JTB/13/01 To: Shepway Joint Transportation Board

By: KCC Highways and Transportation

Date: 1 July 2013

Subject : Highway Works Programme 2013/14

Classification: Information Only

Summary: This report updates Members on the identified schemes approved for construction in 2013/14

1. Introduction

This report provides an update and summarises schemes that have been programmed for delivery in 2013/14

Footway and Carriageway Improvement Schemes – see Appendix A

Drainage Repairs & Improvements – see Appendix B

Street Lighting – see Appendix C

Transportation, PROW and Safety Schemes – see Appendix D

Bridge Works – see Appendix E

Traffic Systems – see Appendix F

Conclusion

1. This report is for Members information.

Contact Officers:

The following contact officers can be contacted on 0845 8247 800

Toby Howe Highway Manager (East) Pauline Rockett Shepway District Manager Sue Kinsella Street Lighting Manager Katie Lewis Drainage Manager Resurfacing Manager Tony Ambrose Structures Manager Appendix A – Footway and Carriageway Improvement Schemes

The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged and the residents will be informed by a letter drop to their homes.

Surface Treatments - Contact Officer Neil Tree

Micro Asphalt Schemes

Road Name Parish Extent of Works Current Status From the school to its Bossingham Road junction with Cherry Completed Gardens Farm Minter Ave/Minter Whole length Close Completed From its junction with High St Marys Road Elham Street to its junction with Completed The Square Whole Length including Fernfield Fern Close Completed From its junction with Harbour Way Harvey Street to its junction Completed with The Tram Road From its junction with Coolinge Lane Folkestone Shorncliffe Road to its Completed junction Audley Road From its junction with Audley Rd Folkestone Shorncliffe Road to its Completed junction with Coolinge Lane From its junction with Twiss South Road Hythe Road to its junction with Completed Stade Street From its junction with Twiss Twiss Ave Hythe Road for the entire length Completed From the Ashford/Shepway Bilsington / Newchurch Road boundary to the junction Completed Newchurch West of Church View From Junction Gammons Programmed to Chapel Lane Newchurch Farm Lane To Junction start 08.07.13 Eastbridge Road From Junction of Ashford Programmed to Cockreed Lane Road to St Marys Road start 04.07.13 From Junction Station Programmed to Arrowhead Lane Road To 20 Meters North start 01.07.13 Of Military Canal. From Junction of Salters Programmed to Salthouse Close Brookland Lane to End Cul De Sac start 04.07.13 From junction of Radnor Programmed to Broadmead Road Folkestone Park Road to junction of start 10.07.13 Bournemouth Road From junction High Street Programmed to Somerset Road Cheriton to junction Shaftesbury start 09.07.13 Avenue Standard Hill Top, and High Programmed to North Elham Hill Elham Street start 14.07.13 Stowting Court From Junction of Curteis Programmed to Stowting Road Lane to Whiteways start 13.07.13 From Junction A20 Programmed to Moorstock Lane Ashford Road to Cock Ash start 11.07.13 Lane

