Wheal Jane Minewater Project Consultancy Studies 199G-1999

Total Page:16

File Type:pdf, Size:1020Kb

Wheal Jane Minewater Project Consultancy Studies 199G-1999 South West/OO-TO E n v ir o n m e n t A g e n c y Wheal Jane Minewater Project Consultancy Studies 199G-1999 Appraisal and Selection of Long Term Treatment Option December 1998 Knight Piesold in association with Plymouth M arin e Laboratory RPA ENVIRONMENT AGENCY (SOUTH WEST) Wheal Jane Minewater Project Consultancy Services 1996 - 1999 Appraisal and Selection of Long Term Treatment Option E n v ir o n m e n t Ag e n c y NATIONAL LIBRARY & INFORMATION SERVICE SOUTH WEST REGION Manley House. Kestrel Way, Exeter EX2 7LQ Knight Piesold Limited Kanthack House Station Road Ashford, Kent TN231PP Telephone: 01233 658200 December 1998 Fax: 01233 658299 11139\R11369 Email: [email protected] Environment Agency (South West) Wheal Jane Minewater Project Appraisal and Selection o f Long Term Treatment Option Consultancy Studies J 996-1999 CONTENTS Page EXECUTIVE SUMMARY.........................................................................................................................1 1. INTRODUCTION..................................................................................................................... 1-1 1.1 PROJECT DESCRIPTION........................................................................................... 1-2 1.1.1 Previous Studies................................................................................................1-2 1.1.2 The Current Project.......................................................................................... 1-2 1.2 APPROACH...................................................................................................................1-5 1.2.1 Report Structure................................................................................................1-6 1.3 ACKNOWLEDGEMENTS.......................................................................................... 1-7 2. BACKGROUND....................................................................................................................... 2-1 2.1 REGIONAL CONTEXT............................................................................................... 2-1 2.1.1 Site Description and Catchment Characteristics............................................. 2-1 2.1.2 Economic Perspective;...................................................................................... 2-1 2.1.3 Geology and Mining History........................................................................... 2-2 2.2 THE MINEWATER LEGACY.....................................................................................2-3 2.2.1 Mechanisms and Historic Levels.....................................................................2-3 2.2.2 Effectof Closure of Wheal Jane...................................................................... 2-4 2.2.3- Recent Changes to the Minewater Regimes .................................................... 2-7 3. EXISTING TREATMENT...................................................................................................... 3-1 3.1 INTRODUCTION......................................................................................................... 3-1 3.2 DESCRIPTION AND PERFORMANCE..................................................................... 3-1 3.2.1 Contingency Design......................................................................................... 3-2 3.2.2 Cessation of Mining by SCP............................................................................ 3-2 3.3 MANAGEMENT AND OPERATION......................................................................... 3-3 3.3.1 Discharge Consent.............................................................................................3-3 3.3.2 Treatment Costs................................................................................................3-3 4. WATER QUANTITY AND QUALITY................................................................................. 4-1 4.1 WATER QUANTITY AND QUALITY..................................... ..................................4-1 4.2 INFLUENT WATER QUANTITY AND QUALITY..................................................4-2 4.3 WATER QUALITY OBJECTIVES..............................................................................4-3 4.4 STATUTORY REQUIREMENTS................................................................................4-3 4.5 REQUIRED METAL REMOVAL................................................................................4-4 5. PROCESS ROUTE ALTERNATIVES.................................................................................. 5-1 5.1 INTRODUCTION......................................................................................................... 5-1 5.2 PREVENTION AND CONTROL OF DISCHARGES................................................5-1 5.3 ACTIVE TREATMENT................................................................................................5-2 5.3.1 Oxidation and Chemical Neutralisation (OCN)...............................................5-2 5.3.2 Biochemical Sulphidisation (BCS).................................................................. 5-3 5.3.3 Ion Exchange (IEX).......................................................................................... 5-4 5.3.4 Treated Effluent Quality (TEQ)....................................................................... 5-4 5.3.5 Alternative and Emerging Technologies......................................................... 