Summary of Detailed Project Report
Total Page:16
File Type:pdf, Size:1020Kb
Detailed Project Report of Baramaniram-Integrated Watershed Management Programme (IWMP-1/2011-12), Darjeeling Summary of Detailed Project Report SECTION - A : PROJECT LOCATION DETAILS Sl. Particulars Details No. 1 Project Name Baramaniram Watershed 2 Project Code IWMP-1 /20 11-12 3 State West Bengal 4 District Darjeeling 5 CD Block Naxalbari 1. Naxalbari Gram Panchayat 6 Gram Panchayat* 2. Maniram Gram Panchayat 3. Hatighisha Gram Panchayat 7 Block Naxalbari Sl. Village / Mouza Jl. Village Gram Panchayat No. Name No. Code i) Chotomaniram 30 44700 Maniram Gram Panchayat ii) Baramaniram 20 43700 Maniram Gram Panchayat iii) Surajbar 18 43500 Maniram Gram Panchayat iv) Dayaram 28 44500 Maniram Gram Panchayat v) Nehal 29 44600 Maniram Gram Panchayat vi) Pataram 17 43400 Maniram Gram Panchayat vii) Mir-Jangla 10 42700 Maniram Gram Panchayat viii) Chhotachenga 8 42500 Hatighisha Gram Panchayat ix) Jaborchhat 11 42800 Maniram Gram Panchayat x) Ketugabur 23 44000 Maniram Gram Panchayat xi) Kamala 22 43900 Naxalbari Gram Panchayat xii) Chhotoganja 16 43300 Maniram Gram Panchayat xiii) Amarsingh 13 43000 Hatighisha Gram Panchayat xiv) Surajbarchhat 12 42900 Hatighisha Gram Panchayat xv) Siubar 14 43100 Maniram Gram Panchayat xvi) Chhotoganjerchhat 15 43200 Maniram Gram Panchayat xvii) Nipania 9 42600 Maniram Gram Panchayat xviii) Bhimram 32 44900 Naxalbari Gram Panchayat i Detailed Project Report of Baramaniram-Integrated Watershed Management Programme (IWMP-1/2011-12), Darjeeling Sl. Village / Mouza Jl. Village Gram Panchayat No. Name No. Code xix) Uttamchand 33 45000 Naxalbari Gram Panchayat xx) Hodobhitar chhat 34 45100 Naxalbari Gram Panchayat xxi) Geni 26 44300 Naxalbari Gram Panchayat xxii) Budhkaran 25 44200 Naxalbari Gram Panchayat xxiii) Fakna 24 44100 Naxalbari Gram Panchayat xiv) Dhanibanir chhat 62 47900 Hatighisha Gram Panchayat xv) Sebdella 51 46800 Maniram Gram Panchayat Watershed Name Regd. No. Remarks Committee * 8 1) Nehal -- Applied for 2) Pataram -- Applied for 3) Budhkaran -- Applied for 9 Micro Watershed Description * 9.1 List of the Mouzas and Area Statement of Nehal Micro Watershed Project Total Sl. Jl. Census Treatable Name of the Mouza(s) Geo. Area No. No. Code Area (in Hac) a. Chotomaniram 30 44700 348.00 311.00 b. Baramaniram 20 43700 420.00 386.00 c. Surajbar 18 43500 206.00 177.00 d. Dayaram 28 44500 193.00 159.00 e. Nehal 29 44600 102.00 82.00 Total 1269.00 1115.00 9.2 List of the Mouzas and Area Statement of Pataram Micro Watershed Project Total Sl. Jl. Census Treatable Name of the Mouza(s) Geo. Area No. No. Code Area (in Hac) a. Fakna 24 44100 104.00 10.00 b. Pataram 17 43400 