Surface Dressing Schemes

Road Name Parish Extent of Works Current Status Beggarsbush From Eighteen Acre Lane Programmed to Beggarsbush Lane to Washington Lane start 20.06.13 From Junction Gammons Programmed to Chapel Lane Burmarsh Farm Lane To Junction start 08.07.13 Eastbridge Road From Junction of Tickners Programmed to Boarmans Lane Brookland Lane to End Cul De Sac start 20.06.13 From Junction of Rhee Programmed to Bowdell Lane Brookland Wall Road to 50 Metres start 19.06.13 North Level Crossing From Junction A259 Rye Programmed to Harvey Road Brookland Road To Junction Beckett start 19.06.13 Road From Junction Tame Lane Church Road And Programmed to Burmarsh To Junction Burmarsh Thorndike Road start 20.06.13 Road From Junction of Brack Programmed to Kennards Lane Lane to King Street start 19.06.13 From Junction of Station Programmed to Snargate Road Burmarsh Road To 20 Meters North start 01-Jul-13 Of Military Canal From Junction Station Programmed to Church Road Warehorne Road To 20 Meters North start 20.06.13 Of Military Canal From Junction of Beckett Programmed to Brack Lane Snargate Road to Kennards Lane start 19.06.13 Dengemarsh From Junction Of Tourney Programmed to Road Road to End Road start 20.06.13 From Junction of Ashford Programmed to Rhee Wall Road Snargate Road to Station Road start 18.06.13 From Junction of Ashford Programmed to Station Road Snargate Road to Station Road start 19.06.13 From Junction of Griggers Programmed to Lower Wall Road Burmarsh Green Road to Tame start 20.06.13 Lane From junction of Programmed to Boyke Lane Elham Canterbury Road and start 23.06.13 White Horse Lane From junction of Main Road Programmed to Harringe Lane Sellinge ( Ashford Road) to start 22.06.13 Aldington Road From Junction of Elvington Programmed to Gibraltar Lane Hawkinge Lane to Crete Road West start 24.06.13 From Junction Park Lane Programmed to Exted Hill Elham To Junction Clavertye start 23.06.13 From Junction of Bunkers Programmed to Vershall Lane Elham Hill and Holly Hill start 24.06.13 From Junction Brady Loughborough Programmed to Road, to Junction Broad Lane start 22.06.13 Street From Junction of Stowting Programmed to Brabourne Lane Stowting Hill to Scots Lane start 22.06.13 From Tanbarn From Junction of Winterage Programmed to Road J/W Mackie Lyminge Lane and Acrise Park Road start 24.06.13 Lane To Acr From Junction of Fryarne Programmed to Fishers Lane Stelling Minnis Park to And Fir Tree Hill start 24.06.13 From Junction of North Programmed to Holly Hill Elham Elham Hill to from North start 24.06.13 Elham Hill to Bunkers Hill From Junction Brady Programmed to Brady Road Lyminge Road, to Junction start 23.06.13 Loughborough Lane From Junction of Standard Programmed to Wick Lane Elham Hill Top to Oak Hill start 24.06.13 From North Elham From Bunkers Hill to Programmed to Hill To Bunkers Elham Canterbury Road to North start 24.06.13 Hill Elham Hill A20 Ashford Road to Programmed to Otterpool Lane Aldington Road start 21.06.13 From Entrance to Upper Programmed to Aldington Road Lympne Park Farm to 200 West start 21.06.13 junction with Otterpool Lane From Vivarage Lane to Mill Programmed to Canterbury Road Elham Hill start 23.06.13

Machine Resurfacing – Contact Officer Russell Boorman

Road Name Parish Extent of Works Current Status From its junction with Calgary Crescent Folkestone Beatty Road to its junction Completed with Ivy Way From its junction with Ivy Holly Close Folkestone Way for the entire length Completed

Park Farm Road Folkestone Whole Length Completed

Grace Hill Folkestone Whole Length Completed From the traffic signals High Street New Romney outside Sainsburys to the Completed junction with West Street. Programmed to High Street Sandgate The Riviera to Undercliffe start Summer/Autumn S/B approach to A20 Programmed to Stanford Stanford Intersection start Intersection Southern rbt Summer/Autumn

Footway Improvement - Contact Officer Wendy Boustead

Extent and Description of Road Name Parish Current Status Works North side of road from its Coolinge Lane Folkestone junction with Sandgate Hill Completed to Girls School – replacing asphalt surface Whole length – replacing A259 High Street New Romney Completed asphalt surface Whole length – replacing Programmed to concrete surface with start 15 July The Derings Lydd asphalt. This scheme is 2013 for twelve still in the design stages. weeks

Appendix B – Drainage Repairs & Improvements

Drainage Repairs & Improvements - Contact Officer Katie Lewis

Road Name Parish Description of Works Current Status Installation of new drainage Maxted Stelling Minnis system to deal with severe flooding Works Complete Street outside Mabledon Riding School Installation of new drainage Broad Lane Works Complete system. Install 2 x new gullies and tie into Honeywood existing system to deal with Lympne Works Complete Close ponding issues outside the post office. Sandling Investigation of possible collapsed Postling Road drainage system. Works Ongoing Drainage Investigation to be Soakaway Stombers Hawkinge carried out to find solution to Cleansing has Lane flooding issue. been carried out. Station Installation of new gully and Lydd Works Complete Road pipework.