5-5 K n igh t Pie sold Final Version (i) V:\REPORTSM1139\fU722\t722FLnildoc 06/12/99 Environment Agency (South West) Wheal Jane Minewater Project Appraisal and Selection o f Long Term Treatment Option Consultancy Studies 1996-1999 5.4 PASSIVE TREATMENT............................................................................................. 5-6 5.4.1 Introduction.......................................................................................................5-6 5.4.2 Descriptions......................................................................................................5-6 5.4.3 Performance and Results.................................................................................5-7 5.4.4 Applicability of Passive Treatment................................................................. 5-7 5.4.5 Summary........................................................................................................... 5-9 5.5 SLUDGE MANAGEMENT.........................................................................................5-9 5.6 COMPARISON OF ALTERNATIVES.................................................................... 5-10 5.6.1 Sustainability...................................................................................................5-10 6. DERIVATION OF TREATMENT OPTIONS..................................................................... 6-1 6.1 INTRODUCTION......................................................................................................... 6-1 6.2 IDENTIFICATION OF TARGET TREATMENT ALTERNATIVES...................... 6-1 6.3 TREATMENT SCENARIOS........................................................................................6-1 6.4 DESCRIPTION OF MODELLING..............................................................................6-3 6.5 MODELLING RESULTS............................................................................................. 6-3 6.6 TREATMENT OPTIONS............................................................................................. 6-6 7. BIOLOGICAL IMPACTS....................................................................................................... 7-1 7.1 INTRODUCTION......................................................................................................... 7-1 7.2 SUMMARY OF FINDINGS.........................................................................................7-1 7.2.1 Estuarine Chemistry.........................................................................................7-2 7.2.2 Predicted Effect of Minewater Treatment........................................................7-3 7.2.3 Conclusions.......................................................................................................7-4 8. TREATMENT COSTS............................................................................................................ 8-1 8.1 DEVELOPMENT OF TREATMENT OPTIONS........................................................8-1 8.1.1 Plant Location.................................................................................................. 8-1 8.1.2 Site Descriptions.............................................................................................. 8-1 8.1.3 Land Ownership...................................... ........................................................ 8-2 8.1.4 Proximity.......................................................................................................... 8-2 8.1.5 Minewater Supply............................................................................................8-3 8.1.6 Planning Implications.......................................................................................8-4 8.1.7 Summary of Treatment Options...................................................................... 8-5 8.2 TREATMENT COST ESTIMATES............................................................................8-6 8.2.1 Scope of Evaluation..........................................................................................8-6 8.2.2 Capital Costs.....................................................................................................8-7
Recommended publications
  • Kevin Barnes Job Title: Project Manager Date: May 2010
    Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Name: Kevin Barnes Job title: Project Manager Date: May 2010 Wheal Jane Minewater Project Pilot Passive Treatment Plant Background – Decommissioning Project Mining has taken place in the Carnon Valley area of Cornwall for thousands of years. The Wheal Jane Mine was opened in Oct 1971. In the 1980’s 900 tonnes of ore containing tin, zinc & copper was mined and processed at the Wheal Jane mine site on a daily basis. In 1985 tin prices fell from £10,500 to £3,300. In 1991 mining was officially terminated at the Wheal Jane site and a temporary water treatment system was installed. On 13th January 1992 50,000m3 of mine water left the Nangiles Adit…. Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Wheal Jane Mine water Treatment Project – The project was initiated following the abandonment of the Wheal Jane Mine and the subsequent 1992 pollution event, to treat the metalliferous acid mine water which was continuing to discharge from the mine workings. A long term treatment strategy with two main options was assessed; 1. An Active Treatment Plant based upon lime dosing and settlement/storage within the Clemow’s Valley Tailings Dam. 2. A Pilot Passive Treatment Plant located in the Carnon Valley. Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Carnon Valley - 1993 Wheal Jane Minewater Project Pilot Passive Treatment Plant – Decommissioning Project Land Ownership The National Rivers Authority acquired 44 hectares of land in the Carnon Valley between July 1993 & November 1994. The land was purchased for the construction of the Pilot Passive Treatment Plant.
