheck the assess result with competence in the relative scope.

5. On-site audit planning and tentative programme The on-site audit will be performed during the inclusion of the 14 CPAs.

6. Interaction with project developer The 14 proposed CPAs will be managed, implemented, operated and monitored by the Coordinating Entity (C/ME) Oasis Science & Technology Co., Ltd.

3 WORKPLAN FOR VALIDATION WITH THE GOLDEN STANDARD: SICHUAN RURAL POOR- HOUSEHOLD BIOGAS DEVELOPMENT PROGRAMME GS 1239, CPA SCHHBG-2014-074 to 087 TÜV NORD JI/CDM Certification Program

The operation of the service network, as well as all necessary surveys and monitoring will be undertaken by the Sichuan Biogas Society under supervision of the Sichuan Rural Energy Office. They will be communicated email and phone, and also per the consultant of UPM.

7. Reporting, detailing procedures and responsibilities for quality control

In order to ensure consideration of all relevant assessment criteria, a validation protocol is used. The protocol shows, in a transparent manner, criteria and requirements, means of validation and the results from pre-validating the identified criteria. The validation protocol reflects the generic GS requirements each GS project has to meet as well as project specific issues as applicable. The validation protocol serves the following purposes: - It organises, details and clarifies the requirements that a GS project is expected to meet; - It ensures a transparent validation process where the validating entity will document how a particular requirement has been validated and the result of the determination. The validation protocol as described in Figure 1.

Validation Protocol Table A-1: Requirement checklist Checklist Item Validation Team Reference Draft Final Comment Conclusion Conclusio n

The checklist items in The section is used to Gives Assessment In case a Table A-1 are linked elaborate and discuss the reference to based on corrective to the various checklist item in detail. It the evidence action or a requirements the includes the assessment information provided if the clarification project should meet. of the validation team and source on criterion is the final The checklist is how the assessment was which the fulfilled (OK), or assessmen organised in various carried out. The reporting assessment a CAR, CL or t at the final sections. Each requirements of the VVM is based on FAR (see validation section is then further shall be covered in this below) is stage is sub-divided as per section. raised. The given. the requirements of assessment the topic and the refers to the individual project draft validation activity. stage.

8. Communication of final validation opinion to the Gold Standard Email address for Zhao Xuejiao is [email protected], and for Li Xuemei is [email protected].