Appendix C – Street Lighting

Structural testing is on-going in Shepway District. Following assessment of the all results, it is anticipated that a number of columns will require replacement which will be listed in future reports.

Street Lighting Column Replacement – Contact Officer Sue Kinsella

Road Name Column Ref Location Status Replacement by end Burmarsh Road NBKX021 OPP 55 of July 2013 Replacement by end Burmarsh Road NBKX004 OPP 55 of July 2013 Replacement by end Station Road NSPY017 OPP J/W CHURCH ROAD of July 2013 Replacement by end Castle Road NCBW003 OPP J/W LACHLAN WAY of July 2013 Removal of redundant Dover Road NDCU551 O/S BARONS GYM sign by end of July 2013 Replacement by end Hill Road NHEM003 OPP BAPTIST CHURCH of July 2013 Replacement by end Hill Road NHEM004 OPP 133 of July 2013 Replacement by end Hill Road NHEM004a OPP 133 of July 2013 Replacement by end Hill Road NHEM006 OPP 136 of July 2013 Replacement by end Hill Road NHEM007 OPP 122 of July 2013 Replacement by end Hill Road NHEM008 OPP 110 of July 2013 Replacement by end Hill Road NHEM009 OPP 104 of July 2013 Replacement by end Hill Road NHEM010 OPP 94 of July 2013 Replacement by end Hill Road NHEM011 OPP IVY WAY of July 2013 Replacement by end Hill Road NHEM012 OPP 84 of July 2013 Replacement by end Sandgate Road NSAT106 OPP J/W GRIMSTON AVE of July 2013 Replacement by end Sandgate road NSAQ501 S/O Tavernetta Restaurant of July 2013 Replacement by end Cheriton Road NCDW013 A259 CHERITON RD FOLK of July 2013 Replacement by end Cheriton Road NCND029 O/S 157 of July 2013 S/O 2 CHERRY GARDEN Replacement by end Cheriton Road NCND050 AVENUE of July 2013 S/O 1 Replacement by end Cheriton Road NCND051 ROAD of July 2013 Cheriton High R/O ROMAN WAY Replacement by end street NCBH029 PLAYGROUND of July 2013 Cheriton High ADJ PETROL STATION Replacement by end street NCDU037 ENTRANCE of July 2013 Replacement by end Foresters Way NFFN002 s/o car park of July 2013 Replacement by end Foresters Way NFFN006 s/o car park of July 2013 Replacement by end Foresters Way NFFN007 s/o car park of July 2013 Replacement by end Foresters Way NFFN008 s/o car park of July 2013 Moore Close Replacement by end NMFY002 O/S 5 of August 2013 Replacement by end Station Road NSPY017 Opp J/W MChurch Road of August 2013 Prospect Road Opp J/W Marine Walk Street Replacement by end Car Park NPGD506 of August 2013 Replacement by end Saxon Close NSSC006 O/S 21 of August 2013 Replacement by end Whitenbrook NWEA002 o/s 44 Naildown Road of August 2013 Langhorne Replacement by end Gardens NLAR501 Opp 1 Clifton Gardens of August 2013 Replacement by end Wear Bay Road NWBG039 O/S 135 of August 2013 Replacement by end Castle Road NCBW003 Opp J/W Lachlan Way of August 2013 Replacement by end Collingwood Rise NCNW005 S/O Garage 11 of August 2013 Replacement by end Wellington Place NWHO001 J/W sandgate Esplanade of August 2013 Replacement by end Cowgate Lane NCKY101 Opp foot path to Fern Close of August 2013 Replacement by end Spitfire Way NSTB009 Opp S/O The Mayfly P/H of August 2013 Replacement by end Sandling Road NSQR016 Opp Brockland of August 2013 Replacement by end Moore Close NMFY002 O/S 5 of August 2013 Replacement by end Seabourne Way NSQU008 O/S 12 of August 2013 Replacement by end Adie Road NADV003 O/S 49 of August 2013 Replacement by end Cliff Road NCNO014 Outside the white house of August 2013 Replacement by end Sandgate Road NSAO011 O/S 39 of August 2013 Replacement by end Dudley Road HDDN006 O/S 53 of August 2013 Replacement by end Wear Bay Road HWBG036 O/S 109 of August 2013 Replacement by end Pike Road NPGR002 S/O 3 of August 2013 Replacement by end Foord Close NFFP008 O/S Bradford Court of August 2013 Bowles Well Replacement by end Gardens NBGI005 Opp Life Church of August 2013