    [Show full text]
  • Visit to Wheal Jane Tin Mine” British Mining No.3, Pp.8-10
    BRITISH MINING No.3 BRITISH MINING No.3 MEMOIRS 1976 Hunter, J. 1976 “Visit to Wheal Jane Tin Mine” British Mining No.3, pp.8-10 NB This publication was originally issued in the 10 by 8 inch format then used by the society. It has now been digitised and reformatted at A5. This has changed the original pagination of articles, which is given in square brackets. ISSN 0309-2199 VISIT TO WHEAL JANE TIN MINE J. Hunter B.Sc. During our Easter field excursion to Dartmoor the other year, we were privileged to be given permission to visit the newly opened Wheal Jane tin mine, near Redruth, Cornwall. We had to set off from our lodgings in Ashburton at 6.00am to be underground by 8.30am. Lamps, belts, helmets and safety boots were all provided, and at the shaft top our party was divided into two groups. One group was left at the 2nd level, and shown around the dry workings, while the rest of us, because we had gone in supposedly waterproof clothing, were taken down to the 7th level, known as the ‘wet level’. Three main lodes are mined at Wheal Jane, two of which are associated with a porphyritic ‘elvan’ dyke and dip at a shallow angle to the S.E. down to the 70 fm. level. The elvan dyke was previously thought to have controlled the deposition of the lodes, but careful study has revealed that the tin ore was deposited in several phases, some of which preceed the dyke, and the presence of the two features in such close proximity is probably due to an earlier shear zone being a favourable site for both.
    [Show full text]
  • A Unique Opportunity for Copper, Tin and Lithium in Cornwall
    A unique opportunity for copper, tin and lithium in Cornwall All information ©Cornish Metals Inc. All Rights Reserved. 1 Cornish Metals Inc Corporate Presentation Disclaimer This presentation may contain forward-looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward looking statements may include statements regarding exploration results and budgets, resource estimates, work programs, strategic plans, market price of metals, or other statements that are not statements of fact. Although the expectations reflected in such forward-looking statements are reasonable, there is no assurance that such expectations will prove to have been correct. Various factors that may affect future results include, but are not limited to: fluctuations in market prices of metals, foreign currency exchange fluctuations, risks relating to exploration, including resource estimation and costs and timing of commercial production, requirements for additional financing, political and regulatory risks. Accordingly, undue reliance should not be placed on forward-looking statements. All technical information contained within this presentation has been reviewed and approved for disclosure by Owen Mihalop, (MCSM, BSc (Hons), MSc, FGS, MIMMM, CEng), Cornish Metals’ Qualified Person as designated by NI 43-101. Readers are further referred
    [Show full text]
  • Computer Simulation at Wheal Jane, Cornwall
    Computer Simulation at Wheal Jane, Cornwall K. A. Lewis,* A. Wells,t and P. Tucker* Abstract Mathematical modelling methods were used at Wheal Jane. to investigate the sensitivity of the Stokes hydrosizer to changes in the operating variables, with the view to improving the process efficiency. The major conclusion was that the hydrosizer was overloaded. The results indicated that throughput and spigot densities were the most sensitive variables. The model predictions demonstrated that a significant improvement in classification efficiency (both in sharpness of separation and in fines misplacement) could be achieved by (i) increasing hydrosizer capacity and (ii) increasing spigot 1 density to its practical limit. Based on these predictions, a decision was made to install a second hydrosizer in parallel with the first. Subsequent test work on the new circuit validated the predictions and confirmed that an improved efficiency had been achieved. From monitoring plant performance for 4 month periods before and after the change, it was established that a significant increase in overall tin concentrate grade had resulted. Further improvements are now expected from optimizing the hydrosizer/primary tabling circuit (as an integral unit), that is by tuning the table operations to more fully exploit the now better classified feeds. Recommendations, in this direction, will be provided by computer simulation methods. This paper reports on the computer simulation techniques used in this study: their basis and their application to optimizing both unit processes and larger blocks of the process flowsheet. The mathematical models of the Stokes hydrosizer and the shaking table are discussed briefly and their scope and limitations are ex~mined within the context of this investigation.