106.00 80.00 c. Mir-Jangla 10 42700 195.00 100.00 d. Chhotachenga 8 42500 372.00 334.00 e. Jaborchhat 11 42800 10.00 1.00 f. Ketugabur 23 44000 155.00 119.00 g. Kamala 22 43900 210.00 192.00 h. Chhotoganja 16 43300 18.00 5.00 i. Amarsingh 13 43000 11.00 9.00 j. Surajbarchhat 12 42900 25.00 7.00 k. Siubar 14 43100 182.00 130.00 l. Chhotoganjerchhat 15 43200 26.00 16.00 m. Nipania 9 42600 177.00 173.00 Total 1591.00 1176.00 ii Detailed Project Report of Baramaniram-Integrated Watershed Management Programme (IWMP-1/2011-12), Darjeeling 9.3 List of the Mouzas and Area Statement of Pataram Micro Watershed Project Total Sl. Jl. Census Treatable Name of the Mouza(s) Geo. Area No. No. Code Area (in Hac) a. Bhimram 32 44900 290.00 248.00 b. Uttamchand 33 45000 75.00 44.00 c. Hodobhitarchhat 34 45100 216.00 182.00 d. Geni 26 44300 236.00 196.00 e. Budhkaran 25 44200 234.00 202.00 f. Fakna 24 44100 104.00 58.00 g. Pataram 17 43400 106.00 22.00 h. Mir-Jangla 10 42700 195.00 74.00 i. Sebdella 51 46800 177.00 138.00 j. Dhanibanirchhat 62 47900 55.00 45.00 1688.00 1209.00 10 Weightage (Table 1.3) 100 Out of 150 11 Project Cost ( Rs in Lakh) 420.00 lakh SECTION - B : SOCIO ECONOMIC PROFILE OF THE PROJECT AREA Sl. Particulars Details No. Name of Project Implementing Agency Assistant Director of Agriculture 1 (PIA) (Soil Survey), Siliguri Nature of PIA, (a) VO b) Panchayat 2 Others c) Others. 3 Total Population in the Watershed 38,021 nos. 4 Total Number of households 5,186 nos. Total Number of ST households 5 1960 nos. ( Tot. Po. / Tot. Family.* ST Po.) Total Number of SC households 6 1332 nos. ( Tot. Family/ Tot. Po.* SC Po.) 7 Total Number of BPL households 2,697 nos. Total Number of Small Farmer 8 115 nos. household (appox) Total number of Marginal farmer 9 2199 nos. household (appox) Total number of landless and asset less 10 2845 nos. households (BPL + Landless families) Number of person days of seasonal 11 7,656 nos. migration iii Detailed Project Report of Baramaniram-Integrated Watershed Management Programme (IWMP-1/2011-12), Darjeeling SECTION - C : Other Details from Base line Survey Sl. Description Particulars No. 1 Total geographical area (ha) 4143.00 hac. 2 Treatable area 1) Waste land (ha) 782.20 hac. 2) Rain fed Agriculture land (ha) 2250.60 hac 3) Irrigated Agriculture land 467.20 hac. 4) Total Treatable Area (ha) {1+2+3}1 3500.00 hac. 5) Forest area available for treatment 0.00 hac. 6) Area available for treatment 3500.00 hac. 3 Total Cropped Area (ha) 4756.15 hac. 4 Net sown Area (ha) 2717.80 hac. 5 Average Cropping Intensity {3/4 *100} 175 % 6 Total no. of water storage structure 47 nos. 7 Total storage capacity of water storage structure (cum) , average ( 20m X 15m X 21150.00 