Appendix D – Transportation, PROW and safety schemes

Appendix D1 – Local Transport Plan Funded Schemes

The Traffic Schemes Team have analysed the crash clusters within the Shepway District, from which a shortlist of sites have been identified. Below is a list of these locations.

Local Transport Plan Funded Schemes- Contact Officer Richard Heaps

Current Road Name Parish Description of Works Status Shepway QBP – Folkestone Clearways, poles/flags, Design in routes 71, 72, 73, 77 and timetable cases and raised progress. & 78 Hawkinge boarders at principal stops on 101/102 routes. Match funded with Stagecoach providing new buses and higher frequency services. A259 Lydd Road New Reduction of speed limit from Design in Romney Derestricted to 50mph, progress sign improvements A259 Dymchurch Reduction of speed limit from Design in Road, Dymchurch derestricted to 40mph progress

Sandgate Hill, Folkestone Junction realignment, changes Consultation Folkestone to complete existing bus stops, new bus stop

Appendix D2 – Developer Funded Works

Developer Funded Works (Section 278 Works) Contact Officer Dean Heynes

Road Name Parish Description of Works Current Status Range Road – New access Works completed with 12 Range Road Hythe month maintenance period ends June 2013. Work is proceeding. Bus Remedial works planned for En brook Valley stop put in. Safety railings week commencing July approved 2013. Wickes Site opposite Technical audit in process Park Farm RoadFolkestone Homebase work commenced on site New signals at junction of Works progressing St Mary’s Dunstall Lane and A259, A259 Bay works progressing. Closure for 4 nights (2nights June/2 nights July)

Appendix E – Bridge Works

Bridge Works – Contact Officer Tony Ambrose

Road Name Parish Description of Works Current Status Replacement of Bridge Mill Road Dymchurch Parapet, 50m from J/W Complete Eastbridge Rd

Appendix F – Traffic Systems

There is a programme of scheduled maintenance to refurbish life expired traffic signal equipment across the county based upon age and fault history. The delivery of these schemes is dependent upon school terms and holiday periods; local residents, businesses and schools will be informed verbally and by a letter drop of the exact dates when known.

Traffic Systems - Contact Officer: Toby Butler

Location Description of Works Current Status To be programmed Refurbishment of traffic A259 Radnor Park / Park Farm Road 2013/14 - will signal controlled Folkestone require four weeks junction. to complete. To be programmed Refurbishment of traffic A259 Seabrook Road near Horn Street 2013/14 - will signal controlled Hythe require two weeks crossing. to complete. To be programmed A2033 Bouverie Road West near Castle Refurbishment of traffic 2013/14 - will Hill signal controlled require two weeks Folkestone crossing. to complete. To be programmed Refurbishment of traffic A259 Prospect Road near Stade Street 2013/14 - will signal controlled Hythe require two weeks crossing. to complete.

1.1 Legal Implications

1.1.1 Not applicable.

1.2 Financial and Value for Money Considerations

1.2.1 Not applicable.

1.3 Risk Assessment

1.3.1 Not applicable.

Contacts: Toby Howe / Pauline Rockett 0845 8247 800