    [Show full text]
  • BRSUG Number Mineral Name Hey Index Group Hey No
    BRSUG Number Mineral name Hey Index Group Hey No. Chem. Country Locality Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-37 Copper Au) 1.1 4[Cu] U.K., 17 Basset Mines, nr. Redruth, Cornwall Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-151 Copper Au) 1.1 4[Cu] U.K., 17 Phoenix mine, Cheese Wring, Cornwall Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-280 Copper Au) 1.1 4[Cu] U.K., 17 County Bridge Quarry, Cornwall Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and South Caradon Mine, 4 miles N of Liskeard, B-319 Copper Au) 1.1 4[Cu] U.K., 17 Cornwall Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-394 Copper Au) 1.1 4[Cu] U.K., 17 ? Cornwall? Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-395 Copper Au) 1.1 4[Cu] U.K., 17 Cornwall Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-539 Copper Au) 1.1 4[Cu] North America, U.S.A Houghton, Michigan Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-540 Copper Au) 1.1 4[Cu] North America, U.S.A Keweenaw Peninsula, Michigan, Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu, Ag and B-541 Copper Au) 1.1 4[Cu] North America, U.S.A Keweenaw Peninsula, Michigan, Elements and Alloys (including the arsenides, antimonides and bismuthides of Cu,
    [Show full text]
  • Georesources Cornwall Working Paper
    VERSION 15 August 2019 WORKING PAPER Version 10 October 2019 Georesources Cornwall Recommendations for development of the Georesources sector in Cornwall 1 VERSION 15 August 2019 REMIX project The aim of this Georesources Cornwall document is to advise Cornwall Council and Cornwall and Isles of Scilly Local Enterprise Partnership on the mining and related opportunities in Cornwall and how best they might be encouraged and facilitated. It is an output of the REMIX project. REMIX was funded by Interreg Europe to encourage resource efficient and environmentally and socially acceptable production of raw materials by working with regional policy instruments. It brought together partners and stakeholders across nine European regions, at different stages of the mining cycle, to share knowledge and develop best practice guidelines. Camborne School of Mines, University of Exeter was the partner for the region. In Cornwall we brought together stakeholders, especially Cornwall Council and the companies in the Cornwall Mining Alliance for workshops on specific topics and facilitated travel to European partners to a series of peer review meetings to learn from their activities and experience. A peer review visit of European partners to Cornwall was held in May 2018. Various interviews were also held with individual businesses. Expertise external to the university was used to help compile information, especially on mineral rights, mine water geothermal energy, the Cornwall Mining Alliance business cluster and potential economic development through growth of this sector. ---------------------------------------------------------------------- Contents Summary recommendations 1. Georesources Cornwall: An integrated approach 2. Technology metals and minerals in Cornwall 3. Geothermal energy 4. The mining life cycle 5.
    [Show full text]
  • 1850 Cornwall Quarter Sessions and Assizes
    1850 Cornwall Quarter Sessions and Assizes Table of Contents 1. Epiphany Sessions ..................................................................................................................................... 1 2. Lent Assizes ............................................................................................................................................... 8 3. Easter Sessions ........................................................................................................................................ 46 4. Midsummer Sessions .............................................................................................................................. 54 5. Summer Assizes ....................................................................................................................................... 69 6. Michaelmas Sessions ............................................................................................................................... 93 Royal Cornwall Gazette 4 and 11 January 1850 1. Epiphany Sessions These Sessions were opened on Tuesday, the 1st of January, before the following magistrates:— J. KING LETHBRIDGE, Esq. Chairman; Sir W. L. S. Trelawny, Bart. E. Stephens, Esq. T. J. Agar Robartes, Esq., M.P. R. Gully Bennet, Esq. N. Kendall, Esq. T. H. J. Peter, Esq. W. Hext, Esq. H. Thomson, Esq. J. S. Enys, Esq. D. P. Hoblyn, Esq. J. Davies Gilbert, Esq. Revds. W. Molesworth, C. Prideaux Brune, Esq. R. G. Grylls, C. B. Graves Sawle, Esq. A. Tatham, W. Moorshead, Esq. T. Phillpotts, W.