cum 1.5 m X 47 nos.) 8 Total number of water extracting units 131 nos. 9 Depth of ground water (bgl) in m a) Pre monsoon 3.00 - 5.00 mtrs. b) Post monsoon 0.50 - 3.00 mtrs. SECTION - D : Year wise Action plan (Physical) Sl. 2013 2014 2015 2016 2017 Particulars / Financial Year Total No. ‐14 ‐15 ‐16 ‐17 -18 1 Watershed Development works 1.1 Land Development 1.1.1 A forestation (on wasteland) (ha) 0 0 0 0 1.25 1.25 (Plantation and nursery) 1.1.2 A forestation (on other land) 0 1.25 0 0 0 1.25 1.1.3 Horticulture (on waste land) (ha) 0 0.75 0 0 0 0.75 1.1.4 Horticulture (on other land) (ha) 0 0.75 0 0 0 0.75 1.1.5 Agriculture (on waste land) (ha) 0 0.50 0.50 0 0 1.00 1.1.6 Agriculture (on other land) (ha) 0 0.50 0.50 0 0 1.00 1.1.7 Pasture Dev ( on waste land) (ha) 0 0 0 0 0 0 1.1.8 Pasture dev (on other land) 0 0 0 0 0 0 1.2 Soil and Moisture Conservation 1.2.1 Staggered Tranching (ha) 0 0 0 0 0 0 1.2.2 Contour Bunding (ha) 0 6 5 4 2 17 1.2.3 Graded Bunding (ha) 0 0 0 0 0 0 1.2.4 Bench terracing (ha) 0 0 0 0 0 0 1.2.5 Others 0 0 0 0 0 0 iv Detailed Project Report of Baramaniram-Integrated Watershed Management Programme (IWMP-1/2011-12), Darjeeling Sl. 2013 2014 2015 2016 2017- Particulars Total No. ‐14 ‐15 ‐16 ‐17 18 1.3 Vegetative & Engineering Structure 1.3.1 Earthen Checks (cum) 0 0 0 0 0 0 1.3.2 Bush Wood Checks (m) 0 0 0 0 0 0 1.3.3 Gully Plugs (cum) 0 50 60 60 20 190 1.3.4 Loose boulders (cum) 0 30 40 30 0 100 1.3.5 Gabion Structures (cum) 0 0 0 0 0 0 1.3.6 Others (nos) Pucca Nala 0 28 38 28 8 102 1.4 Water Harvesting Structure (New) 1.4.1 Farm Pond (no,) 0 6 6 6 1 19 (Cum) 0 1200 1200 1200 200 3800 1.4.2 Check Bundh / Dam (no,) 0 4 3 3 0 10 (cum) 0 500 400 400 0 1300 1.4.3 Nullah Bundh (no.) 0 1 3 3 0 7 (cum) 0 200 600 600 0 1400 1.4.4 Percolation Tank (no.) 0 0 0 0 0 0 (Cum) 0 0 0 0 0 0 1.4.5 Ground water recharge 0 0 0 0 0 0 structures. (no.) (Cum) 0 0 0 0 0 0 1.4.6 Others(no.) DW/STW 0 0 0 0 0 0 (cum) 0 0 0 0 0 0 1.5 Water Harvesting Structure (renovated) 1.5.1 Farm Pond (no,) 0 8 6 4 4 22 (cum) 0 2400 1200 1200 1200 6000 1.5.2 Check Bund (no,) 0 3 2 0 0 5 (cum) 0 300 200 0 0 500 1.5.3 Nullah Bund (no.) 0 4 3 1 1 9 (cum) 0 320 200 60 60 640 1.5.4 Percolation Tank (no.) 0 2 2 0 0 4 (cum) 0 400 400 0 0 800 1.5.5 Ground Water recharge 0 0 0 0 0 0 structures. (no.) (cum) 0 0 0 0 0 0 1.5.6 Others 0 1 1 0 2 4 (cum) 0 100 50 0 60 210 2. Entry Point Activities 2.1 Water harvesting Structure 0 0 0 0 0 0 related (no.) 2.2 Plantation related 2 0 0 0 0 0 2.3 Water Extracting 4 0 0 0 0 0 Structure (no.) 2.4 Others including drinking 10 0 0 0 0 0 water related(no.) v Detailed Project Report of Baramaniram-Integrated Watershed Management Programme (IWMP-1/2011-12), Darjeeling Sl.