    [Show full text]
  • Camborne School of Mines CSMM143: Poldice Assignment James Heslington: 640012228
    College of Engineering, Mathematics & Physical Sciences Camborne School of Mines CSMM143: Poldice Assignment James Heslington: 640012228 CSMM143: GIS for Surveyors Poldice Assignment 640012228 Contents Part A ..................................................................................................................................................... 3 1.1. Overview ........................................................................................................................................ 3 2.1. Site 1 Data ....................................................................................................................................... 4 2.2. Interpretation ................................................................................................................................................ 6 2.3. Spatial Recommendations ............................................................................................................................. 6 2.4. Recommendations ......................................................................................................................................... 6 3.1. Site 2 Data ...................................................................................................................................... 7 Part B .................................................................................................................................................... 11 Aim .....................................................................................................................................................
    [Show full text]
  • Treatment of Acid Mine Drainage 21
    RESEARCH PAPER 99/10 Treatment of Acid Mine 2 FEBRUARY 1999 Drainage The problem of acid mine drainage (AMD) has been present since mining activity began thousands of years ago. Mining activity has disrupted the hydrology of mining areas so badly that it is extremely difficult to predict where water would eventually re-emerge. Individual mine closures have not resulted in massive AMD events as pumping continued so as to allow mining at nearby operational mines. It is now, when whole coalfields will finally close, that AMD will become the problem it has promised to be. AMD will be a chronic problem and one that will degrade local streams, rivers and other watercourses. Whilst, in some cases, drainage occurs that is not acidic, all mine drainage events pose the problem of introducing iron, and potentially other metals, to local watercourses. With the advent of major AMD events, as evidenced by Wheal Jane in Cornwall, it will become necessary to identify methods that will be used to treat AMD when coal fields close and the source of money to pay for them. The alternative is to prevent drainage occurring by continued pumping. Stephen McGinness SCIENCE AND ENVIRONMENT SECTION HOUSE OF COMMONS LIBRARY Recent Library Research Papers include: List of 15 most recent RPs 98/115 The Greater London Authority Bill: A Mayor and Assembly for London 11.12.98 Bill 7 of 1998-99 98/116 The Greater London Authority Bill: Transport Aspects Bill 7 of 1998-99 10.12.98 98/117 Water Industry Bill (revised edition) Bill 1 [1998/99] 10.12.98 98/118 The Greater London
    [Show full text]
  • Cambridge University Press 978-1-108-47093-3 — Trace Metals in the Environment and Living Organisms Philip S
    Cambridge University Press 978-1-108-47093-3 — Trace Metals in the Environment and Living Organisms Philip S. Rainbow Index More Information INDEX Aberdeenshire, 34, 156 Agrostis, 148, 160, 251, 271, 664 Ammodytes, 627 Aberllyn mine, 173 Merseyside refinery, 142, 166, 221, 249 Ampharete, 598 Aberystwyth, 172, 307, 370, 471, 498 tolerance, 172–173, 175, 268 ampharetid polychaetes, 598, See also Abington, 312 Aire River, 432 Ampharete, Melinna Abramis. See bream Aire valley, 32 Amphibalanus, 112, 495, 557 absorption, 68, See also uptake Airedale, 33, 54 Amphinemura, 343–344, 387 Acanthephyra, 585 ALAD, 116, 124, 222, 382, 547 amphipod crustaceans, 362, 551, See also acanthite, 29 Alca. See razorbill Corophium, Echinogammarus, Acarospora, 152, 155–156 alderflies, 318, 361, See also Sialis Gammarus, hyperiids, Rhepoxynius, Acartia, 551, 579–580 Alderley Edge, 27, 34–36 stegocephalids, talitrids Acaster, 432 alga, 286, 323, See also brown algae, bioaccumulation, 90, 99, 101, 103 acceptable daily input (ADI), 266, 660 green algae, phytoplankton, red biomarkers, 119 accumulation, 90 algae detoxification, 98, 101 accumulation patterns, 99 alginates, 441 uptake rates, 83, 85 Achillea, 163 Alice in Wonderland, 8 Anaconda, 50 Achnanthes, 321 Aliivibrio, 551 Analasmocephalus, 247 Achnanthidium, 321–322 Alitta, 443, 450, 515, 551 Anas. See mallard ducks acid mine drainage, 22, 29, 66, 288, 315, alkali disease, 20 Ancylus, 366 317, 389 Alle. See little auk Anglesey, 26, 33, 35, 47, 55, 306 Acid Mine Drainage Index (AMDI), 316 Allen River, 160 anglesite, 28, 33 acid volatile sulphide (AVS), 286, Allendales, 28, 32, 54, 309, See also Allen Anglo-Saxons, 36 315, 397 River, East Allen, West Allen Anguilla.
    [Show full text]
  • Coast-To-Coast Walkers Trail.Pub
    Mining Trails – The Coast-to-Coast Walkers Trail – Portreath to Devoran and Penpol – 16.74 miles ********************************************************************************************** Full Route Directions, with the emphasis on detours for walkers only, avoiding the cycle route ************************************************************************************** Portreath to Cambrose, on the official cycle trail – 2.10 miles Start at the furthest NE corner of Portreath Harbour at 65489/45483. Start on the Coast-to-Coast, passing storyboards ( Portreath Harbour, Tramroad and Incline ) and follow a granite marker ( Devoran 12 miles ) bearing L on a track and a road (Lighthouse Hill and Cliff Terrace) to the Portreath Arms Hotel ( B&B ) on your L. At 0.19 miles follow MT sign (Devoran 11 ) on Sunnyvale Road At 0.47 miles, the road continues as a tarmac lane through trees. At an MT post at 0.51 miles, the lane becomes a rough track, through a gap by a gate ( sign Cornish Way ). After 20 yards pass a granite plaque ( Duke of Leeds Hills ), the route continues as a track through woodland, with the Redruth road below on the R. At 0.60 miles the track becomes tarmac, continuing through woods. At 1.05 miles go through a gap by a gate, cross a road, and through another gap by a gate ( marker Tolticken Hill ). The track continues as tarmac, through a hunting gate at Bridge ( Bridge Inn below ). ( 1.27 miles ) The tarmac ends and a track continues, through a gate, still in woodland, ( marker Bridge at 1.30 miles ) At a fork at 1.34 miles go R (WM), now between high hedges . At 1.77 miles, looking R you get your first view to Carn Brea .
    [Show full text]
  • The Boulton and Watt Archive and the Matthew Boulton Papers from Birmingham Central Library Part 13: Boulton & Watt Correspondence and Papers (MS 3147/3/286­404)
    INDUSTRIAL REVOLUTION: A DOCUMENTARY HISTORY Series One: The Boulton and Watt Archive and the Matthew Boulton Papers from Birmingham Central Library Part 13: Boulton & Watt Correspondence and Papers (MS 3147/3/286­404) DETAILED LISTING REEL 231 3/336 Henry Williams, 1779­1783 (12 items) Henry Williams was an engine erector who mainly worked on engines in the Midlands. These included the Wren’s Nest Forge engine near West Bromwich, and the engines at Coalbrookdale, Ketley and Donnington Wood in Shropshire. The letters are addressed to Matthew Boulton, James Watt, Watt’s assistant William Playfair and the engine firm’s clerk, John Buchanan. 1. Letter. Henry Williams (Wren’s Nest) to James Watt (Soho). 28 Aug. 1779. Docketed “An experiment.” 2. Letter. Henry Williams (Wren’s Nest) to William Playfair (Soho). 23 Jan. 1780. 3. Letter. Henry Williams (Ketley) to William Playfair (Soho). 2 Apr. 1780. 4. Letter. Henry Williams (Ketley) to James Watt (Soho). 24 Apr. 1780. 5. Letter. Henry Williams (Ketley) to Matthew Boulton (Soho). 23 Aug. 1781. 6. Letter. Henry Williams (Ketley) to John Buchanan [Soho]. 5 Sep. 1781. The bottom half of the letter has been torn away. The back of the sheet has been used for calculations. 7. Letter. Henry Williams (Ketley) to John Buchanan (Soho). 21 Jan. 1782. 8a. Letter. Henry Williams (Coalbrookdale) to Matthew Boulton (Soho). 27 Mar. 1782. Enclosing (b) below. b. Letter. Dr. William Moore (Penryndee) to Henry Williams. 20 Mar. 1782. 9. Letter. Henry Williams (Coalbrookdale) to John Buchanan (Soho). 28 May 1782. Docketed “Balance of engine.” His progress with the Coalbrookdale engine.
    [